HomeMy WebLinkAboutmarch 10 CI City of College Station
P OST OFFICE BOX 9960 1 101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840
March 10, 1983
MEMORANDUM
TO: Planning & Zoning Commission
Wick McKean (�
FROM: Project Review Committee:
Jim Callaway (for Al Mayo), Assistant Director of Planning
David Pullen, City Engineer
Jim Behling, Chairman P &Z
Other Staff:
Jane Kee, Zoning Official
Shirley Volk, Planning Technician
SUBJECT: Office /Retail Building by Jan -Wic Homes, Inc. located on Welsh St.
(82 -416)
The P.R.C. met to discuss the revised plans and the plans which had been
approved by the P &Z, but which were not the same.
After discussion of the required and approved 8' -0" setback, the safety and
asthetic reasons for the 8' -0" requirement, and Mr. McKean's statement that
an error had been made for which he apologized, the City Engineer (David Pullen)
and Chairman of the P &Z (Jim Behling) indicated that in their opinion, the
4' -0" setback which is proposed is acceptable, and they can recommend to the
P &Z the revised plans be approved. Their reasoning is that they believe an
error has been made. Mr. Callaway disagreed with this recommendation, prefer-
ring the required 8 ft. setback.
Agreement was reached that the dimensions on the parking lot were acceptable
and would handle traffic and parked vehicles, however, it was pointed out by
staff that 36 parking spaces are required for this project, and the plan as
shown at the time of this review only provides 32 parking spaces. The P.R.C.
recommends that these required 4 spaces be provided for.
P.R.C. also requests that actual dimensions be shown on the site plan.
Any changes to an approved site plan must be cleared through the Office of the
Director of Planning.
Provide 10 copies of the revised plan to the Planning Department by 5 P.M. on
March 11th in order to be included on P &Z Agenda for March 17th.
sjv