HomeMy WebLinkAboutOCTOBER 2021CITY OF C 01.1 EGE STATION
Home ofTexasAeM University°
College Station, TX
Meeting Agenda
Parks and Recreation Board
1818 Harvey Mitchell Pkwy S.
The City Council may or may not attend this meeting.
October 12, 2021
6:00 PM Larry J. Ringer Library
1. Call meeting to order and consider absence requests.
2. Hear Visitors.
At this time, the Chairperson will open the floor to citizens wishing to address issues not already
scheduled on today's agenda. Each citizen's presentation will be limited to three minutes in order to
allow adequate time for the completion of the agenda items. Comments will be received and city staff
may be asked to look into the matter, or the matter may be placed on a future agenda for discussion.
A recording may be made of the meeting; please give your name and address for the record.
3. Agenda Items
3.1. Presentation, discussion, and possible action on the approval of minutes from the previous
meeting.
3.2. Presentation and discussion on a report from the Parks and Recreation Director.
3.3. Presentation and discussion on parks programs or events highlighted by the board chairperson.
3.4. Discussion on Thomas Park public meeting and the November Parks & Recreation Advisory
Board meeting.
3.5. Presentation, discussion and possible action on amendments to Section 8.8 of the Unified
Development Ordinance regarding Parkland Dedication.
3.6. Report and discussion concerning the current Parks Project Summary and Dedications of Less
Than Five Acres from Rusty Warncke.
4. Discussion and possible action on future agenda items.
A member may inquire about a subject for which notice has not been given. A statement of specific
factual information or the recitation of existing policy may be given. Any deliberation shall be limited to
a proposal to place the subject on an agenda for a subsequent meeting.
5. Adjourn.
The Board or Commission may adjourn into Executive Session to consider any item listed on the
agenda if a matter is raised that is appropriate for Executive Session
discussion.
I certify that the above Notice of Meeting was posted on the website and at College Station City Hall,
1101 Texas Avenue, College Station, Texas, on DATE POSTED, 2021 at 5:00 p.m.
City Secretary
College Station, TX Page 1
(kt,'
CITY OF COLLEGE STATION
Staff Present:
PARKS AND RECREATION ADVISORY BOARD AGENDA
Tuesday September 14, 2021
Minutes
Steve Wright, Director; Kelly Kelbly, Assistant Director; Andrea Lauer, Administrative Support
Specialist; Stephan Richardson, Operations Manager
Board Present:
Debe Shafer; Madeline Giroir; John Polasek; David Higdon; Ann Hays; Joel Cantrell, Janet Wood,
David White, Lisa Aldrich
Council Present:
Bob Brick
1. Call meeting to order and consider absence requests. With a quorum present,
the Parks and Recreation Advisory Board was called to order @ 6:00 p.m. on
Tuesday September 14, 2021. No absence requests were received.
2. Hear visitors. None present.
3. Agenda Items
3.1 Presentation, discussion, and the possible approval of minutes from the
previous meeting. Upon a motion made by David White and a second by Ann
Hays, the Parks and Recreation Advisory Board voted nine (9) for and none (0)
opposed, to approve the minutes as written. The motion carried unanimously.
3.2 Presentation and discussion on report from the Parks and Recreation
Director. No report given.
3.3 Presentation and discussion on parks programs or events highlighted by
the board chairperson. Debe Shafer expressed her gratitude for the Parks and
Recreation Board for their input on Chapter 5 of the Comprehensive Plan. She said
she was excited to be a part of setting goals and the vision for the next 10 years.
3.4 Presentation, discussion, and possible action on Chapter 5 of the city-wide
Comprehensive Plan. Alyssa Halle -Schramm, Long Range Planning Administrator
for Planning and Development gave an updated timeline for approval of the
Comprehensive Plan. She stated that all 10 Chapters are expected to go to Council
for approval on October 14. Upon a motion made by David White and a second by
Madeline Giroir, the Parks and Recreation Advisory Board voted nine (9) for and
none (0) opposed, to approve Chapter 5 of the city-wide Comprehensive Plan as
written. The Parks Board would like a monthly update to the board on how sections
of Chapter 5 are being implemented.
3.5 Update on Westside property council resolution. In 2015 negotiations for the
Westside property, a 100-acre tract of land began. In 2017 the price and contract
were approved by Council, then the owner backed out. On August 26, 2021 Council
passed a resolution for eminent domain. This is an ongoing process.
3.6 Update on the Council direction and next steps for Parkland Dedication. The
Parkland Dedication Ordinance went to Council Workshop on August 26th and the
suggestion was made to reduce the number of zones. The Legal Department will
look over the suggestions and then it will go before the Parks and Recreation
Advisory Board on October 12th for a recommendation to send to the P&Z Board.
The P&Z Board will then make a recommendation to go to Council on October 28tn
3.7 Report and discussion, concerning the current Parks Project Summary and
Dedications of Less Than Five Acres from Rusty Warncke. Informational item
only and no action was taken.
4. Presentation, possible action, and discussion on future agenda items: Bird
Blinds and Bird City USA
5. Adjourn. Upon a motion made by John Polasek and second by Ann Hays, the Parks
and Recreation Advisory Board voted nine (9) for and none (0) opposed to adjourn
the meeting at 7:06 p.m. The motion carried unanimously.
This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as
interpreters, readers, or large print are asked to contact the City Secretary's Office at (979) 764-3541, TDD at 1-800-735-2989, or email a¢tajulig.ar_st@s,g&gpv at least two
business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the
City will make a reasonable attempt to provide the necessary accommodations
Sec. 8.8. Requirements for Park Land Dedication.
A. Purpose.
It is hereby declared by the College Station City Council that public park, conservation, and greenway areas
are valuable assets that advance the public's health, safety, and welfare. This Section is adopted to provide
active and passive recreational areas in the form of park facilities as a function of subdivision and site
development in the City of College Station and its Extraterritorial Jurisdiction (ETJ). This Section is enacted in
accordance with the home rule powers of the City of College Station granted under the Texas Constitution,
and the statutes of the State of Texas, including, but not by way of limitation, Texas Local Government Code
Chapter 212 as may be amended from time to time.
This Section recognizes that parkland dedication is a fair, reasonable, and uniform method of financing these
assets that does not impose an unfair burden on new or existing development. The intent is to require new
development to pay its proportionate costs that are associated with providing new, expanded, and
renovated parks, so they are borne by the new residents who are responsible for creating the additional
demand. This is done by integrating such requirements into the procedure for planning and developing
property or subdivisions in the City and its ETJ, whether such development consists of new construction on
vacant land or rebuilding and remodeling of multi -family dwellings that results in an increase in the number
of bedrooms on existing residential property.
The intent of these assets is to provide a variety of outdoor recreational opportunities for new residents
within reasonable proximity of their homes. The primary cost of purchasing, developing, or improving parks
should be borne by the landowners of residential property who, by reason of the proximity of their property
to such parks, shall be the primary beneficiaries of such facilities. To ensure this nexus, park zones have been
established by the College Station City Council. They are shown on the Park Zones Map and they shall be
prima facie proof that any park area located therein is within a convenient distance from any residence
located therein.
Parkland dedication is consistent with, and furthers the objectives and policies of, the City's Comprehensive
Plan and the Recreation, Park, & Open Space Master Plan to protect the health, safety, and general welfare
of the public. It is coordinated with other city policies, ordinances, and resolutions by which the City seeks to
ensure the provision of adequate park facilities in conjunction with the development of land.
B. Applicability.
This Section applies to a landowner who develops land for residential use located within the City or within its
ETJ.
C. Park Zones.
The City is hereby divided into park zones, as shown on the official Park Zones Map, together with all
explanatory matter thereon, and adopted by reference and declared to be a part of this UDO.
Zone boundaries typically follow key topographic features such as major thoroughfares, streams, City limit,
and ETJ boundary lines. New park zones may be created or existing zones amended pursuant to procedures
for amending the UDO.
D. Requirements.
1. General.
The City Manager or his/her designee shall administer this Section with certain review,
recommendation, and approval authorities being assigned to the Planning and Zoning Commission, the
Parks and Recreation Advisory Board, and various City departments as specified herein.
Generally, the developer of residential property must address the following requirements pursuant to
this Section: dedication of land for park use or payment of a fee in lieu thereof, and payment of a
Page 1 of 8
development fee for park improvements necessary to transform the land into a useable park.
Requirements herein are based on actual dwelling units or bedrooms for an entire development.
Increases or decreases in final unit or bedroom count may require an adjustment in fees paid or land
dedicated. If the actual number of dwelling units or bedrooms exceeds the original estimate, additional
park land and additional park development fees may be required in accordance with the requirements
in this Section.
The schedule of fees and required land dedications are identified in Subsection K. The delineation of
park zones is identified in Subsection C.
2. Land Dedication.
a. The amount of land to be dedicated for park purposes shall be as set forth in Subsection K.
The total amount of land dedicated for the development shall be dedicated to the City.in fee
simple:
1) Prior to the issuance of any building permits for multi -family development,
2) Concurrently with the final plat for each phase of the development, or
3) In accordance with the terms of a valid Development Agreement associated with the
property.
If land dedication is to occur in future phases of a multiple -phase development, the developer
may provide the City with financial security against the current dedication requirements by
providing a bond, irrevocable letter of credit, or other alternative financial guarantee such as a
cash deposit in the amount equal to the number of acres park land required and, in a form
acceptable to the City. The amount of the financial guarantee shall be the amount of fee in lieu
of land dedication and improvements as set forth in Subsection K. The financial guarantee will be
released to the developer, without interest, upon the filing of the final plat for the subsequent
phase that dedicates the required park land and pays for the fee for the required improvements.
b. It is likely that residents living in the ETJ will use the City's park facilities. Hence, they should
contribute to the cost of providing them. As a result of the difficulty faced by the City in
maintaining property outside its corporate limits, the City will generally require a fee in lieu
rather than the dedication of land. Alternatively, the dedication requirements of this Section may
be met through the creation of private parkland in the same amount required as set forth in
Subsection K provided the developer enters into a written agreement that all such private
parkland be dedicated to the City at the time of full purpose annexation into the City and
provided that any plat related to such development, is inscribed with a notation regarding same.
If the private parkland option is chosen, a provision for private upkeep of the facilities as
described in Subsection H shall be made.
3. Fee in Lieu of Land.
In lieu of dedicating land for parks, a developer may request to meet some or all of the land dedication
requirements through payment of a fee in lieu thereof in the amounts set forth in Subsection K. Such
fees shall be due at the same time as fees are due for final platting or for issuance of a building permit,
whichever occurs first.
4. City Final Approval.
The City shall have the final authority in determining what proportion of land or fee may be accepted in
lieu of required land dedication. The City may, from time to time, require that a fee be submitted in
lieu of land dedication in amounts as set forth in Subsection K for the park land dedication. Likewise,
the City may, from time to time, require that land be dedicated in amounts as set forth in Subsection K
and that no fee in lieu of land will be accepted.
Page 2 of 8
5. Approval Process for Park Land Dedication.
a. For land dedication of five (5) acres or more to be accepted by the City, the landowner must:
1) Obtain a recommendation from the Parks and Recreation Advisory Board, and
2) Obtain approval from the Planning and Zoning Commission pursuant to the Plat Review in
Article 3 of this UDO.
The Planning and Zoning Commission shall consider the recommendation from the Parks and
Recreation Advisory Board but may make a decision contrary to its recommendation by majority
vote.
b. For land dedication of less than five (5) acres the City Manager or his/her designee is authorized
to accept and approve land dedications of less than five (5) acres if the following criteria are met:
1) The proposed dedication or fee provides a sufficient amount of park land existing in the
park zone of the proposed development for required park land dedication;
2) The proposed dedication has especially attractive park features, as determined by the City
Manager or his/her;
3) Where the proposed dedication is insufficient for a park site under existing park design
standards, some or all of the dedication requirements may be in the form of a fee in
amounts as set forth in Subsection K; and
5) The proposed development of the park is consistent with College Station's Recreation,
Park, & Open Space Master Plan, as may be amended from time to time.
In making his/her decision, the City Manager or his/her designee may choose to submit such
application to the Parks and Recreation Advisory Board for its recommendation. In such event,
the City Manager or his/her designee shall consider such recommendation but may make a
decision contrary in accordance with the criteria set forth herein.
6. Park Development Fee.
In addition to the land dedication requirements for parks, there are also park development fees
established herein sufficient to develop parks in ways that meet the City Park Facility and Equipment
Standards. The amount of development fees assessed to a developer Subject to this Section for parks is
as shown in Subsection K. The process for the approval and collection of development fees shall be the
same as for the park land dedication requirements to which the development relates, and shall be
processed simultaneously with the park land dedication requirements.
7 Construction of Park Improvements in Lieu of Development Fee.
A developer may elect to construct park improvements in lieu of paying the associated development
fees as set forth herein. In such'event:
a A park site plan, developed in cooperation with the Parks and Recreation Department staff, must
be submitted and approved by the Director of Parks and Recreation Department or his/her
designee and the Parks and Recreation Advisory Board upon submission of final plat or upon
application for a site plan and/or building permit, whichever is applicable.
b. Detailed plans and specifications for park improvements hereunder shall be due and processed in
accordance with the procedures and requirements pertaining to public improvements for final
plats, site plans, and for building permits issuance, whichever is applicable.
c. All plans and specifications shall meet or exceed the City Park Facility and Equipment Standards
in effect at the time of the submission.
Page 3 of 8
g.
d. If the improvements are constructed on land that has already been dedicated to and/or is owned
by the City, then the Developer must post payment and performance bonds equal to park
development fees to guarantee the payment to subcontractors and suppliers and to guarantee
the developer completes the work in accordance with the approved plans, specifications,
ordinances, and other applicable laws.
e. The construction of all improvements must be completed in accordance with the requirements
relating to the construction of public improvements for final plats, site plans, and issuance of
building permits, whichever is applicable. This includes the guaranteeing of performance in lieu
of completing the park improvements prior to final plat approval. Notwithstanding any other
applicable ordinances, park improvements should be completed within two (2) years from the
date of the approval.
f. Completion and Acceptance.
Park development will be considered complete and a Certificate of Completion will be issued
after the following requirements are met:
1) Improvements have been constructed in accordance with the approved plans,
2) All park land upon which the improvements have been constructed has been dedicated as
required under this Section; and
3) All manufacturers' warranties have been provided for any equipment installed in the park
as part of these improvements.
Upon issuance of a Certificate of Completion, the developer warrants the improvements for a
period of one (1) year as set forth in the requirements in the City Park Facility and Equipment
Standards.
h. The developer shall be liable for any costs required to complete park development if:
1) Developer fails to complete the improvements in accordance with the approved plans; or
2) Developer fails to complete any warranty work.
8. Submitting Fee.
Any fees required to be paid pursuant to this Section shall be remitted:
a.- Prior to the issuance of any building permits for multi -family development; or
b. Upon the submission of each final plat for single-family, duplex, or townhouse development.
9. Use of Fees.
Fees may be used only for the acquisition, development, and/or improvement of park facilities to
which they relate. Fees in lieu of land dedication may only be used for purchase, development and/or
improvement of parks located within the same zone as the development.
10. Reimbursement for City Acquired Park Land.
The City may from time to time acquire land for parks in advance of actual or potential development. If
the City does take such action, then it may require subsequent dedications to be in fee in lieu of land
only. The fees will serve to reimburse the City for the cost(s) of acquisition.
E. Prior Dedication or Absence of Prior Dedication.
If a dedication requirement arose prior to enactment or amendment of this Section, subsequent
development for the subject tractto which the dedication requirements applies may be subject to vesting as
set forth in Chapter 245 Texas Local Government Code. Depending on the circumstances, additional
Page 4 of 8
dedication may be required for the increase in dwelling units or bedrooms from what was originally
proposed.
F. Comprehensive Plan Considerations.
The City's Recreation, Park, & Open Space Master Plan is intended to provide the Parks and Recreation
Advisory Board with a guide upon which to base its recommendations. Because of the need to consider
specific characteristics in the site selection process and future development, the park locations indicated on
the Plan are general. The actual locations, sizes, and number of parks will be determined when development
occurs or when sites are acquired by the City, including by donations.
G. Special Fund; Right to Refund.
1. All parkland dedication fees will be deposited in a fund referenced to the park zone to which it relates.
2. The City shall account for all fees in lieu of land and all development fees paid under this Section with
reference to the individual plat(s) involved. Any fees paid for such purposes must be encumbered or
expended by the City within 10 years from the date received by the City for acquisition, development,
and/or improvement of a park as required herein. Such funds shall be considered to be spent on a first -
in, first -out basis. If not so encumbered by contract or purchase order or expended, the landowners of
the property on the expiration of such period shall be refunded a prorated refund of such sum,
computed on a square footage of area basis by the City.
H. Credit for Private Park Amenities.
1. Up to 25% of the total fee in lieu and park development fee required by this Section to be paid by a
developer may be eligible for reimbursement if the developer provides private park land and/or
amenities on the site. The remaining percentage is retained for deposit in the City's parkland
dedication fund for the purpose of defraying the financial burden that new residential units impose on
the existing public park system in the City.
2. Private facilities eligible for credit are those outdoor amenities typically found in city public parks,
which will substitute for the improvements otherwise funded by a dedication fee to meet the outdoor
recreation needs of residents.
3. The amount of credit shall be based on actual out-of-pocket dollar costs that the developer incurred in
providing the outdoor recreation amenities:
a. The improvements must be constructed in accordance with the City Park Facility and Equipment
Standards.
b. The developer is required to submit to the City all paid invoices paid toward the construction of
the private amenities.
c. In order to receive the credit, the improvement must be inspected and approved by all
appropriate City staff.
4. Yards, court areas, setbacks, and other open areas required to be maintained under the City's UDO,
and other regulations, shall not be included in the credit computation.
5. Private recreation improvements shall be owned by an incorporated nonprofit homeowners'
association comprised of all property owners in the subdivision. The organization should operate under
recorded land agreements through which each property unit owner in the subdivision is automatically
a member, and each unit is subject to a charge for a proportionate share of expenses for maintaining
the facilities.
6. Should the homeowners' association fail to maintain the developer -provided private park facilities in
compliance with City standards, each property owner agrees that the City may access the facilities to
operate, maintain, and repair them. The costs of such maintenance, operations, and repairs shall be
charged to the homeowners' association.
Page 5of8
7. Use of the private park shall be restricted for park and recreation purposes by recorded covenant,
which runs with the land in favor of future owners of the property, and which cannot be defeated or
eliminated without the written consent of the City.
8. Facilities must be similar or comparable to what would be required to meet public park standards and
recreational needs as set forth in Section.
9. The design of private park amenities must be reviewed and approved by the City prior to final plat
approval.
10. All private park amenities shall be constructed in accordance with Subsection D (7).
1. Park Land Guidelines and Requirements.
Parks should be easy to access and open to public view so as to benefit area development, enhance the
visual character of the City, protect public safety, and minimize conflict with adjacent land uses. The
following guidelines and requirements shall be used in designing parks and adjacent development.
1. Any land dedicated to the City under this Section must be suitable for park and recreation uses. The
dedication shall be free and clear of any and all liens and encumbrances that interfere with its use for
park purposes. The City Manager or his/her designee shall determine whether any encumbrances
interfere with park use. Minerals may be reserved from the conveyance provided that there is a
complete waiver of the surface use by all mineral owners and lessees. A current title report must be
provided with'the land dedication. The property owner shall pay all taxes or assessments owed on the
property up to the date of acceptance of the dedication by the City. A tax certificate from the Brazos
County Tax Assessor shall be submitted with the dedication or plat.
2. Consideration will be given to land that is in the floodplain or may be considered "floodable" even
though not in a federally regulated floodplain as long as, due to its elevation, it is suitable for park
improvements. Sites should not be severely sloping or have unusual topography which would render
the land unusable for recreational activities, as set forth in the City Park Facility and Equipment
Standards.
3. At the discretion of the City, land in floodplains will be considered on a three (3) for one (1) basis.
Three (3) acres of floodplain will be equal to one (1) acre of park land.
4. Where feasible, park sites should be located adjacent to greenways and/or schools in order to
encourage shared facilities and joint development of new sites.
5. Unless intended to serve a larger area, park sites should be adjacent to residential areas in a manner
that serves the greatest number of users and should be located to minimize users having to cross
arterial roadways to access them. Furthermore, park sites should not be encumbered by overhead
utility lines or easements which may limit the opportunity for park development.
5. Where appropriate; sites with existing trees or other scenic elements are preferred.
7. Detention/retention areas may not be considered to meet dedication requirements, but may be
accepted in addition to the required dedication. If accepted as part of the park, the
detention/retention area design must meet specific parks specifications in the City Park Facility and
Equipment Standards.
8. Where park sites are adjacent to greenways, schools, or existing or proposed subdivisions, access ways
may be required to facilitate public access to parks.
9. It is desirable that 50% of the perimeter of a park should abut a public street.
Warranty Required.
1. All materials and equipment provided to the City shall be new unless otherwise approved in advance
by the City Manager or his/her designee and all work shall be of good quality, free from faults and
Page 6 of 8
defects, and in conformance with the designs, plans, specifications, and drawings, and recognized
industry standards. This warranty, any other warranties express or implied, and any other consumer
rights, shall inure to the benefit of the City only and are not made for the benefit of any party other
than the City.
2. All work by the developer or landowner not conforming to these requirements, including but not
limited to unapproved substitutions, may be considered defective.
3. This warranty is in addition to any rights or warranties expressed or implied by law.
4. Where more than a one (1) year warranty is specified in the applicable plans, specifications, or
submittals for individual products, work, or materials, the longer warranty shall govern.
5. This warranty obligation may be covered by any performance or payment bonds tendered in
compliance with this Section.
6. If any of the work performed by the developer or landowner is found or determined to be either
defective, including obvious defects, or otherwise not in accordance with this Section, the designs,
plans, drawings or specifications within one (1) year after the date of the issuance of a Certificate of
Final Completion of the work or a designated portion thereof, whichever is longer, or within one (1)
year after acceptance by the City of designated equipment, or within such longer period of time as may
be prescribed by law or by the terms of any applicable special warranty required by this ordinance,
developer shall promptly correct the defective work at no cost to the City.
7. During the applicable warranty period and after receipt of written notice from the City to begin
corrective work, developer shall promptly begin the corrective work. The obligation to correct any
defective work shall be enforceable under this Code of Ordinances. The guarantee to correct the
defective work shall not constitute the exclusive remedy of the City, nor shall other remedies be
limited to the terms of either the warranty or the guarantee.
8. If within twenty (20) calendar days after the City has notified developer of a defect, failure, or
abnormality in the work, developer has not started to make the necessary corrections or adjustments,
the City is hereby authorized to make the corrections or adjustments, or to order the work to be done
by a third party. The cost of the work shall be paid by developer.
9. The cost of all materials, parts, labor, transportation, supervision, special instruments, and supplies
required for the replacement or repair of parts and for correction of defects shall be paid by developer,
its contractors, or subcontractors or by the surety.
10. The guarantee shall be extended to cover all repairs and replacements furnished, and the term of the
guarantee for each repair or replacement shall be one (1) year after the installation or completion. The
one (1) year warranty shall cover all work, equipment, and materials that are part of the improvements
made under this Section of the ordinance.
K. Park Land Dedication and Development Fees.
Parkland dedication and development fees are indicated below. For developments located in the ETJ, the
land dedication and development fee requirements shall be reduced by 50%.
1. Land dedication
Single -Family: One (1) acre per 61 Dwelling Units (DU)
Multi -Family: One (1) acre per 145 bedrooms (BR)
2. Fee in lieu of land dedication
Single -Family: $524.00 per Dwelling Unit (DU)
Multi -Family: $220.00 per Bedroom (BR)
Page 7.of8
3. Park development fee
Single -Family: $737.00 per Dwelling Unit (DU)
Multi -Family: $467.00 per Bedroom (BR)
4. Total park fees
Single -Family: $1,261.00 per Dwelling Unit (DU)
Multi -Family: $687.00 per Bedroom (BR)
Page 8 of 8
Crn' OF CO] ]F.GR ST ITI ON
PLANNING & DEVELOPMENT SERVICES
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
Parkland Dedication of Less than Five Acres
Administrative Approval
PARKLAND ACRES DEDICATED: 0.000 TOTAL PARKLAND FEES CREDITED: $ 1,261.00
PARKLAND DEDICATION FEES PAID: $ 18,915.00
COMMUNITY PARK ZONE:
Development Fees:
Land Fees:
Community Total:
Residential Type:
Project Number:
Project Name:
Project Address:
Legal Description:
CD
$ 6,000.00
$ 4,000.00
$ 10,000.00
DWELLING UNIT CREDITS:
NEIGHBORHOOD PARK ZONE:
Development Fees:
Land Fees:
1
8
$ 5,792.00
$ 4,384.00
Neighborhood Total: $ 10,176.00
Single -Family
FP2019-000034
EMERALD RIDGE ESTATES PH III A & III B
9009 SANDSTONE DR
EMERALD RIDGE ESTATES PH 1, (FUTURE PHASE) & LOT 14A OF
SANDSTONE
No. of Dwelling Units: 16
Ordinance Vested Date: N/A
Vesting Comments: N/A
77/64,44,..0 Nbectug,tAz
Michael Ostrowski, Director
October 1, 2021
Date
CITY OF COIJ.F.GF. STATION
PLANNING & DEVELOPMENT SERVICES
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
Parkland Dedication of Less than Five Acres
Administrative Approval
PARKLAND ACRES DEDICATED: 0.000 TOTAL PARKLAND FEES CREDITED: $ 0
PARKLAND DEDICATION FEES PAID: $ 10,000.00
COMMUNITY PARK ZONE:
Development Fees:
Land Fees:
Community Total:
Residential Type:
Project Number:
Project Name:
Project Address:
AB
$ 6,000.00
$ 4,000.00
$ 10,000.00
DWELLING UNIT CREDITS:
NEIGHBORHOOD PARK ZONE:
Development Fees:
Land Fees:
Neighborhood Total:
Single -Family
FP2020-000038
WINDING CREEK ESTATES PH 4
5999 STOUSLAND RD
Legal Description: WINDING CREEK ESTATES PH 3, BLOCK 3, LOT 47
No. of Dwelling Units: 16
Ordinance Vested Date: N/A
Vesting Comments: N/A
77/6,1,tv,0 64(owydv:_.
Michael Ostrowski, Director
0
N/A
$ N/A
$ N/A
October 1, 2021
Date
$ 0.00
CITY OF CO1JEGR STATION
PLANNING & DEVELOPMENT SERVICES
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
Parkland Dedication of Less than Five Acres
Administrative Approval
PARKLAND ACRES DEDICATED: 0.000 TOTAL PARKLAND FEES CREDITED: $ 2,522.00
PARKLAND DEDICATION FEES PAID: $ 1,261.00
COMMUNITY PARK ZONE:
Development Fees:
Land Fees:
Community Total:
Residential Type:
Project Number:
Project Name:
Project Address:
Legal Description:
CD
$ 1,125.00
$ 750.00
$ 1,875.00
DWELLING UNIT CREDITS:
NEIGHBORHOOD PARK ZONE:
Development Fees:
Land Fees:
2
2
$ 1,086.00
$ 822.00
Neighborhood Total: $ 1,908.00
Single -Family
FP2021-000015
COLLEGE HILLS ESTATES SECOND INSTALLMENT BLK 10 LTS 16R, 17R
201 GILCHRIST AVE
COLLEGE HILLS ESTATES PH 2, BLOCK 10, LOT 16 & 17
No. of Dwelling Units: 3
Ordinance Vested Date: N/A
Vesting Comments: N/A
77/64AvD gibcci(02,L
Michael Ostrowski, Director
October 1, 2021
Date
PROJECT UPDATE
Parks & Recreation Department I City of College Station
PROJECT UPDATE FY21
As of October 4, 2021
PARKS PROJECTS
Total Number of Park Projects
Number of Projects in Progress 17
Number of Projects Completed in FY 21 14
Park Projects managed by Capital Projects —1 Texas Independent Ballpark
1
17
TEXAS INDEPENDENCE BALLPARK
• Design contract for the first four fields was approved by Council on February 8, 2018. Design firm
working on construction drawings.
• All comments on the 60% drawings were sent to design firm in June.
• 99% construction drawings were submitted to Planning and Development Services on August 16, 2019,
and are currently still under review.
o Meetings with design firm and P&D Services
• Funded by Hotel Tax and Certificates of Obligations
• Revisiting plans to consider 100% synthetic.
• If 100% synthetics are obtainable, construction could start sometime in FY22
SUMMIT CROSSING
• Design of Park funded with Parkland Dedication funds, zone 4
• Design of new park started January 2, 2019.
• Final design set was sent to Planning and Development Services (P&D) for final review on July 17, 2019.
Request form P&D sent back to design firm on 8/7/19. Design firm working on corrections and
requests.
• Development permit issued 10/14/2019.
• Park will be developed once there is enough money in that zone to construct.
VETERANS PARK PHASE 1B
• Funded by certificates of obligation, field redevelopment, and parkland dedication funds.
o Pending budget, park staff is looking at adding another restroom closer to Harvey Road, more
sidewalks, and possibly another playground. In addition, staff is looking at improving drainage
in various areas along with improving the roads within the park.
o At this time, staff is working with engineers, planning and Development Services for all
improvements listed above. Once planning issues development permit, we can move forward
with this project.
Page 1
PROJECT UPDATE
Parks & Recreation Department I City of College Station
o Updated plans sent to Planning and Development Services on 12/9/2019.
• Currently awaiting approval from P&D Services.
• Design firm currently addressing comments from planning. Questions sent to design
firm on 1/29/20. All questions have been answered and addressed by design. Currently
awaiting final review by Planning and Development Services.
• Still looking at bidding this project at the end of February, early March so construction
can start at the end of June 2020.
• Pre bid meeting held on 5/28/20, and the bid opening was on 6/18/20. Five contractors
bid the project. During the evaluation of bids, it was apparent JaCody Construction was
the best choice for this project. We are currently set to go before Council on August 13
for formal approval.
• Approved by council on 8/27/20. Preconstruction meeting to be scheduled.
• AS of October 5, 2020, construction started on 9/21/20. Crews currently working on
sidewalks be fields 5 and 6, as well as restroom subgrade and underground utilities.
• AS of November 3, one third of the proposed sidewalks between fields 1-6 have been
installed. Contractor is positive they will finish the remaining sidewalks over the next
three to four weeks in that area. In addition, the water and sewer lines to the new
restroom have been connected. All underground plumbing for that restroom is also in.
• January 5, 2021. Middle roundabout was poured on 12/22/20. In addition, work has
continued the remaining drainage flumes and sidewalks, along with the new
restrooms.
• As of February 3, 2021— Two of the three roundabouts are complete. Roughly 90% of
the sidewalks are complete, and the restroom is 50% complete. In addition, two of the
shade structures have been installed. Remaining items are the first roundabout and
entry of Harvey, and installation of two playgrounds. Current work is on schedule and
the contractor is expected to be completed on time.
• 3/2/21- Remaining part of February has been rough. Since the last update, very little
has occurred due to weather. However, progress was made on installing the two
playgrounds, demolition of the Harvey side entry, and the restroom was dried in. Metal
roof panels will be installed once weather clears. Currently, contractor working on
restroom and Harvey entrance.
• 4/6/21— Pending weather, Harvey Road entrance could be back open on 3/9/21.
Remaining items include playground surfacing at both playgrounds, installation of
restroom fixtures. Small portion of road work, and landscaping. While it sounds like a
lot, this project could be completed at the end of April.
• As of May 4, 2021, 99% of this project is now complete. A small amount of paving and
landscaping is all that remains to date. Punch list walk through is scheduled for 5/6/21.
Pending weather, the contractor should be 100% complete with the entire project.
• As of June 1, 2021— All punch list items are complete. However, the asphalt surfacing
was not accepted by the parks department on the general contractor. The general
contractor's sub will be removing and replacing the asphalt at their cost. Once it dries
up for more that three days, crews will return.
• Currently awaiting drier weather to redo a section of paving. Other than that, the
project is complete.
Page 2
PROJECT UPDATE
Parks & Recreation Department I City of College Station
CEMETERY MAINTENANCE & SALES SHOP
4,"
• Design of new shop and sales office to house current employees and equipment.
o Request for design proposal to be opened on 1/22/2020.
o Architect/ Engineering to be selected from proposals by 2/15/2020.
o Arkitex Studios chosen as design firm for this project. Design firm currently working on design fees.
Hope to be under contract with design firm by the end of the monthly.
o Cost of design $160,000. This is $28, 000 underestimated cost of design.
o Contract to go before Council on 4/9/20 for approval.
o Project was on Hold due to COVID19.
o 4/22/20 — Project back on Council agenda for official approval. Currently on the May 14 Council
meeting.
o Council has approved contract. Design now in progress.
o 6/5/20 — First design layout received. Since that date, three modifications have been done. We now
have a floor plan that will work while staying within budget.
o As of 10/23/20, the final drawings have been completed. Since that time, they have been under
staff review. 10/6/20, staff will meet with the design firm to make any last changes before plans
are sent over the Planning and Development for review.
o As of November, design is 99% complete. Currently awaiting IT response on fiber routing to the
new shop. Once I have that, plans will be sent to Planning and Development Services for one final
review.
o Plans were sent to Planning and Development services for review. Site plan has been approved. We
are currently awaiting approval on the building. We are still looking to be this project out sometime
in the spring of 21.
o As of January 21, 2021, to have the water flows correct, the Water Department has requested we
install two fire hydrants or a sprinkler system with the shop. We are currently over budget but still
think we could move forward with this project. However, we may have to delay the bidding process
a little.
o As of 3/2/21— Exploring ways to fund this project. Cemetery funds will not support this project in
its entirety.
o 4/6/21— Still working on fully funding this project.
o 5/4/21— Currently working on ways to reduce the overall cost of construction with losing the true
propose of the building.
o 6/1/2021— Multiple meetings held over the last month. Revisions are being made to the final
drawings to get us under the original budget number. We look for this project to go out for bids
late July, early August.
o 7/1/2021— Due to budget constraints, drawings had to be updated. The updated drawings are
complete and under review by both Parks and Planning and Development Services. Any comments
or changes will be sent back to the architect by 7/9/21.
o Awaiting final review by Planning and Development Services. Once complete, this project will be
posted for bids. Still looking at end of this month before its ready to bid.
o Construction plans approved by Planning. All bids due 10/20/21, at 2pm.
Page 3
PROJECT UPDATE
Parks & Recreation Department I City of College Station
CEMETERY MAINTENANCE & SALES SHOP
• Design of new shop and sales office to house current employees and equipment.
o Request for design proposal to be opened on 1/22/2020.
o Architect/ Engineering to be selected from proposals by 2/15/2020.
o Arkitex Studios chosen as design firm for this project. Design firm currently working on design fees.
Hope to be under contract with design firm by the end of the monthly.
o Cost of design $160,000. This is $28, 000 underestimated cost of design.
o Contract to go before Council on 4/9/20 for approval.
o Project was on Hold due to COVID19.
o 4/22/20 — Project back on Council agenda for official approval. Currently on the May 14 Council
meeting.
o Council has approved contract. Design now in progress.
o 6/5/20 — First design layout received. Since that date, three modifications have been done. We now
have a floor plan that will work while staying within budget.
o As of 10/23/20, the final drawings have been completed. Since that time, they have been under
staff review. 10/6/20, staff will meet with the design firm to make any last changes before plans
are sent over the Planning and Development for review.
o As of November, design is 99% complete. Currently awaiting IT response on fiber routing to the
new shop. Once I have that, plans will be sent to Planning and Development Services for one final
review.
o Plans were sent to Planning and Development services for review. Site plan has been approved. We
are currently awaiting approval on the building. We are still looking to be this project out sometime
in the spring of 21.
o As of January 21, 2021, to have the water flows correct, the Water Department has requested we
install two fire hydrants or a sprinkler system with the shop. We are currently over budget but still
think we could move forward with this project. However, we may have to delay the bidding process
a little.
o As of 3/2/21— Exploring ways to fund this project. Cemetery funds will not support this project in
its entirety.
o 4/6/21— Still working on fully funding this project.
o 5/4/21— Currently working on ways to reduce the overall cost of construction with losing the true
propose of the building.
o 6/1/2021— Multiple meetings held over the last month. Revisions are being made to the final
drawings to get us under the original budget number. We look for this project to go out for bids
late July, early August.
o 7/1/2021— Due to budget constraints, drawings had to be updated. The updated drawings are
complete and under review by both Parks and Planning and Development Services. Any comments
or changes will be sent back to the architect by 7/9/21.
o Awaiting final review by Planning and Development Services. Once complete, this project will be
posted for bids. Still looking at end of this month before its ready to bid.
o Construction plans approved by Planning. All bids due 10/20/21, at 2pm.
Page 3
PROJECT UPDATE
Parks & Recreation Department I City of College Station
CENTRAL PARK AND STEEPLECHASE PARK
• CP I Replacement and installation of new sidewalks within the park, Addressing drainage issues.
• SP I Improvements to park, Improved drainage within dog park area, Additional lighting within park,
LED Tight fixtures to basketball court, Dog washing station and new playground and fall surfacing
• The above items are part of Proposal received on 2/13/20. Staff reviewing to ensure all work is within
the scope of work.
o Checking with Planning and Development Services to see if any additional studies or
reports will be needed since we will be working within the detention pond at Steeplechase.
o Since my last report on 2/21/20, the design proposal was submitted and approved by
parks. We are currently waiting on contracts to be signed by design firm. Design firm
should have all contracts turned back in by next week.
o 3/16/20 — All contracts have been signed and approved. Engineer currently working on
design.
o Crew out taking elevation the week of 3/23/20.
o Week of 3/30/20 — Soil samples.
o 3/30 —4/17 — Soil samples, topo, and other design information was gathered. Engineering
firm is now working on design.
o First set of plans came out towards the end of May. Adjustments had to be made to both
Central and Steeplechase. Currently awaiting new set of drawings.
o Final review completed by Park staff and sent to Planning and Development Services on
9/24/20 for final review.
o As of January 5, 2021, pans have been approved and development permit has been issued.
Once the Park Structures project is completed, we will take the remaining funds for that
project and start at Steeplechase. To date, we do not have the funds to cover this project in
its entirety.
o As of 3/2/21— Still exploring options for funding. The original funding source was moved to
over Veterans.
o This project will be fully funded in FY22.
o All bid documents to be sent to Purchasing for advertisement and bidding schedule this
month.
BIRD BLINDS
• Installation of one or two bird watching structures, "Bird Blinds", within Lick Creek Park.
o 9/22/20 — Budget number received from local contractor to construct two "bird blinds" in location
chosen by local bird watching groups.
o 2/12/21 Working with local groups to see if they can be installed cheaper. To date, groups are
looking at cutting concrete paths and various other aspects of this structure. After talking with
Legal on 2/11/21, cutting concrete will not work. If the structure is built, we must have ADA access.
o Currently awaiting a fund source.
Page 4
PROJECT UPDATE
Parks & Recreation Department 1 City of College Station
ADAMSON LAGOON BABY POOL DECKING
• Complete removal of decking, pool coping, and plumbing.
o Due to leaks, ground shifting, and wear and tear, the existing decking around the baby pool is
heaving. Selected contractor will come in and remove all decking 6'-10- around the pool, repair and
replace any water/drain lines that are needed, replace the coping around the pool, and then re -
pour the decking deck so there are to "toe stumpers".
o Work will not start till pools are closed in the fall. Till that time, we will work with local contractors
on what is to be expected, pricing, and contract.
o 4/26/21— Pricing is in and is still estimated to cost just over 50K. Contractor also knows we will not
start this project till October, when the pool closes for summer.
o Change order requested. Construction has not stated but expected to once change order is
completed later this month.
LICK CREEK PARK DRAINAGE
• Improve drainage on the Pebble Creek side of the park, Deer Run Trail
o Working with CIP to have the contractor come back out and make improvements to the drainage
and trail system that they were not able to take care of because of weather.
o As of 4/28/21— CIP and Parks met with contractor to discuss issues with drainage. CIP working with
contractor to come back out, once it dries out, to regrade and re -roll the trail.
COVE OF NANTUCKET PARK
• Installation of an irrigation system for new trees.
o Currently working with JOC's for pricing.
o Electrical and water meters will need to be installed as well. Working with Utilities currently.
o 7/5/21- Awaiting PO
o 8/2/21— PO in. Awaiting waterline tap by COCS Utilities.
o 9/7/21— Installation of irrigation lines schedule to start this week.
o 10/4/21— Contractor finishing out work hopefully this week.
LINCOLN CENTER PLAYGROUND REPLACEMENT
• Total replacement of existing playground and surfacing.
o 5/21/21 —CDBG Funded
o 5/27/21— Scope of work meeting held with engineer. Awaiting proposal.
o 6/18/21— Proposal for work due next week.
o 8/2/21— Proposal in and within budget. Currently working on design contract.
o 9/7/21— Engineer working new design and looking at drainage issues around the playground.
o 10/4/21— Meeting set for 10/5/21 to discuss play unit options and drainage.
VETERANS PARK SOFTBALL GATES
• Installation of gates to allow teams to warm up in the outfield with disrupting the game in progress.
o 6/10/21— Proposal from Vaughn Construction has been sent to purchasing.
o 6/18/21— Awaiting PO.
Page 5
PROJECT UPDATE f I
Parks & Recreation Department 1 City of College Station
o 8/2/21— Work to start on 8/5/21.
o 8/18/21— All work is Complete
WOLF PEN CREEK MARQUEE SIGN REMOVAL
• Removal of existing sign located off Holleman Street.
o JOC proposal in and within estimated cost
o Second JOC requested.
o 5/28/21 Second JOC has yet to send proposal. Moving forward with original.
o 6/4/21— Purchasing to draw up contract for this project.
o 7/20/21— Sign removed. Project Complete
Page 6
CALENDAR OF EVENTS
Parks & Recreation Department I City of College Station
CALENDAR OF EVENTS
SUNDAY, OCT. 3 ■ 7:30 A.M.-4 P.M.
Dash for Down Syndrome 5K
Wolf Pen Creek Amphitheater
TUESDAY, OCT. 5 • 6:30-8 P.M.
National Night Out Block Party
Lincoln Recreation Center
FRIDAY, OCT. 8. 6-11 P.M.
Friday Night Lights presented by Chilifest Inc.
Wolf Pen Creek Amphitheater
TUESDAY, OCT. 12. 6 P.M.
Parks & Recreation Board Meeting
Larry J. Ringer Library
SATURDAY, OCT. 16.9 A.M.-11 P.M.*
STX Fall Budweiser Softball Festival
Veterans Park & Athletic Complex
SATURDAY, OCT. 16 • 5-7 P.M.
Wienerspiei
Wolf Pen Creek Amphitheater
SUNDAY, OCT. 17. 9 A.M.-7 P.M.*
STX Fall Budweiser Softball Festival
Veterans Park & Athletic Complex
SUNDAY, OCT. 17 . 11 A.M.-3 P.M
Wienerspiel
Wolf Pen Creek Amphitheater
SUNDAY, OCT.17. 11 A.M.-3 P.M
Homegrown at Northgate
Northgate Entertainment District
WEDNESDAY, OCT. 20 • 11:30 A.M.
Exploring History Luncheon
Larry J. Ringer Library
Updated: 9/20/2021
CALENDAR OF EVENTS
Parks & Recreation Department I City of College Station
THURSDAY, OCT. 21. 5-7 P.M.
Senior Autumn Fest
American Pavilion at Veterans Park & Athletic Complex
FRIDAY, OCT. 22 ■ 6 P.M. CHECK -IN
Lick Creek Park in the Dark
Lick Creek Park
SATURDAY, OCF. 23 • 7 A.M. BREAK CAMP
Lick Creek Park in the Dark
Lick Creek Park
SUNDAY, OCT. 24 • 1-5 P.M.
Texas A&M Century Men's Society Watermelon Bash
Wolf Pen Creek Amphitheater
MONDAY, OCT. 25 • 9:30-10:30 A.M.
Senior Advisory Committee Meeting
Meyer Senior & Community Center
THURSDAY, OCT. 28. 5:30-8 P.M.
Annual Fall Fest & Haunted House
Lincoln Recreation Center
FRIDAY, OCT. 29. 6-10 P.M.*
Bombers Exposure Weekend
Veterans Park & Athletic Complex, Stephen C. Beachy Central Park & Bee Creek Park
SATURDAY, OCT. 30. 8 A.M.-11 P.M.*
Bombers Exposure Weekend
Veterans Park & Athletic Complex, Stephen C. Beachy Central Park & Bee Creek Park
SATURDAY, OCT. 30 • 6-11 P.M.
Koe Wetzel
Wolf Pen Creek Amphitheater
SUNDAY, OCT. 31. 8 A.M.-7 P.M.*
Bombers Exposure Weekend
Veterans Park & Athletic Complex, Stephen C. Beachy Central Park & Bee Creek Park
*Tournament times are not final due to ongoing registration. Please check the website prior to the event.
Updated: 9/20/2021