Loading...
HomeMy WebLinkAboutAprilBuilding a Better Community with You PLANNING & DEVELOPMENT SERVICES NEWSLETTER APRIL 2013 NATIONAL BIKE MONTH 1 BUILDING PERMIT TOTALS 2 BUILDING INSPECTIONS 3 CODE ENFORCEMENT ACTIVITIES 3 REZONING SCOOP 3 POPULATION 3 BUILDING PERMIT CHARTS 3 SUBURBAN COMMERCIAL REZONING REQUESTS 4 TRACKING THE NUMBERS 4 BRAZOS CLEAN WATER 5 IMPLEMENTATION OF THE COMPREHEN- SIVE PLAN THROUGH CREATION & CONSOLIDATION OF ZONE DISTRICTS 6 7 NORTHGATE REAPING THE REWARDS OF VISIONARY PLANNING 8 DRIVEWAY PERMIT APPLICATION PROCESS 9 PLANNER ON CALL 10 STAFF PROFILE 11 Inside this issue: MAY IS NATIONAL BIKE MONTH Did you know the League of American Bicyclists has declared May National Bike Month? It is a great time to try bicycling for fun, fitness or transporta- tion. Across the nation, on May 13-17, people will be trading their usual vehicles for bicycles to participate in Bike to Work Week. The City of College Station invites you to join the celebration by biking to work on Friday, May 17. The following are tips to help you enjoy biking to work: Be sure your bicycle is properly maintained Always wear a helmet for protection Ride in the right-most lane with the flow of traffic Obey all stop signs, traffic lights and lane markings Wear bright clothing and always signal turns Plan your route using the City of College Station Bike Map & Info Guide available online at www.cstx.gov/bikepedgreenways. Hard copy guides can be requested online or from Venessa Garza, Greenways Program Manager, by email at vgarza@cstx.gov or by phone at 979-764-3674. 1101 Texas Avenue PO Box 9960 College Station, TX 77842 979-764-3570 Fax: 979-764-3496 www.cstx.gov Volume 14 Issue 4 BUILDING PERMIT TOTALS: Month of April 2013 Type of Permit Permit Unit Total Sq. Ft.Heat Sq. Ft.Amount Permit Unit Amount Single Family Home 45 45 127,258 98,213 $7,410,803 139 139 $14,967,764 Duplex 2 4 8,442 7,262 $413,632 19 38 $3,159,703 Tri-plex/Four-plex 0 0 0 0 $0 0 0 $0 Apartment 1 10 0 0 $55,000 0 0 $0 Residential Addition 4 N/A 1,021 1,021 $66,500 4 N/A $137,000 Residential Remodel 10 N/A 860 800 $118,088 6 N/A $162,486 Residential Garage/Carport Addition 1 N/A N/A N/A $350 1 N/A $11,000 Residential Demolition 8 N/A N/A N/A $28,350 5 N/A $1,007,500 Residential Slab Only-SF 0 N/A N/A N/A $0 0 N/A $0 Residential Slab Only-DPLX 0 N/A N/A N/A $0 0 N/A $0 Residential Slab Only-3&4 0 N/A N/A N/A $0 0 N/A $0 Residential Slab Only-Apt.0 N/A N/A N/A $0 0 N/A $0 Hotel / Motel / Inn 1 N/A N/A N/A $5,600,000 0 N/A $0 New Commercial 13 N/A 430,084 8,327 $20,467,608 3 N/A $659,000 Commercial Remodel 17 N/A 16,083 16,027 $5,653,235 7 N/A $1,115,000 Commercial Addition/Retaining Wall 0 N/A 0 0 $0 0 N/A $0 Commercial Demolition 2 N/A N/A N/A $7,000 3 N/A $118,500 Commercial Slab Only 4 N/A 0 0 $2,718,513 0 N/A $0 Swimming Pool 4 N/A N/A N/A $256,550 2 N/A $48,000 Sign 17 N/A N/A N/A $0 10 N/A N/A Moving & Location 0 N/A N/A N/A $0 0 N/A $0 Storage / Accessory 1 N/A N/A N/A $5,769 4 N/A $12,780 Roofing 22 N/A N/A N/A $223,156 25 N/A $147,760 TOTALS 152 59 583,748 131,650 $43,024,554 228 177 $21,546,493 Month of April 2012 January 1, 2013 - April 30, 2013 Type of Permit Permit Unit Total Sq. Ft.Heat Sq. Ft.Amount Permit Unit Amount Single Family Home 246 246 608,984 482,685 $37,653,148 308 308 $38,752,378 Duplex 5 10 19,651 17,671 $1,077,777 30 60 $5,310,901 Tri-plex/Four-plex 0 0 0 0 $0 1 3 $285,000 Apartment 4 50 52,794 44,240 $3,398,052 5 29 $2,050,000 Residential Addition 13 N/A 8,896 3,521 $750,864 18 N/A $683,825 Residential Remodel 26 N/A 3,067 3,007 $328,744 42 N/A $1,252,455 Residential Garage/Carport Addition 6 N/A N/A N/A $114,390 5 N/A $60,725 Residential Demolition 29 N/A N/A N/A $87,650 23 N/A $1,042,800 Residential Slab Only-SF 2 N/A N/A N/A $42,000 87 N/A $630,912 Residential Slab Only-DPLX 0 N/A N/A N/A $0 37 N/A $667,783 Residential Slab Only-3&4 1 N/A N/A N/A $40,000 0 N/A $0 Residential Slab Only-Apt.0 N/A N/A N/A $0 3 N/A $105,000 Hotel / Motel / Inn 1 N/A N/A N/A $5,600,000 0 N/A $0 New Commercial 20 N/A 441,642 19,885 $22,464,608 14 N/A $4,943,562 Commercial Remodel 35 N/A 88,475 87,669 $7,740,314 24 N/A $7,343,232 Commercial Addition/Retaining Wall 0 N/A 0 0 $0 9 N/A $128,759 Commercial Demolition 8 N/A N/A N/A $833,050 7 N/A $456,200 Commercial Slab Only 5 N/A 0 0 $2,732,513 0 N/A $0 Swimming Pool 16 N/A N/A N/A $814,250 13 N/A $806,569 Sign 40 N/A N/A N/A $0 47 N/A NA Moving & Location 0 N/A N/A N/A $0 0 N/A $0 Storage / Accessory 7 N/A N/A N/A $39,769 13 N/A $390,970 Roofing 73 N/A N/A N/A $645,695 84 N/A $641,180 TOTALS 537 306 1,223,509 658,678 $84,362,824 770 400 $65,552,251 January 1, 2012 - April 30, 2012 Page 2/April 2013/www.cstx.gov Page 3/April 2013/www.cstx.gov P E R M I T S BY T Y P E Y EAR TO D ATE Type of Permit Permit Unit Amount Single-Family Home 246 246 $37,653,148 Duplex 5 10 $1,077,777 Tri-Plex/Four-plex 0 0 $0 Apartment 4 50 $3,398,052 New Commercial 20 N/A $22,464,608 Commercial Remodel 35 N/A $7,740,314 NEW SINGLE FAMILY PERMITS 3 YEAR—COMPARISON BY MONTH NEW COMMERCIAL PERMITS 3 YEAR—COMPARISON BY MONTH TOTAL PERMITS 3 YEAR—COMPARISON BY MONTH CODE ENFORCEMENT ACTIVITIES SUMMARY: REZONING SCOOP: CODE ENFORCEMENT ACTIVITIES SUMMARY: MONTH HEALTH & SANITATION PROPERTY MAINTENANCE PUBLIC NUISANCE FIRE PROTECTION TRAFFIC CODE SANITATION UDO/ ZONING RENTAL REGISTRATION TOTAL JANUARY 19 3 3 - 10 287 19 88 429 FEBRUARY 222 11 4 8 16 224 24 52 561 MARCH 63 58 6 0 17 227 16 66 453 APRIL 17 240 5 17 7 247 26 109 668 TOTAL 321 312 18 25 50 985 85 315 2111 PROJECT NO PROJECT NAME LOCATION ACRES REQUEST P&Z DATE STATUS COUNCIL DATE STATUS 13-900020 Hillier Funeral Home 4080 SH6 S 7.5 Amend PDD 7-Mar-13 Approved 28-Mar-13 Approved 13-900064 McGill Tract 2381 Earl Rudder Fwy. S 14.2 Rez 18-Apr-13 Approved 9-May-13 13-900061 Barron Crossing & Bridgewood Sub. 2985 Barron Cut-Off Rd 75.1 R-1&A-O to PDD 16-May-13 23-May-13 13-900076 Barron Rd & Victoria 2301 Barron Rd. 3.7 A-O to SC 16-May-13 23-May-13 MONTH BUILDING PLUMBING ELECTRIC MECHANICAL LAWN SIGN POOL TOTAL JANUARY 350 251 167 123 14 11 4 920 FEBRUARY 338 256 204 154 2 8 5 967 MARCH 389 329 164 138 10 7 10 1047 APRIL 588 354 287 282 19 11 10 1551 TOTAL 1665 1190 822 697 45 37 29 4485 P OPULATION : T HE A PRIL POPULATION ESTIMATE IS 97,982 0 100 200 300 400 2011 2012 2013 0 5 10 15 2011 2012 2013 0 50 100 150 2011 2012 2013 BUILDING INSPECTIONS: SUBURBAN COMMERCIAL REZONING REQUESTS Last fall City Council approved the creation of several new non-residential zoning districts. The purpose of these new districts is to help implement some of the 15 unique Future Land Use and Character designations identified in the Comprehensive Plan. Rezoning requests for one of the new districts, SC Suburban Commercial, have re- cently been submitted to the City for consideration. The rezoning applications that have been submitted thus far are located by the Raintree subdivision along State Highway 6 and in front of the Reatta Meadows subdivision by the new College Station High School. The purpose of the SC Suburban Commercial district is to allow lower intensity commercial uses that provide ser- vices to nearby neighborhoods. Uses in the district are intended to be compatible with the character of subur- ban single-family neighborhoods, which is accomplished by requiring buildings to have more of a residential character and scale and their sites heavily landscaped to minimize the impacts of the non-residential uses and associated parking areas on adjacent residential areas. The district allows for a range of uses with impacts mitigated through additional buffering and architecture requirements of the buildings. In addition to the SC Suburban Commercial district, BP Business Park, BPI Business Park Industrial, and NAP Natural Areas Preserved were also adopted last fall. In creating the districts, City staff worked with a sub- committee of the Planning and Zoning Commission to develop the concepts and language for the districts based on direction provided in the Comprehensive Plan. The new districts are similar to the City’s other existing zoning districts in that they are largely use-based districts with some additional performance standards. For more in- formation, contact Jason Schubert at jschubert@cstx.gov. TRACKING THE NUMBERS New Commercial: YTD – 1 yr YTD – 2 yr 54 % 25% Year-to-date, new commercial per- mits experienced a increase in quan- tity when compared to last year at this time, April 2012, and increased when compared with two years ago, April 2011. New Single-Family Homes: YTD – 1 yr YTD– 2 yr 20 % 34 % Year-to-date, single-family home permits decreased in quantity when compared to last year at this time, April 2012, and increased when compared with two years ago, April 2011. Total Permits: YTD - 1 yr YTD - 2 yr 31% 25% Year-to-date, total permits ex- perienced an decrease in quantity when compared to last year at this time, April 2012, and experi- enced an increase when com- pared with two years ago, April 2011. Page 4/April 2013/www.cstx.gov BRAZOS CLEAN WATER The 18th Annual Brazos Valley Earth Day event held at Wolf Pen Creek proved successful as thousands of residents were educated on our natural and cultural environments. Last month, Brazos Clean Water (BCW) successfully participated in its 4th consecutive showcase, focusing on fertilizer applica- tion and potential runoff problems. A poster board was used to illustrate the water cycle, tips for preventing stormwater pollution as well as the following information on fertilizer usage: Apply fertilizer sparingly Don’t overwater Fertilizer runoff contaminates nearby surface water Storm drains do not treat polluted runoff Excess fertilizer causes eutrophication of our waterways Eutrophication depletes the oxygen necessary for fish, fauna and organisms to survive. In addition, several pieces of educational material were handed out ranging from pamphlets, coloring books, calendars, stickers, wildflower seeds, temporary tattoos and colorful fish stress-relievers citing the brazoscleanwater.org website. This event and other educational and outreach efforts seek to meet milestones enumerated in the overall City of College Station’s Stormwater Management Program (SWMP). More information on up and coming events can be found on the BrazosCleanWater.org calendar. Page 5/April 2013/www.cstx.gov Page 6/April 2013/www.cstx.gov IMPLEMENTATION OF THE COMPREHENSIVE PLAN THROUGH THE CREATION AND CONSOLIDATION OF ZONING DISTRICTS The Comprehensive Plan was adopted in 2009 and acts as a guide to ensure that the vision for College Station is realized through the future growth and development of the City. The Comprehensive Plan approaches the growth of College Station in a manner different from the City’s previous plans; it focuses on the creation and enhancement of places of distinction in College Station. The Plan recognizes the importance of character and capitalizes on that to offer the greatest flexibilities for development, while protecting special places. The Comprehensive Plan identifies 15 unique Future Land Use and Character designations and calls for the creation of zoning districts that align with the objectives of the Plan as one means of implementation. The intent is that new zoning districts be developed for each of the land use classifications to both align with the intent of the Comprehensive Plan and to simplify the nomenclature. Zoning and its associated development criteria help to ensure that the form, character, and quality of development reflect the City’s planning objec- tives. Staff has worked with a sub-committee of the Planning and Zoning Commission to develop the concepts for one- and two- family residential zoning districts based on direction in the Comprehensive Plan. These districts will be similar to the City’s existing set of zoning districts, meaning that they will largely be use-based, with some additional performance standards. Districts will be renamed to simplify the nomenclature. The districts to be created and renamed through this process include: New Districts “RS Restricted Suburban” Changed & Renamed Districts “A-O Agricultural Open” to “R Rural” “A-OR Rural Residential Subdivision” to “E Estate” Renamed Districts “R-1 Single-Family Residential” to “GS General Suburban” “R-3 Townhouse” to “T Townhouse” “R-2 Duplex” to “D Duplex” “R-7 Manufactured Home Park” to “MHP Manufactured Home Park” Retired Districts “R1-B Single Family Residential” PHASED APPROACH Staff has developed a phased approach to the creation and adoption of the new zoning districts, which have been categorized into non-residential, residential, and growth area districts. Phase 1: The completion of Phase I resulted in the adoption of new non-residential zoning districts in Septem- ber 2012. New districts include NAP Natural Areas Preserved, SC Suburban Commercial, BP Business Park, and BPI Business Park Industrial. At that time, existing non-residential districts were either renamed or retired as part of the amendments to the Unified Development Ordinance. Phase 2: Staff is currently working on developing the residential districts. These districts will be similar to our existing set of zoning districts, meaning that they will largely be use-based, with some additional performance standards. Several other existing districts will be renamed to simplify the nomenclature, but the standards will remain the same. Retired districts will remain effective for properties, but will not be available for future rezon- ing proposals. The creation and adoption of the one and two family districts will be done separately from the creation and adoption of the multi-family and mixed-use districts. Phase 3: Once the residential districts are adopted, Staff will begin work on a specific zoning approach for the Growth Areas identified on the Concept Map in the Comprehensive Plan. OPPORTUNITIES FOR INPUT A public meeting was held on Tuesday, April 9, 2013 to present the one- and two-family zoning district concepts to the community for consideration and comment. Since that time, staff has worked with the Planning & Zoning Commission sub-committee to finalize the concepts. Specific ordinance language will be developed over the next couple of months. Once the ordinance language is drafted, stakeholders will have a one month review period to provide comments. It is anticipated that the City Council will consider adoption of the new zoning districts in the early fall. For more information, please contact Jennifer Prochazka at jprochazka@cstx.gov. Page 7/April 2013/www.cstx.gov Page 4/ March 2011 / www.cstx.gov Page 2/ May 2011 / www.cstx.gov Page 2/ May 2011 / www.cstx.gov Page 8/April 2013/www.cstx.gov NORTHGATE REAPING THE REWARDS OF VISIONARY PLANNING The bustling Northgate District is one of many examples where the city worked closely with the community, defined where we wanted to go, then planned and worked together to get there. Several years ago, the City of College Station and Northgate stakeholders began the planning process for this unique entertainment destination. The plan called for an urban area that supported high- density, mixed-use developments, and it required changes to the development code to create new zon- ing districts. Those changes enabled development to conform to the vision that emerged from the collec- tive planning process. With a clear plan in place, the city began investing in the necessary infrastructure and repairs. Tens of millions of dollars were invested in street rehabilita- tion projects, water lines, sewer lines, and public parking enhancements. The city also partnered with the Texas Department of Transportation to improve pedestrian safety in key locations. Those investments have started to pay big dividends. In recent months, the city has issued construction permits for several new mixed-use developments that will pro- vide housing for thousands of residents along with non-residential space. The new development advances the vision for the Northgate District, increases property values, and in some cases has even eliminated blighted conditions. The positive benefits of visionary planning are evident in Northgate and will become even more important as College Station continues to grow and prosper. For more information regarding the North- gate District, please contact Lance Simms at lsimms@cstx.gov. Page 9/April 2013/www.cstx.gov DRIVEWAY PERMIT APPLICATION PROCESS Ever wonder how to go about getting a driveway permitted in the City of College Station? Below is an outline of the process. COMMERCIAL DRIVEWAYS (CITY OF COLLEGE STATION ROADWAY) All commercial driveways are reviewed, processed, and permitted through the Site Plan and Development Permit processes and will meet the Unified Development Ordinance (UDO) requirements. COMMERCIAL DRIVEWAYS (TXDOT ROADWAY) All commercial driveways are reviewed, processed, and permitted through the Site Plan and Development Permit processes and will meet the UDO requirements or TxDOT’s Access Management requirements, which ever requirement is more stringent. All driveways proposed within state ROW require a TxDOT permit. Owner or Owner’s Representative will submit a signed application with supporting documentation. The applicant is responsible for submitting five copies of the permit application and supporting documenta- tion. The permit is reviewed and approved by the Transportation Planning Coordinator and forwarded to TxDOT. Once the response from TxDOT is received, the applicant will be notified of response and the permit will return to Planning and Development Services (P&DS) for processing. RESIDENTIAL DRIVEWAYS FOR NEW HOUSES Driveways proposed with new home construction are processed and inspected through the Building Permit proc- ess and will meet the UDO requirements. EXISTING RESIDENTIAL DRIVEWAY Applicant will fill out application with sketch of proposed improvement and submit application to P&DS. The P&DS Plans Examiner will review for UDO compliance and will sign the permit as the City Represen- tative (the Transportation Planning Coordinator or Engineering may be asked for input) or the applicant will be contacted for more information. Once approved, the Plans Examiner will contact the applicant that it has been approved. For more information, please contact Joe Guerra at jguerra@cstx.gov. . P LANNER ON C ALL F REQUENTLY A SKED Q UESTIONS The Planner on Call system helps over 1,800 people a year that call, email, or come into the P&DS office with questions related to planning and development. This section highlights some of the more common questions. If you have questions for the Planner on Call, please contact us at 979-764-3570 or POC@cstx.gov. Q: I’m considering a site to develop a multi-family project. Are there any height limitations? A: Multi-family buildings that are proposed near any property line adjacent to single-family use or town- home development are required to be setback from the property line twice the distance of its building height. Building height is measured from finished grade or base flood elevation and the height point of a man- sard roof, coping of a flat roof or average height between the eaves and ridge line of a gable, hip or gambrel roof. Typically, equipment such as HVAC units and satellite dishes may be installed on top of the building. These are required to be screened from public view and are included in overall height. Multi-family developments in the Northgate Design District, Redevelopment District Overlay, and Planned Mixed-Use Districts are exempt from this requirement. For more information on height restrictions, please contact the Planner-On-Call. Page 10/April 2013/www.cstx.gov Page 4/ March 2011 / www.cstx.gov Page 2/ May 2011 / www.cstx.gov Page 2/ May 2011 / www.cstx.gov Page 11/April 2013/www.cstx.gov