Loading...
HomeMy WebLinkAboutoctober 17 ��� City of College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE \ e COLLEGE STATION, TEXAS 77840 -2499 October 17, 1984 MEMORANDUM TO FILE SUBJECT: As -Built Landscaping Plan for Church in College Station (84 -706) Attending: t Al Mayo, Director of Planning David Pullen, City Engineer Kim Johnson, Asst. Zoning Official Shirley Volk, Planning Technician Doug Stovall, 907A Cross, College Station, Texas 77840 A review of an as -built landscaping plan was held on this date, and the planning staff informed Mr. Stovall (representative of the Church in College Station) that compliance with the condition required by the Planning and Zoning Commission that shrubbery around the portable building must be 5 gallon size is necessary. In lieu of compliance, the applicant must apply for a Revised Conditional Use Permit which would entail notification of residents within 200 feet, notices in the newspaper, payment of fees and another public hearing. Mr. Stovall was also reminded that ordinance requires that all land- scaping must be replaced should it die. Mr. Stovall indicated to all staff attending that he would prefer to replace the small shrubbery with 5 gallon shrubbery rather than to go through the entire Conditional Use Permit process again. cc: Richard Yeager, Church in College Station, 401 Dominik, College Station. sjv ♦i f llegi POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 -2499 October 17, 1984 MEMORANDUM TO: Saba Halaby, General Partner, Somana Partnership Greg Court, 18 Cargill Drive, Bryan, TX 77802 FROM: Project Review Committee: Al Mayo, Director of Planning David Pullen, City Engineer David Brochu, P&Z Representative Others Attending: Bob Epps, Ass't. Director of Public Services Joe Guidry, Electrical Superintendent Jim McCord, Elec. Power Engrs. Bill Riley, Water & Sewer Department David Riley, GTE Joey Porter, Ass't. Fire Marshal Kim Johnson, Ass't. Zoning Official SUBJECT: Site Plan Permit - Timber Creek Apts. Phase II - (84 -506) The P.R.C. met on this date to review the above mentioned project, and recom- mends approval with the following conditions:* (1) Ordinance requires an 8 ft. setback from property line to parking areas abutting streets (specifically along Spring Loop). (2) A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster locations, utility patds, etc.) Curb detail to be approved by the City Engineer. No exceptions will be made for areas indicated on site plan as "reserved for future parking ". (3) Additional parking for clubhouse may be necessary, depending upon the use of that room. If used for rental to the public, adequate parking is not available. Consult Legal Department regarding development agreement. (4) A 50 foot clear turning radius in front of dumpsters is required. Dumpster pad must be at same elevation as driving surface. A 12' x 12' minimum pad is required for each dumpster. Three six -yard dumpsters will be the minimum requirement for this project. (5) The fire hydrant across Spring Loop cannot be used for protection for this project. Additional hydrant(s) will be required at location designated by the Ass't. Fire Marshal. (6) All curbing must be marked as Fire Lanes. (7) Any work done in the flood plain will require a Flood Plain Development Per- mit. Coordinate with the City Engineer's office. A drainage easement may be required along the creek. (8) A landscape legend which includes species and points is required on the plan. (9) Barricades around trees to be protected must be in place prior to any exca- vation. (Protected trees should be a minimum of 6" caliper.) (10) Indicate the type of irrigation to be used for landscaping. Continue on page 2 P.R.C. Report (84 -506) 10 -17 -84 page 2 (11) Show dimensions of islands on plan. Minimum width required by ordinance is 9 feet. Any changes to an approved site plan must be cleared through the office of the Director of Planning. SUBMIT 8 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT FOR APPROVAL PRIOR TO BEGINNING STEP II OF THE BUILDING PERMIT PROCESS. sjv