HomeMy WebLinkAbout1-11-2007-12.25 - Resolution - 01/11/2007
RESOLUTION NO. 1-11-2007-12.25
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLLEGE STATION,
TEXAS, APPROVING A CONSTRUCTION CONTRACT FOR THE SWITCH
STATION TO POST OAK SUBSTATION AND POST OAK SUBSTATION TO
SOUTHWOOD SUBSTATION TRANSMISSION LINE RECONDUCTOR PROJECT
AND AUTHORIZING THE EXPENDITURE OF FUNDS.
WHEREAS, the City of College Station, Texas, solicited bids for the construction phase of the
Switch Station to Post Oak Substation and Post Oak Substation to Southwood Substation
Transmission Line Reconductor Project; and
WHEREAS, the selection of Texas Power Construction, Ltd. is being recommended as the
lowest responsible bidder for the construction services related to the Switch Station to Post Oak
Substation and Post Oak Substation to Southwood Substation Transmission Line Reconductor
Project; now, therefore,
BE IT RESOLVED by the City Council of the City of College Station, Texas:
PART 1: That the City Council hereby finds that Texas Power Construction, Ltd. is
the lowest responsible bidder.
PART 2: That the City Council hereby approves the contract with Texas Power
Construction, Ltd. for $2,021,000.00 for the labor, materials and
equipment required for the improvements related to the Switch Station to
Post Oak Substation and Post Oak Substation to Southwood Substation
Transmission Line Reconductor Project.
PART 3: That the funding for this Project shall be as budgeted from the College
Station Utilities Capital Improvement Project Fund, Electric Department,
in the amount of$2,02l,000.00
PART 4: That this resolution shall take effect immediately from and after its passage.
ADOPTED this 11 th day of Januarv, A.D. 2007.
~