January 30, 1986
MPMAPAKI IIM
PRESUBMISSION CONFERENCE
TO: Planning and Zoning Commission
Larry Wells, Jerry Bishop & Associates
FROM: Al Mayo, Director of Planning v4k
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Jane Kee, Zoning Official
Lavern Dube, GTE
Shirley Volk, Planning Technician
SUBJECT: Final Plat - Herman F. Krenek Phase Two (86-202)
A Presubmission Conference was held on January 29th to review the
above mentioned final plat, which has minor changes from the approved
preliminary plat.
Staff recommends approval with the following conditions*:
1. The utility easement along the northern property line should be
a minimum of 10 feet in width.
2. Include a 20 foot easement along the easterly end of this
subdivision.
3. Remove the word "utility" from the easement across Lot 4, thus
indicating that the easement Is a "drainage" easement.
SUBMIT FILM POSITIVE AND 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT
BY NOON ON JANUARY 31th TO BE INCLUDED ON P &Z AGENDA FEBRUARY 6th.
*Any changes to an approved plat must be cleared through the office of
the Director of Planning.
sjv
��� City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
January 30, 1986
MEMORANDUM
PRESUBMISSION CONFERENCE
TO: Planning and Zonind Commission
Christian Galindo, Galindo Engineering & Surveying
Brit Rice
Mike Lane
FROM: Al Mayo, Director of Planning
Joe Guidry, Electrical Superintendent
Jane Kee, Zoning Official
Jimmy McCord, McCord Engineering, Inc.
Lavern Dube, GTE
Shirley Volk, Planning Technician
SUBJECT: Final Plat - Replat of Lots 2 &3 Block One Emerald Forest Sec. Two
(86 -203)
A Presubmission Conference was held on this date to review the above mentioned
plat and the following observations /suggestions were made at the time of
this review:
1. Staff prefers that the entire property line be moved, maintaining a
straight line, rather than the proposal as shown which has two offsets.
Even one offset would be preferable to the two being proposed.
2. Staff has requested a larger scale survey showing the two houses with all
dimensions, The purpose is to ensure that this replat will solve the
problem, and to try to prevent any construction mistakes that might
result in encroachment.
SUBMIT FILM POSITIVE AND 10 COPIES OF PLAT TO PLANNING DEPARTMENT PRIOR TO
NOON ON FRIDAY, JANUARY 31st, IN ORDER TO BE INCLUDED ON P &Z AGENDA OF FEBRUARY 6th.
OWNERS OF BOTH LOTS ON PLAT MUST SIGN THE PLAT BEFORE IT WILL BE CONSIDERED
BY THE P &Z.
sjv
� 0 City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
`/ COLLEGE STATION, TEXAS 77840 -2499
January 30, 1986
IbfSMI. n6I IZl
TO: Robert Nash & Wayne Nash, Dalsan Properties
Earl Havel, Jerry Bishop & Associates
FROM: Project Review Committee:
Al Mayo, Director of Planning
David Pullen, City Engineer
Walter Wendler, P &Z Representative
Others attending:
Bob Epps, Ass't. Director of Public Services
Joe Guidry, Electrical Superintendent
Jane Kee, Zoning Official
Kim Johnson, Asst Zoning Official
Jimmy McCord, McCord Engineering
Lavern Dube, GTE
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Revised - College Station Retail Center
located @Texas Ave & Hwy 30, on south side of
Park Place (86 -401)
The P.R.C. met on January 29th to review the revised site plan for the above
mentioned project, and recommends approval of the plan with the following
conditions-:
1. All islands must be a minimum of 9 feet in width.
2. Maintain the 8 foot (landscaped ares) setback from the curb of the
deceleration lane.
3, There may be problems with location /relocation of utility lines in
the area of the deceleration lane. Furnish a plan to all utility
entities concerned which shows existing poles /lines.
4. The State Highway Department has ultimate approval on driveways from
highways, A driveway permit from the Highway Department will be required.
5. Furnish the total square footage of the entire building, along with the
proposed number of seats in the restaurant for review by the Director
of Planning.
6. Furnish an elevation of the proposed tower. If signage is applied to
this unoccupied tower, it will be considered the freestanding sign
allowed for the project by ordinance.
7. Number and location of dumpsters has been approved,
8. The Developer should be aware that there is always a possibility that
channelization may be done on the highways at this location in the
future, which would prevent left -turn movements into or out of this
project,
9. Check with the Building Department regarding the number of handicapped
parking spaces required.
10. RE: Landscaping
a. Point totals on this revision are inadequate. Correct on revised plan.
P.R.C. (86 -401)
College Station Retail Center (Revision)
Page 2
b. Show hose bibs or include a note regarding irrigation.
c. Groundcover Is required in parking lot islands, in swales and
drainage areas, in the 8 foot setback area provided by
Section 7.D.7 and in all unpaved portions of street or highway
right -of -way abutting the property.
d. Eroded or otherwise displaced soil must be removed from the
right -of -way abutting the development before the Certificate of
Occupancy will be issued. (Ord. 1505)
SUBMIT 5 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT FOR APPROVAL PRIOR
TO ISSUANCE OF CERTIFICATE OF OCCUPANCY.
sjv