Loading...
HomeMy WebLinkAboutApril 3Cl April 3, 1985 mrmnpamn11M City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 7784 PRESUBMISSION CONFERENCE TO: Donald Garrett, Garrett Engineering FROM: Al Mayo, Director of Planning Mark Smith, Assistant City Engineer Joe Guidry, Electrical Superintendent Jimmy McCord, McCord Engineering Shirley Volk, Planning Technician SUBJECT: FINAL (REPLAT) PLAT - Lot 4 Block 4 Southeast College Park Addn. (85 -203) A Presubmission Conference was held on this date to review the above mentioned replat and staff recommends approval of this plat as shown. Mr. Garrett informed to have owners' signatures affixed to film positive of plat prior to April 12th, and to return same along with 10 copies of plat to be included on P &Z Agenda April 18th. sjv C1 April 3, 1985 MEMORANDUM City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 TO: Phil Springer, McDonald's, 801 University Drive FROM: Project Review Committee: Al Mayo, Director of Planning Mark Smith, Assistant City Engineer Ron Kaiser, P &Z Representative Others attending: Joe Guidry, Electrical Superintendent Jimmy McCord, McCord Engineering Joey Porter, Fire Department Jane Kee, Zoning Official Kim Johnson, Assistant Zoning Official Bob Epps, Assistant Director of Public Services Shirley Volk, Planning Technician SUBJECT: 85 -404: Parking Lot Plan - Revision to McDonalds' on University Drive. The P.R.C. met on this date to review the above mentioned project, and recom- mends approval with the following conditions *: (1) Have site plan revised to show exactly what the parking /traffic pattern will be. Plan presented shows something altogether different than what exists, and what is planned. Seating for 144 customers is planned, there- fore the project which has 45 parking spaces will be 3 short of the required 48. Applicant has filed for variance before ZBA. Present this revised plan to Planning Department by April 9th for presentation to ZBA on 16th. (2) Update the electrical load data requirement and furnish information to Electrical Department. SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT PRIOR TO CON- TINUING WITH STEP 11 OF THE BUILDING PERMIT PROCESS. `Any changes to an approved plan must be cleared through the office of the Director of Planning. sjv