HomeMy WebLinkAbout900613 -- Library Committee ReportCITY OF COLLEGE STATION
REPORT FROM THE LIBRARY COMMITTEE
by
Chairman Ralph Reed, Vice Chairman Ruth Schultz,
Lee Cole, Edwin Holdredge, Charles Smith, Ment lbrbiville, Christine Mitchell,
Rebecca Landmann, Marifran Bustion, Ann Anderson
June 13,1990
Cl
June 13, 1990
CITY OF COLLEGE STATION
P. O. BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77842-0960
(409) 764 - 3500
The Honorable Mayor
Members of the City Council
City of College Station, Texas
Dear Mayor and City Council:
On January 24, 1990, the Library Committee presented to the City Council its report
concerning library services. Included in this report were the following
recommendations:
(a) The City of College Station support a College Station Public Library within the
standards of the Texas Library Association and as a member of the Central
Texas Library System.
(b) Establish an operating agreement with the Bryan Public Library to promote a
Togetherness System so that both libraries are separately funded but work as
one.
(c) Construct an attractive, efficient, expandable public library facility on the
northwest corner of Rock Prairie Road and Rio Grande Drive with consideration
of constructing a branch library facility in the Wolf Pen Creek area when future
growth indicates it is needed. The recommended building should contain
30,000 square feet.
Subsequent to our report to the City Council, this same report was presented to the
CIP Citizens' Advisory Committee. On April 18, 1990, the City Council requested that
our Committee review and revise its report with stronger consideration given to the
Wolf Pen Creek area and a maximum construction budget of $2,500,000.
We have reviewed our initial report and the new parameters given us by the City
Council and make the following recommendations:
(a) The City of College Station support a College Station Public Library within the
standards of the Texas Library Association and as a member of the Central
Texas Library System.
(b) Establish an operating agreement with the Bryan Public Library to promote a
Togetherness System so that both libraries are separately funded but work as
one.
Home of Texas A & M University
Page 2
(c) Construct an attractive, efficient, expandable public library facility on the
northwest corner of Rock Prairie Road and Rio Grande Drive. The
recommended building should contain 15,000 square feet and be planned for
expansion.
(c 1) Construct an attractive and efficient satellite public library facility in the Wolf
Pen Creek area. The recommended building should contain 14,000 square feet
with no glans for expansion. Additionally, purchase the 5 acre site at the corner
of Rock Prairie and Rio Grande Drive for the future main library facility.
(d) Expand hours of service from 41 to 60.
Budgets for alternate proposals (c) and (cl) afe attached for your consideration.
Should the City Council select alternative (c'), the Library Committee strongly
recommends that the 5 acre Rock Prairie tract be purchased immediately. We believe
this to be the superior location and fear that if it is not purchased now it will be
unavailable when additional library facilities are needed.
We appreciate the opportunity to serve on this Committee and stand ready to provide
additional assistance if necessary.
Resp uully,
Ralph . Reed
Library Committee Chairman
Rock Prairie
and
Rio Grande
ESTIMATED BASIC BUDGET
ROCK PRAIRIE AND RIO GRANDE
Estimated Construction Budget
Construction (15,000 sf)
$ 975,000
Land(5 acres)
235,000
Parking Lot/Landscaping
114,000
Architect
78,000
Library Consultant
25,000
Furnishings
75,500
Initial Book Collection
625,000
Automation System
345,000
Vehicle
15,000
Collection Storage Space
12,000
Total $2,499,500
Estimated ODeratina Budaet
City Librarian
$ 43,750
W/Benefits
3 Professional Librarians
76,950
W/Benefits
7 Full Time Employees
131,775
W/Benefits
1 Custodian
15,315
W/Benefits
Periodicals/Collections
125,000
Utilities
52,200
Office Supplies
2,650
Postage
1,350
Printing
1,550
Janitorial Supplies
2,250
Book Maintenance
5,450
Equipment Rental
400
Training
3,500
Vehicle Maint./Gas
750
Grounds Maintenance
25,600
Building Maintenance
4,500
Subscriptions/Memberships
5,500
Advertising
4,000
Telephone - Local/Long Distance
4,500
Telephone - Maintenance
600
Minor Tools/Equipment
600
Equipment Maintenance
600
Insurance
1,000
Total
$ 509,790
Less Current Budget 230,986*
Additional Funds Needed $ 278,804
* Includes $51,030 for annual lease contract.
Projected Property Tax Increase $ 0.0478
Page 2
Soace Proaram
total net
Administration
1000 sf
Librarian
200
sf
Library Assistant
150
sf
Conference
300
sf
Reception
200
sf
Storage/File
150
sf
Operations
3750 sf
Circulation Desk/Work Area
1000
sf
Book Processing
1500
sf
Computer Room
500
sf
Staff Lounge
500
sf
Staff Rest Room
250
sf
Reading Areas and Stacks
Adult Books
Adult Reference
Children Books
Periodical/New Books
Card Catalog
Adult Reading/Carrels
Public Rest Rooms (2 @ 250 sf)
Mechanical Room
Janitor's Closet
Notes:
2500 sf
1000 sf
1750 sf
500 sf
500 sf
2500 sf
8750 sf
500 sf
750 sf
250 sf
Total 15,000 sf
* Parking estimates are based on 75 parking spaces. This
figure was derived from a Planning Division recommendation of
1 space per every 200 square feet of building.
* An initial book collection budget of $625,000 will bring
the College Station's book collection to 48,000 volumes or
approximately one-third the size of the Bryan Library
collection. An initial book collection budget of $1,000,000
would increase furnishings by '$44,000 and the operating
budget by $63,300 for a total property tax increase of
$0.0175. This would bring the College Station's book
collection to 67,000 volumes or approximately half the size
of the Bryan Library collection.
Page 3
* The estimated automation system costs of $345,000 reflects
a $100,000 grant for a shared system with the Bryan Library.
A shared system would provide the Bryan Library an incentive
to share collections and allow College Station's collection
time to grow.
* The estimated operating budget is based upon maintaining
College Station Library's current operating hours of Tuesday
through Thursday 10 am to 7 pm and Friday and Saturday 10 am
to 5 pm for a total of 41 hours per week. To have similar
hours as the Bryan Library's operating hours of 60 hours per
week will cost an additional $88,125 annually for a property
tax increase of $0.008.
* The estimated operating budget does not allow for staff
transference of books. To allow a patron to request a book
from one library and staff transfer it from the other library
by the next day on a scheduled run will cost an additional
$18,825 annually for a property tax increase of $0.0017.
Wolf Pen Creek
ESTIMATED BASIC BUDGET
WOLF PEN CREEK
Estimated Construction Budget
Construction (14,000 sf)
Land(2 acres @ Wolf Pen Creek)
Land (5 acres on Rock Prairie)
Parking Lot/Landscaping
Architect
Library Consultant
Furnishings
Initial Book Collection
Automation System
Vehicle
Collection Storage Space
Total
Estimated ODeratina Budget
City Librarian
3 Professional Librarians
7 Full Time Employees
1 Custodian
Periodicals/Collections
Utilities
Office Supplies
Postage
Printing
Janitorial Supplies
Book Maintenance
Equipment Rental
Training
Vehicle Maint./Gas
Grounds Maintenance
Building Maintenance
Subscriptions/Memberships
Advertising
Telephone - Local/Long Distance
Telephone - Maintenance
Minor Tools/Equipment
Equipment Maintenance
Insurance
Total
$ 910,000
100,000
235,000
114,000
72,800
25,000
73,500
600,000
345,000
15,000
12,000
$2,502,300
$ 43,750
76,950
131,775
15,315
125,000
52,200
2,650
1,350
1,550
2,250
5,450
400
3,500
750
25,600
4,500
5,500
4,000
4,500
600
600
600
1,000
$ 509,790
Less Current Budget 230,986*
Additional Funds Needed $ 278,804
* Includes $51,030 for annual lease contract.
Projected Property Tax Increase $ 0.0478
W/Benefits
W/Benefits
W/Benefits
W/Benefits
Page 2
Snace Proaram
total net
Administration
1000 sf
Librarian
200
sf
Library Assistant
150
sf
Conference
300
sf
Reception
200
sf
Storage/File
150
sf
Operations
3750 sf
Circulation Desk/Work Area
1000
sf
Book Processing
1500
sf
Computer Room
500
sf
Staff Lounge
500
sf
Staff Rest Room
250
sf
Reading Areas and Stacks
7750 sf
Adult Books
2250
sf
Adult Reference
750
sf
Children Books
1750
sf
Periodical/New Books
500
sf
Card Catalog
500
sf
Adult Reading/Carrels
2000
sf
Public Rest Rooms (2 @ 250 sf)
500 sf
Mechanical Room 750 sf
Janitor's Closet 250 sf
Total 14,000 sf
Notes:
* Under this scenario a Library built at Wolf Pen Creek will
serve as a satellite of a future main Library built on the
corner of Rock Prairie and Rio Grande. Funds will be made
available in this budget to purchase the land for future
growth.
* Parking estimates are based on 70 parking spaces. This
figure was derived from a Planning Division recommendation of
1 space per every 200 square feet of building.
* An initial book collection budget of $600,000 will bring
the College Station's book collection to 47,000 volumes or
approximately one-third the size of the Bryan Library
collection. An initial book collection budget of $1,000,000
would increase furnishings by $44,000 and the operating
Page 3
budget by $63,300 for a total property tax increase of
$0.0175. This would bring the College Station's book
collection to 67,000 volumes or approximately half the size
of the Bryan Library collection.
* The estimated automation system costs of $345,000 reflects
a $100,000 grant for a shared system with the Bryan Library.
A shared system would provide the Bryan Library an incentive
to share collections and allow College Station's collection
time to grow.
* The estimated operating budget is based upon maintaining
College Station Library's current operating hours of Tuesday
through Thursday 10 am to 7 pm and Friday and Saturday 10 am
to 5 pm for a total of 41 hours per week. To have similar
hours as the Bryan Library's operating hours of 60 hours per
week will cost an additional $88,125 annually for a property
tax increase of $0.008.
* The estimated operating budget does not allow for staff
transference of books. To allow a patron to request a book
from one library and staff transfer it from the other library
by the next day on a scheduled run will cost an additional
$18,825 annually for a property tax increase of $0.0017.