Loading...
HomeMy WebLinkAbout11/06/2017 - Regular Agenda Packet - Bicycle, Pedestrian, and Greenways Advisory Board BICYCLE, PEDESTRIAN, AND GREENWAYS ADVISORY BOARD November 6, 2017 3:00 P.M. City Hall 2nd Floor Conference Room 1 1101 Texas Avenue College Station, Texas AGENDA BICYCLE, PEDESTRIAN, AND GREENWAYS ADVISORY BOARD Monday, November 6, 2017, 3:00 PM City Hall 2nd Floor Conference Room 1 1101 Texas Avenue College Station, Texas, 77840 1. Call to Order 2. Hear Visitors - At this time, the Chairman will open the floor to citizens wishing to address the Board on issues not already scheduled on today's agenda. The citizen presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Board and to allow adequate time for completion of the agenda items. The Board will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) 3. Consideration, possible action, and discussion to approve meeting Minutes. • October 2, 2017 4. Presentation and discussion regarding an update on the following item: • Bicycle Parking Standards 5. Public hearing, presentation, possible action, and discussion regarding a recommendation to the Planning and Zoning Commission on proposed changes to the Bicycle, Pedestrian and Greenways Master Plan related to Thoroughfare Plan amendments that incorporate the Bryan/College Station Metropolitan Planning Organization 2050 Thoroughfare Concept and other City-initiated and clean up items. 6. Presentation, possible action, and discussion regarding the Bicycle, Pedestrian, and Greenways Master Plan Update including Project Priorities. 7. Presentation and discussion regarding the Bicycle, Pedestrian, and Greenways Advisory Board calendar of upcoming meetings. • November 14, 2017 ~ TxDOT Public Meeting ~ FM 2818 Corridor ~ Larry J. Ringer Library, 1818 Harvey Mitchell Parkway South ~ 4:30 p.m. – 6:30 p.m. • November 16, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall, Council Chambers, 1101 Texas Avenue ~ 6:00 p.m. • December 4, 2017 ~ Bicycle, Pedestrian, and Greenways Advisory Board ~ City Hall, City Hall 2nd Floor Conference Room 1, 1101 Texas Avenue ~ 3:00 p.m. 8. Possible action and discussion on future agenda items – A Bicycle, Pedestrian, and Greenways Advisory Board Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 9. Adjourn. Notice is hereby given that a Regular Meeting of the Bicycle, Pedestrian, and Greenways Advisory Board of the City of College Station, Texas will be held on Monday, November 6, 2017 at 3:00 p.m. in the City Hall 2nd Floor Conference Room 1, 1101 Texas Avenue, College Station, Texas. The following subjects will be discussed, to wit: See Agenda. Agendas may be viewed on www.cstx.gov. APPROVED: By________________________________ City Manager I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on October 30, 2017 at 5:00 p.m. CITY OF COLLEGE STATION, TEXAS By_________________________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800- 735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder With an Openly Carried Handgun. “Pursuant to Section 30.07, Penal Code (trespass by license holder with an openly carried handgun), a person licensed under Subchapter H, Chapter 411, Government Code (handgun licensing law), may not enter this property with a handgun that is carried openly” Codigo Penal §30.07. Trespasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre” MINUTES BICYCLE, PEDESTRIAN, AND GREENWAYS ADVISORY BOARD Monday, October 2, 2017 3:00 PM College Station City Hall 2nd Floor Conference Room 1 1101 Texas Avenue College Station, Texas, 77840 MEMBERS PRESENT: Chairman Blanche Brick, Jon Denton, Tina Evans, Andrew Middleton, Neal Johnson, Jonathan Coopersmith MEMBERS ABSENT: Molly Fierro STAFF PRESENT: Bicycle, Pedestrian, and Greenways Senior Program Manager Venessa Garza, Transportation Planning Coordinator Jason Schubert, Board Secretary Amber Johnson AGENDA ITEM NO. 1: Call to Order. Chairman Brick called the meeting to order at 3:02 p.m. AGENDA ITEM NO. 2: Hear Visitors. There were no visitors present who wished to address the board. AGENDA ITEM NO. 3: Consideration, possible action, and discussion to approve meeting minutes. Board Member Evans motioned to approve the meeting minutes from September 5, 2017. The motion was seconded by Board Member Denton and was approved (5-0). AGENDA ITEM NO. 4: Presentation and discussion regarding an updated on the following item: Bicycle Parking Standards. This agenda item was discussed after Agenda Item No. 5. Senior Program Manager Garza presented an update to the board on this item. Ms. Garza stated that the item previously discussed by the board was brought before the Planning and Zoning Commission (P&Z). Some of the changes proposed by staff were not supported by P&Z so this item will be going back to P&Z so staff can narrow the scope for discussion and next steps. Board Member Coopersmith attended the Planning and Zoning Commission meeting and provided the board with details regarding their concerns. The board held a general discussion regarding bicycle parking standards. AGENDA ITEM NO. 5: Presentation, possible action, and discussion regarding upcoming changes to the City’s Comprehensive Plan – Thoroughfare Plan and the Bicycle, Pedestrian, and Greenway’s Master Plan based on the Bryan/College Station MPO 2050 Thoroughfare Concept. Transportation Planning Coordinator Jason Schubert presented this item to the board. Mr. Schubert explained that following several months of public meetings and revisions resulting from public comments, the Bryan/College Station Metropolitan Planning Organization (MPO) adopted a 2050 Thoroughfare Concept plan in June 2017. The Thoroughfare Concept includes major roadways classified as arterials and highways intended as a guide to help develop a County-wide roadway network to support the long-term growth anticipated in Brazos County over the coming decades. Staff is in the process of identifying the amendments needed to align the City’s Thoroughfare Plan with the MPO’s 2050 Thoroughfare Concept and corresponding revisions to bicycle and pedestrian facilities along these roadways which will also amend the Bicycle, Pedestrian, and Greenways Master Plan. Amendments to Master Plan will be proposed today and at the November meeting for the Board’s consideration and recommendation to the Planning and Zoning Commission. Board Member Coopersmith arrived at the meeting at 3:06 p.m. The board held a general discussion regarding proposed changes to the thoroughfare plan. Chairman Brick left the meeting at 3:51 p.m. The board returned to Agenda Item No. 4 after this item. AGENDA ITEM NO. 6: Presentation, possible action, and discussion regarding appointing a member of the BPG Board to the Metropolitan Planning Organization’s Alternative Transportation Advisory Panel. Senior Program Manager Garza presented this item to the board. Ms. Garza explained that the advisory panel meets monthly to discuss items related to bicycling and walking at a regional level. The board is made up of representatives from local government entities and citizens and is seeking to fill a citizen spot as well as a citizen alternate spot. Board Member Evans motioned to appoint Board Member Coopersmith as the Alternative Transportation Advisory Panel representative from the BPG board with the alternate being Board Member Johnson. Board Member Denton seconded the motion and was approved (5-0). AGENDA ITEM NO. 7: Presentation, possible action, and discussion regarding the Bicycle, Pedestrian, and Greenways Master Plan Update and Project Priorities Methodology. Senior Program Manager Garza presented this item to the board. The first area evaluated by the board is located along the Gulf States Trail. Ms. Garza stated that staff is proposing to extend the proposed Gulf States Trail down to Peach Creek Road. There was no opposition from the board regarding this item. The second area evaluated by the board is located on Southwest Parkway. Ms. Garza stated that staff is proposing to add a multi-use path on one side of Southwest Parkway from Welsh Avenue to Anderson Street. She added that staff is also proposing removing the bike route on Southwest Parkway from State Highway 6 South to Wellborn Road. The board held a general discussion regarding the ability to construct in the area. Discussion included if there was adequate room to construct a larger facility and the hazardous nature of the existing sidewalk conditions. There was no opposition from the board regarding the proposed changes but expressed the challenges that exist in terms of construction feasibility. The third area evaluated by the board is located on Rock Prairie Road. Ms. Garza stated that staff is proposing to add a multi-use path on Rock Prairie Road from Wellborn Road to College Station Middle School. Board Member Johnson asked if there was a way to connect into the bike lanes that exist on Welsh Avenue and Victoria Avenue. Ms. Garza stated that she will need to look at it closer to determine exactly how those connections are going to be made. There was no opposition from the board regarding this item. The fourth area evaluated by the board is located along State Highway 6 Frontage Road. Ms. Garza stated that staff is proposing adding a trail along State Highway 6 Frontage Road from Harvey Road to Holleman Drive East. There was no opposition from the board regarding this item. The fifth area evaluated by the board is located in the area of Tarrow Park. Ms. Garza stated that based on discussions staff is proposing adding a bike route on Eleanor Street from Holleman Drive to Montclair Avenue and on Montclair Avenue from Eleanor Street to Luther Street as previously discussed and not widening the trail that exists within the park. The board held a general discussion regarding the area. There was no opposition from the board regarding this item. The sixth area evaluated by the board is located in the area of Alexandria Avenue. Ms. Garza stated that staff is proposing adding a trail along the perimeter of the park on Alexandria Avenue from Southern Plantation Drive to the southeastern corner of Southern Oaks Park. There was no opposition from the board regarding this item. The seventh area evaluated by the board is located on Texas Avenue. Ms. Garza stated that staff is proposing adding a trail on both sides along Texas Avenue from FM 2818 to State Highway 6 South. There was no opposition from the board regarding this item. The eighth area evaluated by the board is located on Wellborn Road. Ms. Garza stated that staff is proposing adding a trail on Wellborn Road from State Highway 40 to Barron Cut-Off Road. There was no opposition from the board regarding this item. The ninth and tenth area evaluated by the board is located in the Southern part of town. Ms. Garza stated that staff is proposing adding trails to both Hopes Creek and Peach Creek that following along the creek corridors in anticipation of potential residential growth in the areas with the goal to connect to future schools in these areas. There was no opposition from the board regarding this item. The eleventh area evaluated by the board is located along Harvey Road. Ms. Garza stated that staff is proposing to remove the existing proposed bike route along Harvey Road from Scarlett Ohara to Veteran’s Park as a multi-use path is now being proposed along the corridor. The twelfth area evaluated by the board is located along Tonkaway Lake Road. Ms. Garza stated that staff is proposing to add a bike route along Tonkaway Lake Road from William D Fitch Parkway to Bird Pond Road based on existing use by bicyclists. There was no opposition from the board regarding this item. The thirteenth area evaluated by the board is located at William D Fitch Parkway and State Highway 6 S. Ms. Garza stated that staff is proposing to add a bike facility along William D. Fitch Parkway at State Highway 6 South. There was no opposition from the board regarding this item. The board then began discussion regarding Project Priorities Methodology. Ms. Garza explained that Geographic Information Systems (GIS) is used to construct a model per facility type to objectively develop a list of priorities based on various criteria. Each model includes a criteria that help identify the need is and then a weight based on the level of importance. Ms. Garza stated that the board had previous discussions about wanting to use projected population. She stated that they need how population is going to be weighted between projected versus existing population. The board held a general discussion and agreed on doing running the model with two scenarios: one for equal weights for projecting and existing population of 9 and 9 and another run with a weight of 12 for existing and 6 for proposed. Ms. Garza added that she can start the model with just sidewalks and see what the outcome is. Ms. Garza stated that the other discussion item is in regards to crash data and if they should be broken into major and minor and how they should be appropriately weighted. The group agreed that major crashes should most likely have a higher weight of 12 and minor crashes a weight of 6. AGENDA ITEM NO. 8: Presentation and discussion regarding the Bicycle, Pedestrian, and Greenways Advisory Board calendar of upcoming meetings. • October 5, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall, Council Chambers ~ 6:00 p.m. • October 19, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall, Council Chambers ~ 6:00 p.m. • November 6, 2017 ~ Bicycle, Pedestrian, and Greenways Advisory Board ~ City Hall, 2nd Floor Conference Room 1 ~ 3:00 p.m. AGENDA ITEM NO. 9: Possible action and discussion on future agenda items – A Bicycle, Pedestrian, and Greenways Advisory Board Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There were no future agenda items requested. AGENDA ITEM NO. 9: Adjourn. The meeting adjourned at 5:20 p.m. APPROVED: ATTEST: ____________________________ ____________________________ Blanche Brick, Chairman Amber Johnson, Board Secretary 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM DATE: November 6, 2017 TO: Members of the Bicycle, Pedestrian, and Greenways Advisory Board FROM: Jason Schubert, AICP, Transportation Planning Coordinator jschubert@cstx.gov SUBJECT: Bicycle, Pedestrian and Greenways Master Plan Amendments Related to the 2017 Thoroughfare Plan Update Item: Public hearing, presentation, possible action, and discussion regarding a recommendation to the Planning and Zoning Commission on proposed changes to the Bicycle, Pedestrian and Greenways Master Plan related to Thoroughfare Plan amendments that incorporate the Bryan/College Station Metropolitan Planning Organization 2050 Thoroughfare Concept and other City-initiated and clean up items. Summary: Following several months of public meetings and revisions resulting from public comments, the Bryan/College Station Metropolitan Planning Organization (MPO) adopted a 2050 Thoroughfare Concept plan in June 2017. The Thoroughfare Concept includes major roadways classified as arterials and highways intended as a guide to help develop a County-wide roadway network to support the long-term growth anticipated in Brazos County. Staff has identified the amendments needed to incorporate the MPO’s 2050 Thoroughfare Concept into the College Station Thoroughfare Plan and the recommended revisions to bicycle and pedestrian facilities along these roadways that would amend the Bicycle, Pedestrian and Greenways Master Plan. As part of this effort, staff is proposing to include some other City-initiated amendments and clean up items. Potential changes related to the on-going update of the Bicycle, Pedestrian, Greenways Master Plan are being processed separately as a part of that effort. An overview and initial discussion of the Thoroughfare Plan update and some of the related bicycle and pedestrian changes were presented at the October 2, 2017 Board meeting. This item will present all proposed changes for formal consideration and a recommendation to the Planning and Zoning Commission. The proposed changes are summarized in table form and two map books – one for the Bicycle Master Plan and one for the pedestrian Master Plan. The proposed amendments are tentatively scheduled for public hearing and consideration by the Planning and Zoning Commission at their November 16, 2017 meeting, followed by a public hearing and final consideration by City Council at their November 20, 2017 meeting. Attachments: 1. Table - Changes Based on the Adopted MPO 2050 Thoroughfare Concept 2. Table - Changes Initiated by the City including Cleanup Items 3. Bicycle Master Plan Map Book with related amendments 4. Pedestrian Master Plan Map Book with related amendments Additional Information and Tips PLEASE READ. It will be helpful in navigating all of the information you’ve been provided with. • There are two tables: 1. Changes Based on the Adopted MPO 2050 Thoroughfare Concept 2. Changes Initiated by the City including Cleanup Items • There are two map books: 1. Bicycle Master Plan Map Book 2. Pedestrian Master Plan Map Book Quick Review: 1. Review each Map Book only. 2. Each page has a map with the Adopted/Current Plan and a map with the Proposed Plan. 3. Find each labeled colored dot on each map to find the change proposed. 4. The changes are represented with labeled numbers (circles) that correspond with the tables. For a more detailed review, read below: Table related information a. All the changes related to the Thoroughfare Plan update are described in each table respectively. b. Bicycle and Pedestrian changes are highlighted in gray and are the only changes reflected and numbered in the corresponding map books. c. Look at the map book page # in the table to determine which page to flip to and find the change (please note: pages are printed front and back). Although the changes are in order by number in the table the corresponding map book pages that reflect the changes will not necessary be in order and will require flipping back and forth to find the proposed change. For example, change #2 may be on page 2 in the map book but change #3 may be on page 5. d. The last column of the table references if the Board discussed the proposed change at the board meeting in October. Map book related information a. Each map book has a grid system of the City and reflects the bicycle and pedestrian plan respectively. b. Each page has the Adopted/Current Plan and the Proposed Plan (with recommended changes). c. Changes Based on the Adopted MPO 2050 Thoroughfare Concept are labeled with red circles . d. Changes Initiated by the City including Clean-up items are labeled with purple circles . e. You will skip some pages in each map book as there aren’t any related bicycle or pedestrian changes proposed on those pages. f. Not all roads are labeled due to the scale of the document. Let’s get started: 1. First, review proposed bicycle changes using the Bicycle Master Plan Map Book and the table called Changes Initiated by the City including Cleanup Items. a. Look at the change number column and turn to the appropriate page number in the map book referenced to find the circle labeled in the map that reflects the change described in the table under the column called Proposed Bike Changes. Remember to only look at the rows highlighted in gray for proposed bicycle and pedestrian changes. b. Compare the numbers/dots and associated description with corresponding proposed changes in the map book for all the City Initiated/ Cleanup Items. 2. Then, using the Bicycle Master Plan Map Book and the table called Changes Based on the Adopted MPO 2050 Thoroughfare Concept, do the same as described above to review MPO related changes. 3. Once you’ve reviewed all of the proposed bicycle changes follow the same steps to review the pedestrian changes using the two tables and Pedestrian Master Plan Map Book. # # DRAFT Thoroughfare Plan Update with Bicycle and Pedestrian Related Changes Changes Initiated by the City including Cleanup Items From To 1a 1,7 Hensel Street College Avenue Texas Avenue Add bike lanes as per 2017 TAMU Campus Master Plan Add sidewalks as per 2017 TAMU Campus Master Plan Realign Minor Collector on west to College Avenue at Cross Street and extend to east to intersect Texas Avenue at Rosemary Drive as per 2017 Texas A&M University Campus Master Plan. Roadway on Texas A&M property, alignment shown for planning purposes. 1b 1,7 Front Street University Drive Hensel Street None Remove sidewalks as roadway is removed Remove Minor Collector as not provided as part of Century Square development. 2 2 Future Minor Collector University Drive East Harvey Road None Remove sidewalks Remove as either located on Veterans Park or Texas A&M University System tract, would not have connections to Veterans Park or Crescent Pointe subdivision. 3 2 Summit Crossing thoroughfares and extensions Harvey Road University Drive Adjust bike lanes to proposed alignments Adjust sidewalks to proposed alignments Adjust Summit Crossing Lane and future minor collector as per Summit Crossing Master Plan and realign to existing median breaks on University Drive East at East Crest Drive and on Bonneville Road at Hicks Lane. 4 5,17 Thoroughfares in Grimes County Remove bike route on Peach Creek Road extension and SH 30 None Remove future thoroughfares from plan as Inter-Local Agreement regarding subdivisions not in place with Grimes County. 5 6,7 Finfeather Road/Agronomy Road Raymond Stotzer Pkwy Bryan City limits Add as Major Collector as on City of Bryan Thoroughfare Plan and cross section in 2017 Texas A&M University Campus Master Plan. 6a 7 College Main University Drive Bryan City limits Reclassify from Major Collector to Minor Collector as constructed; remove section from University Drive to Church Avenue which is a pedestrian mall. 6b 7 Boyett Street University Drive Louise Avenue Add as Minor Collector intersecting University Drive to replace College Main. 7a 7 Fairview Avenue George Bush Drive Holleman Drive Reclassify from Major Collector to Minor Collector as per Southside Area Neighborhood Plan. 7b 7 Montclair Avenue George Bush Drive Luther Street Reclassify from Major Collector to Minor Collector as per Southside Area Neighborhood Plan. 8 8 Corsair Drive Emerald Parkway Pavilion Avenue Add bike lanes None Add remaining portion of Corsair Drive and reclassify from Major Collector to Minor Collector as constructed.Oct-17 9a 8 Pavilion Avenue SH 6 Sebesta Road Adjust bike lanes None Reclassify from Major Collector to Minor Collector as constructed. 9b 8 Pavilion Avenue extension Sebesta Road SH 6 Realign bike lanes Realign sidewalks Adjust alignment to consider approved Brazos Valley Auto Complex preliminary plan. 10a 12 River Road/Lost Trail extensions Lightsey Lane Brazos River Remove future Minor Collector extension as no longer crossing Brazos River. 10b 12 Paint Trail extension Paint Trail Brazos River Remove future Minor Collector extension as no longer crossing Brazos River. 10c 12 Lightsey Lane Raymond Stotzer Pkwy River Road Add as Minor Collector to connect existing River Road with future Lightsey Lane extension north of Raymond Stotzer Parkway. 11 13 North Dowling Road realignment Holleman Drive S Luther Street West extension Realign and change bike lanes to multi-use path as constructed Realign sidewalks as constructed Adjust as constructed with realignment and through movement planned to Holleman Drive South via Junction Boys Road. Proposed Thoroughfare Change Description BPG Board Meeting Change # Map Book Page # Thoroughfare Extent Proposed Bicycle Changes Proposed Pedestrian Changes None None None None None None None None Bicycle, Pedestrian and Greenway Master Plan Proposed Changes # From To Proposed Thoroughfare Change Description BPG Board Meeting Change # Map Book Page # Thoroughfare Extent Proposed Bicycle Changes Proposed Pedestrian Changes 12 13 Mission Ranch subdivision minor collectors Change bike lanes to bike route on Cameron Oaks Lane and Feather Run north of Deacon; Adjust all facilities Remove sidewalks on Cameron Oaks Lane and Feather Run from Kerr Valley Lane to Quail Run subdivision; Adjust all facilities Adjust alignment of Deacon Drive West, Feather Run, and Cameron Oaks Lane as per approved Mission Ranch preliminary plan. 13 13 General Parkway Holleman Drive S Aspen Heights subdivision Adjust bike lanes to existing alignment Adjust sidewalks to existing alignment Adjust alignment of General Parkway as constructed with Aspen Heights project. 14 13 Cain Road Realign Cain Road to intersect Holleman Drive South at Paloma Ridge Drive. 15 14 Deacon Drive Welsh Avenue Wellborn Road Reclassify from Minor Collector to Major Collector as constructed. 16a 14 General Parkway extension Rock Prairie Road West William D. Fitch Parkway extension Add bike lanes Add sidewalks Add future Minor Collector extension south of Rock Prairie Road West and North Graham Road to tie into new 4-lane Major Arterial. 16b 14 Old Wellborn Road Rock Prairie Road West North Graham Road Remove as Minor Collector as General Parkway extension will provide thoroughfare access south to North Graham Road. 16c 14 North Graham Road Old Wellborn Road General Pkwy extension Remove bike lanes Remove sidewalks Remove as Major Collector as not needed to tie North Graham Road into Old Wellborn Road due to General Parkway extension to south. 17a 14 Scott & White Boulevard SH 6 Rock Prairie Road Reclassify from Major Collector to Minor Collector as constructed, roadway flares out with turn lane at Rock Prairie Road. 17b 14 Healing Way Scott & White Blvd Lakeway Drive Reclassify from Major Collector to Minor Collector as constructed. 17c 14 Medical Avenue Lakeway Drive Rock Prairie Road Reclassify from Major Collector to Minor Collector as constructed, roadway flares out with turn lane at Rock Prairie Road. 17d 14,15 Lakeway Drive Medical Avenue Spring Creek Reclassify from Major Collector to 4-lane Minor Arterial to reflect 4-lane boulevard section within College Station Medical District PDD. 18a 14,15 Future Major Collector SH 6 Lakeway Drive Remove bike lanes as roadway is removed Remove sidewalks as roadway is removed Remove Major Collector as per Kimley-Horn thoroughfare assessment. 18b 14,15 Barron Road extension SH 6 Rock Prairie Road Remove bike lanes as roadway is removed Remove sidewalks as roadway is removed Remove 4-lane Minor Arterial as per Kimley-Horn thoroughfare assessment and prior alignment study over closed landfill near SH 6. 18c 15 Future Minor Collector Bird Pond Road extension Pebble Creek Parkway extension Realign bike lanes Realign sidewalks Remove future Minor Collector portion crossing Spring Creek as per Kimley-Horn thoroughfare assessment and realign remaining section to Rock Prairie Road at Harris Drive. 19 14,20 Barron Cut-off Road WS Phillips Parkway William D. Fitch Parkway Add Minor Collector to reflect roadway extension as constructed. 20 15 Tower Point Future Major Collector Arrington Road SH 6 Remove Major Collector as already platted and developed with private drive aisle. 21 15,21 Birkdale Drive St. Andrews Drive SH 6 Realign and extend bike lanes Realign and extend sidewalks Realign to existing roadway as constructed and around dormant oil/gas well site. 22 18,23, 28 Thoroughfares in Burleson County None Remove thoroughfares due to Inter-Local Agreement with Burleson County not requiring City subdivision review, also mostly in Brazos River floodplain. 23 20 Etonbury Avenue Greens Prairie Road Barron Cut-Off Road Realign bike lanes Realign sidewalks Reclassify from Major Collector to Minor Collector, existing section in Castlegate II subdivision constructed as Minor Collector with Major Collector right-of-way. 24a 20 Long Creek Lane Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows subdivision. 24b 20 Cottonwood Creek Lane Long Creek Lane Timber Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows subdivision. 24c 20 Timber Creek Lane/Timber Drive Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows subdivision. 24d 20 Creek Meadow Blvd North Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street does not connect through to another thoroughfare. Holleman Drive S None None None None None None None None None None None None None From To Proposed Thoroughfare Change Description BPG Board Meeting Change # Map Book Page # Thoroughfare Extent Proposed Bicycle Changes Proposed Pedestrian Changes 24e 20 Wild Creek Court extension Cottonwood Creek Lane Future Minor Collector Remove bike route on extension section as roadway is removed None Remove as Minor Collector as street is constructed as local street in Creek Meadows subdivision, extends south to another future minor collector. 25 21,22 Margraves/Windham Tracts Future Minor Collectors Change all bike routes to bike lanes for all future minor collectors Add sidewalks to all future minor collectors Adjust location of second Future Minor Collector to be more evenly spaced on Arrington Road between Harpers Ferry Road and Indian Lakes Drive. 26 22 Lakeway Drive extension SH 6 Birkdale Drive Realign bike lanes Realign sidewalks Reclassify future Minor Collector from SH 6 to Future 4-lane Minor Arterial as Major Collector and realign to Lakeway Drive extension to remove offset. 27 21 Southern Pointe sudivision collectors Adjust bike lanes to proposed alignment Adjust sidewalks to proposed alignment Adjust alignment of planned Mather Parkway and Darlington Avenue as per approved Southern Pointe preliminary plan. 28a 24 Straub Road Wellborn Road I&GN Road Remove bike route None Remove as Minor Collector as railroad crossing closed by Union Pacific. 28b 24 Wade Road Wellborn Road Stousland Road None None Remove as Minor Collector as railroad crossing closed by Union Pacific. 28c 24 Future Minor Collector Wellborn Road Future Minor Arterial Remove bike route as roadway removed None Remove as Minor Collector as additional railroad crossing not likely between Greens Prairie Trail and Drake Drive. 28d 24 Saddle Creek Drive Stousland Road Vintage Oaks Drive Add bike route None Add as Minor Collector as constructed to connect existing to other thoroughfares. 28e 24,25, 28 Future Minor Collector Wellborn Road Future Western Arterial Loop Remove as Minor Collector as additional railroad crossing not likely between Drake Drive and the Future Minor Arterial to the south. 29 26,27 Future Major Collector Future Western Freeway Loop SH 6 Add future Major Collector extension to existing SH 6 grade separation between FM 159 and Westward Ho. 30 28 Stousland Road extension Future Western Arterial Loop Future Western Freeway Loop Remove future Minor Collector west of Future Western Arterial loop, constrained by floodplain and intersects Future Western Freeway loop. None None None DRAFT Thoroughfare Plan Update with Bicycle and Pedestrian Related Changes Changes Based on the Adopted MPO 2050 Thoroughfare Concept From To 1 1,7 Texas Avenue University Drive Bryan City limits Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial. 2 2 Future Minor Arterial Harvey Road Linda Lane extension Add bike route None Reclassify from 4-lane Minor Arterial to Major Collector and terminate into extension of Linda Lane as Future Minor Arterial not shown on MPO Concept. 3a 3,9,15 Bird Pond Road and future realignment Rock Prairie Road SH 30 Realign bike route from west of Linda Lane extension to SH 30 None Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial, realign more with existing roadway, and extend across SH 30.Oct-17 3b 9 Future Minor Collector (portion of existing Bird Pond Road)Bird Pond Road (existing)Bird Pond Road (realignment) Remove as Future Minor Collector as portion of Bird Pond Road proposed to revert to existing roadway. 4a 4,10 William D. Fitch Parkway (future realignment) East of Tonkaway Lake Road SH 30 Realign east of Tonkaway Lake Road to the north toward SH 30 to provide adequate spacing from Future Eastern Freeway loop and extend across SH 30. 4b 10 William D. Fitch Parkway (remaining) East of Tonkaway Lake Road SH 30 Remove bike lanes None Reclassify roadway remaining after realignment to Major Collector and tie into realigned portion. 5a 17,22,26 Future Eastern Freeway Loop SH 6 SH 30 Change and realign bike lanes to multi-use path from SH 6 to Rock Prairie Road Change and realign sidewalks to multi-use path from SH 6 to Rock Prairie Road Reclassify Peach Creek Road from 4-lane Minor Arterial to Freeway/Expressway and realign and extend across SH 30. 5b 10 Future Grade Separation Add future grade separation at SH 30 and Future Eastern Freeway loop. 5c 17 Future Grade Separation Add future grade separation at Rock Prairie Road and Future Eastern Freeway loop. 6 6,7 Wellborn Road University Drive Bryan City limits Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial. 7a 6 F&B Road Wellborn Road Turkey Creek Road Change bike route/lanes to multi-use path as per 2017 TAMU Campus Master Plan. Add multi-use path as per 2017 TAMU Campus Master Plan Reclassify from Major Collector to 4-lane Minor Arterial. 7b 6 HSC Parkway Turkey Creek Road SH 47 Add as 4-lane Minor Arterial as constructed. 7c 6 Existing Grade Separation Add existing grade separation at SH 47 and HSC Parkway.Oct-17 8 6,12, 13,18, 19,23,24 Future Western Arterial Loop HSC Parkway Future Western Freeway Loop Reclassify from 6-lane Major Arterial to 4-lane Minor Arterial, realign from continuation of SH 47 to HSC Parkway with future grade separation at Raymond Stotzer Pkwy (FM 60) and intersect Future Western Freeway loop to the south. Oct-17 9a 13 Luther Street West and extension Jones Butler Road North Dowling Road Realign bike lanes on extension Realign sidewalks on extension Reclassify from Major Collector to 4-lane Minor Arterial and realign at North Dowling Road to become through movement. None Change # Map Book Page # Thoroughfare Extent Bicycle Master Plan Pedestrian Master Plan Proposed Thoroughfare Change Description BPG Board Meeting None None Add multi-use path to realigned section Add future grade separation None None Add existing grade separation Add future grade separation at Raymond Stotzer Parkway and multi-use path from SH 47 to North Dowling extension and then bike route beyond to existing Hopes Creek Road. Bicycle, Pedestrian and Greenway Master Plan Proposed Changes # From To Change # Map Book Page # Thoroughfare Extent Bicycle Master Plan Pedestrian Master Plan Proposed Thoroughfare Change Description BPG Board Meeting 9b 7,13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Luther Street West. 9c 13 North Dowling Road extension Luther Street West extension Future Western Arterial Loop Add bike facilities on extension to Future Western Arterial loop Add sidewalks on extension to Future Western Arterial loop Reclassify from Major Collector to 4-lane Minor Arterial, realign at Luther Street West for it to become through movement instead, and add extension at existing 90 degree curve to Future Western Arterial Loop. Oct-17 10a 4,10 SH 30 William D. Fitch Parkway (future realignment) Future Eastern Freeway loop Remove bike route None Reclassify from 4-lane Major Arterial to 6-lane Major Arterial. 10b 10 SH 30 Future Eastern Freeway loop Navasota River Remove bike route None Reclassify from 4-lane Major Arterial to Freeway/Expressway. 11 11,12 Lightsey Lane extension Raymond Stotzer Parkway Bryan City limits Reclassify from 4-lane Minor Arterial to Minor Collector as future Minor Arterial not shown on MPO Concept. 12a 13 Jones Butler Road extension Harvey Mitchell Parkway Holleman Drive South Add bike lanes Add sidewalks Add as future 4-lane Minor Arterial.Oct-17 12b 13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Jones Butler Road.Oct-17 13 13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Holleman Drive South. 14a 19 Blue Ridge Drive North Dowling Road Brazos River Add bike route on realigned section to Hopes Creek Road/Future Western Freeway Loop None Reclassify from Minor Collector to 4-lane Major Arterial, realign portion at curve to extend to Hope Creek Road and Brazos River.Oct-17 14b 13,14 Rock Prairie Road West North Dowling Road Wellborn Road Reclassify from Major Collector to 4-lane Major Arterial. 14c 13,14 Rock Prairie Road Wellborn Road Longmire Drive Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial. 14d 14 Future Grade Separation Add future grade separation at Wellborn Road and Rock Prairie Road. 15a 14 William D. Fitch Parkway extension Wellborn Road Rock Prairie Road West Add bike lanes Add sidewalks Add 4-lane Major Arterial to connect Rock Prairie Road West to future grade separation at Wellborn Road and William D. Fitch Pkwy.Oct-17 15b 14 Towers Parkway extension Rock Prairie Road West I&GN Road Remove bike lanes as roadway is removed Remove sidewalks as roadway is removed Remove future Minor Collector in conflict with proposed 4-lane Major Arterial extension including portion on existing manufactured home park.Oct-17 16 15,16,17 Rock Prairie Road Bradley Drive Peach Creek Road Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial. 17a 22 Pebble Creek Parkway and extension William D. Fitch Parkway SH 6 at Peach Creek Realign bike route and change to bike lanes from Pebble Creek subdivision to Future Minor Arterial to south. Realign sidewalks Reclassify from Major Collector to 4-lane Minor Arterial and realign past future 4- lane Minor Arterial to extend through to SH 6 overpass north of Peach Creek. 17b 22 Existing Grade Separation Add existing grade separation at SH 6 and Pebble Creek Pkwy extension south of Texas World Speedway. 18 15,21, 24, 25 Arrington Road and extension William D. Fitch Parkway Wellborn Road Reclassify from Major Collector to 4-lane Minor Arterial. 19a 16,22 Southern Pointe Parkway extension SH 6 Rock Prairie Road Realign bike lanes Realign sidewalks Extend 4-lane Minor Arterial east of Pipeline Road to Rock Prairie Road and replace future Major Collector east of Lick Creek Park. 19b 22 Pipeline Road extension Southern Pointe Parkway Future Minor Arterial extension Remove bike lanes as roadway is removed Remove sidewalks as roadway is removed Remove future Minor Collector north of Southern Pointe Parkway due to reconfiguration of Pebble Creek Parkway extension. Add future grade separation None Add future grade separation None Add future grade separation None None Add future grade separation None Add future grade separation From To Change # Map Book Page # Thoroughfare Extent Bicycle Master Plan Pedestrian Master Plan Proposed Thoroughfare Change Description BPG Board Meeting 20a 16,22 Future Minor Arterial SH 6 Pebble Creek Pkwy extension Realign bike lanes Realign sidewalks Realign to intersect Pebble Creek Parkway extension instead of extending further east to Peach Creek Road. 20b 16,22 Future Major Collector Pebble Creek Parkway extension Southern Pointe Pkwy extension Realign bike lanes Realign sidewalks Realign future Major Collector to continue Future Minor Arterial east of Pebble Creek Parkway extension and extend to Southern Pointe Parkway extension at future Minor Collector to east. 20c 16,22 Future Major Collector Future Minor Arterial Future Major Collector Remove bike lanes as roadway is removed Remove sidewalks as roadway is removed Remove future Major Collector due to reconfiguration of Pebble Creek Parkway and Southern Pointe Parkway extensions. 21a 20, 23 Royder Road extension Existing Royder Road Brazos River Change bike route to bike lanes from Wellborn Road to Future Minor Collector, Realign bike lanes east of Wellborn Road Add sidewalks from Wellborn Road to Future Minor Collector, Realign sidewalks east of Wellborn Road Reclassify Major Collector to 4-lane Minor Arterial, realign from planned railroad crossing at Greens Prairie Road to realignment of Royder Road at Wellborn Road and extend roadway to Brazos River. Area part of South College Station study with Wellborn community participants. 21b 20 South Dowling Road and realignment I&GN Road Royder Road extension Change bike route to bike lanes and realign Add sidewalks to realigned section Reclassify from Major Collector to Minor Collector and extend to Royder Road extension. Area part of South College Station study with Wellborn community participants. 21c 20 Koppe Bridge Road I&GN Road Wellborn Road Remove bike route None Remove as Minor Collector due to realignment of Royder Road extension. 22 20 Capstone Drive Wellborn Road I&GN Road Realign bike lanes Realign sidewalks Reclassify from Major Collector to 4-lane Minor Arterial and adjust alignment to Barron Road at Wellborn Road. 23 24 I&GN Road/Straub Road/Stousland Road and extension Koppe Bridge Road Future Minor Arterial Realign bike route at I&GN Road and Straub Road None Reclassify from Minor Collector to 4-lane Minor Arterial, realign at Straub Road to become through movement, and extend west of Saddle Creek subdivision to future Minor Arterial to the south. 24 20,24 Greens Prairie Trail extension I&GN Road Future Western Arterial Loop Add future 4-lane Minor Arterial to extend Greens Prairie Trail to the west. 25a 21 WS Phillips Parkway extension Greens Prairie Road Indian Lakes Drive Realign bike lanes Realign sidewalks Realign to Mesa Verde Drive via Indian Lakes Drive and reconfigure Indian Lakes Drive/Mesa Verde Drive intersection.Oct-17 25b 21 Future Minor Collector Arrington Road Castlegate Drive extension Remove bike route as roadway is removed None Remove future Minor Collector from Windham tract due to reduced spacing between WS Phillips Parkway extension and other realigned future Minor Collectors.Oct-17 25c 21,25 Future Minor Collector Mesa Verde Drive Millican Reserve Minor Arterial Remove bike route as roadway is removed None Remove Minor Collector due to reconfiguration of WS Phillips Parkway/Mesa Verde Drive realignment and existing topography. 26a 21 Chaco Canyon Drive Mesa Verde Drive Indian Lakes Drive Reclassify from 4-lane Minor Arterial to Minor Collector as constructed as not shown on MPO Concept and realign to existing roadway. 26b 21,26 Future Minor Collector Chaco Canyon Drive Indian Lakes Drive Remove future Minor Collector as not shown on MPO Concept and not able to extend through Indian Lakes subdivision. 27a 22,26, 28 Future Minor Arterial SH 6 Indian Lakes Drive extension Add future 4-lane Minor Arterial from existing SH 6 grade separation north of Peach Creek to Indian Lakes Drive and extend to Future Western Freeway Loop at grade separation near Brazos River. 28 25,26, 29 High Prairie Road extension Wellborn Road FM 159 Realign bike route None Realign future 4-lane Minor Arterial to FM 159 similar to thoroughfare in Peach Creek Master Plan (Millican Reserve). 29a 26,27, 28,29, 30 Future Western Freeway Loop SH 6 Brazos River Reclassify future western loop from 6-lane Major Arterial to Freeway/ Expressway, remove proposed Minor Collector on FM 159 to accommodate alignment, realign north of Millican community, and extend to Brazos River. 29b 26,27 Existing Grade Separation Add existing grade separation at SH 6 and FM 159. 29c 26 Future Grade Separation Add future grade separation at Future Western Freeway loop and Royder Road extension. None None None None Add multi-use path from SH 6 to Royder Road extension Add existing grade separation Add future grade separation From To Change # Map Book Page # Thoroughfare Extent Bicycle Master Plan Pedestrian Master Plan Proposed Thoroughfare Change Description BPG Board Meeting 29d 26,30 Future Minor Arterial Royder Road extension Future Western Arterial Loop Reclassify future 4-lane Minor Arterial to Minor Collector due to alignment of Future Western Freeway loop. 29e 27 Future Minor Collector Future Western Freeway Loop Royder Road extension Remove future Minor Collector to intersect future Major Collector extension due to Future Western Arterial loop realignment. 29f 27 Future Minor Collector Future Western Freeway Loop Royder Road extension Realign future Minor Collector to intersect future Major Collector extension due to Future Western Arterial loop realignment. 29g 28 Future Grade Separation Add future grade separation at Future Western Freeway loop and Future Minor Arterial near Brazos River. 29h 29 Future Grade Separation Add future grade separation at Future Western Freeway loop and Future Western Arterial loop. 29i 29 Future Minor Collector High Prairie Road extension Future Western Freeway Loop Realign future Minor Collector to continue roadway and intersect Future Western Freeway loop. 29j 30 Future Grade Separation Add future grade separation at Future Western Freeway loop and Wellborn Road. 30 27 Existing Grade Separation Add existing grade separation on SH 6 between FM 159 and Westward Ho overpasses. 31a 27 Existing Grade Separation Add existing grade separation at SH 6 and Westward Ho. 31b 27 Royder Road south extension Future Western Freeway Loop SH 6 Add bike route from Future Eastern Freeway Loop to existing bike route None Realign Future 4-lane Minor Arterial to existing SH 6 grade separation at Westward Ho. None None None None None None None None None B I C Y C L E M A S T E R P L A NB I C Y C L E M A S T E R P L A NM A P B O O KM A P B O O K N O V E M B E R 2 0 1 7N O V E M B E R 2 0 1 7 [DRAFT] 51234 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ¹ 0 5 102.5 Miles Bicycle Master Plan Locator Map !!!!!!!!! !! ! !!!! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!SPEARMA N DRHSC PWGE N E R A L P W I & GN RDPEACHCREEKRDM ESA VERDEVICTORIAAVWALNUTRD SADDL E CREEK D R H A R PER'SFERRYRD IN DIANLAKESDR H OPES CR EEKRDSTOUSLANDRDSTRAUB RDTIMBERLINEDRKOPPEBRIDGERD BIRDPONDRDCHEROKEEDRLONESTARLN TEX A S A V SGEORGEBUSHDRTEX A S A V W E L L B O R N R D E 29TH ST WELSHAV WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHW ESTPWNH AR V E Y MITCHELLPW HARVEY RDWVILLAMARIARDS MA IN STTARRO WST ROCKPRAIRIERD FM 2 1 5 4HOLLEMANDREANDERSONSTLEONARD RDSOUTHWESTPWEGROESBECKSTE A RL R U D D E R F WSWSH21BRIARCREST DRSH 6 S S C O LLE G E A V RAYMOND STOTZER PWN EA RLRU D D ERF W GREENSPRAIRIERDWBOONVILLERD HARVEY MITC HELLPWS RIVERSIDEPW SH 30 FM158 S TE XASAV LINCOLNAVFINFEATHER RDCOUNTYROAD174ROESE C OU N T YROAD 192DEBBIECOUNTYROAD173 C O UN TY R O A D 40 1JOHNRICELANCASTERFM 3090COUNTYROAD175 COUN TYROAD 172 ST J OHNS FM 244COUNTY ROAD 190FM 60COUNTYROAD272FM 2 1 5 5 COUNTY ROAD268COUNTYROAD269LUKEBUSHCOUNTYROAD295 COUNTY ROAD 277FM 5 0 REVEILLE ¹ 0 5 102.5 Miles Existing Bicycle Master Plan Multi-use Path ProposedMulti-use Path Funded! ! ! Multi-use Path Existing Grade Separation Proposed Grade Separation Funded Grade Separation Existing !!!!Bike Lane Existing ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed !!!!!!!!! !! ! !!!! ! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!SPEARMA N DRHSC PWI & G N RD PEACHCREEKRDM ESA VERDEVICTORIAAVWALNUTRD SADDL E CREEK D R H A R PER'SFERRYRD INDIA N LAKESDR H OP ES CR E EKRDSTOUSLANDRDSTRAUB RDTIMBERLINEDRKOPPEBRIDGERD BIRDPONDRDCHEROKEEDRLONESTARLN TEX A S A V SGEORGEBUSHDRTEX A S A V W E L L B O R N R D E 29TH ST WELSHAV WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHW ESTPWNH AR V E Y MITCHELLPW HARVEY RDWVILLAMARIARDS MA IN STTARRO WST ROCKPRAIRIERD FM 2 1 5 4HOLLEMANDREANDERSONSTLEONARD RDSOUTHWESTPWEGROESBECKSTE A RL R U D D E R F WSWSH21BRIARCREST DRSH 6 S S C O LLE G E A V RAYMOND STOTZER PWN EA RLRU D D ERF W GREENSPRAIRIERDWBOONVILLERD HARVEY MITC HELLPWS RIVERSIDEPW SH 30 FM158 S TE XASAV LINCOLNAVFINFEATHER RDCOUNTYROAD174ROESE C OU N T YROAD 192DEBBIECOUNTYROAD173 C O UN TY R O A D 40 1JOHNRICELANCASTERFM 3090COUNTYROAD175 COUN TYROAD 172 ST J OHNS FM 244COUNTY ROAD 190FM 60COUNTYROAD272FM 2 1 5 5 COUNTY ROAD268COUNTYROAD269LUKEBUSHCOUNTYROAD295 COUNTY ROAD 277FM 5 0 REVEILLE ¹ 0 5 102.5 Miles Proposed Bicycle Master Plan Multi-use Path ProposedMulti-use Path Funded! ! ! Multi-use Path Existing Grade Separation Proposed Grade Separation Funded Grade Separation Existing !!!!Bike Lane Existing ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed !( E 25 T H S T SPRING LOOAK HILL DRMU N S O N A V BAR A K L N FRANCIS DRWALTON DRN ROSEMARY DRHENSELDR UNIVERSITY DRE 2 9 TH S T TEX A S A V S TE X A S A VE VILLA MARIA RDC A V I T T A V UNIVERSITY D R EBRIARCRESTDR S C OLLEGEAV N E A R L R U D D E R F W LINCOLN AVTARROWST1a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 1 of 30 See Page See Page See Page 2!( E 25 T H S T SPRING LOOAK HILL DRMU N S O N A V BAR A K L N FRANCIS DRWALTON DRN ROSEMARY DRHENSELDR UNIVERSITY DRE 2 9 TH S T TEX A S A V S TE X A S A VE VILLA MARIA RDC A V I T T A V UNIVERSITY D R EBRIARCRESTDRS C OLLEGEAV N E A R L R U D D E R F W LINCOLN AVTARROWST1a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 7Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(DOMINIK DRCOPPERFIELD DRLIN D A L NUNIVERSITYDRE SH 30 EARLRUD DER F W S HARVEY RDBOONVILLERD FM158 FUTURELINDA LN 2 3 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 2 of 30 See Page See Page 1See Page 3!( !(DOMINIK DRCOPPERFIELD DRLIN D A L NUNIVERSITYDRE SH 30 EARLRUD DER F W S HARVEY RDBOONVILLERD FM158 FUTURELINDA LN 2 3 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 8Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !(BIRDPONDRDSH 30 FU T U R E L I N D A L N 3a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 3 of 30 See Page See Page 2See Page 4!(BIRDPONDRDSH 30 FU T U R E L I N D A L N 3a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 9Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( SH30 4a 10a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 4 of 30 See Page See Page 3See Page 5!( !( !( SH30 FUTUREEASTERNFREEWAYLOOP4a 10a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 10Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(GRIMES COUNTY G R I M E S C O U N T Y PEACHCREEKRDSH 3 0 COUNTYROAD174LANCASTERYERBY C O U NTYROAD185 ROESE GILPIN JUBILEECOUNT YROAD 15 7COUNTYROAD121 COUNTY ROAD166 F M 39 LONG OAKDEBBIEC O UNTYROAD165FM 2 4 4JOHNRICECOUNTY ROAD 164COUNTYR O A D 175FM 3090COUNTYROAD172COUNTYROAD19 0 F U TURE ROCK PRAIRIERD4 4 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 !( !(GRIMES COUNTY G R I M E S C O U N T Y PEACHCREEKRDSH30 COUNTYROAD174LANCASTERYERBY C O UNTYROAD185 ROESE GILPIN J UBILEE COUNT YROAD 15 7 C OU NT Y ROA D 1 21COUNTY ROAD16 6 F M 39 LONG OAKC O UNTYROAD165FM 2 4 4JOHNRICECOUNTY ROAD 164COUNTYRO A D 175FM 3090COUNTYROAD172COUNTYROAD190FUTURE ROCK PRAIRIERD4 4 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed See Page See Page 4See PageSee Page B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( Page 5 of 30 !!!!!!!!!!!!!!( !( !(F & B RDHSCPWTURKEY CREEK RDWVILLAMARIARDHARVEY MITCHELLP W S RAYMOND STOTZER PWWE L L B O R N R D RIVERSIDEPW NHARVEYMITCHELLPW7a 7c 8 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 6 of 30 See Page See Page See Page 7! !!!!!!!!!!!!!( !( !(F & B RDHSCPWTURKEY CREEK RDWVILLAMARIARDHARVEY MITCHELLP W S RAYMOND STOTZER PWWE L L B O R N R D RIVERSIDEPW NHARVEYMITCHELLPW7a 7c 8 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 12Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!!!!( !(!( !(F & B RDDEXT E R D R NU E C E S D R TIM B E R S T DE X T E R D R S FRANCIS DRDOMINIK DRMU N S O N A V GLADEST WALTON DR LUTHER ST WHENSELDR W ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX A S A V WEL L B O R N R DUNIVERSITY DRLINCOLN AVHOLLEMAN DRCO L L E G E A V SOUTHWEST PWTEX A S A V S WELLB ORN R D N HARVEY RDHAR V E Y M I T C H E L L P W S ANDERSONST SCOLLEGEAV GEORGE BUSH DR WHOLLEMANDRW1a 9b 12b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 7 of 30 See Page 1 See Page 6See Page 8!!!!!!!!!!!!!!!!!( !(!(F & B RDDEXT E R D R NU E C E S D R TIM B E R S T DE X T E R D R S FRANCIS DRDOMINIK DRMU N S O N A V GLADEST WALTON DR LUTHER ST WHENSELDR W ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX A S A V WEL L B O R N R DUNIVERSITY DRLINCOLN AVHOLLEMAN DRCO L L E G E A V SOUTHWEST PW TEX A S A V S WELLBORN R D N HARVEY RDHAR V E Y M I T C H E L L P W S ANDERSONST SCOLLEGEAV GEORGE BUSH DR WHOLLEMANDRW 1a 9b 12b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 13Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( GLADE S T NU E C E S D RDOMINIK DRCOLGATE DRMU N S O N A V LONG M I R E D RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDRE M ER A LDPWCORSAIRDRW E L S H A V TEX A S A V S SOUTHWESTPWHARVEY RDSH6 SHOLLEMANDREANDERSONSTDARTMOU T H S T SOUTHWEST PW EE A R L R U D D E R F W S R OCK PRAIRIE RDHARVEYMITCHELLPWS9a 8 9b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 8 of 30 See Page 2 See Page 7See Page 9!( !( !( GLADE ST NU E C E S D RDOMINIK DRCOLGATE DRMU N S O N A V LONG M I R E D RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDRE M ERA LDPWCORSAIRDRW E L S H A V TEX A S A V S SOUTHWESTPWHARVEY RDS H 6 SHOLLEMANDREANDERSONSTDARTMOU T H S T SOUTHWEST PW EE A R L R U D D E R F W S R OCK PRAIRIE RDHARVEYMITCHELLPWS9a 8 9b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 14Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(BIRD POND RDFUTURELINDA LN 3a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 9 of 30 See Page 3 See Page 8See Page 10!( !(BIRD POND RDFUTURELINDA LN 3a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 15Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( !( SH 3 0 WILLIAM D FITCH PWFUT U R E L I N D A L N 4a 4b 10a 10b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 10 of 30 See Page 4 See Page 9See Page 5!( !( !( !( !( SH 3 0 WILLIAMDFITCHPWFUT U R E L I N D A L N FUTUREEASTERNFREEWAYLOOP4a 4b 10a 10b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 16Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 11 of 30 See Page See Page See Page 12BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( HSC P W RAYMONDSTOTZERPWRIVERSIDEPW FUTURE W EST ERN FREEWAYLOOP 7c 8 8 9c ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 12 of 30 See Page 6 See Page 11See Page 13!( !( !( !( HSC P W RAYMONDSTOTZERPWRIVERSIDEPW FUTURE WESTERNFREEWAY L O O P 7c 8 8 9c ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!! !( !(!( !( !( !( !( !( !( !( NU E C E S D R DOWLING RDLUTHER ST WHOL L EMAN D R S N D O W L I N G R D ROCK PRAIRIE R D W TOWERSPW NGRAHAMRDGE N E R A L P WDEACON DR WBLUERIDGEDRI & GN RDGREATOAKSDRHOPESCREEKRDWA L N U T R D HOLLEMA N D R SHOLLEMANDRW WELSHAV W E L L B O R N R DSOUTHWEST PWFM 2 1 5 4 HARVEY MITCHELL PWS 9b 11 13 12 9a 9c 13 12b 12a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 13 of 30 See Page 7 See Page 12See Page 14!!!!!!!!!!!!!!! !( !(!( !( !( !( !( !( !( !( NUE C E S D R DOWLING RDLUTHER ST WHOL L EMAN D R S N D O W L I N G R D ROCK PRAIRIE R D W T OWERSPW NGRAHAMRDGE N E R A L P WDEACONDRW BLUERIDGEDRI & GN RDGREATOAKSDRHOPESCREEKRDWA L N U T R D HOLLEMANDRWHOLLEMA N D R S WELSHAV W E L L B O R N R DSOUTHWEST PWFM 2 1 5 4 HARVEY MITCHELLPWS 9b 11 13 12 9a 9c 13 12b 12a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 19Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!! ! ! ! ! ! ! ! !!!!!!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!! !( !( !( !( !( !( !(GRAHAM RDBROTHERS BLLO N G M IR E D RLAKEW A Y DR GE N E R A L P W NGRAHAMRDI & GN R D NE W P O R T L N VICTORIAAVDEACON DRW ELS H AV BARRON RDWILLIAM D FIT CH PW FM 2 1 5 4 RO CKPRAIRIER DHARVEYMITCHELLPWS S H 6 S 15b 14d 16c 16a 15a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 14 of 30 See Page 8 See Page 13See Page 15!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!! ! ! ! ! ! ! ! !!!!!!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!! !( !( !( !( !( !( !(GRAHAM RDBROTHERS BLLO N G M IR E D RLAKEW A Y DR GE N E R A L P W N GRAHAM RDI & GN RD NE W P O R T L N VICTORIAAVDEACON DRW ELS H AV BARRON RDWILLIAM D FITCH PW FM 2 1 5 4 RO CKPRAIRIER DHARVEYMITCHELLPWS S H 6 S 15b 14d 16c 16a 15a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 20Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!! ! ! ! ! ! ! ! !!!!!!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!( !( !( ROC K P R A I R I E R D SPEARMAN D RBIRDPONDRDSTANDREW S D R ALEXAND R IAAVPARKVIEW DRARRINGTO N RDHU N T E R C R E E K D R PE B B L E C R E E K P W LAKEW AY DR WILLIAM D FITCH PWROCKPRAIRIERD SH 6 S 18b 18c 21 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 15 of 30 See Page 9 See Page 14See Page 16!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!! ! ! ! ! ! ! ! !!!!!!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!( !( !( ROC K P R A I R I E R D SPEARMAN D RBIRDPONDRDSTANDREW S D R ALEXANDR IA AVPARKVIEW DRARRINGTO N RDHU N T E R C R E E K D R PE B B L E C R E E K P W LAKEW AY DR WILLIAM D FITCH PWROCKPRAIRIERD SH 6 S 18b 18c 21 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 21Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !(!( !(!( !( ROCKPRAIRIERD PE B B L E C R E E K P W S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE ROCKPRAIRIE RD 19a 20b 20c20a 17a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 16 of 30 See Page 10 See Page 15See Page 17!( !( !(!( !(!( !( ROCK PRAIRIERD PE B B L E C R E E K P W S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE ROCKPRAIRIE RD F UT UREEASTERN F RE E WA Y L OOP 19a 20b 20c20a 17a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 22Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !(GRIMES COUNTYGRIME S C O U N T Y GRIMES COUNTYFUTUREROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOPLONE STAR LN 4 5c 5a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 17 of 30 See Page 5 See Page 16See Page 5!( !( !(GRIMES COUNTYGRIME S C O U N T Y GRIMES COUNTYFUTUREROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOPLONE STAR LN 4 5c 5a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!BURLESONCOUNTYBURLESO N COUNTYBURLESONCOUNTYKO P P E BRIDGERD WALN UTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268 COUNTY ROAD 443FM60FM2155 FM 1361 FM 5 0 FM 1 6 6 COUNTY ROAD 201COUNTYROAD 270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F M 2039 COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE COUNTY ROAD295FUTUR E WESTERNFREEWAYLOO P ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 18 of 30 See Page 11 See Page See Page 23!!!!BURLESONCOUNTYBURLES O N COUNTYBURLESONCOUNTYWALNUTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268 COUNTY ROAD 443FM60F M 2 1 5 5 FM 1361 FM 5 0 FM 1 6 6 COUNTY ROAD 201C OUNTYROAD270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F M 2039 COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE COUNTY ROAD295FUTURE ROYDER RDFUTUREWEST ERNFREE WA Y L O OP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !(BURLESON COUNTYBU RLESONCOUNTYN D O W L I N G R D S DOW L ING RDN GRAHAM RDI & GN RD HOP E S C REEKRDBLUERIDGEDRH U N TE R ' S CR EE K R D TIMBERLINEDRFUTUREWE S T E R NFREEWAYLOOP14a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 19 of 30 See Page 13 See Page 18See Page 20!(BURLESON COUNTYB U RLESONCOUNTYN D O W L I N G R D S DOWL ING RDN GRAHAM RDI & GN RD HOP E S CREEKRDBLUERIDGEDRH U N TE R ' S CR EE K R D TIMBERLINEDRFUTUREROYDERRDFUTUREWE S T E RNFREEWAYLOOP14a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 23Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! !!!!!!!!!!!!!!!( !( !(!( !( !(GREENS PRAIRIE TRETONBURYAVVICTORIAAV ROYDERRD I & GNRD WOODLAKEDR FRIERSONRDKOPPE BRIDGE RDCALUMETTR GREENSPRAIRIE RDWWILLIAMD FITCH PW FM 2154BARRON RDCAPSTONE DR 22 21b 21a 21c 24e 23 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 20 of 30 See Page 14 See Page 19See Page 21!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! !!!!!!!!!!!!!!!!!( !( !(!( !( !(GREENS PRAIRIE TRETONBURYAVVICTORIAAV ROYDERRD I& G NRD WOODLAKEDR FRIERSONRDKOPPE BRIDGE RDCALUMETTR GREENSPRAIRIE RDWWILLIAMD FITCH PW FM 2154BARRON RDCAPSTONE DR FUTUREROYDERRD22 21b 21a 21c 24e 23 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 24Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!( !( !( !( !( !( STANDREWS D R INDIANLAKESDR M ESA V ER D EH A R P E R'SF ER RY RDARRINGTONRD L AKE WAYDR WOODLAKEDR CAL U M E T T R WILL IAM D FITC H P W GREENSPRAIRIERDWSH 6 S FU T U R E W S P H I L L I P S P W 21 26 25c 25a 25b 25 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 21 of 30 See Page 15 See Page 20See Page 22!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!( !( !( !( !( !( STANDREWS D R INDIANLAKESDR M ESA V ER D EH A R P E R'SFE RRY RD ARRINGTON RDL AKE WAYDR WOODLAKEDR CA L U M E T T R W ILLIAM D FITC H P W GREENSPRAIRIERDWSH 6 S FU T U R E W S P H I L L I P S P W 21 26 25c 25a 25b 25 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 25Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !(!(!( !( !( !( !( !( !( !( !(PEACHCREEKRDS T A NDREWSDRINDIANLAKESDR PEACH CREEK CUT-OFF RD CHEROKEE DRLONESTARLNSH 6 S FUTUREEASTERNFREEWAYLOOP20b 20c20a 26 19b 27 5a 27a 17b 19a 17a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 22 of 30 See Page 16 See Page 21See Page 17!(!(!( !( !( !( !( !( !( !( !(PEACHCREEKRDS T A NDREWSDRINDIANLAKESDR PEACH CREEK CUT-OFF RD CHEROKEE DRLONE STAR LNSH 6 S FUTUREEASTERNFREEWAYLOOP20b 20c20a 26 19b 27 5a 27a 17b 19a 17a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 26Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BU RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO PES C R E E K R D COUNTY ROAD 277F U T U R E WESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 23 of 30 See Page 19 See Page 18See Page 24B U RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO PES C R E E K R D COUNTY ROAD 277FUTURE ROYDER RDF U T U R EWESTERNFREEWAYLOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !(!( I & GN RD SADDLECREEK D R RO Y D E R R D DY M P L E L NKOPPEBRIDGERD THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2 1 5 4 FUTUREWESTERNFREEWAYLOOP 28a 23 28d 28c ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 24 of 30 See Page 20 See Page 23See Page 25!( !( !(!( I & GN RD SADDLECREEK D R RO Y D E R R D DY M P L E L NKOPPEBRIDGERD THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2 1 5 4 FUTUREWESTERNFREEWAYLOOP 28a 23 28d 28c ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 28Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(HIGH PRAIRIE RDINDIA NLAKESDR FM 2 1 5 4 FUTUREROYDERRD 25c 28 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 25 of 30 See Page 21 See Page 24See Page 26!( !(HIGH PRAIRIE RDINDIA NLAKESDR FM 2 1 5 4 FU T U R E R O Y D E R R D 25c 28 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 29Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( !( !( INDIANLAKESDR PEACHCREEKRDCHEROKEE DRFM 2154 SH 6 S FUTUREEASTERNFREEWAYLOOPFUTUREROYDERRD 27a 28 29b 29c 29a 31b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 26 of 30 See Page 22 See Page 25See Page 27!( !( !( !( !( !( INDIANLAKESDR PEACHCREEKRDCHEROKEE DRFM 2154 SH 6 S FUTURE ROYD E R R DFUTUREEASTERNFREEWAYLOOP27a 28 29b 29c 29a 31b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 30Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( GRI M E S C O U N T Y PEACHCREEKRDSH6S FM 2 1 5 4 FUTURE ROYDER RD29b 29a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 27 of 30 See Page See Page 26See Page !( !( GRI M E S C O U N T Y PEACHCREEKRDSH6S FM 2 1 5 4 FUTUREROYDERRD 29b 29a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESON COUNTYBURLESON COUNTYSTOUSLAND RDCOUNTYR O A D 443 FUTUREWESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 28 of 30 See Page 24 See Page 18See Page 29BURLESON COUNTYBURLESON COUNTYSTOUSLAND RDCOUNTYR O A D 443 FUTURE WESTERNFREEWAYLOOP FUTURE EASTERN FREEWAY LOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( HIGH PRAIRIE RDFM 2154 FUTUREWESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 29 of 30 See Page 25 See Page 28See Page 30HIGH PRAIRIE RDFM 2154 F U T U R E E A S T E R N F R E E W AY L O O P FUTUREWESTERNFREEWAYLOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( FM 159FM 2154 FUTURE ROYDER RD F U T U RE W E S T E R N F R E EW AYLOOP¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 30 of 30 See Page 26 See Page 29See Page 27FM 159FM 2154 FUTURE ROY D E R R D F U T U R E E A S T E R N FREEW AYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page Bike Lane Existing ! ! ! !Bike Lane Funded Bike Lane Proposed Bike Route Existing Bike Route Proposed B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing ! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( P E D E S T R I A N M A S T E R P L A NP E D E S T R I A N M A S T E R P L A NM A P B O O KM A P B O O K N O V E M B E R 2 0 1 7N O V E M B E R 2 0 1 7 [DRAFT] 51234 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ¹ 0 5 102.5 Miles Pedestrian Master Plan Locator Map PE B B L E C R E E K P W SPEARM A NDRHS C P WGE N E R A L P W I &GNRD PEACHCREEKRDM E SA VERDEVICTORIAAVHARPER'SFERRYRD INDIA N LAKESDR P EACH CREEK CUT-OFF RD DY M P L E L N WA L N U T R D H OPES CRE E KRDSTRAUBRD TI M B ERLIN EDRKOPPEBRIDGERDBIRDPONDRDCHEROKEEDRLONESTARLN TEX A S A V S GEORGEBUSHDRTEXASAV WEL L B O R N R DUNIVERSITY DRE 29TH ST WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHWESTPWNHAR V E Y MITCHELLPW HARVEYRDW VILLA MARIA RDTARROWST ROCK PRAIRIERDHOLLEMANDREC A VITTAV ANDERSONSTLEONARD RDDARTMOUTHSTGROESBECKST E A RL R U DDE RFWSW SH 21BRIARCREST DREVILLAMARIARDFM 2154 S C O L L E G E A VS MA IN STRAYMOND STOTZER PWN E A R L R U D D E R F W GEORGEBUSHDRWGREENSPRAIRIERDWBOONVILLERD H AR V E Y MITCHELLPW S RIVERSIDEPW SH 30 FM158 SH 6 SLINCOLNAVS TE XASAVFINFEATHER RDROESE DEBBIECOUNTYROAD175JOHNRICELANC A S T ERKING OAKSST J OHNS FM60FM 5 0 COUNTY ROAD 269REVEILLEPRIVATER OAD4048PRIVATEROAD4007¹ 0 5 102.5 Miles Existing Pedestrian Master Plan Multi-use Path ExistingMulti-use Path Funded Multi-use Path Proposed Grade Separation Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides !!!! PEBBLECREEKP W SPEARMA N DRH SC PWI & GN RDPEACHCREEKRDM E SA VERDEVICTORIAAV SADDLE CREEKDR H A RPER'SFERRYRD IN DIANLAKESDR STOUSLANDRDPEACH CREEK CUT-OFF RD DY M P L E L N WA L N U T R D H O PES CRE E KRDSTRAUBRD TIM B ERLI N EDRKOPPEBRIDGERDBIRDPONDRDCHEROKEEDRLONESTARLN TEX A S A V SGEORGEBUSHDRTEXASAV W E L L B O R N R DUNIVERSITY DRE 2 9T HS T WELSH AV WILLIAM D FITCH PWB R IARCRESTDRHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHWESTPW NHARVEYMITCHELLPW HARVEYRDWVILLAMARIARDTARROWST ROCKPRAIRIERDHOLLEMANDREC AVITT AV ANDERSONSTLEONARD RDDARTMOUTH ST E A RL R U DDERFWSEVILLAMARIARDGROESBECKSTFM 2 1 5 4 S C O L L E G E A V RAYMOND STOTZER PWWSH21N E A R L R U D D E R F W GEORGEBUSHDRWFINFEATHER RDGREENSPRAIRIERDWHA R VE Y MITCHELLP W S RIVERSIDEPW SH 30 FM158 SH6SLINCOLNAVS TE XASAV ROESE OWL TREE COUNTYROAD 175DEBBIE COUNTYROAD 173JOHNRICELANCASTERKINGOAKSST J OHNS CAJUN R IDGE COUNTY ROAD 190FM60FM 5 0 COUNTYROAD269REVEILLE PRIVATEROAD4007¹ 0 5 102.5 Miles Proposed Pedestrian Master Plan Multi-use Path ExistingMulti-use Path Funded Multi-use Path Proposed Grade Separation Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides !!!! !(!( E 25 T H S T SPRING LOOAK HILL DRMU N S O N A V BAR A K L N FRANCIS DRWALTON DRN ROSEMARY DRHENSE LDR UNIVERSITY DRE 2 9 TH S T TEX A S A V S TE X A S A VE VILLA MARIA RDC A V I T T A V UNIVERSITY D R EBRIARCRESTDR S C OLLEGEAV N E A R L R U D D E R F W LINCOLN AVTARROW ST1a 1b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 1 of 30 See Page See Page See Page 2!(!( E 25 T H S T SPRING LOOAK HILL DRMU N S O N A V BAR A K L N FRANCIS DRWALTON DRN ROSEMARY DRHENSE L DR UNIVERSITY DRE 2 9 TH S T TEX A S A V S TE X A S A VE VILLA MARIA RDC A V I T T A V UNIVERSITY D R EBRIARCRESTDRS C OLLEGEAV N E A R L R U D D E R F W LINCOLN AVTARROW ST1a 1b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 7P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(DOMINIK DRCOPPERFIELD DRLIN D A L NUNIVERSITYDRE SH 30 EARLRUD DER F W S HARVEY RDBOONVILLERD FM158 FUTURELINDA LN 2 3 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 2 of 30 See Page See Page 1See Page 3!( !(DOMINIK DRCOPPERFIELD DRLIN D A L NUNIVERSITYDRE SH 30 EARLRUD DER F W S HARVEY RDBOONVILLERD FM158 FUTURELINDA LN 2 3 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 8P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BIRDPONDRDSH 30 FU T U R E L I N D A L N ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 3 of 30 See Page See Page 2See Page 4BIRDPONDRDSH 30 FU T U R E L I N D A L N ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 9P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( SH30 4a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 4 of 30 See Page See Page 3See Page 5!( SH30 FUTUREEASTERNFREEWAYLOOP4a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 10P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(GRIMES COUNTY G R I M E S C O U N T Y PEACHCREEKRDLONESTAR LN SH6S SH 3 0 COUNTYROAD174LANCASTERROESE YER BYJUBILEECOUNTYROA D 166LONGOAK COUNTYROAD185 C OUNTYROAD165F M 2 44JOHNRICECOUNTYROAD175 FM 3090COUNT YROAD 172 COUNTYROAD190 5c 5a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 !( !(GRIMES COUNTY G R I M E S C O U N T Y PEACHCREEKRDLONESTAR LN SH6S SH 3 0 COUNTYROAD174LANCASTERROESE YERB YJU BILEEC O U N T Y R O A D 1 2 1 COUNTYROA D 16 6LONGOAK DEBBIECOUNTYROAD185 C OUNTYROAD165F M 2 44JOHNRICECOUNTYROAD175 FM 3090COUNT YROAD 172 COUNTYROAD190F UTURE ROCK PRAIRIERD5c 5a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page See Page 4See PageSee Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( Page 5 of 30 !( !( !(F & B RDHSC PWTURKEY CREEK RDWVILLAMARIARDHARVEY MITCHELLPW S WE L L B O R N R D RIVERSIDEPW RAYMOND STOTZER PWNHARVEYMITCHELLPW7a 7c 8 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 6 of 30 See Page See Page See Page 7!( !( !(F & B RDHSC PWTURKEY CREEK RDWVILLAMARIARDHARVEY MITCHELLPW S WE L L B O R N R D RIVERSIDEPW RAYMOND STOTZER PWNHARVEYMITCHELLPW7a 7c 8 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 12P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !(!( !(!( !(F & B RDDEXTE R D R NU E C E S D R TIM B E R S T DE X T E R D R S FRANCIS DRDOMINIK DRMU N S O N A V GLADEST WALTONDR LUTHER ST WHENSE L DR W ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX A S A V W E L L B O R N R DUNIVERSITYDR LINCOLN AVHOLLEMANDRCO L L E G E A V SOUTHWEST PWTEX A S A V S WELLB ORN R D N HARVEY RDHAR V E Y M I T C H E L L P W S ANDERSONST SCOLLEGEAV GEORGE BUSH DR WHOLLEMANDRW 1a 1b 9b 12b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 7 of 30 See Page 1 See Page 6See Page 8!(!( !(!(F & B RDDEXTE R D R NU E C E S D R TIM B E R S T DE X T E R D R S FRANCIS DRDOMINIK DRMU N S O N A V GLADEST WALTONDR LUTHER ST WHENSE LDR W ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX A S A V W E L L B O R N R DUNIVERSITY DRLINCOLN AVHOLLEMANDRCO L L E G E A V SOUTHWEST PWTEX A S A V S WELLBORN R D N HARVEY RDHAR V E Y M I T C H E L L P W S ANDERSONST SCOLLEGEAV GEORGE BUSH DR WHOLLEMANDRW1a 1b 9b 12b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 13P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( GLADE S T NU E C E S D RDOMINIK DRCOLGATE DRMU N S O N A V LONG M I R E D RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDREMERA LD PW CORSAIRDRW E L S H A V TEX A S A V SHARVEY RDSH6 SHOLLEMANDREAN D E R S O N S T DARTMOUTH STSOUTHWEST PW EE A R L R U D D E R F W S R OCK PRAIRIE RDHARVEYMITCHELLPWS9a 9b ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 8 of 30 See Page 2 See Page 7See Page 9!( !( GLADE S T NU E C E S D RDOMINIK DRCOLGATE DRMU N S O N A V LONG M I R E D RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDREMERA L D PW CORSAIRDRW E L S H A V TEX A S A V SHARVEY RDS H 6 SHOLLEMANDREAN D E R S O N S T DARTMOUTH STSOUTHWEST PW EE A R L R U D D E R F W S R O CK PRAIRIE RDHARVEYMITCHELLPWS9a 9b ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 14P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BIRD POND RDFUTURELINDA LN ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 9 of 30 See Page 3 See Page 8See Page 10BIRD POND RDFUTURELINDA LN ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 15P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( SH 3 0 WILLIAM D FITCH PWFUT U R E L I N D A L N 4a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 10 of 30 See Page 4 See Page 9See Page 5!( SH 3 0 WILLIAMDFITCHPWFUT U R E L I N D A L N FUTUREEASTERNFREEWAYLOOP4a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 16P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 11 of 30 See Page See Page See Page 12BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( HSC P W RAYMONDSTOTZERPWRIVERSIDEPW FUTURE W EST ERN FREEWAYLOOP 7c 8 8 9c ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 12 of 30 See Page 6 See Page 11See Page 13!( !( !( !( HSC P W RAYMONDSTOTZERPWRIVERSIDEPW FUTURE WESTERNFREEWAY L O O P 7c 8 8 9c ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(!( !( !( !( !( !( !( !( !( NU E C E S D R DOWLING RDLUTHER ST WHOL L EMAN D R S N D O W L I N G R D ROCK PRAI R I E R D W TOWERSPW NGRAHAMRDGENERALPW DEACON DR WBLUERIDGEDRI & GN RDGREATOAKSDRHOPESCREEKRDWA L N U T R D HOLLEMA N D RSHOLLEMANDRW WELSHAV W E L L B O R N R DSOUTHWEST PWFM 2 1 5 4 HARVEYMITCHELLPWS 9b 11 13 14 12 9a 9c 13 12b 12a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 13 of 30 See Page 7 See Page 12See Page 14!( !(!( !( !( !( !( !( !( !( !( NU E C E S D R DOWLING RDLUTHER ST WHOL L EMAN D R S N D O W L I N G R D ROCKPRAI RI E R D W TOWERSPW NGRAHAMRDGENERALPW DEACON DR WBLUERIDGEDRI & GN RD GREA T OAK S DRHOPESCREEKRDWA L N U T R D HOLLEMANDRWHOLLEMA N D RS WELSHAV W E L L B O R N R DSOUTHWEST PWFM 2 1 5 4 HARVEY MITCHELLPWS 9b 11 13 14 12 9a 9c 13 12b 12a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 19P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( !( !( !(!(GRAHAM RDBROTHERS BLLO N G M IR E D RLAKEW A Y DR GE N E R A L P W NGRAHAMRDI & GN R D NE W P O R T L NDEACON DRWELSH AV BARRON RDWILLIAM D FIT CH PWFM 2154ROCK PRAIRIE RDHARVEYM ITCHELLPWSS H 6 S 15b 14d 16a 15a 16b16c ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 14 of 30 See Page 8 See Page 13See Page 15!( !( !( !( !( !( !(!(GRAHAM RDBROTHERS BLLO N G M IR E D RLAKEW A Y DR GE N E R A L P W N GRAHAM RDI & GN RD NE W P O R T L NDEACON DRWELSH AV BARRON RDWILLIAM D FITCH PW FM 2154ROCK PRAIRIE RDHARVEYMITCHELLPWSS H 6 S 15b 14d 16a 15a 16b16c ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 20P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( ROC K P R A I R I E R D S P E A RMANDRBIRDPONDRDSTANDREW S D R ALEXAN D RIAAVPARKVIEW DRARRINGTO N RDHU N T E R C R E E K D R PE B B L E C R E E K P W LAKEWAYDR W ILLIAM D FIT CH P W ROCKPRAIRIERD SH 6 S 18b 18c 21 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 15 of 30 See Page 9 See Page 14See Page 16!( !( !( ROC K P R A I R I E R D S P E A RMANDRBIRDPONDRDSTANDREW S D R ALEXAN D RIAAVPARKVIEW DRARRINGTO N RDHU N T E R C R E E K D R PE B B L E C R E E K P W LAKEWAYDR WILLIAM D FITCH P W ROCKPRAIRIERD SH 6 S 18b 18c 21 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 21P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !(!( !(!( ROCK PRAIRIE R D PE B B L E C R E E K P W S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE ROCKPRAIRIE RD 19a 20b 20c20a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 16 of 30 See Page 10 See Page 15See Page 17!( !( !(!( !(!( ROCK PRAIRIE R D PE B B L E C R E E K P W S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE ROCKPRAIRIE RD F UT UREEASTERN F RE E WA Y L OOP 19a 20b 20c20a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 22P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !(GRIMES COUNTYGRIME S C O U N T Y GRIMES COUNTYPEACHCREEKRDLONE STAR LN FUTURE ROCK PRAIRIERD FUTUREEASTERNFREEWAYLOOP5c 5a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 17 of 30 See Page 5 See Page 16See Page 5!( !(GRIMES COUNTYGRIME S C O U N T Y GRIMES COUNTYPEACHCREEKRDLONE STAR LN FUTURE ROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOP5a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESONCOUNTYBURLESO N COUNTYBURLESONCOUNTYKO P P E BRIDGERD WALN UTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268 COUNTY ROAD 443FM60FM2155 FM 1361 FM 5 0 FM 1 6 6 COUNTY ROAD 201COUNTYROAD 270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F M 2039 COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE COUNTY ROAD295FUTUR E WESTERNFREEWAYLOO P ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 18 of 30 See Page 11 See Page See Page 23BURLESONCOUNTYBURLES O N COUNTYBURLESONCOUNTYWALNUTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268 COUNTY ROAD 443FM60F M 2 1 5 5 FM 1361 FM 5 0 FM 1 6 6 COUNTY ROAD 201C OUNTYROAD270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F M 2039 COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE COUNTY ROAD295FUTURE ROYDER RDFUTUREWEST E RNFREE WA Y L O OP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESON COUNTYBU RLESONCOUNTYN D O W L I N G R D S DOW L ING RDN GRAHAM RDI & GN RD HOP E S C REEKRDBLUERIDGEDRH U N TE R ' S CR EE K R D TIMBERLINEDRFUTUREWE S T E R NFREEWAYLOOP¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 19 of 30 See Page 13 See Page 18See Page 20BURLESON COUNTYB U RLESONCOUNTYN D O W L I N G R D S DOWL ING RDN GRAHAM RDI & GN RD HOP E S CREEKRDBLUERIDGEDRH U N TE R ' S CR EE K R D TIMBERLINEDRFUTUREROYDERRDFUTUREWE S T E RNFREEWAYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 23P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !(GREENS PRAIRIE TRETONBURYAVVICTORIAAV ROYDERRD I & G N RD WOODLAKEDR FRIERSONRDKOPPEBRIDGERDCALUMETTR GREENSPRAIRIE RDWWILLIAM D FIT CH P W FM 2154BARRON RDCAPSTONE DR 22 21b 21a 23 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 20 of 30 See Page 14 See Page 19See Page 21!( !( !( !(GREENS PRAIRIE TRETONBURYAVVICTORIAAV ROYDERRD I& G NRD WOODLAKEDR FRIERSONRDKOPPEBRIDGERDCALUMETTR GREENSPRAIRIE RDWWILLIAM D FITCH PW FM 2154BARRON RDCAPSTONE DR FUTUREROYDERR D 22 21b 21a 23 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 24P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( !( STANDREWS D R INDIANLAKESDR M ESA V ER D EHARPER'SFERRYRDARRINGTONRDLAKE WAYDR WOODLAKEDR CAL U M E T T R W ILL IA M D FITCHPWGREENSPRAIRIERDWSH 6 S FUTURE WSPHILLIPSPW 21 26 25a 25 ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 21 of 30 See Page 15 See Page 20See Page 22!( !( !( !( STANDREWS D R INDIANLAKESDR M ESA V ER D EHARPER'SFERRYRD ARRINGTON RDL AKE WAYDR WOODLAKEDR CA L U M E T T R WIL L I A M D FITCHPWGREENSPRAIRIERDWSH 6 S FU T U R E W S P H I L L I P S P W 21 26 25a 25 ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 25P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !(!(!( !( !( !( !( !( !( !(PEACHCREEKRDS T A N DREWSDRINDIANLAKESDR PEACH CREEK CUT-OFF RD CHEROKEE DRLONESTARLNSH 6 S FUTUREEASTERNFREEWAYLOOP20b 20c20a 26 19b 27 5a 17b 19a 17a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 22 of 30 See Page 16 See Page 21See Page 17!(!(!( !( !( !( !( !( !( !(PEACHCREEKRDS T A N DREWSDRINDIANLAKESDR PEACH CREEK CUT-OFF RD CHEROKEE DRLONE STAR LNSH 6 S FUTUREEASTERNFREEWAYLOOP20b 20c20a 26 19b 27 5a 17b 19a 17a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 26P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BU RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO PES C R E E K R D COUNTY ROAD 277F U T U R E WESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 23 of 30 See Page 19 See Page 18See Page 24B U RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO PES C R E E K R D COUNTY ROAD 277FUTURE ROYDER RDFUTURE WESTERN FREEWAYLO OP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( I & GN RD SADDLECREEK D R RO Y D E R R D DY M P L E L NKOPPEBRIDGERD THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2 1 5 4 FUTUREWESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 24 of 30 See Page 20 See Page 23See Page 25I & GN RD SADDLECREEK D R RO Y D E R R D DY M P L E L NKOPPEBRIDGERD THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2 1 5 4 FUTUREWESTERNFREEWAYLOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 28P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( HIGHPRAIRIERDINDIA NLAKESDR S A D DLECREEKDR CA L U M E T T R FM 2 1 5 4 FU T U R E R O Y D E R R D ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 25 of 30 See Page 21 See Page 24See Page 26HIGHPRAIRIERDINDIA NLAKESDR S A D DLECREEKDR CA L U M E T T R FM 2 1 5 4 FU T U R E R O Y D E R R D ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 29P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( !( INDIANLAKESDR PEACHCREEKRDCHEROKEE DRFM 2154 SH 6 S FUTUREEASTERNFREEWAYLOOPFUTUREROYDERRD 29b 29c 29a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 26 of 30 See Page 22 See Page 25See Page 27!( !( !( INDIANLAKESDR PEACHCREEKRDCHEROKEE DRFM 2154 SH 6 S FUTURE ROYD E R R DFUTUREEASTERNFREEWAYLOOP29b 29c 29a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page 30P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( !( !( GRI M E S C O U N T Y PEACHCREEKRDSH6S FM 2 1 5 4 FUTURE ROYDER RD29b 29a ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 27 of 30 See Page See Page 26See Page !( !( GRI M E S C O U N T Y PEACHCREEKRDSH6S FM 2 1 5 4 FUTUREROYDERRDFUTUREEASTERNFREEWAYLOOP29b 29a ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( BURLESON COUNTYBURLESON COUNTYSA D D L E CREEKDR STOUSLAND RDCOUNTYR O A D 443 FUTUREWESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 28 of 30 See Page 24 See Page 18See Page 29BURLESON COUNTYBURLESON COUNTYSA D D L E CREEKDR STOUSLAND RDCOUNTYR O A D 443 FUTURE WESTERNFREEWAYLOOP FUTURE EASTERN FREEWAY LOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( HIGH PRAIRIE RDFM 2154 FUTUREWESTERNFREEWAYLOOP ¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 29 of 30 See Page 25 See Page 28See Page 30HIGH PRAIRIE RDFM 2154 F U T U R E E A S T E R N F R E E W AY L O O P FUTUREWESTERNFREEWAYLOOP ADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!( FM 159FM 2154 FUTURE ROYDER RD F U T U RE W E S T E R N F R E EW AYLOOP¹51234678910 11 12 13 14 15 16 17 18 19 20 21 2223242526 27282930 Page 30 of 30 See Page 26 See Page 29See Page 27FM 159FM 2154 FUTURE ROY D E R R D F U T U R E E A S T E R N FREEW AYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN 0 2010Miles See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e [DRAFT]!!!!Grade Separation Proposed Multi-use Path Existing Multi-use Path Funded Multi-use Path Proposed Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides City Initiated/Cleanup Thoroughfare Changes!( MPO Related Thoroughfare Changes!(