HomeMy WebLinkAboutCity of College Station Statements 1953 - 1957 CITY OF COLLEGE STATION
STATEMENT
FAhruary 14, 195 3
Brown Construction Company
Box 690
College Static':, Texas
TERMS
Charge for installing
x temporary hook — up
Feb. 13, 1953
(includes charge for
electricity used in
sanding floors —
4 houses, Block 9
Oak Terrace) 5 00
CITY OF COLLEGE STATION
STATEMENT
Au 15, 195 -
finest Langford
Collec"e Station, Texas
TERMS
25 of cable (Bn fan Elec.) 3 75
50 romex 4 on
1.5 Of T;.I Wire 75
1 ceiling box
1 wall box 45
1 H. D. Duplex 50
1 Duplex cover 10
4 Romex connect. (Parker ?,7tin) 40
1. 40
L2A2'I
CITY OF COLLEGE STATION
STATEMENT
September° 11 195 3
Lone Star nas Compan
Bryan, Texas
TERMS
Patching Main S t at
North Area and Milner Street
at Ryles
15' a lb . Alpha r � $5.90 per ton 44 25
s; 9 - 53 22 hr . 411.00 22 001
9 53 28 hrs. @ $1.00 28.00)
Truck hire 5 00 ,. 25
- -- -_.____ 4'4' ), �,°
ij D \
CITY OF COLLEGE STATION
STATEMENT
e
December 1, 195 --5-- --
805 Highway #6 So.
texas
TERMS
Materials & Labor to Repla0e
Light Pole Broken by Texa
truck in College Park, 11 -55
Light Pole 1 35' :�.�g}lt . ole C-4 �. 26 00 26 00
1 8' Cross Arm 0 3 32 3 32
1 Large Strain Insu.ator 0 51 51
5 Square D Clevises @ 41 2 05
6 5/8" X 12" Galv. Bolts P 30 1 80
6 Square Washers ® 06 36
2 5/8" X 20" Spacer Bolts Q 54 1 02
2 #6 Automatic Sleeves g 48 96
2 #6 Automatic Dead End Slee es 0? 59 1 18
20 #6 Connectors 0 21 4 20
3 Lead Headed Cross Arm Pins 0 63 1 89
Labor: Electrician 10 00 10 00
Labor: Workers 16 00 422
69 29
CITY OF COLLEGE STATION
STATEMENT
December 30, 1951____
Pugh Lumber Company
Old Highway #6
College Station, Texas
TERMS
3,000 lbs. Asphalt 7 98
CITY OF COLLEGE STATION
STATEMENT
Qmtpr 30, 195 _
Charlie Dohrnvnlney
Route #3
Bryan, TexaR
TERMS
25 12' poles @ 1 45 36 25 jf
God t ;` s C '� . >
<Ns
CITY OF COLLEGE STATION
STATEMENT
195
Culpepper ` on l ty Con pan
':'niton Drive
Colle a station Lox
TERMS
:'.pplication for 3uildinL
Permit ;; '1149 (permit
to relocate house on
of , corner Live Oak
Highway ,: 6) 11 DC;