HomeMy WebLinkAbout04/03/2000 - Regular Agenda Packet - Wolf Pen Creek Oversight Committee WOLF PEN CREEK OVERSIGHT COMMITTEE
REGULAR MEETING
MONDAY, APRIL 3, 2000
12:00 NOON - 1:30 P.M.
CITY HALL COUNCIL CHAMBERS
1101 TEXAS AVENUE
AGENDA
Call to Order
1. Approval of Minutes from January, 2000 Meeting
2. Approval of Member Requests for Absences
3, Presentation, Discussion, and Possible Action on Status of the Hotel and Conference
Center Project No. GG 9701
4. Presentation, Discussion and Possible Action Concerning Current Wolf Pen Creek
Development Projects:
Traffic Signals - Dartmouth & Holleman Project No. FT 9807
Channel Improvements, Texas Ave to Earl Rudder Freeway- Project No. SD-9901:
(This project is complete.)
WPC Tributary B Site Improvements - Project No. PK 9902
Parking Improvements - Project No. WP-9903
Trails and Bridges - Project No. WP-9905
George Bush East Extension - Project No. ST 9916
Riparian Restoration — Project No. WP0001
5. Presentation, Discussion and Possible Action on the Status of WPC Ordinance
6. Presentation, Discussion, and Possible Action Concerning a Design Charette for WPC
7. Presentation, Discussion, and Possible Action Concerning the WPC Public Information
Process
8. Presentation, Discussion, and Possible Consideration of Future Meeting Dates and Agenda
Items, (See attached list of meeting dates.)
9. Adjourn
The building is wheelchair accessible. Handicap parking spaces are available. Any request for sign
interpretive services must be made 48 hours before the meeting. To make arrangements call (979)764-3517 or
(TDD) 1-800-735-2989. Agendas posted on Internet Website http://www.ci.college-station.tx.us and Cable
Access Channel 19.
-::
Thanday, ✓ l4/��rilL 20009 aTParL ani '1(iecq°ed71¢llmDa
WOLF PEN CREEK OVERSIGHT COMMITTEE
MEETING DATES
Please make a note of the following dates that the Wolf Pen Creek Oversight Committee has
been scheduled to meet for the next six months, and mark your calendars. Thank you!
Monday, April 3, 2000
Monday, May 1, 2000
Monday, June 5, 2000
Monday, July 10, 2000 - moved to second week in July to avid Fourth of July holiday
Monday, August 7, 2000
Monday, September 11, 200 - moved to second week in September to avoid Labor Day
holiday
T #134 (4'4 DEPARTMENT OF THE ARMY
177 4' .4'
° FORT WORTH DISTRICT, CORPS OF ENGINEERS
k. €� SrP. O. BOX 17300
F '.Y $° FORT WORTH, TEXAS
.z .�s / 76102-0300
.r,,,� r t► R REPLY TO
41sn! ATTENTION OF January O, 2000
Enviro ental Division
Regulatory Branch
SIAIJECT9
Project ber 199900580
Mr. Smith, P.E.
Director of PublicW r k s
City of College Station
1101 Texas.
P.O. Box996
College S tati , Texas 77842
Dear Mr. Smith:
Thank or yurttro August , 19 , proposaltheCityCollege
Stationtodischarge dredged.:. fillmaterial into at rs of the it States s ate *th
restoration of the l Creek riparian .R.;t of DartmouthStreet in ll Station,
Brazos , Texas. This projectsProject Number Please
include this number all future correspondence *ng
thisproject. Failure to reference the
project number may result in y.
We have reviewed this. ...project r .: with h S ti t Water Act
and
Section f the warps and Harbors Act of 1899. Under Section , t . Corps of
Engineers regulatesthe discharge r ll ate intowatersUnited
States, including wetlands.s. Our responsibility Section ti is regulater::. or
affecting, navigable waters of the UnitedStates. Based on your description of the proposed
work, and ter info ationavailable l to s, we ave .et that this project * not involve
activities sties subject to t requirements ctio 10. However, this project ll involve activities
s .b, t to the requirements ofSection0 Therefore, it will require Department f the ° , ty
authorization.
We have reviewed this project under the notification procedures of Nationwide Pe ®t
General Condition 13 - r .l Register, Vol. 61, No. 241, Friday, December 13, 1996). We have
determinedthat this project is authorized by nation i °t 27 for Wetland
Restoration and Creation t tivities. To use this pe °t, the personresponsible forthe project
J
— 2 —
must ensure that the work is in compliance with the specifications and conditions listed on the
enclosures and the special conditions listed below. The special conditions for this pe *t are as
follows:
1. The pe *ttee shall implement and abide by the restoration plan included in the letter from
Mr. Mark S *th, RE., Director of Public Works, dated December 12, 1999. Completion of all
elements of this restoration plan is a requirement of this pe *t.
2. The pe *ttee shall be responsible for maintenance of restoration areas created to comply
*th Special Condition 1 above until such ta e as the pe *ttee provides documentation to, and
receives verification from, the USACE, that:
a. aquatic areas within the restoration area meet the definition of a water of the United
States under the Regulatory Program regulations applicable at that time;
b. wetlands 'thin the restoration area meet the definition of a wetland under the
Regulatory Progr. regulations applicable at that time;
c. aquatic areas within the restoration area are functioning as the intended type of water of
the United States and at an acceptable level of ecological perfo ance; and
d. rion-aquatic areas, such as buffer and riparian zones, within the restoration area are
functio ° g as the intended type of ecosystem component.
3. The pe *ttee shall establish and implement a self-monitoring prog,r. that includes the
folio * g actions:
a. designation, in ling, of a responsible party to coordinate with the USACE
conce ng on-site inspections and compliance with pe 't conditions;
b. notification to the USACE of the schedule of activities for each phase of the project
at least 30 days prior to the start of soil-disturbirig activities; and
c. plernentation of a reporting progr that shall include . ual °Iten compliance
reports to the USACE, due October 1 each y- begi g in October 1, 2000. The pe *ttee
shall include in each report any schedule changes and a su ary of all activities that occurred
during the reporting period, including demonstration of the pe atteds compliance with the pe
conditions, and documentation of the progress and/or completion of all autho ed work,
including restoration activities. The pe 'ttee shall include in each report photographs, maps, and
a description of the ' pacts to waters of the United States. Compliance reports are required even
if no work is conducted du ' g the reporting period. The pe *ttee shall submit compliance
reports until the USACE verifies that the pe 'ttee has successfully completed all restoration plan
requirements, the restoration .v met the standards of special condition 2 and l
authorizedconstruction cti iti either completed or deleted from the project.
Failure to comply *th these specifications it ns invalidates t e authorization tion and may
result in i lat the Clean Water Act.
Our verification for the st io of an activity
under this
nationwide pe et is valid or
two y s from the dateof this
letter, unless prior to t date the ati e at is suspended
or revoked, r modified such that the activitywould r comply with the to , s and
t nationwidernational basis. Continueddo that
conditions
an
i it complies t the specifications a iti , and any changes to the nationwide
pe 'at, is the responsibility of the pe
r e this ® t s addressed
its endangered species. Basedonthe
® do provided, have t e that this r ml not affect species listed as
threatened or endangered the . . Fish andWildlife ll ,..r pe *t area. However,
please note that you are responsible or meeting the requirements l condition
endangered species.
Theope ettee must sign and s 0t to us the enclosed certification that t e work, including
any required miti ti completed in compliance it the nationwide permit. should
submit
your certification within
30 s of the completion of work.
at should considered as r thedesignfeatures activity
S.pe
i or implication that such constructionis si dere adequate for the s
intended.. t does not th private r. , viprivate . hts, or any
I° tgement of federal, state, or local laws or regulations.
Thank you for r interest u r nation's water resources. Ifyou have any questions
conce *ng our regulatory progr. please contact Ntr. Stan Walker at the address above or
telephone
(817 -3 51. Ifyou wouldlike more informationabout our nationwide pe ®t
progr pl.;•f.k.. contact us _ we will fu *sh you with copy f the .ti e pe et
regulations.
Sincerely,
Z/7.,..„)
r
Enclosures .4., ., re
.,/i. Lea
f,ChieRegulatory Branch
College Station, Texas
• •
i . ,/. •" , , 1 ''
, , , \ /
/
N i I '•• •-•
/r
/' ' \ i
;•,',,.,•' \ ," '' g''' ' I N
' I •
"'-. i •,,,, s
\ s . I '-. / -
i
1 -- ---
...' ' '
7
/ .
////', .Q. ///--- — '-.-'
\V /
li,
\\ \
/ / /
.) '7 OP '/ ..."/"' 7
L. \4\ .// -.-:"--/::/'
--- ,T\ \Vs—, ./----• '
, .-•....,--,..,
-- Z'/7.-.---.1 * ,Z!f.,:.;, . '-• -
., , ,./. ., ,•
• ..,., ,,., -
— \, - ' - --''' ///////'///,.,04,. .-,111111". ''''‘ N\
• ,,.• r.-
100 0 100 200 Feet
..„.,..\\\ ,•,\.,
-' -/-////i/ARM5Stk \
,///, ,,, 4- , ..- \ _
_.„.,..,,,. ,_____,..- •-,..,,,-.. r,_., • ..,.`..'•..-:-.',-,.',.,'
,' ,-AA4V'At*c:;rIV:aa'':'':
i
A. ,--- ,--- -----,-..,---,-/,/; ,,,,-, ..,ve.;.:,i-,-T„,.;;.,fr7.---:-,,::..:i,'_.--:.-_.:.::::.:s-,;:.:,„-:..::.,n,-6,:.-.,,,,,:.,-:::..::..:;.,..::,.-, :.':„-.„-.:,:-,,y.:,,,.. .-„
-- _ ----5,--- (-- i //‹.4,00.4i.k.:*;-,Fitig: :-.,:c:-;,•':::.'7-.-.::::4-::::::,'zigi.:,.,,m,::,,:":,:::,-;:,',w_::,,._ . .... .•:T,: ,,:-- ,;N----..,. _
•
..•6ifigr.;:,,,:Ni,c,,,,;.•-,:..'-;;..::...,.:,--,i:,.:,-.::.iii;:,::',§:::-...i:_1.:::::i:i.,:z::,:'::::;.1„':':*::::,:.,:,1,i.!::.:s5:::;!n::::.i:::::: ..4::imiii:::::•: .,..7. `--- -,,:-_,„:. „- ---
,:)----- \ _)„------,-- ----r„, -,,,,,,,..‘-,imiti:,:!..-:.t:: : -.:::,..;i,.;::::06,2::.:-;:,,,:imsi:,...:::::,:,::::::•.:.,:::::::L::.::: ::::::-...z.-.-..-L:--z : ii:ivi:1::::: :_i ,s,,,,,, .. ---- ----,-...ii-, !
:_;--->-- . ------- ,..„,,,::: -..--..„--,,,--- ;:,:.::::,_ SM°°Th:.::''''.1.:::.::'Z'_X----2----7_-_------_-=_J ')Iiii.:!:1.1i:-..iii::::•:.!ik -, ' :-- I '
-<.-;-'----:"\:7---7-_,,,ligginf8,5 ,:.::::•:iicr,:::::ii:::.•:-:1;:-„:1.:::$:,iii::::ii•:&:::...::::: PLANT"Ass :: -----7---'----...'"----:Nli): f'-'-:;.!';':f.:::\'::::',U:.:i '''''':'''''',-•_:s,.._;,.,,s..,•:/-:-t,'.-',':,'''-',/,.,-;'.,:-1:?:/II, '
.------ --- ,?At9::•,: ii:, Ai,:A•-''-': ::,-:.,-:.;::,.:::::.x.::.;:,::,:,::':1-.i:-,;:..,:.:..-e,:::.:::::.::...:,:;:..i.'::::•-',/ \, <':'.•,i.,,.-,i- -,,-4.;.,i?i,,,,,,,,,,,,,,,,„-;,,-,;;:-:,;:.:.,,:',.1',- ':-'''''7-.;:::,..::
----_- illit';Y4fRof!F4gi'''''''',,',,,;::',''';','"':1"'i',":;:;',"6"------: :-.,..,..v::;'::',:g.:.:'..:.:::',:::::::•111.:..,:y i///,--. / FI-E-v-E-1) &VV.''-i*:,,,:;k:-,ZZI',...,-,-. '''''''i
\--„<;---_-_—_--,------ —_----_—_-- -----...::::,„::;,:iik.;,... ",',x's".y,Ty"e.4,,,q,...,i,,04::!".0''',,,,,',1,.::&=,',",.-.:;',•:-.:0:',.;:::,:',.•,:,:'''' ,,-,/),--,,---------1-' , N,...z:.,:I,..::::':.,-.77/ ' \
)/-<-<-'---,-,-' ,--:---7-' '------_-_--=7---7-:-----.27-1:--:-.71---.-- ,...1:::; ::-:.:.:.'i.*::;:::::::::::,...:::.,:NSN'&4'7>g4,%':',PITQR:','Ai:-;:-i':7 /`;',/------ k' '-'-'''''''y I '\ ' 7 SCAW,:i;1,4'.?"1.0%1 LAKE"'•`...4.-n. .,--1
-- •-i' '''-'-7--=---7-----'-----.-'..:„,,„.„1:::::: :•:':,::„.:-.„„„„„k.:i':"•:‘,":".-;"";.::"11-ie*:,,'•'',1':,E'I'In;::',..Kaii:::.00/ --.- --'--- / \ i (1S4111411',41101?i,'*',„,..f:''W* 1
,.„.............____....:.....,..„..,...„..:.,:.:.:.:.":„.„,,,,.:::"'",,,,,:,,,,i,%,i,R-,"mw::•::,ganer/ --/• . z-------,•-•-,-,--_-_-"7----____.- /
-'--..-.--r'-''.-'''............:..........'........?.......:.:GRADE SMO3TH•....,:•,......-:•••••-••••••••••••,—,,•,••••••••....• ....
I__„. •••..'.......,..........• ............2.11....7..!,,:,:f,':.::::-...:':::::::.:":::.,:f'.,....:-.1!,•,":::'::.:*:' ' '„/ '- ------. • \\ ' ilfl-fi:**41;01,;:11;•.1C--:-::`!'•4,7 t.k 1
•••.•.••••.,,—,,,..................,,,,.......••••-•,, & .-.•••.•••.-.••••••,,-.-.•,-:,,,.••.,w••.-,,-.,,•:-.-.-.-
' .-",,,,,,,;,,,,,,,,,,,,,,,:::,:•:•::: PLANT GRASS .S.:..,:-:-:-..-1-1,--::•-:;-:;.:::::::---',••••••,:-:-::::-•::-.••••:•-•:•::: / / '\\ 'I;.-,a4..14.*•1&41,''.,;tk.,',— •Sr l• , ,
,•,, \/ , i\\\I\\, r'S•4\*54.,,,,.,:‘...e.;.1,'1.1t.43,...:!;,,,,;;'4':....::::,.:*::::.,..i:,,,,,,:::i.i.::'.:::',i):::;Fi_p--,,,,erriu.",v,/,,Ay\,,,,y'.1.-j .
---•-----,•••••••••,,,,,,,,,,,, , / I
) ‘‘ \s\"1155EQ:'1::: 417.911111111111212ERE:1111116: 1 \\ (C --- ..\ \
1\ \ \‘ :-.1112'::'-::':':''''''5'''''''''':..:'-'..1:1.6.:g"'..""1:2-"!.". .{:".:!:::::::::::.':::::::i'':''':.; :''''I'W' J /\ ' \ A
Proposed Conditions: ,
......,,..„__„-....-
,\ , .....!:&.--,•:. ..,;,::,4:,,,-";::,,,.:-:-;_-•.-.._.----__,_------ --- --- .,,, 7-.,_--- .„.- -------A-__. ____
\ \ \\\\\ 1::.:.;:g.:,-,;.,f,::;;,,-ilgg:::.,:.:::..eig:, :.=-.--.--.,-._-..--.-_.-_=---,-,--,------s\_---------- ,-(7-. _.....--- -------- -,.. ,.,• ---.,;:-.-- -_------,_•-:,-------T:-:_-_- --./.-/7,/ .,/
& Plant Grass \ \\':\ -:__--.,;,--:-.---,...:, __-,=*--\_____------ ---- - , \\„/
Wetland Area \ \ \\ __---.----- --:----- ----' ------/ --7 '-----------/ '', \ , ( ,-, '----'s----- E3 '--- ----
,---- ----' \ \ .---- --- --- -----
\\ 17/'-- --- -- i -.- .----'/ -A / \ -.
\\ \ / ------- — ---- '--1------------'- . / / \ ''\s -.'
itlititt:1 Lake \ , ._ - ._------ ---„ ! 1 ,--- 1 , ..-.- i / ‘ \ \
) I (/ / i /.' iu, / \-,\\ '----- ------_
kou Levee
/ , 1
/ ,
i , \ / .,_. / .-- - ------ 1
\ '\'' ------- --------
--\, (----___ -------- -----• ,
57 ‘,—/7--------11-1\-- '---------' / \'------- /---------'
_—__ \-\, s . ------- __ _-
21'.3::iriA Spillway
II', '----A\ / -- ----
--„, -\ \\
-,/,---------„ .,._----____
....k / v-: \\ ,..• „-----
‘„-,-, ----- _---_------ .
-' -- 7-------\..\ \------ -------- -/ .„‘. , .,, „ —.........__ ..... ______ ____•
Main Creek Channel
,../ / ,,, ,, ifl.----__,-, -_______:
r\ (4.,', .,------ /- \ ,/ ,--- \ ___ ... , .. .
' `v \-6.. "'I \l - : \ ....„. ,
/._
-.‘ .\\ \ c ,---------- _---_-_-----__ -,
1.----.1 Parcels
__ --
,, ., •,N '.., .
, „.. .....„ .. __.._
\ 75.-', ( , ,. \\
!VIM Aphitheater / -- / / / , ( • -\
____„----_____, , ,...--,
- -,..,,,,,,,,..\ ---
-..\ \ - ,k ;N. \,,, ---- ../ / ,.., , \ . ,
, „ ..
• ,
z, z Contour Line ...,,
-,„ \-_, .-----X `-', ------------' ,------,,----„ /// ---- ' —
., \ s„/ _ -,:., .. , ...... .,........... -, .\-,.,•,,-..
\ \ \ -_.________, , .:...__, -,
- ---- Dartmouth St Bridge
Wolf Pen Creek
Created by:
kt rea City of College Station, Texas Riparian Restoration Plan
ENGINEERING DIVISION