Loading...
HomeMy WebLinkAboutFebruary 13, 1985� ♦ , �% City of College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE / COLLEGE STATION, TEXAS 77840 -2499 February 14 1985 MFMORANDUM TO: Philip G.E.Vandekerckhove, Trustee Glen Staggs, Infratec Engineering Inc. Bill Brown, Infratec Engineering Inc. FROM: Al Mayo, Director of Planning y,4,A David Pullen, City Engineer Joe Guidry, Electrical Superintendent Jimmy McCord, McCord Engineering Shirley Volk, Planning Technician SUBJECT: Preliminary Plat - Baron Park (44,19 acres) 85 -301 A Presubmission Conference was held on February 13, 1985 to review the above mentioned plat, and staff recommends this plat be redesigned, incorporating the following changes /conditions-: (1) Designate "Private /Public" streets; streets must be paved with curbing and guttering. (2) Provide a seventy (70) foot right -of -way for a public major thorough- fare from Highway 6 to the easternmost property line. The developer will be responsible for the construction of a forty -seven (47) foot paved street to City standards. (3) Consult the local office of the State Highway Department about timing of right -of -way purchase for the Highway 6 improvements. We recommend the developer reflect this right -of -way as a reserve tract on the plat. (4) Consult with the City Engineer and Superintendent of Water & Sewer (Bennie Luedke) regarding the type and availability of service to this property. (5) Permits from the Highway Department will be required for both the water and sewer line crossings. (6) The City may build an electrical feeder line along the east side of the frontage road; the existing line is a City of Bryan rural line and will most likely run parallel to the proposed City of C.S. feeder line. In all probability, a 25 foot utility easement inside this tract and adjacent to the proposed right -of -way for the frontage road will be required. This easement may fall into the building setback. (7) The developer is responsible for costs of water and sewer lines up to 8 in diameter. (8) Submit a letter requesting underground electrical service. Developer would be responsible for installation of conduit. (9) Utility easements from the perimeter easements to the interior ease- ments are required. Continued on Page 2 Presubmission Conference - 85 -301 page 2 (10) Coordinate with the electrical department regarding service requirements. (11) A water system distribution analysis is required. (12) Driveway access is limited to 500 foot intervals along major streets, highways and roads. Suggest use of joint access agree- ment between tracts. These joint access point should be shown on the plat. (13) Furnish storm water calculations to Engineering Department. (14) P.R.C. Drainage Statement provided; compliance required. (15) Construction documents must be completed and approved prior to submitting the Final Plat. (16) There may be a necessity to have utility easements along the major east /west road through this property. (17) As has been recently done on plats of similar commercial sub- divisions, a note should be added to the plat limiting signage. The developer may propose a limit or the staff will recommend one. (18) Show water and sewer line locations on the plat. Locate fire hydrants. (19) The north -south street(s) should be extended to the property lines to allow proper projection into adjacent tracts for orderly growth and circulation. SUBMIT 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT AT LEAST 10 DAYS PRIOR TO A P &Z MEETING TO ALLOW TIME FOR REVIEW PRIOR TO SCHEDULING ON THE AGENDA. PAZ MEETINGS ARE HELD THE FIRST & THIRD THURSDAYS OF EACH MONTH. *ANY CHANGES TO AN APPROVED PLAT MUST BE CLEARED THROUGH THE OFFICE OF THE DIRECTOR OF PLANNING. sjv