HomeMy WebLinkAboutNovember (2)P &
LANNING
D S
EVELOPMENTERVICES
Building a Better Community with You
Volume 7 Issue 11
Building Services - Planning - Development Engineering - Neighborhood
November 2006
INSIDE THIS ISSUE:
P
ERMITSBYTYPE
Calendar of Meetings 2
Y D
EARTOATE
Commercial Projects 3
Apt./Hotel Projects 4
Subdivision Projects 4
Permit Totals 5
Residential Permit Details 6
Commercial Permit Details 7
Miscellaneous Permit Details 8
Inspection Totals 10
Laynes, 1301 Wellborn Road
Inspector’s Corner
Fireblocking, When and Where
Points of Interest:
An often overlooked requirement of the building code is the installation of fireblocking in wall, ceiling and floor
framing. When fire spreads, flames and harmful gases spread through a building. If properly fireblocked, the
movement of flames and gases is restricted and the fire can not easily spread through concealed passages that may
Page 1
be present in the framing of a building. The building code requires fireblocking in the following locations:
In concealed spaces of stud walls and partitions
Inspector’s
At all interconnections between concealed vertical and horizontal spaces such as occur at soffits,
Corner
drop ceilings and cove ceilings
In concealed spaces between stair stringers at the top and bottom of the run
Page 11
At openings around vents, pipes, and ducts at ceilings and floor level
Comprehensive
At open spaces around chimneys and fireplaces, such as floor and ceiling penetrations
Plan Update
Materials approved as fireblocking are listed in section 602.8.1, of the Residential Building Code. Approved mate-
rials include 2 inch thick nominal lumber, ½” gypsum board, and ¼” cement based millboard. For more informa-
tion regarding fireblocking, firestopping, or other code related issues, contact the City of College Station Building
Department @ 979-764-3570.
Chris Haver, CBO
Building Official
Tracking the Numbers
Total Permits:
YTD - 1yr YTD - 2yr
41% 8%
Single-Family Homes:
Commercial:
(Does not include slab onlys)
(Does not include slab onlys)
Year-to-date, total permits experienced a
YTD – 1yr YTD – 2yr
YTD – 1yr YTD – 2yr
decrease in quantity when compared to
22% 10%
last year at this time, October 2005, and
11% 23%
experienced an increase when compared
with two years ago, October 2004.
Year-to-date, single-family home permits
Year-to-date, commercial permits experi-
(Approximately 50% of the total permits
increased in quantity when compared to
enced an increase in quantity when com-
issued in 2005 were roofing permits.
last year at this time, November 2005,
pared to last year at this time, October 2005,
This is a result of a hail storm that took
and increased when compared with two
and increased compared with two years ago,
place early that year.)
years ago, November 2004.
October 2004.
1101 Texas Avenue www.cstx.gov 979.764.3570
Page 2 Volume 7 Issue 11
January 2007
SCHEDULE OF EVENTS
Í Ó Ì É Ì Ú Í
ËÒÑÒËÛÛÜØËÎ×ßÌ
ïñì ú ïñïè
ï î í ì ë ê
д¿²²·²¹ ú Ʊ²·²¹
Í«¾³·¬¬¿´
ÐúÆ
ݱ³³··±² Ó»»¬·²¹
Ü»¿¼´·²»
éæðð ÐÓ
éæðð ÐÓ øÉÍ êæðð ÐÓ÷
ÆÞßóêæðð ÐÓ
è ç ïï ïî
é ïð ïí
Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´
ïñïï ú ïñîë
Ü»¿¼´·²» éæðð ÐÓ
Ý·¬§ ݱ«²½·´ Ó»»¬·²¹
éæðð ÐÓ
ïé ïè
ïì ïê ïç îð
ïë
öØÐÝó̸» ÐúÆ
Í«¾³·¬¬¿´
Ú¿½·´·¬¿¬·±² Ó»»¬·²¹
Ó·´´·½¿² 籬 éæðð ÐÓ
Ü»¿¼´·²»
ïïæíð ÐÓ
Ûª»®§ Ì«»¼¿§
ïæíð ÐÓ
îî îë îê
îï îí îì îé
Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ
Ü»¿¼´·²» éæðð ÐÓ ïïæðð ßÓ
îç
îè íð íï
Í«¾³·¬¬¿´
Ü»¿¼´·²»
ö Ø·¬±®·½ Ю»»®ª¿¬·±²
ݱ³³·¬¬»» øÔ«²½¸»±²÷
February 2007
îñï ú îñïë
Í Ó Ì É Ì Ú Í
ËÒÑÒËÛÛÜØËÎ×ßÌ
д¿²²·²¹ ú Ʊ²·²¹
ï î í
ݱ³³··±² Ó»»¬·²¹
ÐúÆ
éæðð ÐÓ øÉÍ êæðð ÐÓ÷
éæðð ÐÓ
îñé ú îñîî
ë ê è ç
ì é ïð
Í«¾³·¬¬¿´ ÆÞß ÜÎÞ
Ý·¬§ ݱ«²½·´ Ó»»¬·²¹
Ý·¬§ ݱ«²½·´
Ü»¿¼´·²» êæðð ÐÓ ïïæðð ßÓ
éæðð ÐÓ
éæðð ÐÓ
ïì ïë
ïï ïí ïê ïé
ïî
ÐúÆ
Ú¿½·´·¬¿¬·±² Ó»»¬·²¹
Í«¾³·¬¬¿´
éæðð ÐÓ
Ü»¿¼´·²»
Ûª»®§ Ì«»¼¿§
öØÐÝóÒ¿¬·ª»
ß³»®·½¿²
ïæíð ÐÓ
ïïæíð ßÓ
ïç îî îí
ïè îð îï îì
Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ
Ü»¿¼´·²» éæðð ÐÓ ïïæðð ßÓ
îê
îë îé îè
Í«¾³·¬¬¿´
Ü»¿¼´·²»
Page 3
Planning & Development Services
Page 4 Volume 7 Issue 11
ABBREVIATIONS:
SP - Site Plan
MP - Master Plan
DP - Development Permit
PP - Preliminary Plat
CUP - Conditional Use Permit
FP - Final Plat
() Certificate of Occupancy () Current () New Development () Filed
Planning & Development Services
Page 5
B P T:
UILDINGERMITOTALS
M
ONTHLY
P
ERMIT
T
OTALS
Jan. 1, 2006 - November 30, 2006 Jan. 1, 2005 - November 30, 2005
Total Sq. Heat Sq.
Type of PermitPermitUnitAmountPermitUnitAmount
Ft.Ft.
Single Family Home6116111,120,1011,225,124$88,871,332 502502$75,392,290
Duplex 173447,94944,889$3,091,202 2346$4,123,334
Tri-plex/Four-plex 31114,81914,750$793,780 28111$4,563,300
Apartment95879,94386,824$3,870,946 35N/A$5,767,458
Residential Addition58N/A32,64120,673$1,757,01155N/A$1,494,229
Residential Remodel42N/AN/AN/A$858,315 41N/A$633,285
P
Residential Garage/Carport Additio2N/AN/AN/A$45,8172N/A$91,760
ERMIT
Residential Demolition26N/AN/AN/A$103,7506N/A$67,430
T
Residential Slab Only-SF13N/AN/AN/A$206,975 31N/A$431,917
OTALS
Residential Slab Only-DP10N/AN/AN/A$164,000 0N/A$0
Residential Slab Only-3&40N/AN/AN/A$0 1N/A$23,000,000
YTD
Residential Slab Only-Apt.0N/AN/AN/A$0 0N/A$0
Hotel / Motel / Inn00N/AN/A$000$0
New Commercial84N/A534,786370,552$43,235,74664N/A$20,383,658
Commercial Remodel84N/AN/AN/A$5,352,75593N/A$6,889,301
Commercial Demolition24N/AN/AN/A$429,170 22N/A$399,321
Commercial Slab Only34N/AN/AN/A$2,615,2943N/A$209,000
Swimming Pool75N/AN/AN/A$2,844,00164N/A$1,967,060
Sign108N/AN/AN/A$431,023149N/A$495,623
Moving & Location10N/AN/A$26,20016N/A$45,602
Storage / Accessory40N/AN/AN/A$723,40158N/A$385,309
Roofing101N/AN/AN/A$431,0231128N/A$4,843,955
TOTALS13517141,830,2391,762,812$155,851,7412321659$151,183,832
Page 6
Planning & Development Services
B P D:
UILDINGERMITETAILS
R P
ESIDENTIALERMITS
Total Sq. Heat Sq.
Date PermitContractor LotBlkAddressSubdivision FeetFeetApplication Type Valuation
11/1/06 6-3335 STYLECRAFT BUILDERS 29 61 3816 NIGHT RAIN DR WESTFIELD VILLAGE PH 6 2527 1812 New Residential (SF) $119,592
11/1/06 6-3348 BARON CONSTRUCTION 4 0 908 WELSH AVE BREEZY HEIGHTS 3153 2300 New Residential (SF) $151,800
11/1/06 6-3290 STYLECRAFT BUILDERS 18 41 920 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1627 1185 New Residential (SF) $78,210
11/1/06 6-3293 STYLECRAFT BUILDERS 22 40 945 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1627 1185 New Residential (SF) $78,210
11/1/06 6-3332 STYLECRAFT BUILDERS 20 40 941 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1588 1149 New Residential (SF) $75,834
11/1/06 6-3339 STYLECRAFT BUILDERS 6 40 3906 CROWN RIDGE CT 1791 1313 New Residential (SF) $86,658
11/1/06 6-3295 STYLECRAFT BUILDERS 17 41 922 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1521 1116 New Residential (SF) $73,656
11/1/06 6-3343 STYLECRAFT BUILDERS 16 41 924 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1527 1073 New Residential (SF) $70,818
11/3/06 6-3313 ED FROEHLING BUILDERS 6 44 1211 HARRISONBURG LN 2668 2131 New Residential (SF) $140,646
BRANDON BERRY CON-
11/3/06 6-3351 STRUCTION 29 10 925 CRYSTAL DOVE AVE DOVE CROSSING 2148 1632 New Residential (SF) $107,712
11/6/06 6-3324 MARIOTT HOMES 52 94 5305 CASCADES CT PEBBLE CREEK 4753 3435 New Residential (SF) $312,595
11/6/06 6-3326 MARIOTT HOMES 43 94 5300 CASCADES CT PEBBLE CREEK 4677 3997 New Residential (SF) $363,727
11/6/06 6-3328 MARIOTT HOMES 44 94 5302 CASCADES CT PEBBLE CREEK 4230 3175 New Residential (SF) $288,925
11/6/06 6-3330 MARIOTT HOMES 45 94 5304 CASCADES CT PEBBLE CREEK 4467 3298 New Residential (SF) $300,118
11/7/06 6-3288 STYLECRAFT BUILDERS 42 40 3903 CROWN RIDGE CT 1733 1265 New Residential (SF) $83,490
11/7/06 6-3201 H & E CONTRACTING 15 10 930 CRYSTAL DOVE AVE DOVE CROSSING 2246 1707 New Residential (SF) $112,662
11/7/06 6-3203 H & E CONTRACTING 16 10 932 CRYSTAL DOVE AVE DOVE CROSSING 2234 1698 New Residential (SF) $112,068
3723 DOVE CROSSING
11/7/06 6-3204 H & E CONTRACTING 5 20 LN DOVE CROSSING PH 2 2234 1698 New Residential (SF) $112,068
11/8/06 6-3102 STYLECRAFT BUILDERS 1 1 4094 SH 6 S SPRINGBROOK 1937 1697 New Residential (SF) $112,002
11/8/06 6-3104 STYLECRAFT BUILDERS 1 1 4092 SH 6 S SPRINGBROOK 2317 1818 New Residential (SF) $119,988
11/8/06 6-3391 STYLECRAFT BUILDERS 45 40 3909 CROWN RIDGE CT 1884 1390 New Residential (SF) $91,740
4413 ROCKY MEADOWS
11/13/06 6-3409 2-D HOMES 36 10 DR WOODLAND HILLS PH 1 2790 2143 New Residential (SF) $154,460
4415 ROCKY MEADOWS
11/13/06 6-3411 2-D HOMES 37 10 DR WOODLAND HILLS PH 1 2681 2139 New Residential (SF) $154,428
11/14/06 6-3240 AMBERLY HOMES LLC 43 50 4412 HEARST CT CASTLEGATE PH 5 SEC 2 3919 3050 New Residential (SF) $265,000
11/15/06 6-3405 RIVER HILL HOMES, INC 17 20 412 COLD SPRING DR SPRING MEADOWS PH 2 3761 2713 New Residential (SF) $179,058
11/15/06 6-3417 ED FROEHLING BUILDERS 9 94 1506 HUNTER CREEK DR SHENANDOAH PH 19 2841 2249 New Residential (SF) $148,434
11/15/06 6-3439 HUSFELD HOMES 1 94 5201 CASCADES DR PEBBLE CREEK 4653 3228 New Residential (SF) $300,000
11/15/06 6-3423 B A CATHEY 1 81 3900 DEVRNE DR 2917 1955 New Residential (SF) $129,030
FEDORA DEVELOPMENT
11/16/06 6-3352 SERVICES 2008 MOSES CREEK CT WILLIAMS CREEK PH 1 4521 3337 New Residential (SF) $220,242
OAKWOOD CUSTOM
11/16/06 6-3441 HOMES 2 20 2703 HORSE HAVEN LN HORSE HAVEN PH 2 1863 1282 New Residential (SF) $95,000
OAKWOOD CUSTOM
11/16/06 6-3443 HOMES 3 20 2705 HORSE HAVEN LN HORSE HAVEN PH 2 1798 1322 New Residential (SF) $121,000
OAKWOOD CUSTOM
11/16/06 6-3445 HOMES 1 20 2701 HORSE HAVEN LN HORSE HAVEN PH 2 2341 1684 New Residential (SF) $120,000
OAKWOOD CUSTOM
11/16/06 6-3460 HOMES 4 20 2707 HORSE HAVEN LN HORSE HAVEN PH 2 2785 2217 New Residential (SF) $146,322
11/21/06 6-3366 ORION CONSTRUCTION 15 0 815 CHURCHILL ST LLOYD SMITH 1338 1168 New Residential (SF) $77,088
BANDERA CUSTOM
11/22/06 6-3502 HOMES 2 60 4417 AMBERLEY PL CASTLEGATE PH 6 4061 2800 New Residential (SF) $184,800
11/27/06 6-3447 K M CUSTOM HOMES 17 20 932 TURTLE DOVE TRL DOVE CROSSING PH 2 2388 1687 New Residential (SF) $170,000
3717 DOVE CROSSING
11/27/06 6-3449 K M CUSTOM HOMES 2 20 LN DOVE CROSSING PH 2 2337 1690 New Residential (SF) $170,000
11/27/06 6-3486 STYLECRAFT BUILDERS 1 40 3901 BRIDGEBERRY CT WESTFIELD VILLAGE PH 4 1588 1149 New Residential (SF) $75,834
DAVID PRICE HOME-
11/28/06 6-3532 BUILDERS INC 49 94 5311 CASCADES CT PEBBLE CREEK 3741 2833 New Residential (SF) $270,000
11/28/06 6-3509 ED FROEHLING BUILDERS 10 94 1501 BLUEFIELD CT SHENANDOAH PH 19 2671 2181 New Residential (SF) $143,946
DAVID PRICE HOME-
11/28/06 6-3550 BUILDERS INC 49 94 5311 CASCADES CT PEBBLE CREEK 3741 2833 New Residential (SF) $270,000
WATERWOOD TOWN-
11/27/06 6-3513 HOMES, LP 1 0 1001 KRENEK TAP RD E & M JONES FARM PLACE 11122 11122 New Residential (MF) $500,000
2225 ROCKINGHAM
11/8/06 6-3021 HOMEOWNER 10 30 LOOP CASTLEGATE SEC 3 PH 2 415 415 Residential Addition $8,000
COYOTE CONSTRUCTION
11/14/06 6-3218 CO 3 8 1005 WALTON DR COLLEGE HILLS 1587 784 Residential Addition $65,000
11/16/06 6-3462 PDALLAS CONSTRUCTION 0 8 1890 BARRON RD SOUTHERN TRACE Residential Addition $26,000
11/20/06 6-3482 HUSFELD HOMES 7 1 3305 MILDONHALL CT BRANDON HEIGHTS 152 152 Residential Addition $10,000
11/10/06 6-3407 ANCHOR PIERS, LLC. 49 65 1009 CARMEL PL SOUTHWOOD FOREST #1 0 Residential Remodel $11,350
ASPEN SQUARE MANAGE-
11/13/06 6-3298 MENT 0 30 401 HARVEY RD CULPEPPER PLAZA 420 420 Residential Remodel $1,000
WANN BROTHERS CON-
11/14/06 6-3393 STRUCTION, LP 14 16 502 GILCHRIST AVE COLLEGE HILLS 112 122 Residential Remodel $13,000
NOVA TECH FOUNDATION
11/17/06 6-3456 REPAIR 25 1 1403 LAWYER ST SOUTH KNOLL 0 Residential Remodel $11,650
K M HAMILTON CON-Residential Demoli-
11/8/06 6-3404 STRUCTION, LP 21 1 303 FIRST ST BOYETT tion $1,500
Residential Demoli-
11/21/06 6-3365 ORION CONSTRUCTION 15 0 815 CHURCHILL ST LLOYD SMITH tion $2,000
Page 7 Volume 7 Issue 11
B P D:
UILDINGERMITETAILS
C P:
OMMERCIALERMITS
Total Sq. Heat Sq.
Date PermitContractor LotBlkAddressSubdivision FeetFeetApplication Type Valuation
KEYS & WALSH CONSTRUC-
11/15/06 6-3319 TION, LLC 1 20 1602 ROCK PRAIRIE RD BELMONT PLACE #2 1066 1066 Commercial Addition $44,890
SPECIALTY RESTORATION
11/27/06 6-3512 OF TEXAS 3900 SH 6 S Commercial Addition $24,435
Commercial
KEYS & WALSH CONSTRUC-
Churches & Other
11/13/06 6-1906 TION, LLC 1 0 4200 ROCK PRAIRIE RD T CARRUTHERS (ICL) 11100 Religious $1,200,000
Commercial Of-
WESTERHEIM CUSTOM fices/Banks/Professi
11/1/06 6-2878 HOMES 8 0 240 SOUTHWEST PKWY E ASHFORD SQUARE 1296 1334 on $144,000
Commercial Of-
CANTERA DESIGN BUILDERS 400 HARVEY MITCHELL fices/Banks/Professi
11/15/06 6-2537 LLC 0 1 PKWY S J E SCOTT (ICL) 56000 on $2,160,000
Commercial Re-
11/3/06 6-3364 K J G CONTRACTORS 4 10 311 COLLEGE AVE J E SCOTT (ICL) 1925 1925 model $37,000
Commercial Re-
11/6/06 6-2846 TEXAS CIMARRON, INC 1 60 801 UNIVERSITY DR J E SCOTT (ICL) 1314 1314 model $250,000
THE BUSINESS CENTER Commercial Re-
11/6/06 6-3310 G W WILLIAMS 1 10 201 QUALITY CIR AT COLLEGE 625 625 model $40,035
Commercial Re-
11/10/06 6-3386 SOUTHERN STYLE BUILDERS 5 0 1731 TEXAS AVE S CULPEPPER PLAZA 5318 5318 model $27,000
SOUTHWOOD VALLEY PHS Commercial Re-
11/13/06 6-3181 J H W CONTRACTORS 5 18 3600 SH 6 S 1 model $0
Commercial Re-
11/14/06 6-3209 T R S CONSTRUCTION, INC 6 0 1663 TEXAS AVE S CULPEPPER PLAZA 5405 5405 model $200,000
ALL PHASE CONTRACTING 2101 HARVEY MITCHELL Commercial Re-
11/17/06 6-3438 INC. 1 61 PKWY S SOUTHWOOD #26 model $10,000
U S DESIGN & CONSTRUC-Commercial Re-
11/17/06 6-3046 TION INC 2004 TEXAS AVE S 35293 35293 model $60,000
Commercial Re-
11/22/06 6-3378 K J G CONTRACTORS 4 10 311 COLLEGE AVE J E SCOTT (ICL) 1925 model $10,000
1725 HARVEY MITCHELL CRAWFORD BURNETT Slab Only Commer-
11/16/06 6-3231 DOVETAIL BUILDERS 0 10 PKWY S (ICL) 18360 cial $73,440
Commercial Demoli-
11/1/06 6-3349 SOUTHERN STYLE BUILDERS 5 0 1731 TEXAS AVE S CULPEPPER PLAZA 5319 tion $12,000
Commercial Demoli-
11/22/06 6-3514 T R S CONSTRUCTION, INC 6 0 1643 TEXAS AVE S CULPEPPER PLAZA 2000 tion $8,000
B P D:
UILDINGERMITETAILS
Miscellaneous Permits:
Total Sq. Heat Sq.
Date PermitContractor LotBlkAddressSubdivision FeetFeetApplication Type Valuation
CRENSHAW MOBILE HOME
11/1/06 6-3350 MOVING 8 3 400 ANGUS AVE COLLEGE PARK 690 Moving
11/1/06 6-3357 ON TOP ROOFING 13 20 2308 FERGUSON FOXFIRE #2 Reroof $3,000
11/1/06 6-3358 ON TOP ROOFING 51 30 1100 PAINTBRUSH CIR SOUTHWOOD TERRACE #3 Reroof $2,000
UNITED HOME IMPROVE-
11/3/06 6-3376 MENT (ROOF) 25 0 804 WELSH AVE BREEZY HEIGHTS Reroof $1,960
11/6/06 6-3380 ON TOP ROOFING 14 0 1403 SUNNY CT SKRIVANEK Reroof $2,000
CRAWFORD BURNETT
11/16/06 6-3470 LOPEZ ROOFING 1 17 430 SOUTHWEST PKWY (ICL) Reroof $2,900
CRAWFORD BURNETT
11/16/06 6-3471 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $7,800
CRAWFORD BURNETT
11/16/06 6-3472 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $10,700
CRAWFORD BURNETT
11/16/06 6-3473 LOPEZ ROOFING 1 17 430 SOUTHWEST PKWY (ICL) Reroof $3,500
CRAWFORD BURNETT
11/16/06 6-3474 LOPEZ ROOFING 1 17 430 SOUTHWEST PKWY (ICL) Reroof $4,500
CRAWFORD BURNETT
11/16/06 6-3475 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $8,200
CRAWFORD BURNETT
11/16/06 6-3476 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $7,200
CRAWFORD BURNETT
11/16/06 6-3478 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $5,000
CRAWFORD BURNETT
11/16/06 6-3479 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $8,700
CRAWFORD BURNETT
11/16/06 6-3480 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $8,000
Volume 7 Issue 11
Page 8
B P D:
UILDINGERMITETAILS
M.
ISCELLANEOUSPERMITSCONT
Total Heat
Sq.Sq.
Date PermitContractor LotBlkAddressSubdivision FeetFeetApplication Type Valuation
CRAWFORD BURNETT
11/16/06 6-3481 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $2,900
CRAWFORD BURNETT
11/17/06 6-3498 LOPEZ ROOFING 1 17 430 SOUTHWEST PKWY (ICL) Reroof $7,850
CRAWFORD BURNETT
11/17/06 6-3499 LOPEZ ROOFING 1 17 430 SOUTHWEST PKWY (ICL) Reroof $7,850
11/27/06 6-3529 FINAL TOUCH ROOFING 25 1 1403 LAWYER ST SOUTH KNOLL Reroof $4,500
CRAWFORD BURNETT
11/29/06 6-3570 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $3,950
CRAWFORD BURNETT
11/29/06 6-3571 LOPEZ ROOFING 0 17 502 SOUTHWEST PKWY (ICL) Reroof $5,950
11/1/06 6-3346 SUNSHINE FUN INC. 31 10 4519 LAPIS CT STONE FOREST PH 1 45 Swimming Pool $25,000
11/8/06 6-3089 CLEAR WATER POOL CO. 47 40 4829 WILLIAMS CREEK DR WILLIAMS CREEK PH 4 400 Swimming Pool $22,000
11/13/06 6-3425 AGGIELAND POOLS 1 4 200 LEE AVE OAKWOOD Swimming Pool $32,000
11/20/06 6-3508 MOBLEY POOL CO 8 0 2021 OAKWOOD TRL SANDSTONE Swimming Pool $42,400
4921 WHISTLING STRAITS
11/20/06 6-3507 MOBLEY POOL CO 11 6 LOOP PEBBLE CREEK Swimming Pool $40,000
11/17/06 6-3374 TEXAS SHADE SYSTEMS INC. 1 0 106 HOLIK ST COLLEGE STATION ISD 578 Tent $14,039
SOUTHWOOD VALLEY PHS
11/13/06 6-3434 HOMEOWNER 10 62 3005 BOLERO ST 24C 192 Accessory/Storage $4,000
11/10/06 6-3418 SIGNS AND PRINTING 3 0 700 UNIVERSITY DR E UNIVERSITY PARK EAST 32 Banner
11/10/06 6-3421 HEB CONSTRUCTION 1 40 1900 TEXAS AVE S ANDERSON RIDGE PH 4 35 Banner
11/16/06 6-3420 J H W CONTRACTORS 3 0 700 UNIVERSITY DR E UNIVERSITY PARK EAST 36 Banner
11/22/06 6-3519 MC CO-AD SIGNS 2004 TEXAS AVE S 36 Banner
11/30/06 6-3568 JAMES D. RENDON 2501 TEXAS AVE S 40 Banner
P M
ERFORMANCEEASURES
45% of commercial plans that were complete when submitted were reviewed accurately within 5 working days by building
staff in compliance with College Station Codes and Ordinances or have received appropriate variances.
93% of single-family plans that were complete when submitted were reviewed accurately within 1 working day.
100% of building inspections accurately performed within 24 hours.
8 commercial plans submitted, 0 sets of duplex plans submitted, 16 sets of multi-family plans submitted.
10 inspections per day per inspector, in addition to utility walk-through connections and miscellaneous requests.
40 inspections (approx.) per day for this month.
Page 9
Volume 7 Issue 11
B P T:
UILDINGERMITOTALS
C C
OMPARISONHARTS
T P
OTALERMITS
Reviewed Site Plans
3 Y—C B M
EAROMPARISONYONTH
Fire Station #3, 1900 Barron Rd.
(06-500233)
200420052006
Kohl’s/Culpepper Box Culvert, 1701
Texas Ave. (06-500244)
460
440
Gamma Phi Beta Sorority Remodel, 1400
420
400
Athens Dr. (06-500248)
380
360
340
Crescent Pointe Park, 2301 Crescent
320
300
Pointe Pkwy. (06-500253)
280
260
240
Culpepper Plaza Redevelopment, 1701
220
200
180
Texas Ave. (06-500255)
160
140
Gander Mountain, 2301 Earl Rudder Fwy.
120
100
80
South (06-500258)
60
40
20
Gateway Express Car Wash Addition,
0
Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec.
720 Earl Rudder Fwy. South (06-500259)
S F P
INGLEAMILYERMITS
3 Y—C B M
EAROMPARISONYONTH
( O-)
INCLUDESNLYNEWSINGLEFAMILYHOMES
200420052006
110
100
90
80
70
60
50
40
30
20
10
0
Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec.
C P
OMMERCIALERMITS
3 Y—C B M
EAROMPARISONYONTH
( & )
INCLUDESNEWCOMMERCIALCOMMERCIALREMODELS
200420052006
35
30
25
20
15
10
5
0
Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec.
Planning & Development Services
Page 10
B I
UILDINGNSPECTIONS
:
TOTAL
MONTH BUILDING PLUMBING ELECTRICMECHANICAL LAWN SIGNPOOLDEMO MOVING
JAN.415213188107041300940
FEB.3642161611143621000903
MAR.4493142291680715001182
APR.485345259147272518001306
MAY53631029321420527001405
JUN.51331629021925514001382
JUL.39529428718833018001277
AUG.413313270204441518101278
SEPT.2892392341592322000966
OCT.294210199165411200885
NOV.2362021671082810741763
DEC.
YEARLY
4389 2972 2577 1793 240761725012224
TOTAL
R S
EZONINGCOOP
P: The November population estimate is 84,028.
OPULATION
Page 11
Volume 7 Issue 11
ݱ³°®»¸»²·ª» д¿² Ë°¼¿¬»
College Station Comprehensive Plan Update
The City of College Station is in the first phase of updating its Comprehensive Plan. The purpose of this update is to create a more worka-
ble plan that can help guide decisions about the future growth and development of our community.
Public participation is a vital part of creating a successful plan and we want to hear from you! Here are some of the ways that we have
engaged the public to date:
A Comprehensive Plan Advisory Committee (CPAC) was created to provide valuable information and feedback to the
consulting team and City staff. This Committee includes 40 residents from throughout the community.
and 27th to gather valuable input on issues such as
The City hosted thirteen Focus Group meetings on October 26
th
transportation, economic development, historic preservation, land use, community character, growth management and
growth capacity. Over 150 citizens attended the Focus Group meetings.
The City also hosted a Citizens Congress, a community-wide planning meeting, to gather further input from residents on
the future of College Station. Approximately 400 residents attended the Citizens Congress.
College Station residents will receive a community survey in the mail with their utility bills during the month of January.
Please send us your comments!
Look for more opportunities for citizen participation in the coming months! Let us know how you want your community to grow!
For more information on the Comprehensive Plan Update, please visit our website at www.cstx.gov/CompPlanUpdate or contact Jennifer
. Thank you for your interest!
Prochazka at 979.764.3570 or by email at CompPlan@cstx.gov
College Station Comprehensive Plan - Your Community, Your Plan!