HomeMy WebLinkAboutmarch 22 f " 4 ( City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
March 22, 1983
MEMORANDUM
Presubmission Conference
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Harry Davis, Fire Marshal
Joe Guidry, Electrical Superintendent
Jim McCord, Elec. Power Engrs.
Bill Cupp, GTE
Shirley Volk, Planning Technician
Also: David Mayo & Austin Fitch, Area Progress Corp.
SUBJECT: Preliminary Plat - The Glade Section 11 - 83
The staff met on March 22, 1983 to review the above mentioned plat and recom-
mends approval with the following conditions:*
(1) An easement for guys will be necessary on Lot 8.
(2) A copy of a written easement on the unplatted land adjacent to the easement
on lots 15 -22 of 10 ft. (making a total of a 20 ft. easement) is required.
(3) Any additional fire hydrants necessary to be located as directed by
the Fire Marshal and the Water & Sewer Superintendent.
(4) Use a heavier line to designate exactly what land this plat covers.
(5) Supply a written 10 ft. easement on the school property.
(6) There is a possibility that a utility easement will be required across
the front of lots 1 - 5.
Any changes to the approved plat must be cleared through the Office of the
Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT BY 5:00 P.M. MARCH 31
TO BE INCLUDED ON PAZ AGENDA APRIL 7th.
sjv
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
I P
COLLEGE STATION, TEXAS 77840 -2499
March 22, 1983
MEMORANDUM
TO: Planning & Zoning Commission
Jack Teague
FROM: Project Review Committee:
Al Mayo, Director of Planning
Jim Behling, Chairman P &Z
David Pullen, City Engineer
Other Staff:
Harry Davis, Fire Marshal
Joe Guidry, Electrical Superintendent
Dan Dupies, Ass't to Zoning Official
Jim McCord, Elec. Power Engrs.
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - BULLDOG Auto Care (83 -415)
The P.R.C. met on March 22, 1983 to review the above mentioned project, and
recommends approval with the following conditions:*
(1) A 6" raised curb is required around all edges of all parts of all paved
areas without exception. (To include islands, planting areas, access
ways, dumpster locations, utility pads, etc.) Curb detail to be approved
by City Engineer. No exceptions will be made for areas indicated on site
plan as "reserved for future parking ".
(2) An additional fire hydrant will be required at a location approved by
the Fire Marshal and the Water & Sewer Superintendent. All parts of
the building must be within 300 ft. of the hydrant as the hose lays.
Installation plans must be drawn by a registered Professional Engineer.
(3) Ordinance requires an 8 ft. setback from the property line along Holleman
Drive (front setback). Show actual dimension on site plan.
(4) Suggest the sidewalk in front of the building be made 6 ft. in width;
(2 ft. of this sidewalk can then be used for wheel stops).
(5) Dumpster location and size to be approved by the Director of Public
Services.
(6) Island at the corner of the building should be 9 ft. in width. Whether
this additional width can come from the driveway must be determined by
the Director of Public Services (Mac Allen).
(7) The painted island shown on site plan should be changed to a raised curb
island, and should meet ordinance requirements.
(8) Include a note to indicate plantings to be used.
(9) Include an elevation of the planters.
(10) When electrical load requirements are determined, contact Joe Guidry.
SUBMIT 10 COPIES OF REVISED PLAN TO THE PLANNING DEPARTMENT BY 5:00 P.M. THURSDAY,
MARCH 31 TO BE INCLUDED ON P &Z AGENDA APRIL 7th.
*Any changes to the approved plan must be cleared through the Office of the
Director of Planning.
I City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
March 22, 1983
MEMORANDUM
TO: Planning and Zoning Commission
Surrey Enterprises, Inc. dba Jesse Jones & Associates
FROM: Project Review Committee:
Al Mayo, Director of Planning
Jim Behling, Chairman P &Z
David Pullen, City Engineer
Other Staff:
Harry Davis, Fire Marshal
Joe Guidry, Electrical Superintendent
Jane Kee, Zoning Official
Dan Dupies, Ass't to Zoning Official
Jim McCord, Elec. Power Engrs.
Bill Cupp, GTE
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Fuddrucker's Restaurant - 83 -414
The P.R.C. met on March 22, 1983 to review the above mentioned project, and
recommends this project be re -drawn and re-planned and brought back before the
P.R.C. at 9:15 a.m. on Tuesday, March 29, 1983. Recommendations to be considered
in this revised plan are as follows:
(1) The dumpster size and location must be reviewed and approved by the Director
of Public Services, Mac Allen .
(2) Because of its size, the building must be sprinklered.
(3) Parking spaces can be 9x18 ft. if a 2 ft. overhang is available.
(4) Show exact property lines on plan.
(5) The side setback for the building must be 73 ft. from the ground lease
property line.
(6) An additional fire hydrant will be required and must be located as designated
by the Fire Marshal and the Water & Sewer Superintendent (Bennie Luedke). All
parts of the building must be within 300 ft. of the hydrant as the hose lays.
(7) All end island widths should be 9 ft.
(8) Front setback should be 8 ft, from property line.
(9) Show actual driveway dimensions.
(10) Show dimensions on the front island.
(11) A 6" raised curb is required around all edges of all parts of all paved
areas without exception. (To include islands, planting areas, access ways,
dumpster locations, utility pads, etc.) Curb detail to be approved by the
City Engineer. No exceptions will be made for areas indicated on site
plan as "reserved for future parking ".
(12) Submit a copy of the cross parking agreement reached with neighbor; show
access to this parking on the site plan.
(13) Three handicap parking spaces will be required in addition to the required
regular sized parking spaces (90).
P.R.C. (83 -414)
page 2
March 22, 1983
(14) A copy of a legal, guaranteed access agreement (re: access from Texas
Avenue on Kirkpatrick private driveway) must be submitted, along with
the exact plans for access to the service entrance.
(15) Submit a copy of a legal document concerning the shared access entrance
at the main entrance off Texas Avenue; this driveway, as well as any
off -site driveways, entrances and parking areas must be completed prior
to issuance of any certificate of occupancy.
(16) The sign size, location and design must comply with the Ordinance and
be approved by the Zoning Official. Location of sign should be shown
on the plan and plans for the sign should be supplied to Zoning Official.
(17) Any additional easements required for utilities must be supplied to and
approved by the Electrical Department.
(18) Mark Fire Lane on curbing adjacent to building as indicated by Fire
Marshal.
(19) A Grading and Drainage Plan is required by the City Engineer and must
be supplied to and approved by same prior to issuance of Building Permit.
Please refer to PRC Drainage Statement supplied by City Engineer.
Revised site plans for this project will be reviewed by the P.R.C. prior to
going to the Planning & Zoning Commission on April 7th.
sjv