HomeMy WebLinkAboutjune 28 IZ ( Cily of College Station P OST OFFICE BOX 9960 1101 "TEXAS AVENUE COLLEGE STATION, "TEXAS 77840 -2499 June 28, 1983 PRESUBMISSION CONFERENCE Attending: Jim Callaway, Ass't Director of Planning Mark Smith, Assistant to City Engineer Joe Guidry, Electrical Superintendent Jim McCord, Elec. Power Engrs. Shirley Volk, Planning Technician Mike McClure, McClure Engineering SUBJECT: Foxfire Phase iV PRELIMINARY PLAT (83 - 307) The staff held a Presubmission Conference on Tuesday, June 28, 1983 to review the subject preliminary plat. Staff recommends approval with the following changes: (1) Subdivision Ordance No. 690 requires streets to have a 70 ft. right -of -way in rural sections. The applicant is proposing 60 ft. streets with 16 foot easements on each side in accordance with County regulations. (2) Applicant must furnish a letter or some record of permission from the downstream owner concerning discharge of drainage prior to filing of final plat. (3) Approval by the City Engineer of this preliminary plat does not necessarily indicate final approval of any utility sizes or locations. (4) The layout of Blocks should be designated with some kind of logical boundary and numbered accordingly, A block should not be divided by a street and /or a right -of -way. (5) The water line along the proposed section of Frost Drive must be in the right -of -way or in an utility easement. (6) Any required easements across lot lines must be designated such by either written Instrumentation or the owner's signature must be included on the final plat before filing of that final plat. (7) Designate what study established the 100 year flood hazard area. (8) Designate in notes concerning public roadways that they will be 24 ft. wide with a 10 ft. shoulder per Ordinance 690. (9) The final plat should include a note which will advise future property owners of the possibility of future additional electrical facilities being constructed in the Exxon and Gulf States easements by the City. (10) If the drainage area for this plat is greater than 0.5 square mile, drainage will be required to be in rights -of -way rather than easements. FURNISH 10 COPIES OF REVISED PLAT BY 5:00 P.M. JUNE 30th TO BE INCLUDED ON PAZ AGENDA JULY 7th. sjv � City of College Station P OST OFFICE BOX 9960 1 101 TEXAS AVENUE \ / COLLEGE STATION, TEXAS 77840 -2499 June 28, 1983 MEMORANDUM TO: Planning and Zoning Commission J. W. Wood FROM: Project Review Committee: Jim Callaway, Ass't Director of Planning Mark Smith, Assistant to the City Engineer Murl Bailey /Ron Kaiser, P &Z Representative Other Staff: Joe Guidry, Electrical Superintendent Jim McCord, Elec. Power Engrs. Dan Dupies, Ass't to the Zoning Official Shirley Volk, Planning Technician SUBJECT: Parking Lot Plan - Southwest Crossing Office Building (83 -426) The P.R.C. met on this date to review the above mentioned project, and recommends that additional planning and platting take place prior to approval of this project. On the plan shown, the following recommendations were made: (1) As the plan is shown, the project will be allowed only one curb cut, the radius of which cannot encroach adjacent property. (2) Show topographical data, including the direction of drainage and how it will be handled on site. (3) The water line to be bored across Southwest Parkway will be a "dry bore ". Plan should include this note. (4) An easement will be required, location and size to be determined later, from the project to the point of connection to the sewer line. Show the existing sewer line on the plan. (5) An easement will be required on the water line to the fire hydrant. (6) Label all existing and proposed fire hydrants. Hydrant must be within 300 feet of all parts of building as the hose lays. (7) A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster locations, utility pads, etc.) Curb detail to be approved by the City Engineer. The only exception to this curbing requirement is at the end of the driveways which will connect with a neighboring project in the very near future. Wheel stops at those locations will be acceptable until the driveway connections are made. (8) No detached sign will be allowed (A -P zone). If flag poles are planned, they should be shown on the site plan. (9) Coordinate with Electrical Department regarding electrical preferences and requirements. Any boring of Southwest Parkway will be a dry bore. (10) Driveways may have to be widened to accommodate emergency vehicles and maintenance vehicles. Contact Fire Department and Department of Public Services for requirements. P.R.C. June 28, 1983 83 -426; Southwest Crossing Office Bldg. page 2 (11) Fire Department may have problems with access to buildings. Contact Fire Marshall for requirements. An additional P.R.C. review of this proposed project as revised has been scheduled for 10:30 A.M. on July 5, 1983. Tentative date of review by PAZ is July 21, 1983. sjv