HomeMy WebLinkAbout3-8-2007-2h - Resolution - 03/08/2007 RESOLUTION NO. 3 -8- 2007 -2h
i iliepr
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLLEGE STATION,
TEXAS, SELECTING A PROFESSIONAL CONTRACTOR, APPROVING A
PROFESSIONAL SERVICES CONTRACT AND AUTHORIZING THE EXPENDITURE
OF FUNDS FOR THE PARALLEL TRANSMISSION LINE PHASE 3 ENGINEERING
DESIGN AND CONSTRUCTION MANAGEMENT PROJECT.
WHEREAS, the City of College Station, Texas, solicited proposals for the engineering design
and construction management services; and
WHEREAS, the selection of Malcolm Pirnie, Inc is being recommended as the most highly
qualified provider of the Engineering Design and Construction Management services; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION,
TEXAS:
PART 1: That the City Council hereby finds that Malcolm Pirnie, Inc is the most highly
qualified provider of the services for Parallel Transmission Line Phase 3 (State
Highway 21 to Villa Maria Road) Engineering Design and Construction Management_
Project on the basis of demonstrated competence and qualifications.
PART 2: That the City Council hereby approves the contract with Malcolm Pirnie, Inc for an
amount not to exceed $198,432.00 for the Engineering Design and Construction
Management services related to the Parallel Transmission Line Phase 3 Project.
PART 3: That the funding for this Contract shall be as budgeted from the Water Capital
Improvement Fund in the amount of $198,432.00.
PART 4: That this resolution shall take effect immediately from and after its passage.
ADOPTED this 8 day of March, A.D. 2007. •
TEST: APPROVED:
CONNIE HOOKS, City Secretary RON SI , Mayor
APPROVED:
E- Signed by Angela Mt. DetUCt
T RI�€5luthe9tf t ith Alpprg _