Loading...
HomeMy WebLinkAboutapril 19 I e � City of College Station P OST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 April 19, 1983 MEMORANDUM TO: PLANNING & ZONING COMMISSION J. W. Wood FROM: Project Review Committee: Al Mayo, Director of Planning Roy Kelly, Vice Chairman P &Z David Pullen, City Engineer Other Staff: Harry Davis, Fire Marshal Dan Dupies, Ass't to Zoning Official Jim McCord, Elec. Power Engrs, Shirley Volk, Planning Technician SUBJECT: Parking Lot Plan - Eastmark OFc /Svc Center - J.W.Wood - 83 -420 The P.R.C. met on this date to review the above mentioned project, and recommends approval with the following conditions:` (1) Water line through location of fire hydrant must be 8 "; after that point can drop to 6 ". Plans to be prepared by a registered professional engineer. (2) Check with Director of Public Services (Mac Allen) concerning location of dumpster. (3) Include additional landscaping information. (4) Make sidewalks 6 ft. rather than 5 ft. to allow 2 ft, overhang when cars are parked. (5) If one sewer line services more than one building, it must be a "public" sewer line; alternative is each building can be individually sewered by a "private" sewer line. (6) Eliminate one driveway to Eastmark Drive; if one main driveway is used as access to multiple phases, suggest this be widened. (7) If one main driveway is used, an access easement must be provided. *Any changes to the approved site plan must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. APRIL 29th TO BE INCLUDED ON P &Z AGENDA MAY 5th. sjv