Loading...
HomeMy WebLinkAboutMarch 6c- March 6, 1985 MEMORANDUM City of College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 TO: Kenny Broach, Broach Oil Co.,P.O.Box 3819,Bryan Jack Cumpton,4103 S.Texas, Bryan Raymond Huff,900 -10 E.Harvey Rd.,College Station FROM: Project Review Committee: Al Mayo, Director of Planning Mark Smith, Assistant City Engineer Ray Martyn, P &Z Representative Others attending: Bob Epps, Ass't.Dir. Public Services George Spain, Fire Department Joe Guidry, Electrical Superintendent David Riley, GTE Kim Johnson, Ass't. Zoning Official Shirley Volk, Planning Technician SUBJECT: PROJECT PLAN APPROVAL (C -N) Lots 17, 18 & 19 Block 1 Regency Square subdivision (85 -800, 85 -801, 85 -802) The P.R.C. met on this date to review the above mentioned projects which are, at this time, being planned together rather than independently, because access to these lots will be shared due to City restrictions, as well as several other features at the request of this developer. The following conditions apply to all three (3) plans: (1) If one dumpster location is shared by all three projects, some type of written agreement must be furnished to the City to ensure this will be a permanent situation with each project sharing equally in maintenance of dumpsters and surrounding area. (2) If dumpsters are shared as shown, two (2) 6 cubic yard dumpsters will be the absolute minimum required to handle garbage generated. (3) Designate the planned means of access for garbage trucks to reach the dumpsters. Trucks are rear loading and require a 50 foot turning radius; backing distance must be less than 50 feet. PRC 85- 800 -802 page 2 (4) Furnish site grading and drainage plans for the entire area (3 tracts). There must be no point discharge of runoff into the adjacent residential area. If tracts are developed individually or at different times, there will be drainage problems, and some type of written drainage agreement will be required by the City. (5) Existing overhead power lines will be relocated around the perimeter of these lots. (6) Comply with requirements set forth on memorandum from Electrical Department. (7) P.R.C. drainage statement furnished; compliance required. (8) Recalculate landscaping points; match legend with actual site plans; include groundcover information; designate hose bibs or sprinkler systems; all tree sizes should be indicated by caliper rather than container size; 2" trees must be balled and burlapped; suggest mixing tree variety. (9) Typical islands are 9 feet in width; dimension all islands. (10) Check handicapped parking requirements for each project; compliance is required. (11) Access points to all three tracts were discussed, with the determination made that access points as shown from Holleman & Wellborn are acceptable and comply with conditions agreed to at the time rezoning took place, i.e., that there would be no direct access to Lot 18, and access to Lot 18 would be made only through Lot 17 or Lot 19. Ass't. City Engineer stated that he would require additional time to study the proposed access point from Wilcrest Drive before making a ruling. After that study was conducted, he made the determination that there can be no direct access from Wilcrest Drive, a residential street, to this commercial project, and that access to all three lots will be limited to Lots 17 & 19 from Holleman and Wellborn. Furnish some type of shared access agreement to cover access and circulation through all three tracts. (12) The Planning and Zoning Commission will be reviewing both site plans and uses prior to making a determination on any of these proposed projects. If any changes are made to an approved site plan, the site plan must be taken before the P &Z Commission for approval of those changes. Project No. 85 -800 - Lot 18 Block 1 - Convenience Store /Carwash (1) A fire lane will be required in the circulation drives at the front of the convenience store, parallel to both Wellborn Road and Holleman Street. (2) A 20 foot inside turning radius is required on the fire PRC 85- 800 -802 page 3 lanes. (3) Canopy over gas pumps as shown encroaches the required 8 foot setback area. (4) Maintain a minimum 14 foot clearance under canopy when it extends over the fire lane. (5) Designate the direction of travel through the car wash. (6) Suggest less paving and more green space along Holleman. (7) This Convenience Store will have the greatest capacity for gasoline service of any convenience store in the City, and in fact, will have as much and more than some service stations. It will have the capability of serving 6 vehicles at a time and represents the potential for generating more traffic than the typical convenience store. Service stations in the City have the capability of serving from 4 -12 vehicles at once. Project No. 85 -801 - Lot 19 Block 1 - Fast Food Restaurant (1) Mark curbing around building as Fire Lane, with exception of the area of the back of the building and the side with the drive - in window. (2) The overhang left for cars (between car & property line) should be a minimum of 2 feet. (3) A change in the configuration of the corner parking spaces was suggested. (4) Detached signs are not allowed in C -N zoning districts. (5) Staff has problems with allowing fast food restaurants in C -N zoning districts unless the particular C -N district in question is unique in some way. The applicant should be aware that the P &Z Commission will be considering the use as well as the site plan of each project. Project No. 85-802 - Lot 17 Block 1 - 10,000 sq.ft. Rental Space (1) Mark curbing between this building and the building on Lot 18 as Fire Lanes, in addition to that in front of the building. (2) A fire hydrant must be located within 300 feet of all parts of any building as the hose lays (not radius). An additional hydrant may be required for coverage on this lot. Contact the Water & Sewer Superintendent for his instructions as to location of any additional hydrant. PRC 85- 800 -802 page 4 (3) Any trees adjacent to the dumpsters should be approximately 15 ft. from the dumpster. Do not place tall trees under power lines. (4) Show the dimensions of the drive around the building. SUBMIT 10 COPIES OF REVISED PLAN(S) TO PLANNING DEPARTMENT BY 5:00 P.M. MARCH 15th TO BE INCLUDED ON P &Z AGENDA MARCH 21. THE PUBLIC HEARING FOR CONSIDERATION OF THESE ITEMS WAS ADVERTISED FOR MARCH 21. After approval by the P &Z Commission, applicant may pick up 9 copies of approved plans and may then continue with Step II of the Building Permit Process. sjv