Loading...
HomeMy WebLinkAbout10-27-16-2p - Resolution - 10/27/2016 RESOLUTION NO. 10-27-16-2p A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLLEGE STATION,TEXAS, (1) REPEALING RESOLUTION NO. 08-27-09-02 ADOPTED ON AUGUST 27, 2009, RESOLUTION 01-09-14-Ola ADOPTED ON JANUARY 9,2014,AND RESOLUTION NO. 01- 22-15-02 ADOPTED ON JANUARY 22, 2015 AND (2) ESTABLISHING FEES FOR DEVELOPMENT APPLICATIONS AND PERMITS. WHEREAS,on August 27, 2009,the City Council adopted by Resolution No. 08-27-09-02,which contained a schedule establishing fees to be paid for services related to development application and permit fees in the City; and WHEREAS,on January 9,2014,the City Council adopted by Resolution No. 01-09-14-01a,which amended the fee schedule established by Resolution No. 08-27-09-02; and WHEREAS, on January 22, 2015,the City Council adopted by Resolution No. 1-22-15-02, which amended the fee schedule established by Resolution No. 08-27-09-02; and WHEREAS, the City Council of the City of College Station, Texas, desires to update the development application and permit fees established in Chapter 14 "Service Fees", as provided in Exhibit"A" herein; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS: PART 1: That Resolution Nos. 08-27-09-02, 01-09-14-Ola and 1-22-15-02 adopted on or about August 27, 2009, January 9, 2014 and January 22, 2015, respectively are hereby repealed as of the date the development application and permit fees set forth herein go into effect. PART 2: That the development application and permit fees described as set out in Exhibit "A"herein are hereby adopted. PART 3: That the development application and permit fees provided for in Exhibit"A" shall take effect on January 1, 2017. PART 4: That the development application and permit fees provided for in Exhibit"A" shall be adjusted annually based upon the Consumer Price Index published by the U.S. Department of Labor, Bureau of Labor Statistics as of January 1 of each year. ATTEST: APPROVED: qj1W/l — Lrautevc,tr42,1-4/b-trcr City Secret b\('\'') c''9'4'{t---------- Mayor APPROV I: if ill, Ci y A torney r RESOLUTION NO. 10-27-16-2p Page 2 of 5 Exhibit "A" Description Fees Effective January 1, 2017 Administrative Adjustment $100 Alternative Parking Plan $100 Banner Permit $210 Comprehensive Plan Amendment $1,240 Conditional Use Permit $1,240 Construction Board of Adjustments $510 Design Review Board $380 Development Permit/Public Infrastructure One and one half percent (1.5%) of Review and Inspection Fee infrastructure cost ($600 minimum) Reinspection Fee (applies to all inspection $100 types) Final Plat or Development Plat $990 Final plat (minor or amending) $750 License to Encroach $810 MUD —Petition to Create District $30,260 MUD—Petition to Acquire/Annex Land $30,260 MUD —Infrastructure Plan Review& One and one half percent (1.5%) of Inspection (Including in the ETJ) infrastructure cost ($600 minimum) Non-Residential Architectural (NRA) Review* $380 Oil& Gas—Application $6,060 Oil& Gas—Annual Permit Renewal $2,020 Oil& Gas —Abandonment $2,020 Oil& Gas—Consultant Contracted Cost Oil& Gas—Contract Inspector Contracted Cost Oil& Gas—Road Maintenance Agreement As Calculated Oil& Gas—Seismic Survey Permit $5,050 Parade Permit $100 PDD Amendment- Staff Review Only $190 PDD Amendment- P&Z/Council Review $340 Private Improvement in the Public R-O-W $380 (PIP) Permit RESOLUTION NO. 10-27-16-2p Page 3 of 5 Portable Storage Container Permit Fee $50 Preliminary Plan $990 Rezoning (Including PDD and P-MUD) $1,240 R-O-W/Easement Abandonment $750 Sign Permit (except for banners) $72 permit fee + $80 review fee Site Plan $990 Minor Site Plan $380 Waiver or Variance—Subdivision Regulations $250 Written Interpretation $120 Zoning Board of Adjustment $380 Zoning Letter $100 Building Permit See Schedule Below Contractor Registration $60 Demolition Permit $50 I Location Permit $50 Moving Permit $100 Electrical Permit—Repair or Alteration $40 Electrical Permit—Residential and $40 minimum base fee for the first Commercial 1,000 square feet of the building area plus $0.02 per square foot over 1,000 square feet Irrigation Permit $30 Temporary Power Pole $30 permit fee/$45 connection fee Mechanical Permit $30 base fee for the first $1,000 valuation plus $5.00 for each additional$1,000 valuation (or fraction thereof) Plumbing Permit $30 base fee plus additional charges (see schedule below) *Excludes existing projects involving painting only RESOLUTION NO. 10-27-16-2p Page 4 of 5 Building Permit Fee Schedule Estimated Construction Valuation Permit Fee $0.00 to $1,000 $30 $1,001 to $50,000 $30 for the first $1,000 valuation plus $5 for each additional$1,000 valuation or fraction thereof up to $50,000 valuation $50,001 to $100,000 $275 for the first$50,000 valuation plus $4 for each additional$1,000 valuation or fraction thereof up to $50,000 valuation $100,001 to $500,000 $475 for the first$100,000 valuation plus $3 for each additional$1,000 valuation or fraction thereof up to $500,000 valuation $500,000 and up $1,675 for the first$500,000 valuation plus $2 for each additional $1,000 valuation thereafter RESOLUTION NO. 10-27-16-2p Page 5 of 5 Plumbing Permit Fee Schedule Description Fee Plumbing Fixture (includes sinks,lavatories, $5 per fixture water heaters, tubs, showers,urinals,water closets, bidets, drinking fountains, floor drains, dishwashers, sand or grease traps, and washing machines) Sewer Line (new or replacement) $5 Water Line (new or replacement) $5 Gas Permit (basic fee) $5 Gas Piping (up to four gas outlets) $5 Gas Piping (each outlet over gas four) $1