HomeMy WebLinkAbout05-25-95-C-2 - Resolution - 05/25/1995q so[ution
N0.5-25-95-c-2
A RESOLUTION PRESCRIBING AN ASSESSMENT FOR GARBAGE
DISPOSAL IN THE CITY OF COLLEGE STATION, AND PROVIDING
FOR AN EFFECTIVE DATE.
BE IT RESOLVED by the City Council of the City of College Station that:
Pursuant to the provisions of Chapter 11, Section 5, of the City of College
Station Code of Ordinances, there shall be a monthly charge assessed
and collected from each person, firm or corporation within the city limits of
the City of College Station for garbage collection and disposal.
GENERAL RATE PROVISION
Except as otherwise provided in this resolution, the charges for garbage
collection and disposal shall be assessed according to the following
schedule:
User Applicable
Charge
Each single-family residential dwelling unit
utilizing a small automated refuse container
and provided with garbage, rubbish, brush
and recycling collection one weekly.
$11.20
Each single or multi-family residential
dwelling unit utilizing a commercial-type
automated refuse container and provided
with twice per week garbage collection and
once per week rubbish/brush collection.
$11.20
Additional monthly fee for residential
dwelling units having more than one
automated refuse container. This rate shall
be assessed for each additional container
utilized.
$ 8.00
Each multi-family residential dwelling unit
utilizing commercial-type refuse containers
for garbage collection only. Service will be
provided twice weekly.
$ 6.00
Resolution No. 5-25-9 5-c-2
Page 2
Places of business that can best be serviced
with a residential-type automated container
with twice per week collection, without
causing a health, sanitation or litter problem.
$48.40
Places of business that can best be serviced
by a large, commercial-type automated
container with twice per week collection,
without causing a health, sanitation or litter
problem.
$130.00
II.
RATES FOR USERS OF FRONT-END
LOADING CONTAINERS
The charges for garbage collection and disposal for places of business
that can best be served by front-end loading containers shall be assessed
based on container size, number of containers utilized and frequency of
collection per week, according to the following schedule:
Container Size
4 cubic yards
8 cubic yards
Frequency of
Collection
Monthly Charge
2 $140.00
3 $195.00
4 $210.00
5 $245.00
6 $280.00
2 $180.00
3 $23O.OO
4 $28O.OO
5 $33O.OO
6 $380.00
III.
ADDITIONAL CHARGES
The following additional charges will be assessed and collected upon the
performance of the described service or the occurrence of the described
use or condition:
Resolution No. 5-25-9 5-c-2
Page 3
Description
Additional fee for any location (other than
residential) where the container was blocked
and the collection vehicle must return to
provide service.
All roll-off container service per load plus
current per ton landfill charge.
Unprepared solid waste minimum charge.
Actual cost of clean up can be charged
pursuant to City of College Station
Ordinance No. 1845, approved March 22,
1990°
One to ten bags/per collection for places of
business requiring treated medical waste
collection
Charge
$15.00
$75.00
$50.00
$17.53
IV.
GENERAL PROVISIONS
The solid waste superintendent, or his representatives, shall be notified of
any new service locations or changes in service levels and will designate
the container(s) to be utilized. The superintendent can require changes
in service levels at any location when the current service is inadequate
and is causing a health, sanitation, or litter problem.
Payments must be received at the City utility office on or before the due
date to avoid late charges. Payment received after the due date will be
assessed a penalty equaling ten percent (10%) of the current month's
charges with a minimum charge of Three Dollars ($3.00).
The charges provided for in this resolution shall supersede all charges for
garbage collection and disposal set in any previous resolutions passed by
the City of College Station.
The charges set by this resolution that are applicable to each commercial
user shall be effective on the date that the commercial user converts to
front-end loading containers, which shall be either June 12, 1995, or June
26, 1995. All other charges set by this resolution shall be effective on
June 1, 1995.
Resolution No. 5-25-95-¢-2
Page 4
PASSED and APPROVED this 25t~day of
,1995.
APPROVED:
LARRY RINGE~o~''-~