Loading...
HomeMy WebLinkAboutapril 14 �, ♦�� City of College Station P OST OFFICE BOX 9960 1101 TEXAS AVENUE \ / COLLEGE STATION, TEXAS 77840 2 499 April 14, 1983 MEMORANDUM TO: Planning and Zoning Commission Peter Parciany, 6906 Atwell, Suite 131 Houston, TX 77081 FROM: Project Review Committee: Al Mayo, Director of Plann' David Pullen, City Engineer Roy Kelly, Vice Chairman, P& Other Staff: Jim Callaway, Ass't Director of Planning Joe Porter, Fire Department Jane Kee, Zoning Official Joe Guidry, Electrical Superintendent Dan Dupies, Ass't to Zoning Official Jim McCord, Elec. Power Engineers Bill Cupp, GTE Shirley Volk, Planning Technician SUBJECT: 83 -418: Parking Lot Plan - College Station Business Center at intersection of FM 2818 & Longmire, along Valley View Drive The P.R.C. met on this date to review the above mentioned project and recommends approval with the following conditions:* (1) Develop raised islands on ends of parking rows; include dimensions on all islands (minimum typical width - 9 ft.). (2) Separate spaces along building #1 from the building a distance of at least 2 ft., by means of either curbing or wheelstops. (3) Extend the curbing on the buildings with overhead doors to provide stops for the adjacent parking spaces and to divide the loading area from the parking space. (4) Back the curbing away from the ends of the buildings at least 2 ft. to separate the drive from the building (specifically bldgs. #1 & #2). (5) Show all dimensions; specifically mentioned were the 8 ft. setback from the property line, the width of the access way into the project and the drive itself in addition to island dimensions requested under #1. (6) Use a minimum 15 ft. radius on the drive (access drives). (7) Complete drainage plans must be prepared by a professional engineer and approved by the City Engineer prior to issuance of any building permits. Please refer to the PRC Drainage Statement attached. (8) Dumpster locations must be approved by the Director of Public Services (Mac Allen). Dumpsters should not be located under a utility line. (9) Furnish an estimate of electrical load requirements to the Electrical Department as soon as possible. (10) GTE requires conduit looped; check with Bill Cupp or David Riley. continued... PRC Memo 83 -418 page 2 (11) City Engineer has advised that he must check with the Water & Sewer Superintendent (Bennie Luedke) regarding the sewer line; there is a possibility that the line may have to be an 8" public line. Confer with City Engineer concerning results of his investigation. (12) Additional landscaping is required along Valley View Drive. (13) Any sign must conform to Section 8 of the Zoning Ordinance (Ord. 850). Check with Jane Kee, Zoning Official if you have any questions. (14) All solid curbing around the perimeter of the project and the ends of islands in the interior of the project must be marked as specified by the Fire Department as Fire Lanes. If the center section of Bldg. #2 is over 15,000 sq. ft. in area, sprinklers will be required. (15) A 10 ft. easement is required on Fire Lines (water), and may be covered by Separate Instrument. Plans and profile to be prepared by a profes- sional engineer. (16) Fire hydrants must be installed and in operation before any combustible construction begins. (17) An additional 10 ft. easement is required along F.M.2818 and may be covered by Separate Instrument. (18) Trees, signs, etc. in easement should not interfer with overhead power lines. (19) Show all easements on site plan. (20) All easements must be filed prior to use of easement and prior to issuance of Certificate of Occupancy. *Any changes to the approved site plan must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. ON APRIL 29th IN ORDER TO BE ON P &Z AGENDA MAY 5. sjv City o f College Station (,‘ POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 April 15, 1983 MEMORANDUM TO: Tony Jones, 1301 F.M.2818, College Station, TX 77840 File FROM: Project Review Committee: Jim Callaway, Ass't Director of Planning W Roy Kelly, Vice Chairman, P &Z David Pullen, City Engineer Other Staff: Jane Kee, Zoning Official Joe Guidry, Electrical Superintendent Joe Porter, Fire Department Dan Dupies, Asst to Zoning Official Jim McCord, Elec. Power Engr. Bill Cupp, GTE Shirley Volk, Planning Technician SUBJECT: Site Plan - Villas on the Rio Grande - 83 - 505 The P.R.C. met on 4/14/83 to review the above mentioned project, and recommends approval with the following conditions:* (1) City Engineer suggested more visitor parking as the space allowed on site is very small. (2) The rear driveway should be 20 ft. instead of the 15 ft. as shown. (3) Developer will install necessary conduit for underground utility service to poles and must be coordinated with the Electrical Department. (4) Blanket easements will be required for services to townhomes. (5) The access drive radius to Rio Grand must not encroach adjacent property (when this property line is extended). Any changes to the approved plan must be cleared through the Office of the Director of Planning. Furnish 2 copies of revised site plan to the Planning Department prior to issuance of building permit. sjv ��� City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE \ / COLLEGE STATION, TEXAS 77840 -2499 April 15, 1983 MEMORANDUM TO: Grant Wolfe, 8100 Cambridge #128, Houston James A. Pounds IV, Aries Assoc., Inc., 2551G S. Texas Avenue, CS FROM: Project Review Committee: Jim Callaway, Ass't Director of Planning Roy Kelly, Vice Chairman, Pi; David Pullen, City Engineer e Other Staff: Joe Guidry, Electrical Superintendent Dan Dupies, Ass't to Zoning Official Joe Porter, Fire Department Jane Kee, Zoning Official Jim McCord, Elec. Power Engr. Bill Cupp, GTE Shirley Volk, Planning Technician SUBJECT: 83 -419 Parking Lot Plan - Dental Clinic, Lot 28 Richards Subdivision The P.R.C. met on 4/14/83 to review the above mentioned project, and recommends approval with the following conditions:* (1) Include a groundcover note on plans; require additional landscaping which must be identified on plan. (2) Sight triangle must be clear of obstructions, (3) Drainage plan must be prepared by a professional engineer and should include existing elevations, proposed elevations and how the water will travel from this project to the inlet. (4) Electrical service must be approved by the Electrical Department. (5) Curb on the building side (west side) must be marked as Fire Lane. (6) The screen fence from the east property line to the west building line will be acceptable. It should be noted that Mr. Mayo, through Mr. Callaway, as staff representative of P.R.C. recommended a 4 - ft. high solid screen fence along the Richards Street property line to Texas Avenue, but this recommendation was overruled with Mr. Kelly and Mr. Pullen casting votes against this fence. Therefore, a screen fence from the west side of the driveway to Texas Avenue along Richards Street will not be required. Any changes to the approved plan must be cleared through the Office of the Director of Planning. Furnish 2 copies of revised site plan to the Planning Department prior to issuance of the building permit. sjv