HomeMy WebLinkAbout11/16/2023 - Agenda Packet - Impact Fee Advisory Committee
College Station, TX
Meeting Agenda
Impact Fee Advisory Committee
1101 Texas Avenue, College Station, TX 77840
Internet: www.microsoft.com/microsoft-teams/join-a-meeting
Meeting ID: 257 325 334 510 | Passcode: iAGMTc
Phone: 833-240-7855 | Phone Conference: 771 141 369#
The City Council may or may not attend this meeting.
November 16, 2023 6:00 PM City Hall Council Chambers
College Station, TX Page 1
Notice is hereby given that a quorum of the meeting body will be present in the physical location
stated above where citizens may also attend in order to view a member(s) participating by
videoconference call as allowed by 551.127, Texas Government Code. The City uses a third-
party vendor to host the virtual portion of the meeting; if virtual access is unavailable, meeting
access and participation will be in-person only.
1. Call to Order, Pledge of Allegiance, Consider Absence Request.
2. Hear Visitors
At this time, the Chairperson will open the floor to visitors wishing to address the Committee on issues
not already scheduled on tonight's agenda. The visitor presentations will be limited to three minutes in
order to accommodate everyone who wishes to address the Committee and to allow adequate time for
completion of the agenda items. The Committee will receive the information, ask city staff to look into
the matter, or will place the matter on a future agenda for discussion. (A recording is made of the
meeting; please give your name and address for the record.)
3. Consent Agenda
All matters listed under the Consent Agenda, are considered routine by the Committee and will be
enacted by one motion. All items approved by Consent are approved with any and all staff
recommendations. Since there will not be separate discussion of these items, citizens wishing to
address the Committee regarding one or more items on the Consent Agenda may address the
Committee at this time as well. If any Committee desires to discuss an item on the Consent Agenda it
may be moved to the Regular Agenda for further consideration.
3.1. Consideration, discussion, and possible action to approve meeting minutes.
Attachments: 1. May 4 2023
4. Consideration, discussion, and possible action on items removed from the Consent
Agenda by Committee action.
5. Regular Agenda
5.1. Presentation, discussion, and possible action regarding a Semi-Annual Report on System-Wide
Impact Fees for Water, Wastewater, and Roadway.
Sponsors: Carol Cotter
Attachments: 1. Impact Fee Semi-Annual Report - 20231116
2. Future Land Use Map (from FNI Report)
Page 1 of 29
Impact Fee Advisory Committee
Page 2 November 16, 2023
3. Service Area Maps -Water, Wastewater and Roadway
4. Status of Impact Fee CIP - Water Wastewater Roadway - September
2023
6. Discussion and possible action on future agenda items.
An Impact Fee Advisory Board Member may inquire about a subject for which notice has not been
given. A statement of specific factual information or the recitation of existing policy may be given. Any
deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting.
7. Adjourn.
The Impact Fee Advisory Committee may adjourn into Executive Session to consider any item listed
on the agenda if a matter is raised that is appropriate for Executive Session discussion.
I certify that the above Notice of Meeting was posted on the website and at College Station City Hall,
1101 Texas Avenue, College Station, Texas, on November 10, 2023 at 5:00 p.m.
City Secretary
This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting
and who may need accommodations, auxiliary aids, or services such as interpreters,
readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD
at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the
meeting so that appropriate arrangements can be made. If the City does not receive notification
at least two business days prior to the meeting, the City will make a reasonable attempt to
provide the necessary accommodations.
Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun.
"Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly
Carried Handgun) A Person Licensed under Subchapter H, Chapter 411,
Government Code (Handgun Licensing Law), may not enter this Property with a
Handgun that is Carried Openly."
Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia.
“Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire
libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411,
Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad
portando arma de mano al aire libre.”
Page 2 of 29
May 4, 2023 Impact Fee Advisory Committee Minutes Page 1 of 5
Minutes
Impact Fee Advisory Committee
Regular Meeting
May 4, 2023
COMMITTEE MEMBERS PRESENT: Chairperson Dennis Christiansen, Committee
Members Jason Cornelius, Bobby Mirza, Melissa McIlhaney, David White, Marcus Chaloupka,
Aron Collins, Richard Woodward, and John Magruder
COUNCIL MEMBERS PRESENT: Councilmember Dennis Maloney
CITY STAFF PRESENT: Director of Planning & Development Services Michael Ostrowski,
Assistant Director of Planning & Development Services Molly Hitchcock, City Engineer Carol
Cotter, Assistant City Engineer Erika Bridges, Transportation Planning Coordinator Jason
Schubert, Long Range Planning Administrator Alyssa Halle-Schramm, Senior Planner Matthew
Ellis, Graduate Engineer II Katherine Beaman-Jamael, Deputy City Attorney Leslie Tipton-
Whitten, Assistant City Attorney II Aaron Longoria, Administrative Support Specialist Kristen
Hejny, and Technology Services Specialist Joel Lopez
1. Call Meeting to Order, Pledge of Allegiance, Consider Absence Request.
Chairperson Christiansen called the meeting to order at 6:00 p.m.
Chairperson Christiansen recessed the meeting at 6:01 p.m.
Chairperson Christiansen reconvened the meeting at 6:52 p.m.
2. Hear Visitors
No visitors spoke.
3. Consent Agenda
3.1 Consideration, discussion, and possible action to approve meeting minutes.
• November 3, 2022
Committee Member Cornelius motioned to approve the Consent Agenda,
Committee Member Chaloupka seconded the motion, the motion passed 9-0.
4. Consideration, discussion, and possible action on items removed from the Consent
Agenda by Committee Action.
No items were removed from the Consent Agenda for discussion.
Page 3 of 29
May 4, 2023 Impact Fee Advisory Committee Minutes Page 2 of 5
5. Regular Agenda
5.1 Presentation, discussion, and possible action regarding a Semi-Annual Report on System-
Wide Impact Fees for Water, Wastewater, and Roadway.
City Engineer Cotter provided a brief overview of the City’s impact fees and presented
the Impact Fee Semi-Annual Report to the Committee recommending acceptance of the
report for forwarding to City Council.
Chairperson Christiansen asked if capital costs are both City costs and developer costs.
City Engineer Cotter confirmed that capital costs are a combination of both the City’s cost
and developer costs.
Committee Member Cornelius asked for the reasoning behind the lower building numbers
over the past six months.
City Engineer Cotter explained that the overall market has slowed.
Director Ostrowski explained that the City has seen a dip in single-family numbers of over
half from the previous year, likely due to higher interest rates, higher construction costs,
economic uncertainty, and inflation.
Committee Member Woodward asked for the time period on the Capital Improvement
Project (CIP) implementation table.
City Engineer Cotter explained that the total capital expenditures are from 2010 through
today, explaining that since the City is still paying debt service on some of the capital
improvement projects providing capacity, they are allowed to be included in the impact
fee CIP.
Committee Member Woodward clarified that these are capital expenditures that are impact
fee eligible.
City Engineer Cotter confirmed that these are capital expenditures that are impact fee
eligible, explaining that the report shows what has been allocated.
Committee Member Woodward commented on the program overview, stating there are an
eligible $238 million that could have been collected at maximum, what the City has
proposed to collect at the current rate would be $53 million. Mr. Woodward also stated
that impact fees are only allowable on projects that impose costs on the City. Mr.
Woodward further stated that when the City does not collect at the maximum recoverable
rate, it is a subsidy for development to the tune of $197 million, which are big numbers
being left on the table.
Page 4 of 29
May 4, 2023 Impact Fee Advisory Committee Minutes Page 3 of 5
Committee Member Collins asked for clarification that the average single-family home
currently pays $5,500 in impact fees, and at the maximum rate the impact fees costs would
be closer to $13,000.
City Engineer Cotter confirmed the fees on single-family developments.
Committee Member White asked for an explanation on the difference between impact fees
and parkland dedication fees.
City Engineer Cotter stated that parkland dedication fees are in addition to impact fees.
Committee Member White asked if the IFAC oversees parkland dedication fees.
Director Ostrowski clarified that the IFAC does not oversee parkland dedication fees,
parkland dedication fees are set through an ordinance. Mr. Ostrowski also stated that the
Planning & Zoning Commission reviews the parkland dedication fee ordinance and is a
recommending body to the City Council, who will set the fee rates and adopt the ordinance.
Committee Member Mirza asked if impact fees collected are only used to fund CIP.
City Engineer Cotter confirmed that impact fees cannot be used for maintenance,
deficiencies, or bringing things up to code.
Committee Member Chaloupka expressed concerns with rising costs, and asked how often
the fees are adjusted for inflation.
City Engineer Cotter stated that with the 5-year update, the City adopted the maximum
assessable rates, the City Council will revisit the collection rates at their meeting on May
15, 2023.
Committee Member Magruder clarified that there could also be a markup on construction
costs such as, title insurance, realtor fees, or builder markup that the homeowners would
be responsible for in addition to impact fees.
Committee Member Woodward asked if the adopted collection rate is per service unit or
household.
Coordinator Schubert confirmed that the adopted collection rate is per service unit.
Committee Member McIlhaney asked if the City has performed any recent comparisons of
the collection rate with comparable cities.
City Engineer Cotter confirmed that comparisons were done for the collection rate item to
be presented to the City Council on May 15, 2023, stating that many cities have increased
Page 5 of 29
May 4, 2023 Impact Fee Advisory Committee Minutes Page 4 of 5
their collection rates to the maximum, and the City of College Station is on the middle to
lower end of the benchmark cities.
Committee Member McIlhaney stated that there is a lot the community gains with growth
and impact fees, if impact fees are set at the maximum there would be a significant impact
to residential home building.
Committee Member Magruder stated that the homebuyer pool is decreasing each time
home costs are increased.
Committee Member Collins asked for clarification on the price of impact fees as they are
related to the home cost, stating that the fees are irrespective to the value of the house.
City Engineer Cotter confirmed that the fees are the same regardless of the cost of the
home, unless larger meter sizes are purchased.
Committee Member Woodward stated that impact fees are real costs and costs for
impositions on the City. Mr. Woodward also stated that by not collecting at a maximum
rate the City is subsidizing development.
Committee Member Cornelius asked if there was a way to waive impact fees in new,
rezoned areas, such as MH Middle Housing areas that would go toward lower income
housing.
City Engineer Cotter stated that local government code does allow for waivers, but there
are affordable housing requirements that must be met.
Committee Member Collins would like to see a consideration of impact fees as a
percentage of a total project.
Committee Member McIlhaney stated that if collection rates are heavily increased, they
need to be done with a very long lead time.
Committee Member Magruder stated that if property has been platted budgets have
been set, increases in impact fees could ruin a developer’s potential for profit with
retroactive fees.
Committee Member Chaloupka stated that previous impact fees were increased over a time
period.
Chairperson Christiansen stated that there was general agreement amongst the Committee
that the charts and data are accurate.
Page 6 of 29
May 4, 2023 Impact Fee Advisory Committee Minutes Page 5 of 5
Committee Member Chaloupka motioned to recommend approval of the report for
forwarding to the City Council, Committee Member Cornelius seconded the motion,
the motion passed 9-0.
6. Discussion and possible action on future agenda items.
An Impact Fee Advisory Committee Member may inquire about a subject for which notice
has not been given. A statement of specific factual information or the recitation of existing
policy may be given. Any deliberation shall be limited to a proposal to place the subject
on an agenda for a subsequent meeting.
There was no discussion.
8. Adjourn
The meeting adjourned at 7:30 p.m.
Approved: Attest:
___________________________________ _________________________________
Dennis Christiansen, Chairperson Kristen Hejny, Board Secretary
Impact Fee Advisory Committee Planning & Development Services
Page 7 of 29
MEMORANDUM
DATE: November 16, 2023
TO: Impact Fee Advisory Committee
FROM: Carol Cotter, P.E., City Engineer
SUBJECT: Semi-Annual Report - System-Wide Impact Fees for Water, Wastewater, and Roadway
The City of College Station adopted “System-Wide” Impact Fees for water, wastewater, and roadways in
the latter part of 2016. In accordance with Texas Local Government Code, the 5-year update was
completed on November 22, 2021. Revised land use assumptions and capital improvements plans were
adopted including resultant maximum assessable rates and associated collection rates. In July of this year,
residential impact fee collection rates were amended to provide for annual increases to water and
roadway impact fees over the next three years, beginning January 1, 2024.
Texas Local Government Code requires Semi-Annual Reporting to monitor the progress of impact fees and
to determine if an update to the fee study is necessary before the statutory five-year requirement.
Other than the amendment to the collection rates, there have been no major changes in the water,
wastewater, or roadway impact fee programs during this reporting period. This report documents the
period of April 1, 2023 to September 30, 2023, and includes a summary of the utility and roadway
impact fees collected, transferred, and available for capital improvement projects. It also lists
ongoing capital improvement projects partially funded by impact fee revenues.
Staff recommends that the Impact Fee Advisory Committee accept this report and forward to City Council
for their update.
Impact Fee Advisory Committee (IFAC)
The City of College Station Code of Ordinances Chapter 107, Impact Fees, designates the Planning and
Zoning Commission as the Impact Fee Advisory Committee (IFAC). Additional ad hoc members were
appointed for the update process. The role of the IFAC is to:
1. Advise and assist the City in adopting Land Use Assumptions.
2. Review the Capital Improvements Plan and file written comments.
3. Monitor and evaluate implementation of the Capital Improvements Plan.
4. File semi-annual reports with respect to the progress of the Capital Improvements Plan.
5. Advise the City Council of the need to update or revise the Land Use Assumptions, Capital
Improvements Plan, and Impact Fees.
Page 8 of 29
Page 2 of 6
System-Wide Impact Fees
System-wide impact fees for water and wastewater were adopted September 22, 2016, with roadway
impact fees following on November 10, 2016. Maximum assessable rates were adopted, and reduced
collection rates implemented. Water and wastewater fees were phased in, starting at 50% of the
collection rate the first year with full collection rates the following year. Roadway impact fees were phased
in, beginning with zero fee collection in year one and 50% in year two. Full implementation of the initial
collection rates occurred in December 2018.
The statuary 5-year update of the water, wastewater and roadway impact fee programs was completed
November 22, 2021. Amendments to the land use assumptions and capital improvements plans were
adopted, including resultant maximum assessable rates and associated collection rates, and became
effective on January 1, 2022. The collection rate for residential developments was increased by 10% from
the previous rates and became effective March 1, 2022. The service area for roadway impact fees
remained unchanged, bounded by the city limits. Service areas for system-wide water and wastewater
impact fees were adjusted to respective services areas within the city limits, removing areas of the City’s
extra-territorial jurisdiction (ETJ). In July of this year, residential impact fee collection rates were amended
to provide for annual increases to water and roadway impact fees over the next three years, beginning
January 1, 2024. The amendments have been incorporated in the semi-annual report.
Status of the impact fee programs are presented in the following tables.
Impact Fee Program Overview – 2021 Study Updates
Impact Fee
Adopted
Max
Rate
Current
Collection Rate per
Service Unit*
Total
Estimated
Capital Costs
Recoverable
Costs at Max
Rate
(2021 – 2031)
Recoverable
Cost at
Collection Rate
(2021-2031) ** Res Non-Res
Water $3,877 $550 $500 $67,722,554 $54,457,437 $11.8M
Wastewater $5,572 $3,300 $3,000 $189,748,166 $71,917,188 $24.2M
Roadway A $499 $438.83 $80 $13,915,012 $9,052,650 $3.4M
Roadway B $1,261 $438.83 $80 $48,390,353 $20,114,165 $5.9M
Roadway C $2,127 $438.83 $80 $78,250,564 $25,687,488 $8.9M
Roadway D $3,452 $438.83 $80 $74,492,580 $57,399,762 $5.7M
Roadway Totals $215,048,509 $112,254,065 $23.7M
* Refer to Collection Rate Adjustment Schedule table for programmed collection rates.
** Recoverable costs include programmed collection rate adjustments.
Page 9 of 29
Page 3 of 6
Collection Rate Adjustment Schedule
Impact Fee
Collection Rate Per Service Unit
Residential Non-Residential 2024 2025 2026
Water $1,950 $2,150 $2,325 $500
Wastewater $3,300 $3,300 $3,300 $3,000
Roadway A $499 $499 $499 $80
Roadway B $897 $1,163* $1,261* $80
Roadway C $897 $1,163 $1,514 $80
Roadway D $897 $1,163 $1,514 $80
* For properties platted prior to January 1, 2022, the collection rate is limited to the 2016
maximum assessable rate of $1,072.
Impact fee revenues collected since the initial adoption of system-wide impact fees in 2016 are provided
by fiscal year in the table below. Amounts collected for this six (6) month reporting period from April 1,
2023 through September 30, 2023, are also provided.
Page 10 of 29
Page 4 of 6 Impact Fee Revenues Impact Fee FY17 FY18 FY19 FY20 FY21 FY22 FY23 Total Impact Fees Collected Water $45,075 $339,325 $335,400 $381,880 $420,200 $474,025 $328,370 $2,324,275 Wastewater $155,475 $1,606,025 $1,575,150 $1,666,800 $2,243,700 $2,333,880 $1,725,705 $11,306,735 Roadway A $0 $40,893 $81,193 $123,327 $117,261 $454,618 $142,401 $959,693 Roadway B $0 $32,671 $80,625 $427,118 $538,988 $494,585 $316,257 $1,890,244 Roadway C $0 $156,540 $391,243 $186,979 $194,634 $255,872 $205,679 $1,390,947 Roadway D $0 $33,000 $150,526 $79,161 $85,404 $288,661 $229,382 $866,134 Roadway Totals $0 $263,104 $703,587 $816,585 $936,287 $1,493,736 $893,719 $5,107,018 Page 11 of 29
Page 5 of 6
Impact Fee Capital Improvement Plan Implementation as of September 30, 2023
Impact Fee Impact Fees
Allocated
Developer
Constructed
(Estimated)
City
Funded
Total Capital
Project
Expenditures
Water $2,196,085 $120,000 $32,092,575 $34,408,660
Wastewater $10,113,956 $690,000 $69,326,479 $80,130,435
Roadway A $767,500 $0 ($79,135) $688,365
Roadway B $617,500 $0 $29,392,007 $30,009,507
Roadway C $1,193,333 $77,667 $41,573,815 $42,844,815
Roadway D $767,500 $777,500 $9,966,531 $11,511,531
Roadway Totals $3,345,833 $855,167 $80,853,219 $85,054,219
The impact fee revenues are being utilized to aid in funding a number of the impact fee capital
improvement projects. Impact fees may only be spent on eligible projects identified in the respective
impact fee capital improvement plans and are then further restricted to the specific zones for roadway
impact fees. The projects that have received impact fee funding are listed as follows.
Capital Projects Receiving Impact Fee Allocation
Water Impact Fee Projects:
·Well #9 and Collection Line (Project F)
·SH 6 Water Line Phases 1 and 2 (Project N)
·SH 6 Water Line Phase 3 (Project O)
·2021 Impact Fee Study (Project R)
Wastewater Impact Fee Projects:
·Lick Creek Trunk Line (Project C)
·Northeast Trunk Line Phases 1 and 2 (Project E)
·Carters Creek Diversion Lift Station Phase 1 (Project M)
·Lick Creek WWTP Phase 1 Expansion (Project N)
·2021 Impact Fee Update (Project O)
Roadway Impact Fee Projects:
·Zones A and D - Rock Prairie Road from SH 6 to Stonebrook Drive (Project A-5/D-1)
·Zones A and D - Rock Prairie Road from Stonebrook Drive to Town Lake Drive (Project A-6/D-2)
·Zones B and C - Rock Prairie Road W from 715’ west of Towers Parkway to Wellborn Road (Project
B-3/C-1)
·Zone C - Capstone Drive from 1,265’ west of Wellborn Road to Wellborn Road (Project C-4)
·Zone C - Barron Road from Wellborn Road to WS Phillips Parkway (Project C-5)
·Impact Fee Study (all Zones)
Page 12 of 29
Page 6 of 6
Recommendation:
Staff recommends that the Impact Fee Advisory Committee accept this report and forward to City Council
for their update.
Attachments:
1. Future Land Use Map
2. Service Area Maps - Water, Wastewater, and Roadway
3. Status of the Impact Fee Capital Improvements Plans – Water, Wastewater, and Roadway
Page 13 of 29
!!
!
!
!
!!!!!!!!!
!
!
!!!!!!!!!!
!
!
!!!
!
!!!!!!
!
!
!!!!
!
!
!!!!
!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!BRAZOS C
O
BRAZOS C
O
GRIM
ES C
O
GRIM
ES C
O
?¡
?cBryan
?c
?¡
?c
BRAZOS COBRAZOS COWASHI
NGTON COWASHI
NGTON CO?À
Texas A & M UniversityTexas A & M University
TX-6 S
TX-6 N
TX-6
TX -3 0
EAST BYP
FM 2154 RDROCK PRAIRIE RD
TX-47
RIVER RDWILLIAM D FITCH PKWYI AND GN RDBIRD POND RDW
ELSH AVE UNIVERSITY DR ECOLE LNC
A
VITT AVE
HOPES CREEK RDHARVEY RDBARRON RDFM 2818 RD W
TONKAWAY LAKE RD
ARRINGTON RDN DOWLING RDUNIVERSITY DRPEACH CREEK RDW VILLA MARIA RDTEXAS AVE S
COUNTY RD-175
DEACON DRROYDER RD
E
A
R
L R
U
D
D
E
R
F
WY SBARAK LNE
2
9
TH ST
F AND B RDGRAHAM RDN GRAHAM RDS D O W L IN G R D NUNN JONES RDDOMINIK DRCARTER CREEK PKWY
FRANCIS DRGREENS PRAIRIE RD WJONES RD
L
O
N
G
MIR
E D
R
FINFEATHER RD
HOLLEMAN DRQUAIL RUNPIPELINE RD
VICTORIA AVE
CHICK LN
GLADE ST
SEBESTA RDBROADMOOR DRGANDY RDBRADLEY RDK
E
M
P R
D
ANDERSON ST
DUSTY RDFISHTANK RDCAIN RDSOUTHWEST PKWYLOST TRL E VILLA MARI
A RDWOODLAKE DR
ROESE RD
KOPPE BRIDGE RDFROST DR
W
ELLBORN RD BAWMKER RDNAGLE ST
OLDEN LNLINCOLN AVEC A P S T O N E D R
IN
DIAN L
A
KES D
R
LAKEWAY DR
DEER RUN
LUTHER ST WWHITE CREEK RD HOLLEMAN DR EPATE RDW BYPASSPARK PL
WAYSIDE DR
SULPHUR SPRINGS RDBRIARCREST DRT I MBER LINE D R
OLSEN BLVD
MUNSON AVE
GEORGE BUSH DRDEW RD GEORGE BUSH DR WALACIA CTHARVEY MITCHELL PKW Y SS COLLEGE AVE
TODD TRLFM 158 RD
PEACH CREEK CUT OFFGROESBECK STB
O
X
L
E
Y B
N
DFOUNTAIN AVERIO GRANDE BLVD
OLD WELLBORN RD OLD TI RDD E E R P AR K D R DEBBI
E LN4TH ST
TURKEY CREEK RDGOLDEN TRLENCHANTED OAKS DRPAINT TRLF
M ROAD 2
8
1
8
RDBITTLE LN
GREENS PRAIRIE TRLH A R P E R S F E R R Y R DKRENEK TAP RDTARROW STS TRADITIONS DR
FAVOR RDDOGWOOD
T
RLNAVARRO DRTEE DRAUSTIN AVEWALTON DRBECK STNANTUCKET DRSUZANNE PLVISTA LNCHEROKEE DRFM-2818
RAYMOND STOTZER PKWYSOUTHWEST PKWY EALEXANDRIA AVE
LANGFORD ST
BROT
HERS BLVDDA
RT
MOUT
H
S
T
N FOREST PKWYCOKE ST
SMITH LN
SOUTHWOOD DR
LIGHTSEY LN
WILD HORSE RUNABBATE RDROYAL ADELADE DRBOYETT ST
W A Y F A R E R L NN ROSEMARY DRWOODCREEK DRH
U
N
T
E
R
S
C
R
E
E
K
R
D
LEE AVE
AGRONO
MY RD
DECATUR DR
FAIRVIEW AVE
AIRLINE DRFOSTER AVEW CARSON STOLD BARKER RANCH RD
PURYEAR DR
COPPERFIELD DR
WALNUT RD
N HARVEY MITCHELL PKWY
1ST ST
S O A K S DR
HICKORY RD
GOLDEN MIST
SPEARMAN DRHA IN ES D R
PALASOTA DR
HARRIS DREAGLE AVEFAIR W AY DRSWEETWATER DR
ASHBURN AVE
MANUEL DRGREAT OAKS DRPIPER LNWESTWOOD MAIN DRHARDY WEEDON RDRANCHERO RDSAINT ANDREWS DROAK HILL DRKENT ST
CASTLEGATE DREDELWEISS AVEARBOLEDA DRAPPOMATTOX DRLAZY LNLEHR L N WCHRISTINE LNLINDA LN
CLL
TAN
GLE
W
O
OD D
R
RAINTREE DR
CAJU
N RID
GE RD
BALL CIRLYNN DRLOS ROBLES DRLUTHER STOLD COLLEGE RDWEEDON LOOP
E 31ST ST
BLUE RIDGE DRSP RING L OO P
CALUMET TRLHOLLEMAN DR WBIZ
Z
E
LL S
TELM AVETURK RANCH RDFAULKNER DRCENTRAL PARK LN
GUS ROY RD
BRIAR OAKS DR
F
R
E
M
A
N S
C
H
O
O
L R
D WINDING CRKBARRON CUT OFF RDINWOOD DRNUECES DRCARLL LNMORTIER DRCREAGOR LNGLENHAVEN DRR
E
S
E
A
R
C
H
P
K
WY
WHI
T
E
ROCK
RDBEE CRKENFIELD STWINDSOR DR
R
O
BIN D
R
ASHLEY LNOLIVE STVALLEY CIR ROANS CHAPEL RDFOXFIRE DRCAMBRIDGE DRNIMITZ ST
HARTFORD DRH
IL
L R
D MILE DRBUGGY LNPAMELA LN
M E S A V E R D E D RDAIRY CENTER RDCONNIE LN
M IS T Y L N
SA N DSTO N E D R
NORMAND DRPENBERTHY RD CAROL STRUNAWAY RD POLO RDORR STWILLIAMSON DRJENNI
FER DRH
O
U
S
T
O
N S
T
WILLIAMS CREEK DR
BRIG H TON DR
DEERFIELD DRDEXTER DR
CAMELOT DR
NEW MAIN DRHOLIK ST
REDMAN LNGABBARD RDMIDSUMMER LN
LACY WELL RD
NEWPORT LN
COLLEGE AVE
C A R T E R L A K E D R
COPPERFIELD PKWY
LAWYER ST FRENEAU DRLEONARD RDOAK LEAF CROSS PARK DRFLYWAY R D
BURGESS LN AVONDALE AVERITCHEY RDPOTTER LNMCCULLOUGH RDATK INS STPINTO RUNEMERALD PKWY
SILKWOOD DR
M
O
R
RIS LN
TAUBER ST
BRENTWOOD DR ESHELLBOURNES HLHORTICULTURE RDHENSELVINE STMICKTHEA LN
CAMILLE DR
SPRING LN
STUART STNOTTINGHAM DR BIRMINGHAM DROAK ST
PINEWOOD DR
NAVIDAD ST
WINDFREE DR
HIGH LONESOME
SCONSET DR
TALL TIM
BER DR
REGAL OAKS DRDUNN STEDEN LN
FORESTWOOD DR
OAKVIEW ST
HORSE HAVEN LNFRIERSON RDAXIS CT
CHEYENNE DRVALLEY VIEW DRS
A
R
A L
N
VAL VERDE DRC
L
OIS
T
E
R
S D
RJONES STSPENCE ST
CARDINAL LNTHOROUGHBRED RDGWINDHAM RANCH RDQUALITY CIR
KENNEDY PL
MISSION HILLS DRRIDGEWAY DRB
E
RR
Y
CR
KW BRONZE LNORCHID STSWITCH STA RDASH STDEER CREEK DR
GUADALUPE DRSTATE RD
NORHAM DRARNOLD RDSLEEPY R-R RD
WHISPERING RDG ROSE CIRWOODS LNMARION PUGH DRVALLEY OAKS DRN T R A D IT IO N S D R
BELLAIRE BLVD
SHIRE DR
FOUNDERS DR AFTON OAKS DRW RIDGE DRWHITES CREEK LNMORGANS LNSADDLE LNNARROW WAYLAUREN DR
HORSESHOE LNLIS LN
MEDINA DR
HICKORY NUT LN
U-V ROW
KIMMY DR
APRI
COT GLNOXBURGH DRSANDPIPER CVT U C K E R N U C K
A N D O V E R C T
JANE ST
E PLACID DR
LUEDECKE LN IBIS CTEASTMARK DR
BELMONT CIRE A G LE P ASS S TE OA K HI LL DR
BROOKWATER CIRCEDAR RIDGE DRHIDDEN ACRES DROSAGE TRAIL DR
KO
RSH
E
A W
AY
FOREST DR
CLAN VLG
TRIPLE BEND CIRWHISPERING OAKS DRCLARK ST
POST OAK BND
A P P L E B Y P LBRIDLE GATE DRRIDGE WALKSCOTNEY CTWILDERNESS DR
MEADOW OAKROCKY MEADOWS DR
CITATION CIRDAKOTA RIDGE DR
PRO CTFRIARSALLIE LNC R Y S T A L L N
WELLESLEY CTDEAN PUT DR S COULTER DRPRESTWICK CTPUFFIN WAYLAKESIDE STL
E
G
A
C
Y L
N
B
R
O
N
C
O
CIR
FOX CIRMAGNOLIA DRCOLONIAL CIR
W BYPASS
TURK RANCH RDBIZZELL STE A GL E AV EUNIVERSITY DRFLYWAY RD
BLU E R ID G E D RLEONARD RDKEMP RDFOUNDERS DR
TX-47
FM 2818 RD W
ARRI
NGT
ON RDPOTTER LNE
A
R
L R
U
D
D
E
R F
WY S
RAYMOND STOTZER PKWYCLLW BRONZE LN0 2,500 5,000
SCALE IN FEET
FIGURE 2-1CITY OF COLLEGE STATIONWATER AND WASTEWATERIMPACT FEE UPDATEFUTURE LAND USE
!I
Created By Freese and Nichols, Inc.Job No.: CCL14324Location: H:\W_WW_PLANNING\01_DELIVERABLES\00_FINAL_REPORT\(Figure_2-1)-Future_Land_Use.mxdUpdated: Monday, November 8, 2021
LEGEND
Road
Railroad
Stream
Lake
Texas A&M University
City Limit
ETJ Boundary
Other City Limit
County Boundary
LAND USE
Urban Center
Neighborhood Center
General Commercial
Neighborhood Commercial
Business Center
Urban Residential
Mixed Residential
Suburban Residential
Estate Residential
Rural
Neighborhood Conservation
Medical
Wellborn
Institutional/Public
Texas A&M University
Parks & Greenways
Natural Areas
!!!!!!!Redevelopment Areas
Page 14 of 29
0 2,500 5,000
SCALE IN FEET
FIGURE 2-3CITY OF COLLEGE STATIONWATER AND WASTEWATERIMPACT FEE UPDATEWATER IMPACT FEESERVICE AREA
!I
Created By Freese and Nichols, Inc.Job No.: CCL14324Location: H:\W_WW_PLANNING\01_DELIVERABLES\00_FINAL_REPORT\(Figure_2-3)-Water_Impact_Fee_Service_Area.mxdUpdated: Monday, November 8, 2021
LEGEND
!(Emergency Interconnect
!(Active Interconnect
[Ú Pump Station
(#UT Elevated Storage Tank
UT Ground Storage Tank
8" and Smaller Water Line
10" and Larger Water Line
Road
Railroad
Stream
Water Impact FeeService Area
Texas A&M University
Brazos County MUD 1
City Limit
ETJ Boundary
Other City Limit
County Boundary
Page 15 of 29
0 2,500 5,000
SCALE IN FEET
LEGEND
Vä Lift Station
TXWWTP Wastewater TreatmentPlant
8" and SmallerWastewater Line
10" and LargerWastewater Line
8" and SmallerForce Main
10" and LargerForce Main
Road
Railroad
Stream
Lake
Wastewater ImpactFee Service Area
Texas A&M University
Brazos County MUD 1
City Limit
ETJ Boundary
County Boundary
FIGURE 2-4CITY OF COLLEGE STATIONWATER AND WASTEWATERIMPACT FEE UPDATEWASTEWATER IMPACT FEESERVICE AREA
!I
Created By Freese and Nichols, Inc.Job No.: CCL20771Location: H:\W_WW_PLANNING\01_DELIVERABLES\00_FINAL_REPORT\(Figure_2-4)-Wastewater_Impact_Fee_Service_Area.mxdUpdated: Monday, November 8, 2021User: 03812 Page 16 of 29
B
D
A
C SH
6
N GRAHAM ROADROCK PRAIRIE ROADTE
X
A
S
A
V
E
N
U
E
S
BIRD POND ROADEsri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
Legend
City Limits
Service Areas
A
B
C
D
NExhibit 1Service Areas
November 2021
0 10.5 Miles
Page 17 of 29
Water Impact Fees Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Project ID Description of Project(1)Project Cost Project Status as of
September 2023
A High Service Pumping Improvements $ 3,597,227 Complete
B BioCorridor Water Line $ 998,884 Complete
C Area 2 Water Line Extension $ 1,000,000 Complete
D Cooling Tower Expansion $ 3,795,667 Complete
E Well No. 10 Land Acquisition $ 1,048,633 Complete
F Well No. 9 and Collection Line $ 7,623,202 Complete
G Midtown Drive 12-inch Water Line $ 920,000 Complete
H The Crossing at Lick Creek Phase 1 - 3 Oversize Participation $ 45,233 Complete
I Embassy Suites Water Line Oversize Participation $ 15,030 Complete
J Brazos Valley Auto Complex Oversize Participation $ 84,791 Complete
K Castlegate II Oversize Participation $ 50,871 Complete
L Greens Prairie Oversize Participation $ 96,498 Complete
M Summit Crossing Phase 3A Oversize Participation $ 32,550 Complete
N SH 6 Water Line Phase 1 and 2 $ 1,036,568 Complete
O SH 6 Water Line Phase 3 $ 3,050,000 Complete
P 3.0 MG Elevated Storage Tank and Pressure Reducing Valves $ 8,690,000 Complete
Q SH 40 Water Line Phase 1 and 2 $ 4,200,000 In Design/Hold
R 2021 Impact Fee Study $ 150,000 Complete
1 New and Replacement 12-inch Rock Prairie Road Water Line $ 2,289,500 Future
2 New 18-Inch Midtown Business Center Water Line $ 2,796,400 Design Complete/Hold
3 BioCorridor Water Line Improvements $ 2,741,200 Future
4 Water Supply Well No. 10 $ 19,223,900 Future
5 Harvey Mitchel Parkway Water Line Replacement $ 4,236,400 Future
(1)Oversize participation projects include only the portion of costs paid for by the City.
Page 18 of 29
(#UT
(#UT
UTUT[Ú[Ú
!A!(!(!(!(!(!(!(!(!(!((#UT
Texas A & M UniversityTexas A & M University
Brazos CountyMUD 1
City of Bryan29th Street
3.0 MG Park PlaceElevated Storage TankOverflow Elev. = 522'
2.0 MG Greens PrairieElevated Storage TankOverflow Elev. = 522'
Dowling RoadPump Station(3) - 8,000 gpm Pumps(2) - 6,175 gpm Pumps(1) - 6,000 gpm Pump(1) - 5.0 MG Ground Storage Tank(1) - 3.0 MG Ground Storage TankOverflow Elev. = 370'High Service Pumping Improvements
City of College StationHSC Parkway
Texas A&MUniversityVilla Maria
Texas AMUniversityMaple Street
Texas AMUniversityOlsen Field
WellbornFoxfire
Wellborn Holleman
WellbornRock Prairie
Wellborn Waterford Heights
Wellborn Caprock
3.0 MG Rock PrairieElevated Storage Tank and PRVs
(H
24"
(2
(1
(1
(N
(N
(G
(O
(3
(5
(L
(A
(B
18"18"12"
24"30"30"12"1 8 "
&18"18"18"(I
(M
&
&&&(J
(K
(C
(P
(Q
(Q
(O
?c
?c
?¡
?¡
?À
(O20"12"1
8"18"(3
12"
16"
12"
16"
12"
1
6
"12"30"1
2
"
12"24"18"12"12"12"12"12"18"1
2
"24"12"12"12"24"
1
2
"
1 2 "12"18"
12"
18"12"8"
4"
2"
6 "
3"
1"1 1/2"6"8"8"8"6"8"
8"
8"8"6"6"6"8"3"
8"
6"
6"4"4"8"
8"8"8"
8"
8"2"4"4"6"
6"6"6"6"8"6"8"1"8"6"6"6"6"8"8"
8 "8"4"8"8"6"8"6"6"6"8"8"6"
6"6"8"4"
6"4"6"8"8"6"6"6"
6"
8"
6"8"6"3"8"6"8"8"
6"
6"
2"
2"8"8"
8"6"6"6"6"
4"
6"6"8"6"8"8"6"8"4"
6"
6"
8"
8
"8"8"
8"4"8"
8"
6"6"8"6"6"
6
"
4"8"8"8"
6"
6"
6"6"8"6"6"
4"
6"8"4"6"6"6"
6"8"6"3"6"4"2"6"
6"8"8"6"8"8"
8"8"6"6"6"8"6"
6"6"6"6"8"8"8"8"8"8"
6"
6"
4"6"6"6 "
8"6"4"8"8"8"4"
8"
8"8"8"8"6"8"
8"
8"8"8"6"8"6"
8 "8"6"8"6"
6"8"8"
6"
4"8"3"8"8"8"6
"6"6"8"
8"
8"
6"8"6"8 "6"6"4"8"8"8"8"
8"
3"
6"
6"
8"6"6"8"6"
8 "8"6"
8"8"6"8"8"6"
6"8"6"6"
8"6"8"6"8"6 "6"2"8"6"8"8"8"8"6"8"8"8"8"8"8"
6"4"6"8"8 "6"6"8"6"6"6"6"8"8"8"8"6"6"4"3"6"6"6"6"8"8"8"6"8"6"8"
6"
6"8"8"
8"
6"8"8"6"2"8"
6"
6"
8"
8"6"8"8"6"2"8"6"6"8"
8"
8"
6"
6"
8"
6"8"2"8"6"6"
8"
8"
6"
4"6"6"8"8"3"
4"8"6"6"4"8"
4"
6"
6"6"8"
8"
8"8"8"6"8"8"
8"
8"
6"
8"8"8
"6"8"6"8"6"6"4"
8"
6"8"4"6"4"6"8"8"8"
6"
8"8"8 "
8"8"6"
6"
6"
6"8"6"6"6"8"8"
8"8"6"6"8"
6"
8"8"8"2"8"6"8"6"6"6"8"
6"6"8"4"8"8"8"8 "6"
6"
8"6"8"6"8"6"6"4"6"8"2"2"6"4"
8"6"6
"
6"
6"
8"
8"
8"
4"8"6"8"8"8"8"6"
8"
6"6"8"
6 "8"6"
6"8"
6"2"8"
6"
4"
6"6"6"8"8"6"6"8"8"6"
6"
8"8"8"8"8"6"8"8"6"8"8"6"6"6"8"8"6"8"6"4"6"8"6"6"6"
8"6"8"8"6"6"8 "6"
3"
2"8"6 "6"8"8 "8"8"
6"8"8"6"8"8"6"4"6"4"6"6"6
"4"6"8"6"
8"8"8 "8"6"
6"6"6"
3"6"4"8"6"6"6"
8 "
6"6"8"
8 "6"8"
2"
6"8"8"6"
8"8"6"
8 "
6"8"8"
8 "6"
8 "6"
4"
6"6"8"2"8"6"8"6"
6"
6"
8"6"6"8"6"4"6"
8"6"6"6"8"6"8"8"
6"
8"
6"8"8"8"6"6"
6"
6"8"4"8"6"8"6"8"6"8"8"6"8"
6"8"6"
6"
8"
8"6"8"8"
8 "6"
6"8"6"4"6"2"6"
8"6"6"
6"
8"
6"6"6"8"6"8"
6"8"8"6"8"6"
8"6"8"6"8"6"6
"
3"
8"
6"
8"
6"
8"8"6"
6
"
8"6"6"6
"8"6"8"8"8"6"6"
2"8"4"6"8"6"8"2"8"8"8"
8"
8"
6"
6"
6"8"8 "
8"
8"8"8"3"8"8"8"6"8"6"6"8"8"
6"
8"
8"8"6"
8"6"8"
8"
4"
4"6"2"6"8"6"
6"8"6"6"8"8"6"
6"6"2"6"8"6"
8"6"8"
3"8"6"
6"6"6"
6"
8"
8"
2"6"6 "3"8"
6"
8"
8"
8"
8"6"8"8"8"8"6"
6"
6"
8"
8"8"6"6"8"8"6"
6"6"8"6"6"8"
6"
6"
8"
6"6"6"6"6"6"
6"
8"8"8"6"8"2"6"8"2"8"4"
4"
8"
8"
6"6"6"
8"
6"
6 "6"8"36"
30"18"12"24"
4
2
"
16"20"10"18"12"
18"30"12"12"12"12"
18"
1
2"18"12"18"18"
12"
12"
12"
16"
18"18"12"12"12"12"
2 4 "18"
18"18"12"24"
24"
12"12"24"
12"
12"
1 2 "
12"
12"
1
2"
12"
12"
12"12"12"12"12"
12"
24"12"18"1 0 "12"18"
1
2"
18"12"12"
18"
12"
12"
3
6
"16"18"
24"12"12"18"
12"12"12"
12"18"18"12"16"18"18"24"
12"
1 2 "
24"
36"16"12"
1 2 "12"18"
30"12"18"24"18"
18"12"12"18"30"12"16"1 2 "16"1
8
"24"12"12"12"12"12"12"12"12"12"
36"12"12"
12"
12"12"12"18"12"18"30"18"18"24"12"12"12"
12"12"1 2 "12"12"
1
2
"
1
2
"
12"18"12"30"36"12"12"12"16"12"
12"12"12"
1
2"12"16"18"
12"12"18"18"12"18"12"
18"36"
12"
12"
3
0
"
1
2
"
18"
12"
12"
3
0
"
30"
18"18"12"12"18"30"
12"12"18"30"
12"12"18"
12"18"36"12"12"
18"12"12"12"16"18"30"12"1
8
"
12"
12"
1 2 "12"12"20"24"18"12"
1
8
"12"12"12"12"12"
24"
30"18"12"
1 2 "12"12"12
"18"36"
1
2
"
T
X-6 S
TX-6 N
TX-6
T X-3 0
EAST BYPF
M 2154 RDE
2
9TH STROCK PRAI
RI
E RDTX-47
RIVER RDWILLIAM D FITCH PKWYI AND GN RDCOUNTY RD-175
COUNTY RD-190BIRD POND RDHOPES CREEK RDCOLE LNBOONEVILLE RD
C
AVITT A
V
E
ROYDER RD PEACH CREEK RDW 2 8 T H S T
TONKAWAY LAKE RD
ARRINGTON RDN DOWLING RDW VILLA MARIA RDUNIVERSITY DRROESE RD
BARAK LNHARDY WEEDON RD
F AND B RDN GRAHAM RDBROADMOOR DRS DOWLI
NG RDBECK STNUNN JONES RDJONES RD DOMINIK DRCARTER CREEK PKWY
N EARL RUDDER FWY
FRANCIS DRFINFEATHER RD WEEDON LOOPTX-21PIPELINE RDCHICK LN BRIARCREST DRK
E
M
P R
D
GLADE ST
E 25TH ST
S
E
B
E
S
T
A R
D
KOPPE BRIDGE RDGA
NDY
RD BRADLEY RDHICKS LNDUSTY RDFISHTANK RDCAIN RDS MAI
N STPALASOTA DR
LOST TRL
WOODLAKE DR
FROST DR
WELLBORN RD BAWMKER RDNAGLE STE VILLA MARIA RDJOHN RICE DRGROESBECK STOLDEN LNE 27TH ST
LINCOLN AVEC A P S T O N E D R
IN
DIA
N LA
K
E
S DR
DEER RUN
WHITE CREEK RD ELMO WEEDON RDPATE RDPARK PLE 30TH ST
WAYSIDE DR
SULPHUR SPRINGS RDTIM B ER L I N E DR
E WM J BRYAN PKWYE 26TH ST
DEW RD GEORGE BUSH DR WALACIA CT
S COLLEGE AVE
TODD TRLFM 158 RD
PEACH CREEK CUT OFF
B
O
X
L
E
Y B
N
DFOUNTAIN AVEOLD TI RDD E E R P A R K D R DEBBI
E LN4T
H S
TTURKEY CREEK RDGOLDEN TRLEC
H
OLS ST
ENCHANTED OAKS DRPAINT TR LBITTLE LN
GREENS PRAIRIE TRLS ENNIS STOA K D R
ROSES RD
CHEROKEE DRS TRADITIONS DR
DOGWOOD TRL NAVARRO DRTEE DRWALTON DR
NANTUCKET DRSUZANNE PLVISTA LNBAKER AVERAYMOND STOTZER PKWYN FOREST PKWYSMITH LN
CAMELOT DR
LIGHTSEY LN
WILD HORSE RUNABBATE RDCOUNTY RD 172COUNTY RD-173E 31ST ST LUZA STHU
NT
E
RS
C
R
E
E
K
RD
LEE AVEW CARSON STOLD BARKER RANCH RD
PURYEAR DR
WALNUT RD1ST ST
S O A K S D R
GOLDEN MIST
S P E A R M A N D R
EAGLE AVEFAIRW AY DRGREEN VALLEY DR
SWEETWATER DR
GREAT OAKS DR
SUNCREST ST
WESTWOOD MAIN DRRANCHERO RDS SIMS AVEOAK HILL DRKENT ST
LAZY LNS BRYAN AVEC
AJUN RIDGE RD
LINDA LN
CLL
RAINTREE DRWOODCREST DRBALL CIRLYNN DRLOS ROBLES DRBIZZELL STOLD COLLEGE RDBLUE RIDGE DRBENNETT ST
CALUMET TRL
ARBOR DR
TIMBER STELM AVETURK RANCH RDRODEMEL RANCH RD
GUS ROY RD COUNTY RD 174BRIAR OAKS DR
FREMAN SCHOOL RDWINDING CRKINWOOD DRASPEN ST
SOUTH FORK RD
NORTH AVE ES HUTCHINS STOWL TREE LN
FRIERSON RDWH
I
T
E ROCK RDGOLD NUGGETTENFIELD STALICE ST W BR
I
ARGAT
E DRWINDSOR DR PENDLETON DRR
O
BIN D
RS GORDON STLACY WELL RD HOLLY DROLIVE STTROPHY DRVALLEY CIR ROANS CHAPEL RDFOXFIRE DRJOE ROUTT BLVDHIL
L R
DWOOD
L
A
ND
D
R
BUGGY LNHOLICK LN
M E S A V E R D E D RDAIRY CENTER RDCONNIE LN
M IS T Y L N
A U T UM N C I RTATUM STCAROL STAVON STCOMMERCE STBURT ST
SPRING CRK
RUNAWAY RD POLO RDADA OAKSWILLIAMSON DRHOUSTON ST DEERFIELD DRN A S H S T
LAKE STARAPAHO RIDGE DRSAN SABA DRBURGESS RDREDMAN LNGABBARD RDMIDSUMMER LN
TRANT ST
OLD OAKS DRFRENEAU DRPRIVATE ROAD 4007LEONARD RDFLYWAY RD W DUNCAN STHUNTERS RUN
5
T
H
ST
RICHARD ST
E 28TH ST
POTTER LNMCCULLOUGH RDCHACO CANYON DRA TK IN S STPI
NTO RUNPARKWAY TER
LISTER LNRA
V
EN
WOOD DRSILKWOOD DR COPPERFIELD DRMARI
NERS CVLORI LN
MILAM ST
M
O
R
RIS LN
RIVA RIDGE RD
D
U
R
R
A
N
D STQUAIL HOLLOW DRMEADOW LNMOCKINGBIRD RDSHELLBOURNES HLS T A L L IO N R D G MILLS STMEMORIAL DRVINE STMICKTHEA LN
E PEASE ST
CAMILLE DR
SPRING LN
STUART STTODD ST
PARK ST
OAK STFREEDOM BLVD
ROSE RD
HIGH LONESOME
R O SS S TTALL TIMBER DRWATSON STDANSBY LNS
CRI
MSHAW
L
NHOLT STEDEN LN
OAKVIEW ST
CHEYENNE DRHOWARD STVALLEY VIE
W D
R MARY LAKE DRB R A Z O S D R VAL VERDE DRWILDFLOWER DR
C
E
D
A
R BE
N
D R
D CLOISTERS DRJONES STANGELINA CIRKINGSGATE DR
THOROUGHBRED RDGWINDHAM RANCH RDQUALITY CIR
P A T T O N A V E
LEDGESTONE TRLWILLOW OAK ST
RIDGE
W
AY DR B E R R Y C R KW BRONZE LNBAMBOO STGOESSLER RDDEER CREEK DR
STATE RDSUNNYDALE
CORNELL DRHOLLOWHILL DRSLEEPY R-R RD
ASBURY ST
WHISPERING RDG
WOODS LN
KIRKWOOD DR
FOREST BND DOE CIRN TR A D ITIO N S D R
R IV E R O A K S D R
BELLAIRE BLVD
FOUNDERS DR AFTON OAKS DRLESLIE DRM C A R T H U R A V E
NARROW WAYJOSEPH DRHORSESHOE LNBRUSSELS DRLIS LN WOODSIDE LNH U M M I N G B IR D C I R
M
EDINA DR
K IN N A R D A V E
HICKORY NUT LN
KIMMY DR
APRI
COT GLNBA
R
RO
W CT
SANDPIPER CVOAKSIDE DRBANKS AVE
NEWARK CIRM A R S H A L L A V E
E PLACID DRPARK HURSTLUEDECKE LN IBIS CTST O K E S CI R
BELMONT CIRW A L N U T C R E E K C T OAK CIRCAEOUSEL LN
WINDWOOD DR
HIDDEN ACRES DRCHURCH ST
RED RIVER DR
KOENIG STTOLTEC TRLHUNTERS WAY
K
O
RSHEA W
AY
KOCH ST
OAK HILLS CIR
R
OL
LI
N
G
R
D
GCLAN VLG
CHIPPENDALE ST
FINNEYHARDY STGREEN TREE CIRTRIPLE BEND CIRWHISPERING OAKS DRS TEXAS AVE
LAMAR DRPLEASANT STCOUNTY RD-172CRENSHAW CIRPOST OAK BND
H O R S E B A C K C T
HEATHER GLN
M
A
RIN
E
R D
R
WILDERNESS DR
CITATION CIRRENWICK DRIR IS LN
W HITE STONE DRT ROW
C R Y S T A L L N
SYCAMORE TRL ANTLER CIROPAL ST
BRYANT ST
EDGEMORE DRCRESTON LNSPRUCEWOOD ST POST OFFICE STS COULTER DRPRESTWICK CTHOPE LNS O U T H D R
E DODGE STN EARL RUDDER FWY
TX-47 UNIVERSITY DRE 27TH ST
TX-21BURT STCLLTURK RANCH RDKEMP RD
E 30TH ST
POTTER LNFLYWAY RD
K ENT ST
B LU E RID G E D R
FIGURE 3-1CITY OF COLLEGE STATIONWATER IMPACT FEE UPDATECAPITAL IMPROVEMENTS PLAN
!I
Created By Freese and Nichols, Inc.Job No.: CCL20771Location: H:\W_WW_PLANNING\01_DELIVERABLES\00_FINAL_REPORT\(Figure_3-1)-Water_IF_CIP.mxdUpdated: Monday, November 8, 2021 11:12:56 AMUser Name: 03812
0 2,750 5,500
SCALE IN FEET
LEGEND
Impact Fee Eligible Project
Water Line
Ongoing/Recently Completed Improvements
!APressure Relief Valve
(#UT Water Tank
Water Line
Existing Water System
!(Interconnect
(#UT Elevated
UT Ground
[Ú Pump Station
8" and Smaller Water Line
10" and Larger Water Line
Road
Railroad
Stream
Lake
Water Impact Fee Service Area
Brazos County MUD 1
Texas A&M University
City Limit
ETJ Boundary
Other City Limit
County Boundary
UT
UT[Ú[Ú
(5
Dowling RoadPump Station(3) - 8,000 gpm Pumps(2) - 6,175 gpm Pumps(1) - 6,000 gpm Pump(1) - 5.0 MG Ground Storage Tank(1) - 3.0 MG Ground Storage TankOverflow Elev. = 370'High Service Pumping Improvements
(A 30"3
0"
3
0
"30"30"8
"
6"
3"4"6"
8"
8 "8"6"8"8
"
6"6"8"8"8"8"4"8"8 "6"6"8"8"8"8"8"8
"8"8"8"
8
"
8"
8"8"8
"8"8"8"
8"8"6"8"8"8"6"6"
8"
8"6"8"
6"6"8 "
8"
8"8"8"6"8"6"
8"8"6"6"6"8"6 "6"6"6"
6"
6"8"6"8"8"6"6"8"6
"6"8"8"8"8"8"
3"8"8"8"8"
8"8"6"8
"
8"8"8"
8"8"8"8"6"8
"
6"6"8"8"8"8"8"6"6"
8"
6"8"6"
6"
6"6"8"6"6"
8"
6"8"8"8"3 6 "30 "
2
4
"
1 8"42"12"16"48"10"16"12"
12"16"12"12"12"12"2
4"
12"12"12"12"12"18"36"
12"
16"
1
2"
36"
12"10"12"1 2 "12"1
8
"
42"
1 2 "24"36"
1 8 "
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS User Community
The timing of projects shown is subject to change based on development patterns.The utility alignments shown in this figure are for illustration purposes onlyand do not set the alignments. The alignment of each utility will be determinedat the time of the engineering design.
(4
(D
(E
(F
Cooling Tower Expansion
Land Acquisition for Well No. 10
Well No. 9 and Collection Line
New Groundwater Well No. 10
Page 19 of 29
Wastewater Impact Fees Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Project ID Description of Project(1)Project Cost Project Status as of
September 2023
A Royder/Live Oak Sewer Service $ 1,691,256 Complete
B Bee Creek Interceptor Phase 1 and 2 $ 8,472,421 Complete
C Lick Creek Trunk Line $ 14,020,058 Complete
D Medical District Trunk Line Phase 1 (Participation Agreement)$ 1,770,375 Complete
E Northeast Trunk Line Phase 1 and 2 $ 6,558,738 Complete
F Southwood Valley Trunk Line Phase 1 $ 1,518,488 Complete
G 18-Inch Harvey Road Gravity Line $ 188,790 Complete
H Creek Meadows Lift Station Upsizing and Force Main $ 212,587 Complete
I Nagle Street Student Housing Oversize Participation $ 26,854 Complete
J Bee Creek Interceptor Phase 3 $ 3,900,000 Under Construction
K Medical District Trunk Line Phase 2 and 3 $ 3,250,000 Phase 2: In Design;
Phase 3: In Design
L Northeast Trunk Line Phase 3 and 4 $ 13,861,000 Phase 3: In Design;
Phase 4: In Design
M Carters Creek Diversion Lift Station Phase 1 $ 13,900,000 Bidding
N Lick Creek WWTP Phase 1 Expansion $ 39,014,049 Complete
O 2021 Impact Fee Update $ 174,150 Complete
1 15/18/24/30/36-inch Southwood Valley Interceptor Phase 2 $ 7,314,800 Programmed
2 18/21/24-Inch Bee Creek Trunk Line Phase 4 $ 5,357,800 Future
3 18/21-Inch Alum Creek Sewer Trunk Line $ 11,136,600 Funded/Hold
4 8-Inch Creek Meadows Force Main Re-Routed to Alum Creek Trunk Line $ 2,517,900 Future
5 Lick Creek WWTP Phase 2 Expansion (to 8.0 MGD)$ 49,946,000 Future
6 21/24-Inch Harvey Road Replacement Gravity Line $ 4,916,300 Future
(1)Oversize participation projects include only the portion of costs paid for by the City.
Page 20 of 29
Vä
Vä Vä
VäVä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
Vä
VäTXWWTP
TXWWTP
TXWWTP
Texas A & M UniversityTexas A & M University
Brazos CountyMUD 1
Private Lift Station
(3
(H
(B
(L
(K
20" F.M.
(6
(4
(L
(L
8" F.M
8" F.M
(K
(K
(J[]][][(M
(M
(M
(D(2
48"18"21"24"8" F.M
8" F.M18"36"8
"
F.M8"
?c
?c
?c
?c
?c
?¡
?¡
?¡?¡
?À
Carters Creek WWTPPermitted Capacity: 9.5 MGDFunctional Capacity: 7.7 MGD
Carters Lake WWTP
Southern Pointe LS
Indian Lakes LS
Crooked Creek Path LS
Creek Meadow LSExpansion to 0.87 MGD Decommission Existing 6-Inch Force Mains and Re-Route Flows
Aggie Acres LS
Luther Street LS
Fox Fire LS
Valley Park LS
Hensel Park LS2.59 MGD Existing Firm CapacityDecommission Lift Station and 12" Force Main
WASHI
NGTON COWASHI
NGTON COBRAZOS COBRAZOS COBRAZOS CO
BRAZOS CO
GRIMES CO
GRIMES CO
Westminster LS
Lift Station 2Decommission Lift Station and 8" Force Main
Lift Station 3Decommission Lift StationDivert Flow to Lick Creek WWTP
Lift Station 4
Mission Ranch LS
Castlegate LS
Rock Prairie LSDecommission Lift Station and 6-Inch Force Main
15"15"15"15"15"30"10
"36"2
4
"30"18"48"24"21"20"18"42"21"15"18"15"18"
18"27"21"15"
8" F.M.
6" F.M.8" F.M.6" F.M.6" F.M.6" F.M.18"18"15"
42"
12" F.M.
30"18"Bryan
(F
(1
(B
(C
Lick Creek WWTPTreatment Capacity: 2.0 MGDExpansion to 5 MGDExpansion to 8 MGD
(N (5
(M
(A
20" F.M.
30"36"36"
(3
12"30"18"15"30"3 0 "42"42"42"42"4 8 "54"(G
(E
(E(I Diversion Lift StationNew 6 MGD Lift Station
Eastside LS
To A&M Wastewater System 27''36''18''12''
54''
48''
42''
2 4 ''21''18''48''12''12''36''
54''42''
48''18''48''42''48''
48''36''12''
5 4 ''
18''21''24''30''18''18''21''24''
5 4 "
15"
42"18"24"10"30"21"
12"
16"27"60"10"12"
12"
12"12"15"24"16"
10"
1 5 "
1 5"
18"
21"12"15"10"18"10"12"
12"12"12"12"24"12"15"18"12"12"21"12"18"18"12"12"12"12"18"16"12"12"12"12"10"12"10"15"12"10"10"10"12"10"12"15"10"10"18"12"15"
18"10"12 "
12"
15"12"12"18"15"18"12"15"10"
15"10"10"12"12"
1 2 "12"30"18"10"12"30"12"18"10"18"12"12"12"10"12"12"12"12"
10"15"12"21"
21"12"15"15"10"21"21"15"15"10"15"12"
1
2
"
12"12"15"1
0"18"15 "
10"
10"
10"30"15"12"30"12"12"10"27"18"12"10"12"
12"10"1 5 "
18"12"18"12"12"12"
16"12"12"12"10"12"1 2 "10"12"12"
15"
16"16"10"12"12"15"12"12"1
6
"
1
2
"10"18"10"18"18"12"18"12"
24"12"10"18"18"12"12"18"12"
15"
12"18"24 "18"12"18"12"12"10"10"10"
15"
15"
15"12"15"15"
TX-6 S
T
X-6 N
TX-6
T X-3 0
EAST BYP
FM 2154 RDE
2
9
TH ST
ROCK PRAIRIE RD
TX-47
RIVER RDWILLIAM D FITCH PKWYI AND GN RDCOUNTY RD-175
COUNTY RD-190BIRD POND RDW
ELS
H AVEUNIVERSITY DR EHOPES CREEK RDCOLE LNBOONEVILLE RD
C
AVITT A
V
E
BARRON RDF
M 2818 R
D W
PEACH CREEK RDW 2 8 T H S T
TONKAWAY LAKE RD
ARRINGTON RDN DOWLING RDW VILLA MARIA RDUNIVERSITY DRTEXAS AVE S
ROESE RD
DEACON DRE
A
R
L R
U
D
DE
R F
W
Y SBARAK LNHARDY WEEDON RD
F AND B RDN GRAHAM RDBROADMOOR DRS DOWLI
NG RDBECK STNUNN JONES RDJONES RD DOMINIK DRCARTER CREEK PKWY
N EARL RUDDER F
WY
FRANCIS DRGREENS PRAIRIE RD WL
O
N
G
MIR
E D
R
FINFEATHER RD WEEDON LOOPHOLLEMAN DRQUAIL RUNTX-21PIPELINE RD
VICTORIA AVE
CHICK LN BRIARCREST DRK
E
M
P R
D
GLADE ST
E 25TH ST
SEBESTA RDKOPPE BRIDGE RDGANDY RDBRADLEY RDANDERSON ST HICKS LNDUSTY RDFISHTANK RDS MAI
N STPALASOTA DR
SOUTHW EST PKW YLOST TRL
WOODLAKE DR
FROST DR
WELLBORN RD BAWMKER RDNAGLE STE VILLA MARIA RDJOHN RICE DRGROESBECK STOLDEN LNE 27TH ST
LINCOLN AVEC A P S T O N E D R
IN
DIA
N LA
K
E
S DR
LAKEWAY DR
DEER RUN
LUTHER ST WWHITE CREEK RD ELMO WEEDON RDPATE RDW BYPASSPARK PLE 30TH ST
WAYSIDE DR
SULPHUR SPRINGS RDTIM B ER L I N E DR
E WM J BRYAN PKWYE 26TH ST
GEORGE BUSH DRDEW RD GEORGE BUSH DR WA
L
A
C
I
A
C
T
FM 158 RD
PEACH CREEK CUT OFF
B
O
X
L
E
Y B
N
DFOUNTAIN AVED E E R P AR K D R DEBBI
E LNTURKEY CREEK RDGOLDEN TRLEC
H
OLS ST
ENCHANTED OAKS DRPAINT TR LBITTLE LN S ENNIS STTARROW ST
OA K D R
ROSES RD
CHEROKEE DRS TRADITIONS DR
FAVOR RDDOGWOOD
T
RLNAVARRO DRTEE DRWALTON DR
NANTUCKET DRSUZANNE PLBAKER AVEFM-2818
RAYMOND STOTZER PKWYSOUTHWEST PKWY EALEXANDRIA AVEN FOREST PKWYCOKE ST
SMITH LN
CAMELOT DR
LIGHTSEY LN
WILD HORSE RUNN HARVEY MITCHELL PKWY
ABBATE RDROYAL ADELADE DRCOUNTY RD 172COUNTY RD-173E 31ST ST
WOODCREEK DRLUZA STHU
NT
E
RS
C
R
E
E
K
RD
LEE AVE
AGRO
NOMY RD
DECATUR DR
FAIRVIEW AVE
AIRLINE DRW CARSON STOLD BARKER RANCH RD
PURYEAR DR
1ST ST
S O A K S D R
GOLDEN MIST
SPEARMAN DRH AIN ES DR
EAGLE AVEFAIRWAY DRGREEN VALLEY DR
S
W
EET
W
AT
ER D
R
ASHBURN AVE
MANUEL DRGREAT OAKS DRSUNCREST ST
PIPER LNWESTWOOD MAIN DRHENSEL DRS SIMS AVESAINT ANDREWS DROAK HILL DRKENT ST
EDELWEISS AVEAPP
O
M
ATTO
X D
RLAZY LNLEHR L N WS BRYAN AVEC
AJUN RIDGE RD
CLL
TANGLEWOOD DR WOODCREST DRBALL CIRLOS ROBLES DRBIZZELL ST
P
I
E
R
R
E P
L
BLUE RIDGE DRBENNETT ST
S P R I N G L O O P
ARBOR DR
TIMBER ST
HOLLEMAN DR WELM AVETURK RANCH RDCENTRAL PARK LN
RODEMEL RANCH RD
GUS ROY RD COUNTY RD 174BRIAR OAKS DR WINDING CRKBARRON CUT OFF RDRICHARDS STLAVADA LN
NUECES DRASPEN ST
CARLL LNSOUTH FORK RD
MORTIER DRS HUTCHINS STOWL TREE LN
GLENHAVEN DR
WH
I
T
E ROCK RDGOLD NUGGETTENFIELD STALICE ST W BR
I
ARGAT
E DRWINDSOR DR PENDLETON DRROBIN DRS GORDON STLACY WELL RD
ASHLEY LN HOLLY DROLIVE ST TROPHY DRVALLEY CIR ROANS CHAPEL RDCOLGATE DRJOE ROUTT BLVDNIMITZ ST
HARTFORD DRHIL
L R
D
LAURA LN
RENEE LNWOOD
L
A
ND
D
R
HOLICK LN
M E S A V E R D E D RDAIRY CENTER RDCONNIE LN
M I S T Y L N
SA NDS T ONE DRTATUM STCAROL STAVON STCOMMERCE STBURT ST
RUNAWAY RD POLO RDADA OAKSORR STWILLIAMSON DRH
O
USTO
N ST
WILLIAMS CREEK DR
D E E R F IE L D D R
N A S H S T
LAKE STJAGUAR DRDEXTER DR BURGESS RDNEW MAIN DRHOLIK ST
REDMAN LNGABBARD RDTRANT ST
PRIVATE ROAD 4007LEONARD RDOAK LEAF CROSS PARK DRFLYWAY RD W DUNCAN STONYX DRBURGESS LN
RITCHEY RDHUNTERS RUNRICHARD ST
E 28TH ST
EDGEWOOD DRPOTTER LNCHACO CANYON DRA TK IN S STPI
NTO RUNPARKWAY TER
LISTER LNRA
V
EN
WOOD DRSILKWOOD DR COPPERFIELD DRMARI
NERS CVLORI LN
M
O
R
RIS LN
BRENTWOOD DR EQUAIL HOLLOW DRMEADOW LNMOCKINGBIRD RDSHELLBOURNES HLAVENUE BS T A L L IO N R D G MILLS STMEMORIAL DRMICKTHEA LN
E PEASE ST
SPRING LN
STUART STPARK ST
OAK ST
FREEDOM BLVD
AUGUSTA CIR
ROSE RD
PINEWOOD DR
NAVIDAD ST
YEGUA STN O R T O N L N
HIGH LONESOME
SC
O
NSET DR
R O SS S TTALL TIMBER DRLUBBOCK STHAUPT RDS
CRI
MSHAW
L
NHOLT STEDEN LN
WINDING RD
FORESTWOOD DR
OAKVIEW ST
HOWARD STVALLEY VIE
W D
R WHITNEY LNMARY LAKE DRCODY DR
WILDFLOWER DR
C
E
D
A
R BE
N
D R
D CLOISTERS DRJONES STHARDWOOD LNKINGSGATE DR
THOROUGHBRED RDGLAMAR STQUALITY CIR
P A T T O N A V E
WILLOW OAK ST
KENNEDY PL
M IS S IO N H ILL S D R
RIDGE
W
AY DR B E R R Y C R KW BRONZE LNGROVE STBAMBOO STAYRSHIRE STGOESSLER RDDEER CREEK DR
STATE RDSUNNYDALE HOLLOWHILL DRSLEEPY R-R RDCORPORATE LI
MI
TDOVER DRWHISPERING RDG ROSE CIRWOODS LN
KIRKWOOD DR
MA
RI
ON
P
UGH DRKELLI LN
IRELAND ST DOE CIRN TR A D ITIO N S D R
BELLAIRE BLVD
SHIRE DR
FOUNDERS DR AFTON OAKS DRWHITES CREEK LNLESLIE DRLYCEUM CTM C A R T H U R A V E
JOSEPH DRHORSESHOE LNLIS LN WOODSIDE LNK IN N A R D A V E
HICKORY NUT LN
KIMMY DR
APRI
COT GLNBA
R
RO
W CT
SANDPIPER CVOAKSIDE DRBANKS AVE
M A R S H A L L A V E
PARK HURSTLUEDECKE LN IBIS CTL
O
D
G
E
P
O
L
E D
R
VON TRAPP LN
W A L N U T C R E E K C T OAK CIRCAEOUSEL LN
CEDAR RIDGE DROLD MAIN DRHIDDEN ACRES DRSHADY DR
RED RIVER DR
TOLTEC TRLSTILL
W
ATER R
D
K
O
RSHEA W
AY
KOCH ST
SPRINGMIST DR
OAK HILLS CIR ENCINAS PLCLAN VLG
FINNEYHARDY STWHISPERING OAKS DRS TEXAS AVE
BEELER LNLAMAR DRPUM A DRCOUNTY RD-172CRENSHAW CIR
HEATHER GLN
A P P L E B Y P L
CITATION CIRVICTORIA STDAKOTA RIDGE DR
PRO CT
L AND R RD
EDWARD STRENWICK DRIR IS LN FRIARW HITE STONE DRC R Y S T A L L N
OAK
T
E
RSYCAMORE TRL
OPAL ST
BRYANT ST
CONWAY CTCRESTON LNDEAN PUT DR
HOGG STS COULTER DRNATALIE STS O U T H D R
E DODGE STFLYWAY RDTX-21TX-47
TEXAS AVE S
FM 2818 RD WTURKEY CREEK RDE VILLA MARIA RDS TEXAS AVE
KEMP RD TURK RANCH RDK ENT ST
POTTER LNEA
R
L R
U
DDER F
W
Y S
B LU E RID G E D RHOLT STLEONARD RDE 30TH ST
E 27TH ST
N EARL RUDDER FWY
LUTHER ST W
RAYMOND STOTZER PKWY8"6"4"8"8"6"
8"6"6"6"8"
6"6"8"8"6"6"6"
6"8"8"6"
6"8"6"
6"
8"
6"8"8"6"
6"
6"6"8"6"8"6"
6"8"6"8"6"6"6"8"8"8"6"6"
6"8"8"8"6"6"6"8"8"6"8"6
"
6"8"6"
8 "8"
6 "8"
8"
6"
8"
6"6"6"6"
8"8"6"
6"6"8"
6"
6"8"6"6"
8"8"6"8"
6"6"8"8"
8"
6"8"8"
8
"
6"8"6"
8"
8"
8"
8"6"8"6"8"
6"
6"
6"
8 "6"8 "
8"8"8"8"8"8"6"6"8"8"8"8"6"6"6"8"8"6"8"6"6"
8"
6"6"6"8"
8"
8"
6"
8"
8"
8"6"6"6"6"6"6"6 "6"6"8"8"6"
8"
8
"8"8"6"6"6"6"
6"
8"
8"
6
"
6"
6"
6"6"8"
8 "8"8"6"8"8"6"8"6"6"
8"8"6"
8"6"8"6"6"8"
6"
6"
6"
6"6"6"8"6"8"8"8"
8 "6"8"8"6"6"8"6"6"6"6"6 "
8"8"6"6"
8"6"8"
8"
6"6"8"8"6"8"8"8 "6"
6"8"8"8"
6"
6"6"6"8"
8"
6"6"8"6"8"8"6 "8
"
8"
8"6"6"6"6"8"6"6"6"
8"6"6"6"8"
6"
6"6"6"6"8"6"8 "
6"6"6"6"8"8"8"
8"
6"
6"6"8"6"6"
8"
6"
8"
8 "6"
8"8"6"8"6"8"6"6"6"8"8"
6"8"6"6"
6"6"8"8"6"6"
8"
6"
8
"
6"8"6"6"6"8"
6"
6"8"6"
6"8 "
6"6"6"
8"
8"
6"8"8 "8 "6"
8"
6"6"6"
6"8"6"8 "6"
8"
6"8"6"6"8"8"8"6"8"8"
6"
6"
8"
6"
6"
8"
6"
8 "6 "8"6"6"8"6"8"6"6 "6"
6"8"6"
8"6"8"6"6"6"6"8"8"6"8"
6"
6"6"8"
6"8"6"8"
6"
6"
6"8"8"
8"
6"
8"
8"4"8"6"
6"
6"
6"
6"
6"
8 "6"6"
8"
8"
6"6"6"8"6"
8"
8"8"6"6"6"8"
8"8"6"
8 "6"
8"
8"
6"6"8"
6"6"6"6"8"6 "6"6"
8"6"6 "6"6"
6 "
6"
8"
8"8"8"
6"8"8"6"8"6"8"
8"
8"
8"8"8"6"8"6"6"6"
8"
8"
8"6"6"
8"
6"8"6"
8"
6 "
6"
8"6"6"6"6"6"8"8"8"
8"
6
"
8"6"8"8"
6"8"6"8"8"
6"
8"6"8"8 "6"8"
6"
6"8"8"
6
"6"8"8"8"6"6"8"6"6"8"8"8"8"6"
8 "6"
6"
6"
6"
6"8"8"6"8"6"8"8"6"
8 "8"6"
8"
6"
8"
6"
6"8"6"
8"
6"
8"
6"
8"
8"6"6"
6"
8"
8"
8"6"8"6"
6"6"8"
6 "
8"
6"
8"
8"
6"8"8"
8"
8"
8"
8"
8"8"8"
8"
6"
6"8"8"
6"6"6"6"6"8"6"6"8"6"6"8"8"8
"6"6"6"6
"8"6"6"6"
6"8"6"6"
6"
6"8"6"6"
6"
6"6"8"6"
6"6"6"
6"
8"
6"
8"
6"6"8"8"6"
6"
8"6"6"
8"6"6"8"8"6"8"
6"8"6"6"6"8"8"6"8"8"
8"6"6"8 "8"6"6"
8"8"8"8"8"6"6"
8"8"8
"8"8"6"
6"
8 "6"4"8"8"6"6"8"
6"6"6"8"6"6"
8"
8"
6"8"8"6"6"6"
8"6"6"8"8"6"8"8"
6"6"6"8"6"6"6"6"6"6"
6"
8"
8"6"8"8"6
"
6"
8"8"6"6"
8"6"6"6"6"6"6"6"8"8"6"
8"
6"6"6"6"6"
6"6"8"6"8"8"8"8"6"6"6"6"6"6"8"6"8"
6"
6"
6"
6"
8"
8"6"8"8"8"
6
"6"6"6"8"8"
6 "
6"
6"6"6"
8 "6"6"8"8"8"8"6"6 "8"8"6"
6"
6"
8"
8"6"8"6"6"6"6"8"6"8"6"6"8"6"6"6"8"6"6"
8"
6"
6"8"8"8"6"6"8"6"8"
8"6"8"6"8"6"6"6"6"8"8"6"8"8"6"8"6"8"
8"
6"
8"6"6"8"6 "6"8
"8"6"
6
"
8"
6"6"8"6"6"8"8"6"6"
8"
6"6"6"8"6"6"6"
6"8"8"6"6"6"6"8"8"6"6"
6"6"6"8"6"
6"8"6"8"8"6"
6"
6"
8"6"
6"
8"6"6"
8"
6"8"6"6"8"6"8"6"
8"
8"6"6"6"6"
6"
6"6"8"6"6"8"8"6"
6"8"8"6"6"6"6"
8"
6"
8"
8"
8"6"8"6"
8"6"6"8"6"
8"
6"8"8"
6"
6"
6"
6"
6"8"8"6"6"8"8"
6"
6"6"6"
8"6"6"6"8"6"
6"6"6"6"6"8"8"8"8"6"8"6"
6"8"8"6"8"6"8 "8"6 "8"8"8"6"6"
8"8"8"8"6"6"8"6"
6"6"6"6"6"
6"8"8"
8"8"6"
6"8"6"8"6"6"
6"
6"
6"
6"6"6"8"6"
6"
6"6"8"6"6"8"6"6"
8"
8"
6"
8"8"
6"
8"
6"
6"6"6"6"6"8"
6"
8"
6
"6"6"8"8"6"8"6"
6"
6"6"6"6"6"
6"
6"
6"6"6"
6
"
6"
8"
8"
6 "
6"6"6"
6 "8"6"8"8"6"8"
8"
6"
6"8"6"6"6"8"6"8"
8"6"8"6"8"8"6"6"8"8"8"
8"
6"
8"8"8"
6"
8"
6"6"6"
6"6"6"6"8"
8"8"6"
6"
6"8"6"
6"6"6"4"
6"
6"6"6"6"8"
6"6"6"
6"8"6"8"6"8"6"
8"6"8"
6"6"6
"8"6"6"
6"6"8"
6"6"6"8"6"6"8"6"
6"
6"
8 "
8"6"6"6"
6"6"6"6"6"8"
8"
8 "6"8"8"
8"8"6"
6"
6"
8"
8"
8"6"6"
6"
8"
6"6"6"6"6"
8"
6"8"6"6"6"6"8"8"6"6"8"6"6"8"6"8"6 "
8 "
6"6"8"8"6"6"6"8"6"
6"
6"
6"6"6"
6"8"8"6"8"
6"8"8"6"6"
8"6"8"6"8"6"8 "6"6"6"6"8"
6"
6"6"8"8"8"8"6"8 "8"8"8"8"6"6"8"6"8"6"8"6"8"
6"
8"8"6"8"
8"
6"6"8"6"8"6"6"8 "
6"8"6"6"6"6 "8"6"8"6"8"6"6"6"6"6"
6"6"8"
6"
6"
6"6"8"6"6"8"6"
6"8"6"
6"8"6"8"8"8"8"6" F.M.4" F.M.8
"
F.M.12" F.M.4" F.M.
FIGURE 3-2CITY OF COLLEGE STATIONWASTEWATER IMPACT FEE UPDATE CAPITAL IMPROVEMENTS PLAN
!I
Created By Freese and Nichols, Inc.Job No.: CCL20771Location: H:\W_WW_PLANNING\01_DELIVERABLES\00_FINAL_REPORT\(Figure_3-2)-WW_ImpactFee_CIP.mxdUpdated: Tuesday, October 19, 2021 11:10:10 AMUser Name: 03812
0 2,750 5,500
SCALE IN FEET
LEGEND
Ongoing/Recently Completed Improvements
Vä Lift Station
TXWWTP Wastewater TreatmentPlant
Gravity Main
Force Main
Impact Fee Eligible Improvements
Gravity Main
Force Main
Existing Wastewater System
Vä Lift Station
TXWWTP Wastewater TreatmentPlant
8" and SmallerWastewater Line
10" and LargerWastewater Line
Force Main
Road
Railroad
Stream
Lake
Wastewater ImpactFee Service Area
Brazos County MUD 1
Texas A&M University
City Limit
ETJ Boundary
Other City Limit
County Boundary
(J
][(1
(F48"48 "36''42''54''
4 8 ''42''42''36''42''42''5 4 ''54''30''36''30''30''15"36"24"3 0 "
12"
10"
2 1 "
18"1 6 "
12"15"15"
12"10"30"12"10"30"1 5 "12"15"36"12"30"
12"
10"10"30"10"
10"
12"
12"
18"
15"10"12"30"12"
10"
12"
10"12"1
0"
10"
10"
12"30"10"
18"
12"10"12"10"15"
10"
15"
12"15"1 5 "18"18"24"30"
12"
T
X-6 S
MILE DRT
X-6 N
TEXAS AVE S
TODD TRL
HILLS I DE D R MORGANS LNAUSTIN AVE
H A W K T R E E D R
A IR L IN E D R SEBESTA RDCENTRAL PARK LN
ANGELINA CIR
SANDY CIR
HICKORY DR
SUMMIT STEMERALD PLZCOLGATE C IRRAYBURN CT N FOREST PKWYFARM-TO-MARKET ROAD 2818OAK FORREST
A
U
B
U
R
N
C
T
C
AR
N
A
T
I
ON
C
T
YALE CIRBR E NTW O O D D R EWALNUT BNDAZ ALEA CTDARTMOUTH ST
HARVEY MITCHELL PKWY SE
A
R
L R
U
D
D
E
R F
WY S
MOSSY OAKAMHERST CIRCYPRESS DR
EAST BYPVALLEY VIEW DRBROTHERS BLVDEMERALD PKWY
L
O
N
G
MIR
E D
RASHFORD DRCROSS TIMBERS DR
EAST BYPTX-6 STX-6 STX-6 NCO LG A TE C IR
TX-6 STX-6 NLONGMIRE DRAIRLINE DRTX-6 NEAST BYPH AW K TREE D RTX-6 STX-
6
NDARTMOUTH ST
TEXAS AVE S
AIRLINE DRTX-6 SEARL RUDDER FWY SMOSSY OAK
TX-6 NSEBESTA RDAUSTIN AVE8"6"4"8"
8"8"8"8"8"8"6"8"6"6"6"
6"8"8"8"6"8"8"8"6"8"
6"
6"6"6"8"6"6"8"6"8"8"8"6"8"6"6
"8"8"
6"
8"
6"
8"8"6"
6"8"8"
6"
8"6"8"6"
6"6"8"8"6"6"6"8"
8 "
6"8"8"
8"
8"6"6"
6"
6"8"6"6"8"
6"6"8"6"
6"6"8"
8"
8"8"8 "
6"
8"
8"
8"6"6"6"8"6"6"6"8"
8"
6"
8"6"8"8"6"8"6"
6"
8"8"6"8"8"6"8"6"6"6"6"8"6"6"6"8"8"6"8"
6"6"6"8"8"6"8"6"8"8"8"6"8"8"6"6"6"
8"8"6"6"6"6"8"8"6"
8"
8"8"6"8"8"
6"
6"
8"8"6"8"6"6"8"6 "6"
8"
8"8"8"6"6"8"6"8"6"6"6"6"
6"6"6"6
"8"6"6"
8"6"6"8"6"
8"
6 "8"8"
8"
6"6"6"6"8"8"8"8"8"
8"
6"
6"6"6"6"6"
6"8"8"
6"8"6"
8"
8"6"8"
8"
6"
6"8"8"8"6"8"8"6"8"
6"
6"
6"
8"
6 "8"6"6"8"6"6"6"8"
8"6"The timing of projects shown is subject to change based on development patterns.The utility alignments shown in this figure are for illustration purposes onlyand do not set the alignments. The alignment of each utility will be determinedat the time of the engineering design.
Page 21 of 29
Roadway Impact Fee Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Service Area A
From To
A-1 4 lane Minor Arterial George Bush Drive E Dominik Drive Harvey Road Widening 2,409,500$ Future
A-2 2 lane Major Collector Lassie Lane Sterling Street Manuel Drive Future 860,066$ Future
A-3 2 lane Major Collector Dartmouth Street 720' S of Harvey Mitchell Parkway S Texas Avenue S Future 2,423,520$ Future
A-4 4 lane Major Arterial -
TxDOT Harvey Road SH 6 Northbound Frontage Road Boonville Road Widening 2,509,696$ Future
A-5, D-1 4 lane Major Arterial Rock Prairie Road SH 6 Northbound Frontage Road Stonebrook Drive Partial Widening 2,164,000$ Construction
A-6, D-2 4 lane Major Arterial Rock Prairie Road Stonebrook Drive Town Lake Drive Widening 5,136,000$ Construction
A-7, D-8 4 lane Major Arterial Bird Pond Road Rock Prairie Road 1,055' E of Rock Prairie Road Future 1,758,000$ Future
1 400,000$ Future
2 301,515$ Complete
3 397,476$ Complete
Project ID Functional Class Project Limits Project Status as
of September 2023
Harvey Mitchell Parkway S and Dartmouth Street
Texas Avenue S and Brothers Boulevard
Project Type Project Cost
University Drive E and University Towne Center
Intersections
Page 22 of 29
A-4A-6, D-2A-3A-7, D-8A-1
A-5, D-1
A-2
S
H
6
TEX
A
S UNIVERSITYHARVEYBIRD PONDD
ARTMOUTH
SOUTHWESTCOP
P
E
R
F
I
E
L
D
TARROWLASSIEGEORGEBUSHE
3
2
1
Legend
FUTURE THOROUGHFARE
WIDENING
PARTIAL WIDENING
CONSTRUCTED - EXCESS CAPACITY
OTHER THOROUGHFARES
!INTERSECTION IMPROVEMENT - FUTURE
!INTERSECTION IMPROVEMENT - CONSTRUCTED
NExhibit 2CIP - Service Area A
November 2021
0 10.5 Miles
Page 23 of 29
Roadway Impact Fee Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Service Area B
From To
B-1 4 lane Minor Arterial F & B Road 160' E of Turkey Creek Road Harvey Mitchell Parkway S Widening 4,106,520$ Future
B-2 4 lane Minor Arterial (1/2)Luther Street W Harvey Mitchell Parkway Jones Butler Road Partial Widening 2,903,600$ Future
B-3, C-1 4 lane Minor Arterial Rock Prairie Road W 715' W of Towers Parkway Wellborn Road Widening 4,659,868$ Under Construction
B-4, C-2 6 lane Major Arterial Rock Prairie Road Normand Drive SH 6 Constructed 4,017,530$ Complete
B-5 2 lane Major Collector Turkey Creek Road 2,775' N of Raymond Stotzer
Parkway Westbound Frontage Road
Raymond Stotzer Parkway Westbound
Frontage Road Widening 3,278,140$ Future
B-6 6 lane Major Arterial - TxDOT Harvey Mitchell Parkway S Raymond Stotzer Parkway Wellborn Road Widening 1,407,527$ Under Construction
B-7 4 lane Minor Arterial Penberthy Road George Bush Drive Luther Street W Constructed 3,080,683$ Complete
B-8 6 lane Major Arterial - TxDOT Wellborn Road George Bush Drive 940' N of Harvey Mitchell Parkway S Partial Widening 1,486,464$ Future
B-9 2 lane Major Collector Jones Butler Road Harvey Mitchell Parkway S Holleman Drive S Future 9,652,780$ In Design
B-10 4 lane Minor Arterial Holleman Drive S N Dowling Road 290' S of Rock Prairie Road W Constructed 10,631,067$ Complete
3 397,476$ Complete
4 1,190,232$ In Design
5 644,445$ Complete
6 4,532,013$ Under Construction
7 572,000$ In Design
8 350,000$ Future
Project ID Functional Class Project Limits Project Status as of September
2023
Intersections
Wellborn Road and George Bush Drive
Welborn Road and Holleman Drive
Wellborn Road and Deacon Drive
Holleman Drive W and Jones Butler Road
Longmire Drive and Ponderosa Drive
Project Type Project Cost
Texas Avenue S and Brothers Boulevard
Page 24 of 29
TEX
A
S
WE
L
L
B
O
R
N
HARVEY MITCHELLF & B ROADHOL
L
EMAN
HO
P
E
C
R
E
E
K GEORGE BUSHN DOWLINGSOUTHWESTROCK PRAIRIERAYMOND STOTZERSH
6
ROC K P R AIRIEWUNIVERSITYCO
L
L
E
G
E
LUTHERT
U
R
K
E
Y
C
R
EE
K
PE
N
B
E
R
T
H
Y
B-6
B
-
1
0
B-
8
B-2B-5B-1B-7
B-3, C-1B-4, C-2B-
9
8
3
7
6
5
4
Legend
FUTURE THOROUGHFARE
WIDENING
PARTIAL WIDENING
CONSTRUCTED - EXCESS CAPACITY
OTHER THOROUGHFARES
!INTERSECTION IMPROVEMENT - FUTURE
!INTERSECTION IMPROVEMENT - CONSTRUCTED
NExhibit 2CIP - Service Area B
November 2021
0 10.5 Miles
Page 25 of 29
Roadway Impact Fee Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Service Area C
From To
B-3, C-1 4 lane Minor Arterial Rock Prairie Road W 715' W of Towers Parkway Wellborn Road Widening $ 4,659,868 Under Construction
B-4, C-2 6 lane Major Arterial Rock Prairie Road Normand Drive SH 6 Constructed $ 4,017,530 Complete
C-3 4 lane Minor Arterial Barron Road WS Phillips Parkway Decatur Drive Constructed $ 5,795,317 Complete
C-4 4 lane Minor Arterial Capstone Drive 1265' W of Wellborn Road Wellborn Road Future $ 2,765,575 In Design
C-5 4 lane Minor Arterial Barron Road Wellborn Road WS Phillips Parkway Widening $ 4,712,977 In Design
C-6 4 lane Minor Arterial Greens Prairie Road 820' W OF WS Phillips Parkway Arrington Road Widening $ 10,550,324 Under Construction
C-7 4 lane Minor Arterial Greens Prairie Road Wellborn Road 1290' E of Creek Meadow Boulevard N Constructed $ 8,918,795 Complete
C-8 4 lane Major Arterial Towers Parkway Rock Prairie Road W Wellborn Road Constructed $ 10,030,680 Future
C-9 4 lane Major Arterial - TxDOT Wellborn Road Capstone Drive 540' S of Greens Prairie Road Widening $ 2,407,328 In Design
C-10 4 lane Minor Arterial (1/2)WS Phillips Parkway Barron Road Greens Prairie Road Partial Widening $ 5,844,160 ProgrammedC-11 4 lane Minor Arterial (50%)WS Phillips Parkway Greens Prairie Road Arrington Road Future $ 7,311,480 Future
C-12 4 lane Minor Arterial (50%)Royder Road Extension I-GN Road Wellborn Road Future $ 3,360,000 Programmed
C-13 4 lane Minor Arterial Royder Road Wellborn Road 885' S of Greens Prairie Road Constructed $ 7,690,299 Complete
C-14 2 lane Major Collector Victoria Avenue Southern Plantation Drive William D. Fitch Parkway Constructed $ 1,973,927 Complete
9 350,000$ Future
10 320,994$ Complete
11 350,000$ Future
12 350,000$ Future
13 350,000$ Future
14 816,249$ Complete
Project ID Functional Class Project Limits Project Status as of September 2023
Intersections
Barron Road and Alexandria Avenue
Barron Road and Decatur Drive
Barron Road and Longmire Drive
Longimre Drive and Eagle Avenue
William D. Fitch Parkway and Victoria Avenue
Project Type Project Cost
Graham Road and Victoria Avenue
Page 26 of 29
SH
6
I-GNWELLBORNBARRONWS
P
H
I
L
L
I
P
S
ARRINGTONGREENS PRAIRIEROCK PRAIRIEWILLIAM D FITCH
ROYDER
TOWERS
CAPSTONE
C-9C-6C-3C-1
1
C-7C-10
C-8
C-1
3 C-14C-5C-12B-3, C-1B-4, C-2
C-4
9
13
14
1211
10
Legend
FUTURE THOROUGHFARE
WIDENING
PARTIAL WIDENING
CONSTRUCTED - EXCESS CAPACITY
OTHER THOROUGHFARES
!INTERSECTION IMPROVEMENT - FUTURE
!INTERSECTION IMPROVEMENT - CONSTRUCTED
NExhibit 2CIP - Service Area C
November 2021
0 10.5 Miles
Page 27 of 29
Roadway Impact Fee Capital Improvement Plan
Semi-Annual Impact Fee Report: April 2023 - September 2023
Service Area D
From To
A-5, D-1 4 lane Major Arterial (1/2)Rock Prairie Road SH 6 Northbound Frontage Road Stonebrook Drive Partial Widening $ 2,164,000 Construction
A-6, D-2 4 lane Major Arterial Rock Prairie Road Stonebrook Drive Town Lake Drive Widening $ 5,136,000 Construction
D-3 4 lane Major Arterial Rock Prairie Road Town Lake Drive William D. Fitch Parkway Widening $ 17,245,000 In Design
D-4 4 lane Minor Arterial Midtown Drive Medical Avenue 990' E of Medical Avenue Constructed $ 1,028,820 Complete
D-5 4 lane Minor Arterial (1/2)Midtown Drive 990' E of Medical Avenue 800' S of Town Lake Drive Partial Widening $ 4,535,000 Future
D-6 2 lane Major Collector Midtown Drive 800' S of Town Lake Drive 2605' S of Corporate Parkway Constructed $ 5,374,808 Complete
D-7 2 lane Major Collector Durham Drive Midtown Drive Rock Prairie Road Future $ 981,960 Future
A-7, D-8 4 lane Major Arterial Bird Pond Road Rock Prairie Road 1055' E of Rock Prairie Road Future $ 1,758,000 Future
D-9 4 lane Minor Arterial (50%)Town Lake Drive SH 6 Northbound Frontage Road Midtown Drive Future $ 1,753,000 Partial
D-10 2 lane Major Collector Corporate Parkway SH 6 Northbound Frontage Road Midtown Drive Constructed $ 1,436,192 Complete
D-11 2 lane Major Collector Corporate Parkway Midtown Drive William D. Fitch Parkway Future $ 9,894,000 Future
D-12 4 lane Minor Arterial (1/2)Pebble Creek Parkway Royal Adelade Drive St Andrews Drive Partial Widening $ 2,137,000 Future
D-13 4 lane Minor Arterial (50%)Pebble Creek Parkway St Andrews Drive 275' S of Lone Star Lane Future $ 9,181,000 Future
D-14 2 lane Major Collector Lakeway Drive 1645' S of Gateway Boulevard SH 6 Northbound Frontage Road Future $ 2,635,080 Future
D-15 2 lane Major Collector Mather Parkway Nantucket Drive 1920' S of Nantucket Drive Future $ 882,000 Future
D-16 4 lane Minor Arterial (50%)Nantucket Drive SH 6 Northbound Frontage Road Pebble Creek Parkway Future $ 5,877,000 Future
D-17 2 lane Major Collector Nantucket Drive Pebble Creek Parkway Southern Pointe Parkway Future $ 3,083,220 Future
D-18 4 lane Minor Arterial (50%)Southern Pointe Parkway 205' W of Pipeline Road 280' E of Nantucket Drive Future $ 3,902,000 Future
Functional Class Project Limits Project Type
Project Status as
of September
2023
Project ID Project Cost
Page 28 of 29
SH
6
ROCK PRAIRIE
WILLIAM D FITCHPE
B
B
L
E
C
R
E
E
KBIRD PONDN A N TUCKETC O RPORATE
LAKEWAYTOWNLAKEMI
D
T
O
W
N
D-3
D-1
3D-16D-6
D-11
D-17
D-14
D-18D-7D-5
D-9A-6, D-2 A-7, D-8D-
1
2
D-4
D-15A-5, D-1
D-108
3
6
Legend
FUTURE THOROUGHFARE
WIDENING
PARTIAL WIDENING
CONSTRUCTED - EXCESS CAPACITY
OTHER THOROUGHFARES
!INTERSECTION IMPROVEMENT - FUTURE
!INTERSECTION IMPROVEMENT - CONSTRUCTED
NExhibit 2CIP - Service Area D
November 2021
0 10.5 Miles
Page 29 of 29