HomeMy WebLinkAboutjanuary 24 ♦�� City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
January 24, 1984
MEMORANDUM TO FILE
PRESUBMISSION CONFERENCE
Attending: James Jett, Bart Munro, Larry Wells - Reps. of Applicant
Al Mayo, Director of Planning c1 c il tisj'-'
David Pullen, City Engineer
Bennie Luedke, Water & Sewer Superintendent
Jim McCord, Elec. Power Engrs.
Bob Epps, Ass't Director of Public Services
John Goff, GTE
Shirley Volk, Planning Technician
SUBJECT: Preliminary Plat - Newton Place I (84 -301)
A presubmtsslon conference review was held on this date regarding the above
mentioned plat. When the requirement that the developer must make a
land dedication for the extension of Holleman Street was stated, the
applicant stated emphatically that the platting process of this land
would be put on hold for the time being.
Staff continued to review the plat, offering the following requirements
for any future platting of this land.
(1) include and show on the plat an access easement which will provide
circulation through the land, and will also serve all lots in any
phase to be platted. Easement must accommodate large, emergency
vehicles.
(2) Easements for electric service must be coordinated to serve this
area, service preferably to come from Dartmouth. Work with the
Electrical Department prior to platting regarding location, number
and widths of easements necessary for service.
sjv
�, ��� City of College Station
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
\ / COLLEGE STATION, TEXAS 77840 -2499
January 24, 1984
MEMORANDUM
PRESUBMISSION CONFERENCE
Attending: Christian Galindo & Hubert Nelsen - velopers
Al Mayo, Director of Planning
David Pullen, City Engineer
Bennie Luedke, Superintendent of Water & Sewer
Jim McCord, Elec, Power Engrs.
Bob Epps, Ass't Director of Public Services
John Goff, GTE
Shirley Volk, Planning Technician
SUBJECT: Final Plat - Resubdivision of Block E Lots 1 -19 University Park I
and Lot 6, Block V, University Park II (84 -204)
A presubmission conference review of the above mentioned plat was held
on this date, and staff recommends approval with the following conditions:*
(1) A total of 20 feet between Lot 4 and Lot 5 is required for a
utility easement and may be located on either or both lots;
show on plat.
Any changes to the approved plat must be cleared through the Office of
the Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT BY 5:00 P.M. on
FRIDAY, JANUARY 27th TO BE INCLUDED ON PAZ AGENDA FEBRUARY 2nd.
sjv