December 5, 1985
MFMnRANn11M
TO: Jerry Bishop & Associates
(Larry Wells, Lee Ingram, Steve Andrews)
Parkway Circle Associates
(Bill Sisson, Representative)
FROM: Project Review Committee:
Jim Callaway, Assistant Director of Planning
Mark Smith, Assistant City Engineer
David Brochu, P&Z Representative
Others attending:
Elrey Ash, Director of Capital Improvements
Gary Banta, GTE
Jimmy McCord, McCord Engineering, Inc.
Bill Riley, Water Distribution Supervisor
Jane R. Kee, Zoning Official
Harry Davis, Fire Marshal
Barry Clar, Assistant City Attorney
Bob Epps, Assistant Director of Public Services
Kim Johnson, Assistant Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Parking Lot Plan - Parkway Circle Apartment Parking & Landscaping
Addition (0,68 acres, formerly City park area shown on Pecan Tree
Estates 11 Final Plat) *85 -418
The P.R.C. met on December 4, 1985 to review the above mentioned project, and
recommends approval with the following conditions`:
(1) Coordinate the construction of this project with the City (Mike Hester,
Project Engineer) plans regarding construction of City storm drains
in this area.
(2) The P.R.C, has noted that this plan must go before the Planning and
Zoning Commission for consideration of a variance to the requirement
that on interior parking rows, islands must be located after each 15
parking spaces, The P.R.C. recommends that the P &Z approve this request
for variance since this project has been designed with more than the
required setback, and thus will have an ample amount of greenspace.
(3) NOTE TO DEVELOPER: Development of this project cannot be implemented
until rezoning of this tract is complete.
FURNISH 10 COPIES OF THIS PLAN TO THE PLANNING DEPARTMENT BY NOON ON DECEMBEr 13th
TO BE INCLUDED ON P &Z AGENDA DECEMBER 19th.
sjv
cc: Jeffrey Lubchansky, c/o Director of Finance, R.J.REALTY CORPORATION,
25 Ann Street, New York, N.Y. 10038
Cl
December 5, 1985
MFMORANDUM
City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
COLLEGE STATION. TEXAS 77840 -2499
TO: Planning and Zoning Commission
Jerry Bishop & Associates (Larry Wells, Lee Ingram, S.Andrews)
Randy Amen, Tenneco Oil Company
James E. Jett, Trustee
FROM: Project Review Committee
Jim Callaway, Assistant Director of Plannin g
Mark Smith, Assistant City Engineer
David Brochu, P &Z Representative
Others attending:
Elrey Ash, Director of Capital Improvements
Gary Banta, GTE .
Jimmy McCord, McCord Engineering, Inc.
Bill Riley, Water Distribution Supervisor
Jane R. Kee, Zoning Official
Harry Davis, Fire Marshal
Barry Clar, Assistant City Attorney
Bob Epps, Assistant Director of Public Services
Kim Johnson, Assistant Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Project Plan Approval - Tenneco Oil Harvey Road Store, located
on proposed Lot 2B a resubdivision of Lot 2R, Courtyard Apartments
Subdivision Replat (85 -807)
The P.R.C. met on December 4, 1985 to review the above mentioned project and
recommends approval with the following conditions*:
(1) There will be a minimum of one 3 -yard dumpster required for this project.
Minimum dumpster pad dimensions: 12'x 12'
(2) P.R.C. Drainage Statement provided; compliance required,
(3) RE: Drainage and Grading: developer should make a special effort to match
the grades of this project to the existing grades on adjacent property when
crossing the property lines.
(4) The proposed location of the fuel price sign in the utility easement is
questionable. if location is approved, applicant must provide a written
agreement between the City and the property owner to cover this.
(5) Plan and Profile drawings for water service are required.
(6) Furnish a final site plan and electric load data to the Electrical Department.
If underground service Is required, furnish a letter requesting same.
(7) Include 6" raised curbing between Lot 2A and Lot 2B (with exception of
the driveway between the lots)
(8) If relocation of the utility lines on the north side of this project is
required, the developer will be required to bear the expense.
...Continued on page 2
P.R.C. (85 -807)
page 2
(8) The P.R.C. voted unanimously to recommend denial of the access shown
to the adjacent apartment parking lot to the north, because access is
not to a street but rather to a parking lot.
(9) Access Into the apartment project adjacent and to the west will not
receive a recommendation of approval from the P.R.C. unless a written
access agreement Is provided from both property owners. If that written
agreement Is provided, approval of this access will be made by the P.R.C.
only because access to an existing drive to Harvey Road will be shared.
(10) Canopy height must be a minimum of 14 feet to accommodate emergency
vehicles.
*Any changes to an approved site plan must be cleared through the office
of the City Planner.
SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY NOON ON DECEMBER 13th
TO BE INCLUDED ON P &Z AGENDA DECEMBER 19th.