HomeMy WebLinkAbout07/18/2013 - Agenda Packet - Planning & Zoning Commission C-4q
*-A- 44r�
CITY OF COLLEGE STATION
Home of Texas A&M University
Planning & Zoning
Commission
July 18, 2013
City Hall Council Chambers
1101 Texas Avenue
College Station, Texas
Workshop Meeting 6:00 PM
Regular Meeting 7:00 PM
(*Or""
AGENDA
CITY OF COLLEGE STATION
Home ofTexatAd-M University PLANNING & ZONING COMMISSION
WORKSHOP MEETING
JULY 18, 2013,AT 6:00 PM
CITY HALL COUNCIL CHAMBERS
1101 TEXAS AVENUE
COLLEGE STATION, TEXAS
1. Call the meeting to order.
2. Discussion of consent and regular agenda items.
3. Discussion of Minor and Amending Plats approved by Staff.
• Final Plat—Amending— Great Oaks Phase IA Case# 13-00900114 (M. Hester)
4. Discussion of new development applications submitted to the City. [New Development
List]
5. Presentation, discussion, and possible action regarding the status of items within the 2013
P&Z Plan of Work(see attached). (J. Schubert)
6. Presentation, discussion, and possible action regarding an overview of the current
approach to Affordable Housing. (M. Hitchcock/D. Eller)
7. Presentation, discussion, and possible action regarding the Economic Development
Master Plan. (B. Cowell)
8. Presentation, discussion, and possible action regarding the P&Z Calendar of Upcoming
Meetings.
• Thursday, July 25, 2013 — City Council Meeting — Council Chambers — Workshop
6:00 p.m. and Regular 7:00 p.m. (Liaison—Ashfield)
• Thursday, August 1, 2013 — P&Z Meeting — Council Chambers — Workshop 6:00
p.m. and Regular 7:00 p.m.
9. Discussion, review and possible action regarding the following meetings: Design Review
Board, Joint Parks / Planning & Zoning Subcommittee, South Knoll Area Neighborhood
Plan Resource Team, BioCorridor Board, and Zoning District Subcommittee.
10. Discussion and possible action on future agenda items — A Planning & Zoning Member
may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation
shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
11. Adjourn.
2
AGENDA
CITY OF COLLEGE STATION PLANNING & ZONING COMMISSION
Howe of Texas A&M University'
REGULAR MEETING
JULY 18,20139 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
1101 TEXAS AVENUE
COLLEGE STATION, TEXAS
1. Call meeting to order.
2. Pledge of Allegiance.
3. Hear Citizens. At this time, the Chairman will open the floor to citizens wishing to
address the Commission on planning and zoning issues not already scheduled on tonight's
agenda. The citizen presentations will be limited to three minutes in order to
accommodate everyone who wishes to address the Commission and to allow adequate
time for completion of the agenda items. The Commission will receive the information,
ask city staff to look into the matter, or will place the matter on a future agenda for
discussion. (A recording is made of the meeting; please give your name and address for
the record.)
All matters listed under Item 4, Consent Agenda, are considered routine by the Planning &
Zoning Commission and will be enacted by one motion. These items include preliminary plans
and final plats, where staff has found compliance with all minimum subdivision regulations. All
items approved by Consent are approved with any and all staff recommendations. There will not
be separate discussion of these items. If any Commissioner desires to discuss an item on the
Consent Agenda it will be moved to the Regular Agenda for further consideration.
4. Consent Agenda
4.1 Consideration, discussion, and possible action to approve Meeting Minutes.
• June 20, 2013 —Workshop
• June 20, 2013 —Regular
• July 2, 2013 — Special Regular
4.2 Consideration, discussion, and possible action on Absence Requests from meetings.
• Brad Corrier—June 20, 2013
• Mike Ashfield—July 18, 2013
4.3 Presentation, discussion, and possible action on a Preliminary Plat for Great Oaks
Subdivision consisting of 357 residential lots on approximately 224.5 acres generally
located west of Holleman Drive South and north of Rock Prairie Road West. Case
#13-00900059 (M. Hester)
3
4.4 Presentation, discussion, and possible action on a Final Plat for Great Oaks Phase 13
consisting of seven residential lots on approximately 9.2 acres generally located west
of Arboleda Drive in the Great Oaks Subdivision. Case#13-00900032 (M. Hester)
4.5 Presentation, discussion, and possible action on a Preliminary Plat for Indian Lakes
Phase 17 consisting of 19 residential lots on approximately 36.36 acres generally
located east of Matoska Ridge Drive in the Indian Lakes Subdivision, approximately
one mile southwest of State Highway 6 South in the City's Extraterritorial
Jurisdiction. Case#13-00900095 (M.Hester)
Regular Agenda
5. Consideration, discussion, and possible action on items removed from the Consent
Agenda by Commission action.
6. Public hearing, presentation, discussion, and possible action regarding an amendment to
Chapter 12, "Unified Development Ordinance", Section 4.2, "Official Zoning Map" of
the Code of Ordinances of the City of College Station, Texas by rezoning 75.07 acres
located in Robert Stevenson Survey, Abstract No. 54, College Station, Brazos County,
Texas, recorded in Volume 6985, Page 42, of the Official Records of Brazos County,
Texas, more generally located south of William D. Fitch between Barron Road and
Victoria Avenue from R-1 Single-Family Residential and A-O Agricultural Open to PDD
Planned Development District. Case#13-00900077 (T. Rogers) (Note: Final action on
this item is scheduled for the August 8, 2013 City Council Meeting -subject to
change)
7. Presentation, possible action, and discussion regarding a recommendation to City Council
on Capital Improvement Program projects. (D. Harmon)
8. Public hearing, presentation, discussion, and possible action on a Final Plat for Oak
Terrace Addition Second Revision Lot 1R, Block 9 & Lot 1R, Block 12 being a replat of
Oak Terrace Addition Second Revision All of Blocks 9 and 10, Lots 1-10, Block 12,
former Milam Avenue right-of-way, and former Culpepper Drive right-of-way consisting
of two lots on 13.833 acres at 900 & 901 Cross Street. Case # 12-00500246 (M.
Robinson)
9. Public hearing, presentation, discussion, and possible action regarding an ordinance
amending Chapter 12 "Unified Development Ordinance" of the Code of Ordinances of
the City of College Station to allow micro-industrial uses as a permitted use within the
NG-1 Core Northgate and NG-2 Transitional Northgate zoning districts. Case #13-
00900127 (M. Robinson) (Note: Final action on this item is scheduled for the July 25,
2013 City Council Meeting -subject to change)
10. Discussion and possible action on future agenda items — A Planning & Zoning Member
may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation
shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
11. Adjourn.
4
2013 Planning & Zoning Commission Plan of Work
Comprehensive Plan Implementation
Implementation of Adopted Plans
Summary: Project Dates:
Implementation of adopted master plans and 2/14/13: Council discussion regarding board
neighborhood, district, and corridor plans, namely: compositions for Medical District MMD#1 .
Central College Station, Eastgate, and Southside Area 6/20/2013: Discussion regarding CIP development
neighborhood plans, and Bicycle, Pedestrian, and process at P&Z Regular meeting.
Greenways, Parks and Recreation, Water, Waste 7/18/13: Recommendation for FY14 CIP proposal at
Water, and Medical District master plans. P&Z Regular meeting.
Staff Assigned: P&DS Staff JAnticipated Completion: On-going
Wellborn Community Plan
Summary: Project Dates:
Development of a district plan for the recently annexed 4/1/13: Bicycle, Pedestrian, and Greenways Advisory
Wellborn area that contains elements of a rural historic Board recommended approval of the Plan.
community with a unique character that residents of the 4/4/13: P&Z recommended approval of proposed plan.
area desire to retain. 4/25/13: After a public hearing, Council adopted plan.
Staff Assigned: M. Robinson Completed: April 2013
Economic Development Master Plan
Summary: Project Dates:
Development of a Master Plan to provide consistent 2/7/13: Master Plan update at P&Z Workshop.
direction on how the City will help ensure its economic 7/18/13: P&Z Workshop on draft Master Plan.
health for years to come while providing a positive 8/1/13: P&Z recommendation on Master Plan at P&Z
business development environment. I Regular meeting.
Staff Assigned: R. Heye JAnticipated Completion: Summer 2013
South Knoll Area Neighborhood Plan
Summary: Project Dates:
5/21/13: Neighborhood Resource Team meeting.
Development of a neighborhood plan for a number of 7/9/13: Plan Open House in Council Chambers.
unique neighborhood areas. The plan area is generally
bounded by Holleman Drive, Welsh Avenue, Wellborn 7/16/13: Neighborhood Resource Team meeting in
Road, Harvey Mitchell Parkway, and Texas Avenue. Council Chambers at 6:30pm.
8/1/13: Delivery of draft plan at P&Z Workshop.
8/5/13: Bicycle, Pedestrian, and Greenways
Advisory Board recommendation on proposed plan.
8/15/13:After a public hearing, P&Z consideration
and recommendation regarding proposed plan.
Staff Assigned: J. Prochazka, M. Hester JAnticipated Completion: Summer 2013
5 Page 1 of 4
Neighborhood Parking
Summary: Project Dates:
Analyze neighborhood parking issues by engaging 2/21/13: Task Force Final Report presented to P&Z.
stakeholders and working in a Joint Task Force 2/28/13: Task Force Final Report presented to
Subcommittee with Council. Implement recommended Council.
solutions. 7/9/13-8/5/13: Stakeholder comment period for
draft ordinance.
8/15/13: P&Z consideration of proposed ordinance.
9/12/13: Council consideration of proposed
ordinance.
Staff Assigned: B. Cowell, T. Rogers JAnticipated Completion: Summer 2013
Residential Zoning Districts
Summary: Project Dates:
Create and adopt new residential zoning districts to 4/9/13: Public meeting regarding single family and
implement the future land use and character duplex zoning concepts.
designations identified in the Comprehensive Plan. 4/19/13: P&Z Subcommittee meeting.
5/31/13: P&Z Subcommittee meeting.
6/7/13-7/7/13: Stakeholder comment period for draft
zoning ordinance changes.
8/15/13: P&Z consideration of proposed ordinance.
9/12/13: Council consideration of proposed
ordinance.
Staff Assigned: J. Prochazka, T. Rogers JAnticipated Completion: Summer 2013
Medical District Zoning Districts
Summary: Project Dates:
Create and adopt Medical and Urban Village zoning 5/2/13: Presentation regarding Plan implementation at
districts to implement the new future land use and P&Z Workshop.
character designations established by the Medical 8/15/13: Presentation of district concepts at P&Z
District Master Plan. I Workshop.
Staff Assigned: J. Prochazka, M. Robinson JAnticipated Completion:
Research and Education
Plan Implementation
Summary: Project Dates:
The linkage between the Comprehensive Plan, Master
Plans, and Neighborhood, District, and Corridor Plans.
The linkage between regulations, funding, etc and plan
implementation.
• Overview of concept—provide a review of how this 5/2/13: Discussion at P&Z Regular meeting.
system is built in College Station and intended to be
used (link between vision, comprehensive plan,
strategic plan, etc).
s Page 2 of 4
Link between Comprehensive Plan and Master Plans 5/2/13: Discussion at P&Z Regular meeting.
—this would include an overview of each of the adopted
Master Plans and a demonstration of how for example
we plan wastewater to serve the proposed land use and
how for example the BPG Master Plan, if implemented
responds to the desired character of the City, etc.
Link between adopted plans and regulations/ 6/6/13: Discussion at P&Z Workshop.
standards —this would include examples of how we use
regs (for example new zoning districts or block length)
to further the objectives/goals contained in the policy
documents/plans and to help highlight how the success
of those plans is impacted by the regs selected (or not)
—for example how a certain type of block length yields
a certain development pattern and connectivity whereas
a different block length will yield a different pattern.
Link between plans and funding—this would include 6/20/13: Discussion at P&Z Regular meeting.
how the plans have been fiscally constrained and how
funding plays a role in their successful implementation
and how if not adequately funded they will fall short of
expectations.
Staff Assigned: P&DS Staff JAnticipated Completion:
Character and Community Design
Summary: Project Dates:
The purpose and definition of community character,
community design, and the role they play in community
vitality and success.
Overview of community character (versus just a focus 5/16/13: Discussion at P&Z Workshop.
on land use/protection from incompatible uses)—this
would include an overview of what our plans say about
this and again what best practices are in these areas.
Link between community design and livability—this 9/2013: Discussion at P&Z.
would be an overview of what the principles of good
community design are, where these principles have (or
have not) been used in College Station and where
livability has been improved (or negatively impacted)as
a result.
Link between community design and economic vitality 9/2013: Discussion at P&Z.
—this would be an overview of how community design
impacts land values (and thus tax revenues)creates
new economic opportunities, etc.
Staff Assigned: P&DS Staff JAnticipated Completion:
7 Page 3 of 4
Affordable Housing and Community Development
Summary: Project Dates:
Receive updates regarding affordable housing and
other community development efforts.
Overview of the City's current approach to addressing 7/18/13: Discussion at P&Z Workshop.
affordable housing needs.
Overview of the Department's revised approach to 9/2013: Discussion at P&Z.
community development—this would be an overview of
a Community Development Master Plan.
On-going updates as needed (annual action plan,
Community Development Master Plan, etc).
Staff Assigned: P&DS Staff JAnticipated Completion: On-going
Single-Family and Multi-Family Housing Markets
Summary: Project Dates:
Discuss impact of large amount of new multi-family
units and single-family dwellings being used for student
rental purposes on the local housing market.
Overview of the issue/questions —this would be an 5/16/13: Discussion of methodology and scope at P&Z
overview of what the perceived issues/questions are Regular meeting.
and what others might have looked at in other
communities when asking similar questions to devise a
methodology.
Overview of the new multi-family market—this would
be what is being built, by whom, how are they
performing, who is moving into them, etc. may include
surveys, focus groups, guest speakers, etc.
Overview of existing multi-family market—this would
be what exists, who owns it, what are they doing to
maintain and rent it, how are they performing, who is
moving into them, etc. may include surveys, focus
groups, guest speakers, etc.
Overview of the single-family rental market—what is
being built, who is managing what and how, who is
renting, what are the implications/benefits of this
market, etc. may include surveys, focus groups, guest
speakers, etc.
What, if any, response are needed/appropriate by the
City to address issues.
Staff Assigned: P&DS Staff Anticipated Completion:
8 Page 4 of 4
(*400r�
CITY OF COLLEGE STATION
Home of Texas A&M University
1101 Texas Avenue, PO Box 9960
College Station,Texas 77842
Phone 979.764.3570/Fax 979.764.3496
MEMORANDUM
DATE: July 11, 2013
TO: Members of the Planning&Zoning Commission
FROM: David Brower and Brian Piscacek, Community Development Analysts
SUBJECT: Community Development Update
Item: Presentation, discussion, and possible action regarding an overview of current Community
Development programs,area demographics, and housing characteristics.
Community Development Unit Description
The City has received over$33 million in Community Development Block Grant(CDBG) funding (since
1975) and over $12 million in HOME Investment Partnership Grant funds (since 1992) from the U.S.
Department of Housing and Urban Development. Much needed public services, more decent, safe and
affordable housing, and critical infrastructure have been provided to low- and moderate-income residents
as a result of these grant funds.
College Station Demographics
Based upon a review of data from the U.S. Decennial Census and American Community Survey, it is
determined that the City of College Station is uniquely positioned concerning the presence of a low-
income population. With many of the City's residents enrolled as full-time students in higher education—
one-third of the entire population is between the ages of 20 and 24, in fact —much of the "low-income
population" as defined by the U.S. Census Bureau can be attributed to the underemployed student
segment. This does not discount, however, the existence of a true population that can be measured, and
from which conclusions can be drawn.
A greater percentage of families in College Station are at the income extremes when compared to families
in Brazos County or the State of Texas; as a result, there is a smaller middle class. While over 40% of
families earn at least $75,000, over 1,500 families make less than $10,000 annually. Nearly half of all
occupations in College Station are those in management, business, science, and the arts. While there are
numerous white collar, professional positions (mostly in government), low-skill, low-education
opportunities are declining. Compared to the county and state, College Station has a smaller percentage of
manufacturing and other more labor-intensive jobs.
Planning d,Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE -COLLEGE STATION •TEXAS -77842
TEL.979.764.3570 9FAX. 979.764.3496
cstx.gov/devservices
Over 15% of College Station families are below poverty level, a federal measure to determine economic
destitution. To put that in perspective,the poverty threshold for a family of four with two related children
is $23,283. Two-parent families are least likely to be in poverty, as only 6.4% of married—couple families
are in poverty. On the other end of the spectrum, single mothers have the greatest need for assistance, as
41.3% of families with a female householder and no husband present are below poverty. Those numbers
drop significantly if the householder is employed (especially full-time). Minority families are twice as
likely to be in poverty in College Station. Although only 2% of elderly households are in poverty, that
percentage jumps to over 14% if the householder is female with no husband present. Of the more
vulnerable groups, minority and single-mother households area also growing in number. In fact, from
2000-2010,the number of single-mother households increased by 60.5%to nearly 2,700.
Housing Characteristics
The greatest challenge faced by the low- and moderate-income population is securing decent and
affordable housing,rental and owner alike. Because of the dominant student population, about 65% of the
total housing units in the city are rentals — inversely proportional to the state. This creates a scenario in
which 1) there is a relatively limited supply of homeownership opportunities, and 2) nonstudent
households are forced to compete with students in the inflated rental market.
Home prices have outpaced income from 2005-2011; while the median home sales price has increased by
10.2%, median family income has increased by just 6.3%. Furthermore, the College Station-Bryan MSA
was recently ranked 182"d out of 226 national metro areas for affordability—only 20% of all metro areas
ranked below. The City maintains a newer housing stock compared to the county or state;consequently, a
much smaller percentage of "affordable" homes are available for purchase by low/mod households.
Homeowners in College Station spend about 16.9% more on household costs compared to all of Brazos
County.
The renter cost burden is significant, with over 68% of renters spending over 30% of their income on
household costs. The greatest issue is the lack of affordable 3- and 4-bedroom rental units. Over the last
four years, while a two-bedroom unit has increased by just 4.1% in rent, four-bedroom units have
increased by 27.4%. With only a handful of affordable complexes in the City, low-income households do
not have many housing alternatives.
The high price of housing restricts a family from having more discretion in managing finances. Building a
more solid financial foundation through saving is an effective tool; however, many of this targeted
population are "unbanked," or "under-banked," meaning that these residents utilize check cashiers,
payday lenders, and other fringe financial service providers rather than maintaining a more traditional
banking relationship. This can result in paying hundreds and sometimes thousands of dollars each year to
cash checks and enter into small loan agreements. The exploitative nature of these services further
reduces economic stability.
Community Development Master Plan
Staff proposes development of a Community Development Master Plan to further examine the
economically disadvantaged population in College Station and analyze what it means to be in poverty
locally. The plan will discuss various obstacles and barriers that challenge low- and moderate-income
households and the services that are available to overcome them. The overarching goal of this endeavor is
threefold: 1) evaluate the effectiveness of existing means of support throughout the community; 2)
discover where potential gaps exist; and 3)identify opportunities for local government intervention.
10
MINUTES
CITY OF COLLEGE STATION PLANNING & ZONING COMMISSION
Home of Tmo AdM Univrniiy' Workshop Meeting
June 20, 2013, 6:00 p.m.
City Hall Council Chambers
College Station, Texas
COMMISSIONERS PRESENT: Mike Ashfield, Bo Miles, Jerome Rektorik, and Jim Ross
COMMISSIONERS ABSENT: Jodi Warner, Brad Corrier, and Vergel Gay
CITY COUNCIL MEMBERS PRESENT: James Benham
CITY STAFF PRESENT: Bob Cowell, Lance Simms Molly Hitchcock, Jennifer Prochazka,
Jason Schubert, Morgan Hester, Teresa Rogers, Jenifer Paz, Alan Gibbs, Carol Cotter, Erika
Bridges, Joe Guerra, Adam Falco, Jordan Wood, and Brittany Caldwell
1. Call the meeting to order.
Chairman Ashfield called the meeting to order at 6:00 p.m.
2. Discussion of consent and regular agenda items.
There was no discussion regarding consent and regular agenda items.
3. Discussion of Minor and Amending Plats approved by Staff.
• Final Plat — Minor Replat — The Cottages of College Station Ph. 1 L2 Bl. Case # 12-
00500181
Principal Planner Schubert reviewed the above-referenced plat.
4. Discussion of new development applications submitted to the City. [New Development
List]
Executive Director Cowell explained what the New Development List was and what
information it would provide to the Commissioners.
5. Presentation, discussion, and possible action regarding the status of items within the 2013
P&Z Plan of Work(see attached). (J. Schubert)
Principal Planner Schubert gave an update regarding the 2013 P&Z Plan of Work.
6. Presentation, discussion, and possible action regarding an update to the Commission on
Gig.0 — The University Community Next Generation Innovation Project. (James
Benham)
Councilman Benham gave an update regarding Gig. U.
June 20,2013 P&Z Workshop Meeting Minutes Page 1 of 2
11
There was general discussion amongst the Commission regarding the project.
7. Presentation, discussion, and possible action regarding the P&Z Calendar of Upcoming
Meetings.
• Thursday, June 27, 2013 — City Council Meeting — Council Chambers — Workshop
6:00 p.m. and Regular 7:00 p.m. (Liaison—Ross)
• Tuesday, July 2,2013 — Special Planning& Zoning Meeting — Council Chambers 6:00
p.m. (Tentative)
• Thursday, July 18, 2013 — P&Z Meeting — Council Chambers — Workshop 6:00 p.m.
and Regular 7:00 p.m.
Chairman Ashfield reviewed the upcoming meeting dates with the Planning and Zoning
Commission.
8. Discussion, review and possible action regarding the following meetings: Design Review
Board, Joint Parks / Planning & Zoning Subcommittee, South Knoll Area Neighborhood
Plan Resource Team, BioCorridor Board, and Zoning District Subcommittee.
There was general discussion regarding the Residential Zoning Districts status.
9. Discussion and possible action on future agenda items — A Planning & Zoning Member
may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation
shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
There was no discussion regarding future agenda items.
10. Adjourn.
The meeting was adjourned at 6:51 p.m.
Approved: Attest:
Mike Ashfield, Chairman Brittany Caldwell,Admin. Support Specialist
Planning&Zoning Commission Planning&Development Services
June 20,2013 P&Z Workshop Meeting Minutes Page 2 of 2
12
(*OF""
CITY OF COLLEGE STATION MINUTES
Home of Tffz A&M UniversiV* PLANNING & ZONING COMMISSION
Regular Meeting
June 20, 2013, 7:00 p.m.
City Hall Council Chambers
College Station, Texas
COMMISSIONERS PRESENT: Mike Ashfield, Bo Miles, Jerome Rektorik, and Jim Ross
COMMISSIONERS ABSENT: Jodi Warner,Brad Corrier, and Vergel Gay
CITY COUNCIL MEMBERS PRESENT: James Benham
CITY STAFF PRESENT: Bob Cowell, Lance Simms Molly Hitchcock, Jennifer Prochazka,
Jason Schubert, Morgan Hester, Teresa Rogers, Jenifer Paz, Alan Gibbs, Carol Cotter, Erika
Bridges, Joe Guerra, Adam Falco, Jordan Wood, and Brittany Caldwell
1. Call Meeting to Order
Chairman Ashfield called the meeting to order at 7:00 p.m.
2. Pledge of Allegiance
3. Hear Citizens
No one spoke.
4. Consent Agenda
All items approved by Consent are approved with any and all staff recommendations.
4.1 Consideration, discussion, and possible action to approve Meeting Minutes.
• June 6, 2013 —Workshop
• June 6, 2013 —Regular
4.2 Consideration, discussion, and possible action on Absence Requests from meetings.
• Vergel Gay —June 20, 2013
4.3 Presentation, discussion, and possible action on a Final Plat for Williams Creek
Subdivision Phase 6, consisting of 22 residential lots on approximately 61.9 acres
located at 9500 Rock Prairie Road. Case# 12-00500224 (T. Rogers)
June 20,2013 P&Z Regular Meeting Minutes Page 1 of 2
13
4.4 Presentation, discussion, and possible action on a Development Plat for Plantation
Oaks Addition, consisting of one lot on approximately 1.27 acres located at 1500 Earl
Rudder Freeway South, generally located at the corner of Earl Rudder Freeway South
and University Oaks Boulevard. Case# 13-00900098 (M. Hester)
Commissioner Rektorik motioned to approve Consent Agenda Items 4.1 — 4.4.
Commissioner Ross seconded the motion, motion passed (4-0).
Regular Agenda
5. Consideration, discussion, and possible action on items removed from the Consent
Agenda by Commission action.
There was no discussion regarding future agenda items.
6. Presentation, discussion, and possible action regarding an overview of the relationship
between the Comprehensive Plan and funding for the plan implementation (J.
Prochazka)
Principal Planner Prochazka gave an overview of the relationship between the
Comprehensive Plan and funding for the plan implementation.
No action was taken on this item.
7. Presentation, discussion, and possible action regarding an overview of the Capital
Improvement Projects (CIP) development process. (B. Cowell)
Executive Director Cowell gave an overview of the Capital Improvement Projects
development process.
No action was taken on this item.
8. Discussion and possible action on future agenda items — A Planning & Zoning Member
may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation
shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
There was no discussion regarding future agenda items.
9. Adjourn.
The meeting was adjourned at 7:31 p.m.
Approved: Attest:
Mike Ashfield, Chairman Brittany Caldwell,Admin. Support Specialist
Planning&Zoning Commission Planning&Development Services
June 20,2013 P&Z Regular Meeting Minutes Page 2 of 2
14
(*OF""
CITY OF COLLEGE STATION MINUTES
Home of Tffz A&M UniversiV* PLANNING & ZONING COMMISSION
Special Regular Meeting
July 2, 2013, 6:00 p.m.
City Hall Council Chambers
College Station, Texas
COMMISSIONERS PRESENT: Bo Miles, Jerome Rektorik, Vergel Gay, and Jim Ross
COMMISSIONERS ABSENT: Mike Ashfield, Jodi Warner, and Brad Corrier
CITY COUNCIL MEMBERS PRESENT: John Nichols
CITY STAFF PRESENT: Bob Cowell, Jason Schubert, Morgan Hester, Jenifer Paz, Erika
Bridges, Joe Guerra, Roberta Cross, Jordan Wood, and Brittany Caldwell
1. Call Meeting to Order
Acting Chairman Miles called the meeting to order at 6:00 p.m.
2. Pledge of Allegiance
3. Hear Citizens
No one spoke.
4. Consent Agenda
All items approved by Consent are approved with any and all staff recommendations.
4.1 Consideration, discussion, and possible action on Absence Requests from meetings.
• Mike Ashfield—July 2, 2013
• Jodi Warner—July 2, 2013
Commissioner Rektorik motioned to approve Consent Agenda Item 4.1.
Commissioner Gay seconded the motion, motion passed (4-0).
Regular Agenda
5. Public hearing, presentation, discussion, and possible action on a Final Plat for Home2
Suites Subdivision being a replat of Lodgeco Subdivision Lot 2, North Park Section II
Lots 2-4, and former Meadowland Street right-of-way consisting of approximately 2.1
acres at 300 Texas Avenue. Case# 13-00900053 (M. Hester)
July 2,2013 P&Z Special Regular Meeting Minutes Page 1 of 2
15
Staff Planner Hester presented the replat and recommended approval with the condition
that the title block be revised and that a portion of former Meadowland Street right-of-
way be included in the proposed lot if a quit claim document is signed by the adjacent
owner.
There was general discussion amongst the Commission regarding the replat_
Acting Chairman Miles opened the public hearing.
No one spoke during the public hearing.
Acting Chairman Miles closed the public hearing.
Commissioner Ross motioned to approve the replat. Commissioner Rektorik
seconded the motion, motion passed (4-0).
6. Discussion and possible action on future agenda items — A Planning & Zoning Member
may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation
shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
There was no discussion regarding future agenda items.
7. Adjourn.
The meeting was adjourned at 6:03 p.m.
Approved: Attest:
Mike Ashfield,Chairman Brittany Caldwell,Admin. Support Specialist
Planning&Zoning Commission Planning&Development Services
July 2,2013 P&Z Special Regular Meeting Minutes Page 2 of 2
16
(*01""
CITY OF COLLEGE,STATION
Planning ear Development Services
Absence Request Form
For Elected and Appointed Officers
Name Brad Cornier
Request Submitted on 6/20/2013
I will not be in attendance at the meeting on 6/20/2013
for the reason specified: (Date)
Unexpected meeting
Signature Brad Cornier
17
(*01""
CITY OF COLLEGE STATION
Planning ear Development Services
Absence Request Form
For Elected and Appointed Officers
Name Mike Ashfield
Request Submitted on 7/10/2013
I will not be in attendance at the meeting on 7/18/2013
for the reason specified: (Date)
Traveling for work
Signature Mike Ashfield
18
(* r�
+CITY OF COLLEGE STATION
PRELIMINARY PLAN
for
Great Oaks Subdivision
13-00900059
SCALE: 357 residential lots on approximately 224.5 acres
LOCATION: Generally located west of Holleman Drive South and north of Rock
Prairie Road West
ZONING: A-O Agricultural Open, A-OR Rural Residential Subdivision, R-1 B
Single-Family Residential
APPLICANT: Clint Cooper, BCS Rock Prairie
PROJECT MANAGER: Morgan Hester, Staff Planner
mhester@cstx.gov
PROJECT SUMMARY: The Master Plan for this development was approved by the
Commission in January 2007 and the original Preliminary Plat was
approved in February 2007. A revised Preliminary Plat was
approved in January 2012. The proposed Preliminary Plat
reconfigures and adds lots to phases that have not yet been final
platted.
RECOMMENDATION: Staff recommends approval of the Preliminary Plan.
Planning &Zoning Commission Page 1 of 4
July 18, 2013
19
d✓�r��` i [{ yam " i Q' Z
f r
Z El
J
a.
r iu
CTi
Lr)
'* a
Z
Q¢
�C2 co
�P 5;
CGP 0
G� 0 M
?�*�O U)
U3
u9 Y
a
¢P? Q
w
w
a
❑ w
z ~
� J
LU
LL
Q
J
LU
Planning &Zoning Commission Page 2 of 4
July 18, 2013
20
DEVELOPMENT HISTORY
Annexation: March 2008
Zoning: A-O Agricultural Open in February 2008, upon annexation
A-OR Rural Residential Subdivision in May 2008
R-1 B Single Family Residential in May 2008
Site development: Great Oaks Phase 1 is currently developed.
COMMENTS
Water: Water will be provided by Wellborn Water Supply Corporation.
Sewer: Sanitary sewer service will be provided by the City of College
Station for Phases 2-9.
Off-site Easements: None at this time.
Drainage: The subject tract is located in the Hopes Creek Drainage Basin.
The subject tract is not encroached by a FEMA designated
Special Flood Hazard Area. Development of the subject tract will
be required to meet the City's storm water design guidelines.
Flood Plain: There is no FEMA regulated floodplain located on the property.
Greenways: N/A
Pedestrian Connectivity: At the time when Great Oaks was master planned, the tract was
located in the ETJ; therefore, no sidewalks are proposed or
required.
Bicycle Connectivity: At the time when Great Oaks was master planned, the tract was
located in the ETJ; therefore, no bicycle facilities are proposed or
required.
Streets: Access will be provided to the development via Rock Prairie Road
West and within through the use of existing roads within Great
Oaks Phase 1.
Oversize Request: N/A
Parkland Dedication Fees: This development was Master Planned in the ETJ prior to
parkland dedication requirements and therefore no parkland
dedication is required.
Impact Fees: N/A
REVIEW CRITERIA
1. Compliance with Comprehensive Plan and Unified Development Ordinance: The
Comprehensive Plan designates this area to be Restricted Suburban. This portion of Rock
Prairie Road West is shown as a future 2-lane Major Collector on the Thoroughfare Plan.
Four 2-lane Minor Collectors are shown on the Thoroughfare Plan that was adopted in 2009.
As this project was approved in January 2007, these thoroughfares are not required or
provided. This Preliminary Plan is in general compliance with the Future Land Use and
Character Restricted Suburban designation in the Comprehensive Plan.
Planning &Zoning Commission Page 3 of 4
July 18, 2013
21
2. Compliance with Subdivision Regulations: The proposed Preliminary Plan was reviewed
using the Subdivision Regulations applicable to the project when the master plan was
originally approved in January 2007. It is in compliance with these requirements.
STAFF RECOMMENDATION
Staff recommends approval of the Preliminary Plan.
SUPPORTING MATERIALS
1. Application
2. Copy of Preliminary Plan
Planning &Zoning Commission Page 4 of 4
July 18, 2013
22
Microsofl Word-Preliminary Plat- ShowDo- ient.aspx http://cstx.go- -'nodules/ShowDocument.aspx?documentid=4271
FOR OFFICE USE ONLY
CASE NO.:
_ DATE SUIS ITTED:
TIME. Ilia
CITY OF(:OLLEGH STATION
Home of Tures A&M University" STAFF:
PRELIMINARY PLAN APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
V$932 Preliminary Plan Application Fee.
01K $233 Waiver Request to Subdivision Regulations Fee (if applicable).
Application completer) in fall. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
Fourteen(14)folded copies of plan.A revised mylar original must be submitted after approval.
itle report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
J� •❑ Ippact study(if oversized participation is requested).
The attached Preliminary Plan checklist with all items checked off or a brief explanation as to why they are
not.
Date of Optional Preapplication Conference
NAME OF PROJECT &I!Nol'OAks SvMoI;V(�en
ADDRESS
SPECIFIED LOCATION OF PROPOSED SUBDIVISION:
Welk idly sk„+ A-AIR ctiPWV 0A*s PkAge r &4;1 AVA
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name _pI J, A-S E-mail
Street Address
City State _ _ Zip Code
Phone Number Fax Number
PROPERTY OWNER'S INFORMATIONAL owners must be identified. Please attach an additional sheet for multiple
owners):
Name e LLL E-mail
Street Address Zg
City _ 65- State Zip Code -7 7'9
Phone Number ' , 2�0:7me Fax Number
ARCHITECT OR NGINI�ER'S INFORMATIO
Name i"IC� ��C f ^��af �� Q(,e� �., E-mail CH-1 Cg wY C- u/' �.ro�✓,1p c0M
Street Address /oo fJukilce/c
City CS� State __I� Zip Code 775V�;_
Phone Number 9-M.. cel5.X533 Fax Number
1)11 Page 1 of 6
23
1 of 6 3/6/2013 9:24 AM
Microsoft Word-Preliminary Plat-ShowDe- ient.aspx http://cstx.go- "Todules/ShowDocument.aspx?documentid=4271
Total Acreage ZZ+ Ac- Total No. of Lots '2�4 7 R-O-W Acreage ��-
Number of Lots By Zoning District 2-1 / 'K- 15
Average Acreage Of Each Residential Lot By Zoning District:
1.0 / /Z-16 li:ZZ /
Floodplain Acreage Z)
NOTE: Appropriate zoning for the proposed subdivision must be in place before this application can be
considered complete.
Are you proposing to dedicate park land by acreage or fee in lieu of land?
Are you proposing to F- develop the park f dedicate the development fee?(Check one)
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s)and you are requesting the
application be reviewed under previous ordinance as applicable?
FxYes
r No
If yes, provide information regarding the first approved application and any related subsequent applications(provide
additional sheets if necessary):
s
Project Name: A\ek. io*Z5
City Project Number(in known): 1j�I1j�S
Date/Timeframe when submitted: ZC86 .� ei ZDd ► 01 s
Requested wavier to subdivision regulations and reason for same(if applicable):
1111 Page 2 of 6
24
2 of 6 3/6/2013 9:24 AM
Microsoft Word-Preliminary Plat- ShowDo---�ent.aspx http://cstx.go• "lodules/ShowDocument.aspx?documentid=4271
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
F_ - -
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
I. F An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way;
2. f The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. r Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I
rural context;
5. r When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
1111 Page 3 of 6
25
3 of 6 3/6/2013 9:24 AM
Microsoft Word-Preliminary Plat- ShowDo nent.aspx http://cstx.go- -nodules/ShowDocument.aspx?documentid=4271
6. F The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the LIDO; or
7. r The proposed development contains frontage on a Freeway/Expressway as designated by Map 6.6,
Thoroughfare Plan-Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning&Zoning Commission.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE
OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from
the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If
the owner is a company, the application must be accompanied by proof of authority for the company's
representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also
considered owners and the appropriate signatures must be provided as described above.
Signature and title Date
Page 4 of 6
26
4 of 6 3/6/2013 9:24 AM
'UM
1HRF"q
—H-IMM
Lo
!Zk,
PTLI
yy
T-71 R
;-95
1E,
4 7�-
7 1
y 11
�14 f F- - -- -- - -
tis
..........
JLd gr
kAIlII
I'T • ..... xuN
..
1 ode
.i I 7N
j.
N
30,
I i I L
J4 I
T 5-1
n'
(i
*Ar�
CITY OF COLLEGE STATION
FINAL PLAT
for
Great Oaks Phase 13
13-00900032
SCALE: Seven residential lots on approximately 9.2 acres
LOCATION: Generally located west of Arboleda Drive in the Great Oaks
Subdivision
ZONING: A-OR Rural Residential Subdivision
APPLICANT: Clint Cooper, BCS Rock Prairie
PROJECT MANAGER: Morgan Hester, Staff Planner
mhester@cstx.gov
RECOMMENDATION: Staff recommends approval of the Final Plat.
Planning &Zoning Commission Page 1 of 3
July 18, 2013
28
J �
Z J
d
2
co
J�
D
O�
G�
cr?
Nr
co
C?
bQ
O�
d'6
r
CL
fl]
Y
d
0
Q
W
af
LLI
s >
LLI
+- v, w
LLI
Liu
r�'~ ❑
o
Planning &Zoning Commission Page 2 of 3
July 18, 2013
29
DEVELOPMENT HISTORY
Annexation: March 2008
Zoning: A-O Agricultural Open upon annexation
A-OR Rural Residential Subdivision in May 2008
Preliminary Plat: Preliminary Plats have been approved for Great Oaks in 2006,
2012, and a recent revision in 2013.
Site Development: Vacant. Seven residential lots are proposed with this phase,
ranging in size from 1.0 acre to 1.3 acres.
COMMENTS
Parkland Dedication: This development was Master Planned in the ETJ prior to
parkland dedication requirements; therefore, no parkland
dedication is required.
Greenways: N/A
Pedestrian Connectivity: At the time when Great Oaks was master planned, the tract was
located in the ETJ; therefore, no sidewalks are proposed or
required.
Bicycle Connectivity: At the time when Great Oaks was master planned, the tract was
located in the ETJ; therefore, no bicycle facilities are proposed or
required.
Impact Fees: N/A
REVIEW CRITERIA
1. Compliance with Comprehensive Plan and Unified Development Ordinance: The
Comprehensive Plan designates this area as Restricted Suburban and the proposed lot
sizes exceed with this land use. The proposed lots will have access from Arboleda Drive
which connects to Great Oaks Drive, a future 2-lane Minor Collector on the Thoroughfare
Plan and connect to Walnut Drive, a future Minor Collector located in the ETJ.
2. Compliance with Subdivision Regulations: The Final Plat complies with the applicable
Subdivision Regulations contained in the Unified Development Ordinance.
STAFF RECOMMENDATIONS
Staff recommends approval of the Final Plat.
SUPPORTING MATERIALS
1. Application
2. Copy of Final Plat
Planning &Zoning Commission Page 3 of 3
July 18, 2013
30
FOR OFFICE USE ONLY
CASE NO.:
DATE SUBMITTED:
y
CITY OF C01.11'sGi'.STATION TIME: 6��
Home ofTexasAdM University' STAFF:
FINAL PLAT APPLICATION
(Check one) ❑ Minor ❑ Amending 0 Final ❑ vacating ❑Replat
($700) ($700) ($932) ($932) ($932)
Is this plat in the ETJ? ❑ Yes ❑ No Is this plat Commercial ❑ or Residential ❑
MINIMUM SUBMITTAL REQUIREMENTS:
/[ $700-$932 Final Plat Application Fee (see above).
$233 Waiver Request to Subdivision Regulations Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1%of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is>$600, the balance is
due prior to the issuance of any plans or development permit).
t/x Application completed in full. This application form provided by the City of College Station must be used and
4I may not be adjusted or altered. Please attach pages if additional information is provided.
Fourteen (14)folded copies of plat. (A signed mylar original must be submitted after approval.)
x
Two(2)copies of the grading, drainage, and erosion control plans with supporting drainage report.
[x1 Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Copy of original deed restrictions/covenants for replats (if applicable).
[] Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the roved preliminary Ian must be on file before a final latapplication will be considered
Y pp p rY P p
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Great Oaks Phase 13
ADDRESS Arboleda Drive, College Station, Texas
SPECIFIED LOCATION OF PROPOSED PLAT:
,Adjacent to Phase 1 of Great Oaks Subdivision
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name BCS Rock Prairie (Clint Cooper) E-mail
Street Address 1700 Research Pkwy#240
City College Station _ State Tx Zip Code 77845
Phone Number 979-260-7000 Fax Number
1/11 Page 1 of 9
31
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Same as applicant E-mail
Street Address
City State Zip Code
Phone Number Fax Number
ARCHITECT OR ENGINEER'S INFORMATION:
Name McClure &Browne Engineering/Surveying(Jeff Robertson) E-mail %effr@mcclurebrowne.com
Street Address 1008 Woodcreek Drive, Ste 103
City College Station _ _ State Tx Zip Code 77845
Phone Number 979-693-3838 Fax Number 979-693-2554
Do any deed restrictions or covenants exist for this property? ❑ Yes ❑X No
Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No.
Total Acreage 9.21 Total No. of Lots 7 R-O-W Acreage 1.84
Existing Use Open Proposed Use Single Family Residential
Number of Lots By Zoning District 7 / AOR i l
Average Acreage Of Each Residential Lot By Zoning District:
1.05 / AOR
Floodplain Acreage 0
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels)on the property? r Yes r No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
Fx- Yes
F- No
If yes, provide information regarding the first approved application and any related subsequent applications(provide
additional sheets if necessary):
Project Name: Great Oaks Subdivision
City Project Number(if known):
Date/Timeframe when submitted:
1/11 Page 2 of 9
32
A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable):
Additional ors along Arboleda Chive
i
Requested waiver to subdivision regulations and reason for same (if applicable):
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
f
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
i
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. r An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way;
2. F_ The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. F_ Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate/
rural context;
5. [— When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
1111 Page 3 of 9
33
6. r The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO; or
7. r The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6,
Thoroughfare Plan-Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning &Zoning Commission.
Requested Oversize Participation
Total Linear Footage of Parkland Dedication due prior to filing the Final Plat:
Proposed Public:
ACREAGE:
Streets
Sidewalks No. of acres to be dedicated +$ development fee
Sanitary Sewer Lines No. of acres in floodplain
No. of acres in detention
Water Lines
Channels No. of acres in greenways
OR
Storm Sewers
FEE IN LIEU OF LAND:
Bike Lanes I Paths
No. of SF Dwelling Units X$ _ $
(date)Approved by Parks & Recreation Advisory Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application
must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN
HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as
described above.
Signa#ure and title 0 Date
1/11 34 Page 4 of 9
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities.All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
``
—(a—
Property Owner( Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines.All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER,AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE,AND
ACCURATE.
m�.
4' )
-1
Engi r Date
1/11 Page 5 of 9
35
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
* If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
rRequired for Site Plans, Final Plats, Construction Plans, and Fill/Grading Permits:
B. I, certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/11 Page 6 of 9
36
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour)and post construction.
Engineer/ Surveyor Date
Commercial Structures:
E. I, certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer/ Surveyor Date
OR
I, certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation,and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour)and post construction.
Engineer/ Surveyor Date
Conditions or comments as part of approval:
1/11 Page 7 of 9
37
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
X❑ Drawn on 24"x 36"sheet to scale of 100' per inch.
0 Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
0 Title Block with the following information:
0 Name and address of subdivider, recorded owner, planner, engineer and surveyor.
0 Proposed name of subdivision. (Subdivision name&street names will be approved through Brazos
County 911.)
❑x Date of preparation.
❑X Engineer's scale in feet.
❑X Total area intended to be developed.
0 North Arrow.
❑x Subdivision boundary indicated by heavy lines.
0 If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or
larger.
All applicable certifications based on the type of final plat.
❑x Ownership and Dedication
❑X Surveyor and/or Engineer
Q City Engineer(and City Planner, if a minor plat)
Q Planning and Zoning Commission (delete if minor plat)
0 Brazos County Clerk
0 Brazos County Commissioners Court Approval (ETJ Plats only)
❑ If submitting a replat where there are existing improvements, submit a survey of the subject property
showing the improvements to ensure that no encroachments will be created.
[] If using private septic systems, add a general note on the plat that no private sewage facility may be
installed on any lot in this subdivision without the issuance of a license by the Brazos County
Health Unit under the provisions of the private facility regulations adopted by the Commissioner's
Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code.
[7 Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available
data.
® Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
❑x Matches the approved preliminary plan or qualifies as minor amendments(LIDO Section 3.3.E.2).
® The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or forming a
boundary with the subdivision, as well as, those within the subdivision).
Existing Proposed
x❑ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
7 F?Kl Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s
sufficient to meet Thoroughfare Plan.)
7 Street offsets and/or intersection angles meet ordinance.
1/11 Page 8 of 9
38
Existing Proposed
❑ ❑ Alleys.
❑X ❑X Easements.
0 ❑X A number or letter to identify each lot or site and each block (numbered sequentially).
❑ ❑ Parkland dedication/greenbelt area/park linkages. All proposed dedications must be
reviewed by the Parks and Recreation Advisory Board and documentation of their
recommendation provided prior to being scheduled for P&Z Commission consideration.
❑X Construction documents for all public infrastructure drawn on 24"x 36"sheets and properly
sealed by a Licensed Texas Professional Engineer that include the following:
❑X Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall
street, alley and/or sidewalk layout of the subdivision. (may be combined with other
utilities).
❑ Sewer Design Report.
❑ Sanitary sewer plan and profile showing depth and grades. One sheet must show the
overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility
master plan and any future growth areas.)
Water Design Report and/or Fire Flow Report.
[ Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision.
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
FX Storm drainage system plan with contours, street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision.
❑X Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
❑X Letter of completion for public infrastructure or guarantee/surety in accordance with UDO
Section 8.6.
❑X Drainage Report with a Technical Design Summary.
❑X Erosion Control Plan (must be included in construction plans).
Q All off-site easements necessary for infrastructure construction must be shown on the final plat with a
volume and page listed to indicate where the separate instrument easements were filed.
Separate instrument easements must be provided in recordable form to the City prior to being scheduled
for P&Z Commission consideration.
❑X Are there impact fees associated with this development? ❑ YesX❑ No
Impact fees must be paid prior to building permit.
0 Will any construction occur in TxDOT rights-of-way? ❑ Yes ❑X No
If yes, TxDOT permit must be submitted along with the construction documents.
NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing
the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent(NOI) must be submitted prior to
issuance of a development permit.
Print Form
1/11 Page 9 or 9
39
SEC
W
NN; PER N sV€ by
N il
i
di
MH RN,1
dg; win v ;N Q!
E M!Ali TH
y 00 a VIA . . .....
1�f--!=sag k5l Mw 1-1-1
--I r-------------------
any!
'W�
------------
iji
Iwo.
----------
rase
---------------- ------- -------
L------------- --------
mo-------—------
xmc----- - -------
!L-
------------
r--- - --------- --
t
------------ -------
k-;L T
------------
H1,
9'4
----------iv ------
-----------
tq
XED
------------
oa
my �
vim
NO
Sp
!kn
CITY of COLLEGE STATION
PRELIMINARY PLAT
for
Indian Lakes Ph 17
13-00900095
SCALE: 19 residential lots on approximately 36.36 acres
LOCATION: Generally located east of Matoska Ridge Drive in the Indian Lakes
Subdivision
ZONING: N/A (ETJ)
APPLICANT: Travis Martinek, Smiling Mallard Development, Ltd.
PROJECT MANAGER: Morgan Hester, Staff Planner
mhester@cstx.gov
RECOMMENDATION: Staff recommends approval of the Preliminary Plat.
Planning &Zoning Commission Page 1 of 4
July 18, 2013
41
t
■
I r�
.a�'•rl� r�r �� :,F. y'.�',��� ��h�'s1$�� F� / t ��F',��.3{ter,''
lk* ■
! ,y �rfl fib. r _ ■
DEVELOPMENT HISTORY
Annexation: N/A (ETJ)
Zoning: N/A (ETJ)
Master Planned: Master Plan approved in 2002. Subsequent preliminary plats and
final plats have been approved every year since 2004.
Site development: Vacant. Nineteen residential lots are proposed, ranging from 1.15
acres to 2.69 acres.
COMMENTS
Water: Provided by Wellborn Special Utility District.
Sewer: Sanitary sewer service will be provided by private on-septic
systems on each lot. These facilities will be permitted by the
Brazos County Health Department.
Off-site Easements: None at this time.
Drainage: Drainage is generally to the north within the Peach Creek
Drainage Basin.
Flood Plain: There is no FEMA regulated floodplain located on the property.
Greenways: N/A
Pedestrian Connectivity: This site is located in the ETJ so sidewalks are not required.
Bicycle Connectivity: This site is located in the ETJ and no specific facilities for bicycle
connectivity are required.
Streets: Access will be provided from Indian Lakes Phase 4 via Indian
Lakes Drive.
Oversize Request: N/A
Parkland Dedication Fees: This development was approved as a Master Plan in the ETJ prior
to parkland dedication requirements being applicable in the ETJ.
Therefore, no parkland dedication is required.
Impact Fees: N/A
REVIEW CRITERIA
1. Compliance with Comprehensive Plan and Unified Development Ordinance: The
Comprehensive Plan designates this area as Rural. The City, however, does not have land
use authority in the ETJ. The proposed lots will have access through rural residential
streets that connect to Indian Lakes Drive, a Major Collector on the Thoroughfare Plan.
2. Compliance with Subdivision Regulations: The Preliminary Plat complies with the
applicable Subdivision Regulations contained in the Unified Development Ordinance.
Planning &Zoning Commission Page 3 of 4
July 18, 2013
43
STAFF RECOMMENDATION
Staff recommends approval of the Preliminary Plat.
SUPPORTING MATERIALS
1. Application
2. Copy of Preliminary Plat
Planning &Zoning Commission Page 4 of 4
July 18, 2013
44
FOR OFFICE USE N Y
CASE NO.:
DATE SUBMITTED: I
TIME:
CITY ON CO)J EGP.STATION
H—e ofT A&M Unit iq' STAFF:
PRELIMINARY PLAN APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
x $932 Preliminary Plan Application Fee.
❑ $233 Waiver Request to Subdivision Regulations Fee(if applicable).
❑x Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
❑x Fourteen(14)folded copies of plan.A revised mylar original must be submitted after approval.
v X Title report for property current within ninety (90)days or accompanied by a Nothing Further Certificate
current within ninety(90)days. The report must include applicable information such as ownership, liens,
encumbrances,etc.
❑ Impact study(if oversized participation is requested).
❑x The attached Preliminary Plan checklist with all items checked off or a brief explanation as to why they are
not.
Date of Optional Preapplication Conference N/A
NAME OF PROJECT Indian Lakes-Phase 17
ADDRESS Northeast of the intersection of Indian Lakes Drive and Matoska Ridge Drive
SPECIFIED LOCATION OF PROPOSED SUBDIVISION:
Northeast of the intersection of Indian Lakes Drive and Matoska Ridge Drive
APPLICANT/PROJECT MANAGER'S INFORMATION(Primary contact for the project):
Name Travis Martinek E-mail travis@clarkewyndham.com
Street Address 3608 East 29th Street,Suite 100
City Bryan State Texas Zip Code 77802
Phone Number (979)846-4384 Fax Number (979)846-1461
PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple
owners):
Name Smiling Mallard Development,Ltd. E-mail travis@clarkewyndham.com
Street Address 3608 East 29th Street,Suite 100
City Bryan State Texas Zip Code 77802
Phone Number (979)846-4384 Fax Number (979)846-1461
ARCHITECT OR ENGINEER'S INFORMATION:
Name McClure&Browne Engineering,Inc. E-mail leffr@mcclurebrowne.com
Street Address 1008 Woodcreek Drive,Suite 103
City College Station State Texas Zip Code 77845
Phone Number (979)693-3838 Fax Number (979)693-2554
1/11 Page 1 o
45
Total Acreage 36.36 Total No.of Lots 19 R-O-W Acreage 4.18
Number of Lots By Zoning District n/a / n/a n/a I n/a n/a ! n/a
Average Acreage Of Each Residential Lot By Zoning District:
n/a I n/a n/a / n/a n/a I n/a n/a ! n/a
Floodplain Acreage 0.00
NOTE: Appropriate zoning for the proposed subdivision must be in place before this application can be
considered complete.
Are you proposing to dedicate park land by acreage or fee in lieu of land?n/a
Are you proposing to [develop the park r dedicate the development fee?(Check one)
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance.Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s)and you are requesting the
application be reviewed under previous ordinance as applicable?
r'Yes
F-No
If yes,provide information regarding the first approved application and any related subsequent applications(provide
additional sheets if necessary):
Project Name:Indian Lakes Subdivision
City Project Number(in known):unknown
Date/Timeframe when submitted: 2000
Requested wavier to subdivision regulations and reason for same(if applicable):
a
Page 2 of 6
46
Regarding the waiver request,explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
a
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
ri/a
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area,or to the City in administering subdivision regulations.
a
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
a
Fee in lieu of sidewalk construction is being requested because of the following condition(if applicable):
1. r An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way;
2. F_The presence of unique or unusual topographic,vegetative,or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. r A capital improvement project is imminent that will include construction of the required sidewalk.Imminent shall
mean the project is funded or projected to commence within twelve(12)months;
4. F_ Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate/
rural context;
5. F-When a sidewalk is required along a street where a multi-use path is shown on the Bicycle,Pedestrian,and
Greenways Master Plan;
1111 Page 3 of 6
47
6. r The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO;or
7. r The proposed development contains frontage on a Freeway/Expressway as designated by Map 6.6,
Thoroughfare Plan-Functional Classification,in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
n/a
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning&Zoning Commission.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE
OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from
the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If
the owner is a company, the application must be accompanied by proof of authority for the company's
representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also
considered owners and the appropriate signatures must be provided as described above.
���
s,
Signature and title Date
1117 Page 4 of 6
48
CITY ON CO)JJ?GT',STA'T'ION
Home of Te A&M U i—iry'
PRELIMINARY PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
❑X Drawn on 24"x 36"sheet to scale of 100'per inch or larger. Include the words"PRELIMINARY PLAN-
NOT FOR RECORD"in letters 1/2"high.If more than 1 sheet,an index sheet showing entire subdivision
at a scale of 500 feet per inch or larger.
❑X Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
❑X Title Block with the following information:
❑X Name and address of subdivider,recorded owner,engineer and surveyor.
❑X Proposed name of subdivision (subdivision name & street names will be approved
through Brazos County 911).
0 Date of preparation (including the date the plat was submitted and the dates of any
revisions on the plat).
❑X Engineer's scale in feet.
❑X Total area intended to be developed.
�X North Arrow.
❑X Location of current city limit lines and current zoning district boundary. The appropriate zoning district(s)
must be in place for the proposed land uses before the application for a subdivision.
❑X Subdivision boundary indicated by heavy lines. Boundary must include all of parent tract.
�X Descriptions by metes and bounds of the subdivision which shall close within accepted land survey
standards. (Labeled on boundary lines,not separate metes and bounds description.)
❑X Primary control points or descriptions and ties to such control point, to which , later, all dimensions,
angles, bearings, block numbers, and similar data shall be referred. The plat shall be located with
respect to a corner of the survey or tract,or an original corner of the original survey of which it is a part.
❑X Name of contiguous subdivisions and names of owners of contiguous parcels of unsubdivided land,and
an indication whether or not contiguous properties are platted.
❑X Location of the 100 Year Floodplain and Floodway,if applicable,according to the most recent available
data.
❑X Topographic information,including contours at two foot(2 ft.)intervals,wooded areas,and flowline
elevation of streams.
❑X Proposed land uses(in compliance with existing zoning district).
❑X The location and description with accurate dimensions, bearings or deflection angles and radii, area,
center angle, degree of curvature, tangent distance and length of all curves for all of the following:
(Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with
the subdivision,as well as,those within the subdivision).
11f Page 5 of 6
49
JX w
CL V a FI . <x
UJ
�77
Y a
W ax< a m i t z
LL
z
CL Z a
U �
O �g
J �£
o
d
— W
^�� .I `"o,�•�6'M er.st.s - E._ a°'a i�a a Q
II41
-- ` •"
LL
1 � �# �� SII f-- �a' 3I �• - \y� rn
ao ' tea, z
UJI
502-49"�9-E-ST5.R' 5 I S @1 /� 4
��< T
- ..KW.mama Axs-- `mac' - � F• S I SSS I gill U
max¢ � am` �-uo �., 3 tiQ-9.>•'` /�$� 1 ,. 4
8 oar..
4
1-77
r
If
LU
I
J
m v�
�`8 mom• $�- / ryas#\\\\ ;�'�p�'+ �� -
�/� -
_ z
IQ AoJ
Z
l J
-zi
W
I a
�y123�d=$ogff o� Rig
564
WWW sW - a, g s .IRo s
9 � a S j $_ glgg 1 '. am ,
-'J'1111111:11-2 '
Rg 11110��
s �
W ,j $ y H as all .o���Po a �_ �_ m_
CITY OF COLLEGE STATION
Home of Texas Ad-M University'
REZONING REQUEST
for
Bridgewood & Barron Crossing
13-00900077
REQUEST: R-1 Single-Family Residential and A-O Agricultural Open to PDD
Planned Development District
SCALE: 75.07 acres
LOCATION: Robert Stevenson Survey, Abstract No. 54, College Station,
Brazos County, Texas, recorded in Volume 6985, Page 42, of the
Official Records of Brazos County, Texas, more generally located
south of William D. Fitch between Barron Road and Victoria
Avenue.
APPLICANT: Natalie Ruiz, IPS Group
PROJECT MANAGER: Teresa Rogers, Staff Planner
trogers@cstx.gov
PROJECT OVERVIEW: The Comprehensive Plan designates this area as Restricted
Suburban and located in Growth Area IV. In general, growth
areas are located in greenfields and are intended to allow land
use flexibility when coupled with higher design standards. Growth
Area IV is intended for less intense suburban activities. Cluster
development may be utilized when a large portion (15% or more)
of the overall area is retained for open space. In addition,
suburban commercial and townhouse uses are permitted in
planned developments of at least 30 acres.
This request proposes approximately 58 acres of clustered single-
family residential development with the provision of a minimum 8
acres of open space. The maximum gross density is 4 dwelling
units per acre. Average lots sizes will be 8,000 square feet, with
an absolute minimum lot size of 6,500 square feet. In addition,
approximately 9 acres of townhouses and 5 acres of suburban
commercial, with an estimated total of 45,000 square feet, are
proposed.
Planning &Zoning Commission Page 1 of 8
July 18, 2013
51
RECOMMENDATION: Staff recommends approval of the proposed PDD with the
condition pedestrian access is provided from the R-3 Townhouse
development to the open space area and right turn deceleration
lanes be provided for the Suburban Commercial portion of the
project on connections to William D. Fitch Parkway. The specific
location and design of deceleration lanes will be determined at site
planning and must meet TxDOT permitting requirements. Staff
realizes block length requirements have not been met for the
Restricted Suburban portion of the development; however in order
to meet block length a connection would be necessary to a limited
access road or through the shared open space. Therefore, staff
does not feel block length requirements must be met in these
locations, given the unique concept of this PDD.
Planning &Zoning Commission Page 2 of 8
July 18, 2013
52
LLk ° Ur
ti o r y a� 0
�. ❑ O m C N
W
o
L�N�{
tr- LL`�- 1 Z C p O C O O
j
i0 IFS d 55 N
AN C
LLO N 61 N
Q
4 e+,. 0 1 1 1 d
bo-
C �m� Hie,na d— do �ZZZO LY
all,
o a I01 O
„"�Q yb'ONn `��'7 v M
er
i � E
La
E Z1. IDS �
1 r�'
EEL 0-0
0v �� ❑
_al 91 O N tg O
G� LL J U E Q d
W
CA
O
Z
g1Shl pR�Q j >.s Q
in
1i d
e ¢ _ E uo
ES co
S cq
-44 o
OT
r�vmr- w
1 1 1 1 U_ W
Q f� t7U >
q� W
�O cr
z
J�
W
OCG o
CL
��e ~ O
Od ,GP W c � EEw
w LL
ti y
n�
141 � vmL
"k
O %,
11
oye o6 �
777 1 1
Planning &Zoning Commission Page 3 of 8
July 18, 2013
53
NOTIFICATIONS
Advertised Commission Hearing Date: July 18, 2013
Advertised Council Hearing Dates: August 8, 2013
The following neighborhood organizations that are registered with the City of College Station's
Neighborhood Services have received a courtesy letter of notification of this public hearing:
Castlegate HOA
Property owner notices mailed: 30
Contacts in support: None
Contacts in opposition: None
Inquiry contacts: 3
ADJACENT LAND USES
Direction Comprehensive Plan Zoning Land Use
North General Suburban, R-1 Single-Family Residential, Single-Family and
Natural Areas - Reserved, A-O Agricultural Open, and C- vacant
and Urban 3 Light Commercial
South Restricted Suburban and R-1 Single-Family Residential Single-Family and
Estate and A-O Agricultural Open vacant
East Restricted Suburban PDD Planned Development Single-Family
District
West Suburban Commercial C-3 Light Commercial vacant
DEVELOPMENT HISTORY
Annexation: June 1995
Zoning: A-O Agricultural Open upon annexation
R-1 Single-Family Residential in May 2008
Final Plat: Unplatted
Site development: Vacant
Planning &Zoning Commission Page 4 of 8
July 18, 2013
54
REVIEW CRITERIA
1. Consistency with the Comprehensive Plan: The subject tract is designated Restricted
Suburban on the Comprehensive Plan Future Land Use and Character Map and is also
located in Growth Area IV. In general, growth areas are located in greenfields and are
intended to allow land use flexibility when coupled with higher design standards. Growth
Area IV is intended for less intense suburban activities and cluster development may be
utilized when a large portion (15% or more) of the overall area is retained for open space. In
addition, suburban commercial and townhouse uses are permitted in planned developments
of at least 30 acres. The proposed development is consistent with the allowable land uses
for Growth Area IV and also with surrounding land use designations.
2. Compatibility with the present zoning and conforming uses of nearby property and
with the character of the neighborhood: The proposed PDD will enable the development
of clustered Restricted Suburban uses, named Bridgewood Subdivision, closest to the
existing Castlegate Subdivision. Lot sizes will average 8,000 square feet and will be similar
to those of the adjacent Castlegate Subdivision. In addition, open space will be provided
within the development to offset gross density requirements of a maximum of four units per
acre. Townhouse and suburban commercial uses will be located in Barron Crossing
Subdivision and are proposed along the western side of the property, closer to Barron Road,
and will provide a transition for the existing residential areas to William D. Fitch Parkway.
3. Suitability of the property affected by the amendment for uses permitted by the
district that would be made applicable by the proposed amendment: The proposed
land uses permitted through this PDD include those allowed in R-1 Single-family, R-3
Townhouse, and SC Suburban Commercial. The SC Suburban Commercial zoning district
is intended for neighborhood-oriented commercial uses that will have residential-style
architecture. The Suburban Commercial zoning district, along with the residential uses, are
suitable adjacent to single-family and appropriate given the close proximity of William D.
Fitch Parkway and the future W.S. Phillips Parkway.
4. Suitability of the property affected by the amendment for uses permitted by the
district applicable to the property at the time of the proposed amendment: The
property is currently zoned R-1 Single-Family Residential and A-O Agricultural Open. The
current zoning district is suitable for the property given the similar zonings and uses of
nearby subdivisions. The tract narrows between William D. Fitch Parkway and future W.S.
Phillips Parkway and this area is less suitable for single-family detached residences.
5. Marketability of the property affected by the amendment for uses permitted by the
district applicable to the property at the time of the proposed amendment: The
property can currently be marketed under the existing R-1 Single-Family zoning. However,
the applicant has stated, "the marketability of the narrow strip of property between State
Highway 40 and W.S. Phillips Parkway is not feasible."
6. Availability of water, wastewater, stormwater, and transportation facilities generally
suitable and adequate for the proposed use: There is an existing 12-inch water main to
the northwest on Barron Cut-Off Road, which will need to be extended to and through the
property to provide water service. There is also an existing 15-inch sanitary sewer main
traversing the tract that currently has adequate capacity in the downstream system to
accommodate the proposed use. Drainage and other public infrastructure required with site
development shall be designed and constructed in accordance with the BCS Unified Design
Guidelines. Existing infrastructure, with the exception of the referenced water main
extension, appears to be adequate for the proposed use at this time. Access to the site will
be available via William D. Fitch Parkway and Barron Cut-Off Road. When the proposed
development proceeds through the platting process, construction of portions of W.S. Phillips
Parkway will be required in order for the site to be in compliance with the Thoroughfare
Plan. All proposed driveways or streets to William D. Fitch Parkway will require approval
from the Texas Department of Transportation.
Planning &Zoning Commission Page 5 of 8
July 18, 2013
55
REVIEW OF CONCEPT PLAN
The applicant has provided the following information related to the purpose and intent of the
proposed zoning district:
"To develop a sustainable mix of commercial and residential land uses in a
growth area of the City in compliance with the City's Comprehensive Land Use
Plan and Character Designations."
The proposed Concept Plan includes uses permitted through R-1 Single-Family, R-3
Townhouse, and SC Suburban Commercial. The suburban commercial portion of the
development will follow all requirements of SC Suburban Commercial zoning district and have
an estimated building plot square footage of 45,000 square feet. The townhouse portion of the
development will follow all requirements of R-3 Townhouse. Bridgewood Subdivision base
zoning district will be R-1 Single-Family Residential and will follow additional requirements
specified in the Concept Plan that have been provided by the applicant based on the guidance
of the Comprehensive Plan and the proposed RS Restricted Suburban zoning district.
Bridgewood is proposed as a cluster development with a maximum gross density of four units
per acre, average lot size of 8,000 square feet, and absolute minimum lot size of 6,500 square
feet. In order to offset clustered houses a minimum of 8 acres of open space is proposed.
Base Zoning and Meritorious Modifications
At the time of plat and site plan, the project will need to meet all applicable site development
standards and platting requirements of the UDO for the R-1 Single-Family, R-3 Townhouse, and
SC Suburban Commercial zoning classifications, except where meritorious modifications are
granted with the PDD zoning. The applicant is requesting the following meritorious modification:
1. UDO Section 12-8.3.G.2 "Blocks"
According to subdivision regulations, block lengths shall not exceed 1,200 linear feet in
Restricted Suburban designations of the Comprehensive Plan Future Land Use and
Character Map. When a block exceeds this length, an additional street is required to
reduce the length of the block. Block length is required to be broken by the extension of
a public street or a public way. The applicant is requesting modification of this
requirement for Bridgewood Subdivision and feels "the minimum block length of 1,200
feet cannot be met given the lack of connectivity provided in the existing abutting
Castlegate Subdivision and the existing creek area that bisects the property." While
there are opportunities to meet block length along William D. Fitch Parkway, this is a
limited access road. In addition, block length could also be met by connecting Barron
Crossing Subdivision (townhouse development) to the Bridgewood Subdivision, but this
would cause a street to cut through the proposed open space area that is central to the
development. In this case, staff believes there is merit to justify the modification based
on the unique concept of this PDD.
The Unified Development Ordinance provides the following review criteria for PDD
Concept Plans:
1. The proposal will constitute an environment of sustained stability and will be in
harmony with the character of the surrounding area: The proposed development will consist
of residential and suburban commercial land uses that are compatible with the surrounding
neighborhoods. The SC Suburban Commercial district requires structures utilized materials and
designs commonly found within residential areas. Under the SC Suburban Commercial zoning
district each building is required by ordinance to provide architectural relief elements.
Planning &Zoning Commission Page 6 of 8
July 18, 2013
56
2. The proposal is in conformity with the policies, goals, and objectives of the
Comprehensive Plan, and any subsequently adopted Plans, and will be consistent with
the intent and purpose of this Section: The Concept Plan reflects the policies, goals and
objectives of the Comprehensive Plan as it relates to land use and character, connectivity, and
neighborhood integrity, with the addition of the stated staff conditions. The development
proposes land uses allowed for this growth area through the Comprehensive Plan. Upon
platting, the subject property will be required to provide additional right-of-way and build portions
of W.S. Phillips Parkway in compliance with the Thoroughfare Plan.
3. The proposal is compatible with existing or permitted uses on abutting sites and will
not adversely affect adjacent development: The proposed PDD will enable the development
of clustered Restricted Suburban uses, named Bridgewood Subdivision, closest to the existing
Castlegate Subdivision. Lot sizes will be compatible to those of the adjacent subdivisions. In
addition, open space will be provided within the development to offset gross density
requirements of a maximum of four units per acre. Townhouse and suburban commercial uses
will provide a transition for the existing residential areas to William D. Fitch Parkway.
4. Every dwelling unit need not front on a public street but shall have access to a public
street directly or via a court, walkway, public area, or area owned by a homeowners
association: At the time of platting, all residential units will be required to comply with
subdivision regulations regarding access.
5. The development includes provision of adequate public improvements, including, but
not limited to, parks, schools, and other public facilities: At the time of platting and site
planning the development will be required to meet all city regulations. When the proposed
development proceeds through the platting process, construction of portions of W.S. Phillips
Parkway will be required in order for the site to be in compliance with the Thoroughfare Plan.
All proposed driveways to William D. Fitch Parkway will require approval from the Texas
Department of Transportation.
6. The development will not be detrimental to the public health, safety, welfare, or
materially injurious to properties or improvements in the vicinity: This development will
not be detrimental to the public health, safety, welfare, or materially injurious to properties or
improvements in the vicinity.
7. The development will not adversely affect the safety and convenience of vehicular,
bicycle, or pedestrian circulation in the vicinity, including traffic reasonably expected to
be generated by the proposed use and other uses reasonably anticipated in the area
considering existing zoning and land uses in the area: This development will not adversely
affect the safety and convenience of vehicular, bicycle, or pedestrian circulation in the vicinity if
the proposed staff condition to provide a pedestrian connection from the townhouse use to the
open space is added to the Concept Plan. A traffic impact analysis was required. Potential
impacts to the transportation network were diminished with the decrease in the intensity of land
uses, which was part of the final maximum land use density recommendation. However, based
on trip generation of the Suburban Commercial portion of the project, at site planning the
applicant will be required to provide right turn deceleration lanes on connections to William D.
Fitch Parkway in the suburban commercial portion of the project and meet TxDOT permitting
requirements.
Planning &Zoning Commission Page 7 of 8
July 18, 2013
57
STAFF RECOMMENDATION
Staff recommends approval of the proposed PDD with the condition pedestrian access is
provided from the R-3 Townhouse development to the open space area and right turn
deceleration lanes be provided for the Suburban Commercial portion of the project on
connections to William D. Fitch. The specific location and design of deceleration lanes will be
determined at site planning and must meet TxDOT permitting requirements. Staff realizes block
length requirements have not been met for the Restricted Suburban portion of the development;
however in order to meet block length a connection would be necessary to a limited access road
or through the shared open space. Therefore, staff does not feel block length requirements
must be met in these locations, given the unique concept of this PDD.
SUPPORTING MATERIALS
1. Application
2. Rezoning Map
3. Concept Plan
Planning &Zoning Commission Page 8 of 8
July 18, 2013
58
1
ht FOR OFFICE USE ONLY
CASE NO.: 1
DATE SUBMITTED: +
CITY OF COLLEGE;STATION TIME:
Home of Texas A6-M University' STAFF:
ZONING MAP AMENDMENT (REZONING) APPLICATION
PLANNED DISTRICTS
(Check one) (`51,165) Planned Development District(PDD)
E] ($1,165) Planned Mixed-Used Development(P-MUD)
❑ ($315) Modification to Existing PDD or P-MUD Amendment-Planning &Zoning Commission and
City Council Review
Please use Concept Plan Minor Amendment Application for minor amendments as per Section 3.4.J of the UDO.
MINIMUM SUBMITTAL REQUIREMENTS:
U $315- 1,165 Rezoning Application Fee.
application completed in full. This application form provided by the City of College Station must be used and
,may not be adjusted or altered. Please attach pages if additional information is provided.
raffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request.
One(1)copy of a fully dimensioned Rezoning Map on 24"x36"paper showing:
a. Land affected;
b. Legal description of area of proposed change;
c. Present zoning;
d. Zoning classification of all abutting land; and
All public and private rights-of-way and easements bounding and intersecting subject land.
Written legal description of subject property (metes & bounds or lot & block of subdivision, whichever is
.gpplicable).
[ A CAD(dxf/dwg)-model space State Plane NAD 83 or GIS (shp)digital file(e-mailed to
rSDigital&brnittal@cstx.gov).
ie een (14)copies of the Concept.Plan on 24"x36"paper in accordance with Section 3.4.D of the UDO.
,, One(1)copy of the Concept Plan on 8.5"x11"paper in accordance with Section 3.4.1)of the UDO.
w.
V The attached Concept Plan checklist with all items checked off or a brief explanation as to why they are not
checked off.
NOTE: If a petition for rezoning is denied by the City Council, another application for rezoning shall not be filed
within a period of 180 days from the date of denial, except with permission of the Planning&Zoning Commission.
Date of Optional Preapplication Conference
NAME OF PROJECT Barron Crossing&Bridgewood Subdivisions
ADDRESS William D..Fitch Parkway(State Highway 40)-2985 Barron Cut-Off Road
LEGAL DESCRIPTION (Lot, Block, Subdivision) Tract 7 of the Robert Stevenson Survey, Abstract 54
GENERAL LOCATION OF PROPERTY IF NOT PLATTED:
Located along the south side of William D. Fitch Parkway(State Highway 40)just east of the Barron Road intersection.
TOTAL ACREAGE 75.07 acres
10/10 Page 1 of 7
59
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Natalie Ruiz, Principal of IPS Group E-mail natalie@ipsgroup.us
Street Address 511 University Drive East, Suite 204
City College Station State Texas _ Zip Code 77840
Phone Number 979.846.9259 Fax Number 979.260.3564
PROPERTY OWNER'S INFORMATION:
Name Randy French, President of BCS Development Company E-mail rfrench@stylecraftbuilders.com
Street Address 4090 State Highway 6 South
City College Station —State Texas Zip Code 77845
Phone Number 979.690.1222 Fax Number
OTHER CONTACTS(Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.):
Name J. Dale Browne, McClure&Browne Engineering E-mail daleb@mcclureandbrowne.com
Street Address 1008 Woodcreek Drive, Suite 103
City College Station State Texas Zip Code 77845
Phone Number 979.693.3838 Fax Number
This property was conveyed to owner by deed dated October 13, 2005 _and recorded in Volume 6985 , Page 42
of the Brazos County Official Records.
Existing Zoning R-1 and A-0 Proposed Zoning PDD-Planned Development District
Present Use of Property Vacant
Proposed Use of Property Residential Subdivision and Suburban Commercial Subdivision
Proposed Use(s)of Property for PDD, if applicable:
Proposed uses are found in the base zoning districts of R-1 Single Family Residential and SC Suburban Commercial.
P-MUD uses are prescribed in Section 6.2.C. Use Table of the Unified Development Ordinance.
If P-MUD:
Approximate percentage of residential land uses: N/A
Approximate percentage of non-residential land uses: N/A
REZONING SUPPORTING INFORMATION
1. List the changed or changing conditions in the area or in the City which make this zone change necessary.
The development potential of the area and the current market demands for single family residential and suburban
commercial land uses. Public infrastructure investments including State Highway 40, Victoria Avenue and the new
College Station High School have created demand for new residential and supporting commercial land uses in the
area.
10/10 Page 2 of 7
60
2. Indicate whether or not this zone change is in accordance with the Comprehensive Plan. If it is not, explain why the
Plan is incorrect.
The zone change is in compliance with the City's Comprehensive Plan. The land use plan shows the property as
restricted suburban. The extension of W. S. Phillips Parkway parallel to State Highway 40 creates a triangular-
shaped property more suitable for suburban commercial land uses. The proposed PDD provides for single family
homes and supporting suburban commercial land uses.
3. How will this zone change be compatible with the present zoning and conforming uses of nearby property and with
the character of the neighborhood?
The PDD zoning is compatible with the present zoning and conforming land uses of nearby properties. The
attached Concept Plan provides for single family land uses adjacent to the single family homes in the Castlegate
Subdivision. Suburban Commercial land uses are concentrated along State Highway 40 near the Barron Road
intersection and bound by the future W. S. Phillips Parkway.
4. Explain the suitability of the property for uses permitted by the rezoning district requested.
The single family and suburban commercial land uses are suitable for the subject property and in compliance with
the City's Comprehensive Plan. The base zoning district for the commercial land uses is Suburban Commercial
that was created to be within close proximity to single family homes.
5. Explain the suitability of the property for uses permitted by the current zoning district.
The property is suitable for existing single family and agricultural land uses. However, given the extension of W. S.
Phillips Parkway, the narrow strip of property that remains is more appropriate for suburban commercial land uses.
6. Explain the marketability of the property for uses permitted by the current zoning district.
Single family land uses are appropriate for the subject property and are incorporated into this PDD request.
However; the marketability of the narrow strip of property between State Highway 40 and W. S. Phillips Parkway is
not feasible. Suburban Commercial land uses in this area are much more marketable given the amount of
resincto.d suburban development in the area.
7. List any other reasons to support this zone change.
The PDD request is in compliance with the City's Comprehensive Plan.
10/10 Page 3 of 7
61
8. State the purpose and intent of the proposed development.
See attached.
CONCEPT PLAN SUPPORTING INFORMATION
1. What is the range of future building heights?
Building heights have been limited to the regulations of the base zoning districts-R-1 Single Family Residential,
R-3 Townhomes and SC Suburban Commercial.
2. Provide a general statement regarding the proposed drainage.
The storm water drainage from this site will be collected internally between the Bridgewood Subdivision and Barron
Crossing and stored within a retention or detention pond. Storm water requirements will be in accordance with the
B/CS Unified Stormwater Design Guidelines.
3. List the general bulk or dimensional variations sought.
See attached concept plan-minimum block length requirements of 1200'in the Restricted Suburban portion of the
concept plan.
4. If variations are sought, please provide a list of community benefits and/or innovative design concepts to justify the
request.
The minimum block length requirements cannot be met on the residential portion of the subject property given
existing physical limitations. The abutting Castlegate Subdivision to the east does not provide any extensions or
possible connections. To the west of the residential area is a natural open space and drainage area.
s nm n Pnnn d of 7
62
5. Explain how the concept plan proposal will constitute and environment of sustained stability and will be in harmony
with the character of the surrounding area.
The concept plan and proposed land uses are compatible with the surrounding area. The Plan provides for single
family land uses adjacent to the single family homes in the Castlegate Subdivision. Suburban Commercial land
uses are concentrated along State Highway 40 near the Barron Road intersection and bound by the future W. S.
Phillips Parkway.
6. Explain how the proposal is in conformity with the policies, goals, and objectives of the Comprehensive Plan.
The concept plan and proposed land uses are in conformance with the policies, goals and objectives of the
Comprehensive Plan including the Land Use Plan.
i
7. Explain how the concept plan proposal is compatible with existing or permitted uses on abutting sites and will not
adversely affect adjacent development.
The Concept Plan is compatible with the present zoning and conforming land uses of nearby properties. The Plan
provides for single family land uses adjacent to the single family homes in the Castlegate Subdivision. Suburban
Commercial land uses are concentrated along State Highway 40 near the Barron Road intersection and bound by
the future W. S. Phillips Parkway.
8. State how dwelling units shall have access to a public street if they do not front on a public street.
All dwelling units have access to a public street.
g. State how the development has provided adequate public improvements, including, but not limited to: parks, schools,
and other public facilities.
Adequate provision of public facilities and improvements are proposed and in compliance with the City's codes and
ordinances.
10/10 Page 5 of 7
63
10. Explain how the concept plan proposal will not be detrimental to the public health, safety, or welfare, or be materially
injurious to properties or improvements in the vicinity.
The Concept plan will not be detrimental to the public health, safety or welfare. The proposed commercial and
residential developments will comply with all City codes and ordinances except for the meritorious modification to
side setback requirements.
11. Explain how the concept plan proposal will not adversely affect the safety and convenience of vehicular, bicycle, or
pedestrian circulation in the vicinity, including traffic reasonably expected to be generated by the proposed use and
other uses reasonable anticipated in the area considering existing zoning and land uses in the area.
The Concept Plan will not adversely affect the safety and convenience of pedestrian traffic. The Plan provides for
the extension of W. S. Phillips Parkway.
Please note that a "complete site plan" must be submitted to Planning & Development Services for a formal review after
the "concept plan" has been approved by the City Council prior to the issuance of a building permit- except for single-
family development.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true,
correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application
must b companied by proof of authority for the company's representative to sign the application on its behalf.
4
Signa ure an le Date
10/10 Page 6 of 7
64
✓ � 1 ti '�� z c
� m
- - - -------------------- ---
-------------------------~ ----------------,-
-
177
fit
I
� I I
•� 11
ddpp' �i
r�
�I
070/NO2fb'b'g "'—'---
`7/2'
K9
In
1A mm
-12
----------------
2ru 2
VZ
1-4
k-I
Li
Q
(*b
CITE"CJI CO1.I.I?GI STATION
Home of Texas A&M Universio,'
1101 Texas Avenue, PO Box 9960
College Station,Texas 77842
Phone 979.764.3570/ Fax 979.764.3496
MEMORANDUM
DATE: July 18, 2013
TO: Members of the Planning &Zoning Commission
FROM: Donald E. Harmon,Jr., PE, PMP
Assistant Director
Public Works Department
SUBJECT: Capital Improvements Program Recommendation
Item: Presentation, discussion, and possible action regarding a recommendation to the City Council on
Capital Improvement Program Projects.
On an annual basis, the City of College Station prepares a five-year Capital Improvements Program (CIP).
The CIP is presented for City Council review as part of the annual budget process.The program
consolidates all anticipated capital needs for which funding authorization exists.With oversight of the
Comprehensive Plan, the Planning and Zoning Commission makes a recommendation to the City Council
regarding the proposed CIP.The proposed CIP will be presented at the meeting.
67
(Ai
*Arq"
CITY OF COLLEGE STATION
FINAL PLAT
OF
Oak Terrace Addition Second Revision Lot 1 R, Block 9 & Lot 1 R, Block 12
BEING A REPLAT OF
Oak Terrace Addition Second Revision All of Blocks 9 and 10, Lots 1-10, Block 12,
former Milam Avenue right-of-way, and former Culpepper Drive right-of-way
12-00500246
SCALE: Two lots on 13.833 acres
LOCATION: 900 and 901 Cross Street
ZONING: NG-3 Residential Northgate
(N/A, owned by Texas A&M University System)
APPLICANT: Rabon Metcalf, RME Consulting Engineers
PROJECT MANAGER: Jason Schubert, AICP, Principal Planner
jschubert@cstx.gov
PROJECT OVERVIEW: On February 14, 2013, the Council conditionally approved the
abandonment of Milam Avenue, part of Culpepper Drive, and
some public utility easements. This replat consolidates two blocks
of property and former Milam Avenue and Culpepper Drive into
one lot and 10 lots of another block into a second lot. The
abandonment conditions include reconstructing two streets to
Northgate standards: Cross Street as a minor collector between
South College Avenue and Dogwood Street and Culpepper Drive
as a local street between Cross Street and the Culpepper property
to the south. Also conditioned are the relocation of water, sanitary
sewer, and electrical lines among other items.
RECOMMENDATION: Staff recommends approval of the Final Plat.
Planning &Zoning Commission Page 1 of 3
July 18, 2013
68