HomeMy WebLinkAboutNovember 6November 6, 1986
MEMORANDUM
PRESUBMISSION CONFERENCE
TO: Earl Havel, Municipal Development Group
Philip Vandekerckhove, Tr., Houston, TX
FROM: Jim Callaway, Assistant Director of Planning
Mark Smith, Assistant City Engineer
Ray Havens, Electrical Department
Jimmy McCord, McCord Engineering, Inc.
Terran Sanchez, Lone Star Gas Co.
Laverne Dube, GTE
Carol Elmore, Assistant City Attorney
Shirley Volk, Planning Technician
SUBJECT: PRELIMINARY PLAT & FINAL PLAT - Barron Park Subdivision
located on east side of S.H.6, approximately 1000 feet
south of the intersection of Barron Road & S.H.6
(86 -306 & 86 -215)
The above staff /utility personnel reviewed the subject plat and
recommend approval with the following conditions *:
1. Show the location of the Flood Plain on both the Preliminary
and Final plats.
2. Verify the location of the proposed Bryan REA electric
facilities; coordinate that location with all entities
(municipal and private company utilities) to establish the
location of all utilities within easements parallel to S.H.6.
3. Interior easements to service all lots on this property will
be required as needs and location of lines are developed.
4. Show (on the Final Plat) a 10 foot easement along the northern
property line; a 10 foot easement along the eastern property
line; a 10 foot easement along the southern property line; a
20 foot easement between Lots 1 &2; and a 20 foot easement
(west to east) between Lot 3 and Lots 1 &2.
THESE PLATS ARE SCHEDULED TO BE CONSIDERED BY THE PLANNING AND
ZONING COMMISSION ON NOVEMBER 20, AND BY THE CITY COUNCIL ON
DECEMBER 11, 1986. SUBMIT REVISED FILM POSITIVE AND 10 COPIES OF
EACH PLAT TO PLANNING DEPARTMENT PRIOR TO NOON ON NOVEMBER 14TH.
*Any changes to an approved plat must be cleared through the
Planning Division.