HomeMy WebLinkAboutaugust 29 ‘el City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
August 29, 1984
MEMORANDUM
PRESUBMISSION CONFERENCE
Staff Attending:
Al Mayo, Director of Planning
Mark Smith, Ass't. City Enginee
Harry Davis, Fire Marshal
Jim McCord, Elec. Power Engineers
Jane Kee, Zoning Official
John Black, Traffic Engineer
David Riley, GTE
Shirley Volk, Planning Technician
Mark Paulson, Representative of Applicant
SUBJECT: Final Plat - Replat of Lot 5 Block 1 Post Oak Mall (84 -226)
A Presubmission Conference was held on this date to review the above
mentioned plat, and staff recommends approval with the following conditions:-
1. The 15 foot Electrical Easement along the Lister property line must
be a 20 foot "Electrical and Access" easement.
2. Indicate all easements on this plat where there are existing utilities.
*Any changes to an approved plat must be cleared through the Office of the
Director of Planning.
THE ABOVE CONDITIONS MUST BE MET PRIOR TO FILING PLAT AT COUNTY COURTHOUSE.
sjv
City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 778402499
August 29, 1984
Mr. Gary Halbert
Car Wash Equipment Company
4724 Wall Road
Dallas, Texas 75234
RE: Parking Lot Plan - Car Wash Equipment Co. located at the SH 30-
Post Oak Mall Traffic Signal (84 -423)
Dear Mr, Halbert:
On Wednesday, August 29, 1984 the Development Staff of the City of College Station
reviewed the referenced proposed project, at which time the following conditions
were required prior to approval of this project:
1. One drive way access point will be permitted for this project. Please refer
to the enclosed memo from the City Engineer to the Planning Staff.
2. A 6" raised curb is required around all edges of all parts of all paved areas
without exception. Curb detail to be approved by the City Engineer.
3. Compliance with the enclosed P.R.C. Drainage Statement is required.
4. A 6 foot, solid screen fence is required along the northern and eastern
property lines which are adjacent to apartment tracts.
5. Signalization will be required at the access drive. Please refer to the
enclosed memo from the City Engineer to the Planning Staff. Cost of this
signalization will be born by the developer.
6. A fire hydrant must be located within 300 feet of all parts of all buildings.
If an additional hydrant is necessary, location will be determined by the
Fire Marshall (Harry Davis) and the Superintendent of Water & Sewer (Bennie
Luedke) .
7. Close the existing access driveway on Harvey Road closest to the southwest
corner of this tract.
8. A 10 foot utility easement is required along the front property line (along
Harvey Road).
9. Show the location of the water and sewer lines across this tract.
10. Show all dimensions. An 8 foot setback is required along the front property
line.
11. Any water and sewer location changes must be approved by the Water & Sewer
Superintendent (Bennie Luedke).
12. One 3 -yard dumpster will be required for this project; dumpster to be located
in one of the front corners of the tract and must allow a 50 foot clear turning
radius for maneuvering trucks; dumpster pad must be a minimum of 12 ft. x 12 ft.
and also must be on the same grade level as the driving surface.
Continued on page 2
Staff Review - 84 -423
8 -29 -84
page 2
13. Show the location of the signal poles in the setback area along the front
property line.
14. The "Entrance Only" sign must be changed.
15. Compliance with Ordinance 1505 (the Landscape Ordinance) is required. Recom-
mendation offered that Regular Pittosporum, Yaupon or Pfitizer Juniper is
used instead of Dwarf Pittosporum as shown. Include groundcover notes.
Show location of hose bibs, or indicate irrigation if planned. Any existing
concrete areas must be completely removed where planting beds are proposed,
prior to placing topsoil.
16. Do not include any tall, fast growing canopy trees in the easement along
Harvey Road.
On August 21, 1984 Planning Technician Shirley Volk spoke with you on the telephone
and informed you of the fire hydrant requirement, the required 8 foot front setback
and the landscaping requirements. She also told you we would contact you with the
results of the review, which Jane Kee, the Zoning Official has done on this date.
I am enclosing with this report a marked up copy of one of your site plans which
indicates some of the required changes. Also enclosed is a copy of a memo which
I have received from the City Engineer, and resulted from a traffic study completed
by the Traffic Engineer.
If you have any questions regarding any of the City's requirements, please do not
hesitate to contact me or any of the staff indicated at the bottom of this letter.
Please submit 8 copies of your revised site plan for review and approval by the
Planning Department prior to proceeding with Step II of the enclosed Plan Review and
Building Permit Process.
Respectfully,
Albert 0. Mayo, Jr.
Director of Planning
cc: Ray Ellis, Car Wash Equipment Co.
David Pullen, City Engineer
Mark Smith, Ass't. City Engineer
Bob Epps, Ass't. Director of Public Services
Jane R. Kee, Zoning Official
Harry Davis, Fire Marshal
Bennie Luedke, Superintendent of Water & Sewer
Jim McCord, Electric Power Engineers
Joe Guidey, Electrical Superintendent
David Riley, GTE
Cathy Locke, City Attorney
Planning Files
sjv
♦�� City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
August 29, 1984
MEMORANDUM
TO: Kenneth Broach, Broach Oil Co., 1700 Kyle Ave.S, City
Jack W. Cumpton & Assoc., 4103 Texas Avenue S, Bryan, TX
Robert Coen, Benbow- Coen,1606B E. Bypass, Bryan
FROM: Development Staff Attending Review:
Al Mayo, Director of Planning
Mark Smith, Asst. City Engineer
John Black, Traffic Engineer
Rick Ploeger, City Forester
Kim Johnson, Ass't. Zoning Official
Bob Epps, Ass't. Director of Public Services
Jane Kee, Zoning Official
Jim McCord, Elec. Power Engrs.
David Riley, GTE
Harry Davis, Fire Marshal
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Broach Oil Conv. /Service Station (84 -426)
The Development Staff reviewed the above mentioned project on this date, and
recommends approval with the following conditions:*
1. Submit electrical load data requirements to Electrical Department.
2. Traffic Engineer John Black indicated the right turn lane from Jersey
to Texas is a problem and recommends improvement at that corner which
would include creating a lane with a wide radius which would cross
the corner of this tract.
3. Show the dumpster location on a 12' x 12' pad; maintain a 50 foot clear
radius for turning trucks in front of pad.
4. Six (6 ") inch raised curbing is required around all island areas.
5. Show all driveways; maintain a 20 ft. clear drive area.
6. Create curbed islands as shown on the file copy (one by the southern
drive into the shopping center, one on the southwest corner and one by
the drive entrance from Jersey).
7. Furnish a complete landscaping plan for approval.
SUBMIT 8 COPIES OF REVISED PLANS TO PLANNING DEPARTMENT FOR APPROVAL PRIOR
TO BEGINNING STEP II OF BUILDING PERMIT PROCESS.
sjv
♦�� City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
August 29, 1984
MEMORANDUM
TO: Bi11 Trainer, John Powell; 3308 Chisolm, Bryan 77803
Larry Wells, Bishop & Associates, 1812 Welsh Ste 120, City
FROM: Development Staff Attending Revie :
Al Mayo, Director of Planning
Mark Smith, Ass't. City Enginee
John Black, Traffic Engineer
Rick Ploeger, City Forester
Kim Johnson, Ass't. Zoning Official
Bob Epps, Ass't. Director of Public Services
Jane Kee, Zoning Official
Jim McCord, Elec. Power Engrs.
David Riley, GTE
Harry Davis, Fire Marshal
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Wolf Creek Car Wash (84 -425)
The Development Staff reviewed the above mentioned project on this date,
and recommends approval with the following conditions:-'
1. A fire hydrant must be located within 300 feet of all parts of all
buildings as the hose lays. Location of any additional hydrants to
be approved by the Fire Marshal and the Superintendent of Water &
Sewer.
2. Furnish a letter requesting underground electric service and the load
data requirements to the Electrical Department.
3. Compliance with P.R.C. Drainage Statement is required.
4. Furnish details of 6:1 headwall; (State Highway Department details).
5. Indicate culvert size at entrance.
6. A Flood Plain development permit is required.
7. Plans for sewer relocation must be approved by Superintendent of Water
& Sewer.
8. Furnish easement documents for sewer relocation.
9. One 3 -yard dumpster will be required for this project. Locate 12' x 12'
pad in an area which will allow a 50 foot turning radius for trucks.
Show fence around dumpster on plans; do not include gates.
10. Revise landscaping legend; compliance with Ordinance No. 1505 required.
SUBMIT 8 COPIES OF REVISED PLANS TO PLANNING DEPARTMENT FOR APPROVAL PRIOR
TO BEGINNING STEP 1I OF BUILDING PERMIT PROCESS.
sjv