HomeMy WebLinkAbout03/19/2007 - Regular Minutes - Design Review Board.~-
CITY OF COLLEGE_STATION
PCanning eT' Development Services
Minutes
Design Review Board
.Monday, March 19, 2007
Second Floor Conference Room
1101 Texas Avenue
1 l :00 AM
.Board Members Present: Chairman John Nichols, Ward Wells, Hunter Goodwin, and
Alan King
Board Members Absent: Nancy Sawtelle
Staff Present: Staff Planners Crissy 'Hartl, Lindsay Boyer, .and Jason
Schubert, Planning .Administrator Molly. Hitchcock, Graduate
Civil Engineer Carol Cotter and Staff Assistant Brittany
Korthauer
Others Present: Brett McCully, Jane Kee, Mike McClure, Mike Record, Bo
Miles, and Davis Young
AGENDA ITEM NO. 1: Call to order.
Chairman John Nichols called the meeting to order at 11:05 a.m.
AGENDA ITEM N0.2: Consider Absence request
Nancy Sawtelle
Alan-King motioned to approve absence request. Ward Wells seconded the motion; which
passed unopposed (4-0):
AGENDA ITEM. N0.3: Possible action and discussion to approve meeting minutes
for December 8, 2006.
Ward Wells motioned to approve the meeting minutes. The motion was seconded by Alan
King and passed unopposed (4-0).
AGENDA ITEM N0.4 s ..Presentation, .possible action and discussion on a site plan,
building elevations, and sign details for Wolf Creek Condos, located at 1811 George
Bush Drive East in the Wolf Pen Creek District (LB/CC 07-500036).
Lindsay Boyer presented the staff report stating that the applicant is proposing to construct a
27 unit multi-family development located at 1811 George Bush Drive East along the Wolf
Pen Creek Corridor.
Alan King ..motioned for approval of the item as presented with the condition that all
sanitation enclosures are constructed of masonry that is consistent with the building masonry.
Vegetated. screening should be altered to something such as Nandina Compacts. Hunter
Goodwin seconded the motion; whichpassed unopposed (4-0).
AGENDA ITEM NO.S: Presentation, possible action and discussion on a Planned
Development District Concept. Plan (PDD Concept Plan) for Pebble Creek 9C on 13.04
acres located off of Royal Adelade Dr. and Pebble Creek Parkway (CH 07-53).
Crissy Hartl presented the item stating that the applicant is bringing forward a new concept
plan to request 50 residential lots on 13.037 acres with 4.58 acres of common areas that will
be used for landscaping, internal access, open space, and buffering along Royal Adelade
Drive. The. applicant would also like a variation to the front setback to be considered.
Alan King motioned for approval of the concept plan as submitted with the condition that
staff comments are addressed. Ward Wells seconded the motion; which passed unopposed
(4-0).
AGENDA ITEM NO 6: Possible action and discussion on the process of insuring
the. decisions made by the DRB committee are carried through.
Molly Hitchcock presented the item stating that staff insures that all decisions made by the
Design Review Board are carried through. She stated that it is the Planners and Engineers
responsibility to check the site plan to insure that all requirements are met and before
receiving a Certificate of Occupancy the business/development has to have the approval of a
Staff Planner.
AGENDA ITEM N0.7: .Adjourn
Alan King motioned for adjournment. The. motion was seconded by Hunter Goodwin and
passed unopposed (4-0).
ATTEST:
b
Brittany Kort a er Staff Assistant
APPRO
Joh ichols, Chairman