Loading...
HomeMy WebLinkAbout04/11/1995 - Regular Agenda - Parks Board0 J PARKS AND RECREATION BOARD REGULAR MEETING TUESDAY, APRIL 11, 1995 - 7:00 P.M. CENTRAL PARK CONFERENCE ROOM 1000 KRENEK TAP ROAD AGENDA Call to Order 2. Approval of Minutes Hear Visitors Discussion and Consideration of Parkland Dedication a. Park Zone 4 - Mr. Bert Herman b. Park Zone 8 - Myrad c. Park Zone 10 - Shenandoah, Phase Two 5. Discussion of Pool Hours 6. Discussion of 1995 Bond Election 7. Capital Improvement Program Report 8. Other Business/Board Concerns 9. Adjourn PARKS AND RECREATION BOARD REGULAR MEETING TUESDAY, APRIL 11, 1995 - 7:00 P.M. CENTRAL PARK CONFERENCE ROOM 1000 KRENEK TAP ROAD MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: 1. CALL TO ORDER: The meeting wascalled to order at 7:12 p.m. George Dresser, Chair; Ron Gay, Vice Chair; Carol Reynolds; Greg Taggart; Michael Manson; and Nancy Crouch, Council Liaison Bob DeOtte; Barry Harding Steve Beachy, Director; Eric Ploeger, Asst. Director; David Gerling, Special Facilities Supt.; Vera Solis, Aquatics Supv.; Bridgette George, Staff Assistant Tony Cisneros, Bryan Parks & Recreation Director; Mike McClure, McClure Engineering II. APPROVAL OF MINUTES: Minutes were approved as submitted. III. HEAR VISITORS: Mr. Cisneros was present to observe the meeting. IV. DISCUSSION AND CONSIDERATION OF PARKLAND DEDICATION: a. Park Zone 4 - Mr. Bert Herman Steve mentioned that Mr. Bert Herman is proposing to swap approximately two acres of land in Zone 4, adjacent to Windwood Park, in exchange for Switch Station Road. That road would be closed and a different access road opened. This would increase the acreage at Windwood Park to three acres allowing for some open space for ball play. Mr. Herman's second proposal was to sell six acres of land adjacent to the Switch Station. Steve informed the Board that no funds were available in that zone to purchase the six acres. Ms. Crouch asked if there would be a problem closing Switch Station Road. ';Steve stated that the only reason the road is used is for access to the Switch Station. He said that another access road would have to be built priorto closing that one. Ron believes the City will have problems getting public support for changing the land from residential to commercial. Some concerns were raised about having the park adjacent to a parking lot behind sa commercial area. Steve stated that the park would have frontage on Appomattox when the extension is constructed. Steve said that adding two acres to Windwood Park would benefit that park and neighborhood. The Board discussed the fact that the buyer may or may not agree to the ,land swap once he purchases the land. Ron motioned to accept Mr. Herman's proposal of swapping Switch Station Road for two acres of land adjacent to Windwood Park, without the assessment for Appomattox. Michael seconded, the motion passed. b. Park Zone 8 - Mvrad Steve mentioned that Myrad is proposing a dedication of 7.6 acres of land, which is in excess of their required dedication, to offer a buffer between the residential area and the proposed commercial area. He said that there is no adequate access to the proposed parkland. Ric Parks & Recreation Board Regular Meeting April 11, 1995 Page (2) mentioned that there is another area of land that, if added to this land, would make a nice connection between this proposed land and Woodcreek Park, to make one large "L" shaped park. Unfortunately, that land is owned by the Ledbetters. Ms. Crouch suggested asking them to donate that piece of land. She also asked if this land was in the flood plain. On the map that was supplied to the members, there was a written note to Jane stating that "none of the 7.664 acre park is in the flood zone." Ron motioned to accept the proposal without having to pay for city assessments for additional items. Michael seconded. Greg motioned to amend the motion by requesting an alternative access both on the east end and west end of the park and an access from Woodcreek Park; the currently intended access is not adequate. This would ease access to the park by both citizens and emergency vehicles. Ron seconded the amendment. The amendment passed 4-1. The motion passed unanimously. c. Park Zone 10 - Shenendoah, Phase Two Steve mentioned that the proposal includes a combination of parkland dedication with an adjacent storm water detention facility, somewhat similar to what was done with the property close to Southwood Athletic Park a few years ago. By combining the two the City would acquire an approximate three -acre park site. At the present time there is no public park property in this subdivision. There is a private homeowner's association facility with tennis courts, small pool, etc. Mr. McClure got involved in the, platting process in phase II and was asked by Jane Kee to took at the master plan and suggested identifying some parkland. Steve had previously asked Mr. McClure if the adjacent tract could also be added sometime in the future. Mr. McClure stated that his client is more interested in retaining the lot. All of the grading and site, preparation for the detention pond would be at the developer's expense. Steve recommended that Board members take a look at the proposed site which was agreed to by the Board. The proposed park is located across the street from Dove Trail. DISCUSSION OF POOL HOURS: Vera provided the Board witha list of current pool hours. She stated that she has been requested by City Hall staff to provide a noon hour adult lap swim at Thomas Pool. Vera stated that her budget will not currently allow her to provide that service without shifting hours from another time. She also said that the only available time slot at Thomas is 11:00 a.m. to 12:00 p.m., not 12:00-1:00 p.m. Currently the swim team utilizes the pool from 8-11:00 a.m., while the pool is open to the general public from 12:00-6:00 p.m. Michael asked why the pool couldn't have adult lap swim from noon to 1:00 p.m. and let the general public in from 1:00-6:00 p.m. Vera stated that the pool hours at Thomas have already been reduced by one hour to allow the swim team access. She stated that the citizens in that neighborhood were disgruntled when that happened and she would hate to reduce the hours again. She stated that currently there are two lanes open for lap swim at all times. Some members were concerned that citizens wanting to swim at lunch time would not be able to take their lunch an hour earlier. Vera mentioned that Southwood has three lap lanes open and Adamson Lagoon has one large lane open at all times during the noon hour. Greg was asked what was wrong with adults swimming laps while children were in the pool. He stated that he was told it was inconvenient to swim while kids were present. _ George mentioned that when the public hearings were held, the most frequent issue stated was that citizens wanted pools open more. Steve stated that the natatorium should open in November and hopefully the City can utilize that facility and maximize the swim program throughout the year. ' Some Board members suggested adding one more lane to the two already offered at Thomas Pool. Vera stated that if one more lane is opened the diving board activity would have to be eliminated because of the set up. Michael would like to see all of the lanes reserved for adults. ' Vera commented that her pools provide activities for youth -at -risk, and she would like to see these youth in the pool rather than out in the neighborhood getting into trouble. Steve asked how many adults can swim in one lane. Vera stated that swimmers typically don't like to circle swim, but two people can swim comfortably in one lane. Ron stated that he doesn't believe the department should change pool setup for a handful of citizens, while keeping the rest of the public out. Vera suggested opening Adamson Lagoon from noon-1:00 p.m. for adult lap swim. Some discussion took place about the location. George asked Vera to make more lanes available at Thomas, evaluate the usage, and report back after one month. Parks & Recreation Board Regular Meeting April 11, 1995 Page (3) Vera also discussed changing the pool hours at Southwood and Thomas to an hour earlier. This will allow for more swimming before the day gets really hot. The Board agreed to the change of the pools operating on Saturday from 11-6 and Sunday from 1-8. VI. DISCUSSION OF 1995 BOND ELECTION: Steve passed out the Proposed Expenditure Schedule for the 1995 Bond Election. He explained that the $23 million has to be allocated over a 5-year time frame. At a meeting with city staff, Steve voiced his concern about waiting to purchase the parkland the fifth year. George stated that the city needs to purchase the land and have a proposed development plan for the large athletic complex prior the next bond issue around the year 2000, or the same perception of Wolf Pen Creek will arise. Asking for money to build the athletic complex when the City hasn't done what it said it would do with all of the previous funds is asking for problems. The Board discussed moving some of the other issues back instead of waiting to purchase the park land. They also mentioned the fact that land value could substantially increase within the next five years, making the $1.5 million an insufficient amount. Ms. Crouch suggested purchasing the land over a period of years. Ron suggested moving the Northgate project back a few years. The rehabilitation and reconstruction of streets was also identified as items that could be put off a little later. The Board also discussed moving the Wayne Smith Park project a year later. George asked Steve if it would be appropriate for George to talk to Elrey Ash regarding the schedule. Steve stated yes. Ron suggested talking to Glenn Schroeder instead because he would have more knowledge of when these bonds are due. VII. CAPITAL IMPROVEMENT PROGRAM REPORT: Ric reported that the Oaks and Thomas improvements were almost complete, except for one pedestrian bridge which should be completed the following week. The Wolf Pen Creek rest room building is going fairly well although the weather is causing some minor problems. The Southwood Pool renovation is ongoing. The first engineer chosen refused to sign the contract, so the second choice is being considered. However, the same insurance company represents the second choice which is why the first engineer declined. The department is approximately three weeks away from completing the plans for Sandstone Park development. Ms. Crouch mentioned that the school district is interesting in swapping the land adjacent to Sandstone Park for some land next to the Jr. High School. The Board discussed the fact that residents in that subdivision do not want more parkland and would probably be against increasing the park's acreage. Steve stated that trading land in Southwood would probably violate the covenants of the Parks and Wildlife Department which awarded money for the development of that park. George asked Steve to look into it and report back to the Board. The Wolf Pen Creek concrete additions are complete except for clean up. The Brothers Pond area light is being installed due to citizens' concerns regarding vandalism and a dark playground area. The funds used will be from parkland dedication funds in that zone. VIII. OTHER BUSINESS/BOARD CONCERNS: Ron expressed his concern about Mr. Maloney, who is a council candidate, and his message regarding the Wolf Pen Creek. Mr. Maloney is handing out leaflets that say, "The City of College Station needs a councilman who will oppose the politics that circumvented the voters° will and stuck us with the Wolf Pen Creek mud pit." Ron thinks the Board needs to rebut through an editorial, while educating the public at the same time. Ms. Crouch suggested talking to Peggy Calliham, Public Relations/Marketing Manager about this issue. Peggy is considering doing some educational articles regarding Wolf Pen Creek, especially with the interest that the dredging will provide. Some discussion took place whether this rebuttal should come from the Parks Board. Greg suggested not rebutting the issue, but rather just re-educating the public. Ron and George decided to meet with Peggy Calliham regarding this issue. Parks & Recreation Board Regular Meeting April 11, 1995 Page (4) Michael would like the bikeway issue on the next agenda. He would like to discuss the one that is on the high tension power line right-of-way that takes you to Lick Creek Park. He believes there are many citizens who are interested in that issue. George suggested having Ed Hard give a report on this issue. Ms. Crouch stated that several ideas came out of the youth government day. The kids who participated stated that they would like a hang out, like Sweet Eugene's, after school for high school kids. They would also like a dance place with lights, music, etc. Lisa Benson will be surveying kids in the future to find out what these kids would like to have. Ms. Crouch suggested that Ms. Benson call Steve. She also mentioned that CSISD might go in with the City to provide such a facility. George asked about the Pebble Creek Park. Steve stated that the land has been acquired and will be utilized like the park next to Rock Prairie Elementary School. It should be completed by the opening of the school in Fall of '96. George stated that he would like to review the Board's 1995 goals at the next meeting. Especially those related to various park sites. George also stated his concern regarding the fact that HOK is 20% complete with parks, but he has seen no evidence of their work. George asked Steve to find out more information about what's going on. IX. ADIOURN: The Board adjourned at 9: 34 p.m. • PARKS -AND,'RECREATION'BOARD'" iREGULAR MEETING 11,19,95 - 7:00 P.M, CENTRAL PARK CONFERENCE ROOM,: • .:•-• 1000...-.KRENEK TAP ROAD MEMBERS PRESENT:'': George Dresser, Chair; Ron Gay, Vice Chair, Carol Reynolds, Greg —Taggart; Michael Manson; and ,Nancy Crouch, Council Liaison MEMBERS ABSENT: Bob DeOtte; Barry -Harding STAFF PRESENT: Steve Beachy,DirectOr. Eric Ploeger, Asst. Director; David derling L.• uv, Special Facilities Supt.; Vera Solis, Aquatics Supv.; Bridgette . , George, Staff Assistant VISITORS:. Tony Cisneros, Bryan Parks & Recreation Director. Mike McClure, McClure Engineering .-...-..!..":::1-.-'...:...r.,.: CALL TO ORDER:'',.:r..:-: - ..-, „.,. ,.,,. ,, ...„..... ,, .... ... ' • :::: ' ...... ' :: : ''.....:;z;:,..:'.: ;.::',.....:...7 : ..1:::.::....:,:',.',i: ...:,:.; ..-' : ,I.,.: , ... '... :. .'.'.. :... '..,..'...7 .......-...: ':.%....,.:..: :.... . ..,.. ......,... , The meeting was called to order at 7i12-:p.Tri., , `;',..‘..‘.,-•'. -:!:,.., :-,':.:4';‘...:',.....!...,-!...i::!..'i-::,::::......!....;'.i.:,•.,..-1..".;................"..:J..T...."....,'..,'-......':-.,..-' '---'"- • - ,..•..,..:,:..,,...................,.......y.......:.:,...„.....•.....•....,.....::: •.. II. APPROVAL OF MINUTES: Minutes were approved as submitted. . .....,,,.., ;.., ,... ,„. . .. ,...,.....::::„.:;..1..........i.....::;:,..:t,..E..„:,:.....„...,:.,:::..,:::,„;:.,,-,.......:::..:: .................... : : - .' ‘,,,... Mr., Cisneros was present to observe the meeting., • - =-- ,-; IV ''DISCUSSION AND CONSIDERATION OF PARKLAND DEDICATION . • 2;:.;. a Park Zone 4 -Mr. Bert Herman Steve mentioned that Mi. Bert Herman is proposing to swap approximately two acres of land in Zone 4, adjacent to Windwood Park, in exchange for Switch Station Road. That road would be closed and a different access road opened. This would increase the acreage at Windwood Park to three acres allowing for some open space for ball play. Mr. Herman's second proposal was to sell six acres of land adjacent to the Switch Station. Steve informed the Board that no funds were available in that zone to purchase the six acres. Ms. Crouch asked if there would be a problem closing Switch Station Road. Steve Stated that the only reason the road is used is for access to the Switch Station. He said that another access road would have to be built prior to closing that one. Ron believes the City will have problems getting public support for changing the land from' residential to commercial. Some concerns were raised about having the park adjacent to -a parking lot behind a commercial area. Steve stated that the park would have frontage on- , Appomattox when the extension is constructed. Steve said that adding two acres to Windwood Park would benefit that park and neighborhood. The Board discussed the fact that the buyer may or may not agree to the land swap once he purchases the land. Ron motioned to accept Mr. Herman's proposal of swapping Switch Station Road for two acres of land adjacent to Windwood Park, without the assessment for ApPornattox.` Michael seconded, the motion passed b. Park Zone 8 - Mvrad Steve mentioned that Myrad is proposing a dedication of 7.6 acres of land, which is in excess of their required dedication, to offer a buffer between the residential area and the proposed commercial area. He said that there is no adequate access to the proposed parkland. Ric Parks & Recreation Board Regular Meeting Vera also discussed changing the'pool hours'at Southwood and Thomas to an hour earlier. This will allow for more' swimming before the day gets really hot.' The Board agreed to the change' of the pools operating on Saturday from 11 -6 and Sunday frorii 1-8. �x/n � nxnqru |4z��nou kn�10w5 �«�wx�e� EC�����, �~�'�~�.__�'_^___ Steve passed out the Proposed Expenditure Schedule for the, 19.95 Bond Election. He explained that the $23 million has to be allocated.over a.5-year time frame.. At a meeting with city staff, Steve voiced his concern about waiting to 'purchase the parkland the fifth year. George stated that the city needs to purchase the land and have a proposed development plan for the large athletic complex prior the next bond issue around,"the year 2000,'Or the same perception:.of: Wolf Pen Creek will arise. Asking for money to build the athletic complex when the City hasn't done:what it said it would do with all of the previous funds is asking for problems. The Board discussed moving some of the, other issues back, instead of waiting . to purchase the park land. They also mentioned the fact that land value could substantially jric re I ase within the next five years, making the $1.5 million an insufficient amount. Ms. Crouch suggested purchasing the I land over a period of years. Ron suggested moving the Northgate. project back a few years. The rehabilitation4and reconstruction of streets Was also identified as items that could be put off a. little later. The Board also discussed moving the Wayne Smith Park project a year later. - George asked Steve if it would be appropriate for George to talk to Elrey Ash regarding the schedule. Steve stated yes. Ron suggested talking to Glenn Schroeder instead because he would have more knowledge of when these bonds are due. ` ' ~~.~���������� .�~~.~~'~� -~�...~ , CAPITAL __ IMPROVEMENT PROGRAM -_--' REPORT: Ric reported that the Oaks and Thomas improvements were almost complete, except for one op6eun bridge which should be completed the following week. The Wolf Pen Creek rest room building iy going fairly well aKhuu�hthe iscau�ngsome minor problems. The Southwood Pool renovation is ongoing. The Got engineer chosen refused to sign the contract, so the second choice is being considered. However, the same insurance company represents the second choice which is why the first engineer declined. The department is approximately three weeks away from completing the plans for Sandstone Park development. Ms. Crouch mentioned that the school district is interesting in swapping the land adjacent to Sandstone Perk for some land next to the jr. High School. The Board discussed the fact that residents in that subdivision do not want more parkland and would probably be against increasing the park/s acreage. Steve stated that trading !and in Southwood would probably violate the covenants of the Parks and Wildlife Department which awarded money for the development of that park. George asked Steve to look into it and report back to the Board. The |f Pen Creek concrete add | for | ._ `.� The Brothers Pond area .light is being installed due tocitizens' concerns regardingvandalism a dark playground area. The funds used will be from parkland dedication funds in that zone. and VKKl. ' OTHER BUSINESS/BOARD CONCERNS: Ron expressed his concern about Mr. Maloney, who is a council candidate, and his message regarding the Wolf Pen Creek. Mr. Maloney is handing out leaflets that say, "The City of College Station needs a councilman who will oppose the politics that circumvented the voters' will and stuck us with the Wolf Pen , Creek mud the editorial, while educating the public at the same time. Ms. Crouch suggested talking to Peggy -alliham Public_Relations/Marketing`-._�Manager---_- thi_' issue. - Peggy is considering_ — doing -_ educational articles regarding Wolf Ns Creek especially with the interest that the dredging will provide. Some discussion took place whether this rebuttal should come from the Parks Board. Greg suggested not rebutting the issue, but rather just re-educating the public. Ron and George decided to meet with Peggy Ca||ihannregarding this issue. NOTICE OF MEETING OF THE PARKS AND RECREATION BOARD of the City of College Station Notice is hereby given that a (Regular)(Special)( REGULAR PARKS AND RECREATION meeting of the of the City of College Station, State of Texas will be held on the l l th day of APRIL , 1995, at 7 : 00 (A )(P.M.), at 1000 IJRENEK TAP RD. COLLEGE STATION, TEXAS 77840 The following subjects will be discussed, to -wit: SEE AGENDA DATED THIS THE 7th DAY OF APRIL , 1995. CI B F COLLEGki, STATIO CONNIE HOOKS, CITY SECRETARY I, the undersigned authority, do hereby certify that the above Notice of Meeting of the regular meeting of the Parks and Recreation Board of the City of College Station, Texas is a true and correct copy of said Notice and that I posted a true and correct copy of said Notice on the bulletin board, in the City Hall of said City of College Station, Texas, a place convenient and readily accessible to the general public at all times, and said Notice was posted on APRIL 7 1995, at 5 : 0 0 o'clock MI.) (P.M.) DATED THIS THE t --4r• DAY OF SUSCRIBED AND SWORN TO BEFORE ME ON THIS THE DAY OF t\ 1995. NO RY PUBLIC - BRAZOS COUNTY, TEXAS My commission expires: `" CJ CITY BY COLLEGE STATION, TE CONNIE HOOKS, CITY SECRETARY •.,.., YVONNE S. CASARES Notary Public, State of Texas My Commission Expires AUGUST 5,1998 PARKS AND RECREATION BOARD REGULAR MEETING TUESDAY, APRIL 11, 1995 - 7:00 P.M. CENTRAL PARK CONFERENCE ROOM 1000 KRENEK TAP ROAD AGENDA 1. Call to Order 2. Approval of Minutes Hear Visitors 4. Discussion and Consideration of Parkland Dedication a. Park Zone 4 7 Mr. Bert Herman b. Park Zone - Myrad c. Park Zone 10 - Shenandoah, Phase Two 5. Discussion of Pool Hours 6. Discussion of 1995 Bond Election 7. Capital Improvement Program Report 8. Other Business/Board Concerns 9. Adjourn Ar C Y OF COI LEGE STATION c _ Post Office Box 9960 �.101 "Texas venue College Station, Texas 77842-996o (409) 764-3500 MEMORANDUM To. • Parks and Recreation Board FROM: y . . ' e Beach Director of Parks and Recreation DATE: YApril 6, 1995 SUBJECT: ITEMS OF INTEREST 1. Athletic Events:, Texas A&M, was held at Kyle Field on Ramp Rom a 5 K race administered by The R � �� arks ,�, Recreation Department was a co - of April 1 1995. The College Station P s The 5K p ' ste red the finish n i sh line ne and race results. partner of the event and administered the le Field p the Texas A&M campus and finishes by running Y � course is run through ramps. -� five Super Power and five Power. Play Adult Volleyba Session , has ten teams p Station ' All matches are played at the College is held mainly on Thursday nights• 95 and Prairie rie Road. Games began on March 301 1995, High located on Rock P ,. 1�;3(� m. junior Game times are from 6.3o p. rn. p. will continue through April 27, 1995. . signed u All games are played at the r� Adult Basketball has nine teams sig p g r Spring ed nesda April 5, 1995, and w� l l High h as well. Games began on Wednesday-, Junior g continue through Wednesday, [�,�.y 10 1995. Game times are from 6:3 o p.m. .. � 10:30 p.m. . Grunt 8� Crud Biathlon . This race will be Registration strat�on � s going on now for the �ru begin g 5K Run 15K Bike, or 5K Fun Run will held on Saturday, April , 1995. This at $.00 a.m.r at the Southwood Athletic Park. • � Aril 17 1995. Thi s Softball registration will begin Monday, p Girls' Slow Pitch g • earl August. • 6 - 16, and will run mid -May through y gprogram �s for g�rls age As the-1 i h School season winds Parks operations Division 83 Southwood:,g . Par week with all divisions i n action. Senior League down Little League starts play this we being • May. New scoreboards are presently g la(ages 13�-15) will begin in early N� y p yhe new scoreboards are approximately ' stalled on all four Little League fields. T � le installed re urchased b sponsors and friends of Litt twice the size of, the old ones and true p Y League, and installed by the City. Home of Texas ► &M University Items of Interest April 6, 1995 Page (2) Greg bleb en both A&M students} began seasonal employees, � fen Reed and g � g f Twos,helping on the tri m crew unto the end o ark � n the district recently. They will be p g , w as our new full-time G roundsworker, the summer. Vile welcome Chris CummingsEquipment Operator. and congratulate Bruce Brannon on his promotion to Light . satisfactorily completed required training and District Supervisor, Gary Marske, satisfac y p D� p testing,and received his Structural Pest Control Board Applicator's License for the use of herbicides and pesticides. oln Center will be conducting an Easter Egg -Hunt 3. �,dr�Cal�r Recreation Center. Linc e will be a • en ages 8 and under. On April 21-22 then on April 1 1 �, 1995, for children g will also p Tournament, and on the 22nd a Drug rally Membership Drive Basketball T from will have neighborhood parade performances be held. The Drug Rally .. volleyball and activities such as kite flying, relays► Y cheerleaders, guest -speakers, amen, and a basketball tourna ment. nt. There will be another basketball tournament g 5 held on April 29, 199 . • ' of an up-to-date set of encyclopedias. If anyone can The Lincoln n Center �s � n need p . with this effort, lease contact the Lincoln Center* help p 0 0 0 creation is providing two sessions of Spring Swim �.. �n��r�rC��o� i�rv���on. , Parks & Re p .. • class i s classes are alread full and have waiting lists. A new lessons. Many of the � Y 's called Mom for spring n and will continue into the summer. It . being offered this p provides a transition into g Frog, and it's for children 3 - 5 years of age. It pro Dads and F g, Y awater with the child for those class b allowing n the Frog g the parent to go into the children who are shy or fearful of the water or strangers. ` s is being conducted again this year and has The ever popular Water Fitness class , � , p Instruction Division �s �n the process of buying twenty-five enrolled. The Instr professional exercise -equipment that will enhance the professionalism of the class. ' dren enrolled and enrollment for Session Il is Advanced Swim has twenty children r • Gerdes is the new Head Coach far Advanced Swim. expected to be higher. Tanya G • with the p pence as a Head Coach and was a Swim Team instructor Tanya has 'experience program last year. • has been hired. Ronda, who has played tennis A new Tennis Pro, Ronda Harris, • " Tennis e founder and President of the Texas A&M as extensively �s the 'ideas for the Tennis t at Texas A&M. She has some great rd • League, and a student their children offer a Saturday class for adults and to allow Program -- one being to y s, There are now • Southwood Pool while their parents take ng their lesson to swim � n Sout thirty children and adults enrolled in tennis lessons. y • , • • a Ceremony will be held at Oakwood Forestry !]lv�sron. This years Arbor Day Y 5. 28 1995 at 9:3o a.m. Ms. Hielman s Middle School on Friday, Apra 1 • I arts ci ate i n the ceremony as will Lynn Environmental Club members w p p Steve Mcllhaney, Mayor Pro Tem, Dan Mueller with the Texas Forest Service, and i� Beachy. Items of Interest April 6, 1995 Page (3) 5pecia► Events: The Earth Day Celebration will be held in conjunction with the Jazz Fest and Children's Festival`s anfdPexh bits from 4h00 p tm onen Creek Ampitheaer 8 OOril p.m? and 23. Earth Day events include boot on the Colgate side of the Amphitheater on both days. The booths will include activities and information on conservation, recycling, eenvironment and aaath atart. Dah-Veed will perform at 3:00. p.m. Saturday, an 7:00 p.m. on Sunday. The Children's Festival will take placeon Holleman both days from noon face p.m., and will include eight helicopters for the children to tour, games, painting, food, a petting zoo, and more. The Jazz Fest will take place on Saturday, April 22, 1995 from 11:00 a.m. - Apple00 at the AEnsembles from TAMU, A&Meater. Performers will aran Chavis Consol dated, and Bryan Hd The Brew, igh Apple Trio, and Jazz En School. Thanks to Board Members: Thanks to all of the long hours and hard work on the part of the Board in support of the recent bond election. The planning meetings and public hearings that took place over our time and enast two ergys proved The parks prope ol worth sitions t ons the effort. Thanks once againy would not have been successful without you! bg Copies: John Woody, Assistant City Manager/Operations