Loading...
HomeMy WebLinkAboutseptember 20 Ci City of College Station P OST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 September 20, 1983 PRESUBMISSION CONFERENCE Attending: Al Mayo, Director of Planning David Pullen, City Engineer Harry Davis, Fire Marshal Bennie Luedke, Water & Sewer Superintendent Bob Epps, Asst, Director of Public Services Joe Guidry, Electrical Superintendent Jim McCord, Elec. Power Engrs Bill Cupp, GTE Shirley Volk, Planning Technician W. D. Fitch William Dryden, Jr. P,E. (Area Progress Corp.) SUBJECT: Preliminary Plat - Southwood Valley Section 25 - 83 - 313 A Presubmission Conference was held on this date to review the above plat. Staff recommends that the plat is reviewed again after all changes Mr. Fitch has indicated he is planning are made, When replanning this development, the following conditions should be con- sidered: (1) Show the flood plain on the plat. (2) Furnish drainage plan to City Engineer which includes pre- construction and post- construction calculations. (3) Furnish sanitary sewer flow calculations to City Engineer. (4) Show all dimensions, including lot sizes, street widths, etc. (5) Show fire hydrant locations. All residential dwellings must be within 500 ft. of a hydrant. (6) Show all necessary utility easements. (7) Coordinate planning with the City electrical department concerning a route for the utility line for a major feeder tie. (8) If cul -de -sacs are included in plans, name both legs of the street the same name. (9) Staff suggests the Developer consider looping some of the streets rather than having each street in the development shown as a cul -de -sac. SUBMIT AT LEAST 4 COPIES OF A REVISED PLAT TO BE REVIEWED AGAIN AT A PRESUB- MISSION CONFERENCE BY STAFF. sjv CI City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77£34() September 20, 1983 PRESUBMISSION CONFERENCE Attending: Al Mayo, Director of Planning David Pullen, City Engineer Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent Bill Cupp, GTE Shirley Volk, Planning Technician James W. MacArthur, Reg. Public Surveyor SUBJECT: Final Plat - Vacating & Replat of Lots 3, 4, 5 Block 2 Prairie View Heights - 83 -234 A Presubmission Conference was held on this date to review the above plat. Staff recommends approval with the following condition:* (1) Check with Joe Guidry, Electrical Superintendent concerning the required easement at the power pole and guy. Show easement on plat. *Any changes to the approved plat must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED PLAT TO THE PLANNING DEPARTMENT BY SEPTEMBER 30th TO BE INCLUDED ON PAZ AGENDA OCTOBER 6th. No public comment will be received at Commission meeting unless requested by a member of the Commission and allowed by the chairman. Applicant may submit any written comment to the Commission by filing same on the Friday preceding the scheduled meeting. CI City of College Station P OST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 September 20, 1983 MEMORANDUM TO: Planning and Zoning Commission Ronald Cobb - Little River Enterprises, Inc. FROM: Project Review Committee ,�►/` Al Mayo, Director of Planning l l�+ David Pullen, City Engineer Roy Kelly, P&Z Representative Other Staff: Bennie Luedke, Water & Sewer Superintendent Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent Bob Epps, Ass't. Director of Public Services Jim McCord, Elec. Power Engrs. Shirley Volk, Planning Technician SUBJECT: Project Plan Approval in C -N Zone - Schooner's Landing (83 -804) The P.R.C. met on this date to review the above mentioned project and recom- mends approval with the following conditions:* (1) Move wheelstops to location 2 ft. from building. (2) Place some type of barrier along the edge of parking space #13 and back to the fence on the north property line to prevent parking adjacent to fence. (3) Place some type of barrier along the edge of parking spaces #6 and #3, then back to building and along building to prevent parking at those locations. (4) Substituting interior curbing with some other type of curbing meets with the approval of the P.R.C.; however, concrete curbing is required at driveway entrances. (5) Correctly locate the sanitary sewer line and manholes on the site plan. (6) Show existing easements on plan. (7) Do not encroach adjacent property with curbing. (8) The only existing available electrical service is single phase. SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. on SEPTEMBER 30th TO BE INCLUDED ON P&Z AGENDA OCTOBER 6th. This item will be covered in a public hearing on that date. sjv *Any changes to the approved site plan must be cleared through the Office of the Director of Planning. c#01 City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 September 21, 1983 MEMORANDUM TO: Don Dale File FROM: Project Review Committee Al Mayo, Director of Planning David Pulien,City Engineer Roy Kelly, P &Z Representative Other Staff: Bennie Luedke, Water & Sewer Superintendent Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent Bob Epps, Ass't. Director of Public Services Jim McCord, Elec. Power Engrs. Shirley Volk, Planning Technician SUBJECT: Parking Lot Plan - Storage Building - Don Dale (83 -440) The P.R.C. met on September 20, 1983 to review the above mentioned project. It should be noted that the applicant did not have a representative at the review meeting. After reviewing the submitted plan, the P.R.C. recommends this plan be re -drawn and resubmitted, and include the following changes: (1) A 10 ft. utility easement is required on the west side of the western property line in order to maintain a 13 ft. clearspan from the pole centerline to the building. (2) The fence along the rear property line must be a solid screen fence because that portion of the property is adjacent to a residentially zoned single family neighborhood. (3) The front fence must be backed off the property line by 8 ft. to allow for the required 8 ft. setback. (4) More landscaping will be required to meet Ordinance requirements, and additional landscaping note should be included on plan indicating specific landscaping planned, including type of groundcover. (5) The parking lot surface must be paved, either asphalt or concrete, and must be approved by the City Engineer according to Ordinance No. 850, Section 7.B.3 -1. (6) A 6" raised curb is required around all edges of all parts of all paved areas without exception. Curb detail to be approved by City Engineer. This is required on all commercial parking lots. (7) Grading and drainage plans must be submitted to and approved by the City Engineer and should include elevations and runoff figures. PLEASE RE -DRAW AND RE- SUBMIT 4 COPIES OF PROPOSED SITE PLAN WHICH WILL AGAIN BE REVIEWED BY THE PROJECT REVIEW COMMITTEE. SJV