Loading...
HomeMy WebLinkAbout10/15/2026 - Regular Agenda Packet - Planning & Zoning Commission College Station, TX Meeting Agenda Planning and Zoning Commission 1101 Texas Avenue, College Station, TX 77840 Internet: www.microsoft.com/microsoft-teams/join-a-meeting Meeting ID: 287 510 910 141 59 | Passcode: S2Dc7PU7 Phone: 833-240-7855 | Phone Conference ID: 608 651 190# The City Council may or may not attend this meeting. October 15, 2026 6:00 PM City Hall Council Chambers College Station, TX Page 1 Notice is hereby given that a quorum of the meeting body will be present in the physical location stated above where citizens may also attend in order to view a member(s) participating by videoconference call as allowed by 551.127, Texas Government Code. The City uses a third- party vendor to host the virtual portion of the meeting; if virtual access is unavailable, meeting access and participation will be in-person only. 1. Call to Order, Pledge of Allegiance, Consider Absence Request. 2. Hear Visitors. At this time, the Chairperson will open the floor to visitors wishing to address the meeting body on issues not already scheduled on tonight's agenda. The visitor presentations will be limited to three minutes in order to accommodate everyone who wishes to address the meeting body and to allow adequate time for completion of the agenda items. The meeting body will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) 3. Consent Agenda All matters listed under the Consent Agenda are considered routine by the meeting body and will be enacted by one motion. All items approved by Consent are approved with any and all staff recommendations. Since there will not be separate discussion of these items, citizens wishing to address the meeting body regarding one or more items on the Consent Agenda may address the meeting body at this time as well. If any member desires to discuss an item on the Consent Agenda it may be moved to the Regular Agenda for further consideration. 3.1. Consideration, discussion, and possible action to approve meeting minutes. Attachments: 1. August 20 2026 Speaker Protocol An individual who desires to address the Planning & Zoning Commission regarding any agenda item must register with the Commission Secretary two (2) hours before the meeting being called to order. Individuals shall register to speak or provide written comments at https://forms.cstx.gov/Forms/CSCouncil or provide a name and phone number by calling 979-764- 3570. Upon being called to speak an individual must state their name and city of residence, including the state of residence if the city is located out of state. Speakers are encouraged to identify their College Station neighborhood or geographic location. Please do not carry purses, briefcases, backpacks, liquids, foods or any other object other than papers or personal electronic communication devices to the lectern, nor advance past the lectern unless you are invited to do so. Comments should not personally attack other speakers, Commissioners, or staff. Each speaker’s remarks are limited to three Page 1 of 234 Planning and Zoning Commission Page 2 October 15, 2026 (3) minutes. Any speaker addressing the Planning & Zoning Commission using a translator may speak for six (6) minutes. The speaker’s microphone will mute when the allotted time expires and the speaker must leave the podium. 4. Consideration, discussion, and possible action on items removed from the Consent Agenda. 5. Regular Agenda. 5.1. Presentation, discussion, and possible action regarding waiver requests to the Unified Development Ordinance Section 8.3.E.2.b. ‘Relation to Adjoining Street System’, Section 8.3.F.4. ‘Alleys’, Section 8.3.G.2.c. ‘Blocks’, Section 8.3.E.6 ‘Dead-End Streets’, and presentation, discussion, and possible action regarding a Preliminary Plan for Rock Prairie Student Housing Subdivision on approximately 12.44 acres of land, generally located west of the intersection of Rock Prairie Road West and Old Wellborn Road. Case #PP2026-000009. Sponsors: Jeff Howell Attachments: 1. Staff Report 2. Waiver Request 3. Applicant's Supporting Information 4. Aerial and Small Area Map 5. Preliminary Plan 5.2. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending the College Station Comprehensive Plan by amending the Thoroughfare Plan and the Active Transportation Master Plan for the proposed Savannah Oaks subdivision in south College Station, to realign four thoroughfares, reclassify two thoroughfares, remove a future bicycle pedestrian grade separated crossing, realign the future Alum Creek shared use path, and modify future bike lanes and sidewalks to shared use paths. Case #CPA2026-000008 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting - Subject to change). Sponsors: Jesse DiMeolo Attachments: 1. Thoroughfare Plan Amendment Exhibit 2. Bicycle Plan Amendment Exhibit 3. Pedestrian Plan Amendment Exhibit 4. Applicants Supporting Information 5.3. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural & CI Commercial Industrial to PDD Planned Development District (1,104.1 acres) & P-MUD Planned Mixed-Use District (162.6 acres) for the Savannah Oaks Planned Development including single-family, multi-family, commercial, parks and trails on approximately 1,266.7 acres generally located east of the intersection of State Highway 6 and Nantucket Drive, between the Pebble Creek Subdivision and the Southern Pointe Subdivision. Case #REZ2026-000008 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting – Subject to change). Sponsors: Jeff Howell Attachments: 1. Aerial and Small Area Map 2. Rezoning Exhibit 3. Background Information 4. Applicant's Supporting Information Page 2 of 234 Planning and Zoning Commission Page 3 October 15, 2026 5. Existing Future Land Use Map 6. Rezoning Map 7. Concept Plan 8. Savannah Oaks Planned Development document with Exhibits A-H 5.4. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 6 "Use Regulations", Section 6.3.C "Use Table" and Article 11 "Definitions", Section 11.2 "Defined Terms", of the Code of Ordinances of the City of College Station, Texas by amending certain sections relating to the use table and the definition of a data center. (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting - Subject to change). Sponsors: Robin Macias Attachments: 1. Sec._11.2._Redlines 2. Sec._6.3.___Redlines 5.5. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 7, "General Development Standards," Section 7.3.K "Drive-Thru Facility Queuing Requirements", of the Code of Ordinances of the City of College Station, Texas, by amending certain sections relating to off-street drive-thru queuing requirements. Case #ORD2026-000004 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting – Subject to change). Sponsors: Joe Allen Attachments: 1. Ordinance Redlines 2. Ordinance Clean 5.6. Public Hearing, presentation, discussion, and possible action on an ordinance amending the College Station Comprehensive Plan by repealing the Parks, Recreation, and Open Spaces Master Plan dated July 2011 Ordinance No. 3358 and adopting the Parks and Recreation Master Plan. Sponsors: Kelsey Heiden Attachments: 1. Parks and Recreation Master Plan Ordinance 2. Parks-Master-Plan DRAFT 6. Informational Agenda 6.1. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev 6.2. Presentation and discussion regarding an update on items heard: • A request for a Comprehensive Plan Amendment for approximately 12 acres of land from General Commercial to Urban Residential generally located at 2950 Rock Prairie Road West. The Planning and Zoning Commission heard this item on July 2, 2026, and voted (7- 0) to recommend approval. The City Council heard this item on August 13, 2026, and voted (5-1) to approve the request. • A rezoning request for approximately 12 acres of land from R Rural to MF Multi-Family generally located at 2950 Rock Prairie Road West. The Planning and Zoning Commission heard this item on July 2, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 13, 2026, and voted (6-0) to approve the request. • A rezoning request for approximately 54 acres of land from R Rural to MF Multi-Family, MH Middle Housing, and NAP Natural Areas Protected generally located at 4291 Victoria Avenue. The Planning and Zoning Commission heard this item on July 16, 2026, and voted Page 3 of 234 Planning and Zoning Commission Page 4 October 15, 2026 (7-0) to recommend approval. The City Council heard this item on August 13, 2026, and voted (6-0) to approve the request. • A request for a Comprehensive Plan Amendment for approximately 106 acres of land from Business Center to General Commercial generally located at the northeast corner of Midtown Drive and Corporate Parkway. The Planning and Zoning Commission heard this item on August 6, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 27, 2026, and voted (7-0) to approve the request. • A rezoning request for approximately 106 acres of land from M-1 Light Industrial to GC General Commercial generally located at the northeast corner of Midtown Drive and Corporate Parkway. The Planning and Zoning Commission heard this item on August 6, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 27, 2026, and voted (7-0) to approve the request. • A rezoning request for approximately 10 acres of land from PDD Planned Development District to T Townhouse generally located at the terminus of Ascend Lane. The Planning and Zoning Commission heard this item on August 6, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 27, 2026, and voted (7-0) to approve the request. • An Ordinance Amendment amending certain sections related to the name, membership, and duties of the Bicycle, Pedestrian, and Greenways Advisory Board and references to the Bicycle, Pedestrian, and Greenways Master Plan. The Planning and Zoning Commission heard this item on August 6, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 27, 2026, and voted (7-0) to approve the request. • A request for a Comprehensive Plan Amendment to remove the future extension of Corporate Parkway, a Major Collector, between Midtown Drive and William D. Fitch Parkway including associated future bike lanes and sidewalks along with the realignment of the future Spring Creek trail to the existing Lick Creek trail. The Planning and Zoning Commission heard this item on August 6, 2026, and voted (7-0) to recommend approval. The City Council heard this item on August 27, 2026, and voted (7-0) to approve the request. 6.3. Presentation and discussion regarding the P&Z Calendar of Upcoming Meetings: • Thursday, October 22, 2026 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00p.m. • Thursday, November 5, 2026 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. • Monday, November 16, 2026 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00p.m. • Thursday, November 19, 2026 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. • Monday, November 23, 2026 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00p.m. 6.4. Discussion and review regarding the following meetings: Design Review Board and BioCorridor Board. • None 7. Discussion and possible action on future agenda items. Page 4 of 234 Planning and Zoning Commission Page 5 October 15, 2026 A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 8. Adjourn. The Planning and Zoning Commission may adjourn into Executive Session to consider any item listed on the agenda if a matter is raised that is appropriate for Executive Session discussion. I certify that the above Notice of Meeting was posted on the website and at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on October 8, 2026 at 5:00 p.m. City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Page 5 of 234 August 20, 2026 Planning and Zoning Commission Minutes Page 1 of 3 Minutes Planning and Zoning Commission Regular Meeting August 20, 2026 COMMISSIONERS PRESENT: Chairperson Jason Cornelius, Aron Collins, Tre Watson, Marcus Chaloupka, David Higdon, Michael Buckley, and Warren Finch COUNCILMEMBERS PRESENT: William Wright CITY STAFF PRESENT: Director of Planning & Development Services Anthony Armstrong, Assistant Director of Planning & Development Services Molly Hitchcock, City Engineer Carol Cotter, Transportation Planning Administrator Jason Schubert, Land Development Review Administrator Robin Macias, Staff Planner Gabriel Schrum, Graduate Engineer I Gillian Rowland, Assistant City Attorney II Derra Purnell, Development Coordinator Kristen Hejny, and Technology Services Specialist Trey Bransom 1. Call Meeting to Order, Pledge of Allegiance, Consider Absence Request. Chairperson Cornelius called the meeting to order at 6:00 p.m. 2. Hear Visitors No visitors spoke. 3. Consent Agenda 3.1 Consideration, discussion, and possible action to approve meeting minutes. • August 6, 2026 Commissioner Collins moved to approve the Consent Agenda, Commissioner Chaloupka seconded the motion; the motion passed 7-0. 4. Consideration, discussion, and possible action on items removed from the Consent Agenda by Commission Action. No items were removed from the Consent Agenda for discussion. 5. Regular Agenda 5.1 Presentation, discussion, and possible action regarding a waiver request to the Unified Development Ordinance Section 8.3.E.6 ‘Dead-End Streets’ and public hearing, presentation, discussion, and possible action regarding a Final Plat for Southland Addition, Lot 23R, Block 1, being a Replat of Southland Addition Lots 23 and 24, Block 1 and a Page 6 of 234 August 20, 2026 Planning and Zoning Commission Minutes Page 2 of 3 0.057-acre portion of O.M. Ball’s Subdivision, Lots C and D, on approximately 0.306 acres of land, generally located at the terminus of Southland Street. Case #FP2025-000024 Planner Schrum presented the waiver request and final plat to the Commission, recommending approval of both. Commissioner Higdon asked whether the proposed development would affect the drainage system on the property, which is located near a floodplain. Engineer Rowland stated that the applicant submitted a drainage letter indicating 55% impervious cover. Staff reviewed the area and determined that the development would not create drainage issues. Commissioner Watson expressed concerns regarding flooding in the area and asked about the development’s potential impact on flooding and the creek. Planner Schrum stated that staff had reviewed the proposed dedicated drainage easement and was comfortable with the proposal. Director Armstrong clarified that the development would not encompass the entire property and would be required to be constructed two feet above the flood elevation. The development would also require a turnaround and is expected to have minimal to no impact on the surrounding area. Commissioner Watson asked about the potential impact on the existing bridge. Director Armstrong clarified that the waiver provides for the creek and bridge to remain in their current configuration. Commissioner Collins asked whether an existing turnaround was present on the property. Planner Schrum confirmed that there is currently no turnaround. Commissioner Collins asked whether the development would further limit access. Planner Schrum clarified that fire and sanitation services would not be impacted. Commissioner Collins moved to approve the waiver request and final plat as presented, Commissioner Chaloupka seconded the motion; the motion passed 6-1 with Commissioner Watson voting in opposition. Commissioner Watson requested increased code enforcement in the area following the development. Page 7 of 234 August 20, 2026 Planning and Zoning Commission Minutes Page 3 of 3 6. Informational Agenda 6.1 Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev There was no discussion. 6.2 Presentation and discussion regarding the P&Z Calendar of Upcoming Meetings: • Thursday, August 27, 2026 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00p.m. • Thursday, September 3, 2026 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. • Thursday, September 10, 2026 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00p.m. • Thursday, September 17, 2026 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. There was no discussion. 6.3 Discussion and review regarding the following meetings: Design Review Board, BioCorridor Board, and Impact Fee Advisory Committee. There was no discussion. 7. Discussion and possible action on future agenda items. There was no discussion. 8. Adjourn The meeting adjourned at 6:54 p.m. Approved: Attest: _____________________________ _________________________________ Jason Cornelius, Chairperson Kristen Hejny, Board Secretary Planning & Zoning Commission Planning & Development Services Page 8 of 234 Planning & Zoning Commission October 15, 2026 Scale One (1) lot for a future multi-family residential development on approximately 12.44 acres of land. Location Generally located west of the intersection of Rock Prairie Road West and Old Wellborn Road located within the City limits. Applicant Mitchell and Morgan Project Manager Jeff Howell, Senior Planner jhowell@cstx.gov Project Overview This preliminary plan is for a development consisting of a future multi-family residential development on one lot. Waivers are being requested for adjacent street extensions, block length, and dead-end streets. The preliminary plan layout shows one lot with access to be provided from Rock Prairie Road West, Old Wellborn Road and Sergeant Drive. The property is currently zoned R Rural, however a conditional rezoning to MF Multi-Family was approved in August 2026, which requires a sewer line to be upgraded. The proposed lot meets the Density and Dimensional Standards for both the existing and future zoning once the condition has been satisfied, which is why the Preliminary Plan is able to proceed at this time. After the property has been subdivided and the proper zoning is in place, a Site Plan will be required to be submitted for the proposed multi-family development. Several waivers are requested to amend subdivision standards found in UDO Section 8.3. In all, four (4) subdivision regulation waivers are being requested to develop a future multi-family development. Parkland Dedication Parkland dedication fees will be paid at time of building permit at a rate of $1,881 per bedroom. Traffic Impact Analysis A Traffic Impact Analysis (TIA) was required as part of the rezoning to MF Multi-Family (REZ2026-000009) which requires mitigation to be provided. This mitigation will provided at the time of Site Plan for a multi-family development. Preliminary Plan for Rock Prairie Student Housing PP2026-000009 Page 9 of 234 Planning & Zoning Commission October 15, 2026 Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes, with the exception of waivers. Property is located within the Urban Residential future land use designation. Compliant with Subdivision Regulations Yes, with the exception of waiver requests. The waivers are regarding adjacent street extension (Section 8.3.E.2.b.), alley extension (Section 8.3.F.4.), block length (Section 8.3.G.2.c.) and dead-end streets (Section 8.3.E.6). Staff Recommendation Staff recommends approval of the waiver request for the dead-end street, however Staff recommends denial of the other waivers and the Preliminary Plan. Supporting Materials 1. Waiver Request 2. Applicants Supporting Information 3. Aerial and Small Area Map 4. Preliminary Plan Page 10 of 234 SUBDIVISION WAIVER REQUESTS The proposed Preliminary Plan is in compliance with the applicable Subdivision Regulations contained in the UDO except for the following waiver requests: UDO Section 8.3.E.2.b. ‘Relation to Adjoining Street System’-Per the requirements of this section, where there is an existing street adjacent to or through the subdivision, the street shall be constructed. As indicated in the attached waiver request, the first waiver request is to not extend Sergeant Drive, which currently abuts the subdivision to Old Wellborn Road. Page 11 of 234 UDO Section 8.3.F.4. ‘Alleys’-Per the requirements of this section, dead-end alleys are not permitted and would be required to be extended through the subdivision. As indicated below, the second waiver request is to not extend the alley at the northwest corner of the property within the development. Page 12 of 234 UDO Section 8.3.G.2.c. ‘Blocks’ -Per the requirements of this section, block length shall not exceed 1,200’. As indicated in the attached waiver requests, the third waiver request is for block length along Old Wellborn Road, which in this case extends from Tang Cake Drive to Rock Prairie Road West (1,513’). Page 13 of 234 UDO Section 8.3.E.6 ‘Dead-End Streets’-Per the requirements of this section, dead- end streets are prohibited and are to terminate with temporary turnarounds. As indicated below, the final waiver request is to leave Old Wellborn Road which is currently a dead-end street, and not provide a formal turnaround. The applicant is requesting these four (4) waivers as their intention is to provide a new subdivision for a future multi-family development. The applicant states that granting the waivers will not affect the subdivision of the adjacent property because the adjacent properties are developed and already have access. The property is currently zoned R Rural, however a conditional rezoning to MF Multi- Family was approved in August 2026, which requires a sewer line to be upgraded. The proposed lot meets the Density and Dimensional Standards for both the existing and future zoning once the condition has been satisfied, which is why the Preliminary Plan is able to proceed at this time. After the property has been subdivided and the proper zoning is in place, a Site Plan will be required to be submitted for the proposed multi- family development. Page 14 of 234 In accordance with the Subdivision Regulations, when considering a waiver, the Planning and Zoning Commission should make the following findings to approve the waiver: 1) That there are special circumstances or conditions affecting the land involved such that strict application of the provisions of this chapter will deprive the applicant of the reasonable use of his land; The applicant is proposing a multi-family development on one lot. The property is bound on two sides by already platted properties and located adjacent to existing single-family development. The applicant states the Old Wellborn Road no longer connects to Rock Prairie Road West and street extensions for Sergeant Drive or the alley would decrease the developable area. The applicant also states that there is no traffic on this portion of Old Wellborn Road and will be used for residents or emergency access only. The property is adjacent to the railroad tracks and Rock Prairie Road West. For the first three waiver requests, a multi-family development may generate traffic where additional roadway connections and access points may be beneficial. While the adjacent properties have been developed, existing right of way does abut the subject property with existing pavement projections that extend into it. Staff believes that the additional extensions could be provided to allow for additional connectivity that would not necessitate the waivers. Regarding the waiver request for dead-end streets, staff does observe the special condition that the pavement for Old Wellborn Road was recently removed and currently ends in a dead-end without a formal turnaround. 2) That the waivers are necessary for the preservation and enjoyment of a substantial property right of the applicant; If the waivers are not granted, the subject property can still be platted and developed. The property is over twelve (12) acres in size and is currently zoned R Rural. A conditional rezoning was approved for the property to be rezoned to MF Multi-Family, requiring the upgrade of a sewer line which not yet been completed. The property can be developed and platted under the current zoning and provide the necessary streets to meet the requirements of the Unified Development Ordinance. The subdivision is proposed to be one lot, however if additional streets were extended, it could be reconfigured to still meet the requirements of the Unified Development Ordinance. The applicant has stated the multi-family development is proposed, which would be allowed once the rezoning condition has been satisfied, to have gated access from Old Wellborn Road and Sergeant Drive. It is indicated that a hammerhead is still going to be provided with the Site Plan for drivers to turn around, however it will not be formal turn around meeting the required standards. 3) The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering this chapter; and Page 15 of 234 The applicant has stated the existing adjacent properties have been subdivided and alternative access points for them exist. The granting of these waivers may make connectivity challenging. While the adjacent properties have been subdivided, the development could be reconfigured to provide an additional point of access by extending the streets through the development. Adjacent right-of-way has been extended to this property and the future extensions through this development are not proposed. With the limited access points, If a multifamily development is proposed and depending on the number of bedrooms per unit, it may create challenges for those entering/exiting the property. Access to the development from Rock Prairie Road West is also limited due to the existing medians. Regarding the waiver for dead-end streets, Old Wellborn Road currently terminates with a dead-end without a formal turnaround being provided. Signage will need to be installed to indicate this is for egress only and to indicate the Old Wellborn Road is a dead-end street. After further discussion with other City departments, staff does not believe the waiver for dead-end streets will be detrimental. 4) That the granting of the waivers will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of this chapter. The applicant has stated the adjacent properties are platted and developed. The granting of these waivers will not a negative effect on the orderly subdivision of other land in the area. The subject property has not been subdivided and is one of the last un-platted properties along this portion of Rock Prairie Road West. While the adjacent properties have been subdivided and are already developed, Old Wellborn Road currently dead-ends without a formal turnaround being provided. If the Commission approves any or all of the waivers, the Commission shall incorporate the findings of each waiver into the official minutes of the meetings at which such waiver is granted. If any of the waivers are denied, then the preliminary plan is also denied. For this preliminary plan to be approved as proposed, all waivers need to be accepted. Waivers may be granted only when in harmony with the general purpose and intent of this UDO so that public health, safety, and welfare may be secured and substantial justice done. RECOMMENDATION: Staff recommends approval of the waiver request for the dead-end street, however Staff recommends denial of the other waiver requests as they do not meet all of the four criteria for granting the waivers. The adjacent properties have already developed and established right-of-way adjacent to the property for future connectivity. Per the requirements of the subdivision standards, infrastructure which includes streets, is required to be extended to and through property during the subdivision process, which contributes to the connectivity of the area. Given the size and location of the property, the applicant has the opportunity reconfigure the proposed development to meet the standards of the Unified Development Ordinance. Page 16 of 234 Page 1 of 2 PRELIMINARY PLAN APPLICATION SUPPORTING INFORMATION Name of Project: ROCK PRAIRIE STUDENT HOUSING (PP2026-000009) Address: 2860 ROCK PRAIRIE RD Applicant:: MITCHELL & MORGAN Property Owner: BALL DONALD A Legal Description: A000701, CRAWFORD BURNETT (ICL), TRACT 179, 12.4 ACRES Total Acreage: 12.44 Total No. of Lots: 1 ROW Acreage: 0 Floodplain Acreage: 0.00 Number of requested waiver(s) to subdivision regulations, if applicable: 4 Requested waiver(s) to subdivision regulations and reason for same (if applicable): See attached letter. Regarding the waiver request, explain the following: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. See attached letter. Page 17 of 234 Page 2 of 2 2. The waiver is necessary for the preservation and enjoyment of a substantional property right of the applicant. See attached letter. 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. See attached letter. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. See attached letter. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): N/A Detailed explanation of condition identified above: N/A Requested Oversize Participation: Parkland Dedication due prior to filing the Final Plat, if applicable: N/A Parkland Development Fee: N/A No. of acres to be dedicated: No. of acres in floodplain: N/A No. of acres in detention: N/A No. of acres in greenways: N/A Parks & Recreation Advisory Board approval date: N/A Page 18 of 234 Page 19 of 234 Page 20 of 234 Page 21 of 234 SERGE A NT D R O L D W E L L B O R N R D P U B L I C A L L E Y W E L L B O R N R D WA K EW E L L C I R C L E G E N E R A L P A R KW A Y 1513' LI E U T E N A N T A V E N U E ROC K P R AIRIE R O A D GE N E R A L P A R K W A Y WAIVER REQUEST #1 AND #3WAIVER REQUEST #2 WAIVER REQUEST #4 894'TANG CA K E R D Student Housing SubdivisionRevisionsT.979.260.6963 3204 EARL RUDDER FWY S COLLEGE STATION, TX 77840 www.mitchellandmorgan.com PLAN & DESIGN SPECIALISTS IN CIVIL ENGINEERING HYDRAULICS* ** * HYDROLOGY UTILITIES STREETS SITE PLANS SUBDIVISIONS TX FIRM # F-1443 Rock PrairiePreliminary Plan Waiver RequestsPage 22 of 234 Page 23 of 234 Page 24 of 234 3 0 8 'AEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAE AE AE AE AEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS UTUT W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''W-12''E FO FO FO SW SW SW SW SW SWSW SW SW T T TT T T W- 3 0 ' ' W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30''W-30'' STORM STORM STORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORM STORM STORM STORMSTORMSTORMSTORM STORM 308' 30 9 ' 309' 310 ' 310' 311' 311 ' 312' 312' 313' 313' 314' 314' 3 1 4 ' 315 ' 315' 3 1 5 ' 3 1 6 ' 31 6 ' 316' 316 ' 317' 317' 317' 318' 318' 318' 318' 31 9 ' 319'319'320 ' 320' 320' 321' 321' 321' 322 ' 322' 323' 323 ' 324' 325' 327'326'325'324'323'322'321'320'319'318'317'317' 316'315'314'313'312'311'310'309'312'313'314'315'316'317 '318'31 9 '320' 321'322'32 3 '324'325'332.73'184.83'20' PUBLIC UTILITYEASEMENT (7233/93OPRBCT) AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE A E A E AEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAEAE1/2 INCH IRON ROD WITHYELLOW PLASTIC CAPSTAMPED "KERR 4502"FOUND (CM) 1/2 INCH IRON RODWITH PLASTIC CAPSTAMPED "`OE ORR ASELINE" FOUND (CM) N 47°40'34" W 1,057.66' (CALLED N 47° 40' 47" W, 1,057.35' 20613/154 OPRBCT)N 41°12'35" E 517.57'(CALLED N 41° 11' 25" E, 517.47' 20613/154 OPRBCT)S 42°16'32" W 502.49'(CALLED S 42° 17' 18" W, 502.46' 20613/154 OPRBCT)1/2 INCH IRON RODWITH PLASTIC CAPSTAMPED "`OE ORR ASELINE" FOUND (CM) S 46°52'20" E 1,067.40' (CALLED S 46° 52' 45" E, 1067.38' 20613/154 OPRBCT) 9.94' 12.92' S 85°08'57" E16.03' POINT OF EEINNINE 1/2 INCH IRON ROD WITHPLASTIC CAP STAMPED"RPLS Ȏ1ȋ2" FOUND (CM) 1/2 INCH IRON RODWITH PLASTIC CAPSTAMPED "`OE ORR ASELINE" FOUND (CM) PRELIMINARY, THIS DOCUMENT SHALLNOT BE RECORDED FOR ANY PURPOSEAND SHALL NOT BE USED OR VIEWEDOR RELIED UPON AS A FINAL SURVEYDOCUMENT. TITLE COMMITMENT NOTES THIS SURVEY PLAT WAS PREPARED TO REFLECT THE TITLE COMMITMENT ISSUED BYWFG NATIONAL TITLE INSURANCE, GF NO. S50499, EFFECTIVE DATE: 04-20-2026.ITEMS LISTED ON SCHEDULE B ARE ADDRESSED AS FOLLOWS: ·ITEM 10f: (98/95 DRBCT) RIGHT-OF-WAY EASEMENT TO THE CITY OFBRYAN MAY AFFECT THIS TRACT. THERE IS NO DESCRIPTION SO IT ISUNPLOTTABLE. ·ITEM 10g: (132/110 DRBCT) RIGHT-OF-WAY EASEMENT TO SINCLAIRREFINING COMPANY DOES NOT AFFECT THIS TRACT. ·ITEM 10h: (352/555 DRBCT) RIGHT-OF-WAY FOR 10.67 ACRE GANDY ROADDOES AFFECT THIS TRACT AND IS SHOWN HEREON. ·ITEM 10i: (560/800 DRBCT) RIGHT-OF-WAY EASEMENT TO THE CITY OFBRYAN MAY AFFECT THIS TRACT. THERE IS NO DESCRIPTION SO IT ISUNPLOTTABLE. ·ITEM 10j: (570/669 DRBCT) RIGHT-OF-WAY EASEMENT TO THE CITY OFBRYAN DOES AFFECT THIS TRACT. THERE IS NO DESCRIPTION SO IT ISUNPLOTTABLE. ·ITEM 10k: (780/462 DRBCT) 15' RIGHT-OF-WAY EASEMENT TO WELLBORNWATER SUPPLY CORP. DOES AFFECT THIS TRACT AND FOLLOWS THECENTER OF THE WATERLINES AND IS SHOWN HEREON. ·ITEM 10l: (11105/4 OPRBCT) RIGHT-OF-WAY EASEMENT TO BRYAN TEXASUTILITIES DOES AFFECT THIS TRACT AND IS SHOWN HEREON. ·ALL OTHER ITEMS ARE NOT SURVEY ITEMS AND/OR ARE NOT ADDRESSED BY THISPLAT. CONTROL POINTS (TBMS) POINT ID GRID COORDINATES SURFACE COORDINATES ELEVATION DESCRIPTION TBM #1 N:10194127.27, E:3561906.29 N:10194127.19, E:3561906.36 ELEV:322.59''X' IN SQUARE IN CONCRETE TBM #2 N:10193945.54, E:3561740.97 N:10193945.44, E:3561741.03 ELEV:318.13''X' IN SQUARE IN CONCRETE TBM #3 N:10194003.70, E:3561543.193 N:10194003.61, E:3561543.24 ELEV:315.23'5/8 INCH IRON ROD WITH RED PLASTIC CAP STAMPED 'KERR SURV. CONTROL POINT TBM #4 N:10194215.88, E:3561342.66 N:10194215.81, E:3561342.69 ELEV:313.12'5/8 INCH IRON ROD WITH RED PLASTIC CAP STAMPED 'KERR SURV. CONTROL POINT TBM #5 N:10194522.16, E:3560992.65 N:10194522.11, E:3560992.65 ELEV:309.10''X' IN SQUARE IN CONCRETE TBM #6 N:10194852.34, E:3561383.01 N:10194852.32, E:3561383.04 ELEV:314.58''X' IN SQUARE IN CONCRETE ***GRID COORDINATES SHOWN HEREON ARE TEXAS STATE PLANE CENTRAL ZONE, NAD 83 COORDINATES. SURFACE COORDINATES OBTAINED BY SCALING FROM A BASE OFN:10195066.3882, E:3561024.4394 WITH A SCALE FACTOR OF 1.00008633027936*** PREPARED BY: KERR SURVEYING, LLCTBPELS FIRM#100185001718 BRIARCREST DRIVE, BRYAN, TEXAS 77802PHONE: (979) 268-3195SURVEYS@KERRSURVEYING.NET | KERRLANDSURVEYING.COM "WŜĿſ ƉſĿ ƦĿƩưƉſ ưƺĕſĸưƺƉ ŕĕŠſ ƉǚĿƩ ĕſƉƺŜĿƩȼ ƺŜĿŔĕIJƺư žǀưƺ ıĿ ǀſIJƉǚĿƩĿĸ" SCALE: 1 INCH = 50 FEETFIELD SURVEY DATE: 06-05-2026 | PLAT DATE: 10-01-2026JOB NUMBER: 26-0684 | CAD NAME: 26-0684-S PrePlanPOINT FILE: 26-0684DRAWN BY: MH CHECKED BY: TJF & MK 0 150 Feet10050NSCALE: 1" = 50' AE AE DRBCT = DEED RECORDS OFBRAZOS COUNTY, TEXAS ORBCT = OFFICIAL RECORDS OFBRAZOS COUNTY, TEXAS OPRBCT = OFFICIAL PUBLICRECORDS OF BRAZOS COUNTY,TEXAS 123/456 = VOLUME AND PAGEFROM PUBLIC COUNTY RECORDS N/F = NOW OR FORMERLY ( ) = RECORD INFORMATION SW E T FO LEGEND: AERIAL ELECTRIC LINES WATER VALVEWATER METERFIRE HYDRANTSANITARY SEWER MANHOLECLEAN OUTSTORM SEWER MANHOLESTREET SIGNUTILITY POLEELECTRIC SERVICETRANSFORMER / SWITCHGEARTELEPHONE PEDESTALFIBER OPTIC MARKERPINFLAG APPROXIMATE LOCATION OFSANITARY SEWER LINE APPROXIMATE LOCATION OF30" WATER LINE APPROXIMATE LOCATION OF12" WATER LINE SANITARY W-30'' CURB SS SURVEYOR'S CERTIFICATE: I, MICHAEL KONETSKI, R.P.L.S. NO. 6531, DO HEREBY CERTIFY THATTHIS SURVEY SUBSTANTIALLY COMPLIES WITH THE CURRENTTEXAS SOCIETY OF PROFESSIONAL SURVEYORS MANUAL OFPRACTICE REQUIREMENTS FOR A CATEGORY 1A AND 6, CONDITION6, LAND TITLE SURVEY AND TOPOGRAPHIC AS MADE ON THEGROUND UNDER MY SUPERVISION. ____________________________MICHAEL KONETSKIREGISTERED PROFESSIONALLAND SURVEYOR NO. 6531 N/FDONALD A. BALLCALLED 12.435 ACRES(20613/154 OPRBCT) NO BUILDINGS OBSERVED 12.44 ACRES CRAWFORD BURNETT LEAGUESURVEY, ABSTRACT 7 THE BARRACKSSUBDIVISION PHASE 1(8935/70 OPRBCT)THE BARRACKSSUBDIVISION PHASE 2(9694/220 OPRBCT) THE BARRACKS IISUBDIVISION PHASE 102(11646/167 OPRBCT) THE BARRACKS IISUBDIVISION PHASE 400 (13225/186 OPRBCT) THE BARRACKS IISUBDIVISION PHASE 400REPLAT(19730/227 OPRBCT) OLD WELLBORN ROAD(~24' ASPHALT)ROCK PRAIRIE ROAD WEST(FORMERLY GANDY ROAD)(100' WIDE RIGHT-OF-WAY,352/555 DRBCT,~82' CONCRETE ROAD)15" REINFORCEDCONCRETE PIPE TBM #1 TBM #2 TBM #3 TBM #5 TBM #4 TBM #6 GENERAL NOTES BEARING SYSTEM SHOWN HEREON IS BASED ON TEXAS COORDINATE SYSTEM OF 1983,CENTRAL ZONE (4203), GRID NORTH AS ESTABLISHED FROM GPS OBSERVATION USINGTHE LEICA SMARTNET NAD83 (NA2011) EPOCH 2010 MULTI-YEAR CORS SOLUTION 2(MYCS2). COORDINATES AND BEARING SYSTEM SHOWN ARE NAD83 (TEXAS STATE PLANECENTRAL ZONE GRID NORTH) BASED ON THE PUBLISHED COORDINATES OF THE CITY OFCOLLEGE STATION CONTROL MONUMENT CS94-10 AND AS ESTABLISHED BY GPSOBSERVATION. DISTANCES SHOWN HEREON ARE SURFACE DISTANCES UNLESS OTHERWISE NOTED. TOOBTAIN GRID DISTANCES (NOT AREAS) DIVIDE BY A COMBINED SCALE FACTOR OF1.00008633027936 (CALCULATED USING GEOID12B). CONTOUR LINES AND ELEVATIONS SHOWN HEREON WERE CREATED BASED ON DATACOLLECTED IN THE FIELD BY KERR SURVEYING USING CONVENTIONAL SURVEYEQUIPMENT. ELEVATION DATUM: NAVD 1988 (GEOID12B). (CM)INDICATES A CONTROLLING MONUMENT FOUND AND USED AS THE BASIS FORESTABLISHING PROPERTY BOUNDARIES. OTHER MONUMENTS DESCRIBED AS “FOUND”ARE SHOWN AT THEIR LOCATED POSITIONS AND WERE CONSIDERED AS SUPPORTIVEEVIDENCE OF THE BOUNDARY SHOWN HEREON. ORIGINAL SURVEY LINES SHOWN HEREON (IF ANY) ARE BASED ON RAILROADCOMMISSION GIS DATA, ARE APPROXIMATED ONLY AND WERE NOT LOCATED ON THEGROUND. THIS SURVEYOR DID NOT DETERMINE THE EXISTENCE OF ANY VACANCY,EXCESS, OR SHORTAGE OF AREA IN ANY OF THE ORIGINAL GRANTS SHOWN HEREON. UNDERGROUND UTILITIES ARE APPROXIMATED BASED ON ABOVE-GROUND FEATURES,AVAILABLE MAPS, AND MARKINGS BY UTILITY PROVIDERS. THE SURVEYOR HAS NOTBEEN PROVIDED WITH CONSTRUCTION PLANS SHOWING THE LOCATION OFUNDERGROUND UTILITIES. UTILITY MARKINGS WERE REQUESTED THROUGH TEXAS 811(TICKET NO. 2664903065). VISIBLE IMPROVEMENTS WERE LOCATED; NO SUBSURFACEPROBING, EXCAVATION, OR EXPLORATION WAS PERFORMED. ADDITIONALUNDERGROUND UTILITIES AND IMPROVEMENTS MAY EXIST THAT ARE NOT SHOWN ONTHIS SURVEY. THIS PLAT WAS PREPARED IN CONJUNCTION WITH A FIELD NOTES DESCRIPTION(METES AND BOUNDS). THE PLAT AND FIELD NOTES ARE INTENDED TO BE ONEINSTRUMENT TOGETHER. DETERMINATION OF THE OWNERSHIP, LOCATION, OR DEVELOPMENT OF MINERALSRELATED TO THE SUBJECT TRACT FALL OUTSIDE THE SCOPE OF THIS SURVEY. SUCHMATTERS SHOULD BE DIRECTED BY THE CLIENT TO AN EXPERT CONSULTANT. THIS SURVEY DOES NOT PROVIDE A DETERMINATION CONCERNING WETLANDS, FAULTLINES, TOXIC WASTE OR ANY OTHER ENVIRONMENTAL ISSUES. SUCH MATTERSSHOULD BE DIRECTED BY THE CLIENT OR PROSPECTIVE PURCHASER TO AN EXPERTCONSULTANT. FENCES SHOWN HEREON ARE GRAPHIC ONLY, WITH DIMENSIONAL TIES SHOWN ATSPECIFIC LOCATIONS WHERE THEY WERE PHYSICALLY MEASURED. THE FENCE LINEMAY MEANDER BETWEEN SAID MEASURED LOCATIONS. THE DIMENSIONS SHOWINGTHE DISTANCE BETWEEN THE FENCE AND THE PROPERTY LINE ALSO INDICATES WHICHSIDE OF THE PROPERTY LINE THE FENCE IS ON. OTHER IMPROVEMENTS EXIST ON THIS TRACT WHICH ARE NOT SHOWN HEREON. ALL LOTS WILL MEET SETBACK AND OTHER REQUIREMENTS AS SPECIFIED IN THE CITYOF COLLEGE STATION UNIFIED DEVELOPMENT ORDINANCE FOR THE ZONINGCLASSIFICATION IN WHICH THEY LAY. FOR THE PURPOSES OF THIS SUBDIVISION FOR REGULATION OF APPLICABLEDEVELOPMENT STANDARDS, THIS TRACT IS CONSIDERED A BUILDING PLOT. ELECTRIC SERVICE AND STREET LIGHTING FOR THIS SUBDIVISION WILL BE PROVIDEDBY BRYAN TEXAS UTILITIES (BTU). WHERE ELECTRIC FACILITIES ARE INSTALLED, BTU HAS THE RIGHT TO INSTALL,OPERATE, RELOCATE, CONSTRUCT, RECONSTRUCT, ADD TO, MAINTAIN, INSPECT,PATROL, ENLARGE, REPAIR, REMOVE AND REPLACE SAID FACILITIES UPON, OVER,UNDER, AND ACROSS THE PROPERTY INCLUDED IN THE PUE, AND THE RIGHT OFINGRESS AND EGRESS ON PROPERTY ADJACENT TO THE PUE TO ACCESS ELECTRICFACILITIES. THE WATER SUPPLIER FOR THIS DEVELOPMENT IS WELLBORN SUD. THIS PROPERTY IS ZONED RESIDENTIAL MULTI-FAMILY (MF) AS APPROVED WITHCONDITIONS BY THE COLLEGE STATION CITY COUNCIL ON 08-13-2026 BY ORDINANCENO. 2026-4703. PROPOSED USE: MULTIFAMILY RESIDENTIAL THIS TRACT LIES WITHIN THE CITY LIMITS OF COLLEGE STATION. BENCHMARK NOTES PROJECT BENCHMARKCITY OF COLLEGE STATION MONUMENT CS94-10N:10194022.89, E:3560554.95, ELEV:308.39'(ELEVATION DATUM NAVD 1988, GEOID09) ***COORDINATES SHOWN HEREON ARE TEXASSTATE PLANE CENTRAL ZONE GRID (NOTSURFACE) NAD 83 COORDINATES*** FLOOD PLAIN NOTES: THIS TRACT LIES WITHIN FLOOD ZONE 'X' UNSHADED AND DOES NOTLIE WITHIN A SPECIAL FLOOD HAZARD AREA SUBJECT TO THE 1%ANNUAL CHANCE FLOOD (100 YEAR FLOOD PLAIN) ACCORDING TOTHE BRAZOS COUNTY FLOOD INSURANCE RATE MAP (FIRM) PANELNO. 48041C0305F, REVISED DATE: 04-02-2014 AND NO.48041C0310F, REVISED DATE: 04-02-2014, BOTH REFERENCED ON06-10-2026. THIS FLOOD STATEMENT DOES NOT IMPLY THAT THE PROPERTY ORSTRUCTURES THEREON WILL BE FREE FROM FLOODING OR FLOODDAMAGE. ON RARE OCCASIONS FLOODS CAN AND WILL OCCUR ANDFLOOD HEIGHTS MAY BE INCREASED BY MAN-MADE OR NATURALCAUSES. THIS FLOOD STATEMENT SHALL NOT CREATE LIABILITY ONTHE PART OF THE SURVEYOR. APPROXIMATE LOCATION OFBURIED COMMUNICATIONSCABLE APPROXIMATE LOCATION OFBURIED GAS LINE APPROXIMATE LOCATION OFBURIED TELEPHONE LINE UT GAS 15' PUE(9694/220OPRBCT) 20' PUE (7233/93 OPRBCT) LOT 33ABLOCK 2 LOT 1BLOCK 36 LOT 26BLOCK 36 LOT 40BLOCK 36 10' PUE(11105/4OPRBCT) 15' WATERLINEEASEMENT(780/460DRBCT) W-12'' CITY OF COLLEGE STATIONMONUMENT CS94-10 BEARSS 31° 13' 58" W, 688.374' 2860 ROCK PRAIRIE ROAD PRELIMINARY PLAN OFLOT 1, BLOCK 1ROCK PRAIRIE STUDENT HOUSING SUBDIVISION 12.44 ACRESBEING ALL OF A CALLED 12.432 ACRESVOLUME 19296, PAGE 74 OPRBCTCRAWFORD BURNETT LEAGUE SURVEY, ABSTRACT 7COLLEGE STATION, BRAZOS COUNTY, TEXAS~OWNER: DONALD A. BALL1713 BROADMOOR, SUITE 208, BRYAN, TX 77802 24' PUBLIC ALLEY(8935/70 OPRBCT)CORPORAL ROAD(50' RIGHT-OF-WAY, 8935/70 OPRBCT)GENERAL PARKWAY(60' RIGHT-OF-WAY, 8935/70 OPRBCT)24' PUBLIC ALLEY(8935/70 OPRBCT)SERGEANT DRIVE(50' RIGHT-OF-WAY, 8935/70 OPRBCT)KEEFER LP ROCK PRAIRIE RDWELLBORN RD EDELWEISS AV OLD WELLBORN RD ROCK PRAIRIE RD WVICINITY MAPNOT TO SCALE SITE LOCATION WAKEWELL COURT(50' RIGHT-OF-WAY,13225/186 OPRBCT) 24' PUBLIC ALLEY(11646/167 OPRBCT) ENGINEER:MITCHELL AND MORGAN3204 EARL RUDDER FREEWAY,COLLEGE STATION, TX 77845 PROPOSEDLOT 1 BLOCK 1 PROPOSED5' CONCRETESIDEWALK PROPOSED5' CONCRETESIDEWALK UT FUTURE SIDEWALKWILL TIE INTOEXISTING SIDEWALK FUTURE SIDEWALKWILL TIE INTOEXISTING SIDEWALK 10' EXISTINGCONCRETE SIDEWALK 10' EXISTINGCONCRETE SIDEWALK PRELIMINARY PLAN - NOT FOR RECORD PROPOSED 15'PUBLIC UTILITYEASEMENT COMMON AREA NO. 1 COMMONAREA NO. 2 PROPOSED VARIABLEWIDTH PUBLICACCESS EASEMENT Page 25 of 234 October 15, 2026 Item No. 5.2. Savannah Oaks Thoroughfare Plan and Active Transportation Master Plan Amendments Sponsor: Jesse DiMeolo, Senior Planner - Transportation & Mobility Reviewed By CBC: Planning & Zoning Commission Agenda Caption: Public Hearing, presentation, discussion, and possible action regarding an ordinance amending the College Station Comprehensive Plan by amending the Thoroughfare Plan and the Active Transportation Master Plan for the proposed Savannah Oaks subdivision in south College Station, to realign four thoroughfares, reclassify two thoroughfares, remove a future bicycle pedestrian grade separated crossing, realign the future Alum Creek shared use path, and modify future bike lanes and sidewalks to shared use paths. Case #CPA2026-000008 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting - Subject to change). Relationship to Strategic Goals: Improving Mobility Recommendation(s): The Active Transportation Advisory Board considered this item at their August 17, 2026 meeting and recommended approval (4-0). Staff also recommends approval of the request. Summary: The Savannah Oaks property is an approximately 1,266-acre tract located along State Highway 6 between the Pebble Creek and Southern Pointe developments. The applicant is requesting amendments to the City's Thoroughfare Plan to modify several planned roadway alignments and classifications within and adjacent to the property. At a broad level, the proposed Thoroughfare Plan changes include realigning the future extension of what was formerly known as Pebble Creek Parkway and reclassifying that future roadway from a major collector to a minor collector, realigning a future minor arterial along the shared eastern boundary of Savannah Oaks and the City's Extraterritorial Jurisdiction (ETJ), and realigning a future minor collector currently proposed along the northern edge of Southern Pointe. The request also includes amendments to the Active Transportation Master Plan. All bicycle lanes and sidewalks along thoroughfares within the subdivision are proposed to be changed to shared use paths on both sides of the streets. Another proposal is the removal of a future grade separated crossing on Lakeway Drive and replacing it with a shared use path connection to the future Savannah Oaks Boulevard thoroughfare. Lastly, the shared use path running along Alum Creek from Lakeway Drive to the Lick Creek Park trailhead is being flipped from the south side of the creek to the north side. The proposed Comprehensive Plan amendments are being considered in conjunction with a request to rezone the property to a combination of Planned Development District (PDD) and Planned Mixed Use District (P-MUD). Together, these requests would establish a revised framework for the future development of the Savannah Oaks property and the surrounding transportation network as the area continues to grow and develop. REVIEW CRITERIA 1. Changed or changing conditions in the subject area of the City: The subject property and many of the properties to the north, east, and south are designated as Suburban Residential and Natural & Open Areas. The Suburban Residential land use designation is generally for areas that are appropriate for single-family residential areas that consist of low to Page 26 of 234 moderate density single-family lots. Properties to the west along State Highway 6 are designated as General Commercial. This designation is for areas of commercial activities that cater to both nearby residents and to the larger community or region. Generally, these areas tend to be large and located along regionally significant roads. Due to their context, these areas tend to prioritize automobile mobility. Since the adoption of the Comprehensive Plan and subsequent updates to the Thoroughfare Plan and Active Transportation Master Plan, development activity in southeast College Station has changed. As a result, the planned transportation network can now be refined to better reflect existing development patterns, property boundaries, environmental constraints, anticipated travel demand, and access needs. The proposed amendments update the functional classification and alignment of several planned roadways and modify the alignment of the future Alum Creek trail to better connect the area. 2. Compatibility with the existing uses, development patterns, and character of the immediate area concerned, the general area, and the City as a whole: The City's Thoroughfare Plan and Active Transportation Master Plan include several planned roadway and active transportation facilities serving this approximately 1,200-acre tract, making this a complex Comprehensive Plan amendment request. The subject property, also known as the future Savannah Oaks development, is located within the developing area of southeast College Station where large master-planned developments, including Southern Pointe and Pebble Creek, are shaping the future transportation network. As development has progressed, the locations of utility corridors, environmental features, property boundaries, and planned access points have become more defined, allowing for refinement of the City's long-range transportation plans. The proposed amendment modifies the alignment and functional classification of several planned roadways and active transportation facilities to better coordinate with the proposed development pattern and existing site constraints. The amendments continue to provide multimodal connectivity throughout the area while improving the relationship between the transportation network and adjacent land uses. Overall, the proposed changes are compatible with the evolving development pattern of the immediate area and support the orderly expansion of the City's transportation network as development occurs. 3. Impact on environmentally sensitive and natural areas: The proposed amendment provides flexibility for the future active transportation network to respond to these environmental features while preserving connectivity through the site. Rather than establishing a fixed alignment through the floodplain at this stage, the amendment allows the shared use path to generally follow the Alum Creek corridor, with the final alignment to be determined during the Preliminary Plan process once parkland dedication, drainage improvements, and environmental constraints have been finalized. This approach allows the trail to be designed in coordination with the ultimate park configuration while minimizing impacts to environmentally sensitive areas and maintaining the City's long-term active transportation objectives. 4. Impacts on infrastructure including water, wastewater, drainage, and the transportation network: Water and wastewater services will be provided by the City of College Station. The subject property is in the Alum Creek Drainage Basin and drains to Tributaries 2 & 4 of Alum Creek as well as to Alum Creek Directly. Drainage and any other infrastructure required with the site development shall be designed and constructed in accordance with the BCS Unified Design Guidelines. Page 27 of 234 The subject property has frontage to State Highway 6 South, which is designated as a Freeway/Expressway on the City’s Thoroughfare Plan. Several other thoroughfares are stubbed to the subject tract and are expected to continue to and through the property as planned. They are as follows: • Lakeway Drive (from the north) • Mather Parkway (from Southern Pointe) • Southern Pointe Parkway (from Southern Pointe) • Pipeline Road (from ETJ in southern property corner) • Two pairs of Minor Arterial and Minor Collector roadways (from ETJ along the eastern property line) A Traffic Impact Analysis (TIA) was submitted in support of the associated rezoning request and is discussed in greater detail within the rezoning staff report. In the attached “Thoroughfare Plan” exhibit, callout item #3 shows the proposed reclassification of the north-south roadway from a major collector to a minor collector and is the amendment most directly supported by the TIA. The analysis projects approximately 2,750 average daily trips (ADT) on this roadway. Based on these projected traffic volumes, the applicant states that a two-lane minor collector, consistent with the Bryan-College Station Unified Design Guidelines, is sufficient to accommodate the anticipated traffic demand. 5. Consistency with the goals and strategies set forth in the Comprehensive Plan: The proposed amendment remains consistent with the Comprehensive Plan's vision of providing a safe, connected, and context-sensitive multimodal transportation network while allowing the City's long-range transportation plans to evolve as development occurs. The amendment refines the planned roadway and active transportation network to better reflect existing site conditions, environmental features, projected travel demand, and the proposed development pattern for Savannah Oaks. The proposed changes support Comprehensive Plan Strategic Action 6.1 by promoting context- sensitive transportation planning and Strategic Action 5.14, which prioritizes connections between parks, greenways, community facilities, and other destinations as identified in both the Active Transportation Master Plan and the Parks Master Plan. While the amendment modifies the alignment of the proposed shared use path, it maintains the intent of these plans by preserving multimodal connectivity while allowing the final trail alignment to be coordinated with future parkland dedication, environmental features, and the Preliminary Plan process. Although the amendment modifies the location and functional classification of several planned transportation facilities, the overall objective of providing a connected multimodal transportation system is maintained. Budget & Financial Summary: Attachments: 1. Thoroughfare Plan Amendment Exhibit 2. Bicycle Plan Amendment Exhibit 3. Pedestrian Plan Amendment Exhibit 4. Applicants Supporting Information Page 28 of 234 Page 29 of 234 Page 30 of 234 Page 31 of 234 COMP PLAN APPLICATION SUPPORTING INFORMATION Updated 6/26/2026 Name of Project: ROADWAY AND SHARED USE PATH CHANGES (CPA2026-000008) Address: N/A Legal Description: A021001, S D SMITH (ICL), TRACT 21, 1265.851 ACRES, & A020201 SW ROBERTSON Total Acreage: 1266 Applicant: SILVERFIN LAND DEVELOPMENT LLC Property Owner: SILVERFIN CS LAND LLC What element of the Comprehensive Plan and at what location is requested to be amended? As demonstrated on the attached exhibits, the alignment of shared use paths and the alignment of the road network within Savannah Oaks. What is the amendment requested? The alignment of shared use paths and the alignment of the road network within Savannah Oaks What is the reason for the amendment? The current alignment has signiflcant impact on the development potential for the property. The proposed realignment improves connectivity, reduces confiict points between pedestrians/cyclists and vehicular traffic, and refiects the proposed development conditions while increasing the commercial and residential offerings. In addition, the proposed alignment strategically utilizes existing pipeline corridors and natural topography creating more efficient and functional land use. By incorporating these existing constraints and natural features into the overall planning framework, the development is able to maximize usable acreage, improve site circulation, reduce grading impacts, and support a more cohesive integration of residential, commercial and open space areas. Page 32 of 234 How will this change be compatible with the existing uses, development patterns, and character of the immediate area concerned, the general area, and the city as a whole? The broader context within the subject area of the City refiects ongoing growth and development pressures, along with a continued emphasis on aligning infrastructure with current and anticipated land-use patterns. As surrounding areas continue to develop, there is an increasing need for roadway and pedestrian networks that support efficient traffic distribution, phased development, and improved multimodal connectivity. The revised Savannah Oaks alignment responds to these evolving conditions by better integrating transportation infrastructure with existing easements, topography, and planned development in the area. In contrast, the removal of the Pebble Creek Parkway connection creates a signiflcant gap in the planned east– west roadway network, eliminating a key element of continuity intended to support regional circulation. This change alters the intended function of the overall roadway system and reduces the effectiveness of the broader network by limiting planned connectivity and interdependence between internal and external routes. As a result, the roadway system would not operate as originally envisioned in the approved framework, reinforcing the need to reevaluate and adjust the alignment to ensure the network functions as intended. Given the improved efficiency, development coordination, and mobility beneflts provided by the revised Savannah Oaks alignments, and the substantial adverse impacts associated with removing the Pebble Creek Parkway connection, a Comprehensive Plan amendment is warranted to formally adopt the proposed roadway and shared-use path network revisions. Explain the impact on environmentally sensitive and natural areas and infrastructure, including water, wastewater, drainage and transportation network. The revised alignments maintain the intended function of the shared use paths while better integrating with surrounding land uses and existing development patterns. The proposed road network changes better align with current and future roadway access for adjacent properties and remain consistent with the scale and character of Savannah Oaks and the surrounding area of the College Station. In addition, the proposed alignment strategically utilizes existing pipeline corridors and responds to the natural topography of the site to create more efficient and functional land use patterns. By incorporating these existing constraints and natural features into the overall planning framework, the development can maximize usable acreage, improve site circulation, reduce grading impacts, and support cohesive integration between residential, commercial, open space elements. The modiflcations also provide appropriate transitions between land uses, reinforce planned connectivity throughout the area, and support coordinated infrastructure placement. Overall, the proposed changes are compatible with the character and development patterns of the immediate Page 33 of 234 area and further the broader planning objectives of the City by promoting orderly growth, efficient infrastructure, and thoughtful site design. Explain how this change will be consistent with the goals and strategies set forth in the Comprehensive Plan. The revised alignments maintain the intended function of the shared use paths while better integrating with surrounding land uses and existing development patterns. The proposed road network changes better align with current and future roadway access for adjacent properties and remain consistent with the scale and character of Savannah Oaks and the surrounding area of the College Station. In addition, the proposed alignment strategically utilizes existing pipeline corridors and responds to the natural topography of the site to create more efficient and functional land use patterns. By incorporating these existing constraints and natural features into the overall planning framework, the development can maximize usable acreage, improve site circulation, reduce grading impacts, and support cohesive integration between land uses. The modiflcations also provide appropriate transitions between land uses, reinforce planned connectivity throughout the area, and support coordinated infrastructure placement. Overall, the proposed changes are compatible with the character and development patterns of the immediate area and further the broader planning objectives of the City by promoting orderly growth, efficient infrastructure, and thoughtful site design. Environmental Impact The proposed roadway and shared-use path modiflcations are intended to minimize impacts to environmentally sensitive areas while maintaining the overall connectivity objectives of the Comprehensive Plan. The revised shared-use path alignment avoids portions of the site characterized by signiflcant topographic variation, mature-wooded areas, and other environmental constraints. Construction of the originally planned alignment would require substantial clearing, grading, drainage improvements, and long-term maintenance activities within areas containing natural environmental features. By relocating portions of the shared-use path to the Savannah Oaks Boulevard corridor and utilizing planned transportation infrastructure corridors, the amendment substantially reduces disturbance to existing vegetation, preserves larger contiguous natural open space areas, and minimizes encroachment into environmentally sensitive portions of the site. The amendment also removes the previously contemplated shared-use path extension between Lakeway Drive and the Highway 6 frontage road. The original alignment would require the path to traverse areas constrained by Alum Creek, challenging topography, and proposed commercial Page 34 of 234 development. The revised approach directs users to the planned shared-use path network along Lakeway Drive and Savannah Oaks Boulevard, maintaining equivalent connectivity while avoiding construction impacts within environmentally constrained areas and reducing potential confiicts associated with routing a shared-use path through commercial development. The roadway modiflcations similarly reduce environmental impacts by utilizing existing utility and infrastructure corridors where feasible and by responding to the site's natural topography. The proposed roadway network promotes efficient land use patterns and maximizes double-loaded street segments, reducing the need for additional roadway infrastructure, clearing, grading, and associated utility extensions. No signiflcant impacts to planned water, wastewater, or drainage infrastructure are anticipated. The proposed roadway and shared-use path modiflcations remain consistent with the overall utility and drainage framework previously contemplated for the development. Overall, the amendment better balances transportation objectives, environmental stewardship, and efficient infrastructure planning while preserving the functionality of the City's planned transportation network. Infrastructure Impact No signiflcant impacts to water, wastewater, or drainage infrastructure are anticipated as a result of the proposed changes. The revised alignments remain consistent with the planned utility framework and do not materially increase overall utility demand or alter the established drainage strategy for the site. Goals and Objectives The proposed amendment remains consistent with the Comprehensive Plan's goals related to transportation, connectivity, environmental stewardship, and coordinated infrastructure planning. The proposed shared-use path modiflcations continue to provide connectivity between residential areas, parks, open spaces, commercial destinations, and the broader shared-use path network. While portions of the alignment are relocated from a greenway setting to the Savannah Oaks Boulevard corridor, the revised alignment maintains the intended network connections and continues to support pedestrian and bicycle mobility throughout the development and to adjacent destinations, including Lick Creek Park. The amendment also advances Comprehensive Plan objectives related to efficient infrastructure placement and responsible environmental management. The revised alignment avoids areas with signiflcant topographic constraints, mature vegetation, and other natural features that would require substantial disturbance to accommodate construction. By locating portions of the shared- use path within planned transportation corridors, the amendment reduces environmental impacts, minimizes grading requirements, and improves long-term maintainability of public infrastructure. Page 35 of 234 The roadway modiflcations further support Comprehensive Plan policies encouraging coordinated transportation planning and efficient use of infrastructure corridors. Several roadway alignments have been reflned to better respond to existing utility easements, pipeline corridors, adjacent development patterns, and projected traffic demands identifled in the Traffic Impact Analysis. In particular, the proposed roadway classiflcation adjustments refiect current traffic projections while recognizing physical constraints associated with existing utility infrastructure. The amendment preserves the overall connectivity and function of the transportation network while allowing infrastructure to be located in a manner that is more compatible with existing site conditions and future development patterns. Collectively, the proposed changes support the Comprehensive Plan's broader objectives of orderly growth, efficient infrastructure investment, environmental preservation, and development of a connected transportation system. Page 36 of 234 JOB NO. DATE DESIGNER CHECKED SHEET DRAWN THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL.AERIAL IMAGERY PROVIDED BY GOOGLE © UNLESS OTHERWISE NOTED. Imagery ©2026, CAPCOG,Digital Globe,Texas Orthoimagery Program, USDA Farm Service Agency.Date: Jun 16, 2026 10:53 AM User: acoleFile: O:\Users\ACole\Exhibits\CTran\260311_SavannahOaks_Zoning\SavannahOaks.aprx Layout: SavannahOaks_ExistingRoadways_11x17L Map: CStat_ExistingRoadways1672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633TEXAS ENGINEERING FIRM #470 | TEXAS SURVEYING FIRM #10028800F RO N T A G E 6 R D FR ONTAGE6RD H A R P ERSFERRYRD P EB B L E C R E EK P KW Y MATHER PKWYSTANDREWSDRROY A L A D ELADE D R Q U A LIT Y CIR Q U A R R Y O A K S D R L A KE W AY D RPATRI O T D RNANTUCKETDR DARLI N GT O N A V E W A Y F A R E R L N PRESTW ICKCTMARINERSCVVER ON AD RWINDJAMMER CT ROYA L A DELADELOO P BIRKDALEDRCA S C ADESD R C ONGR ESSIONALDRDA Y TO N A D RSYCAMOR E HIL L S DR GA TE W A Y B L V D R OCK F ORD DRTUC K E R N U C K RI VI ERACTPLUMHOLLOW DR SOUTHERNPO IN TE P K W Y OAKS DR P IN E VALLEY D RSCRIMSHAW LN B A L L C IRE LDO R A D R MISTY L N P A T R I O T D RFARAWAYISLANDDR SPART A N D R PI P E L I N E RD S TA T E H I G HW A Y 6 S T A T E H I G H W A Y 6 South Hampton Cove of Nantucket Southern Pointe Pebble Creek Legend Proposed Site College Station Existing Thoroughfare Plan Minor Collector Major Collector Minor Arterial Freeway/Expressway Grade Seperation College Station Bike Plan Bike Facility Proposed Bike Lane Existing Bike Route Proposed Grade Separation Proposed Shared Use Path Existing Shared Use Path Proposed 1.0 CT AC HF Jun 2026 30099-00 COLLEGE STATION, TEXASEXISTING ROADWAYS EXHIBITSAVANNAH OAKS³ 0 1,000 Feet Page 37 of 234 JOB NO. DATE DESIGNER CHECKED SHEET DRAWN THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL.AERIAL IMAGERY PROVIDED BY GOOGLE © UNLESS OTHERWISE NOTED. Imagery ©2026, CAPCOG,Digital Globe,Texas Orthoimagery Program, USDA Farm Service Agency.Date: Jun 25, 2026 11:25 AM User: acoleFile: O:\Users\ACole\Exhibits\CTran\260311_SavannahOaks_Zoning\SavannahOaks.aprx Layout: SavannahOaks_ProposedRoadways_11x17L Map: CStat_ProposedRoadways1672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633TEXAS ENGINEERING FIRM #470 | TEXAS SURVEYING FIRM #10028800F RO N T A G E 6 R D FR ONTAGE6RD H A R P ERSFERRYRD P EB B L E C R E EK P KW Y MATHER PKWYSTANDREWSDRRO Y A L A D ELADE DR Q U A LIT Y CIR Q U A R R Y O A K S D R L A KE W AY D RPATRI O T D RNANTUCKETDR DARLI N GT O N A V E W A Y F A R E R L N PRESTW ICKCTMARINERSCVVER ON AD RWINDJAMMER CT ROYA L A DELADELOO P BIRKDALEDRCA S C ADESD R C ONGR ESSIONALDRDA Y TO N A D RSYCAMOR E HIL L S DR GA TE W A Y B L V D R OCK F ORD DRTUC K E R N U C K RI VI ERACTPLUMHOLLOW DR SOUTHERNPO IN TE P K W Y OAKS DR P IN E VALLEY D RSCRIMSHAW LN B A L L C IRE LDO R A D R MISTY L N P A T R I O T D RFARAWAYISLANDDR SPART A N D R PI P E L I N E RD S TA T E H I G HW A Y 6 S T A T E H I G H W A Y 6 South Hampton Cove of Nantucket Southern Pointe Pebble Creek 1 2 35 45 6 Legend Proposed Site Proposed Thoroughfare Minor Collector Major Collector Minor Arterial Freeway/Expressway Grade Separation Proposed Trails Bike Facility Proposed Bike Lane Existing Bike Route Proposed Shared Use Path Existing Shared Use Path Proposed 1.0 CT AC HF Jun 2026 30099-00 COLLEGE STATION, TEXASPROPOSED ROADWAYS EXHIBITSAVANNAH OAKS³ 0 1,000 Feet Connection to be made by Savannah Oaks developer Page 38 of 234 October 15, 2026 Item No. 5.3. Savannah Oaks Planned Development Sponsor: Jeff Howell, Senior Planner Reviewed By CBC: Parks & Recreation Board Agenda Caption: Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural & CI Commercial Industrial to PDD Planned Development District (1,104.1 acres) & P-MUD Planned Mixed-Use District (162.6 acres) for the Savannah Oaks Planned Development including single-family, multi-family, commercial, parks and trails on approximately 1,266.7 acres generally located east of the intersection of State Highway 6 and Nantucket Drive, between the Pebble Creek Subdivision and the Southern Pointe Subdivision. Case #REZ2026-000008 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting – Subject to change). Relationship to Strategic Goals: Diverse & Growing Economy Recommendation(s): Staff recommends approval of this rezoning request as it is in line with the Comprehensive Plan and compatible with the surrounding area. Summary: This request is to rezone approximately 1,266.7 acres of land generally located east of the intersection of State Highway 6 and Nantucket Drive from R Rural & CI Commercial Industrial to PDD Planned Development District (1,104.1 acres) & P-MUD Planned Mixed-Use District (162.6 acres). The base zoning districts for the PDD area are GS General Suburban and NAP Natural Areas Protected, while the base zoning districts for the P-MUD area are MF Multi-Family, GC General Commercial, and NAP Natural Areas Protected. The tract proposed to be rezoned consists of an un- platted property and is currently vacant. The property was originally zoned to A-O (later renamed to R Rural) upon annexation, with a portion of the property being designated as CI Commercial Industrial in 2007. The applicant is proposing a planned development including single-family, multi-family, commercial, parks and trails which would not be allowed under the current zoning. As indicated by the applicant, the planned development provides a flexible, integrated regulatory framework to implement a master-planned community containing general suburban or single-family residential, townhouse, multifamily and general commercial land uses or districts, with coordinated infrastructure, open space, and design standards that promote walkability, multimodal connectivity, variety of housing, and compatibility with surrounding land uses. The applicant is requesting several modifications to the Unified Development Ordinance such as Density and Dimensional Standards, Subdivision regulations, and Permitted Uses, along with providing several community benefits which can all be found in the supporting information. The applicant intends to develop this property as a master-planned, mixed-use community encompassing approximately 1,266 acres along the Highway 6 corridor as shown on Concept Plan and further outlined in the Savannah Oaks Planned Development document. REZONING REVIEW CRITERIA 1. Whether the proposal is consistent with the Comprehensive Plan: The subject tract is designated as General Commercial, Suburban Residential and Natural and Open Page 39 of 234 Areas on the Comprehensive Plan Future Land Use & Character Map. For the General Commercial land use, the Comprehensive Plan provides the following: Areas appropriate for concentrated areas of commercial activities that cater to both nearby residents and to the larger community or region. Generally, these areas tend to be large and located along regionally significant roads. Due to their context, these areas tend to prioritize automobile mobility. The intent of the General Commercial land use is to accommodate commercial uses, concentrate development at major intersections, support multifamily as a secondary use, and encourage shared surface parking. The zoning districts that are generally appropriate within the General Commercial land use include: General Commercial, Office, and Mixed-Use zoning. The proposed rezoning request to P-MUD Planned Mixed-Use District with a base MF Multi-Family, GC General Commercial, and NAP Natural Areas Protected is consistent with the Comprehensive Plan. A portion of subject tract is also designated as Suburban Residential on the Comprehensive Plan Future Land Use & Character Map. For Suburban Residential land use, the Comprehensive Plan provides the following: Areas appropriate for single-family areas with limited townhomes, duplexes, other housing types, and some non-residential uses that are compatible with surrounding single-family areas. Buildings may be highly consistent within a subdivision or neighborhood. The intent of the Suburban Residential land use is to encourage community facilities such as parks, provide pedestrian and vehicular connectivity, accommodate streetscape features. The zoning districts that are generally appropriate within the Suburban Residential land use include: General Suburban and Restricted Suburban zoning. A portion of subject tract is also designated as Natural and Open Areas on the Comprehensive Plan Future Land Use & Character Map. For Natural and Open Areas land use, the Comprehensive Plan provides the following: Areas that represent a constraint to development and that should be conserved for their natural function or open space qualities. These areas can include floodplains, riparian buffers, common areas, and open space. The zoning districts that are generally appropriate within the Natural and Open Areas land use include: Natural Areas Protected zoning. The Comprehensive Plan serves as a guide to achieve the community’s vision for the future. It anticipates and guides physical development in a manner that provides College Station with a balance of land uses that promote economic development while retaining the quality of life. The future land use designations are generally flexible and are not tied to a specific boundary as compared to the zoning district. Page 40 of 234 The proposed rezoning request to PDD Planned Development District with a base of GS General Suburban and NAP Natural Areas Protected is consistent with the Comprehensive Plan. A Comprehensive Plan Amendment has been submitted in conjunction with this request to amend the Thoroughfare Plan in order to realign and reclassify several thoroughfares, and update sidewalks and shared use paths. Should the request to amend the Comprehensive Plan be denied, the rezoning request is no longer consistent with the Comprehensive Plan as this is reflected within Concept Plan and associated exhibits. 2. Whether the uses permitted by the proposed zoning district will be appropriate in the context of the surrounding area: The subject property is near other existing single-family uses which are adjacent to the north within the Pebble Creek Subdivision, as well as other commercial uses along the State Highway 6 frontage road which is along the western boundary of the proposed development. Lick Creek Park is also located to the north of the development. To the east, the properties are vacant along Lone Star Lane and located in the Extra-Territorial Jurisdiction. To the south is the Southern Pointe subdivision, which consists of primarily single-family development and some commercial uses along State Highway 6 however it is not completely built out and includes future roadways to connect into this development. The proposed zoning district is appropriate in the context of the area as it would allow for infill with additional housing options as well as commercial and multi-family development located adjacent to State Highway 6. For those areas that include floodplain, a flood study will be conducted to assist in the areas to be delineated as NAP Natural and Open Areas. An exhibit provided by the applicant generally indicates about 285 acres of parkland to be provided, which includes floodplain and amenity areas. Parkland areas are to be defined during the Preliminary Plan prior to being dedicated to the City of College Station and finalized with the platting process. The exhibit and articles related to parks were presented to the Parks and Recreation Board Meeting in September, where they were recommended for approval. 3. Whether the property to be rezoned is physically suitable for the proposed zoning district: The size and location of the subject property is suitable for uses allowed within the proposed zoning districts. The site has adequate space to meet the minimal dimensional standards for proposed zoning districts and base zoning districts. As development occurs within the P-MUD areas, additional Concept Plan Amendments will be required to be submitted for review to ensure compliance with the UDO standards as well as the community benefits provided. 4. Whether there is available water, wastewater, stormwater, and transportation facilities generally suitable and adequate for uses permitted by the proposed zoning district: The existing water and wastewater infrastructure is adequate to support the future extension needs of this development. The design of extensions to the City's Water and Wastewater systems will be reviewed with platting of the tract. Drainage and any other infrastructure required with site development shall be designed and constructed in accordance with the BCS Unified Design Guidelines. The subject property is generally located east of State Highway 6. Right of Way alignments and dedications would be determined during the preliminary plan. The subject tract has frontage on State Highway 6 and incorporates the future extension of Southern Pointe Parkway and Pipeline Road. Southern Pointe Parkway has a thoroughfare classification of minor arterial, and Pipeline Road is listed as a minor collector. Both will be extended with the platting of the tract and eventually intersect on the southeastern edge of the development. Other alignments of a minor arterial, major collectors and minor collectors currently shown on the Comprehensive Plan are proposed to be amended by an associated application to make modifications to the Thoroughfare Page 41 of 234 Plan and Active Transportation Master Plan. These modifications can be seen in the Concept Plan and exhibits. A traffic impact analysis (TIA) has been completed with this project with a total build out estimated for 2039. The site's assumed trip generation and traffic mitigation recommendations outlined in the TIA will be fulfilled as buildout happens in phases. Mitigation includes signal timing optimization, signalizing intersections at Nantucket, restriping and bridge widening to create additional lanes at Southern Pointe Parkway and Mesa Verde. 5. The marketability of the property: As indicated by the applicant, the existing zoning of R Rural does not comply with the Future Land Use designations, with the uses being limited and the applicant states the demand for such uses in this location is declining due to the area’s growth and proximity to the Highway 6 corridor. Market trends in College Station indicate stronger demand for a mix of residential, commercial, and higher- density uses supported by infrastructure and access. As a result, the property is less competitive and less economically viable under its current zoning compared to its potential under a Planned Development framework. REVIEW OF CONCEPT PLAN The Concept Plan provides an illustration of the general layout of the proposed development as well as other site related features. In proposing a PDD or P-MUD, an applicant may also request variations to the general platting and site development standards provided that those variations are outweighed by demonstrated community benefits of the proposed development. The Unified Development Ordinance provides the following review criteria as the basis for reviewing Concept Plans: 1. The proposal will constitute an environment of sustained stability and will be in harmony with the character of the surrounding area; 2. The proposal is in conformity with the policies, goals, and objectives of the Comprehensive Plan, and any subsequently adopted Plans, and will be consistent with the intent and purpose of this Section; 3. The proposal is compatible with existing or permitted uses on abutting sites and will not adversely affect adjacent development; 4. Every dwelling unit need not front on a public street but shall have access to a public street directly or via a court, walkway, public area, or area owned by a homeowners association; 5. The development includes provision of adequate public improvements, including, but not limited to, parks, schools, and other public facilities; 6. The development will not be detrimental to the public health, safety, welfare, or materially injurious to properties or improvements in the vicinity; and 7. The development will not adversely affect the safety and convenience of vehicular, bicycle, or pedestrian circulation in the vicinity, including traffic reasonably expected to be generated by the proposed use and other uses reasonably anticipated in the area considering existing zoning and land uses in the area. General: This request is to rezone approximately 1,266.7 acres from R Rural & CI Commercial Industrial to PDD Planned Development District (1,104.1 acres) & P-MUD Planned Mixed Use District (162.6 acres). The base zoning districts for the PDD area are GS General Suburban and NAP Natural Areas Protected, while the base zoning districts for the P-MUD area are MF Multi-Family, GC General Commercial, and NAP Natural Areas Protected. The stated purpose and intent indicate the Page 42 of 234 Savannah Oaks Planned Development is a master-planned, mixed-use community encompassing approximately 1,266 acres along the Highway 6 corridor. The development represents a transformative opportunity to create a vibrant, well-connected, and sustainable community that responds to the City's evolving growth patterns, infrastructure investments, and long-term planning objectives. The Concept Plan proposes a commercial and multi-family area closer to Highway 6, with a residential development consisting of various lot sizes for the remainder, with parkland areas and trails throughout the development. As part of the Savannah Oaks Planned Development, a document was prepared by the applicant to be a part of the rezoning ordinance to provide the regulatory framework for the development. This document includes several articles to outline various development regulations which are unique to this project as well as exhibits to provide additional visual references and guidance. These exhibits include the following: • Legal Description of the overall area within the Savannah Oaks Planned Development • Concept Plan which includes a graphic plan showing boundaries, approximate land use areas, road network, major open-space features • Proposed Zoning Map showing the delineation of zoning districts • Land Use Table to detail permitted, permitted with special use, and prohibited uses by base zoning district • Residential Development Standards Table to include density and dimensional standards • Conceptual Park & Trail Map showing the general layout of parkland areas and trails/shared- use paths • Typical Roadway/Street Cross Sections and Utility Corridors displaying Cross-sections for Minor arterials, Major and Minor collectors • Community Benefits provided Modifications Requested: While there are several modifications requested that are not specifically identified as such. In comparison to the Unified Development Ordinance, the applicant is generally requesting the following modifications which are found within the Savannah Oaks Planned Development document: • Definitions for proposed and existing uses • Permitted and Prohibited Uses to update what is allowed for proposed and existing uses • Residential Density and Dimensional Standards to modify requirements • Development Standards to update townhouse and cluster developments • Specific Use Standards to include proposed and existing uses • Parking Standards to update requirements and alternative surfacing • Street Design including layout and cross-sections • Subdivision Standards including connectivity, block length, and access ways • Park Classification and Dedication process • Trail connectivity to update surfacing and widths • Parkland phasing clarification • Parkland improvement credit for private amenities • On-site Irrigation and Environmental Protection for water usage and tree protection • Shared Use Paths to update the location and width • Signage Guidelines for a Master Sign Program for updated subdivision and wayfinding Page 43 of 234 Community Benefits: The applicant offers the following as community benefits, however additional benefits are found within the Savannah Oaks Planned Development document (Exhibit) provided by the applicant. The benefits highlighted in the associated Article H are summarized below: • Increasing landscape buffer plantings by 50% • Increasing landscape buffer width by 50% • Increasing landscape point requirement by 10% • Meeting NRA standards on all facades • Prohibiting internally illuminated cabinet signs • All canopy trees to be native • Use of smart irrigation controllers • Bicycle parking increased to 150% Budget & Financial Summary: N/A Attachments: 1. Aerial and Small Area Map 2. Rezoning Exhibit 3. Background Information 4. Applicant's Supporting Information 5. Existing Future Land Use Map 6. Rezoning Map 7. Concept Plan 8. Savannah Oaks Planned Development document with Exhibits A-H Page 44 of 234 Page 45 of 234 Page 46 of 234 JOB NO. DATE DESIGNER CHECKED SHEET DRAWN THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL.AERIAL IMAGERY PROVIDED BY GOOGLE © UNLESS OTHERWISE NOTED. Imagery ©2026, CAPCOG,Digital Globe,Texas Orthoimagery Program, USDA Farm Service Agency.Date: Jun 10, 2026 1:28 PM User: acoleFile: O:\Users\ACole\Exhibits\CTran\260311_SavannahOaks_Zoning\SavannahOaks.aprx Layout: SavannahOaks_ProposedZoning_11x17L Map: CStat_ProposedZoning1672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633TEXAS ENGINEERING FIRM #470 | TEXAS SURVEYING FIRM #10028800Misty Ln Q u ality Cir Spearman Dr Sai ntAndrewsDrS a n d p iper C vS ta t e H ig h w a y 6 Pebble Creek Park Technology Way Gateway HarpersFerryRd NantucketDrMarinersCvMidsummer Ln W a y f a r e r L n T u c k e r N u c k Scr i mshawLnE a st B y p South Hampton A lu m CreekRoyalAdeladeD rSaint Andrew s D rCongressionalDrCasc a d e s D rPineValley D r Stonewater Villages P a t r io t D r Mat her PkwyW ayfarerLnSouthernPo in teP k w y C a n t o n D r Hig h w ay 6 Cove of Nantucket PipelineRdPipelineRdDarlin gton AveEl doraDrEld o r a D r P ip elin e R d P ip e l i n e R d D a yt o n a Dr P o c o n o D r Ball C ir Ful tonDrP atriotD rPDD PDD R O GS GS GS R CI GS GSM - 1 R R R R PDD 1104.101 Ac.P-MUD 5.223 Ac. P-MUD 157.368 Ac. Legend Proposed Site Proposed Zoning P-MUD PDD CI Commercial Industrial GS General Suburban M-1 Light Industrial O Office R Rural 1.0 CT AC HF Jun 2026 30099-00 COLLEGE STATION, TEXASPROPOSED ZONING EXHIBITSAVANNAH OAKS³ 0 1,000 Feet Note: Existing zoning is Rural (R) and Commercial Industrial (CI). Proposed zoning is Planned Development District (PDD) and P-MUD. Page 47 of 234 BACKGROUND INFORMATION NOTIFICATIONS Advertised Commission Hearing Date: October 15, 2026 Advertised Council Hearing Date: October 22, 2026 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy letter of notification of this public hearing: Pebble Creek Southern Pointe Nantucket Preservation Association South Hampton Cove of Nantucket Property owner notices mailed: 72 Contacts in support: None at the time of this report Contacts in opposition: None at the time of this report Inquiry contacts: 1 ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North Natural & Open Areas, Parks and Greenways, Suburban Residential, General Commercial GS General Suburban, R Rural, CI Commercial Industrial Vacant, Park (Lick Creek Park), Single-family detached, Commercial development South Rural, Suburban Residential, General Commercial ETJ Extra-Territorial Jurisdiction, Southern Pointe Vacant, Commercial development, Single-family detached East Rural ETJ Extra-Territorial Jurisdiction Vacant, Lone Star Lane (ROW) West Rural, Natural & Open Areas, Suburban Residential, General Commercial GS General Suburban, R Rural, PDD Planned Development District Single-family detached, State Highway 6 (ROW) DEVELOPMENT HISTORY Annexed: November 1996 Zoning: A-O Agricultural Open (upon annexation 1969) Page 48 of 234 • Portion rezoned from A-O Agricultural Open to C-2 Commercial Industrial (2007) • C-2 Commercial Industrial renamed to CI Commercial Industrial (2012) A-O Agricultural Open renamed to R Rural (2013) Final Plat: Unplatted Site Development: Vacant Page 49 of 234 REZONING PDD APPLICATION SUPPORTING INFORMATION Name of Project: SAVANNAH OAKS (REZ2026-000008) Address: Legal Description: A021001, S D SMITH (ICL), TRACT 21, 1265.851 ACRES, & A020201 SW ROBERTSON Total Acreage: 1266 Applicant: SILVERFIN LAND DEVELOPMENT, LLC Property Owner: SILVERFIN CS LAND LLC List the changed or changing conditions in the area or in the City which make this zone change necessary. The proposed rezoning is driven by continued growth and development along the Highway 6 corridor and within the City of College Station. The subject property’s current Rural zoning is no longer consistent with surrounding development patterns, infrastructure expansion, and increased demand for a mix of residential and commercial uses. The City’s Comprehensive Plan supports higher intensity and mixed-use development in this area. Rezoning to a Planned Development allows for a coordinated, flexible approach that better aligns with current conditions and the City’s long-term vision. Indicate whether or not this zone change is in accordance with the Comprehensive Plan. If it is not, explain why the Plan is incorrect. The proposed rezoning is in accordance with the City of College Station Comprehensive Plan. The plan supports higher-intensity commercial development along the Highway 6 corridor, with appropriate transitions to lower-density residential uses. The Savannah Oaks Planned Development implements these objectives by concentrating commercial and multifamily uses along Highway 6 and transitioning to single-family and townhome neighborhoods internally, while incorporating open space, connectivity, and coordinated infrastructure consistent with the City’s long-term vision. How will this zone change be compatible with the present zoning and conforming uses of nearby property and with the character of the neighborhood? While the property is currently zoned Rural and can accommodate agricultural and very low-density uses, its location along the Highway 6 corridor and proximity to expanding infrastructure and development patterns make it less suitable for long-term rural use. The size and strategic location of the property support more intensive, coordinated development than what is typically permitted under Rural zoning. As Page 50 of 234 a result, the current zoning does not fully utilize the property’s potential or align with surrounding growth trends. The proposed Planned Development District (PDD) is intentionally designed to be compatible with the present zoning and conforming uses of nearby properties by incorporating a thoughtful transition of land uses, densities, and neighborhood patterns. Residential areas adjacent to existing neighborhoods reflect similar lot sizes, block configurations, and building setbacks to create a cohesive edge condition. Enhanced landscape buffers, preserved natural features, and open space corridors are strategically placed along the project boundaries to provide separation and maintain privacy. Additionally, the plan uses topography, tree preservation areas, and drainage corridors as natural transitions, allowing the development to blend seamlessly with the surrounding character while minimizing visual and operational impacts. Explain the suitability of the property for uses permitted by the rezoning district requested. The property is well-suited for the proposed Planned Development due to its size, location along the Highway 6 corridor, and access to existing and planned infrastructure. Its scale allows for a coordinated, master-planned mix of residential, commercial, and open space uses, while its frontage along a major thoroughfare supports higher-intensity and mixed-use development. The site’s configuration also allows for appropriate transitions to surrounding areas, making it ideal for the flexible and integrated development approach permitted under the Planned Development District. Explain the marketability of the property for uses permitted by the current zoning district. The marketability of the property under its current Rural zoning is limited. While the property could be used for agricultural or very low-density residential purposes, demand for such uses in this location is declining due to the area’s growth and proximity to the Highway 6 corridor. Market trends in College Station indicate stronger demand for a mix of residential, commercial, and higher-density uses supported by infrastructure and access. As a result, the property is less competitive and less economically viable under its current zoning compared to its potential under a Planned Development framework. 1. Housing Diversity and Market Responsiveness – The development can provide a range of housing options, including single-family homes, townhomes, and multifamily units, helping to meet the needs of a growing and diverse population while responding to evolving market demands. 2. Improved Connectivity and Mobility – The integrated street network, trail systems, and strategic access points improve circulation for all modes of transportation, reduce congestion, and enhance regional connectivity. 3. Environmental Sensitivity and Open Space Preservation – The plan prioritizes the preservation of natural features, including tree stands, drainage corridors, and topographic variations, incorporating them into usable open spaces that also support stormwater management and ecological health. 4. Context-Sensitive Design and Compatibility – The PDD allows for thoughtful transitions between land uses and densities, incorporating buffers, setbacks, and step-downs that ensure compatibility with adjacent properties and protect existing neighborhood character. 5. Advancement of City Planning Objectives – The rezoning aligns with the City’s comprehensive plan by promoting orderly growth, encouraging development along major corridors, and supporting the creation of complete, walkable, and sustainable communities. Overall, the request advances the City’s goals for orderly growth, fiscal responsibility, and the creation of a high-quality, well-connected development that provides lasting community value. Maximum Building Height. PDD Zoning which has a base zoning of General Suburban (GS) Zoning District will be Max Building Height of 35' (Per SOPD Document & Exhibit E) P-MUD Zoning which has a base zoning of General Commercial (GC) and Multifamily (MF) shall adhere to UDO max building height standards per Article 8 of the SOPD document. Page 51 of 234 Variations Sought. Please see Savannah Oaks PD Document. Community Benefits. Please see Article 12 of the Savannah Oaks PD Document and Exhibit F, respectively. Sustained Stability. The Savannah Oaks Planned Development is designed to create a stable, enduring community that harmonizes with the surrounding area. Higher-intensity uses are concentrated along Highway 6, transitioning smoothly to lower-density single-family and townhome neighborhoods internally. Thoughtful buffering, building orientation, preserved open space, and interconnected trails ensure compatibility with adjacent properties, protect neighborhood character, and provide a cohesive, well-planned environment that promotes long-term stability and quality of life for residents. Compatibility with use. The Savannah Oaks Planned Development is designed to be fully compatible with existing and permitted uses on adjacent properties. Higher-intensity commercial and multifamily uses are oriented along Highway 6 and internal collectors, while lower-density single-family and townhome neighborhoods transition toward neighboring residential areas with enhanced buffers, building step-downs, and preserved natural areas. Roadway connections, trails, and open spaces are strategically located to maintain privacy, minimize visual and operational impacts, and ensure a harmonious relationship with surrounding development. In addition, the PDD thoughtfully reflects the existing development pattern of adjacent neighborhoods by incorporating compatible lot sizes and block configurations, creating a seamless transition between communities. Natural features, landscape buffers, and open space corridors are strategically used to reinforce these transitions, helping to blend the new development with the surrounding built environment while preserving neighborhood character. Public Improvements. The Savannah Oaks Planned Development has been designed to provide comprehensive public improvements that support the long-term needs of the community. The development includes nearly 300 acres of dedicated parkland and open space, extensive multi-use trails, and improved parks that will be constructed by the Developer. The trail network is designed to connect directly to Lick Creek Park, enhancing regional recreational access and multimodal connectivity. Additionally, the project includes an 11.59-acre site designated for an elementary school to serve future residents. Public streets, utilities, and stormwater infrastructure will be installed in accordance with City standards. While other schools and public facilities will be served by existing or planned City and independent school district infrastructure, the project’s design ensures adequate access, connectivity, and capacity to support residents, promote recreation, and integrate seamlessly with surrounding public amenities. Public Health. The Savannah Oaks Planned Development has been carefully designed to promote public health, safety, and welfare while minimizing impacts on surrounding properties. The Conceptual Master Plan incorporates well-planned street layouts, sidewalks, and multi-use trails to provide safe and convenient pedestrian and vehicular circulation. Higher-intensity uses are strategically oriented along Highway 6 and internal collectors, with lower-density single-family and townhome neighborhoods buffered and transitioned to protect adjacent properties. Open spaces, greenbelts, and preserved natural areas enhance environmental quality and provide flood mitigation and recreational benefits. Infrastructure improvements—including water, wastewater, and stormwater systems—will be designed and constructed to City standards, ensuring adequate service and minimizing risk to existing development. Collectively, Page 52 of 234 these measures ensure the development is harmonious with its surroundings and does not adversely affect the public health, safety, or welfare, nor the value or use of neighboring properties. Safety. The Savannah Oaks Planned Development has been designed to enhance the safety and convenience of vehicular, bicycle, and pedestrian circulation within and around the site. Street layouts, including internal collectors and neighborhood streets, are planned to meet City standards for capacity, alignment, and connectivity. Sidewalks, multi-use trails, and greenbelt corridors provide safe and accessible routes for pedestrians and cyclists, connecting residential areas, parks, and commercial centers, and linking to regional destinations such as Lick Creek Park. Traffic generated by the development has been analyzed relative to existing and anticipated land uses, and roadway improvements, turn lanes, and signalization will be implemented as needed to maintain smooth traffic flow and minimize congestion. In addition, the plan enhances user safety by removing on-street bike lanes along higher-traffic thoroughfares and instead providing dedicated shared-use paths that are physically separated from vehicular travel lanes. This design reduces potential conflicts between vehicles and cyclists, improves visibility, and creates a more comfortable and secure environment for users of all ages and skill levels. Overall, the Conceptual Master Plan balances mobility, safety, and connectivity, ensuring that the development does not adversely impact circulation for all users in the vicinity. Page 53 of 234 Savannah Oaks Planned Development College Station, Texas Purpose and Intent The Savannah Oaks Planned Development (SOPD) is a master-planned, mixed-use community encompassing approximately 1,266 acres along the Highway 6 corridor in College Statfon, Texas. The development represents a transformatfve opportunity to create a vibrant, well-connected, and sustainable community that responds to the City's evolving growth patterns, infrastructure investments, and long-term planning objectfves. Rezoning Justification and Changed Conditions The subject property is proposed to be rezoned from Rural to a Planned Development District, reflectfng a number of changed and changing conditfons within the area and the City of College Statfon. Contfnued populatfon growth, sustained demand for diverse housing products, and significant infrastructure expansion along the Highway 6 corridor have fundamentally altered the development context of this property. The current Rural zoning, while historically appropriate, is no longer consistent with surrounding development patterns, the City's Comprehensive Plan, or the market realitfes of this corridor. Rezoning to a Planned Development allows for a coordinated, master-planned approach that maximizes the property's potentfal while ensuring compatfbility with adjacent uses and alignment with the City's long-term vision. Development Framework and Land Use Organization The SOPD is organized into two coordinatfng zoning districts. The Planned Development District (PDD), encompassing approximately 1,103 acres, provides a regulatory framework for well-designed single- family and townhome neighborhoods emphasizing suburban character, open space integratfon, and pedestrian connectfvity. The Planned Mixed-Use District (P-MUD), encompassing approximately 163 acres, concentrates higher-intensity commercial, office, and multffamily uses along the Highway 6 frontage, creatfng walkable, actfvity-oriented nodes that support economic vitality and community engagement. Together, these districts implement a flexible, integrated regulatory framework that guides land use transitfons from the Highway 6 corridor inward to lower-density residentfal neighborhoods, ensuring cohesion, compatfbility, and long-term stability throughout the development. Conformity with the Comprehensive Plan The proposed rezoning is fully consistent with the City of College Statfon Comprehensive Plan. The plan supports higher-intensity and mixed-use development along the Highway 6 corridor with appropriate transitfons to lower-density residentfal uses. The SOPD directly implements these objectfves by orientfng commercial and multffamily uses along the corridor, transitfoning internally to single-family and townhome neighborhoods, and incorporatfng open space, multfmodal connectfvity, and coordinated infrastructure throughout. The development advances multfple Comprehensive Plan goals, including the promotfon of walkable communitfes, preservatfon of open space, diversificatfon of housing optfons, and the encouragement of orderly, fiscally responsible growth. Page 54 of 234 Compatibility with Surrounding Properties and Neighborhood Character The SOPD has been intentfonally designed to be compatfble with existfng and permitted uses on adjacent and nearby propertfes. Residentfal areas adjacent to existfng neighborhoods incorporate compatfble lot sizes, block configuratfons, and building setbacks to create a cohesive and seamless edge conditfon. Enhanced landscape buffers, preserved natural features, tree stands, and drainage corridors are strategically placed along project boundaries to provide separatfon, maintain privacy, and minimize visual and operatfonal impacts on neighboring propertfes. Higher-intensity commercial and multffamily uses are concentrated along Highway 6 and internal collector streets, ensuring that the most actfve uses are appropriately located away from lower-density residentfal edges. The overall design reflects a thoughtiul and context-sensitfve approach that protects and reinforces the character of the surrounding area while establishing a distfnct and high-quality community identfty. Open Space, Parks, Trails, and Public Improvements The SOPD incorporates nearly 300 acres of parkland, open space, and greenway corridors, representfng a substantfal investment in public amenity and environmental stewardship. The development's multf-use trail network is designed to provide contfnuous connectfons between residentfal neighborhoods, parks, commercial centers, and regional destfnatfons, including a direct connectfon to Lick Creek Park, significantly enhancing regional recreatfonal access and multfmodal mobility. An 11.59-acre site has been designated for an elementary school to serve the future residents of the community. All public streets, utflitfes, water, wastewater, and stormwater infrastructure will be designed and constructed in full accordance with City of College Statfon standards, with phased delivery coordinated with development actfvity to ensure adequate capacity and service at each stage of growth. Mobility, Safety, and Circulation The SOPD has been designed to enhance the safety and convenience of vehicular, bicycle, and pedestrian circulatfon throughout and beyond the site. The internal street network, including major and minor collectors and neighborhood streets, is planned to City standards for capacity, alignment, and connectfvity, with multfple access points to distribute traffic and support emergency response. Sidewalks and multf-use trails provide safe, accessible, and contfnuous pedestrian and bicycle routes connectfng all areas of the development. A notable safety enhancement is the replacement of on-street bike lanes along higher-traffic thoroughfares with dedicated ten-foot-wide shared-use paths physically separated from vehicular travel lanes, reducing conflicts and creatfng a safer environment for users of all ages and abilitfes. A Traffic Impact Analysis has been prepared and roadway improvements, turn lanes, and signalizatfon will be implemented as needed to maintain adequate levels of service throughout the life of the development. Purpose and Long-Term Vision The Savannah Oaks Planned Development is intended to deliver lastfng and meaningful benefits to the City of College Statfon and the broader community. By providing a diverse mix of housing types, neighborhood-serving commercial uses, extensive open space and recreatfonal amenitfes, and high- quality infrastructure, the SOPD is designed to create a complete, connected, and resilient community. The development will expand the City's tax base, create employment opportunitfes, and support long- term fiscal sustainability, while establishing a high standard of design and livability that will serve residents and the region for generatfons to come. Page 55 of 234 Page 56 of 234 Page 57 of 234 STATE HIGHWAY 6 CASCADES CT. WOODALL CT. RIVIERA CT. BALLYBUNION CT. EL DORA DR. PIPELINE RD. PDD P-MUD MINOR ARTERIALMAJOR COLLECTORMINOR ARTERIALMINOR COLLECTORM A J O R C O L L E C T O R MAJOR COLLECTORM A J O R C O L L E C T O R MINOR COLLECTOR (PIPELINE #2)MINOR ARTERIALMINOR COLLECTOR (PIPELINE #1) MAJOR COLLECT O R P-MUDP-MUDP-MUDP-MU D P-MUDP-MUDPDD PDDPDDPD D PDDPDDPD D PD D PDDMAJOR COLLECTORPDD1 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE PD CONCEPT PLAN NOTES: A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. TRACT G-2 COWART SUBDIVSION VOL. 300, PG. 299 D.R. JTC31CS, LLC VOL. 17300, PG 20 O.P.R. TRACT J-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. ALC90, LLC VOL. 19161, PG. 53 O.P.R. KEY NOTES LEGEND TRACT G-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. JTC31CS, LLC VOL. 17300, PG 20 O.P.R. TRACT F-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. 37.1273 ACRES EDWARD FROEHLING VOL. 12193, PG. 275 O.R. TRACTS E-1 AND E-2 COWART SUBDIVSION VOL. 300, PG. 299 D.R. 24.3699 ACRES EDWARD FROEHLING VOL. 11772, PG. 47 O.R. TRACT Q-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. TRACT D-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. TRACT B-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. EDWARD FROEHLING VOL. 7881, PG. 12 O.P.R. TRACT C COWART SUBDIVSION VOL. 300, PG. 299 D.R. EDWARD FROEHLING VOL. 8709, PG. 221 O.R. 1.84 ACRES STEPHEN B. NAEGELI, ET UX VOL. 18713, PG. 228 O.P.R. TRACT TWO 8.50 ACRES KEITH E. RALPH, ET UX. VOL. 18023, PG. 42 O.P.R. 5.802 ACRES GREGORY G. GUERCIO AND JEREMY PAUL GUERCIO VOL. 13163, PG. 50 O.R. TRACT TWO 6.317 ACRES MARK NEIL ROBINSON, ET UX. VOL. 824, PG. 44 O.R. TRACT ONE 6.004 ACRES MARK NEIL ROBINSON, ET UX. VOL. 824, PG. 44 O.R. 5.999 ACRES DEBORAH ANN MOORE VOL. 14452, PG. 290 O.P.R. (DESCRIBED IN VOL. 2934, PG. 24 O.R) 6.004 ACRES JASON LAFOLLETTE, ET UX. VOL. 2929, PG. 179 O.R. LOT 29A PEACH CREEK ESTATES VOL. 4730, PG. 243 LOT 29B PEACH CREEK ESTATES VOL. 4730, PG. 243 2.92 ACRE ASHRAF LAKHANI VOL. 8902, PG. 256 O.P.R. SOUTHERN POINTE SUBDIVISION SECTION 106 VOL. 18712, PG. 184 P.R. COMMERCIAL OTHER LOT 1 BLOCK 1 ANIMATE HABITAT, PHASE 1 VOL. 8255, PG. 283 O.R. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"EXHIBIT B Page 58 of 234 N86°27'35"E201.72'L1 N86°07'01"E 954.40'L2 L3 N86°27'56"E 1853.75'N3 ° 3 8 ' 3 0 " W 11 4 2 . 2 7 'N36°01'11"E235.14'N44°03'15"E 477.78'L4 S55°06'27"W 3262.43'N47°33'01"W 209.31'N42°29'08"W 482.10'N40°09'49"W 500.00' L6N40°09'49"W 700.00'N48°41'40"W 202.20'N40°09'49"W 2301.90'STATE HIGHWAY 6 S48°41'54"W 2373.01'MA J O R C O L L E C T O R MINOR ARTERIALM A J O R C O L L E C T O R MAJOR COLLECTORMINOR ARTERIALEXTERIOR LINE TABLE 2 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 3 OF 5 PD CONCEPT PLAN NOTES: Page 59 of 234 N39°06'51"E437.49'N51°38'03"E877.34'N48°41'44"E343.70'N39°33'17"W 358.43'S48°41'54"W 2373.01'N86°48'54"E 7325.95'CASCADES CT. WOODALL C T . RIVIER A C T . BALLYBUNION CT.MINOR ARTERIALMAJOR C O L L E C T O RMAJOR COLLECTORMINOR COLLECTOR (PIPELINE #1)MAJOR COLLECTORMINOR COLLECTOREXTERIOR LINE TABLE 3 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 2 OF 5 MATCHLINE "B" - SEE SHEET 4 OF 5MATCHLINE "C" - SEE SHEET 5 OF 5 PD CONCEPT PLAN NOTES: Page 60 of 234 S3 ° 1 8 ' 4 2 " E 25 4 . 5 8 ' S3 ° 1 3 ' 0 5 " E 38 4 . 4 1 'S86°32'14"W 1986.61'S59°17'52"W897.33'L5N39°32'44"W 3381.25' S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 ' EL DORA DR. PIPELINE RD. S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 'MAJOR COLLECTORMINOR ARTERIALM A J O R C O L L E C T O R MINOR COLLECTOR (PIPELINE #2)MINORARTERIALEXTERIOR LINE TABLE 4 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 2 OF 5MATCHLINE "B" - SEE SHEET 3 OF 5MATCHLINE "C" - SEE SHEET 5 OF 5 MATCHLINE "C" - SEE SHEET 5 OF 5MATCHLINE "C"SEE SHEET 5 OF 5PD CONCEPT PLAN NOTES: Page 61 of 234 S3 ° 1 1 ' 2 4 " E 3 1 0 0 . 0 1 'N86°54'48"E451.66'N86°48'54"E 7325.95'S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 ' MAJOR COLL E C T O R M A J O R C O L L E C T O R MINORARTERIALEXTERIOR LINE TABLE 5 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "C" - SEE SHEET 3 OF 5 MATCHLINE "C" - SEE SHEET 4 OF 5 MATCHLINE "C" - SEE SHEET 4 OF 5PD CONCEPT PLAN NOTES: Page 62 of 234 Savannah Oaks Planned Development College Station, Texas ARTICLE 1 — AUTHORIZATION AND PURPOSE 1.1 Authorization. This ordinance establishes the Savannah Oaks Planned Development (SOPD) for the property legally described as a +/-1,266.691 acre, or 55,177,066 square feet more or less, tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1,266.691-acre tract being more fully described in Exhibit A and depicted in Exhibit B, pursuant to the City of College Station zoning and subdivision authority. 1.2 Purpose. The PD provides a flexible, integrated regulatory framework to implement a master-planned community containing general suburban or single-family residential, townhouse, multifamily and general commercial land uses or districts, with coordinated infrastructure, open space, and design standards that promote walkability, multimodal connectivity, variety of housing, and compatibility with surrounding land uses. The Savannah Oaks Planned Development (SOPD) is intended to improve property utilization by facilitating the highest and best uses, strengthening the area's economy, and promoting the general welfare of the community. ARTICLE 2 — APPLICABILITY 2.1 Boundaries. This PD applies to all land within the boundary shown on Exhibit B (Concept Plan) and legally described on Exhibit A (Legal Description/ Metes and Bounds). 2.2 Supersession. Where this PD conflicts with the underlying zoning or development regulations, this PD shall control. Where silent, City of College Station Unified Development Ordinance (UDO) shall apply. ARTICLE 3 — DEFINITIONS 3.1 Terms. Terms defined by City code retain their definitions. Additional key terms: Terms that are not expressly defined below shall have the meanings set forth in the City of College Station Uniform Code of Ordinances (UDO). Terms not defined in either this Savannah Oaks PD or the City of College Station Code of Ordinances shall have their ordinary dictionary meanings, based on the latest edition of Merriam-Webster’s Unabridged Dictionary. A. Buildable Area - lot area excluding required public easements and rights-of way. B. Construction Field Office - shall mean a temporary building used as an office for supervisory or administrative functions related to the construction of (1) new residential structures within the subdivision in which the Construction Field Office is located or (2) a new commercial development on the tract on which the Construction Field Office is located. A Construction Field Office shall not be used as a residence and shall not be constructed with sleeping facilities. RV’s, motor homes, or mobile homes are not permitted or defined as a Construction Field Office. Page 63 of 234 2 C. Industrial, Light - Industrial, Light uses shall be limited to operations conducted entirely within an enclosed building and shall not create external impacts including noise, vibration, smoke, dust, odor, glare, or other nuisances detectable beyond the property line. D. Neighborhood Amenity Centers – The Savannah Oaks Planned Development District may include a variety of private amenity areas owned, maintained, and operated by the Savannah Oaks Residential Association, Inc., or its assigns. These amenity areas are intended to enhance the quality of life for residents and may include, but are not limited to, swimming pools, lazy rivers, water features, fitness facilities, playgrounds, sport courts, trails, and open space gathering areas. Amenity buildings may be developed to accommodate uses such as homeowners’ association offices, package locker facilities, meeting and event spaces, and small-scale office space. The private amenity areas are intended to incorporate a wide variety of uses, some of which may not fall within a specific traditional land use classification or zoning category; however, all such uses shall remain consistent with the overall residential character of the development. E. Patio Home (Zero Lot Line Dwelling): Shall mean a detached, single-family dwelling located on an individual lot where one wall is completely coincident with a side lot line. A patio or side yard shall be oriented toward the opposite side of the dwelling, entirely enclosed by the dwelling's wall, the neighboring dwelling's lot line wall, and/or other fences and walls. Adjoining lots shall not share a common zero lot line. The combined side setback requirements for standard single-family dwellings within Savannah shall be applied entirely to the single non-zero side setback of the patio home. F. Permitted Subject to Specific Use Standards - A land use that is allowed in a zoning district, but only if it meets additional rules or conditions set by the ordinance (like design, size, or operational requirements). G. Permitted Uses – all uses permitted by right within the zoning classification specified. H. Planned Development (PD) – A development approach that permits flexibility in the application of standard zoning district regulations through the adoption of an ordinance establishing a unified plan for development, including land uses, development standards, and design requirements. I. Planned Development District (PDD) – A zoning district established by ordinance that implements a Planned Development (PD) and provides for customized land use regulations and development standards applicable to a specific geographic area. The PDD ordinance, including all exhibits, shall serve as the governing regulations for development within the district. J. Planned Mixed-Use District (P-MUD) – A zoning district established by ordinance that provides for an integrated mix of commercial, multifamily, and other compatible land uses within a unified development plan. K. Primary Frontage/Build-to-line - frontage dimension and minimum setback line along designated streets. L. Professional Office – shall mean a commercial structure used solely for the provision of executive, management, or legal services. Typical uses include engineering, architectural, and legal offices. M. Real Estate Sales Center – shall mean uses that serve to provide community information and show and sell dwelling units within the same development. The use may be located within a single-family or multi- family structure, a retail space, an office space or in the Neighborhood Amenity Center. Real Estate Centers are allowed only as part of an on-going residential development. N. Resort & Resort Amenities - Resort uses shall include lodging facilities and associated amenities designed to serve guests and visitors, including but not limited to recreational, dining, and retail uses. O. Savannah Oaks Planned Development (SOPD) – The Planned Development District established by this ordinance governing the use and development of approximately 1,266.691 acres of land in the City of Page 64 of 234 3 College Station, Texas, as legally described in Exhibit A and depicted in Exhibit B. The SOPD includes all applicable regulations, development standards, permitted uses, and requirements set forth herein and in all associated exhibits, and shall serve as the controlling zoning and development framework for the property. P. Townhouse: One (1) of a group of no less than two (2), no more than twelve (12), attached dwelling units, with each dwelling unit located on a separate lot and thereby distinguished from condominium units. Q. Utility - shall mean land, facilities, and infrastructure used for the provision, transmission, distribution, collection, or storage of public or private utility services. This land use includes, but is not limited to, water, wastewater, stormwater, electric, gas, telecommunications, broadband, and similar systems. Utility uses may include treatment plants, substations, lift stations, pump stations, detention and drainage facilities, utility corridors, and related appurtenances, whether publicly or privately owned. Utility uses are permitted throughout the Planned Development District as necessary to serve the development, and may be located within designated tracts, easements, or rights-of-way, subject to applicable design standards, screening requirements, and approval by the City of College Station and all applicable regulations, including the City of College Station Unified Development Ordinance. Exhibit B: Concept Plan Page 65 of 234 4 Exhibit C: Proposed Zoning Exhibit ARTICLE 4 — ZONING AND LAND USE PROGRAM 4.1 The Savannah Oaks Planned Development (SOPD) shall be organized into two coordinating zoning districts. Planned Development District (PDD) and Planned Mixed-Use District (P-MUD) also depicted in the Zoning Map labeled Exhibit C. Each zoning district has distinct purposes, permitted land uses, and standards: A. Planned Development District (PDD): General Suburban (GS), Natural Areas Protected (NAP) Base Zoning/ Land Use (+/- 1,104.101 acres) i. Purpose: Provide a regulatory framework for residential neighborhoods and compatible neighborhood-serving uses that emphasize a suburban character. ii. Applicability: Applies to parcels designated for GS and NAP in the Concept Plan. iii. Permitted Uses: Detached single-family homes, townhouse, Residential/Neighborhood amenity areas, parks, schools, and civic uses as listed in the PDD Use Matrix. iv. Standards, Review, & Zoning Categories: Development within the PDD shall comply with the applicable single-family lot, setback, streetscape, dimensional, design, and building form standards set forth in Articles 5–6 and the PDD design review process, unless expressly modified herein. While certain residential uses may be permitted in multiple zoning categories, all development shall comply with the standards of the district in which the property is located unless expressly provided otherwise herein. Townhouse developments within the General Suburban (GS) district may utilize Townhouse (T) district dimensional and development standards only when developed on a designated townhouse tract containing a minimum of four (4) contiguous acres, in which case such tract shall be platted and developed in accordance with all applicable Townhouse (T) district standards. Page 66 of 234 5 B. Planned Mixed-Use District (P-MUD): General Commercial (GC), Multifamily (MF), & Natural Areas Protected (NAP) Base Zoning/ Land Use (+/- 162.591 acres) i. Purpose: Support an integrated mix of commercial, office, multifamily, and civic uses that reinforce walkable, transitable, and activity-oriented corridors along the Hwy 6 frontage and internal mixed-use core. ii. Applicability: Applies to parcels designated GC, NAP, and any MF uses shown on the Savannah Oaks Land Use Table in Exhibit D. iii. Permitted Uses: Retail, restaurants, offices, hospitality, medical, entertainment, multifamily residential, and complementary civic/open space uses consistent with the City’s P-MUD intent and the PDD Use Matrix. iv. Mix Requirement: Where developed as P-MUD, the 20% residential / 20% non-residential minimums and 60% flexible mix shall apply (per City UDO P-MUD standards), and submittals must demonstrate compliance. v. Development Standards: All setbacks, height limitations, landscaping, parking, buffering, and other applicable site development standards shall comply with the requirements of the City Unified Development Ordinance (UDO) for the base zoning or land use within the Planned Mixed-Use District (P-MUD), unless otherwise expressly modified herein. C. Cross-District Coordination and Administration i. Unified Master Plan: Both districts are governed by the SOPD Concept Plan (Exhibit B) and shared exhibits (A–H). Phasing, infrastructure, open space, trail connections, and vehicular/pedestrian networks shall be coordinated across districts to ensure functional integration. ii. Consistency & Conflicts: Where PDD provisions conflict with UDO P-MUD requirements, the more specific provision shall control within the SOPD, except where City code mandates otherwise. Where silent, City UDO and technical standards apply. iii. Transition & Buffers: Buffer requirements are not required when a P-MUD abuts open space. iv. Signage & Entries: Entry monuments, wayfinding, and the Master Sign Program shall reflect a unified community identity while allowing differing scale and sign types appropriate to each district (e.g., up to two (2) entry monument signs at major Hwy 6 N entrances as permitted by the PDD sign standards). v. All multifamily and other residential developments authorized under the P-MUD shall be conclusively deemed to have satisfied all applicable parkland and open space requirements at the SOPD-wide level, provided such requirements are satisfied within the SOPD prior to or concurrent with the development’s approval. Compliance may be achieved through dedication to the SOPD- wide park/open-space system, construction of required improvements, or other approved means consistent with City standards, subject to City approval. Once satisfied at the SOPD level, no additional on-site dedication, construction of improvements, maintenance obligation, payment of in-lieu fees for parkland or open space, payment of a Fee in Lieu of Land Dedication, or payment of a Park Development Fee shall be required of the authorized development, except to the extent of obligations expressly reserved in the approved SOPD. vi. Parkland and open space requirements for multifamily and other residential developments authorized under the P-MUD may be satisfied on an SOPD-wide basis, using parkland dedication and/or improvements provided elsewhere within the SOPD, rather than requiring separate on-site dedication or improvements within the P-MUD area itself. To the extent that SOPD-wide dedication and/or improvements (completed or guaranteed prior to or concurrent with approval of the P-MUD Page 67 of 234 6 development) meet or exceed the parkland and open space requirements otherwise applicable to that development under the UDO, those requirements shall be deemed satisfied, and no further on-site dedication, construction, maintenance obligation, in-lieu fee, Fee in Lieu of Land Dedication, or Park Development Fee shall be required for that development, except for obligations expressly reserved in the approved SOPD. If the SOPD-wide dedication and/or improvements are insufficient to fully meet the applicable requirement; whether measured in acreage, improvements, or fees; the development shall remain responsible for the deficiency, which shall be satisfied through additional dedication, improvements, and/or payment of fees in accordance with the UDO. 4.2 Land Use Table. See Exhibit “D” for a full list of Permitted, Permitted Subject to Specific Use and for those not listed shall adhere to City of College Station UDO standards. A. Notwithstanding the Land Use Table, existing agricultural uses, including but not limited to farming, ranching, or pasturage, shall be permitted to continue on any property that maintains an agricultural valuation (ag exemption) and has not been converted to a different use. Such activities may continue until such time as the property is developed or the agricultural valuation is removed, at which point all uses shall comply with the provisions of this Planned Development District and the City of College Station Unified Development Ordinance (UDO) Page 68 of 234 7 Notes: (a) Any land use not expressly listed in the Savannah Oaks Land Use Table shall be regulated in accordance with the City of College Station Unified Development Ordinance Section 6.4 Specified Use Standards Table. (b) Items marked with a “P*” indicator are subject to specific use standards. Most specific use standards are established in Section 6.4 of the College Station UDO. For uses not specifically addressed within the UDO, additional use standards are provided below: Industrial, Light 1. Industrial, Light uses shall be limited to operations conducted entirely within an enclosed building and shall not create external impacts including noise, vibration, smoke, dust, odor, glare, or other nuisances detectable beyond the property line. 2. Permitted activities include assembly, fabrication, processing, packaging, or storage of goods and materials, provided such activities are low intensity in nature and do not involve heavy manufacturing or large-scale industrial operations. 3. No outdoor storage, outdoor processing, or outdoor industrial activity shall be permitted. 4. Truck traffic shall be limited to light delivery vehicles and occasional freight deliveries. Regular heavy truck traffic or distribution hub operations shall not be permitted. 5. All loading, service, and operational areas shall be screened from public rights-of-way and adjacent residential uses in accordance with Article 7, General Development Standards. 6. Uses involving hazardous materials, excessive noise, or high-impact industrial processes, including but not limited to chemical manufacturing, metal smelting, or bulk material processing, shall not be permitted. Page 69 of 234 8 Resort and Resort Amenities 1. Resort uses shall include lodging facilities and associated amenities designed to serve guests and visitors, including but not limited to recreational, dining, and retail uses. 2. Resort amenities may include pools, lazy rivers, water features, fitness facilities, courts (including pickleball or tennis), spas, and similar recreational facilities. 3. Accessory uses such as cafes, restaurants, retail shops, and personal services shall be permitted, provided such uses are intended primarily to serve resort guests and are integrated into the overall resort development. 4. All resort activities and amenities shall be designed and operated to minimize impacts on adjacent properties, including noise, lighting, and traffic. 5. Outdoor recreation and activity areas shall comply with applicable buffering and screening requirements in accordance with Article 7, General Development Standards. 6. Setbacks. Where Resort and Resort Amenities uses are developed within the GS General Suburban area, setbacks shall follow the Suburban Commercial Guidelines of the UDO where applicable, except as otherwise modified herein. Where Resort and Resort Amenities uses are developed within the GC General Commercial area, setbacks shall follow the General Commercial Guidelines of the UDO. 7. Building Height. Notwithstanding the thirty-five (35) foot maximum building height otherwise applicable to Suburban Commercial development under the UDO, Resort and Resort Amenities structures within the GS General Suburban area shall be permitted a maximum building height of fifty (50) feet. Resort and Resort Amenities structures developed within the GC General Commercial area shall comply with the building height standards applicable under the General Commercial Guidelines of the UDO. 8. Parking. Off-street parking for Resort and Resort Amenities uses shall be provided in accordance with the UDO's parking standards for "Hotel/Motel”, provided that shared parking among resort accessory uses (e.g., dining, retail, recreational amenities) serving primarily resort guests shall be permitted in accordance with Article 7, General Development Standards. Residential/Neighborhood Amenity Areas 1. Residential/Neighborhood Amenity Areas located within a FEMA-designated or calculated 100-yr floodplain may contain recreational, park, trail, open space, and amenity improvements, provided such improvements are designed, constructed, and maintained to withstand periodic flooding and comply with all applicable federal, state, and local floodplain regulations. Townhouse 1. Townhouse developments within the General Suburban (GS) district may utilize Townhouse (T) district dimensional and development standards only when developed on a designated townhouse tract containing a minimum of four (4) contiguous acres, in which case such tract shall be platted and developed in accordance with all applicable Townhouse (T) district standards, which are located in SO PD Article 5.1.D and 6.1 (Exhibit E). ARTICLE 5 — GENERAL SUBURBAN (GS) RESIDENTIAL DEVELOPMENT STANDARDS 5.1 Applicability - All residential development within the Savannah Oaks Planned Development shall be governed by the General Suburban (GS) zoning district, the standards established herein, and within Article 6. Residential product types may include detached single-family dwellings, attached residential dwellings, townhouses, and other residential housing types permitted by Exhibit D and authorized by this Planned Development. Any development standards not specifically addressed within this Planned Development District (PDD) shall default to the applicable requirements of the City of College Station Unified Development Ordinance ("UDO"). Page 70 of 234 9 5.2 Lot Flexibility - The PDD shall allow flexibility and adjustment of residential lot dimensions, mix, and configuration through the platting process, subject to the following: A. Minimum Lot Area. No detached single-family lot shall be less than 5,000 square feet. B. Standards Preservation. Adjustments shall preserve required open space, access, street connectivity, infrastructure capacities, utility corridors, drainage facilities, and required landscape or buffer areas. C. Product Type Flexibility. Residential product types may be substituted or mixed within development phases provided that: i. The applicable development standards of this Article are satisfied; ii. Overall density limitations established herein are not exceeded; and iii. The approved land use allocations of the Planned Development are maintained. 5.3 Density Standards A. Detached Single-Family Development shall not exceed eight (8) dwelling units per gross subdivision acre. B. Attached Residential and Townhouse Development shall not exceed fourteen (14) dwelling units per gross subdivision acre. C. For purposes of this Planned Development, Townhouse Development shall mean a residential development consisting of attached dwelling units developed in accordance with the standards contained herein. D. Any standalone Townhouse Development area shall contain a minimum of four (4) contiguous acres. Individual townhouse buildings may be platted on separate lots provided the overall development area satisfies the minimum acreage requirement. E. The location, configuration, and acreage of townhouse development areas may be adjusted through the preliminary plat process provided the minimum acreage requirement is maintained and the overall density limitations established herein are not exceeded. F. Any amendment increasing residential density beyond the limits established herein shall require approval of a Planned Development amendment. 5.4 Cluster Development A. Authority & Purpose: Cluster (conservation) subdivision techniques are permitted in General Suburban (GS) districts consistent with UDO Article 8 to allow alternative lot layouts that preserve open space, natural features, tree stands, drainageways, and improve connectivity while maintaining permitted density and community character. B. Density & Minimums: Cluster lots may be smaller than typical lot types (in area and width) than otherwise required in Article 5.2, but in which clustering shall not increase total dwelling units beyond allocations per Article 5.3. Side setbacks and side street setbacks may comply with other setback standards in this PDD respectively. C. Cluster developments shall be permitted within the PDD subject to compliance with applicable City of College Station UDO cluster development standards, including but not limited to minimum common open space requirements. A minimum of twenty-five percent (25%) of the gross acreage of each cluster development shall be provided as common open space, with at least thirty percent (30%) of the required open space consolidated in one contiguous area, unless otherwise expressly modified herein. Required open space and parkland obligations may be satisfied at the development-wide level across the PDD rather than within each individual subdivision, provided the cumulative open space and Page 71 of 234 10 parkland meet or exceed all applicable UDO and PDD requirements, serve the residents of the applicable cluster areas, and are permanently protected through plat, easement, covenant, or HOA ownership. D. Design, Infrastructure & Services: Cluster layouts must provide safe, accessible street and pedestrian networks, adequate utility and drainage corridors, and emergency vehicle access. Reduced lot dimensions may require modified setbacks or building envelopes to ensure privacy, light, and serviceability; such modifications shall be reviewed administratively per Article 12. Service, parking, and access arrangements must meet City technical standards. E. Review & Approval: Cluster proposals must include a conceptual cluster plan at sketch/preliminary plat submittal showing lotting, conserved/open space, trails, access, utilities, and how UDO Article 8 and PDD objectives are met. The PDD Administrator may approve cluster plans administratively if consistent with this PDD, the UDO, and City technical standards. Proposals that alter density, reduce required open space below PDD minimums, or change primary access require a PDD amendment per Article 12. F. Maintenance & Restrictions: All preserved open space, parks, stormwater BMPs, and conservation tracts created through clustering must have recorded maintenance obligations, allowed uses, and restrictions (HOA or similar) to ensure permanent protection and compliance with City and PDD requirements. 5.6 Accessory Structures - Accessory structures shall comply with UDO Section 6.5 unless otherwise modified by this Planned Development ARTICLE 6 — GENERAL SUBURBAN (GS) RESIDENTIAL STANDARDS 6.1 RESIDENTIAL DEVELOPMENT STANDARDS (base standards): Residential Development Standards (Exhibit E) Savannah Oaks Residential Zoning Districts and Standards General Suburban (GS) Single Family Residential Townhouse Min. Average lot Area per Dwelling Unit 5,000 SF N/A Absolute Min. Lot Area per Dwelling Unit 5,000 SF 1,800 SF Min. Lot Width 50' N/A Min. Lot Depth 100' N/A Min. Front Setback 25' (a) (b) 15' Page 72 of 234 11 Max. Front Setback N/A N/A Min. Side Setback 5' 5' (c) (d) Min. Side Street Setback 10' 10' Max. Side Street Setback N/A N/A Min. Rear Setback 20' 10' Max. Impervious Cover 65% 85% Max. Height 35' 35' Min. Number of Stories N/A N/A Max. Dwelling Units/Acre (Subdivision Gross) 8 14 Min. Dwelling Units/Acre N/A N/A Notes: (a) Minimum front setback may be reduced to fifteen (15) feet when approved rear access is provided, or when side yard or rear yard parking is provided. (b) Front setback applies to primary building face including front facing garage; front porches may encroach 5’ over the min. front setback line or may be reduced to a 20’ front setback on or at cul-de-sac frontage lots respectively. (c) Zero lot line construction of a townhouse residence is allowed where properties on both sides of a lot line are owned and/or developed simultaneously by a single party. (d) Townhouses may be developed in attached groups or clusters. Each complex shall be considered one building for setback purposes. A minimum side setback of five (5’) feet shall be required only from the outermost side walls of each townhouse complex to adjacent lot lines or separate townhouse complex. No side setback shall be required between individual attached dwelling units within the same complex where units share common party walls. (e)Public, civic, and institutional structures shall have a maximum building height of fifty (50) feet in these districts, except for non-occupied structures that may exceed the roof line by 25’, such as church steeples, radio towers, etc. Page 73 of 234 12 ARTICLE 7 — RESIDENTIAL/NEIGHBORHOOD AMENITY AREA(S) 7.1 The Savannah Oaks Planned Development District may include a variety of private amenity areas owned, maintained, and operated by the governing Property Owners Association (POA). These amenity areas are intended to enhance the quality of life for residents and may include, but are not limited to, swimming pools, lazy rivers, water features, fitness facilities, playgrounds, sport courts, trails, and open space gathering areas. Amenity buildings may be developed to accommodate uses such as homeowners’ association offices, package locker facilities, meeting and event spaces, covered sports courts and small-scale office space. The private amenity areas are intended to incorporate a wide variety of uses, some of which may not fall within a specific traditional land use classification or zoning category; however, all such uses shall remain consistent with the overall residential character of the development. All improvements and uses shall comply with applicable health, safety, and building standards as required by the City of College Station. Limited neighborhood-serving commercial uses may be permitted within designated amenity areas, including coffee shops, cafés, sandwich shops, and similar low-intensity establishments, provided such uses are compatible with the development and subject to City approval. 7.2 Private Amenity Parking - Private amenity facilities within Savannah Oaks are intended to serve residents and their guests. Passive recreation amenities, including trails, greenways, open space areas, pocket parks, playgrounds, picnic areas, community gardens, dog parks, pavilions, and similar low-intensity outdoor uses, shall not require dedicated off-street parking. A. Active recreation amenities, including pools, clubhouses, recreation centers, fitness facilities, event spaces, and similar structured or higher-intensity gathering-oriented uses, shall provide a minimum of fifteen (15) off-street parking spaces per amenity area. Where multiple active recreation amenities are located within a common amenity area or are served by a shared parking area, the minimum parking requirement shall not be cumulative. Where a facility shares characteristics of both categories, the passive classification shall govern unless the facility contains a pool, indoor fitness space, or enclosed event venue. B. In addition, active recreation amenities shall collectively provide a minimum development-wide parking supply equal to three (3) percent of the total number of dwelling units approved through recorded final plats within the Planned Development. Required parking may be distributed among multiple amenity locations, provided through shared parking areas, and constructed incrementally as development occurs. Parking spaces provided in excess of the minimum requirement for any individual amenity area may be credited toward the overall development-wide parking requirement. C. Off-street parking areas serving Residential/Neighborhood Amenity Areas shall utilize standard city approved paving materials (concrete) for all fire lanes, dumpster and loading pads, and ADA-accessible parking spaces and access routes, consistent with applicable City fire access and ADA requirements. For standard, non-ADA individual parking spaces within these areas, alternative materials: including but not limited to crushed granite, decomposed granite, or stabilized aggregate surfaces, may be proposed to complement the natural character of the amenity area, subject to review and approval by the City at the time of site plan, upon submittal of justification demonstrating that the proposed material provides adequate durability and stability to accommodate the anticipated parking demand. All parking areas, regardless of material, shall comply with applicable fire access requirements and ADA accessibility standards. Page 74 of 234 13 ARTICLE 8 — P-MUD STANDARDS 8.1 All General Commercial (GC) and Multifamily (MF) (Base Zoning) Use Standards shall comply with Article 4 of this PD Document; all other standards are set by the City of College Station UDO. ARTICLE 9 — PARKING, CIRCULATION, AND ACCESS 9.1 Single-Family Residential Parking: 1 space/ bedroom, with a minimum of 2 spaces, 4 total spaces per unit max; Garage spaces shall count towards requirements if they meet minimum dimensional standards. 9.2 Townhouse: 1 space/ bedroom, with a minimum of 2 total spaces per unit. Garage spaces shall count towards requirements if they meet minimum dimensional standards. 9.3 Commercial Parking: Base ratios per City code; shared parking analysis may reduce required stalls. 9.4 Multifamily Parking: 1 Bedroom Unit = 1.5 space/bedroom, 2+ Bedroom Unit = 1 space/bedroom; bicycle parking shall be 0.5 spaces/ bedroom 9.5 Street Design. A. Internal residential streets shall comply with the B/CS Unified Design Guidelines as adopted at the time of Planned Development approval. and shall maintain a minimum pavement width of twenty-seven (27’) feet, measured back-of-curb to back-of-curb, which reflects the current standard. B. Roadway and Thoroughfare design per B/CS Unified Design Guidelines as adopted at the time of SOPD approval and/or Typical Roadway Cross Sections in Exhibit G. 9.6 Modified Subdivision Connectivity and Access Standards. The following modified connectivity and access standards shall apply within the Savannah Oaks Planned Development in lieu of conflicting provisions of the Unified Development Ordinance (“UDO”): A. Street Connectivity. Subdivisions exceeding two hundred (200) lots shall require a minimum of two (2) street connections to external roadways or adjacent development tracts. The standard requirement for three (3) street connections otherwise applicable under the UDO shall not apply within the Savannah Oaks Planned Development. B. Block Length. Maximum block lengths may be increased from one thousand two hundred feet (1,200’) to approximately one thousand seven hundred and fifty (1,750’) and shall not apply to such blocks that are adjacent to or bordered by open space corridors, parks, greenbelts, drainage corridors, or thoroughfares, as approved through the platting process. C. Access Ways. Required pedestrian or vehicular access way spacing may be increased from nine hundred feet (900’) to correspond with the modified block length standards permitted within the Savannah Oaks Planned Development. D. Cul-de-Sac Access Ways. Pedestrian or access way connections at the terminus of internal residential cul-de-sacs shall not be required unless otherwise determined necessary by the City for emergency access or public safety. Page 75 of 234 14 ARTICLE 10 — PARKS, OPEN SPACE, TRAILS, RECREATION, AND ENVIRONMENTAL 10.1 Purpose and Integration. The Savannah Oaks Park System shall provide an integrated network of parkland, open space, and trails designed to meet the recreational needs of residents and visitors. The system shall incorporate both public and private parks, interconnected through greenbelt trails, sidewalks, and roadways to ensure cohesive connectivity throughout the Planned Development. Trails shall function as the primary connectivity framework, expanding both usable and visual open space and providing multiple access points throughout the development. The park system is intended to blend seamlessly with adjacent residential and commercial uses, reinforcing community identity, wellness, and a sense of place. 10.2 Park Classifications. A. Improved Parks. Improved Parks shall include designated tracts that are graded and developed with constructed facilities and amenities intended to support recreation, civic gathering, and structured play. Such parks may include playground equipment, shade structures, seating, lighting, and similar improvements. B. Natural Parks. Natural Parks shall include designated tracts intended for the preservation and enhancement of natural features, including existing topography, vegetation, floodplain areas, and wildlife habitat. These areas shall be limited to low-impact recreational uses such as trails and minor improvements that complement the natural environment. 10.3 Ownership, Maintenance, and Dedication. A. Pre-Dedication Maintenance. Until formal dedication is accepted by the City, all park tracts, trail segments, amenities, irrigation systems, and landscaping shall be owned and continuously maintained by the Property Owners Association (POA) and/or their assigns at no cost to the City. B. Transfer Upon Dedication. Upon acceptance of a dedication by the City, all maintenance obligations for the dedicated park tracts and trail segments shall transfer to and become the sole responsibility of the City. The Developer and POA shall have no further maintenance obligation for any dedicated tract unless otherwise agreed to in a separate written maintenance agreement executed at the time of dedication. C. Dedication Identification. A tract-by-tract identification of which park tracts and trail segments are proposed for dedication to the City, and which are proposed to remain under POA maintenance, shall be provided at the time of Preliminary Plan and noted on Exhibit F (Park Map). D. Dedication Review and Acceptance. Any proposed dedication of parkland to the City shall be subject to review and acceptance by the City in accordance with applicable City procedures and standards in effect at the time of dedication, including, where applicable, recommendation by the Parks and Recreation Advisory Board and approval by the Planning and Zoning Commission as required under UDO Section 8.8.D.5.a. Page 76 of 234 15 10.4 Connectivity. The Savannah Oaks trail and shared use path network shall consist of a connected hierarchy of trails, including interior residential neighborhood trails and sidewalks, P-MUD District trails and sidewalks, park trails, and shared use paths. The network shall provide continuous connections between parks, open spaces, residential areas, and commercial districts to ensure safe, accessible, and integrated pedestrian and bicycle circulation throughout the Planned Development while supporting the City's regional network. A. Interior Residential Neighborhood Trails and Sidewalks. Sidewalks and/or trails shall be provided at a minimum width of five feet (5') on both sides of residential streets and constructed to City standards. B. P-MUD District Trails and Sidewalks. Sidewalk and trail systems within commercial areas shall be provided in accordance with the Savannah Oaks Commercial Guidelines and shall reflect the specific land uses, including retail, office, and multifamily. Such sidewalks and trails shall be a minimum of five feet (5') in width and constructed to City standards. C. Improved Park and Natural Park Trails. These trails shall range from five feet (5') to ten feet (10') in width and shall be constructed in phases consistent with development phasing. Trails may be constructed using a variety of materials, including but not limited to concrete, asphalt, crushed stone, decomposed granite, soil cement, natural soft surface materials, mulch/wood chips, or boardwalk structures. The maintenance of all trail segments, including surface repairs, drainage, and vegetation management, shall be the sole responsibility of the POA, except where a trail segment is located within land dedicated to and accepted by the City, in which case maintenance responsibility shall transfer to the City upon such dedication and acceptance. Prior to construction of any trail segment, the Developer shall submit the proposed trail route, alignment, and materials to the City for review and approval. D. Shared Use Paths. Shared use paths shall be constructed as ten-foot (10') wide paths located on both sides of designated roadways, where applicable, and along routes designated within the Bicycle, Pedestrian, and Greenways Master Plan. Shared use paths along roadways shall be installed concurrently with roadway construction, located within the public right-of-way, and may meander within that right-of-way subject to applicable setbacks from back of curb and adjacent landscape areas. All shared use paths shall be constructed in accordance with City standards. 10.5 Parkland Dedication Requirements. Parkland dedication requirements shall be determined in accordance with Section 8.8 of the City of College Station Unified Development Ordinance, except as expressly modified by this PD. Where this PD conflicts with UDO Section 8.8, the provisions of this PD shall control. All other UDO Section 8.8 requirements not expressly modified herein shall remain in full effect. A. Base Dedication Standard. Parkland dedication requirements within the Savannah Oaks Planned Development shall be calculated in accordance with Section 8.8 of the UDO, including a dedication rate of one (1) acre of parkland per forty-eight (48) single-family dwelling units and one (1) acre per eighty- three (83) multifamily bedrooms. For phased or mixed-use portions of the development, the City and Developer may apply dedication requirements on a cumulative and proportional basis across the overall Planned Development to account for phased timing and the unified park and trail system established herein. B. Floodplain Credit. Floodplain and floodway areas may be credited toward parkland dedication at a ratio of three (3) acres of floodplain equaling one (1) acre of parkland, subject to acceptance by the City and compliance with applicable park standards. C. Contiguous Park System. For purposes of parkland dedication, park areas separated by a public roadway shall be considered a single contiguous park system where the tracts are directly aligned across Page 77 of 234 16 the roadway and connected via a planned pedestrian crossing and continuous trail network. Such combined areas shall be treated as a unified park space meeting the City's objective for usable, connected parkland. D. Credit for Previously Dedicated Parkland. Parkland previously dedicated to the City or to the POA in connection with any prior phase of the Savannah Oaks Planned Development shall be credited toward the parkland dedication requirements of subsequent phases on a cumulative basis, such that excess dedication from an earlier phase reduces or eliminates the obligation of a later phase. Credits shall be tracked and applied during the platting process for each subsequent phase using the per-acre valuation methodology established within this Planned Development. E. No Additional Fees. The Developer shall not be required to pay separate parkland dedication fees, park development fees, or other park-related exactions for areas where land has been dedicated or park improvements have been constructed by the Developer in accordance with this Planned Development. 10.6 Phasing and Construction of Park Improvements. A. Phased Installation. Park improvements and amenities shall be installed in phases to serve each phase of development, ensuring that recreational facilities are available concurrent with or prior to the delivery of lots, building permits, or certificates of occupancy, as required by the City. B. Phasing Flexibility. For any phase in which a park tract is not yet constructed at the time of final plat approval, the Developer may satisfy the applicable parkland improvement obligation through previously constructed park improvements within the Planned Development, credited on a cumulative basis. Park improvement credits generated by construction in advance of or in excess of phase minimums shall carry forward and may be applied to reduce obligations in future phases. C. Developer Financial Responsibility. The Developer shall be responsible for the design, engineering, site preparation, permitting, and construction of all parkland and open space within the Savannah Oaks Planned Development, including both Improved Parks and Natural Parks, whether intended for private use or future public dedication. Under no circumstances shall the City be financially responsible for the initial costs that may include construction, installation of amenities, and/or landscaping within designated park tracts. D. City Standards. All park improvements shall be constructed in strict accordance with the approved Site Plan, the City of College Station UDO, and current construction standards established by the City's Parks and Recreation and Public Works departments. 10.7 Amenity Planning and Park Board Review. Prior to construction of each Improved Park intended for public dedication, the Developer shall submit a proposed amenities list and conceptual illustrations to the Parks and Recreation Advisory Board for review. The amenities list shall be consistent with the City's Park Facility and Equipment Standards. In preparing the amenities list, the Developer shall coordinate with the City's Parks Director, who shall provide guidance on community priorities informed by the current Parks Master Plan update. Final amenities for each park shall be developed in consultation with the Parks Director prior to Advisory Board review. Page 78 of 234 17 Improved Parks within the development may include, but are not limited to, the following amenities: playgrounds and play structures, pavilions and shade structures, picnic tables and seating areas, benches, trash receptacles, bicycle racks, pet waste stations, open lawn and passive recreation areas, multi-use courts, fitness stations, splash pads or water play features, restroom facilities, trails, shared-use paths, trailhead signage and wayfinding, lighting, landscaping, and other recreational improvements as approved by the City. The specific amenities, locations, and quantities for each park shall be determined at the time of park construction and shall be subject to City review and approval. The Developer reserves the right to modify, substitute, or add amenities within each park provided the overall recreational intent of the park is maintained. 10.8 Private Amenity Credit. Private recreational amenities constructed within the SOPD and owned and maintained by the POA shall receive credit up to fifty percent (50%) of the applicable parkland improvement obligation. This provision expressly supersedes the twenty-five percent (25%) private amenity credit limitation otherwise established by the City of College Station UDO. The remaining percentage is retained for deposit in the City's parkland dedication fund for the purpose of defraying the financial burden that new residential units impose on the existing public park system in the city, beyond the immediate development in which the dwelling is located. Eligible improvements may include, but are not limited to, splash pads, playgrounds, sports courts, pickleball courts, event lawns, covered gathering areas, trails, parking areas, drainage improvements, landscaping, lighting, and other facilities necessary to support the use and operation of recreational amenities serving residents of the Planned Development. Credit shall be based upon the total documented construction cost of eligible improvements, including all site development costs, supporting infrastructure, general conditions, contractor overhead and profit, and other customary project costs directly associated with the design and construction of such improvements. A. Availability of Private Amenity Credit. The purpose of this Section is to encourage the development of public park improvements before or concurrently with the construction of private recreational amenities while preserving the flexibility necessary for phased development. Private amenity credit shall become available upon the Developer demonstrating compliance with the intent of this Section through one or more of the following: i. Completion and City acceptance of the initial public park improvements identified for the applicable phase; ii. Posting of a performance bond, letter of credit, or other financial assurance acceptable to the City securing completion of the remaining required public park improvements identified for the applicable phase; or iii. Another phasing or financial assurance mechanism approved by the City that provides substantially equivalent assurance that the required public park improvements identified for the applicable phase will be completed. Private amenity credit earned more than or in excess of the amount that may be applied within a particular phase, whether due to the fifty percent (50%) limitation or the timing of public park improvements, shall be carried forward and remain available for application to subsequent phases in accordance with this Article. 10.9 Conceptual Nature of Exhibits and Administrative Modifications. A. Conceptual Alignment. The locations, dimensions, acreage, and alignments of the Improved Parks, Natural Parks, and trail networks depicted on Exhibit F (Conceptual Park and Trail Map) are conceptual Page 79 of 234 18 and illustrative in nature, representing the general intent and proposed connectivity of the park system at the time of zoning. B. Allowance for Modification. As detailed engineering, surveying, and site design occur, adjustments to the park system will be necessary. To accommodate final grading, drainage requirements, tree preservation, utility alignments, and final right-of-way locations, the Developer may modify the exact size, shape, boundaries, and locations of individual park tracts without requiring a formal amendment to this Planned Development. 10.10 Environmental Protection. Development within the Savannah Oaks Planned Development shall incorporate the following environmental measures: Existing significant trees and natural drainageways shall be preserved where feasible and incorporated into the park and open space system. All grading and construction activities shall comply with applicable state and City stormwater quality requirements, including erosion and sediment control measures during construction. Page 80 of 234 19 ARTICLE 11 — LANDSCAPING, IRRIGATION, BUFFERING, AND LIGHTING 11.1 On-Site Irrigation Water A. Uses permitted: Landscaped areas, parks, greenbelts, medians, trails, and other open-space areas within the SOPD may be irrigated using on-site sources (permitted wells and/or on-site ponds/lakes) provided irrigation is limited to areas inside the SOPD and water is not sold or supplied off-site. B. Permits & compliance: All wells, pond withdrawals, and irrigation systems must obtain applicable City, state, and groundwater-district permits and comply with TCEQ and City requirements (including backflow prevention and cross-connection control). C. Environmental safeguards: Irrigation withdrawals must not impair required stormwater detention, drainage functions, or critical vegetation; designs must demonstrate no adverse hydrologic impacts. D. System requirements: Non-potable supplies require appropriate filtration/treatment, metering/monitoring as required by the City, and incorporation of water-efficient controls (e.g., smart controllers, moisture sensors). E. Equipment & maintenance: Pumps, piping, and related equipment shall be sited and screened to minimize impacts. Operation, maintenance, insurance, and recorded access/maintenance obligations are the responsibility of the developer/POA/HOA. 11.2 Parking Lot Landscaping. Per city UDO. 11.3 All exterior lighting shall adhere to current City of College Station standards and ordinances. Fixtures shall be directed to minimize light spill and glare into adjoining properties. Provide pedestrian-level lighting in GS & GC corridors per city requirements. Any lighting that may be installed on Greenbelts and/or trails will be mitigated or held at a minimum to lessen environmental impact on natural habitat. Detailed lighting plans demonstrating compliance with lumen caps, cutoff requirements, and photometric analysis may be submitted with site plan or construction documents if applicable. ARTICLE 12-TANGIBLE COMMUNITY BENEFITS (Also attached as Exhibit H) 12.1 Community Benefits A. Increase landscape buffer planting requirements by 50% beyond UDO Section 7.7 minimums between P-MUD uses adjacent to Single Family Residential. i. Savannah Oaks will increase required landscape buffer planting standards by fifty percent (50%) beyond the minimum requirements of Section 7.7 of the UDO. This enhancement applies to all required canopy trees, non-canopy trees, and shrub plantings within buffer, resulting in a significantly denser and more effective vegetative screen than required by code. The increased planting quantities improve year-round opacity, enhance visual separation between land uses, and strengthen compatibility with P-MUD uses adjacent Single Family Residential Where existing natural vegetation is present and meets UDO standards, it will be preserved and credited toward buffer requirements, with supplemental plantings provided as necessary to achieve the enhanced standard. Page 81 of 234 20 Buffer Planting Requirements (+ 50% Enhancement) P-MUD Uses -General Commercial (GC) and Multifamily (MF) Adjacent to Single Family Residential Category UDO Requirement (Sec. 7.7) Savannah Oaks (+ 50% Enhancement) Canopy Trees 1 per 25 LF (min. 2” caliper) 1 per ~16 LF (min. 2” caliper) Non-Canopy Trees 1 per 15 LF (min 1.25” caliper) or shrub substitution 1 per 10 LF (min. 1.25" caliper) or equivalent substitution Shrubs 1 per 3 LF (min. 5-gallon, 3' height) +50% quantity (min. 5-gallon, 3' height, increased evergreen mix) Vegetation Character Standard buffer planting per UDO Increased density, layered planting for improved screening *Landscape buffers between different land use areas within the P-MUD district (MF and GC) will adhere to UDO standards B. Increase landscape buffer widths by 50% beyond UDO Section 7.7 minimums between General Commercial (GC) uses adjacent to General Suburban (GS) and Multi-Family (MF) uses adjacent to Single Family Residential. i. Savannah Oaks will increase required buffer widths by fifty percent (50%) beyond the minimum standards of Section 7.7 of the UDO. This results in greater physical separation between differing land uses, improving the effectiveness of buffering for noise, lighting, and visual impacts. General Commercial (GC) uses adjacent to Single Family Residential will increase from 15 feet to approximately 22.5 feet, and Multi-Family (MF) adjacent to Single Family Residential will increase from 10 feet to 15 feet. When combined with enhanced planting requirements, these expanded buffer areas provide a more substantial and effective transition between land uses than is required under the UDO. Buffer Width Requirements (+ 50% Enhancement) General Commercial (GC) Adjacent to Single Family Residential Category UDO Requirement Savannah Oaks (Enhanced) Buffer Width 15 feet 22.5 feet Screening Wall required (6 ft) Wall maintained (6 ft) Separation Function Standard separation between uses Increased separation for improved noise, lighting, and visual mitigation Buffer Character Narrow landscaped buffer strip Expanded transition zone with increased landscape depth Page 82 of 234 21 Buffer Width Requirements (+ 50% Enhancement) Multifamily (MF) Adjacent to Single Family Residential Category UDO Requirement Savannah Oaks (Enhanced) Buffer Width 10 feet 15 feet Screening Fence required (6–8 ft) Fence maintained (6–8 ft) Separation Function Standard transitional buffer Enhanced separation improving privacy and compatibility Buffer Character Minimal Separation Zone Expanded landscaped transition area *Landscape buffers between different land use areas within the P-MUD district (MF & GC) will adhere to UDO standards ii. Natural Vegetation Buffer Alternative a. Savannah Oaks may utilize existing natural vegetation as an alternative to standard buffer yard improvements where such vegetation meets the performance standards of Section 7.7 of the UDO. Natural vegetation may be credited in lieu of required buffer plantings and screening (fences or walls) provided that it consists of a healthy mix of canopy and understory trees and is of sufficient density to achieve a continuous visual screen. b. To qualify, existing vegetation must provide sufficient opacity to screen views to a height of six (6) feet, as documented through a site assessment. Vegetation used in lieu of standard buffer requirements shall be preserved and protected in accordance with the UDO Landscaping and Tree Protection standards. c. Where existing vegetation does not fully satisfy required buffer standards, supplemental plantings will be installed to meet UDO requirements, including any applicable enhanced standards associated with the Savannah Oaks PD. This approach allows for the integration of high-quality natural features into the buffer design while ensuring consistent compliance with performance-based screening objectives. d. The natural vegetation buffer alternative is preferred because it provides a more effective and sustainable form of buffering than fully constructed improvements. Existing mature vegetation, when preserved and enhanced, offers superior long-term visual screening through layered canopy and understory coverage while also delivering environmental benefits such as improved stormwater infiltration, reduced heat island effects, and preservation of existing ecosystems. This approach allows buffers to respond to existing site conditions rather than replacing them with uniform planted or constructed elements, resulting in more context-sensitive transitions between land uses. In addition, reliance on established vegetation reduces long-term maintenance needs and supports the preservation of mature tree stands that cannot be readily replaced, ultimately producing a higher-quality and more compatible edge condition than standard buffer yard installations alone. Page 83 of 234 22 C. Increase landscaping point requirements by 10% for all non-residential and multi-family development within the P-MUD, with existing protected canopy trees credited toward the increased point total per UDO Section 7.6.C.5. i. Higher point thresholds produce more diverse, higher-quality planting schemes rather than minimum- compliant box-checking. Crediting existing protected canopy incentivizes preservation of mature trees, the most ecologically valuable landscape assets on any site, rather than clearing and replanting. D. Meet Non-Residential Architectural Standards building material requirements on all primary entrance facades and facades facing a public right-of-way; facades not facing ROW or public park shall meet a minimum of 10% qualifying material coverage. i. Savannah Oaks will voluntarily comply with the Non-Residential Architectural Standards Subsection of Article 7 as a community benefit, applying these standards to all applicable non-residential development within the SOPD. This includes the use of durable, high-quality exterior materials such as masonry, brick, stone, or comparable approved finishes, as well as compliance with façade articulation requirements intended to reduce blank wall conditions and enhance architectural interest. These standards shall not apply to private amenity areas. ii. All non-residential buildings, including General Commercial (GC) areas within the P-MUD, will incorporate architectural detailing consistent with Article 7 standards, including material variation, façade modulation, and other design elements that promote visual quality and pedestrian-scale development. By voluntarily adopting these standards, Savannah Oaks ensures a higher level of architectural design consistency and durability than would otherwise be required, enhancing compatibility with surrounding General Suburban (GS) uses and elevating the overall character of the development. E. Prohibit internally illuminated cabinet or box signs located within 200 feet of a General Suburban base zoning district or use, as measured from the sign location to the nearest property line of such district or use; halo-lit, externally lit, and non-illuminated signs permitted without restriction. i. Cabinet signs produce the highest light bleed and glare of any commercial sign type. Within 200 feet of residential uses, they create direct nuisance, particularly at night. Permitting halo-lit, externally lit, and non-illuminated alternatives without restriction preserves full commercial identity flexibility while eliminating the specific sign type most harmful to residential adjacency. F. All required canopy trees per UDO, within Savannah Oaks, shall be 100% Texas native species. i. Native canopy trees are climate-adapted, require less irrigation and maintenance once established, support local pollinators and wildlife corridors, and have higher long-term survival rates in Central Texas conditions. Committing 100% native species creates a cohesive, regionally appropriate tree canopy that performs better and costs less to maintain over time. G. All irrigated common areas, parks, medians, and greenbelt areas shall use smart irrigation controllers. i. Smart controllers adjust watering schedules based on real-time weather and soil conditions, typically reducing outdoor water consumption by 20–50% compared to timer-based systems. In a region facing Page 84 of 234 23 increasing drought pressure and municipal water demand, this commitment reduces the project's long- term water footprint. H. All Neighborhood Amenity Centers shall provide bicycle parking at 150% of the applicable non-residential minimum with fixed-frame racks integrated into entry design and located within 50 feet of an entrance. i. Amenity centers are the highest-frequency destinations within a residential community. Exceeding the minimum by 50% and placing them within 50 feet of an entrance removes the practical barriers to cycling as a primary mode of getting to shared amenities. This is an active transportation infrastructure where it will actually be used. Note: In the event of any conflict or inconsistency between the terms of Article 12 and any other provision of this PD, the terms of Article 12 shall govern and control in all respects ARTICLE 13 — INFRASTRUCTURE AND MAINTENANCE 13.1 Public Infrastructure. Streets, water, sanitary sewer, stormwater mains, and utilities intended for public use shall be constructed to City standards and dedicated to the City. 13.2 Approved Street and Utility Cross-Sections - Approved Cross-Sections. To ensure consistency and clarity in the development of the Savannah Oaks Planned Development District, all streets and utilities shall be designed in conformance with the approved street and utility cross-sections contained herein and within the applicable exhibits of this Planned Development. A. Superseding Standards. The approved street and utility cross-sections established by this Planned Development shall supersede the City of College Station Standard Specifications, Unified Development Ordinance requirements, and other applicable City Street design standards to the extent they differ. The intent of this provision is to provide certainty regarding the approved roadway and utility infrastructure standards applicable to Savannah Oaks and to protect the development from future modifications to City design standards adopted after approval of this Planned Development. B. Shared Use Paths (SUP). Modifications from current City standards include, but are not limited to, the removal of bicycle lanes from thoroughfares in exchange for a ten (10) foot wide shared use path on each side of roadways classified as Minor Collector or higher. These shared use paths are intended to provide safe and efficient transportation facilities for pedestrians, cyclists, and other non-motorized users, while maintaining connectivity throughout the development and surrounding areas of the city. Permitted users of SUPs may include, but are not limited to: pedestrians, joggers, cyclists, skateboarders, in-line skaters, scooter riders, wheelchair and mobility-device users, and e-bikes (Class 1 and 2, as defined by Chapter 664 of the Texas Transportation Code). Low-speed motorized devices such as golf carts and neighborhood electric vehicles (NEVs) may be permitted on SUPs in accordance with applicable speed and weight restrictions. C. Administrative Modifications. Minor modifications to approved street and utility cross-sections that do not materially alter the approved right-of-way width, pavement width, traffic capacity, utility capacity, or overall intent of the Planned Development may be approved administratively by the City Engineer without requiring an amendment to this Planned Development. Page 85 of 234 24 13.3 Private Infrastructure & HOA. Private amenities, internal private streets (if any), open-space maintenance areas, private stormwater BMPs, and landscaping in common areas shall be maintained by a mandatory home owners’ association (HOA) or property owners’ association (POA) unless otherwise noted. 13.4 Financial Assurances. City may require performance bonds, letters of credit, or other assurances for public improvements. Page 86 of 234 25 ARTICLE 14 — ENGINEERING AND TECHNICAL REQUIREMENTS 14.1 All engineering, drainage, stormwater detention, water, and sanitary plans must meet State & City standards. 14.2 Utilities. New utilities shall be installed underground unless waived by the City. Overhead Utilities are allowed adjacent to existing overhead utility lines or on/along property boundaries. Coordination with utility providers required. ARTICLE 15 — SIGNAGE GUIDELINES 15.1 Signage. The community will feature a coordinated signage program or Master Sign Program (MSP) as part of the master plan. The Developer may install permanent signs at some or all locations generally consistent with the Signage System Exhibit. Permanent signs need not be identical but shall share a complementary palette of materials, graphics, and styles that reinforce the community character. Wayfinding, marketing, and street/traffic signs shall likewise reflect the established character. The Master Sign Programs (MSP) purpose is to ensure signage contributes to a cohesive district identity, pedestrian orientation, and legibility while minimizing visual clutter and protecting adjacent residential character. Monument signage is encouraged at major entries. No offsite signage of advertising is permitted. These sign standards apply to all signs within the PD in addition to applicable City sign regulations. Where this PD is more specific or restrictive, these standards control. Where silent, City code applies. A. Primary Community Entry Monument: A primary entry monument shall be constructed at the intersection of Savannah Oaks Boulevard and Highway 6 and designed as a landmark feature incorporating wall and tower elements. These hardscape elements shall comply with the following parameters: i. Wall Height – The wall height shall not exceed eighteen feet (18’). ii. Width – N/A iii. Tower Height– The tower height shall not exceed thirty-five feet (35’). iv. Setback – Hardscape elements will be set back from the Highway 6 right-of-way a minimum of fifteen feet (15’) and from the Savannah Oaks Boulevard right-of-way a minimum of ten feet (10’), and will be located as to not obstruct any Site Distance Triangles at any Public or Private Roadway Intersections. v. Font Size – Font size shall not exceed six feet (6’) Note: Primary Community Entry Monument Signage Right: In addition to the primary monument, the Developer/owner reserves the right to install up to two (2) entry monument signs at each major PDD entrance fronting Hwy 6 N, subject to the PDD sign standards, approval of the Master Sign Program, and applicable City permits. Page 87 of 234 26 B. Secondary Community Entry Monuments: Secondary community monuments may be used at the intersection of any roadway entering or exiting Savannah Oaks that is shown on a thoroughfare plan and/or is equal to or greater than 60 feet in Right-of way width as shown on such plan. They will be smaller in scale and will be designed within the constraints outlined below. i. Height – The height of hardscape elements shall not exceed fifteen feet (15’). ii. Width – N/A iii. Setback – Hardscape elements will be set back at these location’s rights-of-way a minimum of ten feet (10’) and from interior rights-of-way a minimum of ten feet (10’), and will be located as to not obstruct any Site Distance Triangles at any Public or Private Roadway Intersections. iv. Font Size – Font size will not exceed three feet (3’). C. Residential Neighborhood Identifiers: Hardscape and/or landscape elements may be used to identify smaller residential neighborhoods within the overall community. These elements may consist of blade walls, columns, retaining walls, sculptures, planters, fountains, or other hardscape and/or landscape elements. They may or may not include a name or graphics. Materials, graphics, and style will be complimentary to the overall community character. The permanent Residential Neighborhood Identifier may be supplemented with temporary marketing and/or wayfinding signs (defined below). They will be designed within the constraints outlined below. i. Height – The height of hardscape elements will not exceed eight feet (8’). ii. Setback – Hardscape elements will be set back from interior rights-of-way a minimum of ten feet (10’), and will be located as to not obstruct any Site Distance Triangles at any Public or Private Roadway Intersections. iii. Font Size – Font size will not exceed one foot (1’). D. General Commercial (GC) Signage: Signs installed adjacent to non-residential uses by a third-party developer will comply with Savannah Oaks Commercial Guidelines in style and material and with the City of College Station ordinance in size and specifications. E. Public Parks: The park system will include public parks and public trails. A sign standard incorporating the colors, materials, and style that fits within the overall community character will be designed and used throughout the public parks and trail system. The sign standard will be reviewed and approved by City Staff. In addition to the standard sign, “park identifiers” may also be incorporated into landscape or architectural elements of the park such as archways, seating or retaining walls, custom gates, sculptures, arbors, etc. The intent is to allow for creativity of design in order to form a unique personality for each park that fits within the overall community character. The standard signs and park identifiers will be designed within the constraints outlined below. i. Height – The height of hardscape elements will not exceed eight feet (8’). ii. Width – N/A iii. Setback – Hardscape elements will be set back from interior rights-of-way a minimum of ten feet (10’), and will be located as to not obstruct any Site Distance Triangles at any Public or Private Roadway Intersections. iv. Font Size – Font size will not exceed one foot (1’). Page 88 of 234 27 F. Private Amenity Identifiers: Savannah Oaks is planned to have a system of community amenities including parks, greenbelt trails, recreational facilities and open space. These community amenities may be identified with a signage system. These signs may be blade walls, columns, retaining walls, archways, etc. The signs will be designed within the constraints outlined below. i. Height – The height of the hardscape elements will not exceed eight feet (8’) ii. Width – N/A iii. Setback – Hardscape elements will be set back from interior rights-of-way a minimum of ten feet (10’), and will be located as to not obstruct any Site Distance Triangles at any Public or Private Roadway Intersections. iv. Font Size – Font size will not exceed one foot (1’). G. Wayfinding and Marketing Signage: An active marketing program is planned for Savannah Oaks throughout the new home sales life of the community. A marketing and way-finding signage system will be an essential component of the marketing program. A marketing sign standard that incorporates the colors, materials, and style complimentary to the overall community character will be developed. Marketing and way-finding signs will not exceed sixty-four square feet (64 sf). All sides of the marketing sign will be painted or stained to provide a finished look. Prior to the installation of permanent primary and secondary community entrances, temporary marketing signs, not to exceed 100 square feet (100 sf), may be installed at proposed community entrances. Marketing signs may also be used on Highway 6 and internal streets of Savannah Oaks Boulevard, Pebble Creek Parkway, Southern Pointe Parkway and throughout residential streets to guide prospective homebuyers to available inventory and/or sales offices. ARTICLE 16 — STORMWATER AND ENVIRONMENTAL 16.1 Stormwater/ Detention. Provide detention/retention facilities sized per City/regional criteria where applicable. Integrate Best Management Practices (BMPs) and Low Impact Development (LID) where feasible. A. Savannah Oaks Planned Development (SOPD) reserves the right to utilize and drain stormwater into any designated parkland, open space, and/or floodplain areas as part of its overall stormwater management strategy, subject to all compliance and regulation, necessary engineering analysis and design and city review and approval. 16.2 Floodplain Mitigation. Floodplain mitigation may be appropriate in areas designated as Natural Areas if located inconspicuously and approved by the City Engineer. A. Portions of the floodplain may be reclaimed for development as shown on the Conceptual Land Use Plan as Natural Preserve or Parkland or Development Areas. Such land development shall be in compliance with applicable City ordinances, supported by a flood study, and approved by the City Engineer. ARTICLE 17 — COMPLIANCE, ENFORCEMENT, AND APPROVED MODIFICATIONS 17.1 Compliance. All permits, plats, site plans, and development activities within the Planned Development (“PD”) shall comply with the standards, regulations, and provisions set forth in this Agreement, as well as all Page 89 of 234 28 applicable ordinances of the City of College Station, including the City of College Station Unified Development Ordinance, except as expressly modified herein. Failure to comply with this PD or applicable City regulations may result in permit denial, stop-work orders, withholding of approvals, or other enforcement actions as authorized by the City. 17.2 Approved Planned Development Standards. The standards, requirements, and development regulations contained within this Planned Development (“PD”) constitute approved modifications to the underlying zoning districts and applicable provisions of the City of College Station Unified Development Ordinance (“UDO”). To the extent of any conflict between this PD and the otherwise applicable provisions of the UDO or base zoning districts, the standards and requirements of this PD shall control. ARTICLE 18 — EXHIBITS (Attached) • Exhibit A: Legal Description: (Metes and Bounds / Survey Description) Overall • Exhibit B: Concept Plan: Graphic plan showing boundaries, approximate land use areas, road network, major open-space features. • Exhibit C: Proposed Zoning Map • Exhibit D: Land Use Table: Detailed permitted, permitted with special use, and prohibited uses by base zoning district (GS, MF, GC) • Exhibit E: Residential Development Standards Table • Exhibit F: Conceptual Park & Trail Map • Exhibit G: Typical Roadway/Street Cross Sections and Utility Corridors: Cross-sections for Minor arterials, Major and Minor collectors • Exhibit H: Community Benefits ARTICLE 19— TRANSITION PROVISIONS AND EFFECT 19.1 Existing Approvals. Existing valid development approvals remain in force only to the extent consistent with this PD; conflicting entitlements superseded. 19.2 Effective Date. This ordinance takes effect upon approval by City Council and recordation of approval documents and exhibits. Page 90 of 234 METES AND BOUNDS DESCRIPTION FOR A 1266.691 acre, or 55,177,066 square feet more or less, tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00: BEGINNING: At ½” iron rod found on the northeast right-of-way line of State Highway 6, a variable width public right-of-way, the southwest line of said 1282.09 acre tract, for the southwest corner of Lot 1, Block 1, Animate Habitat, Phase 1 recorded in Volume 8255, Page 283 in said Official Records and the most westerly northwest corner of this tract; THENCE: Departing the northeast right-of-way line of said State Highway 6 and the southwest line of said 1282.09 acre tract, with said Lot 1, the following bearings and distance: North 86°27'35" East, a distance of 201.72 feet to a corner of said Lot 1 (unable to set monument), for a corner of this tract; South 03°31'27" East, a distance of 10.00 feet to an iron rod with cap marked “RPLS 4502” found for a corner of said Lot 1; North 86°07'01" East, a distance of 954.40 feet to an iron rod with cap marked “RPLS 4502” found for a corner of said Lot 1; North 54°46'44" East, a distance of 71.70 feet to an iron rod with cap marked “RPLS 4502” found for a corner of said Lot 1; North 02°50'57" West, a distance of 141.35 feet to an iron rod with cap marked “RPLS 4502” found on the south line of the 50.00 acre tract described in Deed to Pebble Creek Development Co. recorded in Volume 1600, Page 313 in said Official Records and a north line of said 1282.09 acre tract, for the northeast corner of said Lot 1, from which an iron rod with cap marked “RPLS 4502” found on the northwest right-of-way line of said State Highway 6, for the northwest corner of said Lot 1 and the southwest corner of said 50.00 acre tract bears South 86°27’56” West, a distance of 1348.78 feet; EXHIBIT "A"Page 91 of 234 Job No.:30099-00 1266.691 Acres Page 2 of 5 THENCE: North 86°27'56" East, with the south line of said 50.00 acre tract and the north line of said 1282.09 acre tract, at a distance of 758.00 feet passing a ½” iron rod found on line for the southeast corner of said 50.00 acre tract and the southwest corner of the 505.19 acre tract described in Deed to Pebble Creek Development Company recorded in Volume 1671, Page 276 in said Official Records, continuing with the south line of said 505.19 acre tract and the north line of said 1282.09 acre tract, a total distance of 1853.75 feet to a ½” iron rod with a yellow cap marked “Pape-Dawson” set for the southeast corner of said 505.19 acre tract, an inner ell corner of said 1282.09 acre tract and this tract; THENCE: North 03°38'30" West, with the east line of said 505.19 acre tract and a west line of said 1282.09 acre tract, a distance of 1142.27 feet to an iron rod with an illegible cap found for the south corner of the 10.955 acre tract described in Deed to Pebble Creek Development Company recorded in Volume 6628, Page 60 in said Official Records and a corner of this tract; THENCE: Departing the east line of said 505.19 acre tract and the west line of said 1282.09 acre tract, with said 10.955 acre tract the following bearings and distances: North 36°01'11" East, a distance of 235.14 feet to an iron rod with cap marked “RPLS 5650” found for a corner of said 10.955 acre tract; North 44°03'15" East, a distance of 477.78 feet to an iron rod with cap marked “RPLS 5650” found for a corner of said 10.955 acre tract; North 07°09'17" West, a distance of 166.13 feet to an ½” iron rod found for a corner of said 10.955 acre tract; North 39°06'51" East, a distance of 437.49 feet to an iron rod with cap marked “McClure” found for a corner of said 10.955 acre tract, a corner of Lot 24, Block 46, Pebble Creek Phase 9-F recorded in Volume 8369, Page 133 in said Official Records and a corner of this tract; THENCE: North 51°38'03" East, with the southeast line of Block 46 of said Pebble Creek Phase 9-F and the southeast line of Block 46, Pebble Creek Phase 9-D recorded in Volume 7655, Page 245 in said Official Records, a distance of 877.34 feet to an ½” iron rod with a yellow cap marked “Pape-Dawson” set for the east corner of Lot 49, Block 46 of said Pebble Creek Phase 9-D, the south corner of Lot 60 of said Block 46 of said Pebble Creek Phase 9-D and a corner of this tract; THENCE: North 48°41'44" East, with the southeast line of said Lot 60 and the southeast line of Lot 61 of Block 46, of said Pebble Creek Phase 9-D, a distance of 343.70 feet to an iron rod with cap marked “RPLS 5650” found for the east corner of said Lot 61; Page 92 of 234 Job No.:30099-00 1266.691 Acres Page 3 of 5 THENCE: North 39°33'17" West, with the northeast line of said Block 46 of said Pebble Creek Phase 9D, a distance of 358.43 feet to an iron rod with cap marked “RPLS 5650” found for the southwest corner of the 27.29 acre tract described in Deed to The City of College Station recorded in Volume 1029, Page 13 in the Deed Records of Brazos County, Texas, a corner of said 1282.09 acre tract and the most northerly northwest corner of this tract; THENCE: North 86°48'54" East, with the south line of said 27.29 acre tract and the north line of said 1282.09 acre tract, at a distance of 100.50 feet passing an ½” iron rod found for the southeast corner of said 27.29 acre tract and the southwest corner of the 1265.370 acre tract described in Deed to The City of College Station recorded in Volume 488, Page 756 in said Official Records, continuing with the south line of said 1265.370 acre tract and the north line of said 1282.09 acre tract, at a distance of 7320.25 feet passing an ½” iron rod found on line, continuing a total distance of 7325.95 feet to an ½” iron rod with a yellow cap marked “Pape-Dawson” set on the west line of Tract J-1, Cowart Subdivision recorded in Volume 300, Page 299 in said Deed Records, for the northeast corner of this tract, from which a ½” iron rod found on the south right-of-way line of Bryan-Sulphur Springs Road, for the northwest corner of said Cowart Subdivision bears North 03°11’24” West, a distance of 4168.93 feet; THENCE: South 03°11'24" East, with the west line of said Cowart Subdivision, at a distance of 499.68 feet passing an iron rod with cap marked “RPLS 2003” found on line for the southwest corner of said Tract J-1 and the northwest corner of Tract G-2 of said Cowart Subdivision, at a distance of 1255.79 feet passing an iron rod with a cap marked “RPLS 2003” found online for the southwest corner of said Tract G-2 and the northwest corner of Tract G-1, of said Cowart Subdivision, continuing a total distance of 3100.01 feet to a ½” iron rod found for the southwest corner of said Tract G-1, an inner ell corner of said 1282.09 acre tract and this tract; THENCE: North 86°54'48" East, with the south line of said Tract G-1 and a north line of said 1282.09 acre tract, a distance of 451.66 feet to an iron rod with cap marked “RPLS 4502” on the west line of Tract F-1 of said Cowart Subdivision, for an outer ell corner of said 1282.09 acre tract and this tract; THENCE: South 02°38'27" East, with the west line of said Cowart Subdivision and the east line of said 1282.09 acre tract, a distance of 2243.89 feet to an iron rod with an illegible cap found for the southwest corner of Tract B-1 of said Cowart Subdivision, the northwest corner of the 1.84 acre tract described in Deed to Stephen B. Naegeli and Lori A. Naegeli recorded in Volume 18713, Page 228 in the Official Public Records of Brazos County and a corner of this tract; THENCE: South 03°18'42" East, with the west line of said 1.84 acre tract, a distance of 254.58 feet to an ½” iron rod found for the southwest corner of said 1.84 acre tract and the most westerly northwest corner of the 8.50 acre tract designated as Tract Two in Deed to Keith E. Ralph, et ux recorded in Volume 18023, Page 42 in said Official Public Records and a corner of this tract; Page 93 of 234 Job No.:30099-00 1266.691 Acres Page 4 of 5 THENCE: South 03°13'05" East, with the west line of said 8.50 acre tract, a distance of 384.41 feet to an iron rod with a yellow cap (no stamp) found for a corner of said 8.50 acre tract, the northeast corner of the 5.802 acre tract described in Deed to Gregory G. Guercio and Jeremy Paul Guercio recorded in Volume 13163, Page 50 in said Official Records, the southeast corner of said 1282.09 acre tract and the southeast corner of this tract; THENCE: South 86°32'14" West, with the north line of said 5.802 acre tract, the north line of the 6.317 acre tract designated as Tract Two, the north line of said 6.004 acre tract designated as Tract One both in Deed to Mark Neil Robinson, et ux recorded in Volume 824, Page 44 in said Official Records, the north line of the 6.004 acre tract described in Deed to Jason LaFollette, et ux recorded in Volume 2929, Page 179 in said Official Records, the north line of the 5.999 acre tract listed in Deed to Deborah Ann Moore recorded in Volume 14452, Page 290 in said Official Public Records and further described in Volume 2934, Page 24 in said Official Records, the north line of the 6.116 acre tract described in Deed to Gerald R. Bonneau, Jr., et ux recorded in Volume 3592, Page 198 in said Official Public Records and a south line of said 1282.09 acre tract, a distance of 1986.61 feet to a iron rod with cap marked “Carlomagno” found for the northwest corner of said 6.116 acre tract, the northeast corner of Lot 29A, Peach Creek Estates recorded in Volume 4730, Page 243 in said Official Records, a corner of said 1282.09 acre tract; THENCE: South 59°17'52" West, with the northwest line of said Lot 29A, the northwest line of Lot 29B of said Peach Creek Estates and a southeast line of said 1282.09 acre tract, a distance of 897.33 feet to a ½” iron rod found for a corner of said 1282.09 acre tract and a corner of this tract; THENCE: South 49°30'10" West, a distance of 207.06 feet to a ½” iron rod found on the northeast line of Southern Pointe Subdivision Section 106 recorded in Volume 18712, Page 184 in said Official Public Records, for the west corner of the 2.92 acre tract described in Deed to Ashraf Lakhani recorded in Volume 8902, Page 256 in said Official Records; THENCE: North 39°32'44" West, with the northeast line of said Southern Pointe Subdivision Section 106, at a distance of 725.04 feet passing an iron rod with cap marked “Jones and Carter” found on line for the north corner of said Southern Pointe Subdivision Section 106, continuing with the northeast line of the 374.89 acre tract, described in Deed to Phillips 3 Land Holdings LLC recorded in Volume 17376, Page 228 in said Official Public Records, a total distance of 3381.25 feet to a ½” iron rod found for the north corner of said 374.89 acre tract, an inner ell corner of said 1282.09 acre and this tract; THENCE: South 48°41'54" West, with a northwest line of said 374.89 acre tract and a southeast line of said 1282.09 acre tract, a distance of 2373.01 feet to a ½” iron rod found for a corner of said 1282.09 acre tract and this tract; Page 94 of 234 Job No.:30099-00 1266.691 Acres Page 5 of 5 THENCE: South 55°06'27" West, continuing with a northwest line of said 374.89 acre tract and the southeast line of said 1282.09 acre tract, at a distance of 1721.84 feet passing a ½” iron rod found on line for the west corner of said 374.89 acre tract, continuing with the northwest line of the 78.63 acre tract described in Deed to Southern Pointe, LLC recorded in Volume 15059, Page 192 in said Official Public Records and the southeast line of said 1282.09 acre tract, a distance of 3262.43 feet to the northeast right-of-way line of said State Highway 6, at the southwest corner of said 1282.09 acre tract and the southwest corner of this tract, from which a ½” iron rod bears South 55°06'27" West, a distance of 1.06 feet; THENCE: With the northeast right-of-way line of said State Highway 6 and the southwest line of said 1282.09 acre tract, the following bearings and distances: North 47°33'01" West, a distance of 209.31 feet to a Texas Department of Transportation Type I monument found for a corner of said 1282.09 acre tract and this tract; North 42°29'08" West, a distance of 482.10 feet to a corner of said 1282.09 acre tract and this tract, from which a Texas Department of Transportation Type I monument found bears South 62°08’03” East, a distance of 0.39 feet; North 40°09'49" West, a distance of 500.00 feet to a ½” iron rod with a yellow cap marked “Pape-Dawson” set for a corner of said 1282.09 acre tract and this tract; North 26°07'39" West, a distance of 206.20 feet to a corner of said 1282.09 acre tract and this tract, from which a Texas Department of Transportation Type I monument found bears North 52°26’02” East, a distance of 0.43 feet; North 40°09'49" West, a distance of 700.00 feet to a Texas Department of Transportation Type I monument found for a corner of said 1282.09 acre tract and this tract; North 48°41'40" West, a distance of 202.20 feet to a ½” iron rod with a yellow cap marked “Pape-Dawson” set for a corner of said 1282.09 acre tract and this tract; North 40°09'49" West, a distance of 2301.90 feet to the POINT OF BEGINNING and containing 1266.691 acres in the City of College Station, Brazos County, Texas. Said tract being described in conjunction with a survey made on the ground and a survey map prepared under job number 30099-00 by Pape-Dawson Engineers. PREPARED BY: Pape-Dawson Engineers Texas Registered Survey Firm # 10028800 DATE: December 18, 2024 JOB NO. 30099-00 DOC. ID. N:\CIVIL\30099-00\Word\30099-00 FN.docx 12/18/2024Page 95 of 234 STATE HIGHWAY 6 CASCADES CT. WOODALL CT. RIVIERA CT. BALLYBUNION CT. EL DORA DR. PIPELINE RD. PDD P-MUD MINOR ARTERIALMAJOR COLLECTORMINOR ARTERIALMINOR COLLECTORM A J O R C O L L E C T O R MAJOR COLLECTORM A J O R C O L L E C T O R MINOR COLLECTOR (PIPELINE #2)MINOR ARTERIALMINOR COLLECTOR (PIPELINE #1) MAJOR COLLECT O R P-MUDP-MUDP-MUDP-MU D P-MUDP-MUDPDD PDDPDDPD D PDDPDDPD D PD D PDDMAJOR COLLECTORPDD1 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE PD CONCEPT PLAN NOTES: A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. TRACT G-2 COWART SUBDIVSION VOL. 300, PG. 299 D.R. JTC31CS, LLC VOL. 17300, PG 20 O.P.R. TRACT J-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. ALC90, LLC VOL. 19161, PG. 53 O.P.R. KEY NOTES LEGEND TRACT G-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. JTC31CS, LLC VOL. 17300, PG 20 O.P.R. TRACT F-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. 37.1273 ACRES EDWARD FROEHLING VOL. 12193, PG. 275 O.R. TRACTS E-1 AND E-2 COWART SUBDIVSION VOL. 300, PG. 299 D.R. 24.3699 ACRES EDWARD FROEHLING VOL. 11772, PG. 47 O.R. TRACT Q-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. TRACT D-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. TRACT B-1 COWART SUBDIVSION VOL. 300, PG. 299 D.R. EDWARD FROEHLING VOL. 7881, PG. 12 O.P.R. TRACT C COWART SUBDIVSION VOL. 300, PG. 299 D.R. EDWARD FROEHLING VOL. 8709, PG. 221 O.R. 1.84 ACRES STEPHEN B. NAEGELI, ET UX VOL. 18713, PG. 228 O.P.R. TRACT TWO 8.50 ACRES KEITH E. RALPH, ET UX. VOL. 18023, PG. 42 O.P.R. 5.802 ACRES GREGORY G. GUERCIO AND JEREMY PAUL GUERCIO VOL. 13163, PG. 50 O.R. TRACT TWO 6.317 ACRES MARK NEIL ROBINSON, ET UX. VOL. 824, PG. 44 O.R. TRACT ONE 6.004 ACRES MARK NEIL ROBINSON, ET UX. VOL. 824, PG. 44 O.R. 5.999 ACRES DEBORAH ANN MOORE VOL. 14452, PG. 290 O.P.R. (DESCRIBED IN VOL. 2934, PG. 24 O.R) 6.004 ACRES JASON LAFOLLETTE, ET UX. VOL. 2929, PG. 179 O.R. LOT 29A PEACH CREEK ESTATES VOL. 4730, PG. 243 LOT 29B PEACH CREEK ESTATES VOL. 4730, PG. 243 2.92 ACRE ASHRAF LAKHANI VOL. 8902, PG. 256 O.P.R. SOUTHERN POINTE SUBDIVISION SECTION 106 VOL. 18712, PG. 184 P.R. COMMERCIAL OTHER LOT 1 BLOCK 1 ANIMATE HABITAT, PHASE 1 VOL. 8255, PG. 283 O.R. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"EXHIBIT B Page 96 of 234 N86°27'35"E201.72'L1 N86°07'01"E 954.40'L2 L3 N86°27'56"E 1853.75'N3 ° 3 8 ' 3 0 " W 11 4 2 . 2 7 'N36°01'11"E235.14'N44°03'15"E 477.78'L4 S55°06'27"W 3262.43'N47°33'01"W 209.31'N42°29'08"W 482.10'N40°09'49"W 500.00' L6N40°09'49"W 700.00'N48°41'40"W 202.20'N40°09'49"W 2301.90'STATE HIGHWAY 6 S48°41'54"W 2373.01'MA J O R C O L L E C T O R MINOR ARTERIALM A J O R C O L L E C T O R MAJOR COLLECTORMINOR ARTERIALEXTERIOR LINE TABLE 2 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 3 OF 5 PD CONCEPT PLAN NOTES: Page 97 of 234 N39°06'51"E437.49'N51°38'03"E877.34'N48°41'44"E343.70'N39°33'17"W 358.43'S48°41'54"W 2373.01'N86°48'54"E 7325.95'CASCADES CT. WOODALL C T . RIVIER A C T . BALLYBUNION CT.MINOR ARTERIALMAJOR C O L L E C T O RMAJOR COLLECTORMINOR COLLECTOR (PIPELINE #1)MAJOR COLLECTORMINOR COLLECTOREXTERIOR LINE TABLE 3 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 2 OF 5 MATCHLINE "B" - SEE SHEET 4 OF 5MATCHLINE "C" - SEE SHEET 5 OF 5 PD CONCEPT PLAN NOTES: Page 98 of 234 S3 ° 1 8 ' 4 2 " E 25 4 . 5 8 ' S3 ° 1 3 ' 0 5 " E 38 4 . 4 1 'S86°32'14"W 1986.61'S59°17'52"W897.33'L5N39°32'44"W 3381.25' S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 ' EL DORA DR. PIPELINE RD. S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 'MAJOR COLLECTORMINOR ARTERIALM A J O R C O L L E C T O R MINOR COLLECTOR (PIPELINE #2)MINORARTERIALEXTERIOR LINE TABLE 4 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "A" - SEE SHEET 2 OF 5MATCHLINE "B" - SEE SHEET 3 OF 5MATCHLINE "C" - SEE SHEET 5 OF 5 MATCHLINE "C" - SEE SHEET 5 OF 5MATCHLINE "C"SEE SHEET 5 OF 5PD CONCEPT PLAN NOTES: Page 99 of 234 S3 ° 1 1 ' 2 4 " E 3 1 0 0 . 0 1 'N86°54'48"E451.66'N86°48'54"E 7325.95'S2 ° 3 8 ' 2 7 " E 2 2 4 3 . 8 9 ' MAJOR COLL E C T O R M A J O R C O L L E C T O R MINORARTERIALEXTERIOR LINE TABLE 5 OF 5SAVANNAH OAKSCOLLEGE STATION, TEXASCONCEPT PLANTEXAS ENGINEERING FIRM #470 I TEXAS SURVEYING FIRM #100288001672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633© © LOCATION MAP BRAZOS COUNTY SITE OWNER & DEVELOPER: ENGINEER & DESIGNER: LAYOUT IS SCHEMATIC AND SUBJECT TO CHANGE A 1266.691 acre tract of land situated in the S.W. Roberson Survey, Abstract No. 202 and the S.D. Smith Survey, Abstract No. 210, both of Brazos County, Texas, out of the remaining portion of the 1282.09 acre tract described in Deed to Animate Habitat, Ltd. in Volume 5463, Page 208 in the Official Records of Brazos County, Texas, in the City of College Station, Brazos County, Texas. Said 1266.691 acre tract being more fully described as follows, with bearings based on the Texas Coordinate System established for the Central Zone from the North American Datum of 1983 NAD 83 (NA2011) epoch 2010.00. LEGEND SCALE: 1"= 1000' INDEX MAP MATCHLINE "A" SHEET 2 OF 5 SHEET 3 OF 5 SHEET 4 OF 5 SHEET 5 OF 5 MATCHLINE "C"MATCHLINE "B"MATCHLINE "C" - SEE SHEET 3 OF 5 MATCHLINE "C" - SEE SHEET 4 OF 5 MATCHLINE "C" - SEE SHEET 4 OF 5PD CONCEPT PLAN NOTES: Page 100 of 234 JOB NO. DATE DESIGNER CHECKED SHEET DRAWN THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL.AERIAL IMAGERY PROVIDED BY GOOGLE © UNLESS OTHERWISE NOTED. Imagery ©2026, CAPCOG,Digital Globe,Texas Orthoimagery Program, USDA Farm Service Agency.Date: Jun 10, 2026 1:28 PM User: acoleFile: O:\Users\ACole\Exhibits\CTran\260311_SavannahOaks_Zoning\SavannahOaks.aprx Layout: SavannahOaks_ProposedZoning_11x17L Map: CStat_ProposedZoning1672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633TEXAS ENGINEERING FIRM #470 | TEXAS SURVEYING FIRM #10028800Misty Ln Q u ality Cir Spearman Dr Sai ntAndrewsDrS a n d p iper C vS ta t e H ig h w a y 6 Pebble Creek Park Technology Way Gateway HarpersFerryRd NantucketDrMarinersCvMidsummer Ln W a y f a r e r L n T u c k e r N u c k Scr i mshawLnE a st B y p South Hampton A lu m CreekRoyalAdeladeD rSaint Andrew s D rCongressionalDrCasc a d e s D rPineValley D r Stonewater Villages P a t r io t D r Mat her PkwyW ayfarerLnSouthernPo in teP k w y C a n t o n D r Hig h w ay 6 Cove of Nantucket PipelineRdPipelineRdDarlin gton AveEl doraDrEld o r a D r P ip elin e R d P ip e l i n e R d D a yt o n a Dr P o c o n o D r Ball C ir Ful tonDrP atriotD rPDD PDD R O GS GS GS R CI GS GSM - 1 R R R R PDD 1104.101 Ac.P-MUD 5.223 Ac. P-MUD 157.368 Ac. Legend Proposed Site Proposed Zoning P-MUD PDD CI Commercial Industrial GS General Suburban M-1 Light Industrial O Office R Rural 1.0 CT AC HF Jun 2026 30099-00 COLLEGE STATION, TEXASPROPOSED ZONING EXHIBITSAVANNAH OAKS³ 0 1,000 Feet Note: Existing zoning is Rural (R) and Commercial Industrial (CI). Proposed zoning is Planned Development District (PDD) and P-MUD. Page 101 of 234 Page 102 of 234 Page 103 of 234 Page 104 of 234 Page 105 of 234 Savannah Oaks Planned Development – Residential Development Standards (Exhibit E) 1 Residential Development Standards (Exhibit E) Savannah Oaks Residential Zoning Districts and Standards General Suburban (GS)   Single Family Residential Townhouse Min. Average lot Area per Dwelling Unit 5,000 SF N/A Absolute Min. Lot Area per Dwelling Unit 5,000 SF 1,800 SF Min. Lot Width 50' N/A Min. Lot Depth 100' N/A Min. Front Setback 25' (a) (b) 15' Max. Front Setback N/A N/A Min. Side Setback 5' 5' (c) (d) Min. Side Street Setback 10' 10' Max. Side Street Setback N/A N/A Min. Rear Setback 20' 10' Max. Impervious Cover 65% 85% Max. Height 35' 35' Min. Number of Stories N/A N/A Max. Dwelling Units/Acre (Subdivision Gross) 8 14 Min. Dwelling Units/Acre N/A N/A Page 106 of 234 Savannah Oaks Planned Development – Residential Development Standards (Exhibit E) 2 Notes: (a) Minimum front setback may be reduced to fifteen (15) feet when approved rear access is provided, or when side yard or rear yard parking is provided. (b) Front setback applies to primary building face including front facing garage; front porches may encroach 5’ over the min. front setback line or may be reduced to a 20’ front setback on or at cul- de-sac frontage lots respectively. (c) Zero lot line construction of a townhouse residence is allowed where properties on both sides of a lot line are owned and/or developed simultaneously by a single party. (d) Townhouses may be developed in attached groups or clusters. Each complex shall be considered one building for setback purposes. A minimum side setback of five (5’) feet shall be required only from the outermost side walls of each townhouse complex to adjacent lot lines or separate townhouse complex. No side setback shall be required between individual attached dwelling units within the same complex where units share common party walls. (e)Public, civic, and institutional structures shall have a maximum building height of fifty (50) feet in these districts, except for non-occupied structures that may exceed the roof line by 25’, such as church steeples, radio towers, etc. Page 107 of 234 LA K E WAY DR F R O N T AG E 6 R D CASCADE S D R ST A NDREWS DR F R O N T AG E 6 R D NANT U C K ET D R PARKLAN D DRTECHNOLOGY WAY Q U A L I T Y C I R W A YFARER LN PATRI OT D RPRESTWICKCTMARINER SCVCONGRESS IONA LDR QU AKERRIDGEDRHARPER S F E RRY RDWINDRIFTCVEBBTI D E C V RIV I ERACTWOODALLCTC A S CADESCTPLUMH OLLOW DRPINE VALLEY D R B A L L YB U N IO N C T BAL L CI R POCO NO D R E L DOR A D R CROSSWATERDR TW I N P O N D CIRFARA WAYI SLANDDRP I P E L I N E R D S T A T E H IG HWA Y 6 South Hampton Cove of Nantucket Southern Pointe Pebble Creek 1672 INDEPENDENCE DR, STE 102 I NEW BRAUNFELS, TX 78132 I 830.632.5633 TEXAS ENGINEERING FIRM #470 | TEXAS SURVEYING FIRM #10028800 Legend Parkland Parkland within Floodplain Private Amenity Future Thoroughfare Improved and Natural Park Trails 10ft Shared Use Path/Trail ³0 800 Feet 6 6 30 Millican Enright Wicker Piedmont College Station College Station ETJ College Station Land Use Type Total Acres Parkland 147.17 Parkland within Floodplain 138.19 Note: Floodplain boundaries are subject to update in accordance to required flood study to be submitted with the preliminary plan. Savannah Oaks: Conceptual Park and Trail Map Note: A tract-by-tract identification of which park tracts and trail segments are proposed for dedication to the City, and which are proposed to remain under POA maintenance, shall be provided at the time of Preliminary Plan. EXHIBIT F Page 108 of 234 EXHIBIT G Page 109 of 234 EXHIBIT H Savannah Oaks Planned Development Community Benefits A. Increase landscape buffer planting requirements by 50% beyond UDO Section 7.7 minimums between P-MUD uses adjacent to Single Family Residential. i. Savannah Oaks will increase required landscape buffer planting standards by flfty percent (50%) beyond the minimum requirements of Section 7.7 of the UDO. This enhancement applies to all required canopy trees, non-canopy trees, and shrub plantings within buffer, resulting in a signiflcantly denser and more effective vegetative screen than required by code. The increased planting quantities improve year-round opacity, enhance visual separation between land uses, and strengthen compatibility with P-MUD uses adjacent Single Family Residential Where existing natural vegetation is present and meets UDO standards, it will be preserved and credited toward buffer requirements, with supplemental plantings provided as necessary to achieve the enhanced standard. Buffer Planting Requirements (+ 50% Enhancement) P-MUD Uses -General Commercial (GC) and Multifamily (MF) Adjacent to Single Family Residential Category UDO Requirement (Sec. 7.7) Savannah Oaks (+ 50% Enhancement) Canopy Trees 1 per 25 LF (min. 2” caliper) 1 per ~16 LF (min. 2” caliper) Non-Canopy Trees 1 per 15 LF (min 1.25” caliper) or shrub substitution 1 per 10 LF (min. 1.25" caliper) or equivalent substitution Shrubs 1 per 3 LF (min. 5-gallon, 3' height) +50% quantity (min. 5-gallon, 3' height, increased evergreen mix) Vegetation Character Standard buffer planting per UDO Increased density, layered planting for improved screening *Landscape buffers between different land use areas within the P-MUD district (MF and GC) will adhere to UDO standards Page 110 of 234 B. Increase landscape buffer widths by 50% beyond UDO Section 7.7 minimums between General Commercial (GC) uses adjacent to General Suburban (GS) and Multi-Family (MF) uses adjacent to Single Family Residential. i. Savannah Oaks will increase required buffer widths by flfty percent (50%) beyond the minimum standards of Section 7.7 of the UDO. This results in greater physical separation between differing land uses, improving the effectiveness of buffering for noise, lighting, and visual impacts. General Commercial (GC) uses adjacent to Single Family Residential will increase from 15 feet to approximately 22.5 feet, and Multi-Family (MF) adjacent to Single Family Residential will increase from 10 feet to 15 feet. When combined with enhanced planting requirements, these expanded buffer areas provide a more substantial and effective transition between land uses than is required under the UDO. Buffer Width Requirements (+ 50% Enhancement) General Commercial (GC) Adjacent to Single Family Residential Category UDO Requirement Savannah Oaks (Enhanced) Buffer Width 15 feet 22.5 feet Screening Wall required (6 ft) Wall maintained (6 ft) Separation Function Standard separation between uses Increased separation for improved noise, lighting, and visual mitigation Buffer Character Narrow landscaped buffer strip Expanded transition zone with increased landscape depth Buffer Width Requirements (+ 50% Enhancement) Multifamily (MF) Adjacent to Single Family Residential Category UDO Requirement Savannah Oaks (Enhanced) Buffer Width 10 feet 15 feet Page 111 of 234 Screening Fence required (6–8 ft) Fence maintained (6–8 ft) Separation Function Standard transitional buffer Enhanced separation improving privacy and compatibility Buffer Character Minimal Separation Zone Expanded landscaped transition area *Landscape buffers between different land use areas within the P-MUD district (MF & GC) will adhere to UDO standards ii. Natural Vegetation Buffer Alternative a. Savannah Oaks may utilize existing natural vegetation as an alternative to standard buffer yard improvements where such vegetation meets the performance standards of Section 7.7 of the UDO. Natural vegetation may be credited in lieu of required buffer plantings and screening (fences or walls) provided that it consists of a healthy mix of canopy and understory trees and is of sufficient density to achieve a continuous visual screen. b. To qualify, existing vegetation must provide sufficient opacity to screen views to a height of six (6) feet, as documented through a site assessment. Vegetation used in lieu of standard buffer requirements shall be preserved and protected in accordance with the UDO Landscaping and Tree Protection standards. c. Where existing vegetation does not fully satisfy required buffer standards, supplemental plantings will be installed to meet UDO requirements, including any applicable enhanced standards associated with the Savannah Oaks PD. This approach allows for the integration of high-quality natural features into the buffer design while ensuring consistent compliance with performance-based screening objectives. d. The natural vegetation buffer alternative is preferred because it provides a more effective and sustainable form of buffering than fully constructed improvements. Existing mature vegetation, when preserved and enhanced, offers superior long- term visual screening through layered canopy and understory coverage while also delivering environmental beneflts such as improved stormwater inflltration, reduced heat island effects, and preservation of existing ecosystems. This approach allows buffers to respond to existing site conditions rather than replacing them with uniform planted or constructed elements, resulting in more context-sensitive transitions between land uses. In addition, reliance on established vegetation reduces long-term maintenance needs and supports the preservation of mature Page 112 of 234 tree stands that cannot be readily replaced, ultimately producing a higher-quality and more compatible edge condition than standard buffer yard installations alone. C. Increase landscaping point requirements by 10% for all non-residential and multi-family development within the P-MUD, with existing protected canopy trees credited toward the increased point total per UDO Section 7.6.C.5. i. Higher point thresholds produce more diverse, higher-quality planting schemes rather than minimum-compliant box-checking. Crediting existing protected canopy incentivizes preservation of mature trees, the most ecologically valuable landscape assets on any site, rather than clearing and replanting. D. Meet Non-Residential Architectural Standards building material requirements on all primary entrance facades and facades facing a public right-of-way; facades not facing ROW or public park shall meet a minimum of 10% qualifying material coverage. i. Savannah Oaks will voluntarily comply with the Non-Residential Architectural Standards Subsection of Article 7 as a community beneflt, applying these standards to all applicable non-residential development within the SOPD. This includes the use of durable, high-quality exterior materials such as masonry, brick, stone, or comparable approved flnishes, as well as compliance with façade articulation requirements intended to reduce blank wall conditions and enhance architectural interest. These standards shall not apply to private amenity areas. ii. All non-residential buildings, including General Commercial (GC) areas within the P- MUD, will incorporate architectural detailing consistent with Article 7 standards, including material variation, façade modulation, and other design elements that promote visual quality and pedestrian-scale development. By voluntarily adopting these standards, Savannah Oaks ensures a higher level of architectural design consistency and durability than would otherwise be required, enhancing compatibility with surrounding General Suburban (GS) uses and elevating the overall character of the development. E. Prohibit internally illuminated cabinet or box signs located within 200 feet of a General Suburban base zoning district or use, as measured from the sign location to the nearest property line of such district or use; halo-lit, externally lit, and non-illuminated signs permitted without restriction. i. Cabinet signs produce the highest light bleed and glare of any commercial sign type. Within 200 feet of residential uses, they create direct nuisance, particularly at night. Page 113 of 234 Permitting halo-lit, externally lit, and non-illuminated alternatives without restriction preserves full commercial identity fiexibility while eliminating the speciflc sign type most harmful to residential adjacency. F. All required canopy trees per UDO, within Savannah Oaks, shall be 100% Texas native species. i. Native canopy trees are climate-adapted, require less irrigation and maintenance once established, support local pollinators and wildlife corridors, and have higher long-term survival rates in Central Texas conditions. Committing 100% native species creates a cohesive, regionally appropriate tree canopy that performs better and costs less to maintain over time. G. All irrigated common areas, parks, medians, and greenbelt areas shall use smart irrigation controllers. i. Smart controllers adjust watering schedules based on real-time weather and soil conditions, typically reducing outdoor water consumption by 20–50% compared to timer-based systems. In a region facing increasing drought pressure and municipal water demand, this commitment reduces the project's long-term water footprint. H. All Neighborhood Amenity Centers shall provide bicycle parking at 150% of the applicable non-residential minimum with flxed-frame racks integrated into entry design and located within 50 feet of an entrance. i. Amenity centers are the highest-frequency destinations within a residential community. Exceeding the minimum by 50% and placing them within 50 feet of an entrance removes the practical barriers to cycling as a primary mode of getting to shared amenities. This is an active transportation infrastructure where it will actually be used. Note: In the event of any confiict or inconsistency between the terms of Article 12 and any other provision of this PD, the terms of Article 12 shall govern and control in all respects Page 114 of 234 October 15, 2026 Item No. 5.4. UDO Amendment - Data Center Definition and Use Table Change Sponsor: Robin Macias, Land Development Review Administrator Reviewed By CBC: N/A Agenda Caption: Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 6 "Use Regulations", Section 6.3.C "Use Table" and Article 11 "Definitions", Section 11.2 "Defined Terms", of the Code of Ordinances of the City of College Station, Texas by amending certain sections relating to the use table and the definition of a data center. (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting - Subject to change). Relationship to Strategic Goals: • Diverse Growing Economy Recommendation(s): Staff recommends approval of the ordinance amendment. Summary: Discussion surrounding data centers has become increasingly prevalent over the past year as communities consider how these uses should be addressed through local development regulations. In response, staff is bringing forward an amendment to the Unified Development Ordinance (UDO) to establish a definition of data center and add the use to the use table. The proposed amendment will provide clarity regarding the classification of data centers and establish the zoning districts in which the use may be permitted. Staff is proposing that data centers be allowed as a conditional use within certain zoning districts. The Conditional Use Permit (CUP) process provides City Council discretionary approval authority and allows each request to be evaluated individually based on its location, design, configuration and potential impacts on surrounding properties. As part of the CUP process, Council may impose additional conditions when appropriate to ensure compatibility with the surrounding area. Such conditions may address items including buffering, screening, lighting, noise and other considerations necessary to mitigate potential impacts and ensure the proposed use is appropriate for a particular location. Budget & Financial Summary: Attachments: 1. Sec._11.2._Redlines 2. Sec._6.3.___Redlines Page 115 of 234 Created: 2026-06-11 10:25:17 [EST] (Supp. No. 9) Page 1 of 1 Sec. 11.2. Defined Terms. Cupola: A small dome and the shaft that supports it on top of a building. Data Center: A structure, or any portion of a structure or accessory structure larger than 5,000 square feet, primarily used for computer and/or network equipment, systems, servers, appliances, and/or other associated components related to computing and digital operations, for the purpose of collection, storage, management, processing, and/or transmission of digital data. Day Care - Commercial: Any facility or premises where a total of seven (7) or more children under sixteen (16) years of age, and/or elderly adults, regularly attend for purposes of custody, care, or instruction. Said children or elderly adults are not members of the family of any person operating the facility or premises. Page 116 of 234 Created: 2026-06-11 10:25:15 [EST] (Supp. No. 9) Page 1 of 3 Sec. 6.3. Types of Use. C. Use Table. Except where otherwise specifically provided herein, regulations governing the use of land and structures with the various zoning districts and classifications of planned developments are hereby established as shown in the following Use Table. 1. Permitted Uses. A "P" indicates that a use is allowed by right in the respective district. Such uses are subject to all other applicable regulations of this UDO. 2. Permitted Uses Subject to Specific Standards. A "P*" indicates a use that will be permitted, provided that the use meets the provisions in the Specific Use Standards Section below. Such uses are also subject to all other applicable regulations of this UDO. 3. Conditional Uses. A "C" indicates a use that is allowed only where a conditional use permit is approved by the City Council. The Council may require that the use meet the additional standards enumerated in the Specific Use Standards Section below. Conditional uses are subject to all other applicable regulations of this UDO. Page 117 of 234 Created: 2026-06-11 10:25:15 [EST] (Supp. No. 9) Page 2 of 3 USE TABLE Specific Uses R WE E WRS RS GS T ** D ** MH MF ** MU ** MHP ** P-MUD ** O SC ** WC GC CI BP ** BPI CU NAP R-1B R-4 ** R-6 ** C-3 ** M-1 M-2 R&D ** WPC ** NG-1 ** NG-2 ** NG-3 ** KEY: P= Permitted by Right, P*= Permitted Subject to Specific Use Standards C= Conditional Use, **= District with Supplemental Standards (refer to Article 5) *** Commercial, Office, and Retail Uses in MH Middle Housing are allowed in Live-Work Units Only Retail Sales, Manufact ured Homes P P * Storage, Self Service P * P * P P P P * P Vehicular Sales, Rental, Repair, and Service P * P * P P * Wholesal es/Service s P * P * P P P P Storage Tank/Cold Storage Plant P P P Page 118 of 234 Created: 2026-06-11 10:25:15 [EST] (Supp. No. 9) Page 3 of 3 USE TABLE Specific Uses R WE E WRS RS GS T ** D ** MH MF ** MU ** MHP ** P-MUD ** O SC ** WC GC CI BP ** BPI CU NAP R-1B R-4 ** R-6 ** C-3 ** M-1 M-2 R&D ** WPC ** NG-1 ** NG-2 ** NG-3 ** Data Center C C C C Micro- Industrial P * P * P P * P * Industrial, Light P P P P P P Industrial, Heavy P P Notes: (a) Multi-family residential uses located in stories or floors above retail commercial uses are permitted by right. (b) Hotels are only allowed when accessory to a country club development and are limited to a maximum of fifteen (15) rooms. (c) Permitted in live-work units only. (Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023; Ord. No. 2023-4468, Pt. 1(Exh. D), 9-14-2023; Ord. No. 2023-4478, Pt. 1(Exh. A), 10-26-2023; Ord. No. 2024- 4557, Pt. 1(Exh. D), 10-24-2024; Ord. No. 2025-4620, Pt. 1(Exh. E), 9-11-2025) Page 119 of 234 October 15, 2026 Item No. 5.5. UDO Amendment - Drive-Thru Queuing Sponsor: Joe Allen, Staff Planner - Transportation & Mobility Reviewed By CBC: Planning & Zoning Commission Agenda Caption: Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, Unified Development Ordinance, Article 7, "General Development Standards," Section 7.3.K "Drive-Thru Facility Queuing Requirements", of the Code of Ordinances of the City of College Station, Texas, by amending certain sections relating to off-street drive-thru queuing requirements. Case #ORD2026-000004 (Note: Final action of this item will be considered at the October 22, 2026 City Council Meeting – Subject to change). Relationship to Strategic Goals: Recommendation(s): Staff recommends approval of the proposed ordinance amendment. Summary: Section 7.3.K of the Unified Development Ordinance (UDO) provides the requirements for off-street drive-thru queuing and has not been updated since the initial adoption of the UDO in 2003. In the time since, drive-thru types and configuration have changed. The proposed ordinance amendment proposes to update Section 7.3.K to better align with more recent drive-thru patterns and trends. The proposed ordinance also seeks to improve clarity and reduce confusion for developers from the outset of the development process. In recent years, many businesses have added curbside pick-up locations in their parking lots which is a newer alternate pick-up method and taken some of the potential increases in drive-thru demand. Curbside pick-up is not included in the drive-thru section but is part of the review of a parking lot performed with a standard site plan review process. The specific activity types listed are proposed to be updated to remove less common drive-thru activity types of photo labs and self-service car washes and pharmacies were added as a new activity type. Restaurant drive-thrus were modified to differentiate between typical drive-thru design that includes both an order box and pick-up windows and those with only a pick-up window for orders placed remotely prior to entering the development. The minimum number of required drive-thru queue spaces for banks and oil change businesses is proposed to be reduced given lesser observed drive-thru demand. The proposed amendment also adds language clarifying that staff may require a queuing analysis for high-intensity drive-thru uses, which is an existing authority by staff in another section of the ordinance but is being added to Section 7.3.K to improve clarity. Budget & Financial Summary: N/A Attachments: 1. Ordinance Redlines 2. Ordinance Clean Page 120 of 234 CODE OF ORDINANCES CITY OF COLLEGE STATION, TEXAS VOLUME II Subpart B – LAND DEVELOPMENT ORDINANCES Appendix A – UNIFIED DEVELOPMENT ORDINANCE ARTICLE 7. - General Development Standards Sec. 7.3. - Off-Street Parking Standards K. Drive-Thru Facility Queuing Requirements 1. Minimum Number of Spaces. Drive-thru queuing spaces shall be provided as indicated in the following table: Minimum Off-Street Queuing Requirements Activity Type Min. Spaces Measure From Automated Teller Machine 3 Teller Bank Teller Lane 4 2 Teller or Window Car Wash Stall, Automatic 4 Service Position Car Wash Stall, Self-Service 3 Service Position Dry Cleaning or Laundry 2 Window Oil Change Station 3 2 Service Position Photo Lab 4 Pick-Up Window Pharmacy 3 Service Window 4 Order Box Restaurant Drive-Thru 3 Order Box to Pick-Up Window Restaurant Drive-Thru 4 Pick-Up Window Only Other As determined by the Administrator 2. Design and Layout. Queuing spaces or queuing areas shall be designed in accordance with the following criteria: a. Queuing spaces or queuing areas may not interfere with parking spaces, parking aisles, loading areas, internal circulation, or driveway access; b. Each queue space shall consist of a rectangular area not less than ten (10) feet wide and eighteen and one-half (18.5) feet long with a vertical clearance as specified in the International Building Code, as adopted; c. Queue spaces are not interchangeable with parking spaces except for the following uses where the space providing services may count toward the parking requirement: bank teller, car wash, and oil-change station; d. A twelve (12) foot bypass lane shall be required adjacent to queue lines to allow vehicles an opportunity to circumvent the drive-thru activity and exit the site; e. Queue areas and drive-thru facilities shall be clearly identified with the appropriate signing and marking; and f. Spaces within a car wash facility or drive-thru oil change station may be counted towards the queuing requirement.; g. Additional queuing analysis may be required by the Administrator for high intensity drive-thru uses. Page 121 of 234 CODE OF ORDINANCES CITY OF COLLEGE STATION, TEXAS VOLUME II Subpart B – LAND DEVELOPMENT ORDINANCES Appendix A – UNIFIED DEVELOPMENT ORDINANCE ARTICLE 7. - General Development Standards Sec. 7.3. - Off-Street Parking Standards K. Drive-Thru Facility Queuing Requirements 1. Minimum Number of Spaces. Drive-thru queuing spaces shall be provided as indicated in the following table: Minimum Off-Street Queuing Requirements Activity Type Min. Spaces Measure From Automated Teller Machine 3 Teller Bank Teller Lane 2 Teller or Window Car Wash Stall, Automatic 4 Service Position Dry Cleaning or Laundry 2 Window Oil Change Station 2 Service Position Pharmacy 3 Service Window 4 Order Box Restaurant Drive-Thru 3 Order Box to Pick-Up Window Restaurant Drive-Thru 4 Pick-Up Window Only Other As determined by the Administrator 2. Design and Layout. Queuing spaces or queuing areas shall be designed in accordance with the following criteria: a. Queuing spaces or queuing areas may not interfere with parking spaces, parking aisles, loading areas, internal circulation, or driveway access; b. Each queue space shall consist of a rectangular area not less than ten (10) feet wide and eighteen and one-half (18.5) feet long with a vertical clearance as specified in the International Building Code, as adopted; c. Queue spaces are not interchangeable with parking spaces except for the following uses where the space providing services may count toward the parking requirement: bank teller, car wash, and oil-change station; d. A twelve (12) foot bypass lane shall be required adjacent to queue lines to allow vehicles an opportunity to circumvent the drive-thru activity and exit the site; e. Queue areas and drive-thru facilities shall be clearly identified with the appropriate signing and marking; and f. Spaces within a car wash facility or drive-thru oil change station may be counted towards the queuing requirement; g. Additional queuing analysis may be required by the Administrator for high intensity drive-thru uses. Page 122 of 234 October 15, 2026 Item No. 5.6. Sponsor: Kelsey Heiden Reviewed By CBC: City Council Agenda Caption: Public Hearing, presentation, discussion, and possible action on an ordinance amending the College Station Comprehensive Plan by repealing the Parks, Recreation, and Open Spaces Master Plan dated July 2011 Ordinance No. 3358 and adopting the Parks and Recreation Master Plan. Relationship to Strategic Goals: • Good Governance • Core Services and Infrastructure • Neighborhood Integrity • Sustainable City Recommendation(s): The Parks and Recreation Advisory Board will consider the Parks and Recreation Master Plan at its October 13, 2026 meeting, followed by consideration by the Planning and Zoning Commission at its October 15, 2026 meeting. Their recommendations will be provided at the dials. Staff recommends approval. Summary: This item is to consider proposed amendments to the City of College Station Comprehensive Plan. Proposed amendments include the adoption of the Parks and Recreation Master Plan update. The Parks and Recreation Master Plan update effort began in the spring of 2025 with the project kick-off meetings with staff and the Parks and Recreation Advisory Board. This plan reflects months of community engagement, thoughtful input from our staff and Parks and Recreation Advisory Board, and careful consideration of the trends shaping our growing city. Parks and Recreation staff gathered community feedback throughout summer and fall 2025. Engagement efforts were carried out at department-hosted community events, scheduled pop-up in the park events, and unscheduled pop-up outreach at neighborhood parks. A variety of meeting formats allowed staff to meet people where they are and have informal face-to-face conversations. Overall, the department hosted 39 engagement opportunities, generating over 850 unique public engagement touchpoints. Most importantly, these efforts fostered a greater sense of accessibility, drawing a diverse cross-section of residents into the engagement process. Residents expressed a strong appreciation for the parks and programs our community enjoys today, along with a shared desire to build upon those strengths. We also heard a growing desire to connect with nature. Environmental education and the preservation of natural spaces emerged as key themes, highlighting not just the recreational value of our parks, but their role in fostering a healthier, more resilient community and providing meaningful connections to nature. The updated Plan reflects the voices of the people who live, work, and play in College Station. • Chapter 2 evaluates existing conditions, including demographics, recreation trends and key user group profiles. Page 123 of 234 • Chapter 3 combines public input with technical analysis, including relevant findings form the city’s comprehensive plan update process, the Recreation Center Feasibility Study needs assessment survey, stakeholder engagement with city staff and the city’s Parks and Recreation Advisory Board, and broader community engagement with the public. • Chapter 4 outlines the Recreational Program Analysis that was completed by the consultant. • Chapter 5 summarizes both the park inventory and the Level of Service (LOS) analysis. • Chapter 5 establishes the foundation for long-term success through policies, programs, and partnerships that support education, safety, and system coordination. • Chapter 6 provides the implementation framework, including goals, objectives, strategies and action steps. The Parks and Recreation Master Plan draft document was reviewed by the Parks and Recreation Advisory Board at their May, June and September meetings with the final document review and consideration at their October 13th meeting prior the October 15th Planning and Zoning meeting. Budget & Financial Summary: N/A Attachments: 1. Parks and Recreation Master Plan Ordinance 2. Parks-Master-Plan DRAFT Page 124 of 234 ORDINANCE NO. _____ AN ORDINANCE OF THE CITY OF COLLEGE STATION, TEXAS, AMENDING THE OFFICIAL CITY OF COLLEGE STATION COMPREHENSIVE PLAN BY REPEALING THE PARKS, RECREATION, AND OPEN SPACES MASTER PLAN DATED JULY 2011 ORDINANCE NO. 3358 AND ADOPTING THE PARKS AND RECREATION MASTER PLAN; PROVIDING A SEVERABILITY CLAUSE; PROVIDING AN EFFECTIVE DATE; AND CONTAINING OTHER PROVISIONS RELATED THERETO. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS: PART 1: That the “Official City of College Station Comprehensive Plan” is hereby amended by repealing the Parks, Recreation, and Open Spaces Master Plan dated July 2011 Ordinance No. 3358; and renumbering Subsection “B”; and by adding new Subsection “B.8” of Exhibit “A” thereto as set out in Exhibit “A”, and as further described in Exhibit “B”, attached hereto and made a part hereof. PART 2: That if any provisions of any section of this Ordinance shall be held to be void or unconstitutional, such holding shall in no way affect the validity of the remaining provisions or sections of this Ordinance, which shall remain in full force and effect. PART 3: That this Ordinance shall take effect immediately from and after its passage. PASSED, ADOPTED and APPROVED this _______ day of ____, 2026. ATTEST: APPROVED: _____________________________ _________________________________ City Secretary Mayor APPROVED: ___________________________ City Attorney Page 125 of 234 ORDINANCE NO. ___________ Page 2 of 8 EXHIBIT A That Ordinance No. 4303 adopting the “Official City of College Station Comprehensive Plan” as amended, is hereby amended by removing Subsection “B.1” and renumbering Subsection “B”; and adding Subsection “B.8” to Exhibit “A” of said plan for Exhibit “A” to read in its entirety as follows: A. Comprehensive Plan The Official City of College Station Comprehensive Plan (Ordinance 4303) is hereby adopted and consists of the following: 1. Plan Foundation; 2. Distinctive Places; 3. Strong Neighborhoods; 4. A Prosperous Economy; 5. Engaging Spaces; 6. Integrated Mobility; 7. Exceptional Services; 8. Managed Growth; 9. Collaborative Partnerships; and 10. Plan Implementation B. Master Plans The following Master Plans are hereby adopted and made a part of the Official City of College Station Comprehensive Plan: 1. Economic Development Master Plan dated February 2026; 2. The Water System Master Plan dated April 2017; 3. The Wastewater System Master Plan dated April 2017; 4. Northeast Gateway Redevelopment Plan dated September 2023; 5. Wellborn District Plan dated October 2023; 6. Housing Action Plan dated September 2024; 7. Active Transportation Master Plan dated May 2026; and 8. Parks and Recreation Master Plan dated October 2026. C. Master Plan Amendments The following Master Plan Amendments to the Official City of College Station Comprehensive Plan are as follows: Page 126 of 234 ORDINANCE NO. ___________ Page 3 of 8 1. Expiring the East College Station Transportation Study dated May 2005 – Ordinance 4404, dated November 10, 2022. 2. Expiring the Central College Station Neighborhood Plan dated June 2010 – Ordinance 4404, dated November 10, 2022. 3. Expiring the Eastgate Neighborhood Plan dated June 2011 – Ordinance 4404, dated November 10, 2022. 4. Expiring the Southside Area Neighborhood Plan dated August 2012 – Ordinance 4404, dated November 10, 2022. 5. Expiring the South Knoll Neighborhood Plan dated September 2013 – Ordinance 4404, dated November 10, 2022. 6. Expiring the Bicycle, Pedestrian, and Greenways Master Plan dated January 2010 – Ordinance 4690 dated May 28, 2026. 7. Expiring the Northgate Redevelopment Plan dated November 1996 – Ordinance 4690 dated May 28, 2026. 8. Expiring the Revised Wolf Pen Creek Master Plan dated 1998 – Ordinance 4690 dated May 28, 2026. 9. Expiring the Northgate Redevelopment Implementation Plan dated July 2003 – Ordinance 4690 dated May 28, 2026. 10. Expiring the Medical District Master Plan dated October 2012 – Ordinance 4690 dated May 28, 2026. 11. Expiring the Parks, Recreation, and Open Spaces Master Plan dated July 2011 – Ordinance XXXX dated October 22, 2026. D. Text Amendments The following Text Amendments to the Official City of College Station Comprehensive Plan are as follows: 1. Text Amendments: a. Chapter 2. Distinctive Places by amending the text regarding the Neighborhood Center future land use description, intent, and generally appropriate zoning districts – Ordinance 4351, dated April 28, 2022. b. Chapter 2. Distinctive Places by amending the text regarding the Planning Areas description to remove expired plans – Ordinance 4404, dated November 10, 2022. c. Chapter 2. Distinctive Places by amending the text regarding the Planning Areas description to rename the Texas Avenue & University Drive (FM 60) Redevelopment Area to the Northeast Gateway Redevelopment Plan – Ordinance 4470, dated September 28, 2023. Page 127 of 234 ORDINANCE NO. ___________ Page 4 of 8 d. Chapter 2. Distinctive Places by amending the text regarding the Planning Areas description to update it to the Wellborn District Plan, to revise the Future Land Use & Character descriptions to remove the Wellborn future land use and incorporate it and the Wellborn-specific zoning districts into the Neighborhood Commercial, Suburban Residential, and Estate Residential future land use descriptions and generally appropriate zoning districts – Ordinance 4474, dated October 12, 2023. e. Chapter 1. Plan Foundation, Chapter 2. Distinctive Places, Chapter 3. Strong Neighborhoods, Chapter 4. A Prosperous Economy, Chapter 5. Engaging Spaces, Chapter 6. Integrated Mobility, Chapter 7. Exceptional Service, Chapter 8. Managed Growth, Chapter 9. Collaborative Partnerships, and Chapter 10. Plan Implementation by amending text based on the recommendations of the Comprehensive Plan 5-Year Evaluation & Appraisal Report 2025 to remove repeated or redundant narrative and outdated information; update existing conditions and contextual data; incorporate strategies and narrative related to the updated Economic Development Master Plan; amend the implementation table to include action items for Chapter 4; and combine and add action items to improve clarity for implementation – Ordinance 4690 dated May 28, 2026. E. Map Amendments The following Map Amendments to the Official City of College Station Comprehensive Plan are as follows: 1. Future Land Use & Character Map: a. Approximately 5 acres of land generally located at 2354 Barron Road from Suburban Residential to Neighborhood Commercial – Ordinance 4365, dated June 23, 2022. b. Approximately 17 acres of land generally located at 400 Double Mountain Road from Medical to Urban Residential – Ordinance 4378, dated August 11, 2022. c. Approximately 0.19 acres of land generally located at 106 Southland Street from Suburban Residential to Neighborhood Commercial – Ordinance 4388, dated September 8, 2022. d. Approximately 2.611 acres of land, generally located at 100 - 170 Graham Road from Business Center to Neighborhood Commercial – Ordinance 4435, dated May 15, 2023. e. Amended as shown in the Northeast Gateway Redevelopment Plan – Ordinance 4470, dated September 28, 2023. f. Amended as shown in the Wellborn District Plan – Ordinance 4474, dated October 12, 2023. Page 128 of 234 ORDINANCE NO. ___________ Page 5 of 8 g. Approximately 3.25 acres of land generally located west of the intersection of Nantucket Drive and State Highway 6 S from Suburban Residential and Natural and Open Areas to Neighborhood Commercial and Natural and Open Areas – Ordinance 4520, dated May 23, 2024. h. Approximately 3 acres of land generally located at located at 116 and 120 Morgans Lane from Urban Residential to General Commercial – Ordinance 4525, dated June 27, 2024. i. Approximately 11 acres of land generally located at 3182 Holleman Drive South from Mixed Residential and Natural & Open Areas to Urban Residential – Ordinance 4566, dated December 12, 2024. j. Approximately 1.047 acres of land generally located at 3423 Cain Road and 3197 Holleman Drive South from Mixed Residential to General Commercial – Ordinance 4571, dated January 23, 2025. k. Approximately 3.60 acres of land generally located at 3768 McCullough Road from Estate Residential to Neighborhood Commercial – Ordinance 4578, dated February 27, 2025. l. Approximately 2.752 acres of land generally located at 2360 Harvey Mitchell Parkway South from General Commercial to Urban Residential – Ordinance 4596, dated June 12, 2025. m. Approximately 2.5 acres of land generally located south of the intersection of University Drive East and East Crest Drive from General Commercial to Urban Residential – Ordinance 4609, dated August 14, 2025. n. Approximately 6.995 acres of land generally located at 8650 Turkey Creek Road from Neighborhood Center to Urban Residential – Ordinance 4660, dated March 26, 2026. o. Approximately 7.2 acres generally located on Harvey Mitchell Parkway South between Dartmouth Street and Earl Rudder Freeway South from General Commercial to Urban Residential – Ordinance 4692, dated July 9, 2026. p. Approximately 12.43 acres of land generally located at 2950 Rock Prairie Road West from General Commercial to Urban Residential – Ordinance 4702, dated August 13, 2026. q. Approximately 106 acres generally located east of the intersection of Midtown Drive and Corporate Parkway from Business Center to General Commercial – Ordinance 4710, dated August 27, 2026. 2. Planning Areas Map: a. Removing the Central College Station Neighborhood Plan, Eastgate Neighborhood Plan, Southside Area Neighborhood Plan, and South Knoll Neighborhood Plan – Ordinance 4404, dated November 10, 2022. b. Renaming the Texas Avenue & University Drive (FM 60) Redevelopment Area to the Northeast Gateway Redevelopment Plan – Ordinance 4470, dated September 28, 2023. Page 129 of 234 ORDINANCE NO. ___________ Page 6 of 8 c. Renaming the Wellborn Community Plan to the Wellborn District Plan – Ordinance 4474, dated October 12, 2023. d. Removing the Medical District Master Plan and renumbering the planning areas Ordinance 4690 dated May 28, 2026. e. Renaming the Harvey Road Redevelopment Area to the Harvey Road Corridor Redevelopment Plan, and adjusting the planning area boundaries – Ordinance 4690 dated May 28, 2026. 3. Functional Classification & Context Class Map: a. Amended as shown in the Northeast Gateway Redevelopment Plan – Ordinance 4470, dated September 28, 2023. b. Amended as shown in the Wellborn District Plan – Ordinance 4474, dated October 12, 2023. c. Amended to remove the future extension of Pebble Creek Parkway, a Minor Arterial, between St. Andrews Drive and the future Minor Arterial to the south – Ordinance 4672, dated April 9, 2026. d. Amended to remove the future extension of Pavilion Avenue, a Minor Collector, between Sebesta Road and State Highway 6 – Ordinance 4677, dated May 18, 2026. e. Amended to reclassify Pebble Creek Parkway shown as a Minor Arterial to a Major Collector – Ordinance 4690 dated May 28, 2026. f. Amended to remove the future extension of Corporate Parkway, a Major Collector, between Midtown Drive and William D. Fitch Parkway – Ordinance 4712, dated August 27, 2026. F. General 1. Conflict. All parts of the Comprehensive Plan and any amendments thereto shall be harmonized where possible to give effect to all. Only in the event of an irreconcilable conflict shall the later adopted ordinance prevail and then only to the extent necessary to avoid such conflict. Ordinances adopted at the same city council meeting without reference to another such ordinance shall be harmonized, if possible, so that effect may be given to each. 2. Purpose. The Comprehensive Plan is to be used as a guide for growth and development for the entire City and its Extraterritorial Jurisdiction (“ETJ”). The Comprehensive Plan depicts generalized locations of proposed future land uses, including thoroughfares, bicycle and pedestrian ways, parks, greenways, and waterlines, and sewer lines that are subject to modification by the City to fit local conditions and budget constraints. Page 130 of 234 ORDINANCE NO. ___________ Page 7 of 8 3. General nature of Future Land Use. The Comprehensive Plan, in particular the Future Land Use & Character Map and any adopted amendments thereto, shall not be, nor be considered, a zoning map, shall not constitute zoning regulations or establish zoning boundaries, and shall not be site or parcel specific but shall be used to illustrate generalized locations. 4. General nature of College Station Comprehensive Plan. The Comprehensive Plan and any additions, amendments, master plans and subcategories thereto depict same in generalized terms including future locations; and are subject to modifications by the City to fit local conditions, budget constraints, cost participation, and right-of-way availability that warrant further refinement as development occurs. Linear routes such as thoroughfares, bikeways, pedestrian ways, greenways, waterlines, and sewer lines that are a part of the Comprehensive Plan may be relocated by the City 1,000 feet from the locations shown in the Comprehensive Plan without being considered an amendment thereto. 5. Reference. The term College Station Comprehensive Plan includes all of the above in its entirety as if presented in full herein, and as same may from time to time be amended. Page 131 of 234 ORDINANCE NO. ___________ Page 8 of 8 EXHIBIT B That the “Official City of College Station Comprehensive Plan” is hereby amended by adopting and making part of it the “Parks and Recreation Master Plan” to read as follows: Page 132 of 234 PARKS AND RECREATION MASTER PLANDRAFT Page 133 of 234 5 10 35 45 58 65 74 82 TABLE OF CONTENTS EXECUTIVE SUMMARY CURRENT CONDITIONS AND TRENDS 11 COMMUNITY PROFILE 21 PLAN REVIEW 23 RECREATION TRENDS 33 KEY PARK USERS COMMUNITY ENGAGEMENT INSIGHTS ENGAGEMENT INSIGHTS PARK CLASSIFICATIONS PARK INVENTORY STRUCTURE APPENDIXDRAFT Page 134 of 234 On behalf of the College Station Parks and Recreation Department, I am elated to share the Parks and Recreation Master Plan Update. This strategic roadmap will guide our department’s efforts and investments in the years ahead. The plan reflects months of community engagement, thoughtful input from our staff and Parks and Recreation Advisory Board, and careful consideration of the trends shaping our growing city. Most importantly, it reflects the voices of the people who live, work, and play in College Station. Through thoughtful conversations and opportunities to share ideas, residents expressed a strong appreciation for the parks and programs our community enjoys today, along with a shared desire to build upon those strengths. You told us that our parks are an important part of what makes College Station a great place to live, and that maintaining and reinvesting in the system we have today must remain a priority. We also heard a growing desire to connect with nature. Environmental education and the preservation of natural spaces emerged as key themes, highlighting not just the recreational value of our parks, but their role in fostering a healthier, more resilient community and providing meaningful connections to the natural world. College Station’s parks system already exceeds national benchmarks in nearly every category, and this plan charts a course for maintaining that standard of excellence as our community grows. More than a list of priorities, this plan reflects a shared vision for parks and recreation that brings people together, connects us to nature, supports healthy lifestyles, and enhances the quality of life that makes College Station special. I look forward to working alongside our staff, residents, and community partners to bring this vision to life. Kelsey Heiden Martinez Director, Parks and Recreation Department City of College Station A MESSAGE FROM THE DIRECTOR DRAFTPage 135 of 234 Parks and Recreation Master Plan | 4 ACKNOWLEDGEMENTS Thank you to the following individuals and groups who contributed to the preparation of this Parks and Recreation Master Plan Update. We appreciate the College Station City Council, Parks and Recreation Board, and City leadership for their vision, guidance, and unwavering commitment to enhancing the quality of life for everyone in College Station. CITY COUNCIL: John Nichols, Mayor Mark Smith, Place 1 William Wright, Place 2 David White, Place 3 Melissa McIlhaney, Place 4 Bob Yancy, Place 5 Scott Shafer, Place 6 CITY MANAGER'S OFFICE: Bryan Woods, City Manager Jeff Capps, Deputy City Manager Jeff Kersten, Assistant City Manager Jennifer Prochazka, Assistant City Manager PARKS AND RECREATION ADVISORY BOARD: Thomas Marty, Chair Neo Jang Cheletia Johnson Kimberly Topp Andrew Arizpe Ryan Pittsinger Amy Arredondo Anthony Branch PARKS AND RECREATION DEPARTMENT LEADERSHIP: Kelsey Heiden Martinez, Director Gene Ballew, Assistant Director of Stephan Richardson, Park Operations Manager Andrea Lauer, Business Services Manager Kelli Nesbitt, Marketing Coordinator Luis Perez, Recreation Manager CONSULTANT TEAM: Asakura RobinsonDRAFT Page 136 of 234 EXECUTIVE SUMMARYDRAFT Page 137 of 234 Parks and Recreation Master Plan | 6 A STRATEGIC ROADMAP TO PARKS AND RECREATION EXCELLENCE With a highly dynamic parks system that ranges from the ecologically vibrant preserves at Lick Creek Park to the sprawling first-class sports facilities at Veterans Park and Athletic Complex, alongside a diverse portfolio of programming that far exceeds the norm in quantity and quality, the City of College Station provides an exemplary parks and recreation system for residents and visitors alike. City leadership and the Parks and Recreation Advisory Board have set a high bar for the Parks and Recreation Department (PARD), aiming to provide a system that serves as a regional benchmark for excellence in parks and recreation. Maintaining that standard of excellence requires intentional planning and focused investment. This plan provides the Parks and Recreation Department with a clear roadmap for the years ahead, directing efforts toward the areas that will most meaningfully shape the system’s future: • Expanding access to and engagement with nature amidst rapid growth and urbanization across the city; • Improving access to park space throughout the city through strategic acquisitions, collaboration with developers, and improvements to undeveloped parkland; • Building resilience infrastructure by leveraging natural systems across City parks, including the city’s greenways that have recently moved to PARD management; • Maintaining a high-quality active recreation system that supports sports tourism and the City’s role in regional tournament play; • Increasing recreation amenities and programming opportunities for all abilities and ages • Improving coordination and collaboration between PARD and external partners. Drawn from input from department staff, the Parks and Recreation Advisory Board, three months of community engagement, and community events during the summer of 2025, the plan is designed to translate community needs and desires into practical actions that will help elevate the College Station parks and recreation system to an even higher level of excellence. With strong leadership, engaged residents, and a robust system to support the needs of a growing city, the future of College Station parks and recreation looks brighter than ever. DRAFTPage 138 of 234 Parks and Recreation Master Plan | 7 KEEPING PACE WITH A GROWING AND DIVERSIFYING COMMUNITY To understand how the department can respond to a growing and diversifying population and emerging or shifting recreation preferences, we reviewed demographic and recreational trends while developing the plan. The following key findings informed the goals and objectives that give the department a solid strategic foundation for serving current and future community needs and preferences. DEMOGRAPHIC TREND HIGHLIGHTS Trend Implication(s) Steady population growth, with the potential to add 20,000 or more residents by 2030. • Need to grow park acreage, ensure adequate park access across the city, and balance natural area preservation with heavily programmed park types. Non-white demographic categories had the largest population growth rates. 20% of College Station residents speak a language other than English at home as of 2023. • Increasingly diverse communities drive a need for more inclusive engagement and community spaces that reflect cultural and community needs. Older adults (50+) and senior populations (65+) have grown significantly since 2018. • Growing need for accessible recreation amenities and senior programming that promotes physical activity and wellness. Youth population (5-19) has also grown significantly since 2018. • Youth recreational programming and play equipment for young children continue to be an important community priority. Young professional and young family categories have declined since 2018. • Parks and recreation play an important role in attracting and retaining young professionals and families. RECREATIONAL TREND HIGHLIGHTS Trend Implication(s) Older generations are increasingly participating in racquet sports. • Increased demand for city racquet court facilities and programming like pickleball or tennis lessons. Younger generations are increasingly participating in water sports. • Higher demand for aquatic facilities and water- based programming like aquafit classes. Outdoor recreation is popular across all age segments. • Higher demand for outdoor amenities like trails, natural areas, and recreation programming like wilderness camps. Inactive populations tend to be most interested in camping, fishing, and cardio fitness. • Expansion of camping-related programming for both kids and adults.• Higher demand for fishing and cardio fitness- related programming. Market potential is highest for basketball, football, and frisbee-related activities. • Higher demand for city basketball, football, and frisbee facilities and programming.DRAFTPage 139 of 234 Parks and Recreation Master Plan | 8 THE COLLEGE STATION PARKS AND RECREATION SYSTEM IN CONTEXT The College Station system includes 55 developed parks across 1,595 acres, two cemeteries that cover 76 acres, and eight undeveloped parks covering 299 acres for a total of 1,971 acres of parkland. The parks system is highly diverse and robust in terms of amenities and programming offered, as can be seen in comparing the system to National Recreation and Parks Association (NRPA) Levels of Service standards, which serve as the national benchmark for evaluating park systems relative to the size of the population they are intended to serve. College Station has 12.4 acres of parkland for every 1,000 residents, which is 2.4 acres more than the NRPA standard of 10/1,000 residents. The City also has more parks per resident, more miles of trails per resident, and more athletic facilities per resident than the national standard in every category, except pickleball and tennis courts. The table below shows the values of the College Station system vs. the NRPA median benchmark for athletic facilities. LOS Metric College Station Value 2025 2025 NRPA Median Values for Jurisdictions with pop. 100,000 – 249,000 Delta Value (College Station vs. Median Comparison Value) Diamond Fields (residents per facility)5,835 6,821 986 Basketball Courts (residents/facility)4,141 9,742 5,601 Soccer Fields (residents/facility)4,011 7,993 3,982 Volleyball Courts (residents/facility)16,046 39,166 23,120 Tennis Courts (residents/facility)9,169 8,587 582 Pickleball Courts (residents/facility)32,092 6,782 25,311 Play Equipment/residents per facility)1,411 5,000 3,589 GOALS FOR THE COMING YEARS The following goals will guide the department’s efforts to maintain and improve the parks and recreation system in College Station over the next several years. Strategies that provide measurable targets for implementation are included in the Recommendations section for each objective, and action steps that provide specific guidance on pursuing each strategy are provided in the Strategic Action Plan. GOAL 1: IMPROVE ENVIRONMENTAL HEALTH AND ENGAGEMENT WITH NATURE - Increase access to nature, expand nature programming, increase native vegetative cover, and continue ecological restoration efforts. Obj 1. Enhance and expand nature-based recreation Obj 2. Improve nature-based programming Obj 3. Build community resilience through nature-based solutions Obj 4. Continue and expand upon ecologically focused initiatives.DRAFTPage 140 of 234 Parks and Recreation Master Plan | 9 GOAL 2: IMPROVE ACCESS TO PARKS AND INCLUSIVE PLAY - Provide greater access to parkland across the city, leverage existing linear parks and the improved greenway system, and offer additional inclusive programming. Obj 1. Activate linear parks Obj 2. Increase park access through greenways Obj 3. Expand inclusive play and programming GOAL 3: PROVIDE HIGH-QUALITY ACTIVE RECREATION AMENITIES AND FACILITIES - Provide dynamic active recreation opportunities, maintain high-quality athletic facilities, and support sports tourism. Obj 1. Provide access to active recreation opportunities Obj 2. Invest in the maintenance and expansion of parks and facilities Obj 3. Support sport tourism excellence Obj 4. Identify and secure alternative funds to support all aspects of parks and recreation. GOAL 4: ENHANCE PARKS DEPARTMENT SYSTEMS - Leverage interdepartmental coordination, program and facility assessments, and ongoing community engagement to provide effective stewardship of the City’s parks and recreational facilities. Obj 1. Perform regular internal assessments Obj 2. Successfully transition the City’s greenways program into the Department Obj 3. Expand and maintain consistent community engagement GOAL 5: STRENGTHEN STRATEGIC PARTNERSHIPS - Leverage relationships with leading regional institutions, student organizations, and community groups to expand access to environmental education, volunteer-driven stewardship, and citizen science opportunities. Obj 1. Formalize partnerships with Texas A&M University, AgriLife Extension, the Rio Brazos Audubon Society, and the Texas A&M Forest Service. Obj 2. Explore partnerships with Texas A&M University’s Recreational Sports and Athletics Departments Hotel Management, and Tourism to strengthen tournament hosting. Obj 3. Explore partnerships with CHI St. Joseph Health, Baylor Scott & White Health, and the Texas A&M School of Public Health. DRAFTPage 141 of 234 CURRENT CONDITIONS AND TRENDSDRAFT Page 142 of 234 Parks and Recreation Master Plan | 11 COMMUNITY PROFILE INTRODUCTION The community profile includes a comprehensive assessment of the City of College Station’s demographics and recreation trends. Key demographic topics covered in the profile include age, education levels, and household composition, offering insights into the changing makeup of the city's population and its impact on the Parks and Recreation Department. The profile also highlights trends in fitness activities, sports, and other types of recreation, noting which are growing or declining in popularity to help anticipate changing wants and needs. The information will help the department better understand the diverse range of park system users and anticipate their needs and preferences throughout the planning process. The profile concludes with a focus on key user groups, which include children, youth, young professionals, parents or guardians, and older adults or retirees. These demographic segments can help guide the rest of the planning process, ensuring that the parks system is inclusive and responsive to the needs of all residents and visitors. DEMOGRAPHIC TRENDS Overview Demographics are an essential piece of the park planning process. By analyzing demographic trends, we can better understand the city’s current needs and anticipate future demands as demographics shift. Age distribution, education – particularly influenced by the presence of Texas A&M University — and household composition are key indicators that differentiate College Station from county and statewide trends. These topics, along with others, are explored in greater depth in the sections that follow. The data presented in this section come from the City of College Station Planning and Development Services Department, which recently completed its existing conditions for the 2025 comprehensive plan update. Additional data is drawn from the U.S. Census Bureau, including the Decennial Census and American Community Survey estimates.DRAFTPage 143 of 234 Parks and Recreation Master Plan | 12 TABLE 1 – DEMOGRAPHIC OVERVIEW AND COMPARISON Topic College Station Brazos County Texas Total Population 128,370 233,849 29,145,505 Sex Male 50.8%50.2%49.4% Female 49.2%49.8%50.6% Age Under 5 5.4%5.9%6.2% Ages 5-19 24.3%22.5%21.7% Ages 20-29 38%28.3%14% Ages 30-64 25.8%33.4%44.5% Ages 65+6.5%9.9%13.5% Race One Race - White 63.5%60%50.1% One Race - Black or African American 8.1%10.4%12.2% One Race - American Indian and Alaska Native >1%>1%1% One Race - Asian 10.2%6.3%5.4% One Race - Native Hawaiian and Other Pacific Islander >1%>1%>1% One Race - Some other Race 7.4%10.1%13.6% Two or More Races 10.2%12.5%17.6% Ethnicity Hispanic or Latino (of any race)19.4%27%39.3% Not Hispanic or Latino 80.6%73%60.7% Income Median Household Income (2023 inflation- adjusted dollars)$51,776 $58,388 $76,292 Educational Attainment (for 25+ population) Less than High School 5%11%14% High School Graduate or Equivalent (GED, etc.)14%21%24% Some College (no degree)17%18%21% Associate’s degree or Higher 63%49%41% Sources: 2020 Decennial Census Table DP1; American Community Survey 5-year estimates 2023 Table B15003 and B19013 DRAFTPage 144 of 234 Parks and Recreation Master Plan | 13 Population FIGURE 1 – POPULATION PROJECTIONS Table 2: College Station Population 2009-2023, Source: Planning and Development Services Year Estimated Population Annual Growth Rate 5-Year Gowth Rate 2009 93,450 2.81% 10.1% 2010 94,929 1.58% 2011 96,767 1.94% 2012 98,085 1.36% 2013 100,096 2.05% 2014 102,332 2.23% 18.9% 2015 106,581 4.15% 2016 109,927 3.14% 2017 116,893 6.34% 2018 118,967 1.77% 2019 121,489 2.12% 7.9% 2020 122,085 0.49% 2021 124,511 1.99% 2022 126,005 1.20% 2023 128,370 1.88% Sources: College Station Planning and Development Services, 2025 180000 160000 140000 120000 100000 80000 60000 40000 20000 2000 2005 2010 2015 2020 2025 20300 2030 POPULATION PROJECTIONS 3.0%, 156,7172.5%, 151,6532.0% 146,729 2018 Projections 2023 Projections Recorded Population Figure 6: 2030 population Projections for College Station; Source: Planning and Development ServicesDRAFT Page 145 of 234 Parks and Recreation Master Plan | 14 College Station’s population dramatically increased during the mid to late 2010s. While the growth rate has steadied in recent years, it remains high. As demand for urban development increases with population growth, pressure on available land resources can reduce the amount of land reserved for parks and open space. Population growth can also strain natural environments within the park system. Urban expansion and growth can increase pollution, stormwater runoff, and habitat loss in the park system. Implications: • To meet the needs of a larger community, park acreage should grow proportionally and be distributed equitably across the city. • The Parks and Recreation Department should continue to be proactive about parkland acquisition, working with developers to improve the quality of parkland dedications and leveraging parkland as green infrastructure to mitigate environmental impacts. Race and Ethnicity FIGURE 2 – RACE, ETHNICITY, AND LANGUAGE SPOKEN AT HOME Figure 10: 2023 Race and Ethnicity; Source: U.S. Census Bureau, ACS 2023 5-Year Estimates Figure 15: Language Spoken at Home; Source: U.S. Census Bureau, ACS 2023 1-Year Estimate White Asian Black of African American Some other race American Indian and Alaska Native Native Hawaiian and Other Pacific Islander PERCENT OF POPULATION BY RACE 67.6% 9.6% 8.8% 3.3% 0.3% 0.1% English only Spanish Other Indo-European languages Asian and Pacific Islander languages Other languages LANGUAGE SPOKEN AT HOME 77.70% 11.00% 5.30% 4.30% 1.70%DRAFTPage 146 of 234 Parks and Recreation Master Plan | 15 Race/Ethnicity 2010 2023 Numerical Change Percent Change White 72,502 81,504 9,002 12.42% Black 6,383 10,015 3,632 56.90% Asian 8,576 11,518 2,942 34.31% Hispanic 13,165 24,288 11,123 84.49% Some Other Race 4,361 5,884 1,523 34.92% Table 3: College Station Race and Ethnicity 2010-2023; Source: U.S. Census Bureau. Sources: College Station Planning and Development Services, 2025 College Station has historically been a majority-white city; however, demographic shifts over the last decade show that the City is becoming increasingly diverse in race and ethnicity. Language spoken at home is another related metric to track when assessing diverse needs. Over 20% of residents speak a language other than English at home, indicating a potential need for multilingual signage. Implications: • Increasing diversity may emphasize a need for more thoughtful and inclusive community engagement and communications from the Parks and Recreation Department. Age FIGURE 3 – AGE BREAKDOWN AND TRENDS Figure 8: College Station Population Pyramid. Source: U.S. Census Bureau 2023 1-Year Estimate 85 years and over 80 to 84 years75 to 79 years70 to 74 years65 to 69 years60 to 64 years55 to 59 years50 to 54 years45 to 49 years40 to 44 years35 to 39 years30 to 34 years25 to 29 years20 to 24 years15 to 19 years10 to 14 years5 to 9 years Under 5 years 2023 POPULATION PYRAMID FOR CITY OF COLLEGE STATION 20,000 15,000 10,000 5,000 0 5,000 10,000 15,000 20,000 Female MaleDRAFT Page 147 of 234 Parks and Recreation Master Plan | 16 Figure 9: Percent Population Change by Age Category 2018-2023; Source: U.S. Census Bureau Sources: College Station Planning and Development Services, 2025 Younger and older adult populations are of particular interest for College Station given both longstanding and emerging demographic trends. Adolescents and young adults make up a significant portion of the city, and planners should integrate their preferences into planning goals. Additionally, various stakeholders have raised concerns over the city’s ability to retain young adults after graduation. The data reflects this dynamic, showing a population decline among 25- to 34-year-olds and suggesting a gap in lifestyle or career offerings that could influence decision-making. More recently, College Station’s older adult population has increased. This trend is supported by both data and stakeholder insights, including reports of former A&M students returning to their alma mater for retirement. This demographic shift introduces new considerations for the park system, which has historically not been compelled to accommodate a large older adult population. Implications: • Young adults may be more inclined towards flexible outdoor spaces for social gatherings rather than highly programmed and traditional park spaces like playgrounds. Parks programming should also align with their interests, such as yoga or fitness classes, recreational sports leagues, or outdoor adventure. • While many factors influence where young adults choose to live, access to quality parks, recreation opportunities and community amenities can play an important role in attracting and retaining residents. • The Parks and Recreation Department should continue to incorporate amenities for older adults, including walking trails and shaded rest areas, or introduce new programming that promotes health, wellness, and social connection in older age. 85 years and over 80 to 84 years 75 to 79 years 70 to 74 years 65 to 69 years 60 to 64 years 55 to 59 years 50 to 54 years 45 to 49 years 40 to 44 years 35 to 39 years 30 to 34 years 25 to 29 years 20 to 24 years 15 to 19 years 10 to 14 years 5 to 9 years Under 5 years PERCENT POPULATION CHANGE 2018 TO 2023 -40% -20% 0% 20% 40% 60% 80% 77.2% 25.0% 18.0% 19.2% 15.1% 48.7% 31.4% 13.8% 1.5% 21.8% 22.0% 17.4% -0.3% -1.6% -20.5% -6.2% -17.5% 27.9%DRAFTPage 148 of 234 Parks and Recreation Master Plan | 17 Income FIGURE 3 – MEDIAN INCOME Figure 14: Median Income in the Past 12 Months Comparisons; Source: U.S. Census Bureau 2023 1-Year Estimate Sources: College Station Planning and Development Services, 2025 Non-family households, composed in part of college students, young adults, or people working lower-paying service jobs, have significantly lower incomes compared to family households in College Station. Additionally, lower-income populations often encounter barriers to participating in public engagement processes, which can lead to their needs being underrepresented in the parks planning process. Implications: • The Parks and Recreation Department may need to seek external funding sources to support improvements to the local park system. • The Department should evaluate program registration fees, particularly those targeting young adults, to minimize financial barriers to participation. • To ensure inclusive engagement during the park planning process, the Department should target these groups using accessible and flexible outreach strategies. Education FIGURE 4 – EDUCATIONAL ATTAINMENT AND COLLEGE ENROLLMENT Figure 11: Educational Attainment; Source: U.S. Census Bureau ACS 2023 1-Year Estimate MEDIAN INCOME IN THE PAST 12 MONTHS(IN 2023 INFLATION-ADJUSTED DOLLARS) COMPARISONS $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 $0 Families Married-couple families Nonfamily households College Station $91,354 $112,420 $31,102 Brazos County $85,214 $107,292 $35,412 Texas $91,467 $109,997 $47,822 Families Married-couple families Nonfamily households EDUCATIONAL ATTAINMENT Graduate or professional degree Bachelor’s degree Associate’s degree Some college, no degree High school or equivalent degree 26.80% 32.30% 5.70% 15.50% 14.40%DRAFTPage 149 of 234 Parks and Recreation Master Plan | 18 Figure 12: Texas A&M University Fall Enrollment; Source: Texas A&M University Office of Academic and Business Performance Analytics: Note: In 2013, Texas A&M added the School of Law campus enrollment to its enrollment counts. In 2014, the university added Galveston, Qatar, and other campuses to the enrollment count. Sources: College Station Planning and Development Services, 2025 College Station has a highly educated population, exceeding the levels seen in both Brazos County and across Texas. A major contributor is Texas A&M University, which strongly influences the City and, in turn, its Parks and Recreation Department. A&M saw rapid enrollment growth during the 2010s, which increased demand for the city’s infrastructure and services. Enrollment at A&M for the Fall 2024 semester was 78,987 people. Although enrollment has steadied more recently, the student population remains a major part of the community and should be considered in park planning efforts. Implications: • The Parks and Recreation Department should assess whether it is adequately serving the City’s large college student population, including whether it is offering relevant programming and events, ensuring park facilities are welcoming and accessible to students, and if it is properly connecting institutional green spaces and trails with the broader park system. Household Composition FIGURE 5 – HOUSEHOLD TYPES AND COMPOSITION Figure 17: Households by Type; Source: U.S. Census Bureau HOUSEHOLDS BY TYPE Texas College-Station Bryan MSA College Station 67.4%32.6% 55.9%44.1% 45.6%54.4% Family Households Non-family Households TEXAS A&M UNIVERSITY FALL ENROLLMENT 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 1923 1933 1943 1953 1963 1973 1983 1993 2003 2013 2023 DRAFTPage 150 of 234 Parks and Recreation Master Plan | 19 Figure 18 Sources: College Station Planning and Development Services, 2025 College Station has a notably lower percentage of family households compared to the broader metropolitan area and the state, reflecting the strong influence of Texas A&M University on the city’s population and demographics. While the number of households with children has declined slightly from 2018 to 2023, they still represent a meaningful portion of the population. Implications: • Parks planning efforts must continue to provide a mix of spaces and programming, offering flexibility and amenities that suit the needs of both families, children, and students. Disability Figure 16: Population with a Disability by Type; Source: U.S. Census Bureau ACS 2023 1-Year Estimate Sources: College Station Planning and Development Services, 2025 College Station has a relatively low share of people with disabilities, which is likely due to the city’s smaller population of older adults. Regardless, promoting accessibility across the park system should remain a priority, especially if College Station wants to continue attracting more retirees and older adults in the coming years. Implications: • Making parks more accessible to people with disabilities can involve a range of strategies, including but not limited to upgrading trails, restrooms and playground equipment to ADA standards. POPULATION WITH A DISABILITY Independent living difficulty Self-care difficulty Ambulatory difficulty Cognitive difficulty Vision difficulty Hearing difficulty 3.50% 1.80% 3.40% 3.90% 2.40% 2.30% HOUSEHOLDS COMPOSITION: CHILDREN 2023 2018 21.0%79.0% 23.2%76.8% Households with Children under 18 Households without Children under 18 DRAFTPage 151 of 234 Parks and Recreation Master Plan | 20 Vehicle Access TABLE 2 – VEHICLE ACCESS Topic College Station Brazos County Texas Vehicles Available by Occupied Housing Unit No vehicle 5.7%5.6%5.3% 1 vehicle 37.9%35.5%32.5% 2 vehicles 38.1%38.2%39.7% 3 vehicles 18.3%20.6%22.5% Sources: 2023 ACS 5-year estimates - “Physical Housing Characteristics for Occupied Housing” Vehicle access in College Station closely mirrors county and statewide trends, suggesting a predominantly car-dependent population. That is somewhat unexpected given the City’s large student population, many of whom may not rely on cars due to campus amenities or financial constraints. The data may reflect inaccuracies in capturing student living situations through the Census, or it may simply reflect the region's broader car-centric infrastructure. Implications: • Regardless of current mode choice, it remains essential for the city to prioritize safe and equitable access to its park system through multiple modes of transportation.DRAFTPage 152 of 234 Parks and Recreation Master Plan | 21 PLAN REVIEW INTRODUCTION Asakura Robinson reviewed the following plans and studies provided by the Parks and Recreation Department: • 2010 Parks and Recreation Master Plan • 2010 Bicycle, Pedestrian and Greenways Master Plan • 2018 Update to Bicycle, Pedestrian and Greenways Master Plan • 2021 City of College Station Comprehensive Plan Update • 2013 College Station Park and Recreation Citizen Input survey • 2016 Parks & Recreation Satisfaction Survey • 2018 The City of College Station Parks and Recreation Needs Assessment Study • 2024 Community Recreation Center Needs Assessment Survey Findings Report by ETC Institute. PLANS 2010 PARKS AND RECREATION MASTER PLAN The mission established in the 2010 Plan continues today: to provide a diversity of facilities and leisure services which are geographically and demographically accessible to our citizens. To achieve this mission, the Plan set out goals and strategies under seven focus areas: 1. Resource Conservation & City Character 2. Health & Wellness 3. Economic Sustainability 4. Connectivity & Mobility 5. Parkland and Neighborhood Character 6. Diversity in Recreation & Cultural Programs 7. Responsible Governance The City placed major emphasis on addressing parkland deficits in 22 of 29 Neighborhood Park Zones and improving connectivity through greenways and an active transportation plan. Key strategies included: • Green the City through park restoration, plantings, streetscape interventions, improvements to parks and recreation design and operations, and acquisition of new parkland. • Promote active lifestyles through providing open space and parks near residences and enhancing existing parks and facilities. • Leverage opportunities to add economic value to the City (i.e., enhanced property values, reduced medical costs, attraction of guests and participants) through supporting signature and athletic events and reducing parkland deficits. • Connect parks and open spaces to the City’s vehicular, bicycle, and pedestrian networks through strategic investments and alignment with other adopted plans, including the Comprehensive Plan, Thoroughfare Plan, Bicycle, Pedestrian, and Greenways Master Plan and neighborhood plans. • Meet resident service needs through renovating and enhancing existing parks and facilities, ensuring diverse park typologies and reducing parkland deficits. • Provide facilities and programming for people of all ages and abilities and celebrate the diversity of cultures found in the community through the development of a community center and specific facility improvements, including Wolf Pen Creek. DRAFTPage 153 of 234 Parks and Recreation Master Plan | 22 • Maintain a cost-effective parks system that balances demand for facilities and programs with available revenue sources, with a focus on the pay-to-play concept, and maximizes partnerships with CSISD, private recreation providers, private developers and land trusts. Progress to date College Station Parks and Recreation Department and its partners have made progress in implementing the 2010 Parks and Recreation Master Plan since its adoption. Key implementation items will be discussed and documented at further stages of the planning process. 2010 Bicycle, Pedestrian and Greenways Master Plan The plan provides a framework to realize the community’s vision of College Station as a bikeable, walkable, environmentally aware, active city. To improve connectivity and accessibility, increase safety, increase outdoor bicycling and walking, and encourage environmental stewardship, the Plan establishes strategies and actions for developing and managing the system, as well as the structure and steps for implementing the recommendations over the next 10 years. The Plan proposes an additional 130 miles of bike lanes, 80 miles of bike routes, 113 miles of sidewalks, 43 miles of multi-use paths, 11 grade-separated crossings, and improvements to/protection of urban, suburban and rural greenways. 2018 Update to Bicycle, Pedestrian and Greenways Master Plan The 2018 update to the Bicycle, Pedestrian and Greenways Master Plan focused on meeting additional community needs due to population growth and development patterns. The changes included more bike lanes and pedestrian paths, removals of certain paths, and changes to lane/path typology (e.g., from bike lane or sidewalk to multi-use path). 2021 City of College Station Comprehensive Plan Update The 2021 Comprehensive Plan Update provided policy guidance and strategic actions to guide the City’s offerings, including parks and recreation system and greenways programs, and serves as the foundation for efforts detailed in the Recreation, Park, and Open Space Master Plan and the Bicycle, Pedestrian, and Greenways Master Plan. The Plan provides guidance for approaching parks and recreation system strategic action using a five-pillar approach: creating a positive and memorable experience for park users, establishing funding for projects, protecting wildlife, plants, water, and soil to enhance quality of life and environmental stewardship, tracking demographics and growth patterns, and using inclusive and accessible design for facilities and programs. It offers direction for enhancement of the Greenways Program by connecting parks, schools, and neighborhoods, and practicing natural resource stewardship through conservation, preservation and restoration. It also establishes policy guidance to provide unique, integrated opportunities for entertainment, education and culture to improve livability and make College Station more attractive to current and potential residents, retirees and businesses. 2026 ACTIVE TRANSPORTATION MASTER PLAN The 2026 Active Transportation Master Plan replaced the Bicycle, Pedestrian, and Greenways Master Plan and reframed non-vehicular mobility as a citywide transportation system rather than a network of recreation-focused facilities. The plan placed greater emphasis on safety, connectivity, and user comfort, and introduced micromobility as a growing component of the active transportation system. The plan also established priority corridors and projects to guide future transportation investment and implementation decisions. 2013 College Station Park and Recreation Citizen Input Survey In a survey completed by researchers and students at Texas A&M AgriLife Extension Service, 244 respondents provided input on priorities for parks and recreation amenities and programming. Residents' strongest priorities were places and opportunities to run, walk, and exercise; water activities; nature and nature-based activities; and close access to parks, followed by age-specific programming and better communication about parks and park amenities.DRAFTPage 154 of 234 Parks and Recreation Master Plan | 23 2016 Parks & Recreation Satisfaction Survey The survey measured resident satisfaction with parks and recreation facilities and program offerings and found that residents were satisfied overall (62% of respondents). At the time of the survey, respondents most often engaged in special events, senior activities, library programs, youth athletics, and most visited the jogging/walking trails, Larry J. Ringer Library, playgrounds and swimming facilities. They were highly satisfied with the parks, walking/jogging trails, swimming facilities and athletic fields. There were concerns raised about aquatics offerings and length of pool facility season, fitness offerings, activities and amenities for all ages, length of/space on hiking trails and loss of swing sets on playgrounds. 2018 The City of College Station Parks and Recreation Needs Assessment Study The study polled 1,144 residents about their park, recreation and open space needs and priorities, with a focus on identifying the use and maintenance of facilities, recreation programs of interest and park facility needs. Respondents were strongly interested in participating in recreation or leisure programs, with a focus on walking/hiking, festivals/events, aquatic programs and fitness classes/events. They identified the need for additional greenways, nature trails, and open spaces, and a new pool or splash pad at Thomas Park, and identified renovating existing parks and facilities as a funding priority. 2024 Community Recreation Center Needs Assessment Survey Findings Report This Findings Report summarizes the results of the ETC Institute’s statistically valid community recreation center needs assessment survey that aimed to help determine the community’s parks and recreation priorities. Priority investments identified include walking trails, an indoor running/ walking track, a swimming pool for lap swimming, adult fitness and wellness programs, special interest classes and community special events. They also identified the need for shade structures, picnic areas and environmental education/nature programs. RECREATION TRENDS OVERVIEW Assessing recreation trends is another important part of the park planning process. In addition to demographics, reviewing trends in indoor and outdoor recreation, sport, and fitness activities will help the City better anticipate residents' future desires. This section examines datasets at multiple scales, including national, state and citywide trends. The national data is pulled primarily from the Sport and Fitness Industry Association’s Topline Participation Report for 2025. The report derives its trends from a nationwide participation survey conducted in calendar year 2024 and ongoing participation reporting from its partners. Data from the United States Department of Commerce Bureau of Economic Analysis supplement information on outdoor recreation trends and their economic impact. Statewide data comes from the National Survey of Children’s Health, developed using online and mailed-in surveys and conducted by the U.S. Census Bureau, and the National Federation of High School Associations, which collects high school sport participation data from across the country. Lastly, this section analyzes sports and leisure market potential data pulled by Esri Business Analyst. The data is based on national propensities to use various products and services and applied to College Station's local demographic composition. Some high-level trends for College Station to watch include the continued popularity of racquet sports among older age groups and the growing popularity of water sports and outdoor recreation among younger generations. More details on these trends, and others, can be found in the sections below.DRAFTPage 155 of 234 Parks and Recreation Master Plan | 24 TABLE 3 – TRENDS OVERVIEW Trend Implications Older generations are increasingly participating in racquet sports.• Increased demand for and/or wear and tear on city racquet court facilities. • Higher demand for racquet sport-related programming like pickleball or tennis lessons. Younger generations are increasingly participating in water sports. • Increased demand for and/or wear and tear on city pool and aquatic facilities. • Higher demand for water-based programming like aquafit classes. Outdoor recreation is popular across all age segments. • Increased use of outdoor recreation facilities, including trails.• Higher demand for outdoor recreation programming like wilderness camps. Inactive populations tend to be most interested in camping, fishing, and cardio fitness. • Expansion of parks programming to include camping-related activities for both kids and adults.• Higher demand for fishing and cardo fitness- related programming. Mainstream team youth sports (i.e. football, basketball, and others) are regaining popularity. • Increased demand for and/or wear and tear on city basketball court and athletic fields. • Higher demand for football and basketball programming. Market potential is highest for basketball, football, and frisbee related activities. • Increased use of city basketball, football, and frisbee facilities.• Higher demand for basketball, football, and frisbee based programming. Sources: SFIA Topline Participation Report 2025; The National Survey of Children’s Health, 2023; National Federation of High School Associations; Esri Business Analyst Report Sports and Leisure Market Potential 2024 NATIONAL TRENDS Sport Preferences by Age and Generation Examples of the different sports and fitness categories according to SFIA: Fitness Activities include but are not limited to stationary cycling, cardio kickboxing, barre, Pilates, dance, aquatic exercise, etc. Individual Sports include but are not limited to archery, martial arts, bowling, hunting, skateboarding, ice skating, disc golf, etc. Outdoor Sports include but are not limited to backpacking, canoeing, climbing, sailing, wakeboarding, surfing, triathlons, trail running, etc. Racquet Sports include but are not limited to badminton, tennis, pickleball, squash, etc. Team Sports include but are not limited to baseball, basketball, cheerleading, gymnastics, water polo, wrestling, etc.DRAFTPage 156 of 234 Parks and Recreation Master Plan | 25 Water Sports include but are not limited to windsurfing, kayaking, rowing, scuba diving, stand-up paddling, jet skiing, etc. Winter Sports include, but are not limited to, cross-country skiing, downhill skiing, snowshoeing, fat tire biking, and snowmobiling. FIGURE 6 – SPORT PARTICIPATION BY GENERATION AND AGE Boomers (1945-1964) 2020 2021 2022 2023 2024 1-year change 2020/2024 change Fitness Sports 59.9%64.4%66.2%68.6%69.3%1.0%15.8% Individual Sports 22.3%229%22.9%23.8%24.3%2.2%9.1% Outdoor Sports 39.5%41.9%43.3%45.3%45.2%-0.1%14.4% Racquet Sports 6.4%6.8%8.0%8.6%9.7%13.9%53.3% Team Sports 4.9%5.1%4.6%5.5%5.7%3.8%15.9% Water Sports 7.8%8.2%8.8%9.4%10.0%5.7%27.5% Winter Sports 3.5%3.7%3.7%4.0%4.3%7.2%24.3% Gen X (1965-1976) 2020 2021 2022 2023 2024 1-year change 2020/2024 change Fitness Sports 66.0%64.2%66.7%66.9%69.3%3.6%5.0% Individual Sports 31.5%29.6%31.9%32.7%34.0%4.0%8.1% Outdoor Sports 52.2%50.4%52.9%54.2%56.1%3.4%7.4% Racquet Sports 12.2%11.8%13.1%14.1%15.2%7.8%24.1% Team Sports 15.5%15.2%14.4%17.8%18.9%6.1%21.4% Water Sports 13.0%12.3%13.4%14.5%15.2%5.1%17.7% Winter Sports 8.7%8.2%9.0%9.8%10.4%5.9%19.1% Millennials (1980-1999) 2020 2021 2022 2023 2024 1-year change 2020/2024 change Fitness Sports 68.7%70.0%69.2%68.2%69.7%2.2%1.6% Individual Sports 41.5%41.3%43.4%43.8%45.2%3.1%8.8% Outdoor Sports 59.4%60.5%61.6%61.3%63.2%3.1%6.5% Racquet Sports 19.3%19.3%21.2%21.1%22.3%5.3%15.5% Team Sports 30.4%30.6%31.3%33.4%35.4%6.2%16.4% Water Sports 17.1%17.2%18.8%19.7%20.4%3.5%19.5% Winter Sports 14.5%14.0%15.8%17.5%19.0%8.2%30.5%DRAFTPage 157 of 234 Parks and Recreation Master Plan | 26 Gen Z (2000+) 2020 2021 2022 2023 2024 1-year change 2020/2024 change Fitness Sports 55.2%55.8%55.5%56.5%56.1%-0.7%1.7% Individual Sports 44.3%44.0%45.4%46.1%46.4%0.7%4.7% Outdoor Sports 60.6%60.8%61.0%61.6%60.4%-2.0%-0.3% Racquet Sports 22.4%22.6%23.4%24.5%25.3%2.9%12.7% Team Sports 56.6%55.8%54.8%55.9%54.6%-2.2%-3.6% Water Sports 16.3%15.8%17.4%18.4%19.1%3.9%17.4% Winter Sports 19.4%19.1%20.4%20.6%22.3%8.3%14.8% Sources SFIA Topline Participation Report 2025 AGE BY SPORT CATEGORIES 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Fitness Sports Individual Sports Outdoor Sports Racquet Sports Team Sports Water Sports Winter SportsDRAFT Page 158 of 234 Parks and Recreation Master Plan | 27 Sports and fitness preferences change as you age, and preferences clearly cluster by generation. Baby Boomers (1945-1964) and Generation X (1965-1979) tend to have similar preferences, while Millennials (1980-1999) and Generation Z (2000+) also share similarities. Both Boomers and Gen X saw a significant increase in racquet sport participation from 2020 to 2024. This aligns with the surge in pickleball popularity during the COVID-19 pandemic. Millennial and Gen Z participation in water and winter sports rose from 2020 to 2024. Fitness sports, such as cardio classes, stationary cycling, and Pilates, maintain participation levels throughout time. Similarly, outdoor recreation, including trail walking, canoeing, and backpacking, also maintains strong participation levels from childhood through older adulthood. These trends can inform the park planning process and help ensure the city’s park system serves a broad range of needs across ages and generations. Inactive Population Trends and Aspirational Activities FIGURE 7 – INACTIVITY TRENDS Sources SFIA Topline Participation Report 2025 INACTIVITY IN THE U.S. 90.0 M - 80.0 M - 70.0 M - 60.0 M - 50.0 M - 40.0 M - 30.0 M - 20.0 M - 10.0 M - 0.0 M – 40.0% – 35.0% – 30.0% – 25.0% – 20.0% – 15.0% – 10.0% – 5.0% 0.0%2019 2020 2021 2022 2023 2024 Participation RateNumber of Inactives (Millions)Inactives (Millions) Inactivity Rate 81.2 M 74.3 M 72.2 M 68.6 M 64.9 M 61.8 M 26.8% 24.4%23.7%22.4%21.2%20.0% INACTIVITY BY INCOME 6-YEAR TREND Under $25K $25K to $49,999 $50K to $74,999 $75K to $99,999 $100 K+ 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 45.0% 50.0% 2019 2020 2021 2022 2023 2024 45.6% 36.8% 32.6% 26.3% 24.3% 19.4% 18.9% 15.4% 16.5% 12.7%DRAFTPage 159 of 234 Parks and Recreation Master Plan | 28 TABLE 3 – ASPIRATIONAL ACTIVITIES Age Group #1 Aspirational Activity #2 Aspirational Activity #3 Aspirational Activity Age 6-12 Camping Fishing Running/Jogging 13-17 Camping Free Weight Workout Swimming 18-24 Running/Jogging Free Weight Workout Swimming 25-34 Running/Jogging Cardio Fitness Free Weight Workout 35-44 Camping Fishing Running/Jogging 45-54 Camping Fishing Cardio Fitness 55-56 Camping Fishing Treadmill 65+Fishing Cardio Fitness Treadmill Income Under $25,000 Camping Fishing Cardio Fitness $25,000 - $49,000 Camping Fishing Cardio Fitness $50,000 - $74,999 Camping Free Weight Workout Cardio Fitness $75,000 - $99,999 Fishing Camping Treadmill $100,000 Cardio Fitness Treadmill Fishing Sources SFIA Topline Participation Report 2025 The Sports and Fitness Industry Association (SFIA) defines the inactive population as the segment of the American population aged six and older who do not participate in any of the 120 sports and fitness activities tracked by the association. Inactivity has consistently decreased over the last five years, with only about 20% of the population considered inactive as of 2024. One key demographic factor correlated with inactivity is income. Lower-income individuals are more likely to be inactive than higher-income individuals. SFIA also tracks activities that the inactive population has interest in participating in. Camping, fishing and cardio fitness are just a few of the most popular aspirational activities. These national trends in inactivity matter at the city level because they can inform policies and practices that make sports and fitness activities more broadly accessible, especially to lower-income and inactive population segments. Recent Changes to Sports and Fitness Participation TABLE 4 – PARTICIPATION TRENDS IN FITNESS AND TEAM SPORTS Rank Activities with Greatest Positive Percent Change Activities with Greatest Negative Percent Change Fitness #1 Pilates training Stationary cycling #2 Yoga Cross-training style workouts #3 Kettlebells Cardio kickboxing Team Sports #1 Football (7-7)Roller Hockey #2 Basketball Rugby #3 Soccer (outdoor)Ultimate Frisbee Sources SFIA Topline Participation Report 2025DRAFT Page 160 of 234 Parks and Recreation Master Plan | 29 SFIA reports that Pilates, yoga, kettlebell workouts, 7-7 football, basketball and outdoor soccer are the fitness and team sport activities that have experienced the greatest increase in participation over the last five years. Activities with the greatest decline include stationary cycling, cross-training style workouts, cardio kickboxing, roller hockey, rugby and Ultimate Frisbee. The trends indicate that group workout classes are still popular, but the format has shifted slightly. It also suggests that more traditional team sports are regaining popularity, while some unique offerings may be going out of style. These trends should inform the park planning process but should be cross-referenced with local preferences gathered through community engagement. Outdoor Recreation and Economic Value FIGURE 8 – OUTDOOR RECREATION AND ECONOMIC IMPACT Sources: Bureau of Economic Analysis, US Department of Commerce TABLE 5 – TOP CONTRIBUTING OUTDOOR RECREATION ACTIVITIES Activity Rank Portion of National GDP Portion of Texas’ state GDP #1 All other supporting recreation activities - $284.7 billion All other supporting recreation activities - $27.6 billion #2 Conventional outdoor recreation activities - $201 billion Conventional outdoor recreation activities - $17.4 billion #3 Other outdoor recreation activities - $128.2 billion Other outdoor recreation activities - $9.1 billion Sources: Bureau of Economic Analysis, US Department of CommerceDRAFT Page 161 of 234 Parks and Recreation Master Plan | 30 Outdoor recreation is not only an important part of a well-balanced park and recreation system, but it can also help drive the economy of a region, state, or nation. The outdoor recreation economy accounted for 2.3% ($639.5 billion) of current dollar gross domestic product (GDP) for the U.S. in 2023. That same figure for Texas’ GDP was 2.2% ($55.9 billion). Conventional outdoor recreation activities, such as bicycling, boating, hiking, and hunting, contribute significantly to these figures at the national and state levels. College Station has a strong recreational sports league culture that supports the outdoor recreation economy. Construction on Texas Independence Park at Midtown at 6291 Rock Prairie Road will transform more than 120 acres of parkland and greenways into one of the area’s most dynamic public parks with a wide range of outdoor recreation opportunities for residents of all ages, including mountain-bike trails, a pump track, and other bike elements. The Parks and Recreation Department should consider how to continue to support these activities and the outdoor recreation economy more broadly. LOCAL TRENDS (STATE AND CITY) Youth Sport Participation FIGURE 9 – YOUTH SPORT PARTICIPATION AND DEMOGRPHICS Current Search CriteriaSurvey: 2022-2023 National Survey of Children's HealthStarting Point: Child and Family Health MeasuresState/Region: Texas vs. NationwideTopic: Community and School ActivitiesQuestion: Participation in sports teams or sports lessons after school or on weekends, age 6-17 yearsSub Group: Yes x Sex of child During the past 12 months, did this child participate in a sports team or did they take sports lessons after school or on weekends, age 6-17 years? Select a Response Category: Yes Male Female Texas %55.4 43.1 C.I.49.1-61.4 37.3-49.1 Sample Count 290 227 Pop. Est.1,392,192 1,105,418 Nationwide %59.2 49.9 C.I.58.1-60.2 48.8-50.9 Sample Count 22,181 18,227 Pop. Est.15,005,087 12,048,065 C.I. = 95% Confidence Interval.Percentages and population estimates (Pop. Est.) are weighted to represent child population in US. During the past 12 months, did this child participate in a sports team or did they take sports lessons after school or on weekends, age 6-17 years? Select a Response Category: Yes English Other than English Texas %56.7 24.0 C.I.52.1-61.2 16.7-33.1 Sample Count 460 56 Pop. Est.2,211,399 279,569 Nationwide %57.9 36.2 C.I.57.1-58.6 34.0-38.5 Sample Count 37,739 2,422 Pop. Est.24,100,414 2,715,508 C.I. = 95% Confidence Interval.Percentages and population estimates (Pop. Est.) are weighted to represent child population in US.DRAFTPage 162 of 234 Parks and Recreation Master Plan | 31 During the past 12 months, did this child participate in a sports team or did they take sports lessons after school or on weekends, age 6-17 years? Select a Response Category: Yes 0-99% of poverty level 100-199% of poverty level 200-399% of poverty level 400% or more of poverty level Texas %27.8 36.8 52.8 70.6 C.I.19.9-37.3 27.6-47.1 45.0-60.4 64.4-76.1 Sample Count 54 65 145 253 Pop. Est.304,728 378,218 805,324 1,009,341 Nationwide %35.0 42.4 55.0 72.3 C.I.33.1-36.9 40.7-44.2 53.6-56.4 71.3-73.2 Sample Count 3,542 5,093 11,476 20,297 Pop. Est.3,119,879 4,156,767 7,941,559 11,834,946 C.I. = 95% Confidence Interval. Percentages and population estimates (Pop. Est.) are weighted to represent child population in US. During the past 12 months, did this child participate in a sports team or did they take sports lessons after school or on weekends, age 6-17 years? Select a Response Category: Yes Two parents, currently married Two parents, not currently married Single parent (mother or father) Grandparent household Other family type Texas %54.4 --36.1 ---- C.I.49.1-59.8 --29.0-43.8 ---- Sample Count 363 --110 ---- Pop. Est.1,687,744 --544,705 ---- Nationwide %61.0 45.3 43.9 41.8 33.7 C.I.60.1-61.9 42.2-48.5 42.3-45.5 37.2-46.5 27.4-40.6 Sample Count 29,799 1,606 7,077 820 225 Pop. Est.18,931,182 1,291,975 5,263,600 652,285 211,270 C.I. = 95% Confidence Interval. Percentages and population estimates (Pop. Est.) are weighted to represent child population in US. -- Dashed lines indicate that the total number of respondents to this measure (unweighted denominator) is less than 30, which does not meet MCHB data display criteria. Sources: The National Survey of Children’s Health, 2023 Among youth nationwide participating in after-school and weekend sports, about 9.3% are male, and 9.2% are female participants from Texas. This is a notable share, suggesting that after-school and weekend sports are an important part of Texas culture. The College Station parks system supports youth sports by providing facilities and programming. Data also show that youth are less likely to participate in after-school and weekend sports if they come from homes with higher poverty levels, single-parent households or speak a language other than English at home. These trends highlight potential barriers to participation that the Parks and Recreation Department can address during the plan update process.DRAFTPage 163 of 234 Parks and Recreation Master Plan | 32 High School Sport Trends FIGURE 9 – YOUTH SPORT TRENDS Percent Change from 2018-2019 school year to 2023-2024 school year BOYSTexas505,386 Football Golf Baseball Basketball Cross Country 3%5%6%3%1% Soccer Swimming & Diving Tennis Track & Field (Outdoor)Wrestling 7%1%2%-1%51% GIRLS353,915 Basketball Competitive Spirit Cross Country Football Golf 1%72%1%625%-1% Soccer Sofball Fast Pitch Swimming & Diving Tennis Track & Field (Outdoor) 7%4%-2%2%4% Volleyball Wrestling 4%46% Sources: National Federation of High School Associations Statewide data shows that from the 2018-2019 school year to the 2023-2024 school year, wrestling gained the most popularity for boys and girls. Other notable increases during this time frame were seen in girls' competitive spirit and football. Most sports gained in participation/popularity, with exceptions to boys’ track & field, girls’ golf, and girls' swimming & diving, which saw slight declines. High school sport participation and trends can indicate to the Department what program offerings and related facilities youth in the region want. DRAFTPage 164 of 234 Parks and Recreation Master Plan | 33 Sport and Leisure Behavior in College Station TABLE 6 – SPORT AND LEISURE MARKET POTENTIAL INDEX Product/Consumer Behavior Market Potential Index (MPI) Participated in rock climbing/12 month 275 Participated in Ping-Pong/12 month 209 Attend college basketball game/12 month 208 Participated in skiing (downhill)/12 month 200 Participated in volleyball/12 month 199 Participated in ice skating/12 month 178 Participated in roller skating/12 month 173 Participated in soccer/12 month 160 Attend college football game/12 month 160 Participated in backpacking/12 month 156 Participated in basketball/12 month 156 Participated in bowling/12 month 155 Participated in football/12 month 155 Participated in frisbee/12 month 154 Sources: Esri Business Analyst Report Sports and Leisure Market Potential 2024 A market potential index (MPI) tells you how likely consumers in a specific area are to purchase a particular product or service compared to the national average. The national average in an MPI is indicated by a score of 100. Any MPIs higher than 100 indicate a higher propensity to purchase a product or service. The MPI values in the table highlight the need for certain facilities. The City parks system should aim to accommodate basketball, football, frisbee, rock climbing, roller skating, soccer and volleyball. The Parks and Recreation Department should also explore how it can support backpacking, bowling, and ping pong either through facilities or programming. KEY PARK USERS OVERVIEW Identifying key park users during the planning process can help the Parks and Recreation Department create a well-rounded, responsive plan attuned to the City’s diverse needs. This approach helps synthesize findings from both the demographic and recreation trends assessments, providing a high-level picture of who might be using the system now and in the future. The memo identifies key user groups mostly by age. Categories include children, youth, young professionals, parents/families and older adults/retirees. These categories are not fully exhaustive of the City’s population and should be used to ensure core and unique groups are accounted for. The final plan will still ultimately serve the entire community.DRAFTPage 165 of 234 Parks and Recreation Master Plan | 34 KEY PARK USER CATEGORIES Children (Age 0-14) • Children make up a little more than 15% of the City’s population. • Children are a core group of park system users because playgrounds and green spaces are essential areas for play, physical activity and social interaction needed during this developmental age. • Park and recreation preferences for children evolve with time, and the Department will need to continuously monitor trends and engage with children to anticipate what sports and programs are most popular. Youth (Age 15-24) • Texas A&M University and other nearby schools draw a large youth population. • Youth activity preferences may be geared more towards organized sports and socially focused recreation spaces. • The Department will need to provide adequate facilities for activities preferred by young people and consider how to integrate technology into traditional park offerings and activities. • Young Professionals (Age 25-35) • The city has historically had some trouble retaining this population segment following graduation from the local universities. • This group may have more of a focus on health and wellness offerings as well as spaces for community connection, gatherings, and events. • The Department can play a role in providing resources for this population group and contributing to the City’s long-term attraction. Parents/Guardians (Misc. Ages) • Parents and guardians, like children, are core users of the park system. • They need safe, family-friendly environments, but could also benefit from nearby adult-oriented amenities such as walking loops, fitness stations or seating areas. • The Parks and Recreation Department can enhance the user experience for parents/guardians by strategically placing adult-focused amenities in areas that already draw families and caregivers. Older Adults/Retirees (Age 65+) • Older adults are a growing demographic group in College Station. • They enjoy accessing nature and socializing in parks just like many other park users but might require more accessible amenities and passive recreation opportunities as they age. • The Department can make accessibility improvements and add age-specific programming to cater to this growing demographic group.DRAFTPage 166 of 234 COMMUNITY ENGAGEMENT INSIGHTSDRAFT Page 167 of 234 Parks and Recreation Master Plan | 36 COMPREHENSIVE PLAN 5-YEAR UPDATE The City went through a 5-year update of its comprehensive plan (2021) at the same time as the parks planning process. The 5-year Evaluation & Appraisal Report was approved by the city’s Planning and Zoning Commission and City Council in September 2025 and included community engagement feedback relevant to the park planning process. Relevant findings: • Strategic Growth & Neighborhood Integrity ◦Residents and stakeholders voiced concern over population growth/development pressures and potential impacts on neighborhood quality and access to City resources, including the park system. • Sustainability and Resilience ◦Stakeholders expressed concerns about climate resilience, water supply, and environmental sustainability, and identified interests in exploring long-term planning solutions for stormwater, heat mitigation and green infrastructure practices. • Parks, Trails, and Public Spaces ◦Community members were positive about the existing park system but highlighted some opportunities for improvements, including an expanded trail/greenway network, more shade/tree canopy/natural area preservation, integrating parks with local businesses/active streetscapes and ensuring park access in newly developed areas. PARKS AND RECREATION DEPARTMENT FEEDBACK The internal kickoff meeting for the parks and recreation plan update included dedicated time engaging with Parks and Recreation department staff on their thoughts about strengths, weaknesses, opportunities, and priorities for the park system. City staff manage the day-to- day operations and are stewards of the park system’s long-term vision and have a unique understanding of system needs. Staff were separated into four groups and walked through two exercises. Below is a summary of the findings from the activities. PARK PLANNING PRIORITIES Participants were asked to choose topics that they saw as most important or relevant to the park planning process. Park access, growth management, public health and economic development were the most popular responses. PARK PLANNING PRIORITIES Park Access Population Growth/Growth Management Public Health Economic Development Public Safety Habitat Restoration and Convervation Public Education Bike/Pedestrian Connectivity Arts & Culture Green Stormwater Infraestructure 13 12 10 10 9 9 8 5 4 2DRAFT Page 168 of 234 Parks and Recreation Master Plan | 37 STRENGTHS, WEAKNESSES, OPPORTUNITIES, THREATS (SWOT) SUMMARY Department staff responded to prompts to gauge the strengths, weaknesses, opportunities and threats facing the park system. The table below summarizes the feedback and key themes gathered through this exercise. Theme Summary of Feedback Resources/Needs • City staff is a key resource supporting the park system, and understaffing is a concern.• Additional office and recreation center space is needed.• Ongoing funding for the park system is a concern.• Swimming pools, baseball fields, and indoor courts are needed the most.• Land acquisition, birding, protecting wildlife, and nature education are additional emerging needs. Park System Offerings • The park system offers strong and diverse programming and spaces for recreation.• The city provides quality natural spaces and facilities and pays attention to detail in maintaining these spaces.• Sports recreational opportunities are strong and contribute to city tourism/economy. External Trends/Factors • City population changes and generational differences.• Encroaching urban development.• Changing wants/needs of the city population indicate traditional sports/recreation might be losing popularity. PARKS AND RECREATION ADVISORY BOARD FEEDBACK College Station’s Parks and Recreation Advisory Board was engaged in the same park priority and SWOT exercises as Parks Department staff at the beginning of the planning process. The Advisory Board is a key stakeholder group that provides valuable public input and guidance to the City Council and staff on matters concerning the establishment, maintenance and operations of the city parks system. PARK PLANNING PRIORITIES Board members were asked to choose topics that they saw as most important or relevant to the park planning process. Park access, growth management and public health were the top three most popular topics. STRENGTHS, WEAKNESSES, OPPORTUNITIES, THREATS (SWOT) SUMMARY PARK PLANNING PRIORITIES Park Access Population Growth/Growth Management Public Health Economic Development Public Safety Habitat Restoration and Convervation Public Education Bike/Pedestrian Connectivity Arts & Culture Green Stormwater Infraestructure 13 12 10 10 9 9 8 5 4 2DRAFT Page 169 of 234 Parks and Recreation Master Plan | 38 Board members responded to prompts to help gauge the strengths, weaknesses, opportunities, and threats facing the park system. The table below summarizes the feedback and key themes gathered through this exercise. Theme Summary of Feedback Resources/Needs • Connecting to school green spaces is an area of opportunity. • The City needs more basketball, baseball and aquatic recreation spaces. • Better connectivity between parks is needed, including trails, sidewalks, etc. • The park system needs more nature-based recreation. • Additional funding is needed to support the park system. Park System Offerings • Lick Creek Park and Veterans Park are well-loved parks in the system. • The city offers a variety of parks with diverse uses across the system. • The City engages residents effectively on park system needs. External Trends/Factors • Population growth and development indicate that the City is prospering, but they present new challenges/potential strain on the park system. • The City population is aging. • Natural disasters, flooding, erosion, and pests are a threat to the system, especially for parks with more wild/natural areas. • Increasing extreme heat/humidity will impact comfort levels for park users. COMMUNITY ENGAGEMENT SUMMER/FALL 2025 OVERVIEW City staff gathered community feedback throughout summer and fall 2025. Staff facilitated three activities focused on park planning priorities, park amenities, and park quality ranking across the system. Staff carried out engagement efforts at department-hosted community events, scheduled pop-up in-the-park events, and unscheduled pop-up outreach at neighborhood parks. A variety of meeting formats allowed staff to meet people where they are and have informal face-to-face conversations. Department merchandise, such as cups, frisbees, or stickers, was handed out during engagement to help spark curiosity and get families and people involved who might not usually participate in the planning process. In total, the department hosted 39 engagement opportunities, generating over 850 unique touchpoints. Most importantly, the efforts fostered a greater sense of accessibility, drawing a diverse cross- section of residents into the engagement process. Across the public engagement effort, residents consistently expressed interest in nature- based recreation, environmental education, reinvesting in older parks, expanding trail systems, improving bike and pedestrian connections and increasing shade along trails. Personal stories and comments complemented the quantitative data gathered through the activities. Together, the inputs help create a comprehensive set of community priorities for the park system.DRAFTPage 170 of 234 Parks and Recreation Master Plan | 39 ACTIVITY RESULTS Activity 1 - Park Priorities Residents were asked which planning initiatives mattered most to them across the park system. The top three most important priorities include park amenities/trails/open space, habitat restoration and recreational programming. Activity 2 – Park Amenities Participants marked what’s working well and what needs improvement on a set of common park system amenities. The top three most successful park amenities are youth sports, concrete trails and community events. The top three amenities that could use the most improvement include conservation, adult sports and disc golf. PARK PRIORITIES Public HealthGreen Stormwater InfraestructureHabitat RestorationBike/Pedestrian ConnectivityPark AccessPublic SafetyArts & CulturePublic EducationPopulation Growth/GrowthEconomic DevelopmentPark Amenities/Trails/Open SpaceRecreational Programming12.01% 8.44%6.42% 8.92% 6.30% 9.16%8.44% 6.18% 3.80%2.38% 18.55% 9.39% PARK AMENITIES 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% working % do better %Concrete TrailNature TrailOpen SpaceConservationCommunity EventsSports FieldsYouth SportsSummer CampSenior ProgramsBikingFitness AquaticsLeisure AquaticsNature EducationPickleballDisc GolfAdult Sports17.6%27.5%25.3% 70.0% 20.6% 43.9% 16.4% 27.5% 37.9% 56.6%56.5%48.8%41.5% 60.3%64.7%68.0% 82.4%72.5%74.7% 30.0% 79.4% 56.1% 83.6% 72.5%62.1% 43.4%43.5%51.2%58.5% 39.7%35.9%32.0%DRAFTPage 171 of 234 Parks and Recreation Master Plan | 40 Activity 3 – Park Quality Across the System Participants noted their favorite parks and which ones needed improvement. The parks with the top three most votes are highlighted in each column, but the table below shows all results. Park Name Number of votes for favorite park Number of votes for parks that need improvement Anderson 4 3 Art & Myra Bright 0 0 Barracks 2 0 0 Bee Creek 19 10 Billie Madeley 0 0 Brian Bachmann 2 4 Bridgewood 2 2 Brison 3 1 Brothers Pond 6 6 Carter's Crossing 0 1 Castlegate 2 0 Castle Rock 5 1 Cove of Nantucket 1 0 Creekview 0 0 Crescent Point 0 0 Cy Miller 0 0 Eastgate 0 0 Edelweiss 1 3 Edelweiss Gartens 0 0 Emerald Forest 1 1 Etonbury 0 1 First Down 5 1 Gabbard 0 0 Georgie K. Fitch 0 0 Greens Prairie Reserve 0 0 Jack & Dorthy Miller 1 1 John Crompton 6 2 Lemontree 3 3 Lick Creek 97 0 Lions 0 0 Longmire 1 1 Luther Jones 2 0 Merry Oaks 1 0 Midtown Reserve 0 0 Northgate 0 2 Oaks 3 0DRAFT Page 172 of 234 Parks and Recreation Master Plan | 41 Parkway 0 0 Pebble Creek 3 0 Phillips 0 0 Reatta Meadows 3 0 Richard Carter 1 0 Sandstone 1 0 Southern Oaks 3 3 Southwest 1 4 Steeplechase 0 0 Stephan C. Beachy Central 59 2 Thomas 1 1 University 0 2 Veterans Park & Athletic Complex 23 0 W. A. Tarrow 0 0 Wallace Lake 0 0 Wildwood 0 0 Windwood 0 0 Wolf PenCreek 26 7 Woodcreek 1 1 Woodland Hills 0 1 COMMUNITY RECREATION CENTER NEEDS ASSESSMENT SURVEY The ETC Institute administered a community recreation center needs assessment survey for the City of College Station during the winter and spring of 2024 to help determine parks and recreation priorities for the community. The survey aimed to collect at least 400 completed responses from residents, and it surpassed this target, collecting 455 completed surveys. The overall results for the sample of 455 residents have a margin of error of at least ±4.59 % at 95% confidence. Most respondents (36%) indicated they have participated in programs/activities during the past year. They were then asked how many programs and activities they participated in. About 30% stated they participated in one program or activity, 51% stated they participated in 2-3 programs and activities, 10% stated they participated in 4-6 programs and activities, and only 9% stated they participated in 7 or more programs and activities. They also rated the programs and activities they participated in. 27% rated the programs excellent, 60% rated them good, 9% rated them fair, and 3% rated them poor. Respondents who said they do not participate in programs were asked what prevented them from participating more often. The top barriers that respondents selected: I don’t know what is offered (53%), too busy/not interested (30%) and program times are not convenient (19%). PRIORITIES FOR AMENITY INVESTMENTS: The ETC Institute developed the Priority Investment Rating (PIR) to provide organizations with an objective tool for evaluating the priority that should be placed on recreation and parks investments. The Priority Investment Rating (PIR) equally weighs (1) the importance that residents place on amenities and (2) how many residents have unmet needs for the amenities. [Details regarding the methodology for this analysis are provided in Section 3 of this report.]DRAFTPage 173 of 234 Parks and Recreation Master Plan | 42 Based on the Priority Investment Rating (PIR), the following programs were rated as high priorities for investment: • Walking trails (PIR=176) • Indoor running/walking track (PIR=166) • Swimming pool for lap swimming (PIR=125) • Cardio equipment/free weights (PIR=117) • Swimming pool for leisure/play (PIR=116) • Shade Structures (PIR=112) • Community garden (PIR=111) • Pickleball courts (PIR=107) Priorities for Program Investments: The Priority Investment Rating (PIR) was developed by ETC Institute to provide organizations with an objective tool for evaluating the priority that should be placed on recreation and parks investments. The Priority Investment Rating (PIR) equally weighs (1) the importance that residents place on programs and (2) how many residents have unmet needs for the programs. TOP PRIORITIES FOR INVESTMENT FOR AMENITIES BASED ONPRIORITY INVESTMENT RATING Walking trailsIndoor running/walking trackSwimming pool for lap swimmingCardio equipment/free weightsSwimming pool for leisure/playShade structuresCommunity gardenPickleball courtsMulti-use spaces for fitness classes or group exerciseSwimming pool therapeutic programsIndoor basketball/volleyball courtsSenior CenterPicnic areasSpecial event spaceGame roomOutdoor multi-use courtsMeeting roomsTeaching kitchenSwimming pool for lessonsPublic loungeRacquetball courtsSplash padsPlaygroundsSports fieldsRentable kitchen facilitiesSpin roomChild watch areaSkate parkeSports gaming area 0 5 100 150 200 176166125117116112111107928986857976767572696767656461616046453836 High Priority(100+) Medium Priority(50-99) Low Priority (0-50)DRAFTPage 174 of 234 Parks and Recreation Master Plan | 43 Based the Priority Investment Rating (PIR), the following amenities were rated as high priorities for investment: • Adult fitness & wellness programs (PIR= 200) • Special interest classes (PIR= 150) • Community special events (PIR= 141) • Arts & crafts programs & activities (PIR= 136) • Environmental education/nature programs (PIR= 136) • Water fitness programs/lap swimming (PIR= 135) • Group fitness programs (PIR= 128) The chart below shows the Priority Investment Rating for each of the 34 programs assessed in the survey. OVERARCHING TAKEAWAYS AND IMPLICATIONS FOR THE PLANNING PROCESS TAKEAWAYS Strong existing park system with room to improve. The City park system is performing well overall, with reliable facilities, diverse recreational programming, effective property maintenance and thoughtful department outreach. TOP PRIORITIES FOR INVESTMENT FOR PROGRAMSBASED ON PRIORITY INVESTMENT RATING 0 5 100 150 200 200150141136136135128128125119118108106100999588877067666159595858565656 High Priority(100+) Medium Priority(50-99) Low Priority (0-50) Adult fitness & wellness programsSpecial interest classesCommunity special eventsArts & crafts programs & activitiesEnvironmental education/nature programsWater fitness programs/lap swimmingGroup fitness programsCultural enrichment programsOutdoor environmental/nature camps & programsSenior programsSelf-directed fitnessSpecial eventsHealthy eating programs & dieting programsPickleball leaguesSTEAM/Tech classesMusic classes & programsAdult sports leaguesDance lessons & programsSwim lessonsAfter school programs for youth of all agesTeen programsYouth summer programs & campsTennis lessons & leaguesYouth sports programs & campsYouth visual arts/crafts/perfoming arts programsYouth summer camp programsYouth fitness & wellness classesYouth sports leaguesGymnastics/tumbling programsDrop-in babysitting while using facilityYouth performing arts programsPreschool programs/early childhood educationRecreation/competitive swim teameGaming/eSports 5655514637DRAFT Page 175 of 234 Parks and Recreation Master Plan | 44 Equitable access and connectivity are top priorities. Expanding park access through pedestrian and bicycle connections is a widely shared goal across stakeholder groups. Focus on core park functions. The public wants the plan update to emphasize foundational park services, including amenities, open space, trails, connectivity and recreational programming. External pressures create uncertainty. Population growth, urban development, and climate/environmental instability are key external forces that raise concerns about the long-term health of the park system. Growing emphasis on environmental and nature-based priorities. Stakeholders and residents have indicated increasing interest in conservation, environmental education and nature-based recreation opportunities. Funding and staffing remain critical challenges. Sustainable investment in the park system is a persistent concern, especially for maintaining and upgrading aging parks and ensuring adequate staffing. Facility needs vary, but some priorities have emerged. Stakeholder groups identified different priorities. Consensus elements include expanding aquatics facilities; investing in sports courts/fields for baseball, basketball, pickleball, and disc golf; and increasing connectivity. Performance varies by park. While community members identified several parks as successful, others need attention, and mixed perceptions (e.g., Bee Creek Park) suggest uneven experiences. Additional engagement and more conversations about targeted improvements are needed. IMPLICATIONS The community engagement findings will guide the overall development of the Parks and Recreation Master Plan. They provide important context for interpreting technical analysis, such as the Level of Service (LOS) analysis and others, ensuring decisions are made with a greater understanding of community needs. Engagement takeaways will be reflected throughout the plan's final recommendations, helping inform funding decisions, investment priorities and future planning efforts. DRAFTPage 176 of 234 RECREATIONAL PROGRAM ANALYSISDRAFT Page 177 of 234 Parks and Recreation Master Plan | 46 ENGAGEMENT INSIGHTS When community members were asked about their satisfaction with several key program categories: • 83.6% said the Department was doing well with youth sports • 79.4% said the Department was doing well with community events • 72.5% said the Department was doing well with summer camps • 62.1% said the Department was doing well with senior programming • 43.5% said the Department was doing well with fitness aquatics • 51.2% said the Department was doing well with leisure aquatics • 32% said the Department was doing well with adult sports During conversations and interviews with Department staff and the Advisory Board, additional trends were identified for future consideration: ◦A growing community enthusiasm and need for more outdoor/nature-based youth education. ◦A broader priority given to planning for more families, aging in place, and retaining young professionals. ◦Regarding planning for families, there is a growing need for more programming for teens. ◦Several interviewees highlighted the City’s growing senior population, which may have significant impacts on senior programming demand. SUMMARY The City of College Station is a highly prolific provider of recreational programming, with a portfolio ranging from history lectures to outdoor survival camps, balancing quantity and quality. For this plan, we analyzed program registration data from 2018, 2019, 2022, 2023, and 2024 to evaluate how different programming categories have performed over time. Among its peers, College Station is an exemplary program provider that well surpasses the upper quartile of the NRPA level of service for programming (2,338 for cities of similar size), providing an average of over 6,200 individual programming sessions each year across the study period. To maintain its robust, dynamic suite of programming, the Parks and Recreation Department has navigated a range of challenges and obstacles in serving the community. The COVID-19 pandemic significantly impacted the Department, disrupting both program provision and participation. Across the years of programming data analyzed, patterns have emerged after several post-pandemic years of programming, revealing new insights into how the pandemic affected programming preferences and highlighting categories of programming that maintained public interest despite such significant disruption. The analysis gives the Department additional insight into how programs can be further categorized to support investment prioritization, along with a quantitative assessment of participation over time to identify program areas that are growing, performing consistently or showing signs of decline. DRAFTPage 178 of 234 Parks and Recreation Master Plan | 47 ANALYSIS OVERVIEW The program analysis for this plan unfolded across a 3-step process: STEP 1: PROGRAM CATEGORIZATION First, programs were sorted into categories by topic or activity type, ranging from specific sports like kickball or basketball to broader categories such as special events and summer camps that share key characteristics but may vary widely in theme or topic. Because specific programs can vary significantly year to year, this approach enables more linear tracking of participation and helps identify which programming categories provide the most value to residents or best align with the Department’s mission. STEP 2: PROGRAM CLASSIFICATION Based on staff input, surveys of other providers in the City, and public engagement insights, staff then sorted each programming category into one of three categories: Essential, Important and Value Add. Essential Programs Programs classified as Essential are in direct alignment with the Department’s mission, provide high-value services to residents, and are either not offered by other public or private providers or have significant cost barriers to participation with limited supply. These programs would generally not be accessible to many residents if the Department did not provide them, and they provide significant social, physical or cultural value to participants. Essential programs are the highest priority programming for the Department. Important Programs Important programs are in direct alignment with the Department’s mission and are well-valued by the community but are often available from other providers. Many of these programs have significant cost barriers or are unique offerings that engage residents in experiences they may not otherwise have. Many of the Important programs see consistently high numbers of participants across the study period, indicating meaningful demand for their provision. Value-Add Programs Value-Add programs are broadly aligned with the Department’s mission but often have a significant presence of other providers in the city and fewer barriers to participation. Nevertheless, many have public health or social benefits, are well attended, and have generally low operating costs. They are lower priority than Essential and Important Programs but still provide value to the community and are worth maintaining as resources allow. DRAFTPage 179 of 234 Parks and Recreation Master Plan | 48 Balancing Programs by Classification Figure 1: Distribution of programs by classification 2018 - 2024 Across the study period, 57.70% of programs were Essential, 31.62% were Important, and 10.68% were Value Add. Variation between years was minimal, with the distribution staying within a few percentage points of the overall average. With Essential Programs making up most of the programming, and Important Programs making up the bulk of the Department’s offering, this is an appropriate balance to maintain. Keeping Value Add programs between 10-15% allows the Department to continue offering these community-valued programs without placing significant strain on overall programming resources while also maintaining a resource buffer that can be reallocated to other programming categories as needed. 100% 90% 80% 70% 60% 50% 40% 30% 20% 1% 0% 10.68% 31.62% 57.70% Essential Important Value Add DRAFTPage 180 of 234 Parks and Recreation Master Plan | 49 Classification 2018 2019 2022 2023 2024 Total Essential 3223 4614 3584 3528 3113 18,062 Adaptive Programs 161 60 20 66 156 463 After-School Programs 125 174 173 180 196 848 Holiday Programs 271 163 286 230 161 1,111 Nature-Based Programs 139 296 193 515 379 1,522 Special Events 443 127 226 228 207 1,231 Summer Camps 242 623 722 506 376 2,469 Swimming 1842 3170 1922 1803 1638 10,375 Important 1771 2056 2119 2334 1620 9,900 Art 50 199 203 170 172 794 Basketball 887 934 987 1165 710 4,683 Exercise *1 18 85 54 158 Field Hockey **12 19 11 42 Softball 175 197 281 188 169 1,010 STEM 147 144 98 221 80 690 Tennis 240 364 457 418 359 1,838 Volleyball 249 193 63 68 65 638 Value Add 193 407 667 1031 1046 3,344 Cooking 16 40 30 4 12 102 History **346 505 470 1,321 Kickball 36 20 35 38 36 165 Martial Arts 33 263 124 370 428 1,218 Meditation **33 36 33 102 Ultimate Frisbee 108 84 99 78 67 436 Grand Total 5187 7077 6370 6893 5779 31,306 Figure 2: Program Participation by Classification 2018 - 2024 Note: * = missing or incomplete data STEP 3: PROGRAM PERFORMANCE After categorizing and classifying the programs, we used registration data to evaluate participation levels across categories over the study period. There are gaps in the dataset due to pandemic service disruptions and program shifts away from registration. However, this analysis identifies overall participation levels across programming categories over time. Further analysis identified trends in specific flagship programs within those categories and which programming categories warrant adjustments to the number of programs provided, based on participation levels and a survey of other providers. Participation in programs was further categorized using the following groupings: Growth Potential, Steady Performers, and Scaling Down. DRAFTPage 181 of 234 Parks and Recreation Master Plan | 50 Growth Potential Programs categorized under Growth Potential have seen consistent overall increases in participation over the years analyzed. While data limitations and COVID-19 disruption make it difficult to confirm a clear longitudinal trend, these programs generally saw steady growth before the pandemic and, in the years that followed, rebounded quickly and maintained growth. Most programs in this category were also emphasized by engagement participants, further highlighting the value and potential demand for additional opportunities. The Department should monitor participation in these programs for continued growth and survey participants to better identify demand for additional or expanded programming. Steady Performers Steady Performer programs showed consistent participation levels across the study period, with small deviations between years that do not indicate any consistent pattern of increased or decreased participation. These deviations often correlated closely with changes in the number of programs offered, suggesting that the Department’s approach to adjusting programming to participation in this category has been effective. Many programs in this category also see strong participation in raw participant counts, indicating clear community value and interest in their provision. Given the minor year-to-year deviations, monitor these programs for shifts in participation over at least 2 years to anticipate potentially significant changes. Scaling Down Like growth-potential programs, those categorized as Scaling Down are not necessarily losing community interest but have seen some decline in overall participation numbers across the study period. For most programs in this category, declining participation was not consistent year to year. Many saw significant post-COVID participation that surpassed pre-COVID levels but was not sustained in later years. In these cases, participation in the most recent year was at the same level as, or higher than, the first study year, indicating that enthusiasm remains high despite the more recent downward participation trend. Categorizing programs as scaling down is not meant to indicate that these programs are losing community value or interest, but that they should be monitored to inform how the Department balances the number of programs provided with participation levels. Engagement Insights In addition to this quantitative analysis, engagement insights emphasize each program category's importance in serving community needs and highlight how it can help meet the needs of growing demographic categories. ESSENTIAL PROGRAMS GROWTH POTENTIAL Adaptive Programs – Aquatics / Challenger Bowling Why It’s Essential: Adapted Aquatics and Challenger Bowling are part of the Department’s growing portfolio of inclusive programs and offer critical opportunities for youth who may not be able to fully participate in other programming. Inclusive recreation is a significant focus for the Department and a type of programming with few providers outside the Department. The significant growth in participation further emphasizes the value this program provides to those who need inclusive recreation opportunities. How It’s Performing: An emerging pre-pandemic program, participation in adapted aquatics more than tripled between 2018 and 2019. Although it has not yet reached or surpassed the 2019 peak, participation has remained consistent and grown from 2022 to 2024. The Challenger bowling program has also seen significant growth in participation, with engagement levels more than doubling from 2023 to 2024. As many bowling alleys across the country have struggled to maintain consistent business, there may be more opportunities to collaborate with local partners to provide valuable exposure while helping the Department maintain or expand existing capacity.DRAFTPage 182 of 234 Parks and Recreation Master Plan | 51 After-school Program Why It’s Essential: After-school care can be a significant financial and logistical challenge for working families, and the Department provides one of the City’s most accessible after-school options. Other low-cost options from private or other public providers are limited, and the Department’s collaboration with CSISD to transport students from their school to program sites further emphasizes the value these programs provide in terms of accessibility. How It’s Performing: The After-School Program is one of the most consistently growing categories in the Department’s portfolio, with no loss in participation between pre- and post-pandemic attendance and steady growth from 2022–2024. That growth surpassed pre-pandemic levels, though only slightly. The Department has done an effective job scaling the program to meet increased needs and should continue to monitor trends that may indicate a need for more significant program growth in the future. Engagement Emphasis: After-school programs impact families with children or young teens, a key demographic group highlighted by staff and the Parks and Recreation Advisory Board for the Department to serve. Nature-Based Programs Why It’s Essential: In urban or urbanizing areas, parks and recreation departments are some of the most critical providers of natural space and programming. That service is especially important in Texas, which ranks among the lowest states for publicly owned land. A limited number of other public and private organizations provide nature-based programs, many of which partner with the department to facilitate City-provided programming. These programs also provide significant public benefits by linking communities to their natural environment and delivering a wealth of physical, social and emotional advantages. How It’s Performing: Participation grew significantly from 2018 to 2024. Although participation dipped somewhat in 2024 compared to the 2023 peak, enthusiastic public support during engagement suggests this category of programming will remain a significant focus. Fewer programs in 2024 may explain the attendance decrease. However, you should generally track attendance at repeated programs over time to evaluate diminishing returns, while new programs should balance repeatable programming with unique offerings that may identify new or emerging interests. Engagement Insights: Across staff, the Parks and Recreation Advisory Board, and community input, nature-based programming emerged as a growing strength for the Department and a core component of overall programming. There was also consensus on the need to continue investing in nature-based programming and to grow the Department’s programming portfolio, aligning with the well-received emphasis on meaningful engagement with nature through programs that get hands dirty and inspire awe. Special Events Why It’s Essential: Special events are a core part of PARD’s programming portfolio, with a range of events that would not be possible without PARD facilitation. Many special events also provide significant social value, and few other providers outside the Department offer them. How It’s Performing: Participation in special events continues to drive consistent attendance and enthusiasm. Emerging events, such as the Show'em Off Car & Bike Show, have grown significantly year to year, suggesting value in repeat events to build consistent awareness and improve participation over time. These events also leverage more perennial event types that are likely to build an enthusiastic base of repeat participants. Engagement Insights: Special events were among the highest rated, with 79.4% of respondents saying that what the Department is doing is working well. DRAFTPage 183 of 234 Parks and Recreation Master Plan | 52 STEADY PERFORMERS Holiday Events Why It’s Essential: Public holiday events are typically only provided with City involvement, and PARD is among the best positioned Departments to leverage existing capacities to organize and facilitate events. Holiday events are an important opportunity for community members to gather, attracting a wide diversity of residents that may not interact regularly outside of public events. Without PARD provision, residents would have significantly fewer public holiday events to attend. What It Includes: As a more general category of programming, Holiday Events cover a wide range of events, including: • Jingle Bell Fun Run • Haunted Hike • Trunk or Tree-T • Christmas in the Park • I Heart America Celebration How It’s Performing: Holiday events are one of the more consistent categories of programming in terms of repeated events and have seen consistent engagement across the study period. Participation in the Jingle Bell Fun Run, one of the most popular holiday-related events, declined in 2024 because of changes to the holiday parade route and overall function. SCALING DOWN Summer Camp Why It’s Essential: Summer youth activities are often vital for working-class families with limited resources for privately provided camps or other forms of summer day programming. PARD summer camps are low- or no-cost and are offered across a wide range of timeframes, increasing their utility for working parents. What It Includes: Summer Camps cover a variety of programming areas, including: • Basketball Agility Camp • Cheer Camp • Football Agility/Skills Camp • Nature-Based Camps • STEM Camps How It’s Performing: Summer programming sees some of the highest participation across all categories, but it has declined year over year from 2022 to 2024. The 2022 data may be inflated by the significant boost in participation seen across many program categories as the pandemic- related barriers to programming began to fade. Still, continued year-over-year decline warrants closer analysis of individual program participation to identify which programs are growing or maintaining consistent engagement and which are falling out of favor. Engagement Insights: Like after-school programs, summer camps serve an important age range of 6-15, providing a valuable service to families with children and young teens identified in engagement as a key focus demographic. About 72.5% of community members who participated in engagement thought the Department was doing well with summer programming, suggesting the Department should maintain its course on summer programming, with any new summer programs focused on nature-based camps and other themes that align with community preferences expressed through engagement. DRAFTPage 184 of 234 Parks and Recreation Master Plan | 53 SWIMMING Why It’s Essential: In a heat-dominated climate, swimming pools are a critical public good that helps provide cooling alongside broader recreational benefits. Public provision is critical for equitable access, with private pools often presenting significant cost barriers. Swimming lessons are an essential service, as private providers are limited, and swimming is a core life skill with personal and public safety implications. What the Data Shows: Swimming has the highest participation level of all program categories but has declined consistently from 2022 to 2024 and has not rebounded to the 2019 pre-pandemic peak. This is largely due to the opening of two private indoor swimming facilities that offer year-round swimming lessons, which has drawn some of the previous participants/users away from City pools. In 2024, 225 swimming lesson sessions were held, similar to the 229 sessions held in 2022, but with approximately 30% fewer attendees. The Department could consider scaling down individual lesson sessions by up to 30%, though an incremental approach is recommended to avoid impacting accessibility. Notably, participation in the Tsunami Swim Team program has remained consistent over the same timeframe, with the highest post-pandemic participation rate in 2024. Year 2018 2019 2022 2023 2024 Total Lessons 1,663 2,656 1,675 1,372 1,184 8,550 Tsunami 393 229 218 277 1,117 Adamson Lagoon 129 28 187 177 521 Total 1,792 3,077 1,904 1,777 1,638 10,188 Figure 3: Performance of Primary Swimming Programs 2018 - 2024 Note: * = missing or incomplete data Engagement Insights: Several comments from staff and Advisory Board members suggested a need for additional swimming facilities, though programming was not specifically mentioned. Public engagement showed mixed results for aquatics programming, with 56.5% of respondents indicating the Department could do better with fitness aquatics programming. The Department provides limited fitness-related swimming programming, so further engagement may help identify which demographic categories would best benefit from new fitness offerings. DRAFTPage 185 of 234 Parks and Recreation Master Plan | 54 IMPORTANT PROGRAMS GROWTH POTENTIAL Art Why It’s Important: Art programming is a valuable opportunity to engage in creative exercises and even build artistic skills. While other private and community providers of art programming are often accessible to different income levels, PARD programming adds value by making art programming more accessible to youth. How It’s Performing: Art programming has seen steady participation across the study period, and it is one of the few program categories with nearly the same participation levels in 2019 and 2022 (pre- and post-pandemic). Participation increased significantly from 2018 to 2019, making this sustained level more noteworthy and indicating that earlier growth in interest in art programs is being maintained over time. Engagement Insights: Art programs are one of the few programs aimed at young adults and above, a key focus demographic identified in engagement. Given the category’s consistent participation levels and overall growth potential, art programs are a vital part of the Department’s programming portfolio that engages a key demographic. STEM Why It’s Important: While CSISD and A&M are primary providers of STEM-related programming, PARD’s programs provide important additional enrichment opportunities, with particular benefit to lower-income families who may lack the resources to access alternative out-of-school programs. How It’s Performing: STEM program participation peaked in 2023, and although overall participation declined significantly in 2024, the number of participants relative to the number of programs has remained consistent. The Department could consider increasing the number of STEM programs in the future, but should monitor participation in individual programs to identify shifts and avoid diminishing returns. Tennis Why It’s Important: While other private providers offer tennis programming, participation often faces significant cost barriers, and public programs help make tennis more economically accessible. The Department offers a wide range of programs, from a round-robin league to beginner lessons, creating multiple entry points that see strong participation each year of the study period. How It’s Performing: Overall, staff input has confirmed continued growth in participation and demand, despite an apparent decline in participation from 2022 to 2024. The decline is not due to reduced interest but because of court resurfacing and other improvements that disrupted programming during the study period. With new courts, enthusiasm and participation are growing again. Engagement Insights: The Department’s range of tennis programs, with more focused age groups of 10-15 and 16+, are well attended and form an important part of the department’s youth sport programming, which had the highest approval rating during public engagement. They also serve key demographics related to family-aged households identified by staff and the Advisory Board. STEADY PERFORMERS Basketball Why It’s Important: While other private providers offer basketball programming, they are either competitive and play-oriented or may have cost barriers to participation. The City’s basketball programming is oriented more toward casual community play and is highly valuable because it lowers the bar for team accessibility and affordability. Basketball programming is also held at the Lincoln Recreation Center, a long-standing community staple in one of the City’s most historic neighborhoods. DRAFTPage 186 of 234 Parks and Recreation Master Plan | 55 How It’s Performing: Basketball programming is one of the highest-participation categories. Participation has remained high across the study period, with a dip in 2024 that correlates directly with a reduction in the number of programs and does not reflect a significant change in overall enthusiasm. Basketball is likely to continue seeing high participation levels given its perennial nature and its role in active recreation in the communities surrounding the Lincoln Recreation Center. Engagement Insights: Residents greatly appreciated youth sports like basketball, with 83.6% of respondents saying the Department was doing well in providing youth sports. Basketball also directly serves youth and young adults, a focus of both broader public engagement and input from staff and the Advisory Board. Exercise Why It’s Important: Many private providers offer physical exercise programming, including affordable, accessible options across age ranges. Nevertheless, exercise programs remain important because they directly improve public health outcomes and are a key way to promote physical activity more broadly. How It’s Performing: The primary exercise program, Yoga in the Park, has shown consistent performance across the study period, with variations in overall participant counts correlating clearly with the number of programs offered. Speed and Agility Training also saw a significant jump in attendance between 2023 and 2024, though additional years of data are needed to establish clear performance expectations. There does not appear to be any indication that additional sessions are warranted. Adult Coed Volleyball Why It’s Important: The Department’s volleyball programming has scaled down post-pandemic but remains a consistently attended mid-size part of the overall athletic program portfolio and will likely continue to perform reliably barring a significant shift in programming from other providers. How It’s Performing: Volleyball programming has had significantly lower participation counts post-pandemic, primarily driven by fewer offerings. However, it continues to draw consistent participation in both the spring and fall rounds. Summer sees a notable drop in participation that appears consistent from 2022 to 2024. That does not necessarily mean the summer round should be discontinued, but other seasons may offer more potential for expanded engagement. Engagement Insights: Volleyball is one of the Department's core adult sport offerings, and it was one of the fewer approved categories during public engagement. This reflects less volleyball's performance and more the need for the Department to maintain the program, given its consistent attendance as a key adult offering. Young adult and early-career demographics are also key focal points identified by staff and the Advisory Board, further emphasizing the importance of programs like volleyball. Yoga Why It’s Important: While private providers often serve yoga well, significant cost barriers can limit participation. Department programming offers valuable access for lower-income participants, and yoga is well documented for its physical and mental benefits, making it an important part of available active recreation programming. How It’s Performing: Participation counts were not available for 2022-2024 because the program is no longer registration-based. Still, staff perspectives indicate consistent engagement, and the shift away from required registration reflects the Department’s confidence in continued participation. Engagement Insights: Yoga is another adult-oriented program that serves a key demographic focus group identified by staff and the Advisory Board. DRAFTPage 187 of 234 Parks and Recreation Master Plan | 56 SCALING DOWN Adult Softball Why It’s Important: Like volleyball, softball has other public and private providers for youth, but has limited options for more casual adult play, where Parks Departments are often key providers. As athletic programming, they encourage physical activity and can be a source of community connection for participants. How It’s Performing: Softball programming has seen a soft decline from 2022 to 2024, though the enthusiastic participation in 2022 may correlate with broader enthusiasm for social activity post-pandemic. Participation across seasons shows minimal variation, though the drop in overall participation does not appear to correlate with the number of programs offered. The Department should closely monitor participation to anticipate further declines. Engagement Insights: Softball is one of the Department's core adult sport offerings and was one of the lower-approved categories during public engagement. Despite declining participation, volleyball remains an important part of the Department’s adult recreation offerings, which further emphasizes the need to monitor participation and participant feedback. Value Add Programs GROWTH POTENTIAL Exploring History Luncheon Why It’s Value Add: There are other history programming providers in College Station, including A&M, non-profits, and libraries, many of which have low- or no-cost options. Given the high level of participation, demand for the Department’s programming remains clear, but it would not be a priority compared to more essential programming. How It’s Performing: The Exploring History Luncheon has performed well since its inception. In July 2024, the luncheon attracted a program high of 79 participants, suggesting that despite slightly lower numbers than in 2023, enthusiasm remains high and is likely to stay consistent in the near future. Adult Kickball Why It’s Value Add: Kickball is a relatively low-input sport to organize and has minimal equipment costs, with few barriers to organizing games outside the Department. As a game oriented towards social interaction and simple fun, the physical activity benefits are less than those of more traditional sports but still offer a valuable opportunity to be outside with running that can at times be intensive. How It’s Performing: Participation has been consistent throughout the entire study period, with counts varying by only 2-3 participants between 2022 and 2024. The fall session appears to be the most attended of the three seasons, though spring is also well attended. Notably, adding a summer session in 2024 did not increase annual participation, largely because spring attendance was lower. No clear correlation exists between the summer addition and the spring decline. However, the Department should monitor attendance over the next couple of years for any signs of sustained decline in spring attendance. Engagement Insights: Kickball is one of the Department's select adult sport offerings and was one of the lower-approved categories during public engagement. Kickball has shown consistent engagement over time, suggesting this program plays a valuable role in the Department’s overall adult sport portfolio. DRAFTPage 188 of 234 Parks and Recreation Master Plan | 57 Martial Arts Why It’s Value Add: Many private martial arts providers operate throughout the city at a variety of price points. Regardless of cost, participation still has an inherent financial barrier, and martial arts are one of the more enduring forms of physical activity alongside traditional sports. City programs can offer more accessible programs for lower-income participants. With significant growth in participation over the past several years, this category appears to be a valuable part of the Department’s programming. How It’s Performing: Martial arts programming has increased dramatically between 2022 and 2024, growing by more than 300%. In 2024, it was among the highest-attended active recreation program categories provided by the Department. While this significant growth in participation may level off or decline slightly over the next couple of years, it’s likely to generate consistent engagement overall. If participation continues to grow, martial arts programming may become a core component of the Department’s active recreation programming and shift into the “important” category. Engagement Insights: The Department’s Martial Arts programs are oriented towards older children and teens, serving key demographics related to family-aged households identified by staff and the Advisory Board. STEADY PERFORMERS Meditation Why It’s Value Add: Meditation is offered by a range of other private providers and is also a highly accessible activity that can be done without external guidance, or through free online guidance. The Department’s meditation programs are consistently attended and are often held in natural environments that provide greater health and wellness benefits. How It’s Performing: The Department’s Sheng Zhen Meditation in Motion is the most well-performing meditation program across the study period, generating modest but regular engagement year to year. Other programs see significantly lower participation, though this may reflect different registration or attendance tracking methods. While there are no clear signs that demand is increasing, these programs will likely continue to see steady participation. SCALING DOWN Ultimate Frisbee Why It’s Value Add: Where Ultimate Frisbee facilities are in place, the sport itself is easily playable without external facilitation, either individually or in groups. Facilitation still adds value, as Ultimate Frisbee rules can be a barrier for beginners. The sport's outdoor nature also offers opportunities to play in more natural areas, as Ultimate Frisbee equipment is generally compatible with wilder vegetation. However, course design must intentionally account for throwing trajectories to reduce the likelihood that players will have to retrieve discs from more sensitive areas. How It’s Performing: Ultimate Frisbee has seen continuous engagement across the study period but does have a clear pattern of declining participation. The fall session appears to be more consistent, with minimal variation across years, whereas the spring session fell sharply between 2022 and 2023 and has not shown signs of reversing course. More investigation into the dynamics of declining spring participation may be warranted, though there are enough participants and minimal overhead to justify continuing to hold spring session.DRAFTPage 189 of 234 PARK CLASSIFICATIONSDRAFT Page 190 of 234 Parks and Recreation Master Plan | 59 PARK CLASSIFICATIONS The Parks and Recreation Master Plan proposes updating the park classifications to better reflect the needs of the Parks and Recreation Department and its existing and future priorities. The criteria for the new classifications include Size, Service Area, and Amenities/Facilities and Features. Criteria Definition Implication Size Park Acreage Larger parks require more extensive maintenance and provide more space for programming Service Area and Access Geographic range of users + how users access the park (walk, bike, car) Ensure access via specified modalities Amenities/Facilities and Features Typical elements users may find at each type of park. Includes athletic fields, playgrounds, open recreation areas, passive recreation amenities (picnic tables, benches), nature-based recreation amenities (swimming, camping, trails), swimming pools, community centers, golf/disc-golf courses, and dog parks. Allocate resources for maintenance of existing amenities/facilities and for future investments Table 1. Classification criteria and associated implications for park system planning. We recommend the following six (6) park classifications for parks in College Station: Neighborhood Park, Community Park, Regional Park (Natural/Conservation and Athletic/sports complex facility), Greenway and Natural Area, Linear Park and Cemeteries. In the following pages, we describe each park classification. See Appendix PC.1 for Park Classification Summary Table. INTRODUCTION The College Station system includes 55 developed parks across 1,595 acres, two cemeteries that cover 76 acres, and eight undeveloped parks covering 299 acres for a total of 1,971 acres of parkland. The City of College Station uses a park classification system better to understand the function and use of each park. Park classifications can guide the selection of amenities and programming at any given site, inform long-term maintenance needs, provide design recommendations for land designated for public use, and provide a framework to maximize community benefits. The City of College Station has traditionally used the classification system established by the National Recreation and Parks Association (NRPA) for parks and open space. College Station has two (2) park classifications: Neighborhood and Community. DRAFTPage 191 of 234 Parks and Recreation Master Plan | 60 IMPLICATIONS When establishing necessary park upgrades, use the park classifications to optimize access to the site via the specified modalities; allocate resources for maintenance of existing amenities/ facilities and for future investments; and allocate resources for future facility upgrades to support programming. In the future, park classifications can be used to develop design standards and guide site assessments for developers to ensure the site is appropriate for the recommended amenities. 1. Neighborhood Parks Neighborhood parks serve a variety of age groups within a limited area or neighborhood. They range in size from 1 to 15 acres and generally serve residents within a quarter- to half-mile radius. These parks are designed to enhance neighborhood identity, preserve or provide neighborhood open space, and improve the quality of life of nearby residents. They are designed for passive and unstructured activities. Facilities are generally unlighted and off-street parking is not recommended. SIZE 1-15 acres SERVICE AREA Neighborhood APPROACH Walk/bike AMENITIES • Playgrounds • Open Recreation Areas • Passive Recreation Amenities • Nature-Based Recreation Amenities • Surfaced Sport Courts COMMUNITY BENEFITS • Recreation: Active and passive recreation opportunities • Nature: Nature-based recreation and programming accessible to neighborhood • Accessibility: Family-friendly spaces, multi-modal access • Social: Informal gathering space, educational opportunities, contributes to neighborhood identity • Connectivity: Potential connections to greenways DRAFTPage 192 of 234 Parks and Recreation Master Plan | 61 2. Community Parks Community parks are larger than neighborhood parks and serve several neighborhoods. They range in size from 16 to 99 acres and generally serve a user area of one to two miles in radius. These parks often accommodate large group activities and include major recreation facilities, such as sports fields. Community Parks are designed to enhance neighborhood and community identity, preserve open space, and enhance the quality of life of community residents. SIZE 16-99 acres SERVICE AREA Multiple Neighborhood APPROACH Walk/bike/car AMENITIES • Playgrounds • Open Recreation Areas • Passive Recreation Amenities • Nature-Based Recreation Amenities • Surfaced Sport Courts • Athletic fields • Disc-golf courses • Swimming Pools/Splash Pads • Community Centers • Dog Parks • Rentable Space COMMUNITY BENEFITS • Recreation: Active and passive recreation opportunities, organized sports • Nature: Nature-based recreation and programming accessible to whole community • Accessibility: Family-friendly spaces, programming for all ages, multi-modal access • Social: Informal and formal gathering space, partnerships with service organizations, larger event spaces, educational opportunities • Connectivity: Potential connections to greenways DRAFTPage 193 of 234 Parks and Recreation Master Plan | 62 3. Regional Parks Regional parks are very large multi-use parks that serve the entire community and have a regional draw. They are 100 acres or larger in size. A regional park provides both active and passive recreation opportunities, with a wide selection of facilities for all age groups. They may also include areas to host sports tournaments and areas of nature preservation for activities such as sightseeing, nature study area, wildlife habitat, and conservation. SIZE 100+ acres SERVICE AREA Region APPROACH Walk/bike/car AMENITIES • Playgrounds • Open Recreation Areas • Passive Recreation Amenities • Nature-Based Recreation Amenities • Surfaced Sport Courts • Athletic fields • Disc-golf courses • Swimming Pools/Splash Pads • Community Centers • Dog Parks • Rentable Space COMMUNITY BENEFITS • Recreation: Active and passive recreation opportunities, organized sports (Athletic) • Nature: Nature-based recreation and programming accessible to whole region (Natural) • Accessibility: Programming for all ages, multi-modal access • Social: Partnerships with service organizations, regional organizations and associations, educational opportunities, contributes to regional identity • Connectivity: Major connection / node for greenways (Natural)DRAFTPage 194 of 234 Parks and Recreation Master Plan | 63 4. Greenways and Natural Areas Greenways and natural areas are publicly owned natural resources that are managed for conservation, environmental education, and passive recreational use, such as walking and nature viewing. This type of land may include wetlands, floodplain, floodway or other similar spaces. Environmentally sensitive areas are considered natural areas and can include wildlife habitats, stream and creek corridors, or areas with unique and/or endangered plant species. 5. Linear Parks Linear parks are developed areas that follow linear corridors such as rights-of-way, creeks, power lines, utilities, and other elongated features. This type of park usually contains trails and seating areas. Activities are generally passive in nature, such as walking, biking, wildlife watching, etc. SIZE <1-10+ acres SERVICE AREA City APPROACH Walk/bike/car AMENITIES • Trails • Benches • Interpretive Signage • Native Plantings COMMUNITY BENEFITS • Recreation: Passive recreation opportunities • Nature: Nature-based recreation and restoration programming • Accessibility: Multi-miodal access, improved access to and between parks, nature access • Social: Informal gathering space, partnerships with restoratioin organizations, nature educational opportunities • Connectivity: Major connectivity assets for broader multi-modal network and within park system SIZE 1-10+ acres SERVICE AREA Neighborhood (as parks) Neighborhood & City (as infrastructure) APPROACH Walk/bike AMENITIES • Passive Recreation Amenities • Nature-Based Recreation Amenities • Exercise Equipment • Interpretive/interactive elements COMMUNITY BENEFITS • Recreation: Active and passive recreation opportunities • Nature: Cooling benefits and increased nature access to neighborhood • Accessibility: Multi-modal access • Social: Informal gathering space, educational opportunities, contributes to city and neighborhood identity • Connectivity: Valuable existing bike/ped connectivity assetsDRAFT Page 195 of 234 Parks and Recreation Master Plan | 64 6. Cemeteries Cemeteries are designated areas set aside for the burial or memorialization of the deceased. College Station has two cemeteries, they contain of park usually contains gravesites, memorial markers, columbarium, and landscaped grounds. Activities are generally passive and reflective in nature, such as visitation, remembrance, and quiet contemplation. APPENDIX PC.1: PARK CLASSIFICATION SUMMARY TABLE Neighborhood Walk/BikeNeighborhood 1-15 acres ◦Athletic fields ◦Playgrounds ◦Open recreation areas ◦Passive recreation amenities ◦Nature-based recreation amenities ◦Disc-golf courses Community Walk/Bike/CarMultiple neighborhoods 16-99 acres ◦[Neighborhood amenities, plus] ◦Swimming pools ◦Community centers ◦Dog parks Regional: natural/conservation Walk/Bike/CarRegion 100+ acres ◦Passive recreation amenities ◦Nature-based recreation amenities ◦Nature play amenities Regional: athletic/sports complex facility Car Region 100+ acres ◦[Neighborhood and Community amenities, plus] ◦Athletic fields ◦Playgrounds ◦Golf/disc-golf courses ◦Swimming pools Greenways & Natural Areas Walk/Bike/CarNeighborhood <1 – 10+ ◦Trails ◦Benches/low footprint gathering ◦Interpretive signage ◦Native plantings Linear Parks Walk/BikeNeighborhood 1-10+ ◦Passive recreation amenities ◦Nature-based recreation amenities ◦Exercise equipment ◦Gathering areas ◦Interpretive/interactive elements Cemetery Walk/Bike, CarRegion N/A ◦Cemeteries ◦Monuments/historic markers SIZE Varies SERVICE AREA Region APPROACH Walk/bike AMENITIES • Cemeteries COMMUNITY BENEFITS • Social: Protected, managed dignified burial grounds DRAFTPage 196 of 234 LEVEL-OF-SERVICE ANALYSISDRAFT Page 197 of 234 Parks and Recreation Master Plan | 66 PARK INVENTORY OVERVIEW SPREADSHEET [Review Note: Please see the spreadsheet attachment for the draft of the park inventory spreadsheet for review to confirm it accurately captures the inventory. The inventory will require InDesign formatting for the final document, which we will coordinate with Joelene. It has been omitted in this Word draft, but is intended to sit directly above/before the High-Level Takeaways below] HIGH-LEVEL TAKEAWAYS • A wide variety of active recreation facilities exist across the park system. Exercise equipment, Basketball, and Soccer are the most common facility types. Pickleball and Futsal are the least represented in the inventory, but that is not surprising given that they are less traditional emerging sports. • Benches and picnic tables are by far the most common facility types under the passive recreation category. These facilities are found in almost every city park and are essential to a successful park system, providing places to rest, gather, and engage with the rest of the park. Passive recreation facilities, such as dog-related amenities, are less common. Still, they represent a potential growth area if the City continues to receive positive feedback from community members on their use and need. • A vast majority of the City’s play structures are traditional, but there are a growing number of other offerings, including musical and inclusive structures at select parks throughout the City. Providing a variety of play structure types across the park system matters because it ensures all children, regardless of age, ability, or interests, have meaningful opportunities to engage in play. SUMMARY This section summarizes the park inventory and the Level of Service (LOS) analysis for the College Station Park Master Plan update. A park inventory is a high-level overview of a park system, often including a list of existing parkland, facilities and amenities. The inventory in this plan provides a simplified summary of the park assessment, developed using data gathered during the department’s system audit from 2024 to 2025. The inventory breaks down the number and type of facilities across all city parks and can help you better understand the distribution and variety of park facilities. The park inventory also provides input values for the LOS analysis. In a Park and Recreation plan, a LOS analysis helps communities identify areas of success and need in their park system. One common way to do this is to compare local values to national standards using metrics such as park acreage per 1,000 residents, number of facilities per resident and number of programs offered annually. The LOS analysis in this plan compares values for College Station’s park facilities, programs, staffing, budgeting, and funding to those of National Park and Recreation Association (NRPA) data gathered for cities of similar size (population 100,000–249,000). The Park Inventory and the LOS will guide the development of goals and recommendations in the plan and help the City track progress and needs for the park system over time. DRAFTPage 198 of 234 Parks and Recreation Master Plan | 67 • Close to 46% of city playgrounds are covered by shade structures. This is nearing a majority but could be improved, especially given the increasing need to mitigate extreme heat in the region. Consider shade structure coverage alongside tree canopy coverage to broaden shade and balance structural and natural shade. • A vast majority (84%) of city trails are paved, concrete trails. Community engagement efforts for this park planning process identified a desire for more variety of trail options, particularly natural paved trails, indicating a need to diversify trail offerings in the future. • Only 12 city parks (22%) have nature-based recreation facilities, indicating a need to expand this type of amenity to additional parks across the system where most suitable. • By far, the most common basic amenities found throughout the park system are trash cans and water fountains. These are offered at nearly all city parks and are essential to keeping these public spaces clean and comfortable. They also serve as a key indicator of the Department’s effectiveness in providing core amenities. SUPPORTING GRAPHS ACTIVE RECREATION FACILITIES ACROSS DE SYSTEM 70 60 50 40 30 20 10 0 BaseballBaseball (Practice)BasketballExercise EquipmentPickleballFutsolSoccerSoftballTennisVolleyball9 22 31 60 4 2 32 13 14 8 PASSIVE RECREATION FACILITIESACROSS THE SYSTEM 350 300 250 200 150 100 50 0 BBQ PitBenchDisc GolfDog PlayDog WashingIntepretive MazeLawn GamePavilionPet AmenitiesPicnic TablePing Pong TableShade Cover74 284 19 9 13 44 292 1 26 2 21DRAFT Page 199 of 234 Parks and Recreation Master Plan | 68 LEVEL OF SERVICE OVERVIEW The Level of Service (LOS) Analysis for this plan primarily uses a standards-based approach, comparing local conditions to benchmarks from peer cities across the U.S. Benchmark data were gathered by the National Recreation and Parks Association (NRPA, a U.S.-based nonprofit organization that supports park and recreation best practices and research. Figures from the NRPA's 2025 Agency Performance Review Report were used in this LOS analysis. The overview table below compares local values for the City of College Station to benchmark metrics from cities of similar population size (100,000–249,000 people). Data collected during the park assessment from 2024 to 2025 informed the City comparison values. Additional key inputs were taken from other components of this parks plan update process, as well as data provided by City departments. The City’s total population estimate (128,370) for 2023 was used as a key input value to determine metrics in the LOS. This differs from the previous parks plan’s LOS analysis, which excluded the college-age population from total population figures. The analysis incorporates the City’s full resident population, recognizing that all residents have the potential to use the park system. We used 54 parks as another key input for calculating LOS metrics. That figure excludes cemeteries and undeveloped parkland. The delta values on the far right of the table are shaded to indicate the city’s performance compared to the 2025 national standards. A blue shaded cell indicates that the city is performing above the median standard, while an orange shaded cell indicates a performance below the median standard. In general, performing above the median standard is preferred, although with some metrics, particularly relating to the budget, performing below the median comparison value could be viewed positively. The takeaways section discusses these nuances further. Two additional non-standards-based metrics are included in the final section of the table (Access + Comfort) to quantify and incorporate other dimensions of the city parks system. We calculated the park access metric in ArcGIS Pro to determine populations within a 10-minute walk of city park entrances. We used OpenStreetMap to generate the service area in Network Analyst and combined it with block-level census population data. We determined tree canopy coverage using the National Land Cover Database’s Tree Canopy Cover layer, apportioning coverage only within park boundaries and representing average canopy cover across the entire system. Because these metrics lack national standards, we provide short-, medium-, and long-term targets as aspirational yet feasible benchmarks. This LOS analysis is a snapshot in time, and the results were assessed and acted upon alongside other factors, including but not limited to community engagement feedback, population growth, and demographic changes/trends. PLAY STRUCTURE TYPES ACROSS THE SYSTEM Play-FFAP12% Play-Musical8% Play - Traditional80%DRAFTPage 200 of 234 Parks and Recreation Master Plan | 69 OVERVIEW TABLE FACILITIES LOS Metric College Station (2025) Comparison Value (2025 NRPA Values for jurisdictions with pop. 100,000 – 249,000) Delta Value (College Station vs. Median Comparison Value) Median Value Upper Quartile Value Number of residents per park (calculation excludes cemeteries and undeveloped parks) 2,377 3,437 2,1861 1,059 Acres of parkland per 1,000 residents (calculation excludes cemeteries and undeveloped parks) 12.4 9.2 3.2 Miles of trails 42 29 13 LOS Metric College Station Value 2025 Comparison Value (2025 NRPA Values for jurisdictions with pop. 100,000 – 249,000) Delta Value (College Station vs. Median Comparison Value) Median Value Diamond Fields (residents per facility)5,835 6,821 986 Basketball Courts (residents per facility)4,141 9,742 5,601 Soccer Fields (residents per facility)4,011 7,993 3,982 Volleyball Courts (residents per facility)16,046 39,166 23,120 Tennis Courts (residents per facility)9,169 8,587 582 Pickleball Courts (residents per facility)32,092 6,782 25,311 Play Equipment/ Playgrounds (residents per facility) 1,411 5,000 3,589 Restrooms (residents per facility)6,113 6,782 669 1This is the lower quartile value because that is the more aspirational figure, e.g. less residents per park is a better performance than more.DRAFTPage 201 of 234 Parks and Recreation Master Plan | 70 PROGRAMMING + STAFFING LOS Metric College Station Value 2025 Comparison Value (2025 NRPA Values for jurisdictions with pop. 100,000 – 249,000) Delta Value (College Station vs. Median Comparison Value) Median Value Upper Quartile Value Number of programs offered annually 6261 490 2,338 5771 Number of FTEs in the Parks Department 74 130.5 195.9 56.5 Number of FTEs per 10,000 residents 5.8 8.2 12.2 2.4 BUDGET + FUNDING LOS Metric College Station Value 2025 Comparison Value (2025 NRPA Values for jurisdictions with pop. 100,000 – 249,000) Delta Value (College Station vs. Median Comparison Value) Median Value Upper Quartile Value Annual operating expenditures (rounded) $11,543,942 $14,754,000 $24,863,000 $3,210,058 Operating expenditure per capita $88.96 $94.27 $157.43 $5.3 Earned revenue as percentage of operating expenditures 9.6%26.2%40%16.6% Five-year capital budget spending (rounded) $13,769,436 $25,550,000 $60,836,000 11,780,563 2A 10-minute walk is generally considered about one-half mile for an able-bodied person and is often viewed as the upper limit most people are willing to walk to reach a destination.DRAFTPage 202 of 234 Parks and Recreation Master Plan | 71 Source of operating expenditure COLLEGE STATIONFY24 General Fund Earned Revenue Special Taxes Operating Grants Sponsorships/In kind donations/Private Grants Other NRPA STANDARDS2025 General Fund Earned Revenue Special Taxes Operating Grants Sponsorships/In kind donations/Private Grants Other ACCESS + COMFORT LOS Metric College Station Value 2025 3-year target 5-year target 15-year target Park Access (populations within a 10-minute walk to a city park entrance2) 67.38%75%80%90% Systemwide Tree Canopy Coverage 32.6%35%40%50%DRAFTPage 203 of 234 Parks and Recreation Master Plan | 72 LEVEL OF SERVICE TAKEAWAYS AMENITIES College Station performs above the median comparison values for both key LOS metrics: number of residents per park and acres of parkland per 1,000 residents. While both metrics provide valuable insight, they do not account for the spatial distribution of parks or park access. A separate metric for park access has been calculated as part of this analysis and will be discussed later in this section. These metrics indicate that the City provides enough parks and green space for its current population; however, additional parks and park acreage will likely be needed in the future given expected population growth. The most recent comprehensive plan assessment estimated that the population is expected to grow to 146,729 to 156,717 people by 2030. The City provides more miles of trails compared to peer cities but has not yet reached the upper- quartile benchmark. The upper quartile represents the threshold for the top 25% of the dataset. To maintain its position as a leading agency, College Station should aim to meet or exceed this benchmark and others. The city performs well compared to peer cities in providing basketball, baseball/softball, soccer, and volleyball facilities. However, it sits below the median for tennis and pickleball facilities. The largest gap is in pickleball, which is not surprising given its relatively recent rise in popularity. As a destination and hub for recreational tournaments and sports tourism, College Station’s strong performance across many of the sports facility metrics reflects the effort and diligence the Department puts into providing and maintaining a robust portfolio of active recreational facilities. PROGRAMMING AND STAFFING Like the amenities metrics, College Station performs very well in providing a large amount of recreational programming compared to other peer parks and recreation departments. The city sits comfortably above the upper quartile benchmark for this figure. This reflects the department’s commitment to offering a variety of programs across categories ranging from youth sports, summer camps, aquatics, senior programming, and nature-based recreation. Moving forward, the department should aim to maintain this standing while continuing to assess its program offerings for diversity and participant satisfaction. The City’s Parks and Recreation Department operates effectively despite having significantly fewer staff than many peer cities. Community engagement findings indicate that the department is generally meeting residents’ needs with its current staffing levels. However, this LOS metric highlights the need for additional staff in the future to maintain this high level of service. This is especially evident given the anticipated population growth and the development of new park and recreation areas, particularly large parks such as Texas Independence Park at Midtown, which will need significant staffing to maintain. Staffing is also a key consideration for maintaining programming levels and potentially expanding natural recreation areas. BUDGET AND FUNDING Similar to staffing levels, the Parks and Recreation Department operates on a lean budget compared to peer cities, which could be viewed positively or negatively. On the positive side, the City appears to meet community needs despite fewer operating resources. A smaller budget can signal efficiency and innovation, and a department that effectively maximizes resources and builds strong partnerships to deliver parks and recreation services. At the same time, a constrained budget can carry limitations or risks, including deferred maintenance, reduced service levels, and limited staff capacity. DRAFTPage 204 of 234 Parks and Recreation Master Plan | 73 The City relies predominantly on general funds to operate. A strong reliance on general funds can be viewed positively because it is typically a more stable, predictable funding source that is easier to manage. On the other hand, overreliance on general funds can leave the department vulnerable to changes in political support and economic ups and downs. Looking ahead, the City should diversify its funding sources and build a more resilient funding strategy while balancing the trade-offs of using other sources such as grants, earned revenue, or special funds. The department's five-year capital budget is also lower than that of peer park systems. Potential benefits of this are like those described for smaller operating budgets. It suggests the City is efficient or selective with its resources and has strong partnerships to help provide facilities. Potential limitations for smaller capital budgets include a growing backlog of capital project needs and limited system growth. A small capital budget isn’t inherently problematic, but it must be addressed alongside other key factors like population growth and the age or condition of existing assets. ACCESS AND COMFORT Most College Station residents live within a 10-minute walk of a City park. While the National Recreation and Park Association (NRPA) does not track this metric, other organizations, such as the Trust for Public Land (TPL), measure it nationally. TPL estimates that approximately two out of three Americans live within a 10-minute walk of a park. A 10-minute walk is generally considered about one-half mile for a non-disabled person and is often viewed as the upper limit most people are willing to walk to reach a destination. College Station performs slightly above the national average on this measure. Still, it should strive to increase this metric and increase access through strategic investments in parks and mobility infrastructure, along with development policies that promote walkability to help further increase park access. The average tree canopy coverage at city parks across the system is 32.6%. The benefits of tree canopy coverage in parks are numerous, including heat reduction, better air quality and stormwater management, psychological benefits for residents, and better infrastructure protection, to name a few. The City should increase tree canopy coverage in parks through stronger tree-protection programs, more resources for tree maintenance and care, and continued support for tree-planting initiatives. One specific initiative supporting tree canopy expansion is the City’s “Cooling College Station” plan from 2022, a five-year planting plan geared toward urban heat mitigation. The Parks and Recreation Department is a key partner in implementing this plan and should continue to use it when making strategic decisions about where to increase the City’s tree canopy coverage. ACTING ON THE PARK INVENTORY AND LEVEL OF SERVICE FINDINGS The park system inventory provides a comprehensive overview of the City’s parks and recreation assets. At the same time, the Level of Service (LOS) analysis evaluates how effectively these facilities and amenities serve residents and how they compare to peer communities. Findings from these analyses informed the development of the priority maintenance table (see Appendix A) and directly shaped the final recommendations and strategic action plan.DRAFTPage 205 of 234 GOALS AND IMPLEMENTATIONDRAFT Page 206 of 234 Parks and Recreation Master Plan | 75 STRUCTURE To develop a road map for the Department to continue its track record of providing a high- quality parks and recreation system, we undertook a process to identify Departmental and community needs, establish goals and objectives to guide the Department’s efforts, and develop an Implementation Plan to reach these goals. This set of goals and objectives resulted from the community engagement process, engagement and discussions within the department, and an analysis of the existing park system and programming portfolio. The Goals below reflect the broad areas of purpose for the department over the next 5 years. Objectives are courses of action that guide internal decision-making and provide specific, targeted paths to achieve those goals, while Strategies signify the measurable outcomes of implementing those objectives. Specific Action Steps to reach these outcomes can be found in the Implementation Plan. DEPARTMENTAL AND COMMUNITY PRIORITIES During the engagement process, we identified several dimensions of parks and recreation in College Station that the community considers a priority. We integrated these dimensions into the plan’s goals and objectives to ensure the resulting plan provides a robust, comprehensive approach to fostering a dynamic parks and recreation system responsive to community priorities. To ensure continuity with broader City planning efforts, which is key to a successful multi- dimensional approach, the community priority dimensions are presented below as they align with the five pillars of parks and recreation identified in the 2021 Comprehensive Plan. All goals and objectives put forward in this plan are aligned with at least one of these City and community priorities. Experience & Engagement • Public education • Arts and culture • Recreational Programming (opportunities for recreation) Capital, Operational & Maintenance Funding • Economic development Natural Resource Management • Habitat restoration and conservation Growth & Sustainability • Public health • Public safety • Managing population growth and increased demand for services Accessibility & Inclusion • Park access • Bike/ped connectivityDRAFT Page 207 of 234 Parks and Recreation Master Plan | 76 GOALS Goal 1. Improve Environmental Health and Engagement with Nature. College Station is home to a diverse range of ecosystems and natural resources. The Department should continue efforts to improve access to and engagement with nature by increasing access to nature areas and expanding nature programming in College Station’s parks. In doing so, the department can pursue opportunities to improve environmental health and mitigate environmental impacts by using nature-based approaches, increasing vegetative cover, and continuing conservation restoration efforts. Goal 2. Improve Access to Parks and Inclusive Play Opportunities. The College Station community takes great pride in its extensive system of parks, all of which provide unique offerings for different park users. In the coming years, the Department can welcome existing and new park users by expanding access to parkland across the City, leveraging existing linear parks and the greenway system, and offering additional inclusive programming and amenities. Goal 3. Provide High-Quality Active Recreation Amenities and Facilities. College Station’s park system is known regionally for sports tourism and active recreation opportunities. The Department can build on this success by improving public health through dynamic active recreation opportunities, maintaining high-quality athletic facilities, and supporting sports tourism. Goal 4. Enhance Parks Department Systems. With over 70 full-time employees, the Parks and Recreation Department relies on strong internal systems to drive continuous park improvements and deliver quality offerings to the College Station community. Interdepartmental coordination, program and facility assessments, and sustained community engagement are essential to ensuring effective, long-term stewardship of the City's parks and recreational facilities. Goal 5. Strengthen Strategic Partnerships The City recognizes that long-term success in conservation, recreation, and community wellbeing depends on an informed and engaged community. By leveraging relationships with leading regional institutions, athletic and hospitality programs, healthcare providers, student organizations, and community groups, College Station will expand access to environmental education, volunteer- driven stewardship, citizen science opportunities, local sports and recreational programming, and initiatives that promote the health and wellbeing benefits of parks and recreation services. DRAFTPage 208 of 234 Parks and Recreation Master Plan | 77 Goal Objective Strategy Action Steps GOAL 1: IMPROVE ENVIRONMENTAL HEALTH AND ENGAGEMENT TO NATUREObjective 1: Enhance and expand nature-based recreation Strategy 1: Increase access to and engagement with nature. Develop new trails in undeveloped parks that have significant existing natural features. Install new interpretive signage near riparian restoration areas, such as Wolf Pen Creek, to build public awareness and increase engagement. Continue to expand nature-based interpretive signage to other parks in complement to nature-related improvements. Evaluate existing natural water features for opportunities to improve access or engagement, such as new riparian plantings, overlooks, or trails. Strategy 2: Provide more opportunities for birding at City parks. Assess accessibility of natural spaces to ensure there are opportunities for all to participate in birding. Explore additional bird-related features, such as owl boxes with cameras, that support bird habitat needs while providing additional public engagement. Identify bird-friendly native planting list for public parks and spaces. Strategy 3: Maintain opportunities for fishing at City parks. Identify a new source for fish to stock public ponds. Engage with the external partners to explore the potential of a collective buying approach. Objective 2: Improve nature-based programming Strategy 1: Expand community engagement in restoration programming. Dedicate additional resources to support conservation and nature programming. Expand volunteer programming to engage the community in restoration efforts at additional parks. Continue to collaborate with partner organizations to grow community participation in restoration at parks and greenways. Strategy 2: Increase access to nature-based programming across the parks system. Expand nature-based recreation programming for all ages through existing afterschool programming. Expand senior nature-based programming related to birding. Strategy 3: Provide programming that promotes engaging with nature to improve health and mental wellbeing. Continue to grow nature-based passive recreation programming opportunities. Develop engagement materials that promote the social and health benefits of engaging in nature. Explore partnerships with local healthcare providers and organizations.DRAFTPage 209 of 234 Parks and Recreation Master Plan | 78GOAL 1: IMPROVE ENVIRONMENTAL HEALTH AND ENGAGEMENT TO NATUREObjective 3: Build community resilience through nature-based solutions. Strategy 1: Explore opportunities for nature-based approach to managing rainwater runoff in City parks. Evaluate the riparian restoration and creek stabilization used at Wolf Pen Creek Park to address current or future erosion or other flooding-related issues. Widen our efforts to incorporate nature-based features such as native grass buffers alongside vegetated swales adjacent to new or existing hardscape trails. Formalize riparian zones along creeks and other low-lying areas for conversion of turf to native plantings. Work with GIS staff to perform an analysis that identifies high vulnerability areas that would benefit most from nature- based improvements on parkland. Strategy 2: Increase vegetative cover to reduce heat in city parks. Prioritize planting locations at specific parks identified in the Cooling College Station plan. Refer to heat mapping in Cooling College Station plan to help prioritize new park development needs. Prioritize shade and support trees that are well suited to park-specific site qualities such as soil characteristics. Incorporate understory native groundcover and perennial plantings into new and recent tree plantings to help retain moisture and improve survivability rates. Strategy 3: Continue to strengthen and build partnerships that allow for expanded heat mitigation efforts. Continue to support the Department's tree giveaway program in alignment with the City's Cooling College Station Plan. Continue to collaborate with Texas A&M Forest Service to host community events like Trunk or Tree-t. Build on existing relationships with key partners to expand collaboration around tree plantings and public engagement about tree selection, establishment, and maintenance. Objective 4: Continue and expand upon ecologically focused initiatives. Strategy 1: Prioritize park improvements that preserve or regenerate nature. Develop internal design specifications for native plantings, including reference plant lists and maintenance practices. Assess the park system for opportunities to convert under-performing ornamental plantings or low/no utility turf areas to native plantings. Work with the Volunteer and Community Engagement Coordinator to expand volunteer workdays to additional parks. Prioritize the preservation of existing nature on undeveloped parkland. Strategy 2: Prioritize proactive conservation of natural resources, endangered species and pollinators through designations. Maintain or expand programming and operational efforts that support the City's Bird City initiative. Maintain or expand programming and operational efforts that support the City’s and the Mayor's Monarch Pledge initiatives. Expand plant giveaways for native plants that support bird and monarch butterfly needs. Maintain efforts that support the City’s Tree City USA initiatives. Strategy 3: Develop trainings to build maintenance staff capacity to establish and maintain native plantings. Continue collaboration with A&M AgriLife Extension Services and A&M University department partners to create training for maintenance staff on native planting planning, establishment, and maintenance. Ensure the Department maintains at least one FTE that is an ISA-certified arborist.DRAFTPage 210 of 234 Parks and Recreation Master Plan | 79 Goal Objective Strategy Action Steps GOAL 2: IMPROVE ACCESS TO PARKS AND INCLUSIVE PLAYObjective 1: Enhance and expand nature-based recreation Strategy 1: Increase access to and engagement with nature. Create "placemaking nodes" featuring points of interest and spaces for gathering. Incorporate features such as seating areas, lighting, public art and fitness stations, creating more inviting, accessible, and active spaces that encourage recreation, social interaction, and long-term public use Add native trees and plants to increase comfort and engagement in linear parks by providing shade, buffering noise and air pollution, and fostering a more natural aesthetic. Strategy 2: Improve Department capacity to engage with developers around parkland dedication. Review strategies to review any new parkland dedication during the development review process. Formalize park standards that promote the ways developers can benefit from higher quality parkland dedications. Identify improvements in parkland dedication zones. Objective 2: Improve nature-based programming Strategy 1: Expand community engagement in restoration programming. Dedicate additional resources to support conservation and nature programming. Expand volunteer programming to engage the community in restoration efforts at additional parks. Strategy 2: Increase access to nature-based programming across the parks system. Expand nature-based recreation programming for all ages through existing afterschool programming. Expand senior nature-based programming related to birding. Strategy 3: Provide programming that promotes engaging with nature to improve health and mental wellbeing. Continue to grow nature-based passive recreation programming opportunities. Develop engagement materials that promote the social and health benefits of engaging in nature. Objective 3: Expand inclusive play and programming Strategy 1: Evaluate participation and community needs to identify potential improvements to adaptable/accessible programming. Analyze programming participation data and preferences of existing participants to identify new programming opportunities. Engage with other local service providers to identify opportunities/gaps for additional all-abilities programming. Strategy 2: Install new all-abilities play features at additional parks. Assess the locations of existing all-abilities features to identify priority parks to improve access to distant residential areas. Engage all-abilities programming participants to identify priority parks for new all-abilities play features.DRAFTPage 211 of 234 Parks and Recreation Master Plan | 80 Goal Objective Strategy Action Steps GOAL 3: PROVIDE HIGH-QUALITY ACTIVE RECREATION AMENITIES AND FACILITIESObjective 1: Enhance and expand nature-based recreation Strategy 1: Increase access to and engagement with nature. Monitor participation in key active recreation programming categories such as swimming, basketball, softball, and tennis to identify growing demand. Maintain a dynamic approach to active recreation programming that adjusts programming to shifting participation patterns. Prioritize accessible active recreation facilities that require minimal equipment or organization to use in parks. Objective 2: Improve nature-based programming Strategy 1: Ensure the parks system provides sufficient high-quality recreational facilities to meet community needs and preferences. Evaluate undeveloped or underutilized parks for opportunities to build new or improve existing infrastructure to meet growing demand. Continue to develop and utilize multi-use field arrangements that allow for flexible uses and better responsiveness to changes in community preferences. Incorporate new disc golf courses and other low-footprint recreational amenities in parks. Hire a consultant to perform a comprehensive assessment of pool facilities to identify maintenance needs. Strategy 2: Maintain, repair, or replace existing recreational facilities and amenities. Establish a process to prioritize maintenance and replacement needs based on the conditions assessment, appendix [enter here]. Strategy 3: Monitor shifting population demographics and community needs to adjust future priorities and funding for parks and recreational facilities. Continue internal public engagement efforts at Parks and other City events to identify shifting recreational facility preferences and needs. Objective 3: Support sport tourism excellence Strategy 1: Continue to maintain and make improvements to facilities that support sport tourism. Develop tournament facility maintenance plan based on a bi-annual park system inventory assessment to balance priority maintenance needs with longer-term considerations. Strategy 2: Pursue additional sport tourism opportunities. Explore the feasibility of disc golf tournaments and mountain bike races at the new Texas Independence Park at Midtown. Objective 4: Identify and secure alternative funds to support all aspects of parks and recreation Strategy 1: Cultivate community and corporate partnerships and/or sponsorships that expand community programs and events. Promote the Adopt a Greenways program to build broader buy-in for creek restoration and create a focused pipeline of corporate volunteers for restoration efforts. Launch a new Adopt a Park program that engages local neighborhoods and businesses as stewards of their local parks. Expand community engagement to increase sponsorship opportunities to promote programs and events. Goal Objective Strategy Action Steps GOAL 4: ENHANCE PARKS DEPARTMENT SYSTEMSObjective 1: Perform regular internal assessments Strategy 1: Assess park system facilities, amenities, and programming on an ongoing basis. Refine our quarterly Park Maintenance Standards process through our asset management system to include a parks system inventory assessment. Develop a process to implement our program and event evaluation form to administer Program Life-Cycle Assessments. Standardize program names for easier tracking and analysis of participation over time. Objective 2: Expand and maintain consistent community engagement Strategy 1: Engage the community on an ongoing basis to collect feedback on delivery of park services and emerging needs. Conduct follow-up community engagement for Wolf Pen Creek Park, Bee Creek Park, and Brother Pond to clarify park usage, needs, and priorities. Create a process to gather input to inform park experience and program evaluation through an evaluation process with enhanced data collection and established metrics. Leverage the newly established Department social media accounts to build awareness of the Department's efforts and recreational or programming opportunities. Proactively pursue interdepartmental coordination with the Public Communications Department on digital and print collateral to grow participation in programs and attendance at events.DRAFTPage 212 of 234 Parks and Recreation Master Plan | 81 Goal Objective Strategy Action Steps GOAL 3: PROVIDE HIGH-QUALITY ACTIVE RECREATION AMENITIES AND FACILITIESObjective 1: Formalize partnerships with Texas A&M University, Texas A&M AgriLife Extensions Services, the Rio Brazos Audubon Society, and Texas A&M Forest Service to enhance natural resource management. Strategy 1: Establish a framework for engaging Texas A&M University student organizations on a project- by-project basis as appropriate opportunities arise. Establish points of contact with student groups and relevant support faculty or department staff (e.g. faculty sponsors of student groups). Actively coordinate with relevant student groups to identify students interested in contributing to City conservation initiatives through volunteer service, capstone projects, internships, or independent study. Strategy 2: Create public education programming and citizen science initiatives that engage Texas A&M University students in teaching and leadership opportunities. Co-develop education programs and events that build community knowledge and connection to local ecosystems, with TAMU student volunteers serving as educators and program support . Support citizen science initiatives within City parks to generate meaningful ecological data while deepening public engagement, leveraging Texas A&M University student groups to lead these events. Strategy 3: Connect local organizations with Texas A&M University students to build collective capacity and community engagement in restoration efforts. Finalize a Volunteer Program that enables residents and students to participate in habitat restoration, invasive species removal, native planting events, and ongoing monitoring activities. Strategy 4: Formalize partnerships with the Texas A&M Forest Service, Texas AgriLife Extension to support and build capacity for Department preservation, restoration and educational efforts. Establish points of contact with the Texas A&M Forest Service and Texas AgriLife Extension Services offices. Continue to work with the Rio Brazos Valley Audubon Society to support Bird City efforts and other bird-related programming and initiatives. Objective 2: Explore partnerships with Texas A&M University's to strengthen tournament hosting and sports tourism capacity. Strategy 1: Formalize partnerships with Recreational Sports and Athletics Departments to enhance access to local leagues and recreational programming. Establish points of contact with Texas A&M University's Recreational Sports and Athletics Department offices. Strategy 2: Formalize partnerships with the School of Hospitality, Hotel Management, and Tourismand to build capacity to strengthen tournament hosting and sports tourism capacity. Establish points of contact with Texas A&M University's School of Hospitality, Hotel Management, and Tourism offices. Objective 3: Explore partnerships with CHI St. Joseph Health, Baylor Scott & White Health and the Texas A&M School of Public Health to promote the health and wellbeing benefits provided by parks and recreation services. Strategy 1: Formalize partnerships and build capacity to support the promotion of health and wellbeing benefits provided by parks and recreation services. Establish points of contact with the Texas A&M School of Public Health. Strategy 2: Formalize partnerships and build capacity to integrate parks and recreation services into clinical and community health initiatives. Establish points of contact with CHI St. Joseph Health. Establish points of contact with Baylor Scott & White Health.DRAFTPage 213 of 234 APPENDIXDRAFT Page 214 of 234 Parks and Recreation Master Plan | 83 Active Recreation Play Trails Nature-Based Rec Interpretive/Cultural Park Name Baseball Baseball (Practice Backstop) Basketball Exercise Equipment Pickleball Futsal Soccer Softball Tennis Volleyball Play - FFAP Play - Musical Play - Traditional Shade Cover Trail - Asphalt Trail - Concrete Trail - Natural "Planters/ Plant Beds" Pond Interpretive Signage Monument Anderson Park 2 4 2 5 1 1 5 Art & Myra Bright Park 2 3 1 Barracks II 4 18 2 1 Bee Creek Park 2 4 1 4 2 1 2 1 Billie Madeley Park 1 1 Brian Bachmann Park 6 4 2 5 4 1 1 3 Bridgewood Park Brison Park 26 Brothers Park 2 1 11 2 1 1 1 15 Carter's Crossing 1 Castle Rock Park 1 1 3 1 Castlegate Park 1 1 2 2 1 1 Cove of Nantucket 1 Creek View Park 4 1 Crescent Pointe 3 1 Cy Miller Park 1 1 1 1 Eastgate Park 2 Edelweiss Gartens 1 2 1 Edelweiss Park 1 1 1 1 2 1 Emerald Forest Park 1 1 1 Etonbury Park First Down Park 1 1 Gabbard Park 2 1 2 2 1 1 Georgie K. Fitch Park 2 1 2 1 1 Jack and Dorothy Miller Park 2 1 1 4 2 1 1 1 John Crompton Park 1 1 1 2 1 23 Lemontree Park 1 1 1 Lick Creek Park 1 2 8 1 Lions Park 1 2 Longmire Park 1 Luther Jones Park 1 PARK INVENTORY ATTACHMENTS DRAFTPage 215 of 234 Parks and Recreation Master Plan | 84 Merry Oaks Park 1 2 1 Midtown Reserve 2 1 1 Northgate Park Oaks Park 1 1 1 Parkway Park 2 Pebble Creek Park (PARD Property)1 2 1 Pebble Creek Park (School Property)2 1 3 3 1 Phillips Park Reatta Meadows 1 1 3 1 1 Richard Carter Park 5 8 Sandstone Park 4 1 1 2 1 1 1 Southern Oaks 1 2 1 1 1 Southwest Park 2 1 1 Steeplechase Park 1 1 1 8 4 Thomas Park 2 2 2 3 2 3 University Park 2 1 2 1 Veterans Park Athletic Complex 13 5 1 3 3 1 18 25 31 W.A. Tarrow Park 3 2 3 3 1 1 Wallace Lake Park 6 1 3 Windwood Park 2 Wolf Pen Creek Park 1 1 1 1 Woodcreek Park 1 1 1 1 Woodland Hills Park 3 2 1 1 Stephen C. Beachy Central Park 1 11 3 4 2 1 10 5 3 9 1 1 2 2 GRAND TOTAL 9 22 31 60 4 2 32 13 14 8 11 7 73 42 2 28 4 43 10 89 75DRAFT Page 216 of 234 Parks and Recreation Master Plan | 85 Passive Recreation Basic Amenities Park Name BBQ Pit Bench Disc Golf Dog Play Dog Washing Intepretive Maze Lawn Game Pavilion Pet Amenities Picnic Table Ping Pong Table Shade Cover Dog Waste Dog Watering Bowl Restroom Trash Cans Water Fountain Anderson Park 9 5 1 10 2 Art & Myra Bright Park 2 3 1 4 1 Barracks II 2 17 4 1 2 5 1 8 1 1 5 Bee Creek Park 2 13 1 2 17 2 1 7 Billie Madeley Park 3 Brian Bachmann Park 1 1 1 25 3 1 Bridgewood Park 2 2 4 Brison Park 3 1 Brothers Park 3 5 1 5 1 Carter's Crossing 1 1 2 Castle Rock Park 2 1 1 2 1 Castlegate Park 1 8 1 1 Cove of Nantucket 2 Creek View Park 1 4 1 2 1 Crescent Pointe 4 1 Cy Miller Park 1 3 1 1 1 Eastgate Park Edelweiss Gartens 1 1 1 2 1 Edelweiss Park 3 1 4 1 Emerald Forest Park 2 3 2 2 1 Etonbury Park 1 1 1 1 First Down Park 12 2 Gabbard Park 3 9 1 3 7 1 Georgie K. Fitch Park 2 2 1 4 5 1 Jack and Dorothy Miller Park 3 10 1 3 4 2 John Crompton Park 3 8 2 13 12 5 Lemontree Park 2 5 2 1 1 4 1 Lick Creek Park 2 1 1 3 Lions Park 2 2 2 4 1 Longmire Park 2 2 2 4 1 Luther Jones Park 1 1 1 PARK INVENTORY ATTACHMENTS DRAFTPage 217 of 234 Parks and Recreation Master Plan | 86 Merry Oaks Park 2 3 3 3 1 Midtown Reserve 2 2 2 1 Northgate Park 2 18 1 4 5 2 Oaks Park 3 3 9 6 10 1 8 1 Parkway Park 1 2 1 1 1 Pebble Creek Park (PARD Property)2 1 1 Pebble Creek Park (School Property)7 1 2 2 4 2 Phillips Park 1 2 1 1 1 1 Reatta Meadows 2 3 2 2 4 1 Richard Carter Park 7 3 3 1 Sandstone Park 4 1 5 1 Southern Oaks 3 9 1 2 3 1 Southwest Park 1 2 3 1 1 Steeplechase Park 2 10 1 1 3 1 7 1 Thomas Park 6 3 2 9 12 3 University Park 1 10 9 1 1 8 10 9 Veterans Park Athletic Complex 1 30 3 80 4 6 8 W.A. Tarrow Park 2 4 1 2 4 Wallace Lake Park 2 1 Windwood Park 2 1 1 3 2 1 Wolf Pen Creek Park 1 3 Woodcreek Park 1 4 1 3 1 Woodland Hills Park 2 1 2 1 2 1 Stephen C. Beachy Central Park 8 23 1 3 50 10 4 14 GRAND TOTAL 74 284 19 9 2 1 13 44 2 292 1 26 15 1 21 144 82DRAFT Page 218 of 234 Parks and Recreation Master Plan | 87 Priority Potential Safety Hazard Future Maintenance Park Name Feature - Simplified Amenity Qty Condition Condition Score Description Maintenance Need Type Maint. Recommendations Work Needing Execution Anderson Park Active Recreation Basketball Court 2 Fair 2 Duel Court, 4 goals, red and tan court coloring Resurfacing Courts need to be resurfaced and weeds need to be reoved from expansion joints. Soccer Goals 4 Fair 2 Soccer goals PVC/Steel tubing with nets. Dimensions: 6'6" tall x 12'6" wide Repair Goals are old and worn. Need paint and new nets or replace all. Infrastructure Trash Cans 5 Poor/Fair 1.5 Wood planks painted green, steel ring Minor Replacement Wood planks are broken, rotted and the paint is chipping off. Need new wood and paint. Water Fountains 2 Poor/Fair 1.5 2 concrete exposed aggregate fountains with 2 bowls each. Replacement One fountain appears to have had a third dog bowl that was removed. Fountain is broken up and both need to be replaced. 1 Fair 2 CMU structure with composite roof. Cleaning Needs cleaning, paint and general repair. Uninteresting. Extremely utilitarian. Needs upgrade. Parking Lot 1 Fair/Good 2.5 31 parking slots, concrete Repair Parking lot needs striping and concrete repair. Remove asphalt patching. Passive Recreation Planter Beds 5 Fair/Poor 1.5 CMU planter stones glued in place 5'X5'X20" Tall Replacement Many stones missing, trees in planters have been removed or have been cut down. Planters need to be rebuilt or removed. Play Structures Playground Shade Cover 1 Fair 2 Rectangular shade tarp stretched ove steel tub frame. Frame has two hip yokes. Cleaning Holes in cloth, mold on entire cloth. Pipe structue needs ro be pressure washed. Play Structure 1 Fair/Good 2.5 Monkey bars, regular slides, multi-deck, 1 intended use sign, poured in place fall zone. Replacement Play structure showing age, paint missing, plastic worn, In tact. Fall zone has wholes and cracks. Needs replacement. Art & Myra Bright Park Infrastructure Park I.D. Sign 1 Fair 2 Composite material sign (Cylex) and posts, paint. Replacement Needs repainting or replacement Barracks II Infrastructure Trash Can 1 Poor 1 Green wood slats with steel ring construction Replacement Trash can needs replacement. Wood is broken and paint is faded. Trash Can 1 Poor 1 Wood slats painted green with a steel ring structure Replacement Replace trash can with composite unit Passive Recreation Outdoor Ping Pong Table 1 Poor 1 Ping ponf table perminately mounted to concrete slab.Repair Net is missing and table is not level Shade Cover 1 Poor 1 14'x22' black rectangular steel structure supported by 2 round steel posts with a hip style roof formed by 2 angled yokes. Replacement 14'x22' Black shade cover is missing Square Picnic Table 1 Fair/ood 2.5 4'X4' square expended metal picnic table coated with black PVC and supported by tubular frame. Repair Table is not stable, one of 4 benches is lose and needs repair. APPENDIX A LEVEL OF SERVICE - PRIORITY MAINTENANCE INVENTORY DRAFTPage 219 of 234 Parks and Recreation Master Plan | 88 Bee Creek Park Active Recreation Tennis Courts 4 Poor/Fair 1.5 4 courts side by side, 10 ft chain link fence fabric, 9 gauge, 8 net posts and 4 nets, 4 net tie downs. Repair Court is heaving due to tree roots located at one end. Renovation will be underway within the next few months. Batting Cage 1 Fair/Good 2.5 Concrete slab, 6 ft- 4 rail chain link 9 gauge fence, 3 vertical 4" dia. post's with horizontal post positioned in the middle and at both ends of the batting cage. There are 3 cables supporting netting that runs the length of the batting cage. Fall zone material on concrete. Replacement Fall zone material sprayed on concrete is in bad shape and needs to be replaced. Infrastructure Parking lot 6 Poor/Fair 1.5 263 parking spaces park wide Repair Parking lot cracking, pot holes sink holes. Need to be repaired and retopped with tar and then restriped/ painted. Wooden Pole lights 2 Poor/Fair 1.5 Wooden telephone poles with cylinder style light fixture/ plastic lense set on top of pole. Replacement Lights look old and out of place, Need to be replace with updated poles/fixtures Steel Bridge (Large)1 Fair 2 10' wide X100' long. Corten steel structure with wood floor. 2x6x10' deck boards. 5 steel angle iron rails and 1 2x6 wood rail. Replacement Wood deckboards need to be replaced as soon as possible. Many are rotted and could fail. Wooden Deck 1 Fair 2 2"X6" wooden deck adjacent to playground area Replacement Still functional but needs to be replaced in the near future. Park I.D. Sign 1 Fair 2 White Mortared in Stone with 9" tall black letters "BEE CREEK PARK"Cleaning Stone needs to be cleaned and power washed Foot Bridge (No Railings) 1 Fair/Good 2.5 6' wide X 20' long without hand rails. All wood construction. old wood, sagging. Painted tan Replacement Still functional but needs to be replaced in the near future. Foot Bridge (With Railings) 2 Fair/Good 2.5 6 ft wide with hand rails. All wood construction. Replacement Old, greyed and sagging. Still functional but needs to be replaced in the near future. Bat. Pavilion Trash Can (B)1 Fair/Good 2.5 Maroon paint, wood verticle planks, steel ring structure Replacement Needs wood replacement and paint. Water Fountain 3 Fair/Good 2.5 1- R2D2 style foutian with able-bodied bowl, disability bowl and dog bowl. 2-Exposed aggregate style with two steel bowls. Replacement Push button caps on exposed aggregate fountains are missing and need replacement. Some chipping and cracking. Need replacement. Interpretive/Cultural Features Bat. Interprative Sign 1 Fair/Good 2.5 Interprative sign warning of various snakes and habitat Replacement signage worn and faded. Needs replacement Passive Recreation Picnic Table (Wood)2 Fair 2 Wood 2X10 boards painted green mounted on tube steel structure Repair Wood needs to be replaced and/or painted green Picnic Table (Expanded Metal)1 Fair 2 Expanded metal, brown PVC coating table top and benches with black steel tube frame Replacement Aged and does not match all other picnic tables on park. Eclectic outlier. Needs replacement. Bat. Pavilion Planter Beds 2 Fair/Good 2.5 Two poured-in-place concrete planters 3'X16' long by 1' wide. Repair No plants in planter, needs landscaping Play Structures Play Structure (1) (5-12 yrs. Old)1 Poor/Good 2 Multidecks stairs, monkey bars, slide, tube slide and fall zone with concrete surround. Replacement Fall zone in poor conditon. Needs to be replaced. Play structure is in good condition. Billie Madeley Park Infrastructure Concrete Ramp 1 Fair 2 Concrete ramp in front of Bridge 3 Replacement Erosion has caused the ramp to sink about 2 inches. Trip hazard. Needs to be raised or replaced. ADA compliant? Bridge 1 1 Fair/Good 2.5 40' long X 6' wide all wood bridge with 4'-6" railing. Railing constructued of 4"X4" posts and 2"x4" railing. Support structure built with large treated timbers, bridge decking build from 2X6 treated lumber. Inspect Wood structure is aged wood with some gator backing of wood surface. There is concern regarding erosion of the wood abutments. Need to inspect to determine existent of damage. Bridge 2 1 Fair/Good 2.5 32' long X 6' wide all wood bridge with 4'-6" railing. Railing constructed of 4X4 posts and 2x4 railing. Support structure built with large treated timbers, bridge decking build from 2X6 treated lumber. Inspect Wood structure is aged wood with some gator backing of wood surface. There is concern regarding erosion of the wood abutments. Need to inspect to determine existent of damage. Bridge 3 1 Fair/Good 2.5 40' long X 6' wide all wood bridge with 4'-6" railing. Railing constructed of 4X4 posts and 2x4 railing. Support structure built with large treated timbers, bridge decking build from 2X6 treated lumber. Inspect Wood structure is aged wood with some gator backing of wood surface. There is concern regarding erosion of the wood abutments. Need to inspect to determine existent of damage. 1 Fair/Good 2.5 32' long X 6' wide all wood bridge with 4'-6" railing. Railing constructed of 4X4 posts and 2x4 railing. Support structure built with large treated timbers, bridge decking build from 2X6 treated lumber. Inspect Wood structure is aged wood with some gator backing of wood surface. There is concern regarding erosion of the wood abutments. Need to inspect to determine existent of damage. Railing loose and needs to be secured. Trails Natural Trails 1 Fair 2 Natural trails through woods. Sandy . Repair Washed out trails with exposed roots and dranches that need to be trimmed. DRAFTPage 220 of 234 Parks and Recreation Master Plan | 89 Brian Bachmann Park Infrastructure Pavilion Lighting 12 Fair 2.5 4' - T8 florescent light fixtures with lenses Repair 2 lenses are cracked and need replacement. Fixtures need to be cleaned. Appear old and faded. Passive Recreation Large Outdoor Pavilion 1 Poor 2 80'X 50.5' pavilion, red iron construction with standing seam roof. 1086 sq.ft. Kitchen/storage area, cook top, refrigerator, micro wave. 2 - doubledoors to access space. Replacement Aged and seldom used. A renovation with more inviting curb appeal would encourage more rentals. Brison Park Infrastructure Water Fountian 1 Fair 2 Exposed aggregate, 2 stainless Steel Bowls Repair Open hole on side of concrete structure. Needs replacement or repair. 12 Fair/Good 2.5 Concrete parking wheel stops Repair Out of place and not secured to the ground with steel spikes. Need yellow paint Interpretive/Cultural Features Bonfire Memorial Lights 12 Good/Fair 2.5 Exposed aggregate poles, Victorian post top light fixture. LED light diodes (solar)? Repair Straighten posts and replace cracked concrete posts with new steel post mounted on footing. Brothers Park Active Recreation Exercise Circuit 11 Poor/Fair 1.5 Miracle exercise curcuit with 11 stations. Each station is conctructed with steel 4"X4" square tubes, 2-3 inch steel tubing and other geometric shaped tubing. Surface material is crushed granite with composite surround. Inspect One exercise apparatuses is missing. Some of the structural units have rusted and could be compromised. Need thorough inspection. Crushed granite has weeds and needs to be cleaned out Half Court Basketball Court 1 Fair/Good 2.5 Half court concrete slab, painted two colors with LayKold or equivenent. "L" shaped goal posts with back board goal and net. Repair Surfacing needs to be scarified and repainted. Some minor cracking in concrete. Needs repair. Some rusting on goal. Infrastructure Water Fountain 1 Fair 2 Single Bowl, exposed aggregate concrete. Repair drain clogged/strainer missing, one broken mounting flange, Needs repair. Pond Overlook Deck 1 Fair/Good 2.5 Deck abutts concrete aprin, consructed of composite material with composite railings. Substructure appears to be sturdy. Repair Deck has 2"X 5" hole, interface/threshhold composite deck boards are broken up and/or replaced buy alternative material. (Wood) Deck needs repairs. Trash Cans 9 Fair/Good 2.5 Green paint, wood vertical planks, steel ring structure Repair Some trash cans need work slats replaced and some need green paint. Interpretive/Cultural Features Born Learning Trail Signs 14 Poor 1 Born learning Trail Signs with promote learning while experiencing the outdoors in a park setting. Sponsorder by the Barazos Valley United Way and the City of College Station Replacement Signs are old and faded. About 6 are completely sun bleached white with no visable information. Need to be replaced or removed. Exercise Circuit Signage 1 Poor/Fair 1.5 Miracle exercise station I.D. signage Replacement Sun faded. Needs to be replaced. Possibly discontinued. Passive Recreation Covered Park Bench 1 Poor 1 Twin post with a 12/3 gabled composite roof wit 3 ft overhang each side. 2"X10" seating board mounted between the two posts. Replacement Composite roof decking and shingles are failing. Holes in roof. Needs to be completely renovated or removed permanently. Picnic Pavilion 1 Poor 1 6-sided structure, cambered wood roof joists 6"X6," 6"X6" structural posts, 2"X6" decking with a composition roof. Replacement 2"X6" decking is rotted and roof is failing. Roof needs complete replacement/ renovation. Holes are unsightly. Play Structures Swing Set 1 Fair/Good 2.5 2 Bay swing with 2 belt swings and 2 toddler swings. 3 Up-side-down U- shape structural legs with cross rail. Fail zone rubber mulch with concrete surround. Suggested usage sign. Repair Powder coating faded. Holes dug out on rubber mulch under belt swings Carter's Crossing Infrastructure Park Rule Sign 1 Fair 2 Park rules & hours of operation Replacement Needs replacement Castlegate Park Infrastructure Trellis 1 Fair 2 Wooden structure, 6 posts 2"x6" shade joists plsced at 9" on center Cleaning Needs pressure washing and staining Park Rule Sign 2 Good/Fair 2.5 Standard rule sign, Plywood Replacement Needs paint or wood replacement Passive Recreation BBQ Pit 1 Fair 2 Duel BBQ Pit, Rusty. Cleaning Needs cleaning and paint Play Structures Playground Shade Cover 1 Poor 1 Rectangular nylon shade cover stretched over a steel frame structure. Nylon cover torn badly. Replacement Needs replacement Central Park Q1 Active Recreation Sand Volleyball Court 1 Fair/Good 2.5 Two, 3"posts painted white, in fair condition, lose torpedo sand (low clay content). No boundary demarcation. Repair Needs court boundary lines Infrastructure Admin Office Parking Lot 1 Fair 2 Curb and gutter perimeter and asphalt surface. 74 parking spaces with 6 being for people with disabilities.Repair Parking lot needs sealcoating, striping and safety painting. Parking Lot 1 Fair 2 74 parking spaces with 6 being handicap spaces. Concrete curbed lot with asphalt surface Repair Needs sealcoating, patching and striping/painting 14 Fair/Good 2.5 Wood slats painted green with steel ring structure. Some are composite slats. Cleaning Need pressure washing, paint and a few wood slats or replace with compsite. Interpretive/Cultural Features Fish Species Sign 1 Fair 2 Pond signage providing fish species and habitat information.Replacement In poor condition. Text is cracked up. Needs replacement or at lease paint.DRAFTPage 221 of 234 Parks and Recreation Master Plan | 90 Central Park Q2 Active Recreation Tennis Courts 2 Fair 2 Two(2) tennis courts with net posts and nets. Two(2) color surfacing. Replacement Courts will be completely replaced with post tention slab with new 2 color surfacing, 4 new net posts and 2 new nets. Fencine and windscreen will also be replaced. LifeTrail Exercise Kiosks 10 Fair/Good 2.5 First kiosk (by tennis courts) is informational regarding the importance of exercise. Kiosk 2--10 have two exercise activity stations per kiosk. Three sided kiosks with in depth explaination board and praphics. Verticle powder-coated steel tubing (green and yellow, pre-formed plastic roof. Repair Lettering/pictures are faded on some kiosks, all need to be pressure washed one kiosk has a concrete mount foot hold this is bent from impact. Needs to be repaired. Infrastructure Water Fountain 1 Poor 1 2 bowl water fountain exposed aggregate/concrete construction. Repair Fountain structure in good condition. Fountain inoperable. Missing button caps and button interworking's Parking Lot 1 Fair/Good 2.5 Concrete curb and gitter with asphalt parking surface. 40 parking spaces with two being handicapped slots. Repair White stripping needs to be refreshed. Cannot see lines anymore. Handicapped markings need paint and cross hatching needs paint as well. Parking Lot Trash Cans 2 Fair/Good 2.5 Wood slats painted green with steel ring structure.Repair Several wood slats need to be replaced. Repaint all slats. Tennis Court Lighting 4 Fair/Good 2.5 4 - 48' Tall tapered galvanized steel poles, 4 - two(2) fixture yokes with two square LED light fixtures on each poe (total 8 lights) Replacement Good Condition, but will be replaced with new Musco lighting Trash cans 9 Fair/Good 2.5 Wood slats painted green with steel ring structure.Cleaning Need pressure washing and new paint. Some wood slats may need replacement. Passive Recreation Smoker Pit 1 Fair 2 Smoker pit with fire box, grill box and chimney Cleaning Rusty, needs cleaning and Rustoleum Paint 1 Fair 2 18'X38' stacked white stone. Stones are 6"X24"x4". Repair 10% of stone border is missing. Need to be replaced Trails Hike and Bike Trail Lights 11 Fair/Good 2.5 Round elevated concrete footing, flange mounted 3.5" diameter steel pole 15' tall faded bronze in color. Square LED fixture.Replacement Poles faded, fixtures need inspection, exposed wires out of plug boxes. General wear and tear. One pole taller than others. Also a few mismatched light fixtures. Need to be replaced on the near future. Central Park Q3 Infrastructure Six(6) Ft. Aluminum Fence 1 Fair/Poor 1.5 Ameristar Echelon Aluminum Residential, 1,138 ft long, Fence construction: 3 - rails, 3/4"X3/4" pickets 6 ft tall, 15 pickets (4" on center gap) per 6ft. fence section. Replacement Fence pickets are soft aluminum and bend easilty. Hundreds have been bent breaching fence. Ameristar Echelon Aluminum Residential fencing has been discontinued. A new fence will need to be budgeted. FFAP/Softball Field Parking Lot 177 Fair 2 Concrete curb and gitter with asphalt parking surface. 177 parking spaces with 17 being handicapped slots. Repair Needs sealcoating. Repair and line striping. Parking Lot Trash Cans 10 Fair 2 Wood slats painted green with steel ring structure.Repair Need pressure washing and new paint. Some wood slats may need replacement. Or replace all with composite slats. FFAP/Softbll Field Handicap Parking 17 Fair/Good 2.5 17 Handicapped parking slots Repair Will need repainting in the near future. Trash Cans 12 Fair/Good 2.5 Green paint, wood vertical planks, steel ring structure Repair Some slats need to be replaced, all trash cans need fresh green paint. Play Structures FFAP Playground/Splash Pad Shade Cover(2)8 Fair 2 23 - 16" & 20 " diameter steel columns painted white, varying in elevation. Colored shade covers cable stretched with turnbuckles between 3 and/or 4 columns. Colors: yellow, light green, and blue. Repair Shade covers are failing at corners. Several are on order with additional covers needing to be ordered. Covers are being reinforced to last longer. One pole is taller than others and there are a few mismatched light fixtures. Creek View Park Active Recreation Exercise Stations 4 Fair/Good 2.5 Pipe structures painted brown placed on a granite pad. Signage for exercise instruction (2) Repair Pipe structures need paint and some repairs. Granite pad has cracks and steel edging that needs to be replaced. Infrastructure Park I.D. Sign 0 0 No Park ID Sign Replacement Needs a new Park I.D. Sign Cy Miller Park Infrastructure Observation Deck 3 Fair/Poor 1.5 3 wooden decks, 1 is closed Repair Decking and some substruture members need to be replaced Interpretive/Cultural Features Interpretive Signage 1 Poor 1 Fish identification sign Replacement Needs replacement Trails Walking Trail 1 Fair/Poor 1.5 5ft wide concrete trail Repair Cracked up in many places, needs section repair/replacement and power washing Edelweiss Gartens Infrastructure Park I.D. Sign 0 0 No sign on property Replacement Needs a new park I.D. sign Park Lighting 6 Good 2 Exposed aggregate poles w/acorn globes Repair 1 globe has a hole in it and all poles need to be pressure washed to remove mold Board Walk 1 Fair/Good 2.5 6' wide board walk w/ railing approximately 120' long Replacement Wood is old and rotting. Needs to be replaced in the next 2 years. Play Structures Swing Set 1 Fair/Poor 1.5 2 bay, 4 swings (2 Youth/Adult swings and 2 for infants ) Fall zone good. Replacement Swing set frame is rusting and powder coating is peeling off. Needs to be replaced. Play Structure (5-12 yr.old)1 Good/Fair 2.5 Climbers, bridges decks, poured in place fall zone, 1 intended use sign. Replacement Old and worn out. Needs replacement. DRAFTPage 222 of 234 Parks and Recreation Master Plan | 91 Edelweiss Park Infrastructure Ornamental Fence 1 Good/Fair 2.5 6' bays, 5' pickets, 4' tall posts, black, w/flange/screw installation. Replacement Two panels need to be replaced due to damage Play Structures Playground Shade Cover 1 Poor 1 Rectangular tarp stretched over steel structure Repair Shade tarp has 2 tears along the ridge pipe of the steel structure. Play Structure (5-12 yr olds)1 Fair 2 5 deck structure, 2 slides 1 stairwell, 4 climbers and poured in place fall zone. Includes 1 intended use signage Repair Has grass growing along edge of fall zone. Etonbury Park Infrastructure Park I.D. Sign 0 N/A 0 No park I.D. sign Replacement Park needs I.D. sign Park Rules Sign 1 Fair/Good 2.5 Steel printed sign with plywood backing and 4x4 wooden post Replacement Steel signage is faded and needs replacement First Down Park Passive Recreation Stone Benches 12 Fair/Good 2.5 Roughcut white sandstone blocks with bronze plaques which include quotes from Red Cashion. Park is in honor of Red Cashion. Replacement Most benches are in good condition; however the 4 benches that make up the football laces are crumbling. Gabbard Park Active Recreation Practice Back Stop 2 Fair/Good 2.5 2 - 3 bay chainlink backstops Repair Both backstops need straightening. One has several crossmembers that have become dislodged. Chainlink is bent up too. Infrastructure Park I.D. (Sign 1)1 Poor 1 Composite material sign and posts, paint. Replacement Needs to be replaced. Poor condition T-Head Pier 1 Fair 2 T -head pier constructed of wood. Replacement Peir needs to be rebuilt Passive Recreation Pond 1 Fair 2 Pond with pier access, aeration fountain and bridges. Repair Although Aeration fountain is working, the pond is full of green algea floating on the top of the water. Treatment contract in the works. Georgie K. Fitch Park Active Recreation Concrete steps 1 Poor 1 4' Wide stairway down from Basket Ball court Replacement Patched with asphalt, needs to be replaced Infrastructure Hand Railing 1 Poor 1 Steel hand railing Replacement Old, rusted and in need of replacement Pavestone wall 1 Poor 1 Medium size pavestone glued in place (red and black mixed color) Around play area REpair Stones missing, stacks need to be straightened Sidewalk 1 Poor 1 4' wide side walk along front of park. Concrete, 4" thick. Replacement 138' of cracked/damaged concrete. Needs replacement Passive Recreation Picnic Tables Rectangular 2 Poor/Fair 0.5 Table to and seating is made of expanded metal and dipped in brown PVC. Steel tubing structure painted black Replacement Need to be replaced Picnic Pavilion 1 Poor 1 12'X12' Square wood structure with 4 -6" square wood posts Replacement Roof has been removed. New Shade structure needed. Jack and Dorothy Miller Park Infrastructure Water Fountain 2 Fair 2 2 bowl water fountain exposed aggregate/concrete construction. Operational Replacement Edges chipped on both foutains. Need to be replaced Interpretive/Cultural Features Interactive Learning Board 1 Fair 2 Aluminum board approximately 3x5 mounted on 2 steel fence posts. Board have pictures and symbols that relate to specific meanings. Replacement Mounting is unattractive and the board is bent and some of the symbols are scratched up. Passive Recreation Picnic Table 3 Poor 1 2-6ft in length expanded metal (dipped in brown PVC) table top and seating on a galvanized steel tube frame. 1- 6 ft. long table with wood table top and seating on a galvanized steel tube frame. Replacement All picnic tables need to be replaced. Picnic Pavilion 1 Fair 2 8-sided pavilion with steel columns, steel compression ring, 2 bricked -in bays, wood beam roof construction, 2X6 decking and a composition roof. Repair Roof is in need of new shingles tar paper, drip edge, facia board and paint. John Crompton Park Infrastructure Park I.D. Sign 2 Poor/Fair 1.5 Composite material sign and posts, paint. Cleaning Primary sign needs pressure washing, possible replacement. Secondary sign in fair shape Passive Recreation Triangular Stone Wall Planter 1 Fair 2 Stones stacked 3 high around a trriangular plant bed formd by walkway intersection. Repair Stones are missing or out of place. Ned repair. Lions Park Infrastructure Ornamental Fence 1 Fair 2 6 ' tall, 54 bays, 432 L.F. / 4' Tall, 39 bays, 312 L.F. Repair Missing steel tubing pickets, fence needs paint Luther Jones Park Active Recreation Dugout benches 2 Fair 2 Located outside of infield, no shade cover. 2"X12"X14' seat board painted green with 5 steel legs for support. Repair Wood needs new paint. Legs need straightening and new paint. Softball Field 1 Fair/Good 2.5 One softball field, 190' Outfield, 10;fencing arould entire field, 750 l.ft. of fencing, no formal dugout. Skinned infield, bases in place, 15' hight 3 bay backstop. One set of aluminum bleachers, 5 seat, 15' long. Repair Softball field needs crowning with sand, fencing needs repair. Many rails are out of socket and the fencing is bent up in some places. Gates need repair work. Park lights are out of plumb. Need straightening. Infrastructure Water Fountain 1 Fair/Poor 1.5 Wood post with drinking fountain fixture on top. Looks to be homemade. Replacement Water fountain needs to be replaced with appropriate SPSI-approved Park water fountain. DRAFTPage 223 of 234 Parks and Recreation Master Plan | 92 Merry Oaks Park Active Recreation Basketball Court 1 Fair 2 Concrete court with 2 goals, 2 backboards and two nets. Court surfaced with LayKold or equivalent material. Replacement Concrete cracked up, sufacing needs replacement. Court needs to be replaced. Infrastructure Wooden Deck Under Table 1 Fair 2 2X6 Decking under picnic table at corner of playstructure Replacement Very old. Needs replacement. Deck boards and possible substructure are rotted. Rules Sign 2 Fair 2 Park rules & hours of operation Replacement Need to be replaced. Water Fountain 1 Fair/Good 2.5 Exposed aggregate style with single steel bowl. Replacement Broken and chipped. Not dangerous but needs o be replaced at some point. Passive Recreation Bar-B-Que Pit 2 Fair/Good 2.5 Swiveling open grill with adjustable grate Replacement One is in Good Condition the other is broken. Grilling box moves in a tilted position. Needs to be Replaced Play Structures Play Structure (5-12 yrs. Old)1 Fair 2 Play structure is an older unit. Multiple decks climbers and circular slide. Pea gravel fall zone.Replacement Pea gravel fall zone does not look to be the proper depth. Play structure is old and dated. Needs to be replaced with newer unit and a poured in place fall zone. Swing Set 1 Fair 2 2 Bay swing with 2 belt swings and 2 toddler swings. 3 Up- side-down U- shape structural legs with cross rail. Repair One of 6 Legs slightly bent. Equipment is old and could use a refresh. Oaks Park Infrastructure Brick Walkway 1 Poor 1 Brick walkway connector to concrete trail. Ryerson steel edging Repair Bricks are missing and need to be replaced. Not safe to walk on at night. Steel edging poses a hazard. Park I.D. Sign 1 Fair/Poor 1.5 Composite material sign and posts, paint. Replacement Needs Replacement Passive Recreation Floor mounted oversized Grill 1 Poor 1 Dual open grill with two separate adjustable grill surfaces. Steel charcoal pan underneath Replacement Steel charcoal pan under grill surface is rusted through. Entire grill needs immediate replacement. Not usable. Disc Golf Course 9 Poor 1 9 disc golf "holes" with newer markers depicting hole specifications 9 hole description board on Pavilion wall. Replacement All goals need to be replaced. All goals are old, out of plumb and unsightly. The hole markers are in good shape. 9 hole course description board is in good shape. Should consider tee boxes. Horse Shoe Court 6 Poor 1 6 Horse Shoe Pits with U-shaped concrete borders Removal Courts look very old and unused. No relationship to the rest of the park. Recommend we remove. Picnic Tables 3 Poor 1 Expanded metal table top and seating with brown PVC coating. Steel tubing frame painted black Replacement All tables need to be replaced. PVC coating has been burned off expanded metal. Rusty and sharp. Bar-B-Que Pits 1 Fair 2 Typical open grill Pit with adjustable grill grate Replacement Needs replacement Vent Hood 1 Fair/Good 2.5 Rectangular Galvanized Steel Vent Hoodheld in place by 4 guide wires Replacement Vend hood is in good condition, but no electric motor. No smoke evacuation unit to draw out smoke. Not usable. Needs replacement or removal. Parkway Park Infrastructure Wood Bridge 1 Fair 2 6' wide by 24' long arched wood structure, 2X6 floor boards, and 4"X4" posts with 2"X4" railing. Inspect Wood structure is at about 80% of life expectancy. Need to plan for replacement. "Pebble Creek Park (PARD Property)" Active Recreation Soccer Goals 4 Fair / Good 2.5 6'6''X 19' goal opening, PVC rectangular plastic frame and net Replacement Goal has substantial UV damage. Recommend replacement. Net is also in poor shape. - Replace Play Structures Swing Set (2-5 yr.olds) 1 Fair to Good 2.5 1 Bay, 2 baby swings, fall zone Replacement Red Powder coating is peeling off posts and clamps Need replacement DRAFTPage 224 of 234 Parks and Recreation Master Plan | 93 "Pebble Creek Park (School Property)" Active Recreation BB Pavilion Court Condition 1 Poor 1 Full basketball court. LayKold (or equivalent) court surfacing 2 color/white striping. Resurfacing Court surfacing in poor shape. Needs to be stripped, acid washed and resurfaced. Backstops 2 Fair/Good 2.5 3 bay chain link fabric/steel pole construction 10' tall with mid-rail. Additional low rail in middle bay. Repair Fence fabric is bent up and missing fence ties. Fabric needs repair/ replacement Infrastructure Misc. Clutter 5 Poor 1 Metal posts, signs Removal Various posts and unessessary signs/posts in playground area. Remove. Basketball Court Lighting 12 Fair 2 12 fixtures , LED lights, aluminum shrouds Replacement Aluminum shrouds bent and dented from basketball. Protective grills missing on 2 shrouds Need replacement Park Dedication Sign 1 Fair 2 Metal sign with aluminum cast dedication sign commemorating the day and donors. Cleaning Metal is dirty and needs to be pressure washed. Park Rule Sign 2 Fair 2 Park rules & hours of operation Replacement Needs paint and a new aluminum printed sign. One sign is missing from green post. Post need paint as well. Passive Recreation Gaga Ball Ring 1 Fair 2 2X8 edge stacked 3 boards high, octagon shape steel corner bracing painted green. Removal Gaga court dried mud, hard and clumpy. Not a safe surface for use. Recommend removal. Play Structures Playground Shade Cover 3 Poor/Fair 1.5 Rectangular shade tarp stretched over steel tubular frame with 2 yokes forming a "hip roof" configuration. Cleaning Shade cloth full of black mold and needs replacement over all three play structures. Steel structure needs pressure washing/paint. Play Structure (5-12 yrs. old) 1 1 Fair/Good 2.5 2 decks 3 ft. off the ground, slide, simple rock climber, 3 interactive panels, 2 slide poles with steps. 1 intended use sign, poured in place fall zone with concrete curb surround. Replacement Dated play structure. Could use an update. Intended use sign needs to be replaced. Play Structure (5-12 yrs. old) 2 1 Fair/Good 2.5 4 desks, 2 slides, rock climber, lilly pad climber, 2 play panels, elevated stairwell pad and 1 climber slide. . Intended use sign post only.Replacement Dated structure. Needs update. Indended use sigh missing. Play Structure (7-12 yrs. old) 3 1 Fair/Good 2.5 2 decks, 2 sided rock climbing wall, 5 balance lillypads, 3 jungle gyms, stairwell to elevated deck, rope climber,arm and leg peddle exercise station. Replacement Dated play spructure. Paint chipping. Need to consider replacing. Richard Carter Park Infrastructure Wood Observation Decks 3 Fair 2 floor joists, Decking 2X6 Treated lumber, Rails are 2X4 with 4"x4" posts. Seating is 2x6 construction. Replacement All wood is well weathered and worn with large cracks. Splinter hazard. Needs replacement or removal. Passive Recreation Classic Backless Park Bench 3 Fair/Good 2.5 Cast metal bench frame with wood slats for seating. Painted green Replacement Broken frame. Needs replacement. Wood slats need replacement and/or repainting. Sandstone Park Play Structures Play Structure (5-12 yr olds)1 Fair 2 4 decks, 3 slides, 1 climber, 4 sided plastic shingle roof, poured in place fall zone. Includes 1 intended use sign Repair Playground powder coating is chipping off. Intended use sign needs to be replaced. Southern Oaks Infrastructure Park I.D. Sign 1 Poor/Fair 1.5 Composite material sign and posts, paint. Cleaning Needs pressure washing, could need replacement Wood Foot Bridges 2 Fair 2 Railess foot bridges 4 ft. wide. 2"X6" decking supported by 4"X4" postes and 2"X6" shirting. Inspect Wood is aged and gets submerged during every rain. Wood still seems sturdy. Need to continue monitoring Passive Recreation Small Picnic Pavilion 1 Poor 1 6-sided all wood structure. 6 vertical wood posts. Some steel brackets and a steel compression ring. Structural joists, 2X6 decking & composite roof. Replacement Needs major repair or replacement. Water damage, rooted wood. Holes in composite roof. Planter Ring 1 Poor 1 5' wide planter ring built with stackable pavestone blocks. Tree planted in the center of the ring. Repair Approximately 8 stones missing from the planter ring. Need to be replaced. Glue in place. Play Structures Play Structure (5-12 yr. old)1 Fair 2 Small play unit, 2 slides, bridge, 2 climbers. Fall zone with concrete walk as border. Suggested usage sign. Repair Dated unit is worn. Powder coating is faded. Needs to be replaced. Fall zone has soft spot in center of playground area. Needs repair. Slide has pinching crack. Needs to be addressed. Southwest Park Infrastructure Park I.D. Sign 0 N/A 0 No park I.D. sign Replacement Need to install a park I.D. sign. Steeplechase Park Infrastructure Park I .D. Sign 1 Poor 1 Short stone (18") seating wall with letters mouned of face wall Replacement Most letters are missing. Cannot identify park. Lettering and stone needs to be repaired/replaced. Passive Recreation Square planters 4 Poor/Fair 1.5 White stone planters 7'X7'X24" tall. Stone construction with man-made cap. Repair Stones missing and no plant materials growing Thomas Park Active Recreation Duel Tennis Court 2 Fair/Good 2.5 Two Tennis courts side by side with 2 nets. Fencing is 10' at back of court and one bay along the sides. The fens then steps down to 6'. Surfaced with LayKold or equivalent. Resurfacing Courts need to be resurfaced. Cracks need repair. Courts taped for pickleball. Needs to be removed. Some fencing needs replacement. Infrastructure Concrete Drainage flums 1 Poor 1 Concrete drainage flums running through park to enhance storm drainage Repair Concrete flums and associated work is broken up and in poor condition. Needs repair/replacement Walking Path 1 Poor 1 Sidewalk covered with ruberized path red in color. Approximately .25 inches thick.Resurfacing Northwestern end of park. Red rubberized path material is pealing off concrete surface. Needs to be removed and reapplied. DRAFTPage 225 of 234 Parks and Recreation Master Plan | 94 University Park Infrastructure Sign Posts 4 Poor 1 Located at each entrance of the dog park. Two posts side by side. No signage.Replacement Signage missing. Replace signage of pull posts. Park I.D. Sign 1 Fair 2 Composite material sign with painted tree and animal figures. Replacement Very dirty. May be permanent stain. If so, replace. Parking Lot 1 Fair/Good 2.5 23 parking slots which include 2 ADA plaking slots. Slots marked using inlaid brick for permanent markings. Repair Broken curbs need repair. Stripped with brick inlays. ADA parking needs repair/replacement Passive Recreation Concrete Splash Pond 1 Poor 1 Concrete dish-shaped pond for dogs to play in. Removal Pond drainage connects to waterway which is unsanitary. Pond needs to be removed . Wooden Picnic Table 1 Poor 1 Heavy wood table top and seating set on a tube steel frame Replacement All heavy wood surfaces are very old, cracking and asplinter hazard. Needs to be replaced. Planter 1 Fair 2 Square Dry-stack stone 7' X 7' X 24" high. Irrigation. No plants growing inside Repair Stones missing around planter ledge. Needs repair. Dog Agility Course 8 Fair/Good 2.5 8 obstacles (1 missing) consisting of an up/down ramp, Bridge ramp, tunnel, zigzag poles, platform, lilly pads and Rover Jump over. Green and Yellow in color. Replacement Missing one agility obstacle. Possibly a seesaw. Needs to be replaced. Trails Crushed Aaphalt Trail 2 Poor 1 Crushed asphalt trails running from the front gate to the the back of the park. Replacement Poor condition. Asphalt is broken up and not navigable for people in wheelchairs. W.A. Tarrow Park Active Recreation Basketball Court 1 Fair/Good 2.5 Full court basketball court. 2 goals, backboards and nets. LayKold Surfacing or equivalent Resurfacing Surface is cracked and chipped. Needs crack repair and resurfacing Infrastructure Concrete Plaza and Walks 1 Poor/Fair 1.5 Concrete plaza and adjacent walkways that radiate outward to perimeter walkways. Replacement Cracks, concrete heaving, sunken concrete/ subsidence. Several areas in need of replacement Passive Recreation Picnic Table 2 Fair 2 Expanded metal table top and seating dipped in brown PVC, Steel tube frame Replacement Need to be replaced Play Structures Climber 1 Poor 1 Monkey Bar style Climber. All bars are same elevation Replacement Outdated, old, paint oxidized, climber in need of replacement Wallace Lake Park Infrastructure Park I.D. Sign 0 N/A 0 No I.D. Sign Replacement Park needs I.D. sign Woodland Hills Park Infrastructure Park Sign 2 Poor/Fair 1.5 Composite material sign and posts, paint. Replacement Faded and dirty. Need replacement Park Lighting 8 Fair 2 12' Tall exposed aggregate poles, (Octagonal in shape) traditional style with acorn shaped LED fixtures. Replacement In fair condition with one acorn globe broken and needing replacement. All other globes are faded and yellow. Need replacement as well. Play Structures Swing Set 1 Poor 1 1- 2 bay swing set with 4 belt swings, 3 up-side-down U-shaped supports with one cross bar Replacement Unit is rusted and paint is chipping off. Needs replacement Playground Shade Covers 2 Poor 1 2 rectangular shade covers stretched over hip roof style pile structures supported by 4 verticle posts over two separate play structures. Both are GameTime units. Replacement Aged cover has holes and mold. Needs Replacement. Play Structure for 3-5 yr. olds 1 Fair 2 Slide, two decks, shimmy pole and climber. Poured in place fall zone. Replacement Play unit has aged and needs replacement. Fall zone has holes and needs replacement or repair. Play Structure for 5-12 yr. olds 1 Fair 2 Cork screw slide, multiple decks, gungle gym, Stairwells, rock clumber and suggested usage sign. Poured in place fall zone material. Replacement Play unit has aged and needs replacement. Fall zone has holes and needs replacement or repair. DRAFTPage 226 of 234 Parks and Recreation Master Plan | 95 What are three factors or trends that College Station must be prepared for in the future? Coding Internal, external If you could wave a magic wand and make one thing happen at College Station parks, what would that be?Coding What is something you think makes the College Station parks system stand out?Coding What are some of the biggest maintenance and operational challenges you face in your day to day? Coding More families External Spring creek nature trails Resources Veteran's Park. Lick Creek.Offerings Hogs External Population growth and water usage External More pools + water sports Resources Variety of parks across the community Offerings Erosion External People first no car first Resources Baseball fields + pools Resources Parks that are close to neighbohroods Offerings Budget Resources More severe weather. Hotter heat. More Storms External A park with plenty of green space Resources The engagement w/ community around needs + changes Offerings Trails at Lick Creek are routinely flooded External Continued aging of the population External All parks connected by network of recreational path Resources Balance between active recreation and nature/green amenities Offerings Pollen + humidity - keeping parks shiny External Offering quality of life experience to attract & retain young families & young talents Resources Less humidity in TX. Ability to ride/walk to food + stores + park + pools.External The conditions. Continued growth.External Global warming -- we will need more shade External More $Resources Lick creek park. Especially Lick Creek Park in the dark + recreationalpath to it.Offerings 3rd places Resources Another large park where nature is a major focus.Resources Variety of parks + activities - paths + playgrounds + water + organized sports facilities. Offerings Summers are no longer a ghost town External Fun for all play facility Offerings Growth of multifam. Folks need parks as their outdoor space.Resources Limited b-ball court availability for ad-hoc community use - e.g. private b-ball coach hard to find because of court limitations Resources School green spaces - has not effectively been merged/incorporated w system - have a need to lessen tension. Resources Coding 1) Resources (what we need) 2) Offerings (what we provide) 3) External Trends/Factors (what will impact us externally) BOARD MEETING DATA DIGITALIZATION DRAFTPage 227 of 234 Parks and Recreation Master Plan | 96 Park Name Favorite Votes Needs Improvement Votes Favorite %Needs Improvement % Anderson 4 3 1.39%4.69% Art & Myra Bright 0 0 0.00%0.00% Baracks 2 0 0 0.00%0.00% Bee Creek 19 10 6.62%15.63% Billie Madeley 0 0 0.00%0.00% Brian Bachmann 2 4 0.70%6.25% Bridgewood 2 2 0.70%3.13% Brison 3 1 1.05%1.56% Brothers Pond 6 6 2.09%9.38% Carter's Crossing 0 1 0.00%1.56% Castlegate 2 0 0.70%0.00% Castle Rock 5 1 1.74%1.56% Cove of nantucket 1 0 0.35%0.00% creekview 0 0 0.00%0.00% crescent point 0 0 0.00%0.00% Cy miller 0 0 0.00%0.00% Eastgate 0 0 0.00%0.00% Edelweiss 1 3 0.35%4.69% Edelweiss Gartens 0 0 0.00%0.00% Emerald Forest 1 1 0.35%1.56% Etonbury 0 1 0.00%1.56% First Down 5 1 1.74%1.56% Gabbard 0 0 0.00%0.00% Georgie K.Fitch 0 0 0.00%0.00% Greens Prairie Reserve 0 0 0.00%0.00% Jack & Dorthy Miller 1 1 0.35%1.56% John Crompton 6 2 2.09%3.13% Lemontree 3 3 1.05%4.69% CITY ENGAGEMENT RESULTS DRAFTPage 228 of 234 Parks and Recreation Master Plan | 97 Lick Creek 97 0 33.80%0.00% Lions 0 0 0.00%0.00% Longmire 1 1 0.35%1.56% Luther Jones 2 0 0.70%0.00% merry Oaks 1 0 0.35%0.00% Midtown Reserve 0 0 0.00%0.00% Northgate 0 2 0.00%3.13% Oaks 3 0 1.05%0.00% Parkway 0 0 0.00%0.00% Pebble Creeek 3 0 1.05%0.00% Phillips 0 0 0.00%0.00% Reatta Meadows 3 0 1.05%0.00% Richard Carter 1 0 0.35%0.00% Sandstone 1 0 0.35%0.00% Southern Oaks 3 3 1.05%4.69% Southwest 1 4 0.35%6.25% Steeplechase 0 0 0.00%0.00% Stephan C Beachy Central 59 2 20.56%3.13% Thomas 1 1 0.35%1.56% University 0 2 0.00%3.13% Veterans Park & Athletc Complex 23 0 8.01%0.00% W A Tarrow 0 0 0.00%0.00% Wallace Lake 0 0 0.00%0.00% Wildwood 0 0 0.00%0.00% Windwood 0 0 0.00%0.00% Wolfpen Creek 26 7 9.06%10.94% Woodcreek 1 1 0.35%1.56% Woodland Hills 0 1 0.00%1.56% Total 287 64DRAFT Page 229 of 234 Parks and Recreation Master Plan | 98 Park Name Number of Trails Surfaced Trails (ft)Unpaved Trails (ft) Anderson Park 1 1,744.70 - Art & Myra Bright Park 3 2,789.80 - Barracks II Park 1 2,984.80 - Bee Creek Park 5 4,314.60 1,056.70 Billie Madeley Park 1 1,143.10 - Brian Bachmann Park 4 3,249.40 - Bridgewood Park 1 778.70 - Brison Park 1 2,325.10 - Brothers Park 4 4,652.10 - Carter's Crossing Park 1 869.80 - Castle Rock Park 1 1,823.50 - Castlegate Park 3 3,930.10 - Cove of Nantucket Park 1 1,309.40 - Creek View Park 2 1,967.40 - Crescent Pointe Park 1 1,775.90 - Cy Miller Park 1 854.80 - Eastgate Park - - - Edelweiss Park 2 3,079.90 - Edelweiss Gartens Park 4 3,972.90 - Emerald Forest Park 1 1,507.40 - Etonbury Park 2 96.00 - First Down Park 1 668.40 - Gabbard Park 2 3,419.20 - Georgie K. Fitch Park 1 2,701.80 - Greens Prairie Reserve Park 1 6,082.00 - Jack & Dorothy Miller Park 2 1,953.90 - John Crompton Park 4 5,189.10 - Lemontree Park 1 2,551.30 - Lick Creek Park 8 2,347.60 26,405.00 LEVEL OF SERVICE CALCULATIONS DRAFTPage 230 of 234 Parks and Recreation Master Plan | 99 Lions Park 1 280.80 - Longmire Park 2 1,589.70 - Luther Jones Park - - - Merry Oaks Park 1 1,861.00 - Midtown Reserve Park 3 9,817.60 - Northgate Park 1 1,156.30 - Oaks Park 2 3,576.10 - Parkway Park 1 173.50 - Pebble Creek Park 2 2,175.40 Phillips Park - - - Reatta Meadows Park 2 1,155.60 - Richard Carter Park 1 2,780.10 - Sandstone Park 2 2,094.00 - Southern Oaks Park 2 5,301.20 - Southwest Park 1 1,094.70 - Steeplechase Park 2 3,272.10 Stephen C. Beachy Park (Central) 5 9,873.80 - Summit Crossing Park 1 872.00 Thomas Park 4 5,969.10 - University Park 3,035.80 - Veterans Park& Athletic Complex 8 22,026.90 - W. A. Tarrow Park 4 6,104.20 Wallace Lake Park 2 1,400.70 - Wildwood Park 1 2,594.60 - Windwood Park 1 1,029.70 - Wolf Pen Creek Park 5 15,533.90 - Woodcreek Park 1 2,249.00 - Woodland Hills Park 1 1,480.30 - Total 116 178,580.80 27,461.70 Miles 33.82 5.20 GRAND TOTAL 39.02 DRAFTPage 231 of 234 Parks and Recreation Master Plan | 100 PROGRAMS CHART Classification 2018 2019 2022 2023 2024 Total Essential 3223 4614 3584 3528 3113 18,062 Adaptive Programs 161 60 20 66 156 463 After-School Programs 125 174 173 180 196 848 Holiday Programs 271 163 286 230 161 1,111 Nature-Based Programs 139 296 193 515 379 1,522 Senior Programming 0 1 42 ** * Special Events 443 127 226 228 207 1,231 Summer Camps 242 623 722 506 376 2,469 Swimming 1842 3170 1922 1803 1638 10,375 Important 1771 2056 2119 2334 1620 9,900 Art 50 199 203 170 172 794 Basketball 887 934 987 1165 710 4,683 Exercise *1 18 85 54 158 Field Hockey **12 19 11 42 Softball 175 197 281 188 169 1,010 STEM 147 144 98 221 80 690 Tennis 240 364 457 418 359 1,838 Volleyball 249 193 63 68 65 638 Yoga 23 24 *** 47 Value Add 193 407 667 1031 1046 3,344 Cooking 16 40 30 4 12 102 History **346 505 470 1,321 Kickball 36 20 35 38 36 165 Martial Arts 33 263 124 370 428 1,218 Meditation **33 36 33 102 Ultimate Frisbee 108 84 99 78 67 436 Grand Total 5187 7077 6370 6893 5779 31,306 Row Labels 2018 2019 2022 2023 2024 Total Lessons 1663 2656 1675 1372 1184 8550 Tsunami 393 229 218 277 1117 Adamson Lagoon 129 28 187 177 521 Total 1792 3077 1904 1777 1638 10188DRAFT Page 232 of 234 Parks and Recreation Master Plan | 101 Row Labels Grand Total Essential 57.70% Important 31.62% Value Add 10.68% Grand Total 100.00% 100% 90% 80% 70% 60% 50% 40% 30% 20% 1% 0% 10.68% 31.62% 57.70% Essential Important Value Add DRAFTPage 233 of 234 DRAFTPage 234 of 234