HomeMy WebLinkAbout1980-1239 - Ordinance - 09/11/1980ORDINANCE NO. 1239
' AN ORDINANCE FIXING AND DETERMINING THE GENERAL SERVICE RATE TO BE CHARGED
FOR SALES OF NATURAL GAS TO RESIDENTIAL AND COMMERCIAL CONSUMERS IN THE CITY
OF COLLEGE STATION, BRAZOS COUNTY, TEXAS; PROVIDING FOR THE MANNER IN WHICH
SUCH RATE MAY BE CHANGED, ADJUSTED, AND AMENDED; AND PROVIDING FOR A
SCHEDULE OF SERVICE CHARGES.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS:
Section 1. Effective with gas bills rendered on and after thirty (30)
days from the final date of passage of this ordinance, the maximum
general service rate for sales of natural gas rendered to residential and
commercial consumers within the city limits of College Station, Texas,
by Lone Star Gas Company, a division of ENSERCH CORPORATION, a Texas
Corporation, its successors and assigns, is hereby fixed and determined
as set forth in Item A, in the Attachment hereto which is incorporated
herein.
Section 2. The residential and commercial rates set forth above shall
be adjusted upward or downward from a base of $2.0279 per Mcf by a Gas
Cost Adjustment Factor expressed as an amount per thousand cubic feet
(Mcf) of natural gas for changes in the intracompany city gate rate charge
as authorized by the Railroad Commission of Texas or other regulatory
body having jurisdiction for gas delivered to the College Station distri-
bution system, according to Item B, in the Attachment hereto which is
incorporated herein.
Section 3. Company shall also receive tax adjustments according to Item
C, in the Attachment hereto which is incorporated herein.
Section 4. In addition to the aforesaid rates, Company shall have the right
to collect such reasonable charges as are necessary to conduct its business
and to carry out its reasonable rules and regulations in effect, as set
forth in Item D, in the Attachment hereto which is incorporated herein.
Section 5. The rates set forth in this ordinance may be changed and
amended by either the City or Company in the manner provided by law.
Service hereunder is subject to the orders of regulatory bodies having
jurisdiction, and to the Company's Rules and Regulations currently on
file in the Company's office.
Section 6. It is hereby found and determined that the meeting at which
this ordinance was passed was open to the public, as required by Texas
Law, and that advance public notice of the time, place and purpose of said
meeting was given.
PASSED, APPROVED AND ADOPTED, this the 11th day of September, 1980.
ATTEST
err'
City Secretary
APPROV
PPROV
ayor
page 2
ATTACHMENT TO ORDINANCE NO. 1239
City of College Station, Texas
M
LONE STAR GAS COMPANY
TARIFFS & SCHEDULES
Item A. The following rates are the maximum applicable to residential and commercial
consumers per meter per month or for any part of a month for which gas
service is available at the same location.
Residential:
Customer Charge
All Consumption @
$2.0000
$2.3764 per Mcf
If the service period is less than 28 days, the customer charge is
$.0714 times the number of days service.
Commercial:
Customer Charge
All Consumption @
$4.0000
$2.3764 per Mcf
If the service period is less than 28 days, the customer charge is
$.1429 times the number of days service.
Bills are due and payable when rendered and must be paid within ten
days from the monthly billing date.
Item B. Gas Cost Adjustment
Each monthly bill at the above rate shall be adjusted for gas cost as follows:
(1) The city gate rate increase or decrease applicable to current billing
month residential and commercial sales shall be estimated to the
nearest $0.0001 per Mcf based upon:
(a) A volume factor of 1.0137 determined for the distribition
system as the ratio of Mcf purchased divided by the Mcf sole
for the 12 month period ended June 30, 1979.
(b) The city gate rate estimated to be applicable to volumes purchased
during the current calendar month, expressed to the nearest $0.0001
per Mcf (shown below as "Re ").
(c) The base city gate rate of $2.0279 per Mcf.
(2) Correction of the estimated adjustment determined by Item B(1) above
shall be included as part of the adjustment for the second following
billing month. The correcting factor (shown below as "c "') shall be
expressed to the nearest $0.0001 per Mcf based upon:
(a) The corrected adjustment amount based upon the actual city gate
rate less
(b) The estimated adjustment amount billed under Item B(1) above
divided by
03277
page 3
(c) Distrubition system residential and commercial sales Mcf recorded
on the Company's books during the prior year for the month that
the correction is included as part of the adjustment.
(3) The adjustment determined by Item B(1) and Item B(2) above shall
be multiplied by a tax factor of 1.03919 to include street and
alley rental and state occupation tax due to increasing Company
revenues under this gas cost adjustment provision.
In summary, the gas cost adjustment (GCA) shall be determined to the
nearest $0.0001 per Mcf by Item B(1), Item B(2) and Item B(3) as follows:
GCA = Item B(1) + Item B(2) x Item B(3)
GCA = (1.0137) (Re - $2.0279) + c x 1.03919
Item C. Tax Adjustment
The tax adjustment shall be an amount equivalent to the proportionate
part of any new tax, or increased tax, or any other governmental
imposition, rental, fee or charge, (except state, county, city and
special district ad valorem taxes and taxes on net income) levied,
assessed or imposed subsequent to January 1, 1980, upon or allocable
to the Company's distribution operations, by any new or amended law,
ordinance or contract.
Item D. Schedule of Service Charges
(1) Reconnect Charge
In addition to the charges and rates set out above, the Company
shall charge and collect the sum of:
Schedule Charge
8 a.m. to 5 p.m. Monday thru Friday $20.00
5 p.m. to 8 a.m. Monday thru Friday 30.00
Saturdays, Sundays & Holidays 30.00
as a reconnection charge for each reconnection or reinauguration of gas
service, where service has been discontinued at the same premises for
any reason, with the following exceptions:
(a) For a builder who uses gas temporarily during construction or for
display purposes.
(b) For the first occupant of the premises.
(c) Whenever gas service has been temporarily interrupted because
of system outage, service work or appliance installation done
by Company; or
(d) Any reason deemed necessary for Company operations.
2715
page 4
Service Charge
Clean and replace mantles $ 5.00
Painting (black and white and /or
replacing glass panes) $ 4.00
All new company sold gas lights serviced free of charge for 90 days, during
standard working hours.
Air Conditioning Service
Schedule Hourly Charge
Any hour Sunday through Saturday and Holidays $20.00
Time in excess of one hour prorated in 15 minute increments, as follows:
Increments All Hours
15
(2) Appliance,
Gas Light and Air Conditioning
Service Charges
minutes
$10.00
Appliance Service Charges
minutes
$15.00
Schedule
Hourly
Charges
8 a.m, to 5 p.m.
Monday thru Friday $18.00
5 p.m. to 8 a.m.
Monday thru Friday 27.00
Saturdays, Sundays
& Holidays 27.00
An additional charge
of $12.00 added to the above charges when a
second employee
(helper) is required.
Time in excess of
one hour prorated in 15 minute increments, as follows:
Standard
Non - Standard
Increments
Working Hours
Working Hours
15 minutes
$ 4.50
$ 6.75
30 minutes
$ 9.00
$13.50
45 minutes
$13.50
$20.25
60 minutes
$18.00
$27.00
Standard working
hours defined as 8 a.m. to 5 p.m. Monday through
Friday except holidays.
All new company
sold grills serviced free of charge for 90 days, during
standard working
hours.
Gas Light Service
Service Charge
Clean and replace mantles $ 5.00
Painting (black and white and /or
replacing glass panes) $ 4.00
All new company sold gas lights serviced free of charge for 90 days, during
standard working hours.
Air Conditioning Service
Schedule Hourly Charge
Any hour Sunday through Saturday and Holidays $20.00
Time in excess of one hour prorated in 15 minute increments, as follows:
Increments All Hours
15
minutes
$ 5.00
30
minutes
$10.00
45
minutes
$15.00
60
minutes
$20.00
U3279
page 5
All new company sold air conditioning units serviced free of charge
for one year from date of installation.
No additional charge for second employee (helper).
Labor charges in excess of factory allowances for warranty replacement
and repair will be passed on to the customer.
(3) Charges for replacing Yard Lines
Item or Service
Basic service charge for all replacement
work
Prebent Riser with Support Post
Noncorrodible Prebent Riser
Stopcock
Ditch, replace 1 and 1/4 inch (or smaller)
pipe, and obtain city inspection
Remove grass, ditch, replace 1 and 1/4 inch
(or smaller) pipe, obtain city inspection
and replace grass
Insert 1 and 1/4 inch (or smaller) Polyethylene
pipe in existing service line
Special trip to perform yard line work at
customer's request and work cannot be
scheduled for Company convenience
Work performed on overtime basis at
customer's request
Disconnecting and reconnecting customer
yard line at main when yard line is
replaced by other contractors
Charge
$40.00
$20.00
$15.00
$ 4.95
$ 2.00 per foot
$ 2.30 per foot
$ 1.90 per foot
$40.00 additional
$60.00 per hour l/
$40.00
A firm price quotation will be made on the basis of labor, material,
and other costs for replacing yard lines larger than 1 and 1/4 inch
in size.
l / Computed at one - fourth the hourly rate for each 15 minute
period or fraction thereof. The same work performed on a
call -out basis will be charged at the overtime rate with a
two hour minimum charge.
(4) Main Line Extension Rage (Residential)
The charge for extending mains beyond the free limit established
by Lone Star Gas, or any free limit established by city franchise
is $4.50 per foot except for large commercial and industrial con-
sumers which are handled on an actual cost per foot basis.
(5) Returned Check Charges
A returned check handling charge of $5.00 is made for each check re-
turned to the Company for reasons of non - sufficient funds, account
closed, payment withheld, invalid signature or improper preparation.
th3280