Loading...
HomeMy WebLinkAboutOctober 23C 1 October 23, 1985 y w � �111)ul City of College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 TO: Mike Dunlap, Texas Copy Harry Bostic, 4500 Carter Creek, Bryan FROM: Project Review Committee: Al Mayo, Director of Planning Mark Smith, Assistant City Engineer George Dresser, P&Z Representative Other staff attending: Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent Jimmy McCord, McCord Engineering, Inc. Barry Clar, Assistant City Attorney Bob Epps, Assistant Director of Public Services Rick Ploeger, City Forester Jane Kee, Zoning Official Kim Johnson, Assistant Zoning Official Shirley Volk, Planning Technician SUBJECT: Parking Lot Plan - Texas Avenue Joint Venture (Texas Copy) 85 -416 The P.R.C. met on this date to review the above mentioned project and recommends approval with the following conditions:* (1) The driveways across this tract must be connected across the vacant lots. (2) furnish electrical load data information to the Electrical Department as soon as possible. (3) Show the exact location of existing fire hydrants. All parts of every building must be within 300 feet of a hydrant as the hose lays. The developer may be required to install an additional hydrant to cover this building. Check with Superintendent of Water & Sewer (Bennie Luedke). (4) A dumpster will be required; location, number of dumpster(s) and size to be determined by the Assistant Director of Public Services after additional information is provided to him. (5) PRC drainage statement provided; compliance is required. In addition to this, furnish site runoff calculations based on a 25 year storm to the Engineering Department. (6) A 6 foot solid screen fence is required along the rear property line. FURNISH 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT FOR APPROVAL PRIOR TO CONTINUING WITH STEP II OF THE BUILDING PERMIT PROCESS. *Any changes to an approved site plan must be cleared through the Office of the Director of Planning. 1 Cl October 23, 1985 MEMORANDUM RESUBMISSION CONFERENCE City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 TO: Planning and Zoning Commission Donald Garrett & Jeff Garrett, Garrett Engineering Aldersgate United Methodist Church FROM: Al Mayo, Director of Planning �uw Mark Smith, Assistant City Engineer Joe Guidry, Electrical Superintendent Jimmy McCord, McCord Engineering, Inc. Barry Clar, Assistant City Attorney Shirley Volk, Planning Technician SUBJECT: Preliminary Plat - Windwood Phase 6 Subdivision (Lot 51, Block One & Lot 1 Block Six (85 -311) A Presubmission Conference was held on this date to review the above: mentioned plat and staff recommends approval with the following conditions:* (1) Remove the lines designated "building setback lines ". Setbacks are regulated by ordinance. Submit sepia and 10 copies of revised plat to Planning Department prior to noon on November 1st to be included on P &Z agenda for meeting of November 7, 1985. *Any changes to an approved plat must be cleared through the Office of the Director of Planning. 1