Loading...
HomeMy WebLinkAboutfebruary 15 ♦�� City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE \ / COLLEGE STATION, TEXAS 77840 February 15, 1983 PRESUBMISSION CONFERENCE Attending: Al Mayo, Director of Planning l' 417"-A."-- David Pullen, City Engineer Mac Allen, Director of Public Services Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent David Riley, GTE Shirley Volk, Planning Technician SUBJECT: Final Plat - Marion Pugh Blvd. Ofc /Service Center - 83 -207 Staff recommends approval with the following changes:* (1) A 20 ft. easement is required over the sewer line. Check with City Engineer for location and way to handle the easement; show easement o plat. (2) Check with the City Engineer concerning a water line easement which cuts across this plat. Show easement on plat. SUBMIT 10 COPIES OF REVISED PLAT BY 5 P.M. FEBRUARY 25th TO BE INCLUDED ON P &Z AGENDA MARCH 3rd. Any additional changes to the approved plat must be cleared through the Office of the Director of Planning. sjv Ch I City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 February 15, 1983 PRESUBMISSION CONFERENCE Attending: Al Mayo, Director of Planning David Pullen, City Engineer Elrey Ash, Director of Capital Improvements Harry Davis, Fire Marshal Mac Allen, Director of Public Services Joe Guidry, Electrical Superintendent David Riley, GTE Shirley Volk, Planning Technician SUBJECT: Final Plat - Texana Bank - 83 -206 Staff recommends approval with the following changes:* (1) Reflect on plat easements to cover all existing utilities. (2) Check with Electrical Superintendent (Joe Guidry) concerning possible additional easement across the back of property for guys. Locate pole easement on plat. SUBMIT 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT BY 5 P.M. FEBRUARY 25th TO BE INCLUDED ON MARCH 3rd PAZ AGENDA. "Any changes to the approved plat must be cleared through the Office of the Director of Planning. sjv ♦�� City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE \ / COLLEGE STATION, TEXAS 77840 February 15, 1983 MEMORANDUM TO: Planning and Zoning Commission Brooks Catlin & Jim Holster FROM: Project Review Committee Al Mayo, Director of Planning David Pullen,City Engineer Jim Behling, Chairman PAZ Other Staff: Elrey Ash, Director of Capital Improvements Harry Davis, Fire Marshal Mac Allen, Director of Public Services Joe Guidry, Electrical Superintendent Jane Kee, Zoning Official Dan Dupies, Ass't Zoning Official David Riley, GTE SUBJECT: Parking Lot Plan - Valley Business Park 83 -409 The P.R.C. met on this date to review the site plans for the above mentioned project, and recommends approval with the following changes:- (1) Dumpster pad must be on grade with the parking lot and a minimum of 12'x12' per unit interior measurements must be allowed. There can be no obstruction for 50 ft. in front of dumpster. (2) Remove the word "Preliminary" from the plan. (3) Show landscaping details. (4) The radius of a driveway cannot extend beyond the extension of a property line. As shown, the radius of the driveway is partly on neighboring property. (5) A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster locations, utility pads, etc.) Curb detail to be approved by the City Engineer. No exceptions will be made for areas indicated on site plan as "reserved for future parking ". (7) A letter requesting underground service must be submitted. Conduit will be furnished by the developer to the Property Line. Meters will be ganged at one location. (8) Sign location is too close to Property Line. Check with Jane Kee, Zoning Official for size and location of sign. (9) A drainage study prepared by a registered professional engineer is required. SUBMIT 10 COPIES OF THE REVISED PLAN TO THE PLANNING DEPARTMENT BY 5 P.M. FEBRUARY 25th TO BE INCLUDED ON MARCH 3rd P &Z AGENDA. Any changes to the approved plan must be cleared through the Office of the Director of Planning. sjv City of College Station POST OFFICE BOX 9960 1 101 TEXAS AVENUE S I COLLEGE STATION, TEXAS 77840 February 15, 1983 MEMORANDUM TO: Planning and Zoning Commission Roy Harper, Harry Jemison, Jim Jett FROM: Project Review Committee Al Mayo, Director of Planning David Pullen, City Engineer Jim Behling, P &Z Chairman Other Staff: Elrey Ash, Director of Capital Improvements Harry Davis, Fire Marshal Mac Allen, Director of Public Services Joe Guidry, Electrical Superintendent Jane Kee, Zoning Official Dan Dupies, Ass't Zoning Official Shirley Volk, Planning Technician David Riley, GTE SUBJECT: Parking Lot Plan - Texana National Bank - 83 -408 The P.R.C. met on this date to review the site plans for the above mentioned project, and recommends approval with the following changes:* (1) Relocate handicap parking spaces (covered in Building Code) to a closer proximity to ramps. (2) Widen the island at the curb cut on Highway 30 to 9 ft. (3) Square off the curbing at the corner of Stallings & Hwy.30. (4) Widen the island at the curb cut on Stallings. (5) Extend the island at the NW corner of property; add an island to the other end of that row of parking. (6) Redraw site plan and change to an engineering scale (1:10 or 20). (7) Check with Director of Public Services (Mac Allen) concerning location of dumpster. Pad must be at the same grade as the driveway, and an interior minimum of 12'x12' allowed for each unit. (8) Furnish a complete drainage study and plan by a registered professional engineer which includes runoff prior to construction, runoff possible after construction and how much detention is proposed on site. (9) A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster location, utility pads, etc.) Curb detail to be approved by the City Engineer. No exceptions will be made for areas indicated on site plan as "reserved for future parking ". (10) An additional fire hydrant is required and is to be located by the Fire Marshal. All points of all buildings must be within 300 ft. of hydrant as the hose lays. (11) Electrical service will probably be off Highway 30. Check with Electrical Superintendent (Joe Guidry) concerning location of transformer and load requirements. P.R.C. Memo 83 -408 February 15, 1983 page 2 (12) The driveway off Highway 30 should be wider than the 25 ft. shown. Thirty -six (36) feet is recommended. (13) Suggest that 6" concrete rather than the proposed 42" be used. (14) Conduit for telephones are required to the property line. Check with David Riley of GTE concerning location and required service. (15) Existing and proposed contours are to be shown on site plan. *Any changes to the approved plan must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT BY 5 P.M. FEBRUARY 25th TO BE INCLUDED ON MARCH 3rd PAZ AGENDA. sjv