HomeMy WebLinkAboutDec 17December 17, 1986
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840.2499
MEMORANDUM
TO: Ernie Camp, University Bookstore, 409 University Drive
Ray Britton, P. 0. Box 4696, Bryan, TX 77802
FROM: Project Review Committee: �J" —
Al Mayo, Director of Planning
Mark Smith, Assistant City Engineer
David Brochu, P &Z Representative
Others attending:
Ray Havens, Electrical Department
Terran Sanchez, Lone Star Gas Co.
Bob Epps, Assistant Director of Public Services
Tino Ocon, Public Services Dept.
Kim Johnson, Assistant Zoning Official
Harry Davis, Fire Marshal
Ron Ragland, Assistant City Manager
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Addition to existing University
Bookstore located on Lots 8 &9 Block 2 Boyett Addition
subdivision which is at 409 University Drive (86 -432)
(Commercial Northgate Zoning District)
The P.R.C. met on December 17, 1986 to review the above mentioned
project and recommends approval of the project with the following
conditions *:
1. Coordinate electric load data requirements with Ray Havens;
service will be underground.
2. Coordinate telephone requirements with Laverne Dube of GTE.
3. Coordinate natural gas requirements with Terran Sanchez of
Lone Star Gas.
4. One 3 -yard dumpster will be required; relocate away from the
building addition so it will be in line with the loading lane.
5. Parking area must be paved; include 6" raised curb with drain
outlets around this area. Coordinate final Drainage Plan with
Engineering Department.
6. The existing water line and gas line are under the proposed
addition to the rear of the existing building and will have to be
moved; coordinate with Water & Sewer Department and Lone Star Gas
Company.
1
,r P.R.C. (86 -432)
12 -17 -86
page 2
7. Some electric power lines will have to be moved at the time
the portable buildings are moved; coordinate timing of that move
with Electric Department to facilitate a smooth transition.
8. Some landscaping around /in the parking area is preferred but
not required.
THE FIRE MARSHAL RAISED A QUESTION REGARDING WHETHER OR NOT A TWO
STORY ADDITION WILL BE ALLOWED TO THIS EXISTING BUILDING WHICH IS
LOCATED IN A FIRE DISTRICT. BUILDING OFFICIAL COY PERRY TO MAKE
FINAL DETERMINATION IMMEDIATELY FOLLOWING THIS MEETING. 0 -
SUBMIT 5 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT FOR
APPROVAL PRIOR TO CONTINUING WITH STEP II OF THE BUILDING PERMIT
PROCESS.
*Any changes to an approved site plan must be cleared through the
Office of the Director of Planning.
4