AN ORDINANCE AMENDING ORDINANCE NO. 1146, FIXING THE SCHEDULE OF ELECTRIC
UTILITY RATES FOR LARGE INDUSTRIAL CUSTOMERS (SCHEDULE LP-3).
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS:
1. Section 1. Schedule of Rates shall be amended to add the following:
Subsection G. Electric Rate - Schedule LP-3
(Large Industrial)
Applicable: To all large industrial customers who contract for over 2,500 kw
of demand and where service is taken through one meter at one
point of delivery. Before service is supplied, individual contracts
should be negotiated outlining all details of the service to be
supplied, the terms of the contract, and the obligations of each
party.
Character of Service:
A.C.; 60 cycles per second, single phase, 120/240 volts; three phase,
120/240, 120/208, 240/480, 2300/4160, 7200/12,470 volts, as available
at point of service. Three phase customers served via underground
primary to pad -mounted transformers will be offered only 120/208 or
277/480 volt service.
Rate: Demand Charge: $3.00 per kw of billing demand.
Energy Charge: 1.50� per kwhr.
Billing Demand:
The billing demand shall be the maximum 15 minute measured kw in
the month, but not less than 75% of the peak demand measured in
the twelve month period ending with the current month.
Where the customer provides an integrating graphic demand meter
satisfactory to the City, off-peak service will be provided for
in ,the negotiated contract.
Minimum Bill:
$3.50 per kw of billing demand plus applicable power cost adjust
ment on the kwhrs used plus applicable tax adjustment.
Power Cost Adjustment:
The net energy charge per kilowatthour under the above rate shall
be increased or decreased to reflect the application of a power
cost adjustment calculated in accordance with Schedule PCA.
Power Factor:
Should the power factor be lower than 0.90 lagging, the City may
adjust the measured demand by multiplying by the ratio of 0.90 to
,rr the actual power factor.
03128
Page 2
Ordinance No. 1172
Primary Service:..
Where service is taken by the customer at the City's available
primary voltage, a credit of 4% of the net bill will be allowed.
Metering may be primary or secondary (corrected by transformer
losses) at the City's option.
2. This rate shall be effective on all invoices submitted by the City of
College Station to users on or about August 1, 1979.
3. Any ordinance or portion thereof in conflict with this ordinance is
hereby repealed, and the provisions of this ordinance, in case of con-
flict, shall govern. If any portion of this ordinance shall be declared
invalid, such declaration shall not affect the other portions thereof.
PASSED, APPROVED, AND ORDERED PUBLISHED this the 26th day of July, 1979.