Loading...
HomeMy WebLinkAboutIRIS local status form 1967 DATE I ' Information in this column. INCREASED READINESS INFORMATION SYSTEM (IRIS) LOCAL STATUS FORM and the TEXT are to be report- ed to the STATE CD OFFICE REPORT NUMBER Report ONLY CHANCES in Increased Readiness actions from yesterday. Use criteria on back of this STATUS FORM. If no changes have occurred, report NO CHANCE. FROM: (Originating Office) Submit report to STATE CD OFFICE' daily by 1800 (6 pm) local time (dr other time requested by State CD.) For tests and exercises, use test or exercise name at beginning and end of message. A B C D 'E FCDG INCREASED READINESS ACTIONS TO BE REPORTED PREVIOUSLY C R REF (See Federal CO Guide, Part G, Chapter 5) REPORTED CONDITION NEW CONDITION TODAY CONDITION REPORTED G -5 -I BASIC ACTIONS TO INCREASE LOCAL GOVERNMENT READINESS ; "; •i 'i : • • •.. • I A HEAD OF GOVERNMENT BRIEFED AND FCDG G-5 AND APPENDICES (Yes) "Yes," tf a change ( REVIEWED t . 14 •• ••: r • ::::::::: :• :::: :: •:: • :•• • ::_:•:.•. :•. G EMERGENCY PUBLIC INFORMATION ::: : : : :. : ::: : : :i::•:::•::•:: = : :•:: ::::: ;::::•::::•:•: 2A MODERATE STEP -UP IN LOCAL CD PUBLIC INFORMATION ACTIVITIES (Yes) t � Yes, It a change ST ARTED I 2A (Yes) 1 "Yes;' 0 a change 2B LOCAL CSP -TYPE INFORMATION DISSEMINATED TO PUBLIC 2 B 2C PUBLIC URGED BY LOCAL AUTHORITIES TO MAKE FINAL CRISIS (Yes) "Yes;' 0 o change PREPARATIONS SHORT OF TAKING SHELTER 1 2C G -5 -3 SIGNIFICANT PUBLIC ACTIONS DURING INCREASED READINESS PERIOD ::: ::::::::.i:i:i:_ ::: ::ii :::: :: :::::: :: ::: 3A ESTIMATED LEVEL OF RETAIL FOOD SALES ABOVE NORMAL alai 3A new level % 3B ESTIMATED LEVEL OF RETAIL GASOLINE SALES ABOVE NORMAL new level ° /a 3B EMD EL WIRAWA new level 3C+ INSTITUTIONS LEV ABOVE OF NORMAL LS FROM FINANCIAL % 3C new level 3D ESTIMATED LEVEL OF SCHOOL ABSENTEEISM ABOVE NORMAL D ie 3D °/o 3E ESTIMATED LEVEL OF ABSENTEEISM FROM WORK -ABOVE NORMAL new level % 3E 3F ; 3F ACCELERATED TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . :•: ; ::•::•::•:•:::•:: r•:::•:::::•: ...... (Yee) 1 : " Yes, • If a change 4A ACCELERATED TRAINING STARTED 4A number 1 new total 4B NUMBER OF SHELTER MANAGERS COMPLETING TRAINING j 4B number 1 new total 4C NUMBER OF RADIOLOGICAL MONITORS COMPLETING TRAINING 4C L PM ., •::: ::: G 5-5 EOC FACILITY IMPROVEMENT OR DEVELOPMENT E ....... ........................:. . • ............ ....::::................... 5A (lf no odequate EOC focilify exists) IMPROVEMENT OR (Yes) Yes ;' 0 o change DE OF EOC FACILITY STARTED 5A 5B IMPROVEMENT OR DEVELOPMENT OF EOC COMPLETED (YB8) "Yes;' It a change G - DIRECTION •:. :. f::::::. 5B 5 - IRECTION AND CONTROL READINESS .......................................:•::.•:::•::• :• :•::•::•:ti :•: :• : ...... ..... ..... •:: - - .. (Yes) 1 "Yes: If a change 6A EOC MANNED 24 -HOURS AT STANDBY LEVEL 6A 6B EOC MANNED AT MINIMUM OPERATIONAL. LEVEL (Yes) 6B "Yes;'If o change 6C EOC FULLY MANNED (Yes) 6C "Yes;' Ito change 6- 5-7,8,9 COMMUNICATIONS, WARNING, RADEF -NO IRIS REPORTS REQUIRED :::::: :: ::: ::: G -5 -10 PUBLIC SHELTER DEVELOPMENT OR IMPROVEMENT:: :: :i::� :r: :i :: •....... ... 10 ACCELERATED PUBLIC SHELTER MARKING STARTED (Y88) j 104 "Yes;'If a change I 10B ACCELERATED PUBLIC SHELTER STOCKING STARTED (Yes) "Yea,' 0 a change IOB 10 C EXPEDIENT GROUP SHELTER CONSTRUCTION STARTED (Yes) "Yes;' It a change IOC 10D IOD G-5-11 THROUGH 21 NO IRIS REPORTS REQUIRED 1I I11111111 1t1111l tl I ' : :::: i :— :::'::•:::•:•::•: •::•:::::::•:::•::::•::• ::'T` :ki .................. ....••• . If necessary, briefly explain the items above, identifying the item by number, e.g. 3A. Also include any actions deemed highly significant but not covered in checklist above. COMMUNICATORS INITIALS TIME SENT OCD FORM 766 4, JULY 1967 1. IRIS REPORT FILE