HomeMy WebLinkAbout1975-0973 - Ordinance - 07/24/1975ORDINANCE NO. 973
AN ORDINANCE AMENDING THE SCHEDULES OF UTILITY RATES FOR THE CITY OF COLLEGE
STATION, REPEALING ORDINANCE NO. 913 AND PROVIDING FOR AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS:
SECTION 1. Schedule of Rates:
The monthly rates to be charged customers for public utility services
--namely electricity shall be in accordance with the schedules as follows:
Rates for Electricity
A. ELECTRIC RATE -- SCHEDULE R
(RESIDENTIAL)
Applicable: To single family residential customers for all domestic usage.
Rate: 5.60(,% per kwhr for the first 25 kwhrs.
4.40t per kwhr for the next 75 kwhrs.
3.540, per kwhr for the next 100 kwhrs.
1.90r,% per kwhr for all kwhrs over 200, except
1.300, per kwhr for all over 700 kwhrs used per month in
the months of November through April.
Delayed Payment:
10% of bill not to exceed $5.00 added after the due date.
If service is discontinued because of non-payment, a meter
reconnection charge will be made.
Minimum Bill: $2.50 per month.
Multiple -Dwelling Units:
Multiple dwelling units where served under one meter shall
be billed under the applicable commercial rate.
Fuel Adjustment:
iw► The net energy charge per kilowatthour shall be increased or
decreased by an amount per kilowatthour equal to any increase
or decrease in the wholesale rate paid for electric energy
by the City of College Station by virtue of the fuel clause
in that wholesale contract. 02582
ORDINANCE NO. 973
Page 2
t
B. ELECTRIC RATE -- SCHEDULE SC
(SMALL COMMERCIAL)
Applicable: To all commercial customers, multiple dwelling units, and
other customers whose monthly kilowatt demand does not
exceed 15 kw. Demand meters will be installed on all such
customers whose (1) installed load would indicate that
demands over 15 kw would be experienced or (2) whose monthly
kilowatthours exceed 5000.
Rate: 6.00, per kwhr for the first 100 kwhrs.
5.00, per kwhr for the next 400 kwhrs.
'3.40G per kwhr for the next 500 kwhrs.
1.901,% per kwhr for the next 5000 kwhrs.
1.25i� per kwhr for all kwhrs over 6000 kwhrs.-
Delayed Payment:
10% of bill not to exceed $5.00 added after the due date.
If service is discontinued because,of non-payment, a meter
reconnection charge will be made.
Minimum Bill: $2.50 per month.
Fuel Adjustment:
The net energy charge per kilowatthour shall be increased or
decreased by an amount per kilowatthour equal to any increase
of decrease in the wholesale rate paid for electrical energy
by the City of College Station by virtue of the fuel clause
in -that wholesale contract.
ORDINANCE NO. 973
Page 3
C. ELECTRIC RATE -- SCHEDULE LP-1
(MEDIU114 COMMERCIAL AND INDUSTRIAL)
Applicable: To all commercial and industrial customers, multiple -dwelling
units, and other customers where service is taken through one
meter and where monthly kilowatt demand is between 15 kw and
300 W.
Character of Service:
A.C.; 60 cycles per second, single phase, 120/240 volts; three
phase, 120/240, 120/208, 240/480, 277/480, 2300/4160, 7200/12,470
volts, as available at point of service. Three phase customers
served via underground primary to pad -mounted transformers will
be offered only 120/208 or 277/480 volt service.
Rate: Demand Charge: $1.85 per kw of billing demand.
Energy Charge: 1.90C per kwhr for the first 5,000 kwhrs.
1.50t per kwhr for the next 35,000 kwhrs.
.92� per kwhr for all kwhrs over 40,000 kwhrs.
Billing Demand: The billing demand shall be the maximum 15 minute measured kw
in the month, but not less than 50% of the peak demand measured
in the twelve month period ending with the current month.
Delayed Payment:
10% of bill not to exceed $5.00 added after the due date.
If service is discontinued because of non-payment, a meter
reconnection charge will be made.
Minimum Bill: $2.50 per kw of billing demand.
Fuel Adjustment:
The net energy charge per kilowatthour shall be increased or
decreased by an amount per kilowatthour equal .to any increase
or decrease in the wholesale rate paid for electric energy
by the City of College Station by virtue of the fuel clause
in that wholesale contract.
Power Factor: Should the power factor be lower than 0.85 lagging, the City
may adjust the measured demand by multiplying by the ratio of
0.85 to the actual power factor.
0f584
ORDINANCE NO. 973
Page 4
D. ELECTRIC RATE -- SCHEDULE LP-2
(LARGE CO11MERCIAL AND INDUSTRIAL)
Applicable: To all commercial and industrial customers, multiple -dwelling
units, and other customers who contract for over 300 kw of demand
and where service is taken through one meter at one point of
delivery. Before service is supplied, individual contracts should
be negotiated outlining all details of the service to be supplied,
the terms of the contract, and the obligations of each party.
Character of Service:
A.C.; 60 cycles per second, single phase, 120/240 volts; three
phase, 120/240, 120/208, 240/480, 277/480, 2300/4160, 7200/12,470
volts, as available at point of service. Three phase customers
served via underground primary to pad -mounted transformers will be
offered only 120 M8 or 277/480 volt service.
Rate: Demand Charge:
$1.70 per kw of billing demand for the first 300 kw
$1.45 per kw of billing demand for all over 300 kw
Energy Charge:
1.80t per kwhr for the first 25 kwhrs per kw of billing demand
1.45e, per kwhr for the next 100 kwhrs per kw of billing demand
1.00C. per kwhr for the next 125 kwhrs per kw of billing demand
.85C per kwhr for all additional kwhrs.
Billing Demand: The billing demand shall be the maximum 15 minute measured kw
in the month, but not less than 50% of the peak demand measured
in the twelve month period ending with the current month.
Where the customer provides an integrating graphic demand meter
satisfactory to the City, off-peak service will be provided for
in the negotiated contract.
Delayed Payment: 10% of bill not to exceed $5.00 added after the due date. If
service is discontinued because of non-payment, a meter
reconnection charge will be made.
Minimum Bill: $2.50 per kw of billing demand.
Fuel Adjustment: The net energy charge per kilowatthour shall be increased or
decreased by an amount per kilowatthour equal to any increase
or decrease in the wholesale rate paid for electric energy by
the City of College Station by virtue of the fuel clause in
that wholesale contract.
Power Factor: Should the power factor be lower than 0.85 lagging, the City
may adjust the measured demand by multiplying by the ratio of
0.85 to the actual power factor.
Primary Service: Where service is taken by the customer at the City's available
primary voltage, a credit of 4% of the net bill be allowed.
Metering may be primary or secondary (corrected for transformer
losses) at the City's option. W 85
ORDINANCE NO. 973
Page 5
E. ELECTRIC RATE -- SCHEDULE SL
(175 TIATT SECURITY LIGHTS)
Applicable: To service to 175 watt security lights installed and main-
tained by the City for customers at their request. The
customer will be required to contract for this service for
a period to be determined by the City.
Character of Service:
1. Security lighting equipment, including lamps, fixtures,
control units and the necessary security lighting circuits,
transformers, guys, anchors, fittings, etc. will be fur-
nished by the City subject to the payment of an installa-
tion fee as set by the City.
2. Lamp replacement will be made by the City without additional
charge, except that damage to lamps and luminaires resulting
from vandalism shall be charged to the customer at cost as
a separate item on his monthly bill for service.
Rate: $3.75 per month per light.
bemand Payment: 10% of bill not to exceed $5.00 added after the due date.
Fuel Adjustment: The net energy charge per kilowatthour shall be increased or
decreased by an amount per kilowatthour equal to any increase
or decrease in the wholesale rate paid for electric energy
by the City of College. Station by virtue of the fuel clause
in that wholesale contract.
SECTION 2.
In view of the fact that the city must have access to the meters for
reading and service no authorized city representative shall be denied access
to the meter. All connections, reconnections and disconnections shall be
made only by an authorized representative of the city.
SECTION 3.
These rates shall be effective on all invoices submitted by the
City of College Station to users on or about August 1, 1975.
PASSED, APPROVED AND ORDERED PUBLISHED this the 24th day of July, 1975.
ATTEST
City Secrptar
APPROVED
Mayor