July 19, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Mike Jones & Darrell Parker
FROM: Project Review Committee:
Al Mayo, Director of Planning
Mark Smith, Ass't to City Engineer
David Hill /Ron Kaiser, P &Z Representative
Other Staff:
Joe Guidry, Electrical Superintendent
Dan Dupies, Ass't Zoning Official
Jim McCord, Elec. Power Engrs
Bennie Luedke, Water & Sewer Superintendent
Harry Davis, Fire Marshal
Shirley Volk, Planning Technician
SUBJECT: Site Plan Permit - Two 4- plexes on Cherry Street (Lot 3 and part
of Lot 5 Block 23 W.C.Boyett Estate Partition) - 83 -510
The P.R.C. met on this date to review the above mentioned project and recom-
mends approval with the following conditions:*
(1) Additional fire hydrant must be located within 300 ft. of all parts
of each building as the hose lays.
(2) Water and sewer line problems and easements are to be coordinated
and approved by Bennie Luedke.
(3) Electrical requirements and the location of service and easements are
to be coordinated and approved by the Electrical Superintendent.
(4) This project must comply with the Flood Plain Ordinance regarding slab
elevations. The finished floor at the highest point must be 1 ft. higher
than the ground elevation adjacent to the building. INCLUDE THIS NOTE
ON THE SITE PLAN.
(5) Furnish a more exact landscaping plan which shows existing and proposed
vegetation, including type and size to be used. Please note that any
vegetation shown on the proposed site plan which dies or is removed after
approval of plan must be replaced as the Zoning Ordinance requires.
(6) Check with Alfred Miller (Director of Public Services) regarding location
and size of dumpster,if requred.As shown on proposed plan, dumpster is
located in the 8 ft. setback from the street right -of- way,which is not acceptable.
(7) A 6 ft. wood screen fence will be required between this property and the
adjacent residential property, and must be in place prior to beginning
construction of this project. (Refer to Section 6 -J(2) of the Zoning
Ordinance. Refer any questions to Jane Kee, Zoning Official).
(8) Staff prefers a replat of this property and the adjacent property which
is owned by the same persons, indicating the additional land which is needed
for parking for this project to be a part of this property, rather than the
use of the proposed parking easement to accomplish the same purpose.
(9) Show dimension of the curb cut into this project.
Continued.,,
P.R.C, (83 - 510)
page 2
7 -19 -83
(10) All curbed area to be marked as Fire Lane,except that in actual parking
spaces.
(11) A 6" raised curb is required around all edges of all parts of all
paved areas without exception. (To include islands, planting areas,
access ways, dumpster locations, utility pads, etc.) Curb detail
to be approved by the City Engineer. No exceptions will be made for
areas indicated on site plan as "reserved for future parking ".
*Any changes to the approved site plan must be cleared through the Office of
the Director of Planning.
SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT BY JULY 29th TO
BE INCLUDED ON AUGUST 4th P &Z AGENDA.
sjv
♦�� City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
July 20, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Matt Klunkert, Bryan Constr. Co., 1700 Barak, Bryan
FROM: Project Review Committee:
Al Mayo, Director of Planning V I"'
David Pullen, City Engineer
D. Hill/ R. Kaiser, P &Z Representative
Other Staff:
Joe Guidry, Electrical Superintendent
Dan Dupies, Ass't Zoning Official
Jim McCord, Elec, Power Engrs,
Bennie Luedke, Water & Sewer Superintendent
Harry Davis, Fire Marshal
Mark Smith, Ass't to City Engineer
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Brazos Savings (C.S.) Renovation & Expansion (83 -429)
The P.R.C. met on July 19th to review the above mentioned project, and recommends
approval with the following conditions:*
(1) Suggest the addition of some type of sidewalk or separation from the rear
of the building to the driveway area.
(2) Suggest removing 2 spaces of parking area closest to SWParkway to allow
more greenspace which may help preserve existing trees.
(3) Show only what is proposed on the revised site plan. Delete all items
which will not be on the ground when construction is complete.
(4) Furnish electrical requirements to the Electric Department. Locations and
type of service to be approved by Electrical Superintendent.
(5) Show all landscaping information, including existing and proposed, size and
type of trees, type of grass, shrubs, etc. Addition landscaping to that on
plan reviewed is preferred.
(6) Show all existing utility easements.
(7) Show the exact location of the existing fire hydrant,
(8) A 6" raised curb is required around all edges of all parts of all paved areas
without exception. (To include islands, planting areas, access ways, dumpster
locations, utility pads, etc.) Curb detail to be approved by the City Engineer.
No exceptions will be made for areas indicated on plan as "reserved for future
parking ".
*Any changes to the approved site plan must be cleared through the Office of the
Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. JULY 29th to
BE INCLUDED ON PAZ AGENDA AUGUST 4th.
sjv
♦# City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
July 20, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Joe R. Barron, 223 S. Main St., Bryan 77802
Leonard E. Morehead, Sr. (same address)
FROM: Project Review Committee h,v
Al Mayo, Director of Planning
Mark Smith, Ass't to City Engineer
D.Hi11 /R.Kaiser, P &Z Representative
Other Staff:
Joe Guidry, Electrical Superintendent
Dan Dupies, Ass't Zoning Official
Jim McCord, Elec. Power Engrs,
Bennie Luedke, Water & Sewer Superintendent
Harry Davis, Fire Marshal
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Glass Warehouse for Acme Glass - 83
The P.R.C. met on July 19th to review the above mentioned project, and
recommends approval of the project with the following conditions:*
(1) A 20 ft. dedicated easement across the rear property line (adjacent
to residences) will be required, and must be shown on site plan.
(2) A location map showing how access is to be taken, as well as all
adjacent properties and buildings is required.
(3) An all weather surface will be required on access ways from any public
street to this building. City Engineer will determine type of surface
required.
(4) The water line which is shown is not all the way to Walton; it stops at
the meters.
(5) Show existing fire hydrants on either site plan or location map. A fire
hydrant must be located within 300 feet of all parts of this building as
the hose lays.
(6) There may be a sewer service problem; location of line and service to be
determined with help of Bennie Luedke, Superintendent of Water & Sewers.
(7) Show site grading and drainage flow direction on site plan.
(8) Check with Alfred Miller, Director of Public Services concerning size and
location of dumpster.
(9) Parking spaces should be kept off the alley. (The first space may have to
be eliminated to allow room for the dumpster if that location is chosen).
Continued...
P.R.C. (83 -430)
July 19, 1983
page 2
(10) Install some type of protection to separate the entire length of parking
spaces which are adjacent to loading spaces In front of loading doors.
(11) A 6 ft. solid screen fence is required between this project and adjacent
residential development.
SUBMIT 4 COPIES OF REVISED SITE PLAN PRIOR TO ISSUANCE OF BUILDING PERMIT.
*Any changes to the approved plan must be cleared through the Office of the
Director of Planning.
sjv
e City of College Station
P OST OFFICE BOX 9960 1 101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
July 20, 1983
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Dan Dupies, Ass't Zoning Official
Jim McCord, Elec. Power Engrs.
Bennie Luedke, Water & Sewer Superintendent
Harry Davis, Fire Marshal
Shirley Volk, Planning Technician
Mike McClure, McClure Engr.
SUBJECT: Preliminary Plat - Woodway West Phase II (23.1260A) - 83
A Presubmission Conference was held on July 19th to review the above plat.
Staff recommends approval with the following conditions:*
(1) Plat this area with a dedicated R.O.W. for the extension of Marion
Pugh Drive.
(2) Platting with easements for water lines is preferred, and will be
acceptable by submitting a replat of "as- built" or at the time of
Final Plat.
(3) Show dedicated 20 ft. utility easements on the east, west and Luther
Street sides of this tract.
*Any changes to the approved plat must be cleared through the Office of the
Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO THE PLANNING DEPARTMENT BY JULY 29th TO BE
INCLUDED ON PAZ AGENDA FOR AUGUST 4th.
sjv