HomeMy WebLinkAboutjuly 26 CA City of College Station
P OST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
July 27, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Matt Klunkert, Bryan Construction Company
Brazos Banc Savings Association of Texas
FROM: Project Review Committee:
Al Mayo, Director of Planning
David Pullen, City Engineer
M.Bailey /S.Hansen, P &Z Representative
Other Staff:
Joe Guidry, Electrical Superintendent
Harry Davis, Fire Marshal
Bennie Luedke, Water & Sewer Supt.
Jim McCord, Elec. Power Engr.
Dan Dupies, Ass't to Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Revised to accommodate ATM Building (83 -431)
The P.R.C. met on July 26th to review the above revised plan, and cannot
recommend approval of the addition of an ATM building on this site. Com-
ments were as follows:
(1) Director of Planning is of the opinion that the site which combines
a service station, car wash and drying shed has the potential of
being extremely busy; the curb cuts at this location are shared
with other commercial tracts to be developed in the future, and
additional traffic for this type of facility could cause over-
crowding of the cuts; and, other future commercial development
in this area will increase traffic in the shared access drives
to fullest capacity, without the addition of this facility on
this tract.
(2) The City Engineer expressed concern with the additional potential
traffic flow and the circuitous traffic pattern through an already
potentially busy site.
(3) The P &Z Representatives think this corner has the potential of being
too busy to safely accommodate this additional potential traffic
generator.
sjv
�� , City of College Station
P OST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
July 27, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Ben Sample, Metro Properties Mngmt., Inc.
FROM: Project Review Committee:
Al Mayo, Director of Planning O t/I*-
David Pullen, City Engineer
M.Bailey /S.Hansen, PAZ Representatives
Other Staff:
Joe Guidry, Electrical Superintendent
Harry Davis, Fire Marshal
Bennie Luedke, Water & Sewer Superintendent
Jim McCord, Elec. Power Engr.
Dan Dupies, Asst to Zoning Official
Jane Kee, Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Revised Landscaping at Woodstone Commerce Center
(83
The P,R.C. met on July 26th to review the above mentioned project, and has
noted that the application has a note stating: "stamped concrete shown on
plan to be eliminated and replaced with St. Augustine Grass ". The P.R.C.
recommends lapproval of this revised landscaping plan with the following
condition:*
(1) Mark the main entrance drive curbing and the curbing along and parallel
to Highway 30 as "Fire Lanes,"
*Any changes to the approved site plan must be cleared through the office
of the Director of Planning
THIS REVISED PLAN IS SCHEDULED FOR P &Z AGENDA AUGUST 4th.
sjv
♦� City of College Station
P OST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
July 27, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Tad Vaughn, P. 0. Box 9831, College Station
Lloyd Graham,c /o Joe Courtney, Inc., Box 10088, CS
FROM: Project Review Committee:
Al Mayo, Director of Planning
David Pullen, City Engineer
M. Bailey /S. Hansen, PAZ Representative
Other Staff:
Joe Guidry, Electrical Superintendent
Harry Davis, Fire Marshal
Bennie Luedke, Supt. of Water & Sewer
Jim McCord, Elec. Power Engrs.
Dan Dupies, Ass't Zoning Official
Jane Kee, Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Site Plan Permit - Woodway Village Section Two, Lots 1 -7 Block Two
Fourplex project (83 -511)
The P.R.C. met on July 26th to review the above mentioned project, and recommends
approval with the following conditions:*
(1) Show existing sewer services.
(2) Show existing power poles.
(3) Show depth of parking spaces. Spaces should be 21 ft. deep with a 6 ft.
concrete walk due to the narrow width of the alley. If the sidewalk is
omitted, or less than 6 ft. in width, parking spaces must be 23 ft. in
depth.
(4) Parking easements must be supplied and shown on the site plan. (Separate
instrument will suffice for legal document.)
(5) Locating dumpsters in islands reduces amount of landscaping. Islands as
shown are too small for dumpster pads. Suggest applicant pursue the possi-
bility of eliminating dumpsters entirely and using trash bag pickup.
(6) Some type of screening device along Jones Butler Road at the entrance to
the alley will be required to act as a screen to the parking area off the
alley. A screen fence, berm with landscaping or other type of landscaping
would be acceptable. Please indicate what will be used on the site plan.
(7) There is at least one tree shown which is located over a sanitary sewer
line. This is not allowed.
(8) Include a landscape plan which indicates size and type of trees, groundcover,
and size and type of shrubbery to be used, as well as location of landscaping.
(9) A 6" raised curb is required around all edges of all parts of all paved
Continued on page 2...
P.R.C,
(83 -511) Woodway Vlg. Sec. Two
7 -27 -83
areas without exception. (To include islands, planting areas, access
ways, dumpster locations, utility pads, etc.) Curb detail to be approved
by the City Engineer. No exceptions will be made for areas indicated on
site plan as "reserved for future parking".
(10) If the sidewalk along Woodsman is on this property, show it on the site
plan.
*Any changes to the approved site plan must be cleared through the Office of
the Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. AUGUST 12th
TO BE INCLUDED ON P &Z AGENDA AUGUST 18th.
sjv
♦�� City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
July 27, 1983
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Harry Davis, Fire Marshal
Bennie Luedke, Water & Sewer Superintendent
Jim McCord, Elec. Power Engr.
Jane Kee, Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Final Plat - Vacating & Resubdivision of Lot 24 Block One Emerald
Forest Phase One; Lot 1 Block Two Emerald Forest Phase Two (83 -223)
Staff cannot recommend approval of this replat as shown due to the fact that
the City Engineer is of the opinion that there is a problem with the 20 foot
utility easement as it pertains to drainage. Additional information will be
necessary before approval can be given.
sjv
cr City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
July 27, 1983
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Harry Davis, Fire Marshal
Bennie Luedke, Water & Sewer Supt.
Jim McCord, Elec. Power Engr.
Dan Dupies, Ass't Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Preliminary Plat - Walden Pond Townhomes (21.64 Acres) 83 -310
A Presubmission Conference was held on July 26th to review the above plat.
Staff recommends approval with the following conditions:*
(1) The 20 ft. utility easement shown in the area of the creek bottom
may not be allowed. Determination will be made following a study of
area.
(2) Sewerage of this property may be a problem. Further study will be
necessary. Consult Bennie Luedke.
(3) A drainage profile study will be required. "PRC Drainage Statement"
supplied. Results to be forwarded to City Engineer.
(4) A 20 ft. utility easement across the front of this property (along
F.M. 2818) will be required,
(5) Show a 20 ft. utility easement along the property line adjacent to
Southwest Parkway.
Any changes to the approved plat must be cleared through the Office of the
Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO THE PLANNING DEPARTMENT BY AUGUST 12th
TO BE INCLUDED ON PAZ AGENDA AUGUST 18th.
sjv
cc: John Olsen, Jerry Bishop & Associates, Inc.
Ralph Reser, Guy King Enterprises, Inc.