Loading...
HomeMy WebLinkAbout1984-1545 - Ordinance - 08/23/1984ORDINANCE NO. 1545 AN ORDINANCE DECLARING THE NECESSITY FOR THE CONSTRUCTION OF A PORTION OF GREENS PRAIRIE ROAD IN THE CITY OF COLLEGE STATION, PROVIDING THAT THE ABUTTING PROPERTY OWNERS ON SAID PORTION SO CONSTRUCTED BE ASSESSED A SHARE OF THE EXPENSE, PROVIDING FOR A PUBLIC HEARING, AND PROVIDING A SAVING CLAUSE IN THE EFFECTIVE DATE. WHEREAS, the City Council hereby declares the necessity for the construction of a portion of Greens Prairie Road in the City of College Station, Texas, by raising, grading, filling the same, installing paving and drainage structures, as provided in the plans, with necessary incidentals and appurtenances, at the location described as follows in that portion of Greens Prairie Road from its intersection at Texas Avenue eastward 5300 feet, all as is shown on the plat attached hereto as Exhibit A. NOW, THEREFORE, be it ordained by the City Council of the City of College Station: That the property owners of the abuttinG property on said portion of said street to be improved and constructed be assessed a proportionate cost of said improvements, same to be on a per linear foot basis for pavinG and drainage structures. The cost of the paving and drainage structures is to be shared by the property owners and the City in proportion provided by law. Notice shall be given by advertisement inserted at least three (3) times in a newspaper published in the City as required by Article 1105-b of the Texas Revised Civil Statutes of a public hearing to be had on the ordinance providing for such improvements to be made and assessing property owners and fixing a lien against the abutting property to cover the cost of said improvements. II. This ordinance shall be cumulative of all ordinances in the City of College Station, Texas; and in the event of any conflict with any prior ordinance, the terms and provisions of this ordinance shall be controlling. O 3S8 ORDINANCE NO. 1545 III. This ordinance shall become effective and be in full force and effect from and after its passage and approval by the City Council and duly attested by the Mayor and City Secretary, 19 84. Attest: PASSED AND APPROVED this the 23rd day of August City Se~r~gtary -2- WALTON A&:Y:K]t?IAT March 26, 1984 Mr. David Pullen C~ty Engineer City of College Station P. O. Box 9960 College Station, Texas 77840 RE' Greens Prairie Road Project Dear David: Attached is your requested estimated cost breakdown by Phases for the referenced project. As shown in the Attachments, the estimated cost breakdown is as follows: Phase I $ 541,467 Phase II 448,61 9 Phase III 125,651 TOTAL $1,115,737 Phase I costs are high due to the fact that the majority of project excavation occurs in Phase I, and four of the eight culverts designed for the project are located within Phase I boundaries. Please call me if you have any questions. ely, D. Blaschke, P.E. JDB/jr Attachments 1722 Broadmoor · Sufle 110 · Bryan Texas 77802 · 409~779-3144 C,v,i · EI~.F'rr,caJ · Mechanical · S,ructur'~l · cJa,F.,y · T~rl_S,p..o,~t~tJon GREENS PRAIRIE ROAD COST ESTIMATE PHASE I Excavation and Roadbed Preparation 46,061 CY.x $3.50/CY Crushed Limestone Base Main Lanes (12" Base) 27 ftx 5r300 ft ($10.O0/yd2) 9 ft2/yd2 Shoulders (6" Base) 18 ft x 5t300 ft ($5.00/yd2) g ftZ/yd2 Lime Stabilization Roadway (6" Depth) 27 ftx $~300 ft ($2.20/yd2) 9 ftg/yd2 Under Culverts (6" Depth) 3.440 ft2 ~ ($2'20/yd~) Pavement Surface 25 ftx 5~300 ft g ftZ/ydZ ($6.00/yd2) Shoulders (T~o-course Surface Treatment) 20 ft x 5m300 ft ($o. gO/yd2) 9 ftZ/yd2 Structure No. 1 (Complete and in Place) Structure No. 2 (Complete and in Place) Structure No. 3 (Complete and in Place) Structure NO. 4 (Complete and in Place) Oelineators $7.50 Striping Raised Pavement Markers 80 x $4.00 $161,214 $159,000 $ 53,000 $ 34,980 $ 841 88,333 $ 10,600 $ 6,578 $ 5,140 $ 6,320 $ 14,711 $ 150 $ 280 $ 32O TOTAL ESTIMATED COST (PHASE 1) $541,467 0zl,331 GREENS PRAIRIE ROAD COST ESTIMATE PHASE II Excavation and Roadbed Preparation 420 C¥ x $3.50/CY Crushed Limestone Base Main Lanes (12" Base) 27 ft x 2r300 ft ($10.O0/yd2) 9 ftg/ydg Shoulders (6" Base) 18 ft x 2r300 ft ($5.00/yd2) g ft2/yd2 Lime Stabilization Roadway (6" Depth) 27 ftx 2~300 ft ($2.20/yd2) 9 ft2/yd2 Under Culverts (6" Depth) ~ ($2.20/yd2) 9 ft'/yd~ Pavement Surface 25 ftx 2~300 ft 9 ftg/yd2 ($6.00/yd2) Shoulders (Two-Course Surface Treatment) 20 ft x 2)300 ft ($O. gO/yd2) g ft2/yd2 Structure No. 5 (Bridge) (Complete and in Place) Structure No. 6 (Complete and in Place) Structure No. 7 (Complete and in Place) Structure No. 8 (Complete and in Place) Structural Excavation 2,300 C¥ x $3.50/C¥ Delineators 6 x $7.50 Striping Raised Pavement Markers 20 x $4.00 $ 1,470 $ 69,000 23,000 $ 15,180 $ 880 $ 38,333 $ 4,600 $231,695 $ 20,1 96 $ 20,1 96 $ 15,814 $ 8,050 $ 45 $ 8O $ 80 TOTAL ESTIMATED COST (PHASE II) $448,61 9 GREENS PRAIRIE ROAD COST ESTIMATE PHASE III Excavation and Roadbed Preparation 9,619 CY ~ $3.50/C¥ Crushed Limestone Base Main Lanes (12" Base) 27 ft x 1~320 ft ($10.O0/yd2) 9 ftg/yd2 Shoulders (6" Base) 18 ftx 1,320 ft ($5.00/yd2) 9 ft2/yd2 Lime Stabilization Roadway (6" Depth) 27 ft x 1,320 ft 9 ft~/ydZ ($2.20/yd2) Under Culverts 460 ft2 ($2.20/yd2) Pavement Surface 25 ftx 1~320 ft 9 ft2/yd2 {$6.00/yd2) Shoulders 20 ftx 1~320 ft 9 ft2/yd2 ($0.90/yd2) Structure No. g (Complete and in Place) Delineators 10 x $7.50 Striping Raised Pavement Markers 60 x $4.00 $ 33,667 $ 39,600 $ 13,200 $ 8,712 $ llg $ 22,000 $ 2,640 $ 5,265 $ 75 $ 140 $ 240 TOTAL ESTIMATED COST (PHASE III) $125,651 333 $C4LE I"-' /MILE PROJE G T L 0 CA TION OT£XaS WON L D LOCATION MAP