Loading...
HomeMy WebLinkAboutConcrete Panels Placed at City Hall; newspaper photo (08-03-1969)Concrete Panels Placed at CS City Hall A hydraulic lift places the 15 feet high precast ing to Stanley Thomas, designer for architect concrete planels in position as work on the new C. R. Watson. During final construction the pan- city hall at College Station continues. The panels els will be welded together and a concrete beam vary in width. After they are lifted into place poured around the perimeter. (Eagle Photo by they are aligned and temporarily braced, accord- Gene Dennis) I