HomeMy WebLinkAboutMay 29glq City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
May 29, 1985
MFMnPAM IIM
Presubmission Conference
Attending: Al Mayo, Director of Planning NJ
David Pullen, City Engineer
Barry Clar, Assistant City Attorney
Bill Riley, Water and Sewer Department
Joe Guidry, Electrical Superintendent
Jimmy McCord, McCord Engineering, Inc.
Shirley Volk, Planning Technician
Phyllis Hobson, Nantucket, Ltd.
Larry Wells, Jerry Bishop & Associates, Inc.
SUBJECT: Master Preliminary Plat - Nantucket Phase 3 - 85
A presubmission conference was held on this date to review the above mentioned
plat, and staff recommends approval as shown.
The applicant, Ms. Hobson, informed staff that two street names will be changed
prior to the P &Z Commission meeting on June 20th.
SUBMIT 10 COPIES AND FILM POSITIVE OF REVISED PLAT TO PLANNING DEPARTMENT BY
5:00 P.M. ON JUNE 14th TO BE INCLUDED ON P &Z AGENDA JUNE 20th.
Any changes to an approved plat must be cleared through the office of the
Director of Planning.
sjv
Cl
May 29, 1985
MFMnpamn11M
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Jim McCord, McCord Engineering, Inc.
Bill Riley, Water & Sewer Department
Barry Clar, Assistant City Attorney
Shirley Volk, Planning Technician
William Fitch, Area Progress Corporation
William Dryden, Area Progress Corporation
Austin Fitch, Area Progress Corporation
SUBJECT: Master Preliminary Plat - Belmont Place - 85 -306
A presubmission conference was held on this date to review the above mentioned
preliminary plat and staff recommends approval with the following conditions:-
(1) Atlanta Street should be in a 70 foot right -of -way and should be 47 feet
in width (b -b) as is required in a commercial area.
(2) At the time of Final Platting, the following information should be
included:
(a) Lot 1 Block 1 (if configuration remains the same) should be
provided an access easement; no curbcut will be allowed to
this lot within 200 feet of the intersection.
(b) Lots 1 & 2 Block 2 will be regarded as 1 premises for purposes
of freestanding signs,
(c) Show all existing utility easements on the Final Plat.
SUBMIT 10 COPIES OF REVISED PLAT AND FILM POSITIVE TO PLANNING DEPARTMENT
PRIOR TO 5:00 P.M. ON JUNE 14th TO BE INCLUDED ON AGENDA FOR JUNE 20th.
-Any changes to an approved plat must be cleared through the office of the
Director of Planning.
sjv
C �IVP41_00f� City o f College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
May 29, 1985
MEMORANDUM
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Jimmy McCord, McCord Engineering, Inc.
Bill Riley, Water & Sewer Department
Shirley Volk, Planning Technician
Barry Clar, Assistant City Attorney
Tim Chinn, Kling Engineering & Surveying
SUBJECT: Final Plat - Petterak Subdivision - 85 -213
A presubmission conference was held on this date to review the above mentioned
plat and approval cannot be recommended until the following conditions are met-:
(1) Position the lot line between Lot 1 and Lot 2A in one of two positions;
(a)Either on the existing building line to create "lot line" construction, or
(b)Seven and one -half (72) feet from the building to conform to ordinance
setback requirement. Positioning the lot line in either of the above
two locations will create a conforming building; leaving the lot line
as shown on the proposed plat reviewed on this date is unacceptable
as it creates a non - conformity.
(2) Lot 2A should be large enough to allow enough land to provide required
parking for uses in the existing building or a shared parking agreement
between Lots 2A and 2B or between Lots 2A and Lot 1 must be provided.
(3) Provide access easements which allow cross circulation between all lots
in this subdivision in order to preclude re- entering either Wellborn or
Luther to get from one tract to another. This can be accomplished by
Including easements on this plat, or preferably by first developing an
existing /future site development plan prior to finalizing the plat.
(4) Include a note on the plat.indicating that for signage purposes Lot 1
will be regarded as one premises and Lots 2A & 2B together will be regarded
as one premises.
(5) Provide a 20 foot utility easement to cover existing utilities (10 ft. on
each side of electric line centerline).
Note to applicant: The above conditions must be met by the date of the P &Z
meeting (June 6, 1985) or staff will request that consideration of this plat
by the Commission is tabled until satisfactory access easements or acceptable
site development plan is received.
SUBMIT 10 COPIES OF REVISED PLAT AND FILM POSITIVE TO PLANNING DEPARTMENT PRIOR
TO NOON ON MAY 31st IN ORDER TO BE INCLUDED ON P &Z AGENDA JUNE 6th.
'Any changes to an approve plat must be cleared through the office of the Director
of Planning.