Loading...
HomeMy WebLinkAbout03/31/1998 - Regular Agenda - Parks BoardCITY OF COLLEGE STATION PARKS AND RECREATION BOARD SPECIAL MEETING TUESDAY, MARCH 31, 1998 — 7:00 PAL CENTRAL PARK CONFERENCE ROOM 1000 KRENEK TAP ROAD AGENDA 1. Appoint Lincoln Recreation Center Advisory Committee Member 2. Discussion of Capital Improvement Program (CIP) 3. Appoint CIF' Subcommittee 4. Adjourn This building is wheelchair accessible. Handicapped parking spaces are available. Any request for sign interpretive services must be made 48 hours before the meeting. To make arrangements call 409-764-3547 or (TDD) 1-800-735-2989. MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: -- MINUTES -- CITY OF COLLEGE STATION PARKS AND RECREATION BOARD SPECIAL MEETING TUESDAY, MARCH 31, 1998 - 7:00 P.M. CENTRAL PARK CONFERENCE ROOM 1000 KRENEK TAP ROAD Elizabeth Cunha, Chair; Debra Anderson, Vice Chair; Bob DeOtte; John Crompton; and Mike Manson Gary Halter Steve Beachy, Director; Eric Ploeger, Assistant Director; and Bridgette George, Staff Assistant VISITORS: None The meeting was called to order at 7:06 p.m. I. Appoint Lincoln Recreation Center Advisory Committee Member — John motioned to appoint A. C. Clark. Debra seconded, Bob abstained. The motion passed. II. Discussion of Capital Improvement Program - The Board was given a list of potential CIP projects. The Board and staff reviewed and discussed the preliminary list. John asked that the following projects also be considered. 1) John stated that City Manager Skip Noe met with Dr. Jim Scales and they discussed working together on building joint recreation facilities when new schools are constructed. He stated that when that happens, there needs to be funds in the budget for that joint project. 2) Establishing funding for a Greenways Plan to purchase land. 3) Obtain a user surcharge for adult softball for future renovation projects such as lights and general upkeep and put it in a dedicated development fund. Steve stated that this would need to be set up in the budget process if the Board decided that's what they wanted to do. It would also take it out of the CIP list. Bob stated that the Board should consider requesting the same surcharge for all adult users, and possibly youth. The Board decided to discuss this issue at the next meeting. 4) Incremental increases in property taxes to pay for the acquisition and development of future parks. III. Appoint CIP Subcommittee — Elizabeth appointed John, Chris, and Bob to serve on the subcommittee. IV. Adjourn: The meeting adjourned at 9:37 p.m. Page 1 of 2 APPROVED: Elizabeth Cunha, Chair Date Attest. Bridgette George CPS, Board Secretary Date Parks Board Minutes March 31, 1998 Page 2 of2 3/31/98 CITY OF COLLEGE STATION PARKS & RECREATION DEPARTMENT FY98 GOALS O Continue Park Development and Improvement O Continue Park Planning Projects O Complete Reengineering Projects O Total Quality Service Improvements O Continue Staff Development O Implement City Council Strategic Issues Continue Park Development and Improvement O Wayne Smith Baseball Complex • Edelweiss Park - Phase I O Business Center Phase II O Central and Bee Creek O OTIS Building Continue Park Planning • Complete Lick Creek Park Conceptual Design Complete Lick Creek Park Master Plan O Complete Business Center Phase II Landscape Design O Complete Parks System Master Plan O WPC Master Plan Revision O Complete Design of Teen Center O Conceptual Design of Regional Athletic Park O Develop CIP Bond Recommendation O Parkland Dedication Ordinance Revision Reengineering Projects O Improved Parks and Grounds Maintenance Operations • Enhanced Department Marketing Efforts O Improve Aquatic Operations ® Privatization of Concession Operations Total Quality Service Improvements O Participation in NRPA Economic Impact Study Collaboration in School -age Care Survey Participation in Jr. High Wellness Survey O City Program Participation Surveys O Begin TQM Training Continue Staff Development O Develop Skills -based Pay System O Plan and Conduct County -wide Emergency Management Exercise • Conduct Emergency Management Academy O 50% of all Supervisors Complete City Supervisory Academy City Council Strategic Issues O #3 - Total Quality Management O #8 - WPC Drainage O #11 - Youth Center Services • #27 - Tourism Marketing Plan PARKS & RECREATION COLLEGE STATION CITY OF COLLEGE STATION PARKS & RECREATION DEPARTMENT FY98 GOALS O Continue Park Development and Improvement O Continue Park Planning Projects O Complete Reengineering Projects O Total Quality Service Improvements O Continue Staff Development O Implement City Council Strategic Issues Continue Park Development and Improvement O Wayne Smith Baseball Complex • Edelweiss Park - Phase I O Business Center Phase II O Central and Bee Creek O OTIS Building Continue Park Planning O Complete Lick Creek Park Conceptual Design • Complete Lick Creek Park Master Plan O Complete Business Center Phase II Landscape Design O Complete Parks System Master Plan O WPC Master Plan Revision O Complete Design of Teen Center O Conceptual Design of Regional Athletic Park O Develop CIP Bond Recommendation O Parkland Dedication Ordinance Revision Reengineering Projects O Improved Parks and Grounds Maintenance Operations ® Enhanced Department Marketing Efforts O Improve Aquatic Operations ® Privatization of Concession Operations Total Quality Service Improvements O Participation in NRPA Economic Impact Study ® Collaboration in School -age Care Survey O Participation in Jr. High Wellness Survey O City Program Participation Surveys O Begin TQM Training Continue Staff Development O Develop Skills based Pay System O Plan and Conduct County wide Emergency Management Exercise ® Conduct Emergency Management Academy O 50% of all Supervisors Complete City Supervisory Academy City Council. Strategic Issues O #3 - Total Quality Management O #8 - WPC Drainage O #11 Youth Center Services O #27 - Tourism Marketing Plan PARKS . RECREATION COREqE STATION March 31, 1998 PARKS & RECREATION BOARD 1998/99 GOALS Action Plan lete parks master plan B. Inventory potential areas for future parks and greenbelts. C. Analysis of survey data, comprehensive plan recommendations and inventory results. D. Develop recommendations for implementation including financial impact. E. Prioritize recommendations and develop timeline strategies. 2. Complete acquisition of the athletic park site and develop a long term development master plan A. Complete property acquisition (Jul., `98) B. Conduct site visits to selected athletic parks in Texas (Summer, `98) C. Conduct needs assessment with the Sports and Recreation Association and Parks and Recreation Board (Summer, `98) D. Concept preparation by Parks Planning (Fall, `98) E. Develop budget estimate by Parks Planning Staff or consulting firm if funds allow (Fall, `98) Revision of the master lan for Wolf Pen Creek (City Council Issue #8) Present draft revisions to Parks and Recreation Board (Apr. 14, `98) K. Present draft revisions to Planning and Zoning Commission (Apr. 16, '98) L. Present draft revisions to the Tax Increment Finance Board (Apr., `98) M. Submit revised Wolf Pen Creek Master Plan and recommendations to City Council for consideration (Apr. 23, `98) • cQrzCC st?for u ; o aosals fete cl srgn se F.I. • - h 'City Cou. nc l p rov r:'b °co tr e for esigii se.ry .4,:es Open interim teen center (YAHOOZ) at old Shenanigans' location. (Apr. 3, '98) K. City Council approval of completed design/Authorization to bid project (Jun., '98) L. Bid approved by City Council (July 24, '98) M. Construction complete (Jan. 1, '99) al dezafro of ca rtzal z am larpa t za. aMC. :: F ' CxtyCozzncrl� ppr°oval of nwne r:eeommeg... fions f. G. Begin first season (Summer '98) H. Develop recommendation for future improvements (Summer, '98) Conduct public hearings and oversee .design process for WoodwayYPark Ice o p •land dedt atron fz or�a Nl h ose 4pa, lEments pz 8: `:Acceptance pf parkland i'edreatton froln emit..Ax s par ttheni pro C. Conduct public hearings, develop conceptual designs (Fall, '98) D. City Council approval of plans and authorization to begin construction (Fall, `98) Develop a Master Plan for Lick Creek Park a:Lwk.Fart;Ad oiyCoinmitt o• ljunry> dsi'a03e$4901e zt z t o e t c vxdr et;1esr rssntcoz ce 01181 Cr:m;... Cl i Pro . Appoint Standing committee (April, '98) J. Request funding for archaeological survey of site (May, '98) Madeley Park Development 'ub of rc uestforfu.ndrn .•tt . Co:rnrnun t :: Developinent :City Ct rzuerl app :oval r f irn rng:for acgwsrt ?n.aacent . i oper::ty C. Conduct public hearings concerning potential improvements (Fall, `98) D. Complete property acquisition for adjacent tracts (Fall, '98) E. Board consideration of Park Master Plan (Fall, '98) F. City Council approval of Park Master Plan (Fall, '98) . DesiQn small park that serves the Spring Loop residents e1Jn.(ze: e $i trt�r::ot.trse::ofe rSfrri :i r stx ee Page 2 of 3 B. C. D. Obtain population density estimates and demographic information Develop potential alternatives and recommendations and present (Summer `98) Include in future Capital Improvement Program funding request. ( 10. Consider revisions to the Parkland Dedication Ordinance Recre a0.021110 Bad" :::::::::::::..............::::::::::::::.::.............::::::::.::::::::::::.::.:::::::.:::::::::::::.:::::.:. ..........• .:: t alzneetrr� 1.JnCI sexltatxan of revrs .... -. .:.....: _........_ .. _ Approval of draft ordinance by Planning & Zoning Commission (Summer, 98) J. Workshop and presentation to City Council (Summer, `98) K. Approval of revised ordinance by City Council (Summer, `98) 11. Develop a Greenways Plan A. Appoint of an advisory board for greenways oversight. (April, `98) B. Inventory of potential greenway locations. (Summer, `98) C. Develop methodology for greenway acquisition. D. Prioritize greenways on the basis of expediency and importance. E. Identify ownership of land in the priority greenways. F. Develop time lines for implementing stages of each of the priority greenways. G. Develop mechanism/strategies for building public support for greenways. 12. Develop a structure with the school board for joint development of indoor athletic facilities. uela a stiff carrrrnrresenta: Synchronize a long-term plan that ensures bond money from both entities is available when needed to bring the projects to fruition. D. Develop model/briefs/specifications/set of elements for each type of school projects that show desired extent of city involvement. E. Discuss with Teen Board the potential for integrating teen center development into these proposals. F. Tour Plano parks and school facilities. 13. Develop an Urban Forestry Plan A. Inventory of trees on streets and develop recommendations on which new tree planting efforts should focus. FRSC 420 Arboriculture Class (Fall, `98) B. Develop a proactive planting initiative based on city -resident partnerships similar to the NeighborWoods program in Austin. C. Establish a committee to develop a City Tree Ordinance after reviewing those adopted in other Texas cities. (Spring `98) findings to the Board `99) C. Page 3 of 3 matron Mr. Vinzant i� _ ✓ . Bill Fox Nth M. Griffith ""-- john crompton edseljones-"" david scoff nancy crouch james 4• moffitt gayle touchstone °"--- eric Lindquist craig hall stan lorch V bob deotte Charlie thomas " randall pitcock/ david petei lee blank bill davis / robert droleskyV maaiet7seeendeEL asd ?Norma Miller V raborn metcalf mike mcmichen andrew haul' scott schaffer tim jones steve seconded... e ueg ted Exhibit A An Illustration of How Incremental Increases in Property Taxes may pay for the Acquisition and Development of Parks. Zone C Zone B Zone A 1210 yds 50 acre park T Costs • Acquisition and development of a 50-acre natural park area with some appealing topographical and/or vegetation features. • Assume cost of acquisition and development (fencing, trails, supplementary planting, some landscaping) is $20,000 an acre, so total park capital cost is $1 million. • Annual debt charges for a 20 year G.O. Bond on $1 million at 5% are approximately $90,000. Income • If properties around the park are 2000 square foot homes on half -acre lots (40 yds x 60 yds) with 40 yard frontages on to the park then there would be 70 lots in Zone A (30 lots along each of the 1210 yard perimeters, and 5 lots along each of the 200 yard perimeters). Assume total property taxes payable to city, county and school district are 2% of the market value of the property. • Assume market value of similar properties elsewhere in the jurisdiction, beyond the immediate influence of this park is $200,000. • Assume the desire to live close to a large natural park creates a willingness to pay a premium of 20% for properties in Zone A, 10% in Zone B, and 5% in Zone C. one ►utside the ark's Influence (20% remium) (10% remium) (5% remium) Annual Increment of Property Tax Accruing from Each Zone Market Value of Each Home $200,000 $240,000 $220,000 $210,000 Incremental Value Attributed to the Park 0 $40,000 $20,000 $10,000 Total Property Taxes at 2% $4,000 $4,800 $4,400 $4,200 Incremental Property Taxes Attributed to the Park 0 $800 $400 $200 Aggregate Amount of Property Tax Increments given 70 home sites 0 $56,000 $28,000 $14,000 $98,000 Thus, the incremental income from property taxes attributable to the presence of the park (approximately $98,000) is sufficient to pay the annual debt charges (approximately $90,000) for acquisition and development of the park. COLLEGE STATION PARKS & RECREATION POTENTIAL CIP PROJECT LIST 1999-2004 I. NEIGHBORHOOD PARK DEVELOPMENT Zone 2 (Spring Loop Perk): University Park Development of a 10'2-acre site to serve the north Zone 2 area. Edelweiss Park: $1,100,000 TOTAL $250,000 $200,000 Complete development of the park following use of dedication funds for partial development. Southwest Park: Neighborhood park development (10 acres). Shenandoah: Development of a re site to serve the Shenandoah Subdivision. Billie Madeley Park: Neighborhood park development (10 acres) $250,000 $200,000 $200,000 II. ADDITIONAL MAINTENANCE FACILITIES $850,000 TOTAL West District Maintenance Facility: New facility to replace the aging Lincoln Maintenance Shop. This will be constructed at the Wayne Smith Baseball fields. Renovation of existing shops for other uses. 5,000 square foot x $75 sq. foot = $375,000 utilities 20,000 paving 30,000 $425,000 Forestry Maintenance Building: S425,000 This will provide a new stand-alone shop for Forestry/Horticulture activities and free up needed space in the Central Park shop, currently shared by the Forestry and East District crews. Page 1 of 6 O:\ budget\ cip\ 20041istdoc I I. PARK IMPROVEMENTS Arboretum Pond Improvements: 1. Sidewalks 2. Lighting 3. Aerator 4. Dig out ponds $60,000 Anderson Park: 1. Irrigation replacement $24,000 2. Remove tree wells and repair area 5,000 3. Area lighting on walk to Holleman (5) 15,000 4. Parking lot - eliminate one soccer field 100,000 $144,000 Bee Creek Park: 1. Basketball court 20,000 2. Rest Rooms at shelter or ballfields 65,000 3. Sidewalk repair 25,000 4. New ballfield lights and poles 100,000 ._.., 5. Tennis court fence replacement 20,000 6. Replacement bridges (to Bee Creek Street) 40,000 7. Additional bleachers 10,000 $280,000 Brison Park: 1. Additional lights (6) $ 21,000 2. Walk (continue around west side?) 30,000 3. Drainage improvements (1/4 mile) 50,000 $101,000 Brothers Pond Park: 1. Area lighting (pond and around track) $20,000 2. Playground replacement 30,000 3. Walk replacement 60,000 4. Pond improvement 50,000 5. Additional rail fencing 1,000 6. Pond renovation (pier, aerator, etc.) 10,000 $171,000 Central Park: 1. Area light replacement $10,000 2. Shop renovation (Operations) 20,000 3. Walks (ballfield to Krenek) 7,500 4. Irrigation replacement - softball/soccer fields 45,000 5. Parking lot curbing (Frontage Road exit) 4,200 $86,700 Page 2 of 6 0: \ budget \ cip\ 20041ist.doc Lna Ati.M0 e.oyvtek i;y6f-fA/y) Conference Center: 1. Irrigation replacement 2. Two new patio covers 3. Additional parking lot (26 spaces) Cy Park/ ce Department: 1., Parkin. ot (61 spaces) $ 5,000 11,000 33,000 $49,000 $65,000 Gabbard Park: 1. Basketball court $20,000 2. Track replacement (concrete & rubber) 95,000 Track replacement (just concrete) 26,000 3. Area lights (12) 30,000 4. Playground replacement 30,000 5. Pier replacement 7,500 ' qd-U19 "B ALI 5 Ub ;110 $182,500 Jack & Dorothy Miller Park: 1. Replace jogging track with concrete rubber surface (concrete & rubber) $60,000 " (concrete only) 19,000 $79,000 11 I/ Lemontree Park: 1. Ballfield light replacement 2. Fence replacement 3. Irrigation replacement 4. New park sign 5. Playground replacement Luther Jones Park: 1. Parking lot 2. Sidewalk $60,000 21,000 6,500 1,800 30,000 $119,300 $25,000 21,000 S46,000 Merry Oaks Park: 1. Walk replacement (concrete only) $17,000 2. Playground replacement 30,000 3. Area lights (10 lights) 25,000 $72,000 Oaks Park: 1. Replace long wood bridge $25,000 Page 3 of 6 0: \ budget \ ciA20041istdoc Raintree Park: 1. Basketball court $20,000 2. Playground replacement 30,000 $50,000 Richard Carter Park: 1. Playground $25,000 2. Area lights (12 lights) 30,000 3. Walk replacement (concrete only, in place of brick or gravel) 14,000 $69,000 Sandstone Park: 1. Rest rooms $65,000 Southwood Athletic Park: 1. Tennis courts (4 with lights) $100,000 2. Irrigation replacement (8 fields) 70,000 3. New backstops 55,000 4. New ballfield lights (6 fields) 5. Dirt bin 10,000 6. Sidewalks to Senior League dugouts 2,000 7. Shade Structures (6 fields) 50,000 8. Shop security fence 9,000 Thomas Park: 1. Pave remainder of track 2. Replace area lights and lights on south end (16 lights) 3. Replace playground m,Q.on flag 4. Replace basketball court Wayne Smith Park: 1. Dugout covers 2. Additional bleachers 3. Bleacher covers Windwood Park: 1. Area lights (3) Woodcreek Park: 1. ADA water fountain $83,000 40,000 30,000 45,000 $198,000 $6,000 12,000 18,000 $36,000 $ 8,000 $1,500 Page 4 of 6 O:\budget\cip\ 20041ist.doc IV. LICK CREEK PARK DEVELOPMENT 5,0 $400,000 This amount covers approximately half the development cost of the proposed master plan. Grant funds will possibly cover the remaining needs. V. ATHLETIC PARK DEVELOPMENT $2,000,000-,$5,000,000 Complete to partial development of the future 150-acre Athletic Park. This will include a maintenance shop. VI. POOL IMPROVEMENTS Adamson Lagoon Swimming Pool (in Bee Creek Park) 1. Interactive play structures $ 45,000 2. Slides - shotgun, drop, or body slides 150,000 ea. 3. Master Blaster 1,000,000 4. Slide catch pools 40,000 ea. 5. Additional bath house or remodel 150,000 6. Pool liner 100,000 7. Repair concrete decks 20,000 8. Additional lighting 5,000 9. New filters, baby pool pump, replace piping 13,000 10. Sand volleyball court 7,000 11. Public announcement system 3,000 12. Game room for teens 40' x 48' 150,000 13. Repair pool walls, patching exposed aggregate 8,000 14. New site for pool chemicals 6,000 15. Add theme signage 6,000 16. New ladder anchors and starting block anchors 10,000 17. Replace baby pool concrete decking 15,000 18. New deck covering - "Flow Crete" rubber cushioning 40,000 19. Additional waterslide 98,000 20. Shade structure at deep end (24 x 24) 30,000 $37-3 000- " 51 Hallaran Swimming Pool (in Southwood Athletic Park) 1. Play equipment in pool, or slides 2. Dry play structure 3. Filters 4. Lane lines and lane line reel 5. Shade structure with tables $ 18,000 $ 30,000 $ 40,000 $ 3,500 $ 12,000 $103,500 Page 5 of 6 O:\budget\ cip\20041ist.d oc Thomas Swimming Pool (in Thomas Park) 1. Shelter over baby pool 35' x 45' 2. Shelter by fence west of Bath House 3. Mural on pump room wall 4. Additional parking (20-24 spaces) 5. Large water slide 6. New catch pool and fence with slide 7. Floating toys 8. Concrete deck replacement 9. Vinyl liner 10. Additional light pole 11. New sump pump 12. Remodel office/rest rooms $40,000 15,000 9,000 30,000 150,000 70,000 15,000 25,000 60,000 5,000 6,000 20,000 i445,000 Page 6 of 6 O:\budget\ cip\ 20041ist.doc