PRESUBMISSION CONFERENCE
Attending: Al Mayo,Director of Planning
Harry Davis, Fire Marshal
Jane Kee, Zoning Official
W.D. Fitch, Bill Dryden (Applicants)
Jim McCord, Electric Power Engineers
David Pullen, City Engineer
Dan Dupies, Ass't. Zoning Official
John Goff, GTE
SUBJECT: Master Preliminary Plat- Southwood Valley Sect. 25 - 84 -300
A presubmission conference was held on 12/21/83 to review the above mentioned
plat, and staff recommends approval with the following conditions:*
(1) Show fire hydrants - all residences must be within 500'
(2) Furnish drainage plan to City Engineer which includes pre- construction
and post- construction calculations.
(3) Furnish sanitary sewer flow calculations to City Engineer.
(4) Maintain minimum 2' separation between high voltage conduit and low voltage
conduit in the utility easements.
(5) Transformers should be set just behind the R.O.W. Work with E.P.E. in setting
transformers.
(6) Will need 20' utility easement on the south side of the project (cul -de -sacs
Pueblo, Rayado & Arroyo) from the utility easement on the Family Tree side
to the cul -de -sacs.
(7) Size and configuration of drainage easement to be determined at the time
calculations are submitted to the City Engineer.
- (8) Recommend looping some streets rather than having so many cul -de -sacs.
* Any changes to the approved plat must be cleared through the office of the
Director of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO THE PLANNING DEPARTMENT BY 5:OOP.M. ON DECEMBER
28 TO BE (INCLUDED ON P &Z AGENDA JANUARY 5TH 1984.
C_I City of College Station
P OST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
December 21, 1933
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
Jane Kee, Zoning Official
David Pullen, City Engineer
Jim McCord, Electric Power Engineers
John Goff, GTE
SUBJECT: Replat of lot 1 Block One North Park Addition and a previously unplatted
1.92 acre tract to be known as Texian Inn Addition - 84 -200
A presubmission conference was held on 12/21/83 to review the above mentioned
plat, and the staff recommend approval with the following condition.*
(1) Staff cannot recommend the sharp jog in the 10' utility easement along the
northwest side.
(2) There may be a requirement for a 20' utility easement along Texas Ave. Verify
this with the City Engineer.
* Any changes to the approved plat must be cleared through the office of the Director
of Planning.
SUBMIT 10 COPIES OF THIS PLAT TO THE PLANNING DEPARTMENT BY 5:00 P.M. ON DECEMBER
28TH TO BE INCLUDED ON P &Z AGENDA JANUARY 5TH 1984.
C_I C ity of College Station
P OST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840 -2499
December 21, 1983
PRESUBMISSION CONFERENCE
Attending: Al Mayo, Director of Planning
Jim McCord, Electric Power Engineers
Jane Kee, Zoning Official
David Pullen, City Engineer
John Goff, GTE
SUBJECT: Replat of lots 6 &7 Block B Eastmark II - Allen Honda - 84 -201
A presubmission conference was held on 12/21/83 to review the above mentioned plat,
and staff recommends approval, with the comment that the plat will not be filed
until the Staff receives an answer form the City Council concerning the alignment
of Southwest Parkway.*
* Any changes to the approved plat must be cleared through the office of the
Director of Planning.
SUBMIT 10 COPIES OF THIS PLAT TO THE PLANNING DEPARTMENT BY 5:00 P.M. ON DECEMBER
28TH TO BE INCLUDED ON P &Z AGENDA JANUARY 5TH 1984.
� ♦ City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
` / COLLEGE STATION, TEXAS 77840 -2499
December 21, 1983
PRESUBMISSION CONFERENCE
Attending: Chris Galindo (Applicant)
Jim McCord, Electric Power Engineers
Dan Dupies, Ass't Zoning Official
Jane Kee, Zoning Official
Al Mayo, Director of Planning
David Pullen, City Engineer
John Goff, GTE
SUBJECT: Replat of lots 10 & 11 Block U University Park II
A presubmission conference was held on 12/21/83 to review the above mentioned
plat, and staff recommends approval with the following conditions:*
(1) Will need a 20' utility easement along the eastern boundary line with a minimum
of 10' on lot 10. Show 10' of the 20' easement on lot 15 Block T on this
plat. If it is difficult to acquire 10' on lot 15 Block T, then show the
entire 20' on lot 10 Block U.
(2) Designate the 60' &65' P.A.E. as a parking and access easement, preferably as
a private parking and access easement.
* Any changes to the approved plat must be cleared through the office of the Director
of Planning.
SUBMIT 10 COPIES OF REVISED PLAT TO THE PLANNING DEPARTMENT BY 5:00 P.M. ON DECEMBER