Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
June (2)
P & LANNING D S EVELOPMENTERVICES Building a Better Community with You Volume 7 Issue 6 Building Services - Planning - Development Engineering - Neighborhood Services June 2006 INSIDE THIS ISSUE: T RACKINGTHE Calendar of Meetings 2 N UMBERS Commercial Projects 3 Apt./Hotel Projects 3 Subdivision Projects 4 Total Permits: YTD - 1yr YTD - 2yr Permit Totals 5 44% 12% Residential Permit Details 6-7 Year-to-date, total permits experienced a Commercial Permit Details 7 decrease in quantity when compared to last year at this time, June 2005, and ÞÝÍ ß·¿² Ú±±¼ ¿²¼ É» 벬 ׬ ´±½¿¬»¼ ¿¬ Miscellaneous Permit Details 8 experienced an increase when compared îéðì Ì»¨¿ ߪ»²«» ͱ«¬¸ò Inspection Totals 9 with two years ago, June 2004. (Approximately 50% of the total permits issued in Permit Comparison Charts 10 2005 were roofing permits. This is a result of a hail storm that took place early that year.) Points of Interest: Commercial: Pg 1 Single-Family Homes: (Does not include slab onlys) (Does not include slab onlys) Inspector’s Corner YTD – 1yr YTD – 2yr YTD – 1yr YTD – 2yr Pg 11 23% 7% 18% 29% Sign Ordinance Changes Year-to-date, single-family home permits Year-to-date, commercial permits experienced an in- Pg 11 increased in quantity when compared to last crease in quantity when compared to last year at this UDO Changes , year at this time, June 2005and increased time, June 2005, and increased compared with two years when compared with two years ago, June ago, June 2004. 2004. P ײ°»½¬±®i ݱ®²»® ERMITSBYTYPE ̸» Ý·¬§ ±º ݱ´´»¹» ͬ¿¬·±² Ý·¬§ ݱ«²½·´ ®»½»²¬´§ ¿°°®±ª»¼ ½¸¿²¹» ¬± ¬¸» ËÜÑ Year to Date ø˲·º·»¼ Ü»ª»´±°³»²¬ Ñ®¼·²¿²½»÷ ¬± ¾» »ºº»½¬·ª» í Ö«´§ îððêò Ѳ» ±º ¬¸» »½ó ¬·±² ¬¸¿¬ ½¸¿²¹»¼ ©¿ »½¬·±² éòíò Ю»ª·±«´§ ¬¸» »½¬·±² ¿´´±©»¼ º±® ®»·¼»²ó ÉÔÜÑÙËÔÇØÆÜÄÊÉÎÛØÛØÉÆØØÏ iiéÕ» »½¬·±² ²±© ¬¿¬» ¬¸¿¬ ®»·¼»²¬·¿´ ¼®·ª»©¿§ ³«¬ ¾» ¿ ³·²·³«³ ©·¼¬¸ Î× iÜÏÙÜÐÜÅÔÐÈÐÆÔÙÉÕÎ×i Ú±® ³±®» ·²º±®³¿¬·±² ±² ¼®·ª»©¿§ ©·¼¬¸ ±® ½¸¿²¹» ¬± ¬¸» ˲·º·»¼ Ü»ª»´±°ó ³»²¬ Ñ®¼·²¿²½» °´»¿» ½±²¬¿½¬ ¬¸» ݱ´´»¹» ͬ¿¬·±² Þ«·´¼·²¹ Ü»°¿®¬³»²¬ ¿¬ éêìóíëéðò ݸ®· Ø¿ª»®ô ÝÞÑ Þ«·´¼·²¹ Ѻº·½·¿´ 1101 Texas Avenue www.cstx.gov 979.764.3570 Page 2 Volume 7 Issue 6 JULY 2006 SCHEDULE OF EVENTS Í Ó Ì É Ì Ú Í ËÒÑÒËÛÛÜØËÎ×ßÌ éñê ú éñîð ï д¿²²·²¹ ú Ʊ²·²¹ ݱ³³··±² Ó»»¬·²¹ éæðð ÐÓ øÉÍ êæðð ÐÓ÷ î í ì ë ê é è Í«¾³·¬¬¿´ ÑÚÚ×ÝÛ Ð ú Æ éñíô éñïðô éñïéô ú éñîì Ü»¿¼´·²» ÝÔÑÍÛÜ éæðð ÐòÓò Ю±¶»½¬ «¾³·¬¬¿´ ¼»¿¼´·²» ç ïð ïï ïî ïí ïì ïë ïðæðð ßÓ Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ Ü»¿¼´·²» éæðð ÐòÓò ïïæðð ßòÓ éñïì ú éñîè ïê ïé ïè ïç îð îï îî Ü»·¹² λª·»© Þ±¿®¼ Ð ú Æ ú Ý·¬§ ݱ«²½·´ Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ïïæððßÓ éæðð ÐòÓò Ü»¿¼´·²» éæðð ÐòÓò éñïï îí îì îë îê îé îè îç Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ Æ±²·²¹ Þ±¿®¼ ±º ß¼¶«¬³»²¬ Ü»¿¼´·²» éæðð ÐòÓò ïïæðð ßòÓ êæððÐÓ íð íï éñïíô éñïçô éñîðô ú éñîé Ý·¬§ ݱ«²½·´ Ó»»¬·²¹ éæðð ÐÓ èñï ÆÞß Ó»»¬·²¹ AUGUST 2006 êæðð ÐÓ øÉÍ ëæððÐÓ÷ èñí ú èñïé д¿²²·²¹ ú Ʊ²·²¹ ݱ³³··±² Ó»»¬·²¹ Í Ó Ì É Ì Ú Í ËÒÑÒËÛÛÜØËÎ×ßÌ éæðð ÐÓ øÉÍ êæðð ÐÓ÷ ï î í ì ë ÆÞß ÐúÆ èñïï ú èñîë êæðð ÐòÓò éæðð ÐòÓò Ü»·¹² λª·»© Þ±¿®¼ ïïæððßÓ ê é è ç ïð ïï ïî Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ Ü»¿¼´·²» éæðð ÐòÓò ïïæðð ßòÓ èñïð ú èñîì Ý·¬§ ݱ«²½·´ Ó»»¬·²¹ ïí ïì ïë ïê ïé ïè ïç éæðð ÐÓ Í«¾³·¬¬¿´ ÐúÆ Ü»¿¼´·²» éæðð ÐòÓò îð îï îî îí îì îë îê Ú¿½·´·¬¿¬·±² Ó»»¬·²¹ Í«¾³·¬¬¿´ Ý·¬§ ݱ«²½·´ ÜÎÞ Ûª»®§ Ì«»¼¿§ Ü»¿¼´·²» éæðð ÐòÓò ïïæðð ßòÓ ïæíð ÐÓ îé îè îç íð íï Í«¾³·¬¬¿´ Ü»¿¼´·²» Page 3 Planning & Development Services W’ U HATSP C P: OMMERCIALROJECTS Raising Cane’s, 1045 Texas Ave., (DP-5-100056) (SP COCS Lions Park Basketball Court, 501 Chappel 05-500184) (BP 05-3884) St, (SP 06-500103) First American Plaza Tenant Space (shell only), 1 First American Laynes, 1301 Wellborn Rd., (DP 06-100025) (SP Blvd, (SP 03-247)(DP 03-77) (BP 04-969) 06-500099) KM Custom Homes, 240 Southwest Pkwy (SP 05-88) (DP 05-21) Benjamin Knox Arts Center, 405 University Wells Fargo Bank, 200 Southwest Pkwy (DP 05-100028) (SP 05- Drive, (DP 06-100034) (SP 06-500120) 500110) McDonalds, 801 University Drive, (SP 06-500117) College Station Prof. Bldg 2, 1604 Rock Prairie Rd., (DP 05-100029) Fish Daddy’s, 1611 University Drive, (SP 06-500133) (SP 05-500113) (BP 05-3245) Corner Bar, 401 University Drive, (SP 06-500139) BCS Heart, 1721 Birmingham, (DP 05-100031) (SP 05-500116) (BP 05-2549) C S: KM Custom Homes, 232 Southwest Pkwy, (DP 05-100043) (SP 05- OMMERCIALUBDIVISIONS 500147) ~Crescent Pointe Ph. 2, 3500 University Dr., (PP Allen Honda Shop & Parking Addition, 2450 Earl Rudder Fwy., (SP 06-500004) (FP 06-500105) (DP 06-100027) 05-143) (DP 06-100016) (BP 06-431) Cornerstone Commercial Sec 1, (3.595 acres/2 lots) (FP 03-173) Brazos County JP Pct #3, 1500 George Bush Dr., (SP 05-500144) (DP 06-100002) (BP 06-150) Fedora Subdivision, 2892 Graham Rd. N (PP 02-267) (FP 03- 131) Autozone, 2704 Texas Ave S., (SP 05-500178) (DP 05-100067) (BP 05-4047) F&B Road Addition (14.57 ac/3 lots/C-1) F&B Road (PP 05-31) COCS Veterans Park & Athletic Complex, 3101 Harvey Rd., (DP 05- Williamsburg (7 ac/mini storage units) 2320 Harvey Mitchell 100061) (SP 05-500203) (BP 05-4101, 05-4102, 05-4103, 05-4104) Pkwy S, (SP 02-227) Elms Orthodontics, 1501 Emerald Pkwy., (DP 05-100063) (SP 05- Valley Park Center, 400 Harvey Mitchell Pkwy., (PP 05-500129), 500208) (BP 06-654) (DP 05-100036) (DP 05-100055) (SP 05-500174) Popeye’s Restaurant, 1842 Graham Rd., (SP 05-500210) (DP 06- Spring Creek Commons, 4401 SH 6, (05-500161) 100004) (BP 05-4079) Crescent Pointe Ph. 1., 3300 University Dr., (FP 05-500130) Wal-Mart, 1825 Brothers Blvd., (DP 05-100064) (SP 05-500211) (BP Woodlands of College Station (Commercial & Residential), 100 05-4162) Southwest Pkwy., (FP 05-500242) (DP 06-100001) Brenham National Bank, 2470 Earl Rudder Fwy., (DP 05-100065) Emerald Park Plaza, 1501 Emerald Pkwy., (DP 06-100002) (SP 05-500212) (BP 05-4202) Ponderosa Place Sec. 2, 3850 SH 6, (FP 06-500022) Rosa’s Café, 710 University Drive E., (PP 05-500235) (FP 05- Aggieland Business Park, 5942 Raymond Stotzer Pkwy., (PP 06- 500236) (BP 06-220) 500048) Stop-N-Store (Expansion), 3910 Harvey Rd., (SP 05-500226) (DP North Forest Professional Park, 2801 Earl Rudder Fwy, (DP 06- 06-100033) 100017) (SP 06-500065) KM Custom Homes Office, 244 Southwest Pkwy., (SP 05-500239) Plazas at Rock Prairie, Rock Prairie Rd., ( DP 06-100019) (SP Paradowski, 1580 Copperfield Pkwy., (DP 05-100068) (SP 05- 06-500080) (PP 06-500074) 500227) Gateway Ph 2A, 1501 University Dr E., (DP 06-100026) Champion Creek Development, 2200 Raintree Dr., (SP 06-500016) (SP 06-500101) (DP 06-100006) Greens Prairie Center, SH 40, (PP 06-500094) Rock Prairie Baptist Church, 2405 Rock Prairie Rd., (SP 06-500046) (DP 06-100010) Super B (Crossroads), Phase 2, 2000 FM 158, (DP 06- 100037), (SP 06-500136) (PP 06-500134) Ashley Home Front, 1201 Earl Rudder Fwy., (DP 06-100011) (SP 06- 500044) North Forest, 2801 Earl Rudder Freeway, (FP 06- 500115) Riviera Day Spa, 2821 Rock Prairie Rd., (DP 06-100012) (SP 06- 500030) A & H P: Boston Pizza, 820 University Dr. E., (DP 06-100016) (06-500060) PARTMENTOTELROJECTS Rock Prairie Baptist Church, 4200 Rock Prairie Rd., (PP 06-500015) Callaway House, 305 Marion Pugh Dr (DP 05-17) (BP 05-3014) Christ United Methodist Church, 4203 SH 6, (DP 06-100022) (SP 06- Woodlands of College Station, 100 Southwest Pkwy., (Residential & 500088) Commercial) (DP 05-100045) (PP 05-500151) (DP 05-100051) (DP COCS Fire Station No 3, 1900 Barron Rd., (DP 06-100030) (SP 06- 05-10050) (FP 05-500242) (BP 05-4152) 500109) () Certificate of Occupancy () Current () New Development (~) Filed Page 4 Volume 7 Issue 6 W’ U HATSP Autumn Chase Fourplexes, Autumn Chase Loop, (DP 06-100018, 06- North Forest Estates, 2075 North Forest Pkwy., (PP 06- 100021) 500079) Spring Creek Townhomes Ph 4, Arrington Rd., (DP Williams Creek Ph 5, 6 & 7, 9500 Rock Prairie Rd., (PP 06- 500089) 06-100028) (FP 06-500107) Edelweiss Gartens Ph 4A, 3850 Victoria Ave, (FP R P: ESIDENTIALROJECTS 06-500112) Carter’s Crossing, Phase 1, 2050 North Forest Horse Haven Estates Ph 2, 2600 Horse Haven Ln (13.88 ac/58 lots) Parkway, (DP 06-100036) (FP 06-500128) (PP 04-193) (FP 04-270) (DP 04-66) Carter’s Crossing, Phase 2, 2050 North Forest Horse Haven Estates Ph 3, 2710 Horse Haven Ln (1205 ac/53 lots) Parkway, (DP 06-100035) (FP 06-500127) (DP 04-70) (FP 04-283) Lakeside Village, SH 6, (PP 06-500131) Callaway Ph 2 (13.5 ac) 201 Marion Pugh Dr (PP 04-29) (FP 04-30) Kenneth W Schick, 100 Southwest Pkwy (9.6 ac/6 lots) (DP 04-1)(FP S ETJ: UBDIVISIONIN 04-8) Gardens @ University, 900 University Dr E (SP 03-148) Indian Lakes Ph. 9, (14.65 ac) Arrington Rd (PP 05-83) (PP 05- 500216) (FP 05-500232) Stonebrook Sub, (11 ac/93 lots/R-4) 2800 Old Rock Prairie Rd (PP 04-160) Indian Lakes Ph. 8, Arrington Rd (PP 05-500219) (FP 06- 500047) Williamsgate Ph 1 (8.45 ac/33 lots/R-1) (FP 05-13) (DP 05-4) Las Palomas (8.77 ac), Cain Rd., (FP 06-500037) (DP 06- Williamsgate Ph 2 (7.83 ac/31 lots/R-1) (FP 05-14) 100024) Williamsgate Ph 3 (3.88 ac/18 lots/R-1) (FP 05-15) Indian Lakes Ph. 10 (79.71 ac), Arrington Rd., (PP 05-500035) Richards Addition (.85 ac/3 lots) (FP 05-21) Duck Haven Ph 3, 4, 5, & 8 (PP 06-500091) Pebble Creek Ph 9D Royal Adelade Dr (FP 05-20) (DP 05-05) Indian Lakes Ph 4 (Amending Plat), Arrington Rd., Gardens of Castlegate (9.23ac/ 30 Lots/PDD-H) (DP 02-16) (FP 02- (FP 06-500102) 75) Tuscany Trace, FM 2154, (FP 06-500123) Castlegate Sec 7 2270 Greens Prairie Rd W (24 Lots/31 ac) (PP 06- 500106) Richards Sub. Ph 2, 107 Sterling St., (FP 05-500111) A: BBREVIATIONS Liberty Subdivision, 2500 Earl Rudder Fwy., (FP 05-500112) (DP 05- SP - Site Plan 100038) MP - Master Plan Dove Crossing PH 1C, Graham RD, (DP 05-100039) (FP 05- 500138) DP - Development Permit Lakeview Acres, 120 Morgans Ln., (FP 05-500171) PP - Preliminary Plat Castlerock, SH 40, (PP 05-500218) CUP - Conditional Use Permit Edelwiess Gartens Ph. 7, Brandenburg Ln., (FP 06-500032) (DP 06- 100009) FP - Final Plat Edelweiss Gartens Ph 12, Brandenburg Ln., (DP 06-100023) (FP 06- SDSP - Special District Site Plan 500092) BP - Building Permit R S EZONINGCOOP Planning & Development Services Page 5 B P T: UILDINGERMITOTALS Month of June 2006 Month of June 2005 Total Sq. Type of PermitPermitUnitHeat Sq. Ft.Amount PermitUnitAmount Ft. Single Family Home5959147,881113,146$8,173,117 7474$9,049,422 Duplex 4815,16212,198$896,34000$0 Tri-plex/Four-plex 0000$000$0 Apartment0000$0 00$0 Residential Remodel11N/AN/AN/A$297,21021N/A$392,502 M Residential Demolition2N/AN/AN/A$4,50000$0 ONTHLY Residential Slab Only-SF1N/AN/AN/A$10,4940N/A$0 Residential Slab Only-DP0N/AN/AN/A$00N/A$0 P ERMIT Residential Slab Only-3&40N/AN/AN/A$00N/A$0 Residential Slab Only-Apt.3N/AN/AN/A$146,2090N/A$0 T Hotel/Motel/Inn00N/AN/A$000$0 OTALS New Commercial3N/A12,19912,199$310,000 5N/A$3,205,200 Commercial Remodel9N/AN/AN/A$1,733,000 11N/A$1,484,095 Commercial Demolition2N/AN/AN/A$9,0004N/A$97,700 Commercial Slab Only0N/AN/AN/A$0 0N/A$0 Swimming Pool9N/AN/AN/A$283,900 2N/A$66,500 Sign13N/AN/AN/A$100,348 20N/A$56,048 Moving & Location3N/AN/AN/A$6,500 4N/A$10,100 Storage/Accessory4N/AN/AN/A$55,405 6N/A$26,950 Roofing7N/AN/AN/A$55,431 292N/A$1,422,182 TOTALS13067175,242137,543$12,081,454 43974$15,810,699 Jan. 1, 2006 - June 30, 2006 Jan. 1, 2005 - June 30, 2005 Total Sq. Type of PermitPermitUnitHeat Sq. Ft.AmountPermitUnitAmount Ft. Single Family Home4124121,038,924817,238$59,073,950 351351$50,071,848 Duplex 163248,47244,889$2,889,242 2040$4,053,324 Tri-plex/Four-plex 31114,81914,750$793,780 28111$4,563,300 Apartment31829,43028,798$1,205,065 742$2,628,585 Residential Remodel65N/AN/AN/A$1,612,749 62N/A$1,259,135 Residential Demolition15N/AN/AN/A$72,00022$5,750 Residential Slab Only-SF6N/AN/AN/A$75,312 15N/A$224,220 Residential Slab Only-DP0N/AN/AN/A$0 0N/A$0 P ERMIT Residential Slab Only-3&40N/AN/AN/A$0 0N/A$0 Residential Slab Only-Apt.3N/AN/AN/A$146,209 0N/A$0 T OTALS Hotel/Motel/Inn00N/AN/A$000$0 New Commercial58N/A295,888244,720$25,239,89036N/A$8,772,645 Commercial Remodel55N/AN/AN/A$3,856,48357N/A$5,020,843 YTD Commercial Demolition9N/AN/AN/A$90,520 15N/A$323,151 Commercial Slab Only2N/AN/AN/A$357,0002N/A$195,000 Swimming Pool45N/AN/AN/A$1,511,35032N/A$977,377 Sign92N/AN/AN/A$389,57381N/A$276,163 Moving & Location6N/AN/AN/A$26,0009N/A$25,000 Storage/Accessory26N/AN/AN/A$463,17330N/A$381,780 Roofing63N/AN/AN/A$874,615925N/A$4,035,153 TOTALS8794731,427,5331,150,395$98,676,9111672546$82,813,274 P: The June population estimate is 82,750. OPULATION Page 6 B P D: UILDINGERMITETAILS R P ESIDENTIALERMITS Total Sq. Date PermitContractor LotBlkAddressSubdivision Application Type Description Valuation Feet 6/1/2006 6-788 OAKWOOD CUSTOM HOMES 06 01 4426 SPRING BRANCH DR SPRING MEADOWS PH 2 2518 RESIDENTIAL, SF $140,000 6/1/2006 6-1115 OAKWOOD CUSTOM HOMES 07 01 4424 SPRING BRANCH DR SPRING MEADOWS PH 2 2781 RESIDENTIAL, SF $146,520 6/1/2006 6-1628 GOLDEN HOMES 11 02 4426 SPRING MEADOWS DR SPRING MEADOWS PH 2 3780 RESIDENTIAL, SF $178,332 6/1/2006 6-1630 GOLDEN HOMES 13 02 4430 SPRING MEADOWS DR SPRING MEADOWS PH 2 3417 RESIDENTIAL, SF $170,610 6/1/2006 6-1626 GOLDEN HOMES 14 02 4432 SPRING MEADOWS DR SPRING MEADOWS PH 2 3397 RESIDENTIAL, SF $167,310 6/1/2006 6-784 OAKWOOD CUSTOM HOMES 37 02 3716 BRIDLE CT BRIDLE GATE ESTATES PH 2 3141 RESIDENTIAL, SF $165,000 6/1/2006 6-1690 STYLECRAFT BUILDERS 13 08 927 CRESTED POINT DR WESTFIELD VILLAGE PH 4 2257 RESIDENTIAL, SF $110,154 6/1/2006 6-1688 STYLECRAFT BUILDERS 15 08 931 CRESTED POINT DR WESTFIELD VILLAGE PH 4 2175 RESIDENTIAL, SF $109,230 6/1/2006 6-1707 H & E CONTRACTING 45 03 4416 HEARST CT CASTLEGATE PH 5 SEC 2 3335 RESIDENTIAL, SF $176,220 6/1/2006 6-1676 ED FROEHLING BUILDERS 12 47 1502 BLUEFIELD CT SHENANDOAH PH 19 2594 RESIDENTIAL, SF $138,930 6/2/2006 6-1679 JOE COURTNEY 08 20 134 STERLING ST RICHARDS 1580 RESIDENTIAL, SF $81,378 6/5/2006 6-1699 CLASSIC CENTURY HOMES 00 03 2452 NEWARK CIR CASTLEGATE PH 5 SEC 2 2827 RESIDENTIAL, SF $154,572 6/6/2006 6-1738 ARDEN'S HOME CONST. 04 14 3907 FAIMES CT EDELWEISS GARTENS PH 6 2486 RESIDENTIAL, SF $140,000 BENCHMARK HOMES/DBA 6/7/2006 6-1669 12 14 3902 FAIMES CT EDELWEISS GARTENS PH 6 2140 RESIDENTIAL, SF $105,666 G.D.T.INC BENCHMARK HOMES/DBA 6/7/2006 6-1671 11 14 3904 FAIMES CT EDELWEISS GARTENS PH 6 2140 RESIDENTIAL, SF $105,666 G.D.T.INC 6/7/2006 6-1746 HERMAN E COUCH - BUILDER 18 27 134 WALCOURT LOOP EDELWEISS GARTENS PH 9 2401 RESIDENTIAL, SF $119,922 6/8/2006 6-1767 CROWLEY CONSTRUCTION 39 03 2480 NEWARK CIR CASTLEGATE PH 5 SEC 2 3248 RESIDENTIAL, SF $151,866 6/9/2006 6-1663 DOUBLE D HOMES 13 03 8425 LAUREN DRNORTH FOREST 2410 RESIDENTIAL, SF $125,000 6/13/2006 6-1810 STYLECRAFT BUILDERS 44 08 3907 CROWN RIDGE CT WESTFIELD VILLAGE PH 4 1733 RESIDENTIAL, SF $83,490 6/13/2006 6-1797 STYLECRAFT BUILDERS 03 08 905 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1627 RESIDENTIAL, SF $78,210 6/13/2006 6-1807 STYLECRAFT BUILDERS 06 10 1008 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1609 RESIDENTIAL, SF $77,616 6/13/2006 6-1795 STYLECRAFT BUILDERS 05 10 1010 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1733 RESIDENTIAL, SF $83,490 6/13/2006 6-1719 DONOVAN HOMES 29 02 1715 TWIN POND CIR COVE OF NANTUCKET PH 1 2316 RESIDENTIAL, SF $110,154 6/13/2006 6-1827 GREEN VALLEY HOMES INC 04 47 5207 CASCADES DR PEBBLE CREEK 4878 RESIDENTIAL, SF $217,140 BLACKHAWK CUSTOM 6/14/2006 6-1756 24 02 2403 NEWARK CIR CASTLEGATE SEC 5 PH 1 2782 RESIDENTIAL, SF $138,800 HOMES 6/14/2006 6-1703 K M CUSTOM HOMES 23 04 937 CRYSTAL DOVE AVE DOVE CROSSING 2337 RESIDENTIAL, SF $150,000 6/15/2006 6-1769 MARIOTT HOMES INC 05 49 5208 CASCADES DR PEBBLE CREEK 3700 RESIDENTIAL, SF $253,176 NEW VISION CUSTOM 6/20/2006 6-1654 14 01 4302 WHITWICK PL CASTLEGATE SEC 3 PH 2 4835 RESIDENTIAL, SF $395,000 HOMES, INC 6/20/2006 6-1851 STYLECRAFT BUILDERS 17 08 935 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1860 RESIDENTIAL, SF $89,958 6/20/2006 6-1917 D R HORTON HOMES 01 05 3701 DOVE CROSSING LN DOVE CROSSING 2454 RESIDENTIAL, SF $132,066 6/21/2006 6-1939 ED FROEHLING BUILDERS 14 01 907 DELREY DR REATTA MEADOWS SEC 1 PH 1 2695 RESIDENTIAL, SF $133,254 6/21/2006 6-1829 ED FROEHLING BUILDERS 03 05 915 SCOFFIELD DR REATTA MEADOWS SEC 1 PH 1 2395 RESIDENTIAL, SF $124,278 BLACKHAWK CUSTOM 6/21/2006 6-1944 18 03 2412 NEWARK CIR CASTLEGATE SEC 5 PH 1 2966 RESIDENTIAL, SF $154,400 HOMES INC 6/22/2006 6-1954 ED FROEHLING BUILDERS 13 01 909 DELREY DR REATTA MEADOWS SEC 1 PH 1 2057 RESIDENTIAL, SF $106,128 6/22/2006 6-1930 H & E CONTRACTING 04 06 3721 DOVE CROSSING LN DOVE CROSSING PH 2 2149 RESIDENTIAL, SF $106,260 6/22/2006 6-1932 H & E CONTRACTING 06 06 3725 DOVE CROSSING LN DOVE CROSSING PH 2 2246 RESIDENTIAL, SF $112,662 6/23/2006 6-1973 STYLECRAFT BUILDERS 19 11 902 CRESTED POINT DR WESTFIELD VILLAGE PH 4 2087 RESIDENTIAL, SF $99,726 WESTERHEIM CUSTOM 6/26/2006 6-1863 57 25 720 PLUM HOLLOW DR PEBBLE CREEK 3882 RESIDENTIAL, SF $191,400 HOMES 6/26/2006 6-1977 STYLECRAFT BUILDERS 31 08 900 EAGLE AVE WESTFIELD VILLAGE PH 4 1924 RESIDENTIAL, SF $107,118 ILLAGE PH 4 1924 RESIDENTIAL, SF $107,118 6/26/2006 6-1975 STYLECRAFT BUILDERS 32 08 902 EAGLE AVE WESTFIELD V 6/26/2006 6-1826 NEW AMERICAN DREAM 15 01 121 SOUTHLAND ST SOUTHLAND 1786 RESIDENTIAL, SF $91,000 6/27/2006 6-1641 CORNERSTONE HOMES 09 11 2218 BROUGHAM PL CASTLEGATE SEC 10,11,12,13 2305 RESIDENTIAL, SF $129,150 6/27/2006 6-1695 CORNERSTONE HOMES 06 22 2216 CARLISLE CT CASTLEGATE SEC 10,11,12,13 2227 RESIDENTIAL, SF $118,875 6/27/2006 6-1693 CORNERSTONE HOMES 34 21 2214 CARLISLE CT CASTLEGATE SEC 10,11,12,13 2258 RESIDENTIAL, SF $122,305 6/27/2006 6-1969 ED FROEHLING BUILDERS 01 05 911 SCOFFIELD DR REATTA MEADOWS SEC 1 PH 1 2057 RESIDENTIAL, SF $106,128 6/27/2006 6-1972 ED FROEHLING BUILDERS 04 01 903 SCOFFIELD DR REATTA MEADOWS SEC 1 PH 1 2291 RESIDENTIAL, SF $110,880 6/27/2006 6-1987 STYLECRAFT BUILDERS 30 08 3903 VICTORIA AVE WESTFIELD VILLAGE PH 4 1729 RESIDENTIAL, SF $88,440 6/27/2006 6-1979 STYLECRAFT BUILDERS 09 08 919 CRESTED POINT DR WESTFIELD VILLAGE PH 4 1688 RESIDENTIAL, SF $81,312 6/28/2006 6-2047 D P L CONTRACTORS 16 01 4303 VELENCIA CT CASTLEGATE SEC 8 0 RESIDENTIAL, SF $0 6/28/2006 6-1837 RIKE HOMES 58 02 1752 TWIN POND CIR COVE OF NANTUCKET PH 1 2182 RESIDENTIAL, SF $231,400 4736 JOHNSON CREEK 6/28/2006 6-1925 WACD3, LLC 15 03 WILLIAMS CREEK PHASE 3 4758 RESIDENTIAL, SF $281,364 LOOP 4718 JOHNSON CREEK 6/28/2006 6-1923 WACD3, LLC 09 03 WILLIAMS CREEK PHASE 3 2934 RESIDENTIAL, SF $264,443 LOOP 6/29/2006 6-1995 OAKWOOD CUSTOM HOMES 05 01 4428 SPRING BRANCH DR SPRING MEADOWS PH 2 2780 RESIDENTIAL, SF $185,000 6/29/2006 6-1997 OAKWOOD CUSTOM HOMES 23 02 3711 BRIDLE CT BRIDLE GATE ESTATES PH 2 2785 RESIDENTIAL, SF $185,000 Page 7 Volume 7 Issue 6 B P D: UILDINGERMITETAILS R P C…. ESIDENTIALERMITSONT Total Sq. Date PermitContractor LotBlkAddressSubdivision Application Type Description Valuation Feet 905 CRYSTAL DOVE 6/30/2006 6-1879 K M CUSTOM HOMES 39 04 DOVE CROSSING 2400 RESIDENTIAL, SF $155,000 AVE 6/30/2006 6-2066 CHARLES THOMAS HOMES, INC. 01 27 100 WALCOURT LOOP EDELWEISS GARTENS PH 9 2065 RESIDENTIAL, SF $105,000 6/30/2006 6-2064 CHARLES THOMAS HOMES, INC. 02 27 102 WALCOURT LOOP EDELWEISS GARTENS PH 9 2190 RESIDENTIAL, SF $105,000 6/30/2006 6-2062 CHARLES THOMAS HOMES, INC. 02 28 103 WALCOURT LOOP EDELWEISS GARTENS PH 9 2293 RESIDENTIAL, SF $115,000 3715 DOVE CROSSING 6/30/2006 6-2060 K M CUSTOM HOMES 01 06 DOVE CROSSING PH 2 2337 RESIDENTIAL, SF $160,000 LN 6/2/2006 6-1732 HOMEOWNER 18 02 8601 FERN CT EMERALD FOREST #1 0 RESIDENTIAL, ADDITION $0 4709 JOHNSON CREEK 6/6/2006 6-1753 WESTERHEIM CUSTOM HOMES 14 01 WILLIAMS CREEK PH 2 459 RESIDENTIAL, ADDITION $16,000 LOOP 4700 JOHNSON CREEK 6/6/2006 6-1752 WESTERHEIM CUSTOM HOMES 01 03 WILLIAMS CREEK PH 2 408 RESIDENTIAL, ADDITION $16,000 LOOP 6/13/2006 6-1824 FOSTER CONSTRUCTION 01 90 602 BELL ST COLLEGE PARK 330 RESIDENTIAL, ADDITION $28,000 6/13/2006 6-1823 RONALD LEWING 01 30 210 FIDELITY ST WEST PARK (CS) 612 RESIDENTIAL, ADDITION $10,000 6/13/2006 6-1860 CROWLEY CONSTRUCTION 03 32 5104 ST ANDREWS DR PEBBLE CREEK 132 RESIDENTIAL, ADDITION $5,000 6/15/2006 6-1815 MARK ROBINSON CUSTOM HOMES 09 10 1004 SHADY DR CARTER'S GROVE 3421 RESIDENTIAL, ADDITION $155,000 2127 ROCKCLIFFE 6/26/2006 6-1865 WESTERHEIM CUSTOM HOMES 14 02 CASTLEGATE SEC 2 PH 2 803 RESIDENTIAL, ADDITION $22,500 LOOP RESIDENTIAL, REMODEL & 6/5/2006 6-1726 ANCHOR PIERS, LLC. 08 00 1016 FRANCIS DR WOODLAND ESTATES 0$10,860 RENOVATION 1811 SHADOWWOOD RESIDENTIAL, REMODEL & 6/6/2006 6-1730 ALLEN - CRAFT CABINETS 10 02 SOUTHWOOD #2 0$30,000 DRRENOVATION RESIDENTIAL, REMODEL & 6/7/2006 6-1760 ANCHOR PIERS, LLC. 06 01 1701 SERVAL LN CAT HOLLOW 0$3,850 RENOVATION 6/6/2006 6-1748 D P L CONTRACTORS 00 95 4300 SH 6 SOUTHERN TRACE 0 DEMOLITION, RESIDENTIAL $0 6/13/2006 6-1836 RADAKOR LLC 09 04 415 TAUBER ST BOYETT 0 DEMOLITION, RESIDENTIAL T $4,500 SPRING CREEK TOWN- 6/30/2006 6-2015 STYLECRAFT BUILDERS 31 04 1716 HEATH DR 2803 SLAB ONLY RES. (SF) $10,494 HOMES PH 1 B P D: UILDINGERMITETAILS C P OMMERCIALERMITS Total Sq. Date PermitContractor LotBlkAddressSubdivision Application Type Description Valuation Feet COMMERCIAL, STORES & CUSTOMER 6/5/2006 6-1350 CRAIN ZAMORA 00 00 1416 TEXAS AVE REDMOND TERRACE 6162 $180,000 SERVICE COMMERCIAL, STORES & CUSTOMER 6/28/2006 6-1890 HULSEY CONST. 00 00 1418 TEXAS AVE 3600$55,000 SERVICE RETAIL CONSTRUC- 6/1/2006 6-1416 01 00 1927 TEXAS AVE WOLF PEN PLAZA 2437 COMMERCIAL, OTHER $75,000 TORS INC 6/5/2006 6-1387 FENI LLC 00 00 703 ANDERSON ST 32 COMMERCIAL, ADDITION $10,000 6/23/2006 6-1922 BRAD BROWN 01 03 1708 ROCK PRAIRIE RD L O BALL MEMORIAL PH 2 0 COMMERCIAL, ADDITION $3,000 6/8/2006 6-1243 E M J CORPORATION 04 01 1500 HARVEY RD POST OAK MALL 120000 COMMERCIAL REMODEL/RENNOVATION $1,100,000 6/1/2006 6-416 BRAZOS CONT. 08 02 409 UNIVERSITY DR 2046 COMMERCIAL, REMODEL/RENOVATION $128,000 6/2/2006 6-974 MITCHELL CONST. 00 00 2008 TEXAS AVE 1200 COMMERCIAL, REMODEL/RENOVATION $30,000 PARKWAY CONSTRUC- 6/2/2006 6-1347 08 02 409 UNIVERSITY DR 3093 COMMERCIAL, REMODEL/RENOVATION $400,000 TION & ASSOC. WARWICK CONSTRUC- 6/6/2006 6-1705 04 01 1500 HARVEY RD POST OAK MALL 766COMMERCIAL, REMODEL/RENOVATION $49,000 TION, INC 6/6/2006 6-1667 DREW GIBSON 06 01 115 COLLEGE MAIN BOYETT 950 COMMERCIAL, REMODEL/RENOVATION $3,000 6/16/2006 6-1914 THE CORNER BAR 01 02 401 UNIVERSITY DR 2000 COMMERCIAL, REMODEL/RENOVATION $10,000 6/2/2006 6-1729 THE CORNER BAR 01 02 401 UNIVERSITY DR 0 DEMOLITION, COMMERCIAL $2,000 6/14/2006 6-1876 MSM CONSTRUCTION 05 02 420 TEXAS AVE GORZYCKI'S MEADOWLAND 0 DEMOLITION, COMMERCIAL $7,000 OAKWOOD CUSTOM 6/23/2006 6-1133 04 21 1000 SPRING LOOP UNIVERSITY PARK #2 8936 SLAB ONLY COMMERCIAL $32,500 HOMES OAKWOOD CUSTOM 6/23/2006 6-1132 04 21 1000 SPRING LOOP UNIVERSITY PARK #2 11509 SLAB ONLY COMMERCIAL $58,500 HOMES OAKWOOD CUSTOM 6/23/2006 6-1130 04 21 1000 SPRING LOOP UNIVERSITY PARK #2 8936 SLAB ONLY COMMERCIAL $55,209 HOMES Page 8 Planning & Development Services B P D: UILDINGERMITETAILS M P ISCELLANEOUSERMITS Total Sq. Application Type Date PermitContractor LotBlkAddressSubdivision Valuation FeetDescription ACCES- 6/1/2006 6-1685 PARTY TIME RENTALS 01 00 1103 ROCK PRAIRIE RD SOUTHWOOD HOLDINGS 800$520 SORY/STORAGE ACCES- 6/2/2006 6-1597 COLLEGE STATION ISD 00 00 1101 WILLIAMS ST VISOSKI 1536$50,000 SORY/STORAGE ACCES- 6/16/2006 6-1831 HOMEOWNER 10 20 9203 LAKE FOREST CT WOODCREEK #6 NORTH 108$4,000 SORY/STORAGE ACCES- 6/19/2006 6-1780 CITY OF COLLEGE STATION (GN) 01 63 1900 ANDERSON ST CRAWFORD BURNETT (ICL) 2400$885 SORY/STORAGE CRENSHAW MOBILE HOME MOV- 6/6/2006 6-1741 15 04 411 NIMITZ ST COLLEGE HEIGHTS (CS) 0 MOVING $4,500 ING 6/6/2006 6-1749 MORGAN & MORGAN 00 00 12611 FM 2154 0 MOVING $1,000 6/28/2006 6-2034 MORGAN & MORGAN MOVING 01 01 13223 FM 2154 EDELWEISS BUSINESS CENTER 0 MOVING $1,000 6/6/2006 6-1751 ON TOP ROOFING 26 40 1005 FOSTER AVE COLLEGE HILLS 0 RER00F $3,000 6/6/2006 6-1750 ON TOP ROOFING 13 02 2505 MONITOR CT RAINTREE #3 0 RER00F $2,500 UNITED HOME IMPROVEMENT 6/7/2006 6-1771 11 08 1021 GUADALUPE DR SOUTHWOOD #9 0 RER00F $11,651 (ROOF) UNITED HOME IMPROVEMENT 6/21/2006 6-1946 01 60 2200 RIO GRANDE BLVD SOUTHWOOD VALLEY PHS 10B 0 RER00F $20,000 (ROOF) PYRAMID WATERPROFFING 6/21/2006 6-1951 01 00 707 TEXAS AVE TEXAS 707 800 RER00F $5,600 ROOFS 6/26/2006 6-1999 LARAN CONSTRUCTION 07 04 712 HONEYSUCKLE LN BRANDON HEIGHTS #2 0 RER00F $8,680 6/29/2006 6-2048 ON TOP ROOFING 45 50 2801 CIMARRON CT SOUTHWOOD VALLEY PHS 10B 0 RER00F $4,000 6/2/2006 6-1723 WAKEFIELD SIGN SERVICE 08 02 409 UNIVERSITY DR 66 SIGN PERMIT $1,200 6/2/2006 6-1728 WAKEFIELD SIGN SERVICE 04 02 1808 TEXAS AVE KAPCHINSKI 260 SIGN PERMIT $17,238 6/12/2006 6-1486 HARDAMN SIGNS 00 04 305 MARION PUGH DR J E SCOTT (ICL) 25 SIGN PERMIT $12,000 2050 NORTH FOREST 6/16/2006 6-1904 WAKEFIELD SIGN SERVICE 00 67 M RECTOR (ICL) 128SIGN PERMIT $2,000 PKWY 6/16/2006 6-1882 AM NEON SIGN 00 00 1416 TEXAS AVE REDMOND TERRACE 195 SIGN PERMIT $5,500 6/20/2006 6-1804 MAPP CONSTRUCTION, LLC 15 30 1045 TEXAS AVE COLLEGE HILLS 96 SIGN PERMIT $2,000 6/20/2006 6-1928 BONANZA SIGNS & GRAPHICS 01 01 701 UNIVERSITY DR CHIMNEY HILL RETAIL PLAZA 0 SIGN PERMIT $75 6/20/2006 6-1915 WAKEFIELD SIGN SERVICE 08 02 409 UNIVERSITY DR 112 SIGN PERMIT $1,500 6/21/2006 6-1884 SIGN PRO 02 00 1420 TEXAS AVE REDMOND TERRACE 0 SIGN PERMIT $3,000 1801 HARVEY MITCHELL 6/21/2006 6-1942 SIGN EDGE 01 00 SOUTHWOOD #5 103 SIGN PERMIT $26,835 PKWY 6/22/2006 6-1835 SPARKLE SIGN COMPANY 03 01 1508 HARVEY RD POST OAK MALL 597 SIGN PERMIT $9,000 6/22/2006 6-1956 SPARKLE SIGN CO 03 00 400 HOLLEMAN DR HOLLEMAN PLACE 0 SIGN PERMIT $17,000 6/22/2006 6-1834 SPARKLE SIGN COMPANY 16 88 475 GRAHAM RD UNIVERSITY INDUSTRIAL CENTER 40 SIGN PERMIT $3,000 6/7/2006 6-1742 MOBLEY POOL 02 20 300 FIDELITY ST WEST PARK (CS) 0 SWIMMING POOL $28,740 6/7/2006 6-1744 MOBLEY POOL 22 01 4310 BERWICK PL CASTLEGATE SEC 2 PH 2 0 SWIMMING POOL $44,660 6/7/2006 6-1745 MOBLEY POOL 23 03 2438 NEWARK CIR CASTLEGATE SEC 5 PH 1 0 SWIMMING POOL $27,800 6/8/2006 6-1560 AGGIELAND POOLS 18 19 307 BERNBURG LN EDELWEISS ESTATES PHS 7 0 SWIMMING POOL $35,500 6/20/2006 6-1935 HOMEOWNER 18 04 1306 MARKHAM CT ALEXANDRIA PH 2 0 SWIMMING POOL $8,000 6/22/2006 6-1965 MOBLEY POOL 04 10 1206 WINDING RD THE KNOLL 0 SWIMMING POOL $35,800 6/22/2006 6-1967 MOBLEY POOL 31 02 2163 ROCKCLIFFE LOOP CASTLEGATE SEC 2 PH 1 0 SWIMMING POOL $26,200 6/22/2006 6-1966 MOBLEY POOL 36 01 4400 EDINBURGH PL CASTLEGATE SEC 1 PH 2 0 SWIMMING POOL $35,950 6/23/2006 6-1874 AGGIELAND POOLS 04 01 1106 12TH MAN CIR PEBBLE CREEK 0 SWIMMING POOL $41,250 P M ERFORMANCEEASURES 100% of commercial plans that were complete when submitted were reviewed accurately within 5 working days by building staff in compliance with College Station Codes and Ordinances or have received appropriate variances. 89% of single-family plans that were complete when submitted were reviewed accurately within 1 working day. 100% of building inspections accurately performed within 24 hours. 10 commercial plans submitted, 0 sets of duplex plans submitted, 3 sets of multi-family plans submitted. 16 inspections per day per inspector, in addition to utility walk-through connections and miscellaneous requests. 63 inspections (approx.) per day for this month. Page 9 Planning & Development Services B I UILDINGNSPECTIONS : TOTAL MONTH BUILDING PLUMBING ELECTRICMECHANICAL LAWN SIGNPOOLDEMO MOVING JAN. 415213188107041300940 FEB.3642161611143621000903 MAR. 4493142291680715001182 APR.485345259147272518001306 MAY53631029321420527001405 JUN. 51331629021925514001382 JUL. AUG. SEPT. OCT. NOV. DEC. YEARLY 2762171414209691084747007118 TOTAL Coming Soon 2006 Comprehensive Plan Update! The City of College Station has begun a process to update its Comprehensive Plan. The purpose of this update is to create a more workable plan that can help guide decisions about future growth and development. WHAT IS THE COMPREHENSIVE PLAN? The Comprehensive Plan is a statement of the community's vision for the future and a guide to achieving that vision. Generally, the purpose of a Comprehensive Plan is to anticipate growth and to guide that growth in a manner that provides College Station with a balance of land uses that promote economic growth while retaining the quality of life. The Comprehensive Plan is not a “zoning regulation” and it does not affect existing approved zoning. Instead, it provides the foundation for making changes or developing new regulations that implement identi- fied vision, goals and policies. The Comprehensive Plan includes, among other components, a Land Use Plan and a Transportation Plan. WHEN WAS THE CURRENT COMPREHENSIVE PLAN ADOPTED? The current Comprehensive Plan was adopted in 1997. While small area and neighborhood plans have been developed since 1997, the cur- rent Comprehensive Plan has not been reviewed in its entirety since its adoption. Since 1997, College Station’s population has increased by 40%, building permits have been issued for over 5,000 single-family homes and College Station has increased in size by over 4,000 acres. WHY DO WE NEED A NEW COMPREHENSIVE PLAN? The City is updating the Comprehensive Plan in order to determine the City's vision for the future; decide which types of development oppor- tunities are compatible with the vision; determine where and how the City should grow; provide guidance in making land use decisions; pre- serve and improve the integrity of neighborhoods and overall quality of life; and promote economic development. HOW LONG WILL THE COMPREHENSIVE PLAN UPDATE TAKE? The update is anticipated to take several years to complete. Because public input is a vital part of a successful planning process, there will be many public meetings, work sessions, and workshops. If you are interested in receiving information regarding the Comprehensive Plan Up- date, sign up for the College Station CityLink E-notifier to receive emails and meeting schedules by selecting the "2006 Comprehensive Plan Update" under "Notice Categories," or contact Jennifer Prochazka at jprochazka@cstx.gov. Page 10 Volume 7 Issue 6 B P T: UILDINGERMITOTALS C C OMPARISONHARTS T P OTALERMITS Reviewed Site Plans 3 Y—C B M EAROMPARISONYONTH McDonald’s, 801 University Drive, (Sp 06- 500117) Benjamin Knox Art Center, 405 University 200420052006 Drive, (Sp 06-500120) Fish Daddy’s, 1611 University Drive, (SP 06- 460 440 500133) 420 400 380 360 The Crossroads, 2000 FM 158, (SP 06- 340 320 300 500136) 280 260 240 Corner Bar, 401 University Drive, (SP 06- 220 200 180 500139) 160 140 120 100 80 60 40 20 0 Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec. S F P INGLEAMILYERMITS 3 Y—C B M EAROMPARISONYONTH ( O-) INCLUDESNLYNEWSINGLEFAMILYHOMES 200420052006 110 100 90 80 70 60 50 40 30 20 10 0 Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec. C P OMMERCIALERMITS 3 Y—C B M EAROMPARISONYONTH ( & ) INCLUDESNEWCOMMERCIALCOMMERCIALREMODELS 200420052006 35 30 25 20 15 10 5 0 Jan.Feb.MarchAprilMayJuneJulyAug.Sept.Oct.Nov.Dec. Page 11 City Council Approves Changes to Sign Ordinance As part of the Unified Development Ordinance annual review, the College Station City Council recently approved sev- eral changes to the sign ordinance. The changes, which go into effect on 3 July, are summarized below: Non-commercial and political signs: Language was added to section 7.4.R, limiting the size of non-commercial and political signs to 50 square feet. New language also clarifies that signs may not be placed in any public Right- of-Way and provides a time limit for the placement of signs (allows sign placement up to 90 days prior to the event and requires sign removal within 10 days after the event). Sign removal: Language was added to Section 7.4.Y, requiring signs to be removed if the associated building is demolished. When new signage is installed, it will be required to comply with the current provisions of the Unified Development Ordinance. Community Spirit Signs: Community spirit signs were relocated to Section 7.4.E (Exempt Signs) and language was added that provides for on-premise as well as off-premise community spirit signs. Signage for neighborhood groups: Provisions have been made in Section 7.4.E (Exempt Signs) to allow for neighborhood event signage with the following conditions: The name of the association sponsoring the event is featured on the signs The neighborhood group/association is registered with the City of College Station The signs are located within the perimeter of the neighborhood The signs are in good repair, and; The signs may be placed up to 14 days prior to the event, and removed within 24 hours after the event. Commercial Banners: Section 7.4.J was added to address the use of commercial banners. Commercial banners may be displayed for a 14 day period provided a permit is obtained from the City of College Station. The permit fee of $200.00 is waived for non-profit associations or organizations. For more information concerning sign regulations, please contact the Planning & Development Services Department at 979.764.3570 or visit us online at www.cstx.gov. Changes to the Unified Development Ordinance Approved by City Council The College Station City Council recently approved several changes to the Unified Development Ordinance (UDO) as a result of the annual review process. The changes, effective 3 July, are summarized by section below: General Approval Procedures (Section 3.1) Section 3.1 of the UDO was amended to make notice requirements consistent with the Texas Local Government Code. The proposed language will make the timing of both published and mailed notices consistent regardless of the applica- tion type. Currently, some application types only require ten days for the mailed notice but 15 days for the published notice. Administrative Adjustments (Section 3.15) Developers can only apply to the Administrator for an Administrative Adjustment to those requirements related to residential, non-residential, and design district dimensional standards (Sections 5.2, 5.4 and 5.7, respectively). All other requests for a variance to the UDO will be heard by the Zoning Board of Adjustment Limited Mix of Uses in PDDs (Section 5.5.C) Section 5.5.C “Planned Development District (PDD)” was changed to allow for some mix of uses in a PDD. The pur- pose of this amendment was to delete Section 5.5.C.4 that restricts the combination of commercial and residential Volume 7 Issue 6 Page 12 UDO Changes Cont…. land uses in a PDD. Currently, this practice is only permitted in a P-MUD, or Planned Mixed-Use District. These dis- tricts do vary such that the P-MUD zoning district is identified in Section 6.2 Types of Use (Use Table) with a specific menu of permitted uses. Permitted uses in PDDs are specifically identified within the context of the rezoning to PDD. Further, P-MUD has specific requirements and thresholds that address the ratio of the mixed uses. A PDD that pro- poses a mix of uses (residential and non-residential) is only appropriate in areas where the Land Use Plan reflects Planned Development or Redevelopment. WPC Setback (Section 5.7) All residential zoning districts in College Station (with the exception of A-O and A-OR) are permitted to reduce the re- quired front setback to 15 feet when approved rear access is provided, or when side yard or rear yard parking is pro- vided. The Wolf Pen Creek (WPC) Design District requires a front setback of 25 feet for all uses, including multi-family projects. This was changed to allow for a reduced setback for multi-family projects when the above mentioned condi- tions are met. Wireless Transmission Facility (Section 6.3) Section 6.3 was amended is to encourage collocated wireless facilities by making their application process less ardu- ous and to improve the organization of this section of the UDO as it relates to the type of wireless facility proposed. Portable Storage Structures (Section 6.4.E) Section 6.4.E was amended to address the use, location, and size of portable storage structures. Farmers’ Markets (Section 6.5.A) The purpose of this amendment was to provide specific standards for farmers’ markets as a temporary use. The provi- sions are intended to address their location, signage, and define eligibility. Building Permits and Setbacks (Section 7.1) “Features Allowed within Required Yards” was amended to clarify that structures requiring building permits may be subject to additional regulations and to allow open-sided porches to extend up to 6 feet into front and side street set- backs on a limited basis. Site Design Standards References/Parking Ratios/Curbing and Surfacing (Sections 7.2.F, 7.2.G, 7.2.H) Sections 7.2.F, 7.2.G, and 7.2.H were amended to refer to the Site Design Standards. The off-street parking table now includes a ratio for freestanding furniture sales at one (1) space per 350 square feet. The table was also amend- ing by changing the ratio for motor vehicle service areas from one (1) space per 100 square feet to one (1) space per 200 square feet. This section was also changed to consistently identify the Administrator as the person with the dis- cretion to allow for alternative drive surfaces and to specify surfacing requirements. Drive-Thru Facility Queuing Requirements (Section 7.2.J) This amendment requires the design of queuing areas for drive-through facilities. Change to Alternative Parking Option (Section 7.2.K) Bicycle parking was removed as an alternative parking option. Geometric Design of Driveway Access (Section 7.3) Section 7.3 was amended as follows: Section 7.3.C.7 “Geometric Design of Driveway Access” to change acceptable curb return radii for residential from 2.5’-10’ to 3’-10’, and from 20’-30' to 25’-30’ for non-residential; To identify the Administrator as the person whom may require a larger radii; and To change the range for a residential driveway approach width from 10'-28' to 12'-25'. Page 13 Volume 7 Issue 6 Signs (Section 7.4) Non-commercial and political signs: Language was added to section 7.4.R, limiting the size of non-commercial and political signs to 50 square feet. New language also clarifies that signs may not be placed in any public Right-of-Way and provides a time limit for the placement of signs (allows sign placement up to 90 days prior to the event and re- quires sign removal within 10 days after the event). Sign removal: Language was added to Section 7.4.Y, requiring signs to be removed if the associated building is de- molished. When new signage is installed, it will be required to comply with the current provisions of the Unified Devel- opment Ordinance. Community Spirit Signs: Community spirit signs were relocated to Section 7.4.E (Exempt Signs) and language was added that provides for on-premise as well as off-premise community spirit signs. Signage for neighborhood groups:Provisions have been made in Section 7.4.E (Exempt Signs) to allow for neighbor- hood event signage complying with the following conditions: The name of the association sponsoring the event is featured on the signs The neighborhood group/association is registered with the City of College Station The signs are located within the perimeter of the neighborhood The signs are in good repair, and; The signs may be placed up to 14 days prior to the event, and removed within 24 hours after the event. Commercial Banners:Section 7.4.J was added to address the use of commercial banners. Commercial banners may be displayed for a 14-day period provided a permit is obtained from the City. The permit fee of $200.00 is waived for non-profit associations or organizations Solid Waste Standards (Section 7.8) Section 7.8 was amended to allow City staff more discretion with the standards for solid waste services, warn property owners that dumpster screening should be located outside of utility easements, clarify that special standards do not apply to small-lot single family but instead apply to townhouses, and to provide guidelines for 300-gallon side-loading automated containers. Non-Residential Architectural Standards (Section 7.9) Section 7.9 was reorganized into a format that is easier to understand—by building/building plot size in a cumulative manner. A summary chart of requirements is also proposed for the beginning of the section. Because this is the first review of the NRA, there were several grammatical changes and overall wordsmithing of the section. Following are the specific changes: Section 7.9.A “Applicability” to clarify that the non-residential architectural standards apply to all non-residential development, redevelopment, and façade changes. Section 7.9.B “Standards for All Non-Residential Structures”: graphic added to summarize the requirements of the non-residential architectural standards, to define what façades face a right-of-way, and to define what consti- tutes a right-of-way. A graphic was also added to help clarify when a facade faces a right-of-way. Section 7.9.B.2 “Building Mass and Design” to remove requirements for front building façades and have them ap- ply to all façades facing a right-of-way. Section 7.9.B.3 “Building Materials” to clarify that existing buildings may utilize non-conforming building materials for maintenance purposes, but any material change or replacement of more than 10% of the total area of all facades shall require material and color compliance; to establish a minimum percentage of surface area that must utilize a required building material; to clarify which concrete products are allowed; to restrict reflective glass on all façades facing a public right-of-way; to add an exception to the reflective glass limitation; and to add a restriction against unbuffered painted steel panel siding and galvanized steel use from residential areas. Section 7.9.B.5 “Pedestrian/Bike Circulation & Facilities” to include a standard for how much area is needed for a bike rack and to only allow the racks to be anchored to the ground. Volume 7 Issue 6 Page 14 Section 7.9.B.6 “Parking Lots” to clarify that drive aisles are considered part of parking areas. Section 7.9.D “Additional Standards for 20,000 S.F. or Greater” to set a minimum percentage of surface area that must utilize a required building material and to remove the requirement for a 30-inch band of specified material at the base of buildings. Section 7.9.E.1 “Building Mass and Design” to remove requirements for front building façades and have them apply to all façades facing a right-of-way for 50,000 sq.ft. or greater buildings/building plots. Section 7.9.E.3 “Landscaping” to define minimum tree well requirements and to allow for unlimited substitutions of non-canopy trees for canopy trees against a building. Section 7.9.E.4 “Pedestrian/Bike Circulation & Facilities” to set a standard of brick pavers or stamped dyed concrete for required walkways in parking lots for 50,000 sq.ft. or greater buildings/building plots. Section 7.9.F “Additional Standards for 150,000 S.F. or Greater” to increase the minimum area for a plaza from 200 to 500 sq.ft., clarify that the area of a plaza can not count towards parking lot island requirements, remove the option of vegetation shading as a minimum component of a plaza, set a minimum percentage of surface area that must utilize a required building material, and require parking areas to be screened by berms. Section 7.9.G “Variances – Design Review Board” to increase the amount of an allowable variance from 75% to 100% of the total percentage of a standard. Section 7.9.H “Submittal Requirements” added to define what information is needed from the developer at what time in the development process. Definitions (Section 11.2) The following specific definitions were changed in Article 11: Building Plot or Premises: All of the land within a project, whether one or more lots, developed according to a com- mon plan or design for similar or compatible uses, that may have shared access or parking, and that singularly or in phases is treated as such for site plan review purposes. The determination of the boundaries of a building plot shall be made as the first step in the site plan or project review, unless such determination has previously been made at the time of plat approval. For development not subject to site plan review, the building plot or premises shall be the exte- rior boundary of any included lots, in the event that the structure sits astride two or more lots. In the event that two or more lots are under single ownership and the structure does not meet the required side yard setback, both lots shall be considered the building plot or premises. Demolished sites located in larger parking lots that may not have pre- viously been considered part of a larger building plot, will be considered part of the plot if access is shared with the site. Clinic: An institution, public or private, or a station for the examination and treatment of out-patients by a group of doctors, dentists, opticians, veterinarians, psychologists, or other similar medical professionals. In general, a clinic shall not exceed 20,000 square feet in size and larger clinics shall be considered to be hospitals. A facility operated by one or more physicians, dentists, chiropractors, or other licensed practitioners of the healing arts for the examination and treatment of persons solely on an outpatient basis. Hospital or Sanitarium: A building, or portion thereof, used or designed for the medical or surgical treatment of the sick, mentally ill, or injured persons, primarily on an inpatient basis, and including as an integral part, related facili- ties such as laboratories, outpatient facilities, or training facilities; provided that this definition shall not include rooms in any residential dwelling, hotel, or apartment hotel not ordinarily intended to be occupied by said persons. For more information on the recent UDO changes, please contact the Planning & Development Services Department at 979.764.3570 or via the internet at www.cstx.gov.