Loading...
HomeMy WebLinkAboutAdditions & Alterations 2 •'Asrw � �� KEYED DEMOLITION NOTES GEifVIE#i>�: NOTES e ol 1 (G i) Verify work items to be undertaken by Owner. 1. Remove walls. Provide bracing as required during removal. r (G2) Field verify existing conditions. 2. Remove existing door and frame. A, ,. \x (G3) All items noted to be remov etas the property of the Contractor unless noted 3. Remove siding and sheathing where existing exterior exposed at new addition otherwise and are to be removedpromptly from the site and disposed of in an interior. acceptable manner at the expense of the Contractor. Grnr3ve existing window and frame. (G4) Reuse existing items removed including doors and windows, hardware, etc. where possible in new construction-�. g- 5. Abandon existing hose bibs. �\ (G5) items to be removed and reinstalled are to he removed with ,re, ond sty ire 6. Remove existing window and frame. Salvage for relocation. 'c > ♦`, "�'� _ the appropriate manner. Clean and repair items rerracwed as needed before reinstallation. Refer to Floor Plan for relocated items. 7. Remove existing shelving/casework. (G6) Remove and salvia existing tight fixtures as noted. Refer to Floor Tian for reio- 8. Remove existing sink, shelving, and casework. Salvage for relocation. $ �, �.. = sated and new f E!ec+tr al wrrrns not rf?�tu' to rww construction should / - be pr erty ca abandlor' \ - 9, Remove exist nq recessed vanity mirror. Salvage for relocation at new Toilet � � '� ((;7t r rr sawn a existing plumbingfixtures as noted. Plumbs tx s not for new construction ould be rooerly capped and ahAnd ned. Refer 10. Remove existing water FIeater for relocation directly above in attic. � or Plan for relocated and new fixtures. 11. Remove existing furnace and floor grille. yY (G8) Extend piping and wiring as required from plumbing fixtures and light fixtures /, ` scheduled to be removed to new and relocated fixtures when applicable. 12, Remove all existing wail heaters. (G9) Repair all existing surfaces damaged during demolition. Patch as required. 11 Remove existing tub,and sink,and toilet. Prepare surfaces to receive new finishes as noted. 14. Remove existing!fight fixture. (G 10) qulality and workmanship interiorfinishes, relocated fixtures. trim, hardware, etc. is to match existing in both 15.' Ct.G. �a ,.T Jt • w� �/2 SN f�HNc� ,, � _ existing light fixture. Salvage for relocation. Refer to Floor Plan for ' , X- airy Tv 1ti4 t �x! -t �' ` ' _ 16. Remove existing wood 1eck. x 17. Remove existing door and frame. Salvage for relocation- { 18. Remove existing mail slot. 0V 19. Remove rotted perimeter beam and replace-19 r. << V 4 19 `1 `' — —--17 III 1 I �1� q> i, IN.' ti — •J i—•L \ I ! \ \ 19, f > ! I L , �� ♦/ is , .� \ /Air f� t! L l� ___ • }- '3 PAf�B� 14' OC.=.W. -" �Arw TtB '"� SA�2v C 64' ttl. ` \ , 4' SAi>l� CUSHION GU rc> Mli— f-OL I { j \ t'+t I j _ 4' SAND C .t {ON , + I 1 -....._ ' ♦ � I + � � ; i � �(--- —�3 TIES ee 3' >a' O.C. I `\ ��.v e a ADDITiON AND ALTERATIONS TO:Jill —� I f .' , 4�7.1 G peat: .�� THE D U<E 5 f ID ENGE 2 -0o 2 F.� ARCHITECTS X AM T INTERIOR I:3 i�i TAi1_ ST,AT I C>N, .43; 3; _ SCALE: 3/4' -0' l m' LA�RE�TCE GRAUKE ASSOCIATES, _`,�_., � cj+•�:��v� �x�