Loading...
HomeMy WebLinkAbout09/01/2022 - Agenda Packet - Planning & Zoning Commission College Station, TX Meeting Agenda Planning and Zoning Commission 1101 Texas Ave, College Station, TX 77840 https://zoom.us/j/8116453692 Phone: 888 475 4499 and Webinar ID: 811 6452 3692 The City Council may or may not attend this meeting. September 1, 2022 6:00 PM City Hall Council Chambers College Station, TX Page 1 Notice is hereby given that a quorum of the meeting body will be present in the physical location stated above where citizens may also attend in order to view a member(s) participating by videoconference call as allowed by 551.127, Texas Government Code. The City uses a third- party vendor to host the virtual portion of the meeting; if virtual access is unavailable, meeting access and participation will be in-person only. 1. Call to Order, Pledge of Allegiance, Consider Absence Request. 2. Hear Visitors At this time, the Chairperson will open the floor to visitors wishing to address the Commission on issues not already scheduled on tonight's agenda. An individual who wishes to address the Commission regarding any item on the agenda shall register with the Commission Secretary prior to 4 p.m. on the day of the meeting. To register, the individual must provide a name and phone number by calling 979.764.3751 or emailing khejny@cstx.gov prior to 4 p.m. To submit written comments to the Commission, email khejny@cstx.gov and they will be distributed to the Commission. The visitor presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Commission and to allow adequate time for completion of the agenda items. The Commission will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) 3. Consent Agenda All matters listed under the Consent Agenda, are considered routine by the Commission and will be enacted by one motion. These items include preliminary plans and final plats, where staff has found compliance with all minimum subdivision regulations. All items approved by Consent are approved with any and all staff recommendations. Since there will not be separate discussion of these items, citizens wishing to address the Commission regarding one or more items on the Consent Agenda may address the Commission at this time as well. If any Commissioner desires to discuss an item on the Consent Agenda it may be moved to the Regular Agenda for further consideration. 3.1. Consideration, discussion, and possible action to approve meeting minutes. Attachments: 1. August 18 2022 3.2. Presentation, discussion, and possible action regarding a Final Plat for Mission Ranch Phase 403 on approximately 10 acres of land, located where Sherrill Court & Hardin Hills Drive meet. Case #FP2021-000026 Sponsors: Derrick Williams Attachments: 1. Staff Report 2. Vicinity Map, Aerial, and Small Area Map Page 1 of 107 Planning and Zoning Commission Page 2 September 1, 2022 3. Final Plat 4. Consideration, discussion, and possible action on items removed from the Consent Agenda by Commission action. 5. Regular Agenda 5.1. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundary from GS General Suburban to GS General Suburban and ROO Restricted Occupancy Overlay on approximately 9.86 acres being 26 lots within North Forest Estates, Block 1 and 2, generally located along Justin Avenue. Case #REZ2022-000014 (Note: Final action of this item will be considered at the September 22, 2022 City Council meeting – Subject to change). Sponsors: Alyssa Halle-Schramm Attachments: 1. Staff Report 2. Vicinity, Aerial, and Small Area Map 3. Background Information 4. Rezoning Map 5. Original Subdivision Plat 6. Applicant's Supporting Information 7. Petition Committe Members 8. Neighborhood Meeting Materials 9. Petition Signatures 5.2. Presentation, discussion, and possible action on the Small Area Plan Audit. (Note: Discussion of this item is scheduled for the September 22, 2022 City Council Meeting on the regular agenda - Subject to change). Sponsors: Naomi Sing Attachments: 1. Memo 2. Small Area Plan Audit 5.3. Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 6, "Use Regulations," Section 6.3 "Types of Use,” Section 6.4 "Specific Use Standards,” Article 7, "General Development Standards," Section 7.2 "General Provisions,” Section 7.3 "Off-Street Parking Standards,” Section 7.6 "Landscaping and Tree Protection,” Section 7.7 "Buffer Requirements,” Article 11, "Definitions," Section 11.2 "Defined Terms,” of the Code of Ordinances of the City of College Station, Texas, regarding the creation of a new use called Shared Housing. Case #ORDA2022-000005 (Note: Final action on this item will be considered at the September 22, 2022 City Council Meeting - Subject to change). Sponsors: Michael Ostrowski Attachments: 1. Cover Sheet 2. UDO - Section 6.3 - Types of Uses 3. UDO - Article 7 - General Development Standards 4. UDO - Section 11.2 - Defined Terms Page 2 of 107 Planning and Zoning Commission Page 3 September 1, 2022 6. Informational Agenda 6.1. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev 6.2. Presentation and discussion regarding the P&Z Calendar of Upcoming Meetings:  Thursday, September 8, 2022 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00 p.m. (Liaison - Christiansen)  Thursday, September 15, 2022 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m.  Thursday, September 22, 2022 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00 p.m. (Liaison - Cornelius)  Thursday, October 6, 2022 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. 6.3. Presentation and discussion regarding an update on items heard:  A Rezoning of approximately 12 acres of land from General Commercial to Planned Development District located at 103 North Dowling Road. The Planning & Zoning Commission heard this item on August 4, 2022 and voted (7-0) to recommend approval. The City Council heard this item on August 25, 2022 and voted (7-0) to approve the request. 6.4. Discussion and review regarding the following meetings: Design Review Board, BioCorridor Board.  None 7. Discussion and possible action on future agenda items. A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 8. Adjourn. The Planning and Zoning Commission may adjourn into Executive Session to consider any item listed on the agenda if a matter is raised that is appropriate for Executive Session discussion. I certify that the above Notice of Meeting was posted on the website and at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on August 26, 2022 at 5:00 p.m. City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification Page 3 of 107 Planning and Zoning Commission Page 4 September 1, 2022 at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 4 of 107 August 18, 2022 P&Z Meeting Minutes Page 1 of 6 MINUTES PLANNING & ZONING COMMISSION 1101 Texas Ave, College Station, TX 77840 August 18, 2022 6:00 p.m. Phone: *888 475 4499 and Webinar ID: 827 8199 3573 Internet: https://zoom.us/j/82781993573 COMMISSIONERS PRESENT: Dennis Christiansen, Bobby Mirza, William Wright, Jason Cornelius, Melissa McIlhaney, Mark Smith, and Thomas Jackson COUNCIL MEMBERS PRESENT: Linda Harvell and Dennis Maloney CITY STAFF PRESENT: Michael Ostrowski, Alyssa Halle-Schramm, Jason Schubert, Anthony Armstrong, Lucas Harper, Bekha Wells, Parker Mathews, Matthew Ellis, Naomi Sing, Gillian Sitler, Lindsey Pressler, Katherine Beaman-Jamael, Gabe Schrum, Tim Neeley, Leslie Whitten, Brian Piscacek, and Kristen Hejny 1. Call Meeting to Order, Pledge of Allegiance, Consider Absence Request. Chairperson Christiansen called the meeting to order at 6:00 p.m. 2. Hear Visitors No visitors spoke. 3. Consent Agenda 3.1 Consideration, discussion, and possible action to approve meeting minutes. • August 4, 2022 3.2 Presentation, discussion, and possible action regarding a Final Plat for Southern Pointe Subdivision Phase 104 & 120 Consisting of 65 single-family lots on approximately 12 acres generally located in the City’s Extraterritorial Jurisdiction along Darlington Avenue. Case #FP2022-000002 3.3 Presentation, discussion, and possible action regarding a Final Plat for Mission Ranch Phase 303 consisting of 16 single-family lots on approximately 10 acres located at Hidalgo Pass Court, generally located northeast of the intersection at Feather Run and Deacon Drive West. Case #FP2022-000001 Chairperson Christiansen requested an amendment to the August 4, 2022 minutes revising Regular Agenda Item #5.2 to read: “Chairperson Christiansen opened the meeting for visitor comments. Tina Evans, The Knoll Subdivision, College Station, spoke in opposition to the proposed zoning district citing concerns for a hostile takeover for profit, maps not being transitional, and a loss in areas within the city. Page 5 of 107 August 18, 2022 P&Z Meeting Minutes Page 2 of 6 There were no further visitors who spoke.” Commissioner Wright motioned to approve Consent Agenda Item #3.1 with the amendment, and Consent Agenda Items #3.2 and #3.3. Commissioner Smith seconded the motion, motion passed (7-0). 4. Consideration, discussion, and possible action on items removed from the Consent Agenda by Commission Action. No items were removed. 5. Regular Agenda Public Hearing, presentation, and discussion on Regular Agenda Items #5.1 and #5.2 were held together. 5.1 Public Hearing, presentation, discussion, and possible action regarding an ordinance amending the Comprehensive Plan – Future Land Use & Character Map from Suburban Residential to Neighborhood Commercial for approximately 0.16 acres, generally located at 106 Southland Street. Case #CPA2022-000006 (Note: Final action of this item will be considered at the September 8, 2022 City Council Meeting – Subject to change). 5.2 Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundary from PDD Planned Development District and GS General Suburban to PDD Planned Development District on approximately 0.75 acres of land located at Southland Addition Block 2, Lots 6 & 7 and the remainder of Lots 1-5, generally located at the intersection of Southland Street and Wellborn Road. Case #REZ2022-000010 (Note: Final action of this item will be considered at the September 8, 2022 City Council Meeting – Subject to change). Staff Planner Macias presented the comprehensive plan amendment and rezoning to the Commission, recommending approval. Commissioner Smith asked for clarification on the landscape buffer. Staff Planner Macias explained that the landscape buffer will consist of a wall with a 30-foot landscape buffer. Ms. Macias further clarified that this distance is an increase of 15 feet over the standard buffer and that the landscaping within the buffer will be determined at time of site plan. Commissioner Wright asked if the structures on this lot are being demolished. Staff Planner Macias confirmed that structures are being demolished. Commissioner Mirza asked if the development is meeting all parking requirements. Staff Planner Macias confirmed that all parking requirements are being met. Page 6 of 107 August 18, 2022 P&Z Meeting Minutes Page 3 of 6 Commissioner McIlhaney asked about the increased distances from the property line to the building. Staff Planner Macias confirmed that the original PDD approved the pick-up window at 59 feet from the property line and stated that distance to the west property line was not measured on the original PDD. Chairperson Christiansen asked why staff is recommending approval with a reduction to the UDO required distance between a restaurant with a drive-thru and single-family. Staff Planner Macias stated that staff is recommending approval because of the improvements from the existing PDD, including changing the layout and proposing the drive-thru in a different location. Ms. Macias also stated that the applicant is adding additional buffering along Southland Street. Commissioner Cornelius asked if this modification would lead to a change in location of the existing entrance. Staff Planner Macias clarified that there would not be a change to the existing entrance. Commissioner Wright asked if staff recommended approval on the previous PDD. Staff Planner Macias confirmed that staff did recommend approval on the previous PDD. Applicant, Rabon Metcalf, RME Engineers, was available to answer questions from the Commission. Chairperson Christiansen opened the public hearing. No visitors spoke. Chairperson Christiansen closed the public hearing. Commissioner Wright motioned to recommend approval of the Comprehensive Plan Amendment. Commissioner Smith seconded the motion. Director of Planning & Development Services Ostrowski provided additional clarification on the 150-foot distance requirement, stating that the distance requirement comes into play because of the Suburban Commercial zoning. Mr. Ostrowski further explained that a General Commercial zoning, similar to surrounding businesses, would not have that distance requirement. The motion passed (7-0). Commissioner Wright motioned to recommend approval of the Rezoning and Concept Plan. Commissioner Cornelius seconded the motion. Commissioner McIlhaney asked for clarification on why the Commission is hearing this item as a modification to an existing PDD. Page 7 of 107 August 18, 2022 P&Z Meeting Minutes Page 4 of 6 Staff Planner Macias clarified that the Commission is hearing the item because of the additional space, the drive-thru orientation, and the distances between the drive-thru and the residential area. Director of Planning & Development Services Ostrowski further clarified that the applicant must expand the boundaries of the PDD because of the purchase of an additional lot. The motion passed (7-0). 6. Informational Agenda 6.1 Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev There was no discussion. 6.2 Discussion of Minor / Amending Plats approved by staff: • Aggieland Business Park II: Block 1, Lot 1 ~ Case #FPCO2022-000004 There was no discussion. 6.3 Presentation and discussion on economic development initiatives in College Station. Economic Development Manager Piscacek and Business Development Manager Neeley presented this item to the Commission. Chairperson Christiansen asked about a redevelopment of Post Oak Mall. Economic Development Manager Piscacek stated that a redevelopment would resonate well with the Economic Development Master Plan, however he could not speak to any plans at the moment. Commissioner Mirza asked if the City is only seeing bio-related uses in the BioCorridor or if there are other uses. Economic Development Manager Piscacek clarified that the BioCorridor is not the only area for biotechnology, there are several other areas in town that support biotechnology. Business Development Manager Neeley also clarified that the City is viewing biotechnology in a much broader sense. Commissioner McIlhaney asked if rapid inflation has been taken into account and how has it impacted the outlook for the City. Economic Development Manager Piscacek stated that the City has not seen a slowdown in retail development. Commissioner Smith asked if the City is looking at developing any chip manufacturing. Page 8 of 107 August 18, 2022 P&Z Meeting Minutes Page 5 of 6 Economic Development Manager Piscacek stated that development is about finding the right place for the right product, and the City must consider utility capacity. Commissioner Jackson asked if the City keeps statistics on sales or occupancy. Economic Development Manager Piscacek clarified that the City is limited in data from secondary sources as they are focused on the primary metro areas, but the City works with The Retail Coach as a consultant who is measuring demand and leakage from the retail side. Commissioner Jackson asked if the state has data on sales tax volumes. Economic Development Manager Piscacek stated that the state does have sales tax data and the City utilizes it to analyze the local economy. Business Development Manager Neeley further stated that the retail consultant has provided cell phone analysis reports to show retail patterns within the community. Commissioner Cornelius asked if there is internal thought or plans for local entrepreneurs. Business Development Manager Neeley confirmed that there are internal plans for small businesses and innovation from the City of College Station, the Brazos Valley EDC, the City of Bryan, and Texas A&M University, all of whom are looking at developing and supporting an ecosystem for small businesses. Commissioner Wright stated that locally grown businesses give identity that not a lot of signature businesses provide. Mr. Wright expressed a desire for more mid-scale businesses. Mr. Wright also commented that retail/living space does not seem to be working. Economic Development Manager Piscacek stated that the hope is that the City can develop a high level strategy to backfill and redevelop empty spaces. Chairperson Christiansen asked about recruiting businesses that end up in Century Square and asked about the relationship between the City of College Station and Texas A&M University. Economic Development Manager Piscacek stated that the City works with The Retail Coach and the University System office to align efforts. 6.4 Presentation and discussion regarding the P&Z Calendar of Upcoming Meetings: • Thursday, August 25, 2022 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00 p.m. (Liaison – Smith) • Thursday, September 1, 2022 ~ P&Z Meeting ~ Council Chambers 6:00 p.m. • Thursday, September 8, 2022 ~ City Council Meeting ~ Council Chambers ~ Open Meeting 6:00 p.m. (Liaison – Christiansen) • Thursday, September 15, 2022 ~ P&Z Meeting ~ Council Chambers ~ 6:00 p.m. There was no discussion. 6.5 Presentation and discussion regarding an update on items heard: Page 9 of 107 August 18, 2022 P&Z Meeting Minutes Page 6 of 6 • A Rezoning of approximately three acres from Planned Development District to Planned Development District located at 2849 Barron Road. The Planning & Zoning Commission heard this item on July 21, 2022 and voted (6-0) to recommend approval. The City Council heard this item on August 11, 2022 and voted (7-0) to approve the request. • A Comprehensive Plan Amendment of approximately 17 acres from Medical to Urban Residential located at 400 Double Mountain Road. The Planning & Zoning Commission heard this item on July 21, 2022 and voted (4-2) to recommend approval. The City Council heard this item on August 11, 2022 and voted (4-3) to approve the request. There was general discussion regarding the August 11, 2022 City Council Meeting. 6.6 Discussion and review regarding the following meetings: Design Review Board, BioCorridor Board. • None There was no discussion. 7. Discussion and possible action on future agenda items. A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There was no discussion. 8. Adjourn The meeting adjourned at 7:07 p.m. Approved: Attest: _____________________________________ _________________________________ Dennis Chairperson Christiansen, Chairperson Kristen Hejny, Admin Support Specialist Planning & Zoning Commission Planning & Development Services Page 10 of 107 Planning & Zoning Commission September 1, 2022 Scale 32 lots and 4 common areas on 10.223 acres Location Located where Sherrill Court & Hardin Hills Drive meet Property Owner BCS Mission Ranch, LP Applicant Schultz Engineering, LLC Project Manager Derrick Williams, Staff Planner dwilliams@cstx.gov Project Overview This plat will establish lots within the Mission Ranch Subdivision. This phase of the development will consist of 32 residential lots and 4 common areas. This is the 10th phase to be platted. Preliminary Plan The northern portion of the subdivision was originally part of the Great Oaks Subdivision and is vested to 2007 regulations; the southern half of this development is subject to current subdivision regulations. This phase falls within the southern portion. A Preliminary Plan was approved in 2014 granting waivers to cluster development requirements in UDO Section 8.3.H.4, which requires the average lot size in a cluster development to be less than the minimum lot size of the base zoning district. A revised Preliminary Plan was approved in 2019, which granted a waiver request for additional block lengths, included the addition of a tract zoned for multi-family and excluded property sold to the school district. In 2020, a revised Preliminary Plan was approved with minor changes but no additional waivers. Public Infrastructure Total linear feet proposed: 2,630 Streets 1,095 Sanitary Sewer Lines 2,315 Sidewalks 2,098 Water Lines (Wellborn SUD) 1,025 Storm Sewer Lines Parkland Dedication Parkland dedication fee-in-lieu for 32 single-family lots, totaling $40,352, will be due prior to filing of the plat. Traffic Impact Analysis N/A Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes, with previously approved waivers to average lot size in a cluster development. Staff Recommendation Approval Supporting Materials 1.Vicinity Map, Aerial, and Small Area Map 2.Final Plat Final Plat for Mission Ranch Subdivision Phase 403 FP2021-000026 Page 11 of 107 Page 12 of 107 Page 13 of 107 Page 14 of 107 COMMON AREA 31 1 1 2 2 3 3 4 4 5 5 6 7 8 9 10 BLOCK 24 BLOCK 23 16 15 14 13 12 11 10 9 8 76 COMMONAREA 51 9 10 16 17 BLOCK 23 BLOCK 18 BLOCK 23 BLOCK 24 LOT 15R LOT 14R HOA COMMONAREA 13A-R2AND PRIVATEDRAINAGE EASEMENTAMENDINGPLAT, 16622/67 FEATHER RUN H A R D I N H I L L S D R I V ESHERRILL COURTHARDIN HILLS DRIVEROCK PRAIRIE ROAD W.HARDIN H ILLS DR IVE HARDIN HILLS DRIVESHERRILL C O U R T HARDIN HILLS DRIVE BLOCK 20 BLOCK 18 BLOCK 24 BLOCK 24 BLOCK 20 BLOCK 18 COMMONAREA #2-R COMMONAREA 522.56 AC. COMMON AREA 53 & PUE 0.08 AC. 18 17 16 15 COMMON A R E A 5 4 A N D P U E , 0. 0 3 A C . 14 22 12 21 COMMONAREA 52& PrDE2.56 AC. 20 19 13 11 C OMM O N A R E A 6 6 , 0 . 0 3 A C . 12 9 8 7 15 14 13 11 6 10 4 5 2 3 1 15 11 12 13 14 CI B I L O C R E E K C O U R T MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF = 275.0 MIN FF =279.0 MIN FF = 279.0 MIN FF =279.0 MIN FF = 279.0 MIN FF = 279.0 Table 1 Parcel # 4031801 4031802 4031803 4031804 4031805 4031806 4031807 4031808 4031809 4031810 4031811 4031812 4031813 4031814 4031815 4032011 4032012 4032013 4032014 4032015 4032411 4032412 4032413 4032414 4032415 4032416 4032417 4032418 4032419 4032420 4032421 4032422 BLOCK 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 20 20 20 20 20 24 24 24 24 24 24 24 24 24 24 24 24 LOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 11 12 13 14 15 11 12 13 14 15 16 17 18 19 20 21 22 AREA (SF) 7,116 7,096 7,096 7,855 11,226 9,915 7,459 7,309 7,359 7,623 8,577 8,027 7,324 7,163 7,660 7,754 7,641 6,875 6,875 6,875 7,878 7,871 8,328 9,756 6,875 6,875 6,875 10,788 8,919 6,875 6,875 6,763 MAXIMUM IMPERVIOUS COVER (%) 68 68 68 59 50 52 65 67 65 64 56 62 66 68 69 59 59 70 70 70 62 62 58 50 70 70 70 50 54 70 70 72 LEGEND LEGEND VICINITY MAP NOT TO SCALE F EATHER RUNHOLLEMAN DR IV E S .DEACON DRIVE W.GREAT OAK DR.ROCK PRAIRIE ROAD W. MISSION RANCH DR. SHEET 1 OF 2 COMMONAREA 50& PUE COMMONAREA #3& PUE TBPE NO. 12327911 SOUTHWEST PKWY E. College Station, Texas 77840  (979) 764-3900 ENGINEER: FINAL PLAT MISSION RANCH SUBDIVISION PHASE 403 10.223 ACRES JAMES ERWIN SURVEY , A-119 COLLEGE STATION, BRAZOS COUNTY, TEXAS 32 LOTS BLOCK 18, LOTS 1-15 BLOCK 20, LOTS 11-15 BLOCK 24, LOTS 11-22 COMMON AREAS 52, 53, 54 & 66 SCALE 1'' = 50'OCTOBER, 2021 OWNER/DEVELOPER: BCS MISSION RANCH, LP 9955 Barker Cypress Rd., Suite 250 Cypress, TX 77433(979) 260-7000 SURVEYOR: Brad Kerr, RPLS No. 4502 Kerr Surveying, LLC 409 N. Texas Ave. Bryan, TX 77803 (979) 268-3195TBPELS FIRM # 10018500 P:\21-926 Mission Ranch Ph 403 - Documents\FINAL PLAT\Mission Ranch Phase 403.dwg, Final Plat 1 of 2Page 15 of 107 LEGEND SHEET 2 OF 2 METES AND BOUNDS DESCRIPTION OF ALL THAT CERTAIN TRACT OR PARCEL OF LAND LYINGAND BEING SITUATED IN THE JAMES ERWIN SURVEY, A-119 COLLEGE STATION, BRAZOSCOUNTY, TEXAS. SAID TRACT BEING A PORTION OF THE REMAINDER OF A CALLED 270.800 ACRETRACT AS DESCRIBED BY A DEED TO BCS MISSION RANCH, LP, RECORDED IN VOLUME 13842,PAGE 179 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS. SAID TRACT BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 1/2 INCH IRON ROD FOUND ON THE SOUTH LINE OF COMMON AREA 2-R,MISSION RANCH, PHASE 101, ACCORDING TO THE PLAT RECORDED IN VOLUME 16299, PAGE 31 OFTHE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, MARKING THE WEST CORNER OFLOT 10, BLOCK 20, MISSION RANCH, PHASE 401, ACCORDING TO THE PLAT RECORDED IN VOLUME14856, PAGE 161 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, AND THENORTHEAST CORNER OF SAID PORTION OF 270.800 ACRE TRACT. COORDINATES AND BEARINGSYSTEM SHOWN HEREON ARE NAD83 (TEXAS STATE PLANE CENTRAL ZONE GRID NORTH) BASEDON THE PUBLISHED COORDINATES OF THE CITY OF COLLEGE STATION CONTROL MONUMENTCS94-117 (N:10191793.14, E:35559913.46) AND AS ESTABLISHED BY GPS OBSERVATION. DISTANCESSHOWN HEREON ARE GRID DISTANCES. TO DETERMINE SURFACE DISTANCES MULTIPLY BY ACOMBINED SCALE FACTOR OF 1.00009959277366 (CALCULATED USING GEOID12B); THENCE: ALONG THE COMMON LINE OF SAID REMAINDER OF 207.800 ACRE TRACT ANDMISSION RANCH, PHASE 401, FOR THE FOLLOWING CALLS: S 35° 40' 10" E FOR A DISTANCE OF 125.02 FEET TO A ½ INCH IRON ROD WITH CAP STAMPED“MCCLURE BROWNE” FOUND ON THE NORTHWEST LINE OF SHERRILL COURT (50' PRIVATER.O.W.) MARKING THE SOUTH CORNER OF SAID LOT 10 AND THE BEGINNING OF ACLOCKWISE CURVE HAVING A RADIUS OF 269.97 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 02° 42' 32" FOR AN ARC DISTANCE OF12.76 FEET (CHORD BEARS: S 55° 06' 40" W - 12.76 FEET) TO THE END OF SAID CURVE AND THEBEGINNING OF A CLOCKWISE CURVE HAVING A RADIUS OF 424.95 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 02° 48' 24" FOR AN ARC DISTANCE OF20.82 FEET (CHORD BEARS: S 57° 23' 23" W - 20.81 FEET) TO THE END OF SAID CURVE; S 31° 12' 24" E ACROSS THE PLATTED END OF SHERRILL COURT FOR A DISTANCE OF 50.00FEET TO A ½ INCH IRON ROD FOUND MARKING THE NORTHEAST CORNER OF COMMONAREA 3, BLOCK 24, AND THE BEGINNING OF A CLOCKWISE CURVE HAVING A RADIUS OF474.95 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 09° 32' 47" FOR AN ARC DISTANCE OF79.13 FEET (CHORD BEARS: S 63° 33' 59" W - 79.04 FEET) TO THE NORTHWEST CORNER OF SAIDBLOCK 24; S 15° 32' 52" E, AT 10.05 FEET PASS A ½ INCH IRON ROD WITH CAP STAMPED “MCCLUREBROWNE” FOUND, CONTINUE ON FOR A TOTAL DISTANCE OF 223.18 FEET TO A ½ INCH IRONROD WITH CAP STAMPED “MCCLURE BROWNE” FOUND MARKING THE SOUTHWESTCORNER OF SAID BLOCK 24; S 88° 15' 04" E FOR A DISTANCE OF 228.73 FEET TO THE SOUTHEAST CORNER OF SAID BLOCK24 AND THE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 661.30; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 14° 10' 44" FOR AN ARC DISTANCE OF163.65 FEET (CHORD BEARS: N 47° 40' 45" E - 163.23 FEET) TO A ½ INCH IRON ROD WITH CAPSTAMPED “KERR 4502” FOUND MARKING THE WEST CORNER OF LOT 10, BLOCK 24, MISSIONRANCH SUBDIVISION, PHASE 402, ACCORDING TO THE PLAT RECORDED IN VOLUME 16508,PAGE 62 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE: ALONG THE COMMON LINE OF SAID REMAINDER OF 207.800 ACRE TRACT ANDMISSION RANCH SUBDIVISION, PHASE 402, FOR THE FOLLOWING CALLS: S 49° 19' 33" E FOR A DISTANCE OF 136.34 FEET TO A ½ INCH IRON ROD WITH CAP STAMPED“KERR 4502” FOUND ON THE NORTHWEST LINE OF HARDIN HILLS DRIVE (50' PRIVATER.O.W.) MARKING THE SOUTH CORNER OF SAID LOT 10; S 49° 17' 19" E ACROSS THE PLATTED END OF HARDIN HILLS DRIVE FOR A DISTANCE OF 50.00FEET TO A ½ INCH IRON ROD WITH CAP STAMPED “KERR 4502” FOUND; N 85° 51' 17" E FOR A DISTANCE OF 20.73 FEET TO A ½ INCH IRON ROD WITH CAP STAMPED“KERR 4502” FOUND MARKING THE WEST CORNER OF COMMON AREA 50; S 48° 10' 23" E ALONG THE SOUTHWEST LINE OF SAID COMMON AREA 50 FOR A DISTANCE OF62.60 FEET TO A ½ INCH IRON ROD WITH CAP STAMPED “KERR 4502” FOUND MARKING THEBEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 535.00 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 05° 28' 24" FOR AN ARC DISTANCE OF51.11 FEET (CHORD BEARS: S 50° 51' 03" E - 51.09 FEET) TO A ½ INCH IRON ROD WITH CAPSTAMPED “KERR 4502” FOUND ON THE NORTHWEST LINE OF LOT 16, BLOCK 18, MARKINGTHE SOUTH CORNER OF SAID COMMON AREA 50; S 44° 53' 53" W, AT 98.91 FEET PASS A ½ INCH IRON ROD WITH CAP STAMPED “KERR 4502”FOUND MARKING THE WEST CORNER OF SAID LOT 16, CONTINUE ON THROUGH SAIDREMAINDER OF 270.800 ACRE TRACT FOR A TOTAL DISTANCE OF 250.56 FEET TO ASOUTHEAST CORNER OF THIS HEREIN DESCRIBED TRACT; THENCE: THROUGH SAID REMAINDER OF 270.800 ACRE TRACT FOR THE FOLLOWING CALLS: S 66° 21' 33" W FOR A DISTANCE OF 319.70 FEET; S 82° 42' 19" W FOR A DISTANCE OF 138.86 FEET; S 27° 00' 18" W FOR A DISTANCE OF 97.27 FEET TO A ½ INCH IRON ROD FOUND MARKING ANANGLE POINT IN THE NORTHERLY LINE OF ROCK PRAIRIE ROAD (VARIABLE WIDTH R.O.W.)AND THE MOST SOUTHERLY CORNER OF THIS HEREIN DESCRIBED TRACT; THENCE: N 22° 48' 21" W ALONG THE NORTHERLY LINE OF ROCK PRAIRIE ROAD FOR ADISTANCE OF 235.48 FEET TO A ½ INCH IRON ROD WITH CAP STAMPED “MCCLURE BROWNE”FOUND; THENCE: S 87° 56' 24" W CONTINUING ALONG THE NORTHERLY LINE OF ROCK PRAIRIE ROADFOR A DISTANCE OF 421.51 FEET TO THE SOUTHWEST CORNER OF THIS HEREIN DESCRIBEDTRACT; THENCE: THROUGH SAID REMAINDER OF 270.800 ACRE FOR THE FOLLOWING CALLS: N 13° 36' 39" E FOR A DISTANCE OF 258.92 FEET; N 73° 30' 28" E FOR A DISTANCE OF 324.92 FEET; N 15° 32' 52" W FOR A DISTANCE OF 100.32 FEET; N 60° 32' 52" W FOR A DISTANCE OF 35.36 FEET; S 74° 27' 08" W FOR A DISTANCE OF 22.00 FEET; N 15° 32' 52" W FOR A DISTANCE OF 175.00 FEET TO THE SOUTH LINE OF THEAFOREMENTIONED COMMON AREA 2-R (PLAT 16299/31) AND THE NORTHWEST CORNER OFTHIS HEREIN DESCRIBED TRACT; THENCE: ALONG THE SOUTH LINE OF SAID COMMON AREA 2-R FOR THE FOLLOWING CALLS: N 74° 27' 08" E ALONG THE SOUTH LINE OF SAID COMMON AREA 2-R FOR A DISTANCE OF171.44 FEET TO THE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF299.97 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 19° 17' 29" FOR AN ARC DISTANCE OF101.00 FEET (CHORD BEARS: N 64° 48' 39" E - 100.52 FEET) TO THE END OF SAID CURVE ANDTHE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 144.98 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 01° 54' 01" FOR AN ARC DISTANCE OF4.81 FEET (CHORD BEARS: N 54° 12' 54" E - 4.81 FEET) TO THE POINT OF BEGINNINGCONTAINING 10.223 ACRES OF LAND AS SURVEYED ON THE GROUND. TBPE NO. 12327911 SOUTHWEST PKWY E. College Station, Texas 77840  (979) 764-3900 ENGINEER: FINAL PLAT MISSION RANCH SUBDIVISION PHASE 403 10.223 ACRES JAMES ERWIN SURVEY , A-119 COLLEGE STATION, BRAZOS COUNTY, TEXAS 32 LOTS BLOCK 18, LOTS 1-15 BLOCK 20, LOTS 11-15 BLOCK 24, LOTS 11-22 COMMON AREAS 52, 53, 54 & 66 SCALE 1'' = 50'OCTOBER, 2021 OWNER/DEVELOPER: BCS MISSION RANCH, LP 9955 Barker Cypress Rd., Suite 250 Cypress, TX 77433(979) 260-7000 SURVEYOR: Brad Kerr, RPLS No. 4502 Kerr Surveying, LLC 409 N. Texas Ave. Bryan, TX 77803 (979) 268-3195TBPELS FIRM # 10018500 P:\21-926 Mission Ranch Ph 403 - Documents\FINAL PLAT\Mission Ranch Phase 403.dwg, Final Plat 2 of 2Page 16 of 107 September 1, 2022 Regular Agenda Rezoning – North Forest Estates Restricted Occupancy Overlay To: Planning & Zoning Commission From: Alyssa Halle-Schramm, Long Range Planning Administrator Agenda Caption: Public Hearing, presentation, discussion and possible action regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundary from GS General Suburban to GS General Suburban and ROO Restricted Occupancy Overlay on approximately 9.86 acres being 26 lots within North Forest Estates, Block 1 and 2, generally located along Justin Avenue. Case #REZ2022-000014 (Note: Final action of this item will be considered at the September 22, 2022 City Council meeting – Subject to change). Summary: This request is to rezone approximately 9.86 acres being 26 lots within the North Forest Estates subdivision from GS General Suburban to GS General Suburban and ROO Restricted Occupancy Overlay. This request is to add the ROO, which is a single-family overlay zoning district, to the existing base zoning within the North Forest Estate subdivision boundaries. The ROO overlay is intended to provide subdivision-specific occupancy regulations – not to exceed two unrelated persons per single- family dwelling or accessory living quarter. The Petition Committee, comprised of North Forest Estates homeowners, has met all requirements of the ROO application process. The Petition Committee submitted the application materials including the ROO petition that contained 20 total signatures. City staff were able to verify 19 of the 20 signatures, representing 73.1% of the subdivision in support of the requested ROO. REZONING REVIEW CRITERIA 1. Whether the proposal is consistent with the Comprehensive Plan: The subject tract is designated as Suburban Residential on the Comprehensive Plan Future Land Use & Character Map. The surrounding areas to the northeast and southwest are also Suburban Residential. The property to the southeast is designated as Natural & Open Areas and is part of Bee Creek and its floodplain. The property to the northwest across North Forest Parkway is designated Neighborhood Commercial and is developed as the St. Thomas Aquinas Catholic Church. North Forest Parkway is an existing 2-lane minor collector and is shown on the Comprehensive Plan’s Thoroughfare Plan as a future 2-lane major collector. The Comprehensive Plan discusses single-family overlay zoning districts in both Chapter 3, Strong Neighborhoods and Chapter 9, Collaborative Partnerships. The plan states that, “various single-family overlay zoning districts have been created to help mitigate the issues associated with tear-downs in established neighborhoods. These include the Neighborhood Conservation Overlay, the Restricted Occupancy Overlay, and the Historic Preservation Overlay.” The plan goes on to state that collaboration between the City and Texas A&M University is vital to proactively address issues caused by the rapid growth of the university and the stressors and potential changes that places on nearby neighborhoods. Pursing a single-family overlay zoning Page 17 of 107 is a tool that a neighborhood can choose for itself to help address and mitigate perceived, anticipated, and actual changes within an established single-family neighborhood. While the Neighborhood Conservation and Historic Presentation Overlays address and mitigate changes to physical property characteristics, the intent of a ROO is to address and mitigate issues associated with overoccupancy. As a tool that a neighborhood can pursue for itself to address issues of overoccupancy and preserve neighborhood character, the request is aligned with the Comprehensive Plan. 2. Whether the uses permitted by the proposed zoning district will be appropriate in the context of the surrounding area: The subject property is surrounded by GS General Suburban zoned single-family homes to the northeast in the Emerald Forest subdivision and to the southwest in the North Forest subdivision (which is separate from North Forest Estates). The property to the southeast is zoned GC General Commercial but is part of Bee Creek and its floodplain and, as such, is undevelopable. The property located to the northwest across North Forest Parkway is St. Thomas Aquinas Catholic Church, which is zoned R Rural and GS General Suburban. The single-family uses allowed by the GS General Suburban zoning district will remain and the addition of the ROO overlay solely restricts the number of unrelated persons per single-family dwelling or accessory living quarters to no more than two unrelated persons. As stated in the Unified Development Ordinance (UDO), “single-family overlay districts create an additional zoning district that is superimposed over the underlying zoning district. Single-family overlay districts are intended to provide additional standards for College Station neighborhoods. These standards promote residential development patterns and are intended to protect and enhance desirable neighborhood characteristics, livability, and harmonious, orderly, and efficient growth and development. The underlying zoning district establishes the permitted uses and standards and shall remain in effect. The requirements of the overlay district are to be applied in addition to the underlying zoning district standards.” The ROO overlay standard is as follows: “Occupancy of either, a detached single-family dwelling or accessory living quarter, shall not exceed two unrelated persons per single-family dwelling or accessory living quarter. Related persons are specified in [UDO] Section 11.2 ‘Defined Terms’ in the definition of ‘Family.’ Accessory living quarter requirements are further specified in [UDO] Section 6.5 ‘Accessory Uses’ within the standards for ‘Living Quarters.’” UDO Sections 3.3, 4.1, and 5.11 detail the application process and regulations for single-family overlay districts and the ROO Process Handbook serves as a policy guide for residents. The process requires that a subdivision interested in pursuing a ROO form a Petition Committee. That committee is tasked with leading the effort, organizing their neighbors, hosting a neighborhood- led meeting and notifying all neighbors of the meeting via certified mail, collecting the petition signatures, and submitting the completed application and all required materials. The North Forest Estates Petition Committee was comprised of three members: Fred Boeheim, Mark Hawthorne, and Rey Sully. The Petition Committee hosted their neighborhood meeting on June 25, 2022, discussed pursing the ROO for their subdivision, answered questions from their neighbors, and began collecting petition signatures. Property owners from 11 of the 26 lots were in attendance, as were City staff, and an owner from each property signed the petition. Page 18 of 107 The Petition Committee finished collecting petition signatures and submitted their ROO application in July 2022. City staff verified that the application was complete, and all requirements were met. The submitted ROO Petition contained 20 total signatures. City staff were able to verify 19 of the 20 signatures. The signature that staff were unable to verify was a property held within a trust that required both trustees sign transactions on behalf of the trust, and thus was missing a signature from the second trustee. The Petition Committee was unable to obtain the second signature within the timeframe needed to move forward and asked that the application continue with the 19 confirmed signatures, representing 73.1% of the subdivision in support of the requested ROO. Staff held a required City-hosted neighborhood meeting for the North Forest Estates ROO request on September 9, 2022. There were five residents in attendance, three from North Forest Estates who signed the petition in support of the ROO, one participating remotely on Zoom who did not provide comment, and one from the nearby North Forest subdivision who was interested in learning about the ROO application and whether it applied to his property, which it does not. 3. Whether the property to be rezoned is physically suitable for the proposed zoning district: The ROO overlay zoning does not affect any of the physical characteristics of the underlying GS General Suburban zoning district. The existing subdivision meets the dimensional standards for GS General Suburban zoned properties as set forth in the UDO and is already developed as a single- family residential subdivision. 4. Whether there is available water, wastewater, stormwater, and transportation facilities generally suitable and adequate for uses permitted by the proposed zoning district: The existing water, wastewater, stormwater, and transportation infrastructure is adequate to support the needs of this existing development. No additional development and subsequent impacts are anticipated from the addition of the ROO overlay zoning designation. 5. The marketability of the property: The single-family uses allowed by the GS General Suburban zoning district will remain and are marketable as single-family residential homes. The ROO overlay only restricts the number of unrelated persons per single-family dwelling or accessory living quarters to no more than two unrelated persons. SUPPORTING MATERIALS 1. Vicinity, Aerial, and Small Area Map 2. Background Information 3. Rezoning Map 4. Original Subdivision Plat 5. Applicant’s Supporting Information 6. Petition Committee Members 7. Neighborhood Meeting Materials 8. Petition Signatures Page 19 of 107 Page 20 of 107 Page 21 of 107 Page 22 of 107 BACKGROUND INFORMATION NOTIFICATIONS Advertised Commission Hearing Date: September 1, 2022 Advertised Council Hearing Date: September 22, 2022 Property owner notices mailed: 83 Contacts in support: None at the time of this report Contacts in opposition: None at the time of this report Inquiry contacts: One at the time of this report ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North Suburban Residential GS General Suburban Residential South Suburban Residential GS General Suburban Residential East Natural & Open Areas GC General Commercial Undeveloped West Right-of-Way 2-Lane Major Collector n/a North Forest Parkway 2-Lane Minor Collector DEVELOPMENT HISTORY Incorporated: September 1977 Zoning: A-O Agricultural Open (1977) R-1 Single-Family Residential (2006) R-1 Single-Family Residential renamed to GS General Suburban (2013) Final Plat: North Forest Estates (2008) Site Development: Single-Family Residential Page 23 of 107 Page 24 of 107 Page 25 of 107 Name of Project: RESTRICTED OCCUPANCY OVERLAY Address: 8416 JUSTIN AVE Legal Description: NORTH FOREST ESTATES, BLOCK 2, LOT 9 Total Acreage: 9.86 Applicant: North Forest Estates HOA, Inc Property Owner: HAWTHORNE MARK ALAN & DEBRA SC List the changed or changing conditions in the area or in the City which make this zone change necessary. North Forest Estates is a plat of 26 properties currently zoned as Suburban Residential. In 2012, the residents of North Forest Estates assumed control of the Homeowners Association (HOA). The HOA is named the North Forest Estates HOA (NFEHOA). Indicate whether or not this zone change is in accordance with the Comprehensive Plan. If it is not, explain why the Plan is incorrect. The NFEHOA Declaration of Covenants, Conditions and Restrictions (DCCR) has always had a line item limiting the number of unrelated persons in each home to no more than 2. The recently updated DCCR also states in paragraph 4.08 - Renting and Leasing, "No property within North Forest Estates Subdivision, Inc. shall be purchased by any individual or corporation for the express intent of engaging in Short Term Rental or Month To Month Rental activity wherein the homeowner does not reside." How will this zone change be compatible with the present zoning and conforming uses of nearby property and with the character of the neighborhood? The establishment of a ROO for NFEHOA will help mitigate the chance that an individual or corporation will attempt to purchase a property within NFEHOA for investment/income generation. The NFEHOA property owners have voted twice to proceed with the ROO application - once each in 2020 and 2022. Both votes passed with 20 of the 26 properties recently voting unanimously to proceed. Explain the suitability of the property for uses permitted by the rezoning district requested. As such, the rezoning with regards to a ROO for NFEHOA aligns perfectly regarding intent and effect for the benefit of the City and NFEHOA. Explain the suitability of the property for uses permitted by the current zoning district. As such, the rezoning with regards to a ROO for NFEHOA aligns perfectly regarding intent and effect for the benefit of the City and NFEHOA. REZONING PDD APPLICATION SUPPORTING INFORMATION Page 1 of 3 Page 26 of 107 Explain the marketability of the property for uses permitted by the current zoning district. The establishment of a ROO for the 26 properties in NFEHOA will help maintain and/or positively affect property values. List any other reasons to support this zone change. In addition, the ROO will help maintain relationships between property owners within the NFEHOA because the enforcement of the ROO, and subsequently the DCCR, falls to the Code Enforcement Division. It takes the onus of enforcement from HOA officers and/or members, and, in turn, helps keep the peace in the neighborhood. Maximum Building Height. N/A Proposed Drainage. N/A Variations Sought. N/A Community Benefits. N/A Sustained Stability. N/A Page 2 of 3 Page 27 of 107 Conformity. N/A Compatibility with use. N/A Access to Streets. N/A Public Improvements. N/A Public Health. N/A Safety. N/A Page 3 of 3 Page 28 of 107 Excerpts from North Forest Estates Deed Restrictions 3.32 Occupancy Restrictions. No dwelling on any Lot shall be occupied by more than two (2) persons, unless all the persons occupying the dwelling consist of a parent, or parents, and their children. 4.08 Rental and Leasing. A Short-Term Rental (STR) is defined as a rental of less than thirty (30) consecutive days at a time. A Month-to-Month Rental (MTMR) is defined as a rental of more than thirty (30) consecutive days at a time, but less than one (1) year. A Long-Term Rental (LTR) is defined as a rental or lease of at least one (1) year. Renting is defined as a fixed return made by a tenant or occupant of property to the owner for the possession and use thereof. Leasing is defined as entering into a contract by which one conveys real estate for a specified term and for a specified rent. No property within North Forest Estates Subdivision, Inc. shall be purchased by any individual or corporation for the express intent of engaging in STR or MTMR activity wherein the homeowner does not reside. Page 29 of 107 North Forest Estates Restricted Occupancy Overlay (ROO) Petition Committee Fred Boeheim 8400 Justin Ave Mark Hawthorne 8416 Justin Ave Rey Sully 8413 Justin Ave Page 30 of 107 Page 31 of 107 Page 32 of 107 Page 33 of 107 Page 34 of 107 MEMORANDUM September 1, 2022 TO: Members of the Planning & Zoning Commission FROM: Naomi Sing, Staff Planner SUBJECT: Small Area Plan Audit Item: Presentation, discussion, and possible action on the Small Area Plan Audit. (Note: Discussion of this item is scheduled for the September 22, 2022 City Council Meeting on the regular agenda – Subject to change). Recommendation: To receive and make a recommendation to accept the audit. Summary: City staff will present the Small Area Plan Audit that includes findings from the audit process, implementation highlights, challenges of the small area planning process and recommendations to improve future planning efforts, peer city research, next steps, and maps and implementation charts of each plan. The five plans evaluated through this audit are the Central College Station Neighborhood Plan, the Eastgate Neighborhood Plan, the Southside Area Neighborhood Plan, the South Knoll Area Plan, and the Wellborn Community Plan. From the audit process and conversations with peers, City staff developed four key recommendations for future small area planning efforts: 1) Develop a clear implementation tracking strategy early in the plan creation process that ideally includes plan action tracking software to support collaboration across City departments. 2) Distinguish between actions that are the responsibility of the City to implement and those that must be neighborhood-led. 3) Develop specific and quantifiable actions that lead to measurable outcomes. 4) Set clear planning horizons with sunset provisions that expire plans after a certain date. City staff will present the findings of the audit, discuss the intent to sunset existing plans that are beyond their planning horizons, and detail the next small area planning efforts that are identified in the Page 35 of 107 Comprehensive Plan in Chapter 2: Distinctive Places and shown on Map 2.1 Planning Areas, along with the general timelines of those planning efforts which are launching in Fall/Winter 2022. Background: Upon adoption of the 2009 Comprehensive Plan, a series of five small area plans were developed that engaged residents and outlined area-specific initiatives that both the City of College Station and neighborhood leaders could enact to create stronger neighborhoods. The need for the Small Area Plan Audit was identified through discussions with the Planning & Zoning Commission, City Council, and the public. The need was also established with the 10-year Comprehensive Plan evaluation and is included as action number 3.8 within the updated Comprehensive Plan, which states that the City should “evaluate relevancy of neighborhood and small area plans that are beyond their planning horizon [and] develop a process to either retire or update plans.” The five plans evaluated through this audit are the Central College Station Neighborhood Plan, the Eastgate Neighborhood Plan, the Southside Area Neighborhood Plan, the South Knoll Area Plan, and the Wellborn Community Plan. All of these plans are past their planning horizons – the implementation timeline identified within each respective plan – with the exception of the Wellborn Community Plan which ends in 2023. Supporting Materials: 1. Small Area Plan Audit Page 36 of 107 SMALL AREA PLAN AUDIT Page 37 of 107 This plan audit evaluates the City of College Station’s five small area plans that focus on existing residential neighborhoods and communities, and identifies the successes and shortcomings of the plans and their implementation. This audit is organized as follows: • Small Area Plan Overview • Audit Origination • Implementation Highlights • Challenges & Recommendations • Next Steps • Mapped Infrastructure Projects • Appendices – Plan Implementation Charts SMALL AREA PLAN AUDIT Page 38 of 107 Small Area Plan Overview Upon adoption of the 2009 Comprehensive Plan, a series of five small area plans were developed that engaged residents and outlined area-specific initiatives that both the City of College Station and neighborhood leaders could enact to create stronger neighborhoods. The five plans evaluated through this audit are the Central College Station Neighborhood Plan, the Eastgate Neighborhood Plan, the Southside Area Neighborhood Plan, the South Knoll Area Plan, and the Wellborn Community Plan. All of these plans are past their planning horizons – the implementation timeline identified within each respective plan — with the exception of the Wellborn Community Plan which ends in 2023. CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) The Central College Station Neighborhood Plan was adopted by the City Council on June 10, 2010. The planning area is made up of approximately 1,450 acres and is located in the geographic center of College Station. It is bounded by Texas Avenue South, State Highway 6 South, Harvey Mitchell Parkway South, Wellborn Road, and Rock Prairie Road. EASTGATE NEIGHBORHOOD PLAN (2011-2018) The Eastgate Neighborhood Plan was adopted by the City Council on June 23, 2011. The planning area is made up of approximately 567 acres located along the eastern edge of the Texas A&M University campus and is bounded by University Drive East, Texas Avenue South, Dominik Drive, and east of Munson Avenue and ending just before Westover Street. SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) The Southside Area Neighborhood Plan was adopted by the City Council on September 13, 2012. The planning area is made up of approximately 720 acres located directly across from the southern edge of the Texas A&M University campus and is bounded by George Bush Drive, Wellborn Road, Southwest Parkway, Welsh Avenue, Holleman Drive, and Texas Avenue. SOUTH KNOLL AREA PLAN (2013-2020) The South Knoll Area Neighborhood Plan was adopted by the City Council on September 26, 2013. The planning area is made up of approximately 3,500 acres within the City’s core and is bounded by Wellborn Road, Harvey Mitchell Parkway, Texas Avenue, Holleman Drive, Welsh Avenue, and Southwest Parkway. WELLBORN COMMUNITY PLAN (2013-2023) The Wellborn Community Plan was adopted by City Council on April 25, 2013. The planning area is located in the southwestern portion of the City and includes much of the remaining historic Wellborn Community. The Wellborn planning area is made up of approximately 929 acres and is bounded by I&GN Road, Greens Prairie Road West, Royder Road, Barron Cut-Off Road, and Capstone Drive. Page 39 of 107 PLANNING AREAS GEORGE BUSH DRFM 2 8 1 8FM 60 W E L L B O R N R DF&B RDFM 2818UNIVERSITY DRHARVEY RDF M 2 1 5 4 WILLIAM D FITCH PKWYHOLLEMAN DR SBARRON RDGREENS PRAIRIE RD SH 6GRAHAM RDDEACOND R LA KE W A Y D RSOUTH WEST PK W Y EAGLE AVVICTORIA AVMIDTO W N D R ROCK PRA I R I E R D S H 6 TE X A S A V S WELLBORN COMMUNITY PLAN SOUTH KNOLL AREA PLAN SOUTHSIDE AREA NEIGHBORHOOD PLAN EASTGATE NEIGHBORHOOD PLAN CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN Page 40 of 107 Audit Origination The need for the Small Area Plan Audit was identified through discussions with the Planning & Zoning Commission, City Council, and the public. The need was also established with the 10-year Comprehensive Plan evaluation and is included as action number 3.8 within the updated plan which states that the City should “evaluate relevancy of neighborhood and small area plans that are beyond their planning horizon [and] develop a process to either retire or update plans.” This audit’s purpose is to review the plans that are beyond or nearing their planning horizons, to assess what was achieved relative to each plan’s recommendations, what was not achieved, and why, and whether further planning efforts are warranted for each area. Implementation Highlights The implementation charts included within the appendices identify the action items that reside within the respective plan and their statuses. Some of the original action items have been separated into multiple parts to better represent the various components of multi-step initiatives that were identified within the action item. Due to this, the totals listed within the audit report and the charts are reflective of the overall statuses rather than the actual number of the action items from the original plan documents. Using this methodology, there are 392 total action items between the five plans which were intended to be addressed over the course of each of the individual plan’s timeline. Approximately 61.7% of all plan action items have been completed, 6.9% are currently in-progress, 20.2% are incomplete, and 11.2% no longer being pursued by the City. The implementation charts include statuses of all actions and narrative that explains why certain actions were not completed. These reasons typically include varying levels of project feasibility, lack of continued neighborhood support, or lack of available funding. Many of the projects that lack identified funding were included within the FY22 Unfunded Projects list. Page 41 of 107 Completed Designed orFunded 20.2% In Progress 11.2% Completed - 62.8% Designed or Funded - 0% Incomplete - 20.7% In Progress - 4.1% No Longer Pursuing - 12.4% Completed - 67.4% Designed or Funded - 0% Incomplete - 12% In Progress - 7.6% No Longer Pursuing - 13% Completed - 53.5% Designed or Funded - 0% Incomplete - 29% In Progress - 10.5% No Longer Pursuing - 7% Completed - 63.5% Designed or Funded - 0% Incomplete - 19% In Progress - 8% No Longer Pursuing - 9.5% Completed - 60% Designed or Funded - 0% Incomplete - 20% In Progress - 3.3% No Longer Pursuing - 16.7% 61.7% 121 392 63 3092 86 Incomplete No LongerPursuing 6.9%0% Page 42 of 107 Challenges & Recommendations This audit enabled staff to identify challenges in small area plan implementation and ways in which future planning efforts should be strengthened to better implement resident desires and the community’s vision as represented in the Comprehensive Plan. The first challenge staff identified was the inconsistency in tracking progress across each of the plans and over many years. Plan implementation was not continuously monitored or organized in a uniform manner until the audit began. This made for a lengthier audit process to find, identify, and consolidate various records from the past decade. The inconsistency in tracking is due to many factors including gaps in staffing, inconsistent engagement of and coordination between departments, different tracking systems between departments, and not all implementations being digitized. In some cases, the institutional knowledge of plan action statuses was lost when the staff member responsible for that action departed the City. Staff recommend a more formalized and standard action tracking process that utilizes best practices and newer software tools as crucial to implementing future planning efforts. Plan action software will allow staff across multiple departments to regularly access plan action items, be sent reminders that they are responsible for implementing and reporting on actions, and for the updates to be tracked under one consolidated platform. Planning & Development Services staff submitted a Service Level Adjustment for funding consideration in FY2023 to migrate all plan tracking to an integrated plan action software. This will include tracking progress on the 2021 Comprehensive Plan actions and new small area plans and could be expanded to include other City master plans, Key Performance Indicators, and strategic initiatives. Page 43 of 107 Second, through the audit process staff found that the small area plans lacked clarity in identifying and communicating which plan actions were meant to be neighborhood-initiated and which were City-initiated actions. This also complicates the tracking of plan implementation as there are some items that are difficult to determine if they have been completed since they were intended to be community-initiated and/or community-led. Due to the nature of small area planning and community engagement, it is common for action items to be supported by engaged residents and included in the plan and then the action loses traction shortly after the planning effort. Community engagement and interests vary, especially over the course of years, so an action that was heavily supported one year may not be feasible or supported the next. Staff recommend that all future small area plans explicitly state which actions the City has the jurisdiction to implement, and which must be neighborhood-initiated and led by neighborhood organizations. These distinctions should be discussed during the community engagement portion of the planning process and clearly documented in the plans, such as with identifier icons indicating responsibility. Staff may consider tracking these separately in the future to more accurately represent plan implementation that is within the City’s ability and jurisdiction. Third, staff noted that the types of actions varied widely within and between the small area plans. Actions that were clear, concise, and measurable were significantly easier to track and report over time. A large portion of the completed actions were infrastructure or maintenance-oriented and were precisely spelled out where the community wanted physical changes to their area. Actions that were more nebulous to track were broad actions such as “preserve single-family character” or “strengthen neighborhood relationships.” These broader ideas should be classified as goals within a planning effort instead of actions. The 2021 Comprehensive Plan incorporates these same ideals within the goal statements of Chapter 2: Distinctive Places and Chapter 3: Strong Neighborhoods, respectively. Staff recommend that future small area planning efforts focus on specific and quantifiable actions that lead to measurable outcomes that also support broader goals. The final challenge identified by staff is the planning horizons written within the plans. These timelines are helpful in knowing the relevancy of each plan, but do not specify what happens when the plan reaches the end of the given timeline. The absence of a sunset clause and clear plan expiration language creates an unclear situation for all involved – neighborhood residents who were involved in the plan creation and wonder “what’s next,” for City staff attempting to communicate the relevance of older plans, and for elected officials to know which plans and actions are pertinent to policy making decisions. Staff recommend setting clear planning horizons with sunset provisions that expire the plan after a certain date. The need to update a small area plan or create new small area plans should be considered holistically within the broader Comprehensive Plan evaluation and update process to ensure participation across and equity amongst the entire City in determining and prioritizing future planning efforts. PEER CITY RESEARCH FINDINGS In addition to evaluating the City’s plans, staff researched the small area planning and plan implementation efforts of peer cities. Staff found that cities of similar size to College Station typically do not have small area neighborhood planning efforts. Of those that identified specific small areas, neighborhoods, or districts, they are included within Page 44 of 107 their respective comprehensive plan and do not function as separate plan documents. This finding led staff to reach out to major cities such as Austin, Dallas, and Houston for additional insight. Discussions with those planners ultimately reaffirmed the challenges that College Station staff found during the audit process. Planners from these larger cities expressed difficulty with tracking the implementation of plans, maintaining consistent levels of community engagement as the years pass after adoption, and having set timeframes and clear expectations of plan expiration or sunset provisions. Tracking implementation through all the small area plans, especially for large cities with dozens of plans, requires ample staff attention and time. This often requires at least one dedicated staff member to steer the process and document implementation, which was not always readily available to the cities that College Station staff interviewed. Those cities mentioned that in addition to staff capacity issues, plan tracking was often not viewed as a top priority compared to other projects that have time-sensitive deadlines. Community engagement is a crucial aspect of small area planning but is notably difficult to maintain over the course of many years. This difficulty was evident for the large cities and is influenced by factors such as changes in the area’s demographics, general interest, and the resident’s available time to be actively involved in the planning process. Without active engagement by the community, it is easy for the planning efforts and implementation of new projects to be unfulfilled if the area does not seem interested in changes. The larger cities also experienced hurdles created by existing, older plans during their newer planning efforts. This was because older plans that were no longer reflective of the community’s existing conditions had not officially been concluded, expired, or retired. This created difficulties in identifying a clear plan hierarchy since there were conflicting action items and strategies noted in the small area plans and the comprehensive plan for the respective city. Without the clear distinction of authority and consistency of information between the plans it is difficult to know which plan supersedes the other. While plan hierarchy is not an issue for the City of College Station – the Comprehensive Plan is the highest in the plan hierarchy – there is still the importance of defining how to effectively conclude small area plans that are beyond their planning horizons. Planners from the larger cities also mentioned equity issues that sometimes arise from outdated plans. This can occur when community leaders with existing, but outdated plans point to those plans as justification for political support or project funding within their area, without consideration of changed conditions or whether those funds are better prioritized or more equitably distributed in other areas of that may not have had the benefit of small area planning efforts. This was especially true in Austin, where 20-year-old small area plans had been used to justify projects without holistic consideration of city needs. A 2016 equity audit of City of Austin practices specifically noted this issue with outdated neighborhood plans. In summary, the audit process and conversations with peers helped staff solidify four key recommendations for future small area planning efforts: 1) Develop a clear implementation tracking strategy early in the plan creation process that ideally includes plan action tracking software to support collaboration across City departments 2) Distinguish between actions that are the responsibility of the City to implement and those that will be neighborhood-led Page 45 of 107 3) Develop specific and quantifiable actions that lead to measurable outcomes 4) Set clear planning horizons with sunset provisions that expire plans after a certain date Next Steps Future planning efforts were identified during the Comprehensive Plan evaluation and update process. These are specified in Chapter 2: Distinctive Places and shown on Map 2.1 Planning Areas. Of these, the top priorities and next small area planning efforts being led by staff include the University Drive & Texas Avenue Redevelopment Area Plan and an update to the Wellborn Community Plan, which are both projected to begin during fall/winter 2022 and continue through 2023. The University Drive & Texas Avenue Redevelopment Area is consistently ranked as a high priority for future planning efforts by residents and City leadership due to the number of underperforming land uses that are in close proximity to two of the busiest corridors in the City. The proximity of existing neighborhoods and the Texas A&M University campus requires careful site planning and building design. These efforts should be complimentary to the nearby hospitality corridor planning efforts, the Eastgate area, and the Texas A&M University Campus Master Plan while focusing on bringing vertical mixed-use and other aspects of urban character to this portion of the City. The Wellborn area is facing continued development pressures for growth that may now be appropriate, in contrast with the existing plan direction. A renewed planning effort is needed to allow current residents to actively participate in the process and provide updated direction. Two additional areas for small area planning efforts in coming years include the Harvey Road Redevelopment Area and the George Bush Drive & Wellborn Road (FM 2154) Redevelopment Area, as specified in the Comprehensive Plan. The Harvey Road area includes newer commercial areas and a number of underperforming commercial and older multi-family properties and apartment complexes. This area also includes the Post Oak Mall, which will likely need to reposition itself in the near future to remain competitive. This presents an exciting opportunity to evolve into a denser area of the City, including vertical and horizontal mixed-use developments, which could compliment the adjacent Wolf Pen Creek District. Page 46 of 107 The George Bush Drive & Wellborn Road area, also referred to as “Area V” in the current Southside Area Neighborhood Plan, will change in character once the proposed TxDOT interchange project occurs. Redevelopment planning efforts should focus on bringing vertical and horizontal mixed-use and other aspects of urban character to this portion of the City, while providing contextually appropriate transitions to established areas of the Southside neighborhood. Residents strongly opposed changes to interior portions of the Southside neighborhood across from Texas A&M University, thus future planning efforts within the Southside neighborhood should center on the area surrounding the George Bush Drive and Wellborn Road (FM 2154) intersection. Staff does not recommend updating the Central College Station Neighborhood Plan, the Eastgate Neighborhood Plan, the Southside Area Neighborhood Plan, or the South Knoll Area Plan at this time. These neighborhoods are not experiencing the same developmental pressures as the areas addressed above. While staff recognizes that some changes do occur within these neighborhoods, there are other available methods of addressing said change that does not warrant a renewed planning effort at the present time. If a need is identified in the future, staff will address and evaluate if an updated plan is needed for any of these neighborhoods. In addition to these projects, with the concluding of these plans and with the acceptance of the audit’s findings, staff will bring forward amendments to the Unified Development Ordinance (UDO) and any other impacted ordinances in reference to these plans being active. Page 47 of 107 COMPLETED CAPITAL PROJECTS Central College Station Neighborhood Plan C1 HARVEY MITCHELL PARKWAY MULT I-USE PATH C2 DEACON DRIVE & WELLBORN ROAD SIDEWALK C3 SOUTHWOOD DRIVE BIKE ROUTE SIGNAGE C4 BROTHERS BOULEVARD BIKE ROUTE SIGNAGE C5 TODD TRAIL BIKE ROUTE SIGNAGE C6 PONDEROSA DRIVE BIKE ROUTE SIGNAGE C7 BALCONES DRIVE BIKE ROUTE SIGNAGE C8 BALCONES DRIVE & LARRY J. RINGER LIBRARY MULT I-USE PATH C9 NORMAND DRIVE SIDEWALK C10 PEDERNALES DRIVE SIDEWALK C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 W E L S H A V E RI O G R A N D E B L V D TE X A S A V S DEACON DRPONDEROSA DRL O N G M I R E D RBROTHERS BLVDPage 48 of 107 COMPLETED CAPITAL PROJECTS Eastgate Neighborhood Plan PURYEAR DRIVE SIDEWALKEG7 DOMINIK DRIVE SIDEWALKEG6 TARROW STREET SIDEWALKSEG8 UNIVERSITY DRIVE EAST SIDEWALKEG9 WALTON DRIVE & FRANCIS DRIVE 4-WAY STOPEG2 EASTGATE NEIGHBORHOOD SIGNAGEEG1 LINCOLN AVENUE & TARROW STREET 3-WAY STOPEG3 NIMITZ STREET REHABILITATIONEG4 EISENHOWER STREET EXTENSIONEG5 EG10 EISENHOWER STREET SIDEWALK EG11 LIVE OAK STREET SIDEWALK EG12 NIMITZ STREET SIDEWALK EG13 LINCOLN AVENUE & UNIVERSITY TOWN CENTER MULT I-USE PATH EG7 EG6 EG8 EG9 EG2 EG1 EG3 EG4 EG5 EG10 EG11 EG12 EG13 LINCOLN AVEFRANCIS DRMU N S O N A V E TA R R O W S T NI M I T Z S T WALTON DRFRANCIS DRDOMINIK DRUNIVERSITY DR ETE X A S A V E Page 49 of 107 GEORGE BUSH DRWE L LBO RN RDHOLLEMAN DRSO UTHWEST PK W Y TE X A S A V S SS7 SS6 SS8 SS9 SS10 SS2 SS1 SS3 SS4 SS5 SS11 DE X T E R D R PARK PLACEPARK PLACEGL A D E S T ER S O N S T AN D WE L S H A V E COMPLETED CAPITAL PROJECTS Southside Area Neighborhood Plan SS4 ELEANOR STREET & PHOENIX STREET PEDESTRIAN IMPROVEMENTS SS5 GEORGE BUSH DRIVE & TIMBER STREET PEDESTRIAN IMPROVEMENTS SS11 SOUTHWEST PARKWAY & WELSH AVENUE PEDESTRIAN IMPROVEMENTS SS7 HOLLEMAN DRIVE & WELLBORN ROAD PEDESTRIAN IMPROVEMENTS SS6 GEORGE BUSH DRIVE & DEXTER STREET PEDESTRIAN IMPROVEMENTS SS8 HOLLEMAN DRIVE & WELSH AVENUE INTERSECTION IMPROVEMENTS SS9 HOLLEMAN DRIVE & ANDERSON STREET INTERSECTION IMPROVEMENTS SS10 HOLLEMAN DRIVE & TEXAS AVENUE PEDESTRIAN IMPROVEMENTS SS2 PARK PLACE PEDESTRIAN IMPROVEMENTS SS1 SOUTHWEST PARKWAY SIDEWALK SS3 SOUTHSIDE NEIGHBORHOOD SAFETY IMPROVEMENT PROJECTS Page 50 of 107 COMPLETED CAPITAL PROJECTS South Knoll Area Plan ANDERSON ARBORETUM IMPROVEMENTSSK2 BEE CREEK IMPROVEMENTSSK1 LEMON TREE PARK IMPROVEMENTSSK3 GABBARD PARK IMPROVEMENTSSK4 HARVEY MITCHELL PARKWAY TRAIL LANDSCAPINGSK5 TE X A S A V S W E L S H A V E SK2 SK1 SK3 SK4 SK5 SOUTH W E ST PK W Y D E X T E R D R S HAINES D R GLAD E S T AN D E R S O N S T LA N G F O R D S T NUEC E S D R HARVE Y MIT C H ELL P K W Y S Page 51 of 107 COMPLETED CAPITAL PROJECTS Wellborn Community Plan GREENS PRAIRIE ROAD IMPROVEMENTSW2 VARIOUS ROADWAY MAINTENANCE PROJECTSW1 ROYDER ROAD REHABILITATIONW3 GREENS PRAIRIE ROAD REHABILITATIONW4 W1 W3 W2 W4 W1 W1 W1 W1 FM 2154FM 2154VICTORIA AVEMCCULLOUGH RDRO Y D E R R D GREENS PRAIRIE RDI&GN RD S DOWLING RD Page 52 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEImage Corridor CC1.1 Develop Image Corridor and Gateway Image Plan/Update Streetscape Plan to consider the following: (1) Landscape Plan that focuses on native plantings; (2) implement schedule that focuses on aligning capital outlays to time with appropriate planting seasons. Focused Planning Effort Planning & Development Services This was not completed in a holistic way. Some additional landscaping was installed along the multi- use path on the north side of Harvey Mitchell Parkway near its intersection with Texas Avenue.  CC1.2 Develop and adopt an Image Corridor Suburban Commercial Overlay for vacant commercial properties that are not zoned in compliance with the Comprehensive Plan. Policy-based decision Planning & Development Services The Suburban Commercial zoning district was adopted in October 2012, in lieu of an overlay. The intersection of Deacon Drive and Wellborn Road has since been developed with commercial uses that are zoned General Commercial (GC).  CC1.3 C1 Work with TxDOT to incorporate landscaping into Harvey Mitchell Parkway South median project (similar to the landscaping projects along Texas Avenue South). Capital Improvement Planning & Development Services Landscaping was installed in 2019 along the Harvey Mitchell Parkway multi-use path on the northwest side of Harvey Mitchell Parkway near its intersection with Texas Avenue.  CC1.4 Designate Deacon Drive and Rio Grande Boulevard as neighborhood image corridors and make them the focus of mobility enhancements.Policy-based decision Planning & Development Services This action has not been completed. Comprehensive Plan CC2.1 Amend the Comprehensive Plan’s Community Character and Future Land Use Map for the non-floodplain impacted areas to reflect a future Urban character (Map 1.3). Policy-based decision Planning & Development Services The land use in this area was changed to Urban. With the 10-Year Comprehensive Plan Update, which overhauled the Urban category, these properties were changed to Mixed Residential to allow a mix of housing types.  CC2.1 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to reflect an Urban character which could include commercial, multi-family, or a mix of two uses (Map 1.4). Policy-based decision Planning & Development Services The land use in this area was changed to Urban. With the 10-Year Comprehensive Plan Update, which overhauled the Urban category, these properties were changed back to General Commercial to allow intense commercial uses along the SH 6 Frontage Road.  CC2.3 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to reflect a future Urban character (Map 1.5).Policy-based decision Planning & Development Services The land use in this area was changed to Urban. With the 10-Year Comprehensive Plan Update, which overhauled the Urban category, this property was changed to Urban Residential to reflect the existing multi-family development on the property.  CC2.4 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to reflect a range of commercial uses transitioning from more intense General Commercial uses along the frontage road backing up to Business Park uses along the east side of Longmire Drive, then to Suburban Commercial uses along the west side of Longmire Drive. Use of a PDD zoning district or a Suburban Commercial overlay (Map 1.6). Policy-based decision Planning & Development Services The land use in this area was changed to Suburban Commercial and Business Park. With the 10-Year Comprehensive Plan Update, the land uses were revised to Medical for the previously Suburban Commercial area and the Business Park area was enlarged with a name-change to Business Center.  CC2.5 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to designate this area as Neighborhood Conservation.Policy-based decision Planning & Development Services The land use in this area was changed to Neighborhood Conservation. Appendices Page 53 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEComprehensive Plan CC2.6 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to support Urban character development opportunities on this property upon the extension of Balcones Drive. Policy-based decision Planning & Development Services The land use changes were completed. With the 10- Year Comprehensive Plan Update General Commercial and Urban Residential uses were selected to reflect the Jones Crossing development. The Natural & Open Areas boundaries were adjusted and expanded based on updated flood data.  CC2.7 Amend the Comprehensive Plan’s Community Character and Future Land Use Map to designate this area as General Suburban.Policy-based decision Planning & Development Services The land use in this area was changed to General Suburban. With the 10-Year Comprehensive Plan Update these properties were changed to Mixed Residential to allow a mix of housing types.  Zoning CC3.1 Initiate a rezoning on properties adjacent to single-family areas to R-2, Duplex from the existing zoning of R-6, High Density Multi-Family (Map 1.11). Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.2 Initiate a rezoning to R-6, High Density Multi-Family for the C-1, General Commercial portions of Airline Drive (Map 1.12).Policy-based decision Planning & Development Services This zoning change was completed in 2011. CC3.3 Initiate a rezoning from R-4, Apartment/Low Density, to R-1, Single-Family zoning (Map 1.13).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.4 Initiate a rezoning from R-4, Apartment/Low Density, to R-1, Single-Family zoning (Map 1.14).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.5 Initiate a rezoning to add a corridor overlay to promote Suburban Commercial style development (Map 1.15).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.6 Initiate a rezoning from R-4, Apartment/Low Density, to R-1, Single-Family zoning (Map 1.16).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.7 Initiate a rezoning to add a corridor overlay to promote Suburban Commercial style development (Map 1.17).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.8 Initiate a rezoning to Suburban Commercial (Map 1.18).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.9 Approach property owners to initiate a rezoning from R-6, High-Density Multi-Family, to Suburban Commercial (Map 1.19).Policy-based decision Planning & Development Services This City-initiated zoning change was not completed. CC3.12 Adopt character-specific zoning districts to follow the Community Character and Future Land Use plan.Regulation Planning & Development Services In 2012, the City created and adopted new zoning districts including NAP Natural Areas Protected, SC Suburban Commercial, BP Business Park, and BPI Business Park Industrial. In 2013, the City adopted R Rural, E Estate, GS General Suburban, RS Restricted Suburban, D Duplex, T Townhouse, and MHP Mobile Home Park.  CC3.8, 10 Adopt Suburban Commercial zoning district to limit building height and style of development to be compatible with the suburban character of the area. Regulation Planning & Development Services The Suburban Commercial zoning district was adopted in October 2012. Site Development CC4.1 Investigate the feasibility of a site and commercial building façade improvement program that includes the identification of funding sources and alternative financing opportunities. Project / Program Planning & Development Services / Economic Development This action was not completed and is not currently being pursued. CC4.2 Repair parking and circulation facilities in front of existing businesses.Project / Program Planning & Development Services / Public Works There has been some activity in recent years to update the properties and repair some of the pavement. The pavement is on private property so would not become a public project.  Appendices Page 54 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEFloodplain CC5.1-2 Pursue purchase of the property 3020 Texas Ave South & Natural Areas through the Greenways acquisition program.Policy-based decision Planning & Development Services The property owner was contacted, but the City was unable to purchase this property (2011). The funds for this project are no longer available.  CC5.3 Develop comprehensive floodplain management program that will reduce flood risk to developed flood prone areas - Residential, Multi-Family, Commercial. Project / Program Planning & Development Services / Public Works / CIP The City’s flood ordinance has been revised to add additional restrictions for development in FEMA special flood hazard areas. The B/CS Unified Design Guidelines enhances floodplain management through required detention to mitigate increased flows from development.  Effective Organizations NI1.2 Create neighborhood partnership requirements to develop responsibilities for participating organizations, so the City services can be aligned based on the organizations’ schedules and priorities. Project / Program Neighborhood Services Neighborhood Partnership Program had been in effect, but services were adjusted in 2012 to include more neighborhood associations and loosely based groups.  NI1.4 Utilize the Neighborhood Partnership Program to create an organizational mentoring program for additional support to new or struggling organizations. Project / Program Neighborhood Services The Neighborhood Organization Tool Kit is available for neighborhoods to use as a manual in times they need guidance or assistance in procedures.  NI1.5 Create a civic engagement component to the Neighborhood Partnership Program to increase neighborhood participation in local governance. Project / Program Neighborhood Services Civic engagement was encouraged to the Neighborhood Partnership Program through programs such as Citizen’s University, Police Academy, Fire Academy, etc.  NI1.6 New resident contact program to promote neighborhood services and online resources.Project / Program Neighborhood Services Neighborhood Services established Welcome Bags to give to new residents (2009) and continues the program through present day. NI1.8 Create an ongoing evaluation process of neighborhood characteristics to readjust service provisions and evaluate effectiveness. Project / Program Neighborhood Services A Neighborhood Indicator Program with guidelines have been developed in each of the defined neighborhoods. The guidelines were submitted to staff for comments and staff has visited with internal stakeholders. This program was ultimately not implemented.  NI1.3 Create an online clearinghouse for neighborhood organization and tracking information.Project / Program Neighborhood Services The City’s website was updated with neighborhood contact links and webpages and links to SeeClickFix for neighborhood code enforcement activity.  NI1.7 Work with existing organizations to create a Know Your Neighbor campaign to increase active participation.Project / Program Neighborhood Services / Police The Neighborhood Organization Tool Kit is available for neighborhoods to use as a manual in times they need guidance or assistance in procedures.  NI1.9 Develop leadership training programs for newly elected homeowner association officers and committee members (Area A). Project / Program Neighborhood Services New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013- 2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with the Greater Houston Community Association Institute hosting training opportunities.  NI1.10 Provide technical assistance to HOAs for succession planning with a focus on assisting with the creation of standard operating procedures for newly elected officers (Area A). Project / Program Neighborhood Services Neighborhood Organization Tool Kit is available for neighborhoods to use as a manual in times they need guidance or assistance in procedures.  NI1.11 Work with organization leadership to identify and provide assistance in recruiting new leaders to fill vacant positions on existing committees (Area B). Project / Program Neighborhood Services Neighborhood Organization Tool Kit is available for neighborhoods to use as a manual in times they need guidance or assistance in procedures.  Appendices Page 55 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEffective Organizations NI1.12 Provide in-depth training similar to the new organization program for reorganized executive committee (Area B).Project / Program Neighborhood Services  Board training was established in 2013-2016. NI1.14 Create deed restriction enforcement training (Area B).Project / Program Neighborhood Services Attorneys Cully Lipsey and Heath Poole gave a presentation on the creation and enforcement of deed restrictions at the April 22 seminar supper (FY 2013). It was attended by 43 association members from around the community, with 4 HOAs from the Central CS area represented. Since it was so well received it will be repeated at least every other year. New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013-2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with the Greater Houston Community Association Institute hosting training opportunities.  NI1.15 Create homeowner associations in areas that are interested and work with residents through the Neighborhood Partnership program to do this (Area C). Project / Program Neighborhood Services Homeowner Associations were encouraged to form and the City is supportive of HOAs forming, but there were a high number of rentals in the neighborhood which made it unattainable for most neighborhoods to do so.  NI1.17 Create a specific support program for new organizations that focuses on providing specific technical assistance to organizations to ensure their viability over time. Project / Program Neighborhood Services New organizations are supported through various programs offered by the City. There is new Neighborhood Associations and Homeowner Association trainings, the Neighborhood Organization Tool Kit is also available for neighborhoods to use as a manual in times they need guidance or assistance in procedures.  NI1.18 Develop training for communication plan development to make sure organizations are providing pertinent information to residents (Areas A, B, C, D).Project / Program Neighborhood Services The City’s Neighborhood Partnership Program identified the necessity of providing information to association members (2013). The program states what information will be given from the City to neighborhood organizations and when that info should be distributed to the general membership. Organizational leaders are now required to provide contact information for all board members to prevent the funneling of information to residents. The City also publishes the weekly Neighborhood eNewsletter to widely distribute neighborhood information and resources, as well as overhauled the Neighborhood Services website to serve as a resource for all organizations and residents.  NI1.19 Work with residents to develop a new neighborhood organization or incorporate these areas into existing nearby neighborhood associations. Project / Program Neighborhood Services The Neighborhood Organization Tool Kit is available for neighborhoods to use as a manual in times they need guidance or assistance in procedures. A blog was published with community associations institute video essentials of HOA operations linked to it (2012). Neighborhood Services has coordinated training for residents that is presented by CAI. The 4 hour workshop “Essentials of HOA Operation” will cover finances and reserves, insurance for the HOA and board members, and ethics.  Appendices Page 56 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEffective Organizations NI1.13 & 16 Allow for the use of neighborhood grant funding for legal consultations (Area C) as well as for neighborhood organizing in these areas (Area B).Policy-based decision Neighborhood Services Attorneys Cully Lipsey and Heath Poole gave a presentation on the creation and enforcement of deed restrictions at the April 22 seminar supper (FY 2013). It was attended by 43 association members from around the community, with 4 HOAs from the Central CS area represented. Since it was so well received it will be repeated at least every other year. New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013-2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with the Greater Houston Community Association Institute hosting training opportunities.  Code Enforcement NI2.2 Incorporate code enforcement training for organizations to help them better understand local and state legal requirements for pursuing enforcement action on a property. Project / Program Neighborhood Services Outreach to student groups and HOA’s are completed upon request. NI2.1 Create an indicator program that tracks code enforcement and property maintenance case activity to identify frequent violations, specific properties, and time periods. Project / Program Code Enforcement Community Development created a Property Maintenance checklist in 2014. Staff performed a baseline survey of all identified properties and offered assistance and information to properties that were not in compliance. All properties are re-surveyed on a regular basis to identify property deterioration and to proactively intercede. “Walk and talk” events are scheduled each semester. During this event, representative from Code Enforcement, Neighborhood Services, Police, TAMU and others as deemed necessary canvas the neighborhood, meeting with residents and providing information. Areas are chosen based upon their recent levels of non-compliance with codes and or illegal activity.  NI2.3 Create a neighborhood oversight process to alert significant cod enforcement and property maintenance activity (Areas A,B,C,D,E, and F). Project / Program Code Enforcement Various departments share information regarding significant code enforcement activity. Code Enforcement, Police, building staff, sanitation, and others communicate on a regular basis to address identified issues.  NI2.4 Establish an annual face to face proactive enforcement contact program by Code Enforcement officers with rental property occupants.Project / Program Code Enforcement This is being implemented by Code Enforcement Officers who make contact with residents, owners, and/or property managers regarding violations. NI2.5 Develop a more focused property maintenance code enforcement program to include specific training on codes.Project / Program Code Enforcement This is being implemented through proactive code enforcement. NI2.6 Create a proactive health and sanitation violation program to alert residents to possible future violations before enforcement to allow an opportunity to address the issues before action is necessary. Project / Program Code Enforcement The Health and Sanitation pre-violation program occurred in FY 2013. NI2.8 Utilize rental registration program information to provide annual reminders about code requirements (Area G).Project / Program Code Enforcement Registered rental code enforcement notification program began in FY 2013. Code Mobile Mapping Application allows staff to notify property owners, managers, and utility customers when a code violation occurs. Reactive code reinforcement is also used to assist with rental code enforcement.  Appendices Page 57 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETECode Enforcement NI2.10 Work with Aggie Up organizations to reinvigorate student mediation program to allow students to learn about property maintenance.Project / Program Neighborhood Services Community Living course is expected to resume in Fall 2022. NI2.11 Increase monitoring of properties adjacent to areas A, B, C, and D, to ensure property maintenance isn’t negatively impacting owner-occupied areas. Regulation Code Enforcement Code Mobile Mapping Applications allows for monitoring of all code violations or issues at rental properties. Code Enforcement conducts proactive monitoring of all areas.  Neighborhood Image NI3.11 Develop a neighborhood cleanup program with Sanitation, Recycling, and neighborhood organizations to include a once-a-year event to bring the neighborhood together and encourage active neighborhood participation in maintaining and improving neighborhood image. Project / Program Public Works The Adopt-A-Street Program has (80) organizations enrolled to collect litter along 76.3 miles worth of street segments. The City also works with the TAMU Big Event, Keep Brazos Beautiful for on-demand clean-ups and the annual Texas Trash Off event, and Community Services for on-demand clean-up events as requested.  NI3.2 Identify additional funding and matching fund opportunities for beautification projects.Policy-baseddecision Planning & Development Services Funding for beautification projects were identified through community partners such as Keep Brazos Beautiful with assistance from the City, as well as the amendments to the Neighborhood Grant Program which allows for funding for beautification projects within neighborhoods.  NI3.9 Identify additional grants and other funding opportunities to improve the safety and aesthetics of drainage channels.Policy-baseddecision Planning & Development Services The City is participating in the Lower Brazos Regional Flood Plan which provides grant funding opportunity for prioritized projects through the State’s Flood Infrastructure Fund, which is managed by the Texas Water Development Board.  NI3.3 Streamline Permit for Private Improvements in Public Right-of-Way process for neighborhood projects.Project / Program Neighborhood Services / Planning & Development Services The City developed a Gateway Grant program to provide opportunities for neighborhoods to enhance neighborhood identification and streamline the permitting process for private improvements in public rights-of-way.  NI3.5 Identify and work with key community partners (Big Event, Aggie Replant, Keep Brazos Beautiful, etc.) to assist with neighborhood beautification projects. Project / Program Community Services / Public Works A neighborhood clean-up program was established (2010). This program, while identified in the Central College Station Neighborhood Plan, is now offered on- demand to neighborhoods throughout the City through Community Services and the Sanitation division. Additionally, local service organizations such as the TAMU Big Event and Keep Brazos Beautiful provide support for on-demand and one-day annual clean-ups.  Develop an increased monitoring program for public facilities (drainage ways, sidewalks, and roads) that prioritizes improvements to owner- occupied areas (Areas A, B, C, D, and E). Project / Program Planning & Development Services / Public Works As part of the City’s Stormwater Management Program, all drainage outfalls are inspected within the five year program window.  Work with organizations to develop neighborhood improvement projects to repair neighborhood elements (fences, drainage ways, signs, etc.).Project / Program Neighborhood Services The Neighborhood Grant program was amended to allow neighborhood associations to apply for the grant without having insurance. This allowed for grant funding to be more readily available to a wider range of neighborhoods and improvements.  Appendices Page 58 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEmergency and Law Enforcement Services NI4.2 Increase education to neighborhoods and student organizations about property crimes and security during school breaks.Project / Program Neighborhood Services Community Living course is expected to resume in Fall 2022. NI4.4 Work with established organizations to develop or reinstate neighborhood watch or other neighborhood policing programs that would assist law enforcement and emergency responders.Regulation Code Enforcement Code Mobile Mapping Applications allows for monitoring of all code violations or issues at rental properties. Code Enforcement conducts proactive monitoring of all areas. NI4.8 Develop nuisance monitoring and enforcement programs that are in line with state and local requirements.Project / Program Code Enforcement This program was not developed. Code Enforcement Officers are expected to identify and monitor problem properties.  NI4.9 Amend Neighborhood Grant Program to include funding for neighborhood watch programs for signage or incidental costs (Areas A, B, C, D). Project / Program Neighborhood Services The Neighborhood Grant Program was amended (2013) to make the funding more flexible and accessible to neighborhood groups looking to pursue projects such as neighborhood identification or beautification. Changes to the program included lessening insurance requirements, allowing in-kind donations for match funding, and allowing neighborhood beautification projects. This allowed for grant funding to be more readily available to a wider range of neighborhoods and improvements.  NI4.5 Develop an on-going parking monitoring program in conjunction with the Neighborhood Traffic Calming Program and emergency responders to monitor on-street parking issues and take action. Project / Program Community Services Code Enforcement and Northgate Staff respond to complaints regarding parking in neighborhoods in addition to proactively monitoring their areas.  NI4.10 Increase notifications to property owners about noise violations and other significant activity on a property (Areas A,B,C,D).Regulation Community Services / Police Code Enforcement notifies property owners when there are on-going violations on their property. The Police Department also notifies owners when there are repeated disturbances on properties. This is done when warranted and is therefore on-going.  Thoroughfares M1.2 Maintain and rehabilitate identified streets and thoroughfares and prioritize based on health and safety first.Capital Improvement Planning & Development Services / Public Works The completion of traffic warrant studies for five intersections within the planning area were conducted in FY 2010. Traffic counts, traffic volume and incident data were analyzed to determine if the warrant studies merited stop signs or traffic signals. After evaluating the traffic warrant studies, all five intersections did not warrant traffic signal or stop sign.  M1.3 Identify intersections for traffic warrant studies that could use improvements.Project / Program Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. M1.4 Warrant Study: Brothers Boulevard and Deacon Drive (traffic signal). Capital Improvement Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration.  Warrant Study: Longmire Drive and Brothers Boulevard (4-way stop). Capital Improvement Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration as a potential location for a roundabout.  Warrant Study: Ponderosa Drive and Longmire Drive (4-way stop). Capital Improvement Public Works Traffic Engineering has continued to monitor this location for potential traffic control and it has not been justified. Warrant Study: Edelweiss Avenue and Rock Prairie Road (traffic signal). Capital Improvement Public Works A CIP project is under construction (2022) that will install a traffic signal as part of relocating the railroad crossing at Cain Road to Deacon Drive.  C2 Warrant Study: Deacon Drive and Wellborn Road (traffic signal). Capital Improvement Public Works This action has not been completed. Appendices Page 59 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEThoroughfares M1.6 Install Deacon Drive median Capital Improvement Public Works This action has not been completed. Install Rio Grande Boulevard median Capital Improvement Public Works This action has not been completed. Install Welsh Avenue median Capital Improvement Public Works This action has not been completed. Bicycle & Pedestrian M2.1 Navarro Drive bike lane installation Capital Improvement Planning & Development Services / Public Works The Navarro Drive bike lane installation was not completed. Edelweiss Avenue bike lane installation Capital Improvement Planning & Development Services / Public Works The Edelweiss Avenue bike lane installation was not completed. M2.2 C3 Southwood Drive bike route signage Capital Improvement Planning & Development Services / Public Works The Southwood Drive bike route signage was installed (2011). C4 Brothers Boulevard bike route signage Capital Improvement Planning & Development Services / Public Works Brothers Boulevard bike route signage was installed (2011). C5 Todd Trail bike route signage Capital Improvement Planning & Development Services / Public Works Todd Trail bike route signage was installed (2011). C6 Ponderosa Drive bike route signage Capital Improvement Planning & Development Services / Public Works Ponderosa Drive bike route signage was installed (2011). C7 Balcones Drive bike route signage Capital Improvement Planning & Development Services / Public Works Balcones Drive bike route signage was installed (2011). M2.3 Deacon Drive bike lane gap Capital Improvement Planning & Development Services / Public Works The Deacon Drive bike lane gap was not completed. Rio Grande bike lane gap Capital Improvement Planning & Development Services / Public Works The Rio Grande bike lane gap was not completed. M2.6, 2.10 C8 Amend Bicycle, Pedestrian, and Greenways Master Plan to include a multi-use path connection between Balcones Drive to Larry J. Ringer Library. Capital Improvement Planning & Development Services / Public Works This was added to the BPG Master Plan and the connection was constructed in 2020. M2.7, 2.11 San Pedro Drive sidewalk Capital Improvement Planning & Development Services / Public Works A sidewalk was constructed from West Ridge Drive to Welsh Avenue (2014). West Ridge Drive sidewalk Capital Improvement Planning & Development Services / Public Works A sidewalk was constructed from Welsh Avenue to Pintail Trail (2014). M2.8, 2.11 Airline Drive sidewalk Capital Improvement Planning & Development Services / Public Works The Airline Drive sidewalk was not completed. C9 Normand Drive sidewalk Capital Improvement Planning & Development Services / Public Works A sidewalk was constructed from Rock Prairie Road to Ponderosa Drive (2016). Val Verde Drive sidewalk Capital Improvement Planning & Development Services / Public Works The property owner at 901 Val Verde Drive didn’t want a sidewalk to be constructed. This project is no longer being pursued. C10 Pedernales Drive sidewalk Capital Improvement Planning & Development Services / Public Works The Pedernales Drive sidewalk was completed (2012). M2.11 Construct multi-use paths identified in the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works / CIP This action is partially complete. The multi-use path from Steeplechase Park to FM 2818 has been constructed (2018). The path along FM 2818 from Waxwing Lane to Larry Ringer Library is currently funded.  Appendices Page 60 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETETransit M3.1 Identify opportunities to collaborate and promote a co-ridership program between TAMU Transit and the Brazos Transit District. Policy-based decision Planning & Development Services Texas A&M University and Brazos Transit District (BTD) have implemented a co-rider program. With a BTD pass, riders can be on TAMU buses. With a TAMU ID, riders can ride BTD buses.  M3.3 Bus shelter relocation on Longmire Drive in from the east side to the west side in order to better service the TAMU Transit stop on the other side of the street.Capital Improvement Planning & Development Services / Public works TAMU no longer operates a transit route on Longmire Drive. M3.4 Work with TAMU Transit and Brazos Transit District to identify existing stops with high-ridership to upgrade to a bus shelter.Project / Program Planning & Development Services Brazos Transit District has assessed stop locations that have a higher ridership and have identified potential shelter locations. City staff is assisting with the evaluating the fixed stop and shelter locations.  M3.5 Coordinate with TAMU Transit and Brazos Transit District to provide signage and route information at scheduled bus stops.Project / Program Planning & Development Services Brazos Transit District has not implemented fixed stop locations where bus stop signage would be placed. M3.6 Provide pedestrian crosswalks where they will be crossing major thoroughfares to reach designated bus stops.Capital Improvement Planning & Development Services This action has not been completed. Recycling S1.1 Develop a neighborhood recycling notification program.Project / Program Public Works A recycling contractor provides monthly reports regarding commodity and contamination tonnages, as well as carts collected per service area. We relay this information back to Council via KPI information as well as through educational outreach programs.  S1.2 Develop a standing neighborhood green committees that works on encouraging recycling, participation in green events, and promoting sustainable living practices. Project / Program Neighborhood Services This is no longer being pursued. S1.4 Begin tracking recycling participation at a neighborhood level to provide baseline data for evaluating program effectiveness.Project / Program Public Works Public Works Solid Waste has been tracking recycling participation, tonnages, and contamination since 2016 when the City moved from the bag system to automated, single-stream recycling collections.  S1.5 Explore opportunities to create a community gardening project that would encourage these organizations to utilize public spaces, like parks, to host community gardens. Project / Program Community Services / Parks & Recreation Staff researched other community gardens around the state and met with local stakeholders. A summary of findings was presented to management, which recommended carrying out a garden project in a local park with a nonprofit managing the day to day activities. The Parks and Recreation Department selected a location within Fitch Park for the garden and developed an agreement with Keep Brazos Beautiful for maintaining the garden.  Utility Conservation S2.1 Expand neighborhood grant opportunities for neighborhood organizations to conduct water and energy audit campaigns, installation of efficient irrigation systems, or replanting drought- resistant plants in community areas. Project / Program Neighborhood Services Neighborhoods can use grant opportunities to install rain barrels. S2.3 Work with neighborhood organizations to develop a green work day (rain barrel, xeriscaping installation, or other like projects) as neighborhood building activities.Project / Program College Station Utilities Water conservation methods and tips are available on the City’s website under the College Station Utilities page. It provides details on benefits of xeriscaping and methods for installation. Appendices Page 61 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEUtility Conservation S2.4 Promote and educate neighborhoods about water and energy audits through neighborhood organizations.Project / Program College Station Utilities College Station Utilities (CSU) Energy Division has attended neighborhood block parties when invited, CSU also has a booth at the Home and Garden Show every year to promote programs and remains in contact with organizations throughout the City such as the Home Builders’ Association, and audits are performed on an as-requested basis.  S2.5 Work with community partners (Keep Brazos Beautiful, Brazos County Agricultural Extension, and others) to develop a residential xeriscaping and native lawn planting guide. Project / Program Planning & Development Services / Parks & Recreation Brazos Valley Master Gardeners completed a planting guide in FY 2014 for the area. Staff disseminated it to local groups and updated the Site Design Standards in 2018 to incorporate native and adapted species.  S2.6 Incorporate green seminar participation as a part of the Neighborhood Partnership program participation responsibilities.Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. Seminar Suppers often feature green and sustainability topics, with a recent (2022) example of a water conservation presentation by the City’s Water Resources Coordinator.  S2.7 Explore opportunities and fiscal feasibility to reduce or eliminate permitting fees for LEED certifiable homes, solar voltaic panel installation, and other green building upgrades. Project / Program College Station Utilities College Station Utilities has several programs that aim to incentivize residents to invest in more sustainable energy options. There is the Connected Thermostat Program, Good Cents New Home Program, Energy Back II Rebate Program, Residential LED Lighting Program, and Energy Conservation staff is available to provide on-site energy surveys free of charge.  S2.8 Track utility use and rebate participation.Project / Program College Station Utilities Programs are available and tracked on a citywide basis. The tracking of utility use is an element included in the proposed Neighborhood Indicator program guidelines (FY 2014). The guidelines were submitted to staff for comments and staff has visited with internal stakeholders. This program was ultimately not implemented.  S2.9 Explore alternate financing opportunities and grants to incent residential sustainable investments.Project / Program College Station Utilities This is not a College Station Utilities (CSU) program. Solar programs were put in place originally to kickstart the initiative, which is now running on its own. Stormwater Management S3.1 Develop neighborhood stormwater education.Regulation Planning & Development Services / Public Works The City has maintained a Stormwater Management Plan since 2008. The plan is updated every five years in accordance with state and federal regulations. This document outlines a series of actions that staff implements to enhance education, outreach, and public involvement during each five year period. It incorporates education and public input processes and ways in which the public may alert city staff to existing stormwater issues. This is a continually implemented program.  Appendices Page 62 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEStormwater Management S3.2 Develop stormwater promotional activities for neighborhoods (creek clean-up or a chemical free fertilizer campaign) to increase awareness and participation in stormwater management practices. Project / Program Planning & Development Services Educational and promotional activities from the Stormwater Management Program have included “Scoop the Poop,” “Turn around don’t drown,” and “Only Rain Down the Drain” campaigns. Other City events and programs include the Adopt-a-Greenway program (which also includes stormwater outfalls) and participation in the annual Texas Trash Off hosted by Keep Brazos Beautiful.  S3.4 Identify opportunities to utilize rain gardens and other stormwater management techniques to reduce pavement and provide additional water filtration. Project / Program Planning & Development Services / Public Works The B/CS Unified Design Guidelines include stormwater Best Management Practices (BMPs) that allow for alternative stormwater management solutions such as rain gardens, cisterns, and other innovative strategies to promote water quality.  S3.6 Work with Neighborhood Partnership organizations to include neighborhood residents in developing additional stormwater management standards. Project / Program Planning & Development Services The City’s stormwater programming solicits input from residents during educational events and through the City’s See-Click- Fix program. As part of the five year update of the Stormwater Management Plan, the draft plan is posted for public comment.  Alternative Transportation S4.3 Explore opportunities and feasibility of having a carshare program (such as U Car Share or Zipcar in College Station).Policy-based decision Planning & Development Services Efforts to implement or support travel demand management programs like carshare have not begun, but have been identified as a future strategy to be accomplished with the Comprehensive Plan (Strategy 6.13).  S4.4 Promote Bike to Work Week, or develop a No Drive say to encourage biking, walking, and bus ridership.Project / Program Planning & Development Services This action has not been completed. S4.5 Work with neighborhood organizations to develop work or shopping carpools or rideshare programs.Project / Program Planning & Development Services Efforts to implement or support travel demand management programs like carpools and rideshare have not begun, but have been identified as a future strategy to be accomplished with the Comprehensive Plan (Strategy 6.13).  Education S5.1 Incorporate green seminar education into seminar supper program.Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. Seminar Suppers often feature green and sustainability topics, with a recent (2022) example of a water conservation presentation by the City’s Water Resources Coordinator.  S5.2 Promote Green Seminar Lunch series through the neighborhood partnership program.Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments and programs.  S5.3 Work with Neighborhood Partnership organizations to include neighborhood residents in developing additional stormwater management standards. Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. Seminar Suppers often feature green and sustainability topics, with a recent (2022) example of a water conservation presentation by the City’s Water Resources Coordinator.  Appendices Page 63 of 107 CENTRAL COLLEGE STATION NEIGHBORHOOD PLAN (2010-2017) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEducation S5.4 Work with community organizations (like Keep Brazos Beautiful) to bring education and other sustainability opportunities to neighborhoods.Project / Program Neighborhood Services The City partners with various community organizations for sustainability education and programs in neighborhoods, such as partnering with Keep Brazos Beautiful on their annual Tree Sale, neighborhood clean-ups, the annual Texas Trash Off event, and annual awards luncheon for sustainability leaders in the community. The City also partners with the TAMU Big Event and Aggie Replant, among others.  S5.6 Continue to fund and promote other existing education programs.Project / Program Neighborhood Services The tracking of certain sustainability factors was an element included in the proposed Neighborhood Indicator Program Guidelines (FY 2014). The guidelines were submitted to staff for comments and staff has visited with internal stakeholders. This program was ultimately not implemented.  76 5 0 15 25 Total 121 Appendices Page 64 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETELand Use CC1.1 Amend the Future Land Use and Character Map in the Comprehensive Plan in the Pasler Area to change from Urban and General Suburban to Neighborhood Conservation. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the Pasler area as Neighborhood Conservation with the Comprehensive Plan adoption in 2021.  CC1.2 Amend the Future Land Use and Character Map in the Comprehensive Plan for the properties along Lincoln Avenue east of Tarrow Street from Urban to General Suburban (with an approx. depth of a single-family lot). Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show General Suburban for the properties along Lincoln Avenue east of Tarrow Street with the Comprehensive Plan adoption in 2021.  CC1.3 Amend the Future Land Use and Character Map in the Comprehensive Plan from General Commercial to General Suburban for the single-family lot at 903 Grand Oaks Circle; from General Suburban and Neighborhood Conservation to General Suburban for the single-family lot at 926 Grand Oaks Circle. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show Suburban Residential in both lots with the Comprehensive Plan adoption in 2021. CC1.4 Amend the Future Land Use and Character Map in the Comprehensive Plan from Institutional to Neighborhood Conservation for the residential properties along Gilchrist Avenue (adjacent to College Hills Elementary). Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show Neighborhood Conservation for the residential properties along Gilchrist (adjacent to College Hills Elementary) with the Comprehensive Plan adoption in 2021.  CC1.5 Amend the Future Land Use and Character Map in the Comprehensive Plan from Urban to Natural Areas Protected for the properties on the northwest side of George Bush Drive East between Texas Avenue South and Foster Avenue. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the northwest side of George Bush Drive East between Texas Avenue South and Foster Avenue as Neighborhood Center with the Comprehensive Plan adoption in 2021.  CC1.6 Amend the Future Land Use and Character Map in the Comprehensive Plan from Urban Mixed Use to Urban for the lots along the north side of Dominik Drive between Texas Avenue South and George Bush Drive East. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the lots along the north side of Dominik Drive between Texas Avenue South and George Bush Drive East as General Commercial (GC) with the Comprehensive Plan adoption in 2021.  CC1.7 Amend the Future Land Use and Character Map in the Comprehensive Plan from Neighborhood Conservation and Natural Areas Reserved to Urban for the townhome properties located at the intersection of Geroge Bush Drive East, Dominik Drive, and Puryear Drive. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the townhome properties located at the intersection of George Bush Drive East, Dominik Drive, and Puryear Drive as Mixed Residential with the Comprehensive Plan adoption in 2021.  Zoning CC2.1, 2, 4 Develop/Amend Single-Family Overlay Ordinance for Neighborhood Conservation Areas 1, 2, & 3. Policy-based decision Planning & Development Services Multiple meetings were held in 2011 with the College Hills Neighborhood Association in the Pasler area to gauge interest in pursuing a single-family overlay to support their conservation efforts. The neighborhood did not move forward with the NCO.  CC2.3 Approach property owners to rezone properties in compliance with Plan: R-6 High Density Multi-Family to R-3 Townhouse on Foster between Walton Drive and Francis Drive. Policy-based decision Planning & Development Services These properties redeveloped on their own before rezoning was implemented.  CC2.5 Approach property owners to rezone properties in compliance with Plan: Rezone 604 Tarrow from C-3 Light Commercial to R-1 Single Family. Policy-based decision Planning & Development Services This was completed by the property owner and was readdressed to 617 Banks. Appendices Page 65 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEZoning CC2.6 Prepare a redevelopment plan with a market analysis for Redevelopment Area II: Texas Avenue, University Drive, and Harvey Road in Comprehensive Plan. Focused Planning Effort Planning & Development Services A redevelopment plan for the Texas Ave / University Dr area, including the new and former City Hall sites, is underway in late 2022 and will continue through 2023. CC2.7 Identify strategies for modification of parking requirements for the commercial properties at Walton Drive and Texas Avenue.Regulation Planning & Development Services The commercial area at Walton Drive was surveyed for potential zoning overlay in 2013. This area is located within a Redevelopment Area in the Future Land Use and Character Map and will be reengaged with the small area planning effort along the Texas Ave. and University Dr. intersection.  Flood Management CC4.1 Develop a conservation easement program to help preserve the floodplain.Project / Program Planning & Development Services A conservation easement was not created. There is a nature trail managed by the Kiwanis Club adjacent to the College Hills Elementary School property.  Effective Neighborhood Organizations NI1.2 Encourage creation of homeowner associations in areas of interest or where there is a near 100% owner-occupancy rate.Project / Program Neighborhood Services This area had didn’t have enough owner-occupied homes to establish a Home Owners Association. Deed restrictions were used as a tool to set certain limitations within neighborhoods. Some residents tried to use the Neighborhood Conservation Overlay, but was ultimately unsuccessful.  NI1.3 Assist homeowner associations in creating deed restrictions and covenants that address neighborhood integrity issues that the City cannot regulate.Project / Program Neighborhood Services New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013-2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with the Greater Houston Community Association Institute.  NI1.4 Develop deed restriction enforcement training.Project / Program Neighborhood Services Attorneys Cully Lipsey and Heath Poole gave a presentation on the creation and enforcement of deed restrictions at the April 22 seminar supper (FY 2013). It was attended by 43 association members from around the community, with 4 HOAs from the Central CS area represented. Since it was so well received it will be repeated at least every other year. New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013-2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with Greater Houston Community Association Institute hosting training opportunities.  NI1.5 Create an ongoing evaluation process of neighborhood characteristics to readjust service provisions and evaluate effectiveness. Project / Program Community Services Guidelines were developed for a “Neighborhood Indicator Program.” These have been incorporated into Code Enforcement’s regular activities. Appendices Page 66 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEffective Neighborhood Organizations NI1.6 Work with student groups to find proactive methods to reach out to off campus students.Project / Program Neighborhood Services The City partnered with Off Campus Aggies to work on student issue (2008-2013). TAMU no longer has an Off-Campus Student Services or Off-Campus Aggies as of 2015 which ended the partnership. The City still operates the Be A Good Neighbor Program.  Amend neighborhood grant opportunities Project / Program Neighborhood Services The Neighborhood Grant Program was amended (2013) to make the funding more flexible and accessible to neighborhood groups looking to pursue projects such as neighborhood identification or beautification. Changes to the program included lessening insurance requirements, allowing in-kind donations for match funding, and allowing neighborhood beautification projects.  Conservation of Neighborhood Resources NI2.2 Conduct educational sessions with potential historic district and landmark property owners to gauge interest in pursuing historic preservation regulations. Project / Program Planning & Development Services Educational slides regarding ways to preserve Campus Homes through historic preservation overlays were created in 2013. “A Driving Tour of Historic Campus Homes” was published in 2019 and distributed amongst the community. Individual property owners can apply for designation through the Historical Marker Program or coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay.  Enhanced Neighborhood Identity and Investment NI3.2 Support community garden efforts on Pasler Street.Project / Program Planning & Development Services / Parks & Recreation There have been discussions with the College Hills Neighborhood Association regarding a community garden (2012), but the project never came to fruition after staff research.  NI3.3 Support community bulletin board concept by providing assistance and possible grant funding.Project / Program Planning & Development Services / Parks & Recreation The community bulletin board concept was explored for a location within Thomas Park and supported by the City. There was not enough resident interest to volunteer to maintain the board and the project was not pursued.  NI3.4 Implement the Parks and Recreation Master Plan by performing individual park master plans in the area to identify park needs and opportunities. Focused Planning Effort Parks & Recreation A citizen’s survey has been conducted and a community conversation has been hosted as a way to assess the parks and recreation needs for the community as well as further operations and facility options for Thomas Pool (2019). Thomas Park’s playgrounds were renovated, surfacing was redone, and a shade structure was added (2020).  NI3.5 Encourage neighborhood organizations to pursue common neighborhood signage for identity and image. Neighborhood grant funding opportunities should be supported. Project / Program Neighborhood Services Neighborhood identification signage installed using Neighborhood Matching Grant Program within College Hills and College Hills Woodlands subdivisions (48 signs). NI3.6 Implement the Water Master Plan and the Wastewater Master Plan by completing Phase IV of the Eastgate Utility Master Plan water and wastewater upgrades. Focused Planning Effort College Station Utilities Eastgate Rehabilitation Project Phase IV has been completed. A portion of Phase V is being completed with the James/Puryear Rehabilitation Project (2022). The remaining Phase V rehabilitation efforts are being postponed for a later date.  NI4.1 Utilize neighborhood associations and other communication mechanisms to increase awareness of housing assistance programs. Project / Program Neighborhood Services Flyers and informational brochures have been created and distributed; this is an ongoing process. Appendices Page 67 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEProactivePropertyMaintenance and CodeEnforcement NI4.2 Evaluate the availability of existing housing assistance programs offered for single-family owner-occupied housing and expand programs or make adjustments to increase program effectiveness. Project / Program Community Services A flyer was mailed to targeted residents about current owner occupied housing programs: minor repair, rehabilitation, reconstruction, down payment assistance, and homebuyer education classes. Flyers were sent out to homes that were: Within College Station City limits, Owner-Occupied, Built in 1985 or before, valued at $115,000 or less. In total 791 flyers were sent to homes in the 3 neighborhood areas of focus Central (405), Eastgate (201), Southside (185). This was done in FY 2013.  NI4.3 Create an indicator system that tracks code enforcement and property maintenance activity to identify frequent violations.Project / Program Code Enforcement The development of Code Mobile Mapping Application was completed to assist with significant code enforcement activity. NI4.4 Provide code enforcement training to neighborhood organizations so that they can better understand local and state legal requirements for pursuing enforcement action on a property.Project / Program Code Enforcement Code Enforcement presentations are available to HOA’s upon request and presentations to Seminar Supper are completed annually (except for years cancelled due to COVID). NI4.5 Develop a more robust property maintenance enforcement program to include specific training on the International Property Maintenance Code and cross-training with Police, Fire, and Utilities to identify issues and respond. Project / Program Code Enforcement This is being implemented through proactive code enforcement. NI4.6 Utilize rental registration program information to provide annual reminders to rental property residents about code requirements and notify property owners of significant enforcement activity. Project / Program Code Enforcement Code Enforcement Officers make phone calls, send emails, and leave door tags to educate residents on issues that are repeated or prior to determination of a violation.  TargetedEmergencyand Law Enforcement Services NI5.2 Increase education to neighborhoods and student organizations about property crimes and security.Project / Program Neighborhood Services / Police The College Station Police Department held a neighborhood association meeting to discuss crime in the area at College Hills Baptist Church (2012). The Police Department also created the Community Enhancement Unit in place of a Neighborhood Watch and has encouraged neighborhoods to use the Nextdoor website as a means of communication about crime and other safety concerns.  NI5.3 Work with organizations to develop neighborhood watch or similar programs to assist law enforcement and emergency responders.Project / Program Neighborhood Services / Police Neighborhood Watch programs were discontinued nationwide (2012-2013). The College Station Police Department created the Community Enhancement Unit in place of a Neighborhood Watch and has encouraged neighborhoods to use the Nextdoor website as a means of communication about crime and other safety concerns.  NI5.4 Develop an on-going parking monitoring program with the Neighborhood Traffic Calming Program and emergency responders to monitor on-street parking issues. Project / Program Planning & Development Services / Public Works / Fire A parking flyer was created explaining parking regulations and ordinances and who to contact for various parking issues. Parking monitor programs were also formed based on area indicators. College Station Police regularly monitor parking for the neighborhood and issue citations for violations. Public service announcements are also published by the Police Department.  NI5.5 Develop a speed awareness program by acquiring radar speed signs to utilize at targeted locations.Project / Program Public Works / Police Radar speed signs were acquired with the addition of a speed spy box for the Police Department. Appendices Page 68 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEThoroughfares and Local Streets M1.1 Amend the Thoroughfare Plan to designate Walton Drive between Foster Avenue and Francis Drive with a restricted Suburban context and street type. Policy-based decision Planning & Development Services The was completed with amendments to the Thoroughfare Plan when the plan was adopted (2011). Amend the Thoroughfare Plan to designate Foster Avenue and Walton Drive with a Restricted Suburban context and street type. Policy-based decision Public Works The was completed with amendments to the Thoroughfare Plan when the plan was adopted (2011). M1.2 Maintain and rehabilitate streets where funding permits.Capital Improvement Planning & Development Services / Public Works Public Works performs maintenance and rehabilitation work based upon regularly updated pavement index scores. Roadway Maintenance Fees were implemented in 2016 to provide a dedicated funding source for street maintenance.  M1.3 Warrant Study: Walton Drive and Francis Drive Capital Improvement Planning & Development Services / Public Works The study was completed and a 4-way stop was installed (2015). Warrant Study: Foster Avenue and Francis Drive Project / Program Planning & Development Services / Public Works The study was completed and no change was necessary. Warrant Study: Lincoln Avenue and Tarrow Street Capital Improvement Planning & Development Services / Public Works The study was completed and a three way stop was installed (2015). Warrant Study: Lincoln Avenue and Munson Avenue Project / Program Planning & Development Services / Public Works The study on Lincoln was conducted and no change was necessary. M1.4 Evaluate substandard local streets for possible reduction to posted speed limit if warranted.Project / Program Planning & Development Services / Public Works The speed awareness program was initiated in 2012. M1.5 Nimitz Street rehabilitation between Lincoln Avenue and Ash Street. Capital Improvement Planning & Development Services / Public Works The Nimitz Street rehabilitation from Lincoln Avenue to Ash Street was completed in 2017 and includes a sidewalk on one side (preliminary design 2015, under construction 2016). Eisenhower Street extension between Lincoln Avenue and Ash Street.Capital Improvement Planning & Development Services / Public Works The Eisenhower Street extension between Lincoln Avenue and Ash Street was completed in 2016. Bike lanes, bike route signage, along with a sidewalk on one side were added to this extension.  Gilbert Street rehabilitation.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Puryear Drive/James Parkway rehabilitation south of Francis Drive into one-way pair.Capital Improvement Planning & Development Services / Public Works The capital project to reconstruct Puryear Drive and James Parkway south of Francis Drive is funded and is in the design process. The streets will continue to operate with two-way traffic instead of the one-way pair option offered in the plan.  Bicycle & Pedestrian M2.1 Amend Bicycle, Pedestrian, and Greenways Master Plan for the following proposed bicycle facilities: Replace the planned bike lane on Walton Drive between Nunn Street and Gilchrist Avenue with a planned bike route. Policy-based decision Planning & Development Services This was completed through the adoption of the Bicycle, Pedestrian, and Greenways Master Plan. Amend Bicycle, Pedestrian, and Greenways Master Plan for the following proposed bicycle facilities: Replace the planned bike lane on Francis Drive between Ashburn Avenue and Glenhaven Drive with a planned bike route. Policy-based decision This was completed through the adoption of the Bicycle, Pedestrian, and Greenways Master Plan. Amend Bicycle, Pedestrian, and Greenways Master Plan for the following proposed bicycle facilities: Reclassify the bike lanes on Lincoln Avenue between future Eisenhower Street and Tarrow Street from proposed to existing. Policy-based decision This was completed through the adoption of the Bicycle, Pedestrian, and Greenways Master Plan. Appendices Page 69 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEBicycle& Pedestrian M2.5 Amend Bicycle, Pedestrian, and Greenways Master Plan for the following proposed sidewalks: University Drive East (southside); Eisenhower Street from Lincoln Avenue to Ash Street; Foster Avenue; Dominik Drive from Texas Avenue to George Bush Drive East; Gilchrist Avenue from Texas Avenue to Foster Avenue; James Parkway north of Francis Drive to fill in the gap to the park walking loop; Live Oak Street from Texas Avenue to Eisenhower Street; Nimitz Street from Lincoln Avenue to Ash Street; Nunn Street; Puryear Drive from Dominik Drive to Kyle Avenue; Puryear Drive from Walton Drive to James Parkway; and Wellesley Court. Policy-based decision Planning & Development Services This was completed through the adoption of the Bicycle, Pedestrian, and Greenways Master Plan. M2.9 Amend Bicycle, Pedestrian, and Greenways Master Plan regarding multi-use paths to: Remove the planned multi-use path between Lincoln Avenue and Dominik Drive while retaining the Natural Areas Reserved; and replace the planned multi-use path along future Eisenhower Street between Lincoln Avenue and Ash Street with planned sidewalks and bike route. Policy-based decision Planning & Development Services This was completed through the adoption of the Bicycle, Pedestrian, and Greenways Master Plan. M2.2 Dominik Drive bike lane installation in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices. Capital Improvement Planning & Development Services / Public Works This project is not complete, but has been included on the Bicycle Plan under the Bicycle Facility Proposed category. Francis Drive bike lane installation in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices. Capital Improvement Planning & Development Services / Public Works This project was completed with Francis Drive rehabilitation from Walton Drive to Munson Avenue. The section from Walton Drive to Texas Avenue is under design. Lincoln Avenue bike lane gap in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices.Capital Improvement Planning & Development Services / Public Works Lincoln Avenue bike gap was addressed and construction was completed. Tarrow Street bike lane installation in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices. Capital Improvement Planning & Development Services / Public Works This project is not complete, but has been included on the Bicycle Plan under the Bicycle Facility Proposed category. M2.3 Eisenhower Street bike route signage to be in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices. Capital Improvement Planning & Development Services / Public Works Eisenhower Street bike route signage was added (2016). Foster Avenue bike route signage to be in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices.Capital Improvement Planning & Development Services / Public Works Foster Avenue bike route signage was added (2016). Francis Drive bike route signage to be in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices. Capital Improvement Planning & Development Services / Public Works Francis Drive bike route signage was added (2016). Walton Drive/Nunn Street bike route signage to be in compliance with the Bicycle, Pedestrian, and Greenways Master Plan and the Manual on Uniform Traffic Control Devices.Capital Improvement Planning & Development Services / Public Works Walton Drive/Nunn Street bike route signage was added (2016). M2.6 EG6 Identify and install/repair the Dominik Drive sidewalk gaps. Capital Improvement Planning & Development Services / Public Works The items within the scope of Eastgate Neighborhood Plan have been completed. There is a full sidewalk on the south side of Dominik from Texas to Munson (completed 2016) but sidewalk gaps still exist on the northern side; at Munson sidewalk switches to northern side and is complete for the remainder of Dominik. This project is shown on Pedestrian Plan as Sidewalk Existing.  Identify and install/repair the James Parkway sidewalk gap north of Francis Drive.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Appendices Page 70 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEBicycle& Pedestrian M2.6 Identify and install/repair the Kyle Avenue sidewalk gap between George Bush Drive E and Puryear Drive.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Identify and install/repair the Lincoln Avenue sidewalk gaps between future Eisenhower Street and Munson Avenue.Capital Improvement Planning & Development Services / Public Works The Lincoln Avenue sidewalk gap between Eisenhower Street and Munson has been completed (2013). EG7 Identify and install/repair the Puryear Drive sidewalk gap between Kyle Avenue and Dominik Drive.Capital Improvement Planning & Development Services / Public Works The Puryear Drive sidewalk gap between Kyle Avenue and Dominik Drive has been completed. EG8 Identify and install/repair the Tarrow Street sidewalk gap between University Drive East and Peyton Street.Capital Improvement Planning & Development Services / Public Works The Tarrow Street sidewalk gap between University Drive East and Peyton Street has been completed (2015). EG9 Identify and install/repair the University Drive East sidewalk gaps. Capital Improvement Planning & Development Services / Public Works The University Drive East sidewalk gap from Texas Avenue to Lions Park has been completed (2013). M2.7 EG10 Eisenhower Street sidewalk construction in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works A sidewalk on one side of Eisenhower Street from University Drive East to Ash Street (constructed and completed in 2017). Foster Avenue sidewalk construction in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works The Foster Avenue sidewalk from Francis Drive to Gilchrist Avenue was completed (2021). The remaining portions of Foster Avenue have not been completed. Gilchrist Avenue sidewalk construction between Texas Avenue and Foster Avenue in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works This action was completed with the construction of City Hall (2021). EG11 Live Oak Street sidewalk between Texas Avenue and Eisenhower Street Capital Improvement Planning & Development Services / Public Works The Live Oak Street sidewalk between Texas Avenue and Eisenhower Street (Completed in 2017). EG12 Nimitz Street sidewalk construction between Lincoln Avenue and Ash Street in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works Nimitz Street from Lincoln Avenue to Ash Street has been rehabilitated and now includes a sidewalk on one side (Completed in 2017). Nunn Street sidewalk construction in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works The Eastgate Sidewalk Safety Improvements project includes sidewalk improvements on one side along Nunn Street from Lincoln Avenue to Walton Drive, Walton Drive from Nunn Street to Puryear Drive, and Puryear Drive from North Walton Drive to James Parkway (Completed in 2022).  Puryear Drive sidewalk construction between Walton Drive and James Parkway in compliance with the Bicycle, Pedestrian, and Greenways Master Plan. Capital Improvement Planning & Development Services / Public Works Walton Drive sidewalk construction between Foster Avenue and Francis Drive in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works Wellesley Court sidewalk construction in compliance with the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. M2.10 EG13 Lincoln Avenue to University Town Center multi-use path as identified in the Bicycle, Pedestrian, and Greenways Master Plan.Capital Improvement Planning & Development Services / Public Works A public way was completed within the University Town Center Development from Lincoln Avenue to the existing development with a shared-use path on one side (2020).  Transit M3.1 Identify opportunities to collaborate and promote a co-ridership program between TAMU Transit and the Brazos Transit District.Project / Program Planning & Development Services Texas A&M University and Brazos Transit District (BTD) have implemented a co-rider program. With a BTD pass, riders can be on TAMU buses. With a TAMU ID, riders can ride BTD buses.  M3.2 Work with TAMU Transit and Brazos Transit District to identify existing stops with high-ridership to upgrade to a shelter.Project / Program Planning & Development Services Brazos Transit District has assessed stop locations that have a higher ridership and have identified potential shelter locations. City staff is assisting with the evaluating the fixed stop and shelter locations.  Recycling M3.3 Identify opportunities to expand funding sources Policy-based decision Planning & Development Services City staff has been supportive of Brazos Transit District efforts to obtain additional funding for implementation of fixed stops and bus shelters. Appendices Page 71 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETERecycling S1.2 Work with established neighborhood organizations to develop standing neighborhood green committees to work on encouraging recycling, participation in green events, and promote sustainable living practices. Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. However, there is not a specific program to encourage neighborhood green committees.  S1.3 Begin tracking recycling participation rates at a neighborhood level to provide baseline data for evaluating program effectiveness.Project / Program Public Works Recycling participation, tonnages, and contamination have been tracked since 2016 when the City moved from the bag system to automated, single-stream recycling collections. Utility Conservation S2.2 Work with neighborhood organizations to develop a green work day for rain barrel or xeriscaping installation or other like projects as neighborhood -building activities . Project / Program Neighborhood Services Neighborhoods can utilize grant opportunities to install rain barrels. The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. However, there is not a specific program to encourage neighborhood green committees.  S2.3 Promote and educate neighbors about water and energy audits through neighborhood organizations.Project / Program College Station Utilities College Station Utilities Energy Division has attended neighborhood block parties when invited. They also have a booth at the Home and Garden Show every year to promote programs and remains in contact with organizations throughout the City such as the Home Builders’ Association. Audits are performed on an as-requested basis.  S2.4 Track utility use, Wind Watts participation, utility audits, and rebate participation through a neighborhood indicator program.Project / Program College Station Utilities This hasn’t been discussed and is not a utility directive. Programs are available and tracked on a citywide basis. Benefit of doing this is not readily apparent.  S2.5 Explore alternate financing opportunities and fiscal impact of Property Assessed Clean Energy (PACE) financing to incent residential sustainable investments. Project / Program College Station Utilities College Station Utilities has several programs that aim to incentivize residents to invest in more sustainable energy options. There is the Connected Thermostat Program, Good Cents New Home Program, Energy Back II Rebate Program, Residential LED Lighting Program, and Energy Conservation staff is available to provide on-site energy surveys free of charge.  Stormwater Management S3.1 Develop neighborhood stormwater education and promotional activities (such as creek clean-up or a chemical-free fertilizer campaign) to increase awareness and participation in stormwater management practices. Project / Program Planning & Development Services The City has maintained a Stormwater Management Plan since 2008. The plan is updated every five years in accordance with state and federal regulations. This document outlines a series of actions that staff implements to enhance education, outreach, and public involvement during each five year period. It incorporates education and public input processes and ways in which the public may alert city staff to existing stormwater issues. This is a continually implemented program.  S3.3 Work with Neighborhood Partnership organizations to include neighborhood residents in developing additional stormwater management standards.Project / Program Planning & Development Services The City’s stormwater programming solicits input from residents during educational events and through the City’s See-Click-Fix program. As part of the five year update of the Stormwater Management Plan, the draft plan is posted for public comment.  Appendices Page 72 of 107 EASTGATE NEIGHBORHOOD PLAN (2011-2018) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEGreenways and Open Space S4.2 Explore opportunities to create a community gardening project for neighborhood organizations to utilize public spaces (including Parks) to host community gardens. Project / Program Community Services / Parks & Recreation Staff researched other communal gardens around the state and met with local stakeholders. A summary of findings was presented to management which recommended carrying out a garden project in a local park with a nonprofit managing the day to day activities. The Parks and Recreation Department has mapped a location within Fitch Park for the garden. An agreement with Keep Brazos Beautiful was being developed.  Alternative Transportation S5.3 Explore opportunities and feasibility of having a carshare program (such as U Car Share or Zipcar).Project / Program Planning & Development Services Efforts to implement or support travel demand management programs like carshare have not begun, but have been identified as a future strategy to be accomplished with the Comprehensive Plan (Strategy 6.13).  S5.4 Promote Bike to Work Week, or develop a No Drive Day to encourage biking, walking, and bus ridership.Project / Program Planning & Development Services This action has not been completed. Education S6.1 Incorporate green education components into new organization training.Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. Seminar Suppers often feature green and sustainability topics, with a recent (2022) example of a water conservation presentation by the City’s Water Resources Coordinator.  S6.2 Promote Green Seminar Lunch series to neighborhoods through the neighborhood partnership program.Project / Program Neighborhood Services The City had a grant funded Green College Station Sustainability Program Coordinator position, which created and maintained many Green Program activities. The funding for the position ended (2012), but many of the program components were incorporated into standard operations within various City departments. Seminar Suppers often feature green and sustainability topics, with a recent (2022) example of a water conservation presentation by the City’s Water Resources Coordinator.  S6.4 Create a green score program that rates neighborhood sustainability through sustainable living practices.Project / Program Neighborhood Services The creation of a green score program has not been completed. 62 7 0 12 11 Total 92 Appendices Page 73 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEEnhancing Viability of Existing Uses NI&CC 1.1 Explore ways to preserve Campus Homes by incentivizing preservation and restoration for alternative uses (such as game-day rentals or bed & breakfasts).Project / Program Planning & Development Services Educational slides regarding ways to preserve Campus Homes through historic preservation overlays were created in 2013. “A Driving Tour of Historic Campus Homes” was published in 2019 and distributed amongst the community. Individual property owners can apply for designation through the Historical Marker Program or coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay.  NI&CC 1.2 Create an alternative development plan to preserve the neighborhood shopping in the Southgate Commercial Area, this should include a market analysis and a concept plan. Focused Planning Effort Planning & Development Services Staff had discussions with commercial property owners. This area is located within a Redevelopment Area in the Future Land Use and Character Map and will be reengaged with the small area planning effort once the timing of the George Bush Dr. and Wellborn Rd. interchange is known.  NI&CC 1.3 Conduct educational sessions with potential historic districts and landmark property owners to gauge interest in pursuing historic preservation regulations. Project / Program Planning & Development Services Educational slides regarding ways to preserve Campus Homes through historic preservation overlays were created in 2013. “A Driving Tour of Historic Campus Homes” was published in 2019 and distributed amongst the community. Individual property owners can apply for designation through the Historical Marker Program or coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay.  Character Preservation NI&CC 2.1 Amend UDO to include Character Preservation Overlay zoning option to provide the neighborhood with the flexibility to select character elements and certain areas that may apply.Regulation Planning & Development Services Character preservation options exist in the Neighborhood Conservation Overlay (NCO) district which was created in 2007 and overhauled in 2020, along with the accompanying NCO Handbook which guides residents through the application process.  NI&CC 2.2 Assist neighborhoods in getting a Character Preservation Overlay zone.Regulation Planning & Development Services The McCulloch Neighborhood Conservation Overlay was approved by the City Council in 2015. The Heart of Southside Neighborhood Conservation Overlay was approved by Council in 2019. City staff provide assistance to neighborhoods interested in pursuing single-family neighborhoods.  Neighborhood Development Pattern NI&CC 3.1 Amend the Comprehensive Plan - Future Land Use and Character Map in the Redmond Terrace Subdivision from General Suburban to Neighborhood Conservation. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the Redmond Terrace Subdivision from General Suburban to Neighborhood Conservation with the Comprehensive Plan adoption in 2021.  NI&CC 3.2 Amend the Comprehensive Plan - Future Land Use and Character Map in the McCulloch’s Subdivision from Urban and General Suburban to Neighborhood Conservation.Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the McCulloch Subdivision as Neighborhood Conservation, as well as Urban Residential and Mixed Residential with the Comprehensive Plan adoption in 2021.  NI&CC 3.3 Amend the Comprehensive Plan - Future Land Use and Character Map’s Redevelopment description for the southeast corner of George Bush Drive and Wellborn Road (Area V). Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show the Redevelopment for Area V as Neighborhood Center along the majority of George Bush Drive, Urban Center on the corner of Wellborn Road and George Bush Drive and continues down Wellborn, and Mixed Residential along Luther Street. This amendment was completed with the Comprehensive Plan adoption in 2021.  NI&CC 3.4 Amend the Comprehensive Plan - Future Land Use and Character Map in Area V to move the Neighborhood Conservation designation to the west (located along Montclair Avenue) to provide protection to areas east of Area V. Policy-based decision Planning & Development Services The Future Land Use and Character Map was amended to show Neighborhood Conservation to the west of Area V (along Montclair Avenue). Appendices Page 74 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEZoning NI&CC 4.1 Work with property owners to initiate rezoning of non-conforming properties in the Fairview Avenue, Luther Street, and Montclair Avenue area to reflect current land use. Project / Program Planning & Development Services The properties were developed before rezoning was completed. NI&CC 4.2 Amend UDO to allow development/redevelopment in Area V to utilize typical R-1, Single-Family Residential (now retired) standards and more restrictive standards for redevelopment in older subdivisions. Regulation Planning & Development Services The UDO was amended for interim Area V lot sizes and was approved by City Council Nov. 18, 2012. NI&CC 4.3 Develop a new zoning district to implement recommended future development in Area V.Regulation Planning & Development Services This has not been completed to date, but is part of the ongoing Middle Housing zoning district creation. Off-Street Parking NI&CC 5.1 Amend UDO single-family and duplex parking standards to limit the size of allowed parking areas within the front portion of single-family and duplex. Regulation Planning & Development Services Platting and parking ordinance revisions for Area V were initiated 2012 and adopted in 2013, and single-family parking standards were adopted in 2013. NI&CC 5.2 Amend UDO single-family and duplex parking standards to define appropriate parking surfaces.Regulation Planning & Development Services NI&CC 5.3 Amend UDO single-family and duplex parking standards to require rear-yard screening from adjacent single-family properties.Regulation Planning & Development Services NI&CC 5.4 Amend UDO single-family and duplex parking standards to require one parking space per bedroom with a max of four spaces required.Regulation Planning & Development Services Neighborhood Associations NI&CC 6.1 Encourage the coordination of a partnership with Neighborhood Services to establish new neighborhood associations (such as the Redmond Terrace Subdivision). Project / Program Neighborhood Services This area had didn’t have enough owner-occupied homes to establish a Homeowners Association. Deed restrictions were used as a tool to set certain limitations within some subdivisions before the Heart of Southside Neighborhood Conservation Overlay was pursued (2018).  NI&CC 6.2 Provide support in the creation and leadership training for new associations.Project / Program Neighborhood Services New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013- 2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with Greater Houston Community Association hosting training opportunities.  Code Compliance NI&CC 7.1 Identify properties not meeting code and speak with the property owners to move toward compliance.Project / Program Community Services A property maintenance checklist was developed by Community Development (FY 2014) which performs a baseline survey of all identified properties and offers assistance and information to properties that are not in compliance or are nearing non-compliance. All properties are re-surveyed on a regular basis to identify property deterioration and to pro-actively intercede. The Manual for Neighborhood Associations was updated and posted online.  On-Street Parking M 1.1 Conduct safety evaluation of on street parking in the Redmond Terrace Subdivision (including portions of Redmond Drive, Rosemary, and Armistead). Action should be made if warranted. Project / Program Public Works & Fire Safety evaluations of on-street parking are conducted when warranted and therefore are on-going. Character of Existing Streets M 2.1 Evaluate the appropriateness of ribbon curbs on streets with an open ditch section in order to retain existing character.Project / Program Planning & Development Services / Public Works Included in the FY15, FY16, FY17 and FY22 Unfunded Projects list for potential funding consideration. Evaluate ribbon curb opportunities: West Dexter Dr. (Hereford St. to Ayrshire St.)Project / Program Planning & Development Services / Public Works Included in the FY15, FY16, FY17 and FY22 Unfunded Projects list for potential funding consideration. Evaluate ribbon curb opportunities: Angus Ave. (Ayrshire St. to Fairview Ave)Project / Program Planning & Development Services / Public Works Included in the FY15, FY16, FY17 and FY22 Unfunded Projects list for potential funding consideration. Appendices Page 75 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETECharacter of Existing Streets M 2.1 Evaluate ribbon curb opportunities: Old Jersey St. (Ayrshire St. to Fairview Ave.)Project / Program Planning & Development Services / Public Works Included in the FY15, FY16, FY17 and FY22 Unfunded Projects list for potential funding consideration. Evaluate ribbon curb opportunities: Welsh Ave. (Park Place to Angus Dr)Project / Program Planning & Development Services / Public Works Included in the FY15, FY16, FY17 and FY22 Unfunded Projects list for potential funding consideration. M 2.2 Revise B/CS Design Guidelines to add ribbon curb option that may be used for public street rehabilitation.Regulation Planning & Development Services A ribbon curb detail is provided in the B/CS Unified Standard Details though only is stated for use with rural section streets. M 2.3 Amend Thoroughfare Plan to add neighborhood-appropriate thoroughfare cross-section to protect the character of streets such as Dexter Drive. Policy-based decision Planning & Development Services This action has not been completed. M 2.4 Explore additional traffic calming opportunities for Dexter Drive, such as elongated speed tables, rumble strips, and so on.Project / Program Planning & Development Services / Public Works This action is currently being explored. Bicycle & Pedestrian Safety at Intersections M3.1 Amend Bicycle, Pedestrian, and Greenways Master Plan: Holleman Drive sidewalks on both sides where possible to increase pedestrian safety. Policy-based decision Planning & Development Services This action is partially complete. The Master Plan was amended to add sidewalks on both sides of Holleman Drive. Pedestrian improvements were completed along Holleman Drive from H-E-B to Village Drive in 2019. The incomplete sidewalk segments were included in the FY22 Unfunded Projects list for potential funding consideration.  M 3.2 SS1 Amend Bicycle, Pedestrian, and Greenways Master Plan: Southwest Parkway sidewalks on both sides where possible to increase pedestrian safety.Policy-based decision Planning & Development Services The Master Plan was amended to add sidewalks to both sides of Southwest Parkway. Southwest Parkway from Wellborn Road to Welsh Avenue received pedestrian improvements in the form of stand-alone sidewalks and bicycle improvements to address ADA concerns (2018).  M 3.3 Amend Bicycle, Pedestrian, and Greenways Master Plan: Welsh sidewalks on both sides between Holleman Drive and Southwest Parkway to increase pedestrian safety. Policy-based decision Planning & Development Services The Master Plan was amended to add sidewalks on Welsh between Holleman Drive and Southwest Parkway. This was included in the FY22 Unfunded Projects list for potential funding consideration. Sidewalks are to be on both sides of the road.  M 3.4 Amend Bicycle, Pedestrian, and Greenways Master Plan: Sidewalk loop through McCulloch Subdivision to allow safe pedestrian access to Holleman Drive and Welsh Avenue to increase pedestrian safety. Policy-based decision Planning & Development Services The Master Plan was amended to add a sidewalk loop through McCulloch Subdivision. This was included in the FY22 Unfunded Projects list for potential funding consideration. Sidewalks are to be added to both sides of the road.  M 3.5 Amend Bicycle, Pedestrian, and Greenways Master Plan: Montclair Avenue sidewalks on both sides to increase pedestrian safety.Policy-based decision Planning & Development Services The Master Plan was amended to add sidewalks on both sides of Montclair Avenue. This was included in the FY22 Unfunded Projects list for potential funding consideration. Sidewalks are to be added to both sides of the road.  M 3.6 Amend Bicycle, Pedestrian, and Greenways Master Plan: Milliff Road at Texas Avenue and Park Place at Texas Ave sidewalk gaps to increase pedestrian safety. Policy-based decision Planning & Development Services This action is partially complete. The Master Plan was amended to fix sidewalk gaps at these locations. The sidewalk gaps on Park Place were fixed. Milliff has not been completed at this time; the sidewalk segment is missing a small corner piece and it has not been determined if an easement is needed. This was included in the FY22 Unfunded Projects list for potential funding consideration.  M 3.7 SS2 Amend Bicycle, Pedestrian, and Greenways Master Plan: Tower Park Apartment pedestrian connection to Park Place through City- owned property to increase pedestrian safety. Policy-based decision Planning & Development Services The Master Plan was amended to add the pedestrian connections at the described location. Pedestrian improvements were completed along Park Place from H-E-B to Tower Park Apartments (2019).  M 3.8 Amend Bicycle, Pedestrian, and Greenways Master Plan: Southland Street sidewalk to connect the pedestrian bridge to Oney Harvey and Wellborn Road to increase pedestrian safety.Policy-based decision Planning & Development Services The Master Plan was amended to add a sidewalk connection at the described location. The sidewalk on Southland has not been completed. Appendices Page 76 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEBicycle & Pedestrian Safety at Intersections M 3.9 Explore alternative sidewalk treatments where they are already proposed along roadways with existing right-of-way or vegetation constraints (such as Park Place and Fairview Avenue). Policy-based decision Planning & Development Services / Public Works This action has not been completed. M 3.10 SS3 Evaluate streets surrounding schools for improvements (such as underground drainage system, allowing on-street parking, and sidewalks). Capital Improvement Planning & Development Services / Public Works The Southside Neighborhood Safety Improvements Project addressed pedestrian, drainage, street rehabilitation, and utilities. Park Place was widened to a minor collector with a sidewalk on one side and buffered bike lanes along from Timber Street to Glade Street. The utilities and street were rehabilitated and sidewalks were added on both sides along Park Place from Glade Street to Anderson Street, along Anna Street from Timber Street to Holik Street, along Glade Street from Park Place to Anna Street, and along Holik Street from Park Place to Anna Street. The existing water and wastewater utilities were rehabilitated in the vicinity of Park Place and Timber Street. The project was completed in 2021.  Evaluate area surrounding schools for improvements: Park Place from Anderson Street to Glade Street. Evaluate area surrounding schools for improvements: Anna Street from Glade Street to Timber Drive. Evaluate area surrounding schools for improvements: Glade St. from Park Place to Anna St. Evaluate area surrounding schools for improvements: Holik St. from Park Place to Anna St. M 3.11 Evaluate existing Glade Street sidewalks to identify improvements that are in compliance with the Americans with Disabilities Act (ADA) issues. Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. The project will need to be evaluated for ADA construction improvements.  M4.1 Amend Bicycle, Pedestrian, and Greenways Master Plan to designate Monclair Avenue and portions of Luther Street as Bike Routes to provide additional north-south options.Policy-based decision Planning & Development Services / Public Works This project is not complete, but has been included on the Bicycle Plan under the Bike Route Proposed category. M 4.2 Explore way-finding opportunities to direct bicycles through the neighborhood in addition to existing signage.Project / Program Planning & Development Services This action has not been completed. M 4.3 Re-stripe bike lanes on Holleman Dive.Capital Improvement Planning & Development Services / Public Works The bike lanes on Holleman Drive have been re-striped. M 5.1 SS4 Increase pedestrian safety at the crosswalk at Eleanor Street / Phoenix Street and Holleman Drive.Capital Improvement Planning & Development Services / Public Works Bicycle and pedestrian improvements at Holleman Drive and Eleanor Street have been completed (2016). M 5.2 Conduct a warrant study at Dexter Drive and Holleman Drive to determine if a four-way stop is appropriate.Project / Program Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Evaluate intersections for needed pedestrian and bicycle improvements.Project / Program Planning & Development Services / Public Works This action has not been completed. M 5.3 Intersection improvements: George Bush Drive at Texas Avenue - Bicycle improvements will require further engineering study to determine how to accommodate through movements in the existing limited right-of-way. Capital Improvement Planning & Development Services / Public Works This project has not been completed but is included in the scope of the George Bush Drive Separated Bike Lanes grant project. M 5.4 Intersection improvements: George Bush Drive at Anderson Street - The crosswalk on the west side of George Bush Drive is being moved to the east side of the intersection in order for the left turn movement from Anderson Street to George Bush Drive to coincide with pedestrians there. Additional pedestrian improvements proposed include perpendicular curb ramps at the southwest and southeast corners of the intersection. Bicycle improvements proposed include the continuation of bicycle lanes that drop before the intersection. Capital Improvement Planning & Development Services / Public Works This was Included in the ADA Transition Plan. The crosswalk was moved and bicycle improvements were completed. The perpendicular curb ramps likely will not change based on TxDOT’s preference to keep the diagonal ramps.  Appendices Page 77 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEBicycle & Pedestrian Safety at Intersections M 5.5 SS5 Intersection improvements: George Bush Dr. at Timber Street/ Bissell - Pedestrian improvements include sidewalks to close existing gaps, perpendicular curb ramps, the removal of an obstruction (water valve) in the sidewalk on the southwest corner, and concrete pads to make the pedestrian crosswalk signal buttons ADA accessible. Capital Improvement Planning & Development Services / Public Works Bicycle and pedestrian improvements at George Bush Drive and Timber Street have been completed (design 2015, construction completed 2016).  M 5.6 SS6 Intersection improvements: George Bush Drive at Dexter Drive - Pedestrian improvements include leveling the sidewalk connection to the multi-use path at the southwest corner of the intersection. Bicycle improvements include repairing the pavement in the southbound bike lane of Throckmorton. A section of the pavement currently drops down and creates a hazard. Capital Improvement Planning & Development Services / Public Works Bicycle and pedestrian improvements at George Bush Drive and Dexter Driver have been completed (design 2015, construction completed 2016).  M 5.7 SS7 Intersection improvements: Holleman Drive at Wellborn Road - This intersection has an at-grade RR crossing, existing and proposed sidewalks approaching the intersection and bike lanes that end before the intersection. Pedestrian improvements proposed include sidewalks to close existing gaps and perpendicular curb ramps. Bicycle improvements will require further study. This intersection will also require coordination between the City, TxDOT, and the Union Pacific RR Company. Capital Improvement Planning & Development Services / Public Works The sidewalk and ADA improvement components were completed with a CIP project. However, the bicycle improvements were not included. M 5.8 SS8 Intersection improvements at Holleman Drive at Welsh Avenue - Proposed curb ramp to cross south on Holleman and perpendicular curb ramps at the southeast corner, continuation of bike lanes that drop before the intersection going northbound on Welsh. Capital Improvement Planning & Development Services / Public Works The intersection improvements for Holleman Drive at Welsh Avenue were completed in 2019. M 5.9 Intersection improvements at Holleman Drive at Glade Street - Proposed concrete pads to make the pedestrian crosswalk signal buttons ADA accessible at the south and northwest corners as well as updating the existing curb ramps without detectable warnings (south and northwest corners) with perpendicular curb ramps. Capital Improvement Planning & Development Services / Public Works Included within ADA Transition Plan as well as the Unfunded Projects list for FY 15 and FY 18. The cost estimate for these improvements is $109,900 which was adjusted from 2018 dollars ($101,119) to 2021 dollars. This was also sent to be included on the CIP Unfunded Projects master list (Nov. 2021).  M 5.10 SS9 Intersection improvements: Holleman Drive at Anderson Street - Continuation of the bike lanes that drop before the intersection or need to be restriped in all directions and there appears to be adequate room to accommodate the continuation. Capital Improvement Planning & Development Services / Public Works The intersection improvements for Holleman Drive at Anderson Street were completed in approximately 2019. M 5.11 SS10 Intersection improvements: Holleman Dr. at Texas Avenue. - Pedestrian improvements proposed include restriping the existing crosswalks. Bicycle improvements will require further engineering study to determine how to accommodate through movements in the existing limited right-of-way. Capital Improvement Planning & Development Services / Public Works This action is partially completed. The pedestrian improvements in this area were completed. The bicycle improvements have not been completed to date.  M 5.12 SS11 Intersection improvements: Southwest Parkway at Welsh Avenue - Pedestrian improvements proposed include updating the existing curb ramps without detectable warnings (three of four) with perpendicular curb ramps. Capital Improvement Planning & Development Services / Public Works The intersection improvements for Southwest Parkway at Welsh Avenue were completed in 2019. Area V Traffic Impact M6.1 Amend the Comprehensive Plan - Thoroughfare Plan to designate Montclair Avenue as a Minor Collector with a reduced right-of-way width.Policy-based decision Planning & Development Services This project is included on the Thoroughfare Plan, but the costs and project scope are uncertain at this time. M 6.2 Amend the Comprehensive Plan - Thoroughfare Plan to reduce the designation of Fairview Avenue to a Minor Collector with a reduced right-of-way width. Policy-based decision Planning & Development Services The Thoroughfare Plan was amended to designate Fairview Avenue to a 2 lane Minor Collector with the Comprehensive Plan adoption in 2021.  Appendices Page 78 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEArea V Traffic Impact M 6.3 Install half-street closures on Angus Avenue, between Fairview Avenue and Montclair Avenue, allowing traffic to flow west and not east. Capital Improvement Planning & Development Services / Public Works This project’s timeline is dependent on the George Bush Drive and Wellborn Road TxDOT project and is therefore unknown. Install half-street closures on Kerry Street, between Fairview Avenue and Montclair Avenue, allowing traffic to flow west and not east. Capital Improvement Planning & Development Services / Public Works This project’s timeline is dependent on the George Bush Drive and Wellborn Road TxDOT project and is therefore unknown. Install half-street closures on Fidelity Street, between Fairview Avenue and Montclair Avenue, allowing traffic to flow west and not east.Capital Improvement Planning & Development Services / Public Works This project’s timeline is dependent on the George Bush Drive and Wellborn Road TxDOT project and is therefore unknown. Install half-street closures on Park Place, between Fairview Avenue and Montclair Avenue, allowing traffic to flow west and not east.Capital Improvement Planning & Development Services / Public Works This project’s timeline is dependent on the George Bush Drive and Wellborn Road TxDOT project and is therefore unknown. Bicycle & Pedestrian in Constrained Areas M 7.1 Amend Bicycle, Pedestrian, and Greenways Master Plan to remove the proposed sidewalks on the following street sections from the Plan: Village Drive (east of Glade Street), Old Jersey Street, and Park Place (from Timber Street to Dexter Drive). Policy-based decision Planning & Development Services The Bicycle, Pedestrian, and Greenways Master Plan was amended and removed the proposed sidewalks from Village Drive (east of Glade Street), Old Jersey Street, and Park Place (from Timber Street to Dexter Drive).  M 7.2 Amend the Bicycle, Pedestrian, and Greenways Master Plan to remove the proposed multi-use path that is shown at the rear of lots between Dexter Drive and Suffolk Avenue. Policy-based decision Planning & Development Services The Bicycle, Pedestrian, and Greenways Master Plan was amended to remove the proposed multi-use path shown between Dexter Drive and Suffolk Avenue.  Neighborhood Identity PF&S 1.1 Explore way-finding and identification signage options that promote a sense of place.Project / Program Planning & Development Services Neighborhood identification signage was installed using the Neighborhood Matching Grant Program ( 24 signs) PF&S 1.2 Replace removed Billy Goat Bridge sign in Brison Park to bring back a piece of history to the neighborhood.Capital Improvement Parks & Recreation The Billy Goat Bridge sign within Brison Park was replaced in 2018. PF&S 1.3 Encourage neighborhood organizations to pursue common neighborhood signage for neighborhood identity. Neighborhood grant funding opportunities should be supported. Project / Program Neighborhood Services Neighborhood identification signage was installed using the Neighborhood Matching Grant Program ( 24 signs) Floodplain PF&S 2.1 Promote the Adopt-A-Greenway Program to create better creek environments, aesthetics, and function.Project / Program Planning & Development Services The Adopt-A-Greenway Program is promoted regularly. PF&S 2.2 Acquire flood-prone properties in the Southland Area that may be utilized as part of the proposed multi-use path.Policy-based decision Planning & Development Services 138 Southland Street was purchased in 2012 and 128 Southland Street was purchased in 2015. PF&S 2.3 Acquire flood-prone properties in the Redmond Terrace Area to protect the floodplain and development.Policy-based decision Planning & Development Services The City was not able to acquire flood-prone properties in the Redmond Terrace Area due to lack of interest from the property owner. Infrastructure PF&S 3.1 Implement Water and Wastewater Master Plan by completing programmed Utility Master Plan water and wastewater upgrades.Capital Improvement College Station Utilities (CSU) The Woodson Village Utility Rehabilitation Project addresses utilities in the area of Haines Drive, Glade Street, Dexter Drive, Timm Drive, Hawthorn Street, and Park Place (designed in 2019-2020, construction underway in 2021). The McCulloch Neighborhood Utility Rehabilitation Project addresses utilities in the area of Arizona Street, Phoenix Street, Carolina Street, Georgia Street, Nevada Street, Holleman Drive, and Southland Street (design underway in 2020 & 2021).  PF&S 3.2 Evaluate open-ditch sections within the Southside Area to determine areas that are in need of reshaping or re-establishing.Project / Program Public Works Public Works regularly evaluates open drainage areas and addresses the areas that need to be reshaped. Residents are also able to share any concerns and they will be addressed as well. PF&S 3.3 Post additional Lincoln Center splash pad signage that displays hours of operations.Project / Program Parks & Recreation Additional Lincoln Center splash pad signage was posted and completed in 2012. Appendices Page 79 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETECommunity Development PF&S 4.1 Promote owner-occupied housing assistance programs offered by the City (down payment assistance, rental rehabilitation program, and so on). Project / Program Community Services Housing assistance programs have been offered by the City and are being promoted as well beginning in 2013. PF&S 4.2 Partner with Code Enforcement officers to identify property owners in need of assistance and/or units in need of rehabilitation.Project / Program Code Enforcement This project is currently in progress. Many houses in need of rehabilitation have been addressed by the market (purchase, demolition, and development of new housing). Information regarding rehabilitation programs is shared by word-of-mouth, through partner agencies, and through media. Staff has also participated in distributing information directly through the McCulloch subdivision and with neighborhood groups.  PF&S 4.3 Partner with non-profit developers of affordable housing to build new homes for eligible homebuyers.Policy-based decision Community Services This can be completed through partnerships with other organizations. However, the significant increase in land values has significantly limited the ability to purchase land in this neighborhood. This is not being pursued at this moment.  PF&S 4.4 Encourage other community organizations to provide assistance for affordable housing opportunities.Policy-based decision Community Services Coordinated with Habitat for Humanity for affordable housing opportunities on Carolina Street (2019). Public Safety PF&S 5.1 Evaluate where additional street lights may be needed and installed in the Redmond Terrace area.Capital Improvement College Station Utilities (CSU) Streetlights were installed as per the guidelines at the time of development. If additional lighting is desired it will require funding and easements. PF&S 5.2 Evaluate existing street lights in the McCulloch & Southland Subdivisions area for effectiveness.Capital Improvement College Station Utilities (CSU) This area has been investigated. The streetlight issue in this area is due to the tree coverage and the lights being decorative and therefore not producing adequate lighting. Collaboration between staff and homeowners is being established to determine the possibility of replacing the current lighting with proper streetlights.  PF&S 5.3 Assist in the organization on Neighborhood Watch programs through the City’s Neighborhood Services and Police Department.Project / Program Neighborhood Services / Police Neighborhood Watch programs were discontinued nationwide (2012-2013). The College Station Police Department created the Community Enhancement Unit in place of a Neighborhood Watch and has encouraged neighborhoods to use the Nextdoor website as a means of communication about crime and other safety concerns.  PF&S 5.4 Develop and implement a parking monitoring program with the Neighborhood Traffic Calming Program and emergency responders to monitor parking issues and make actions. Project / Program Planning & Development Services / Police / Public Works / Fire A parking monitor program is in service in certain areas and a parking flyer that includes parking regulations, ordinances, and contacts for parking issues were also created (FY 2013).  PF&S 5.5 Utilize Code Enforcement Officers to assist in sporadic parking enforcement based on complaint patterns.Project / Program Code Enforcement Code concerns received through SeeClickFix are responded to by Code Enforcement and Northgate District staff by phone or by email. Staff will continue to monitor areas that are experiencing repeated issues.  Code Enforcement PF&S 6.1 Increase the awareness and accessibility of SeeClickFix through Neighborhood Services and the Police Department.Project / Program Neighborhood Services / Police Code enforcement education program was initiated in 2013. PF&S 6.2 Proactive Code Enforcement in CDBG eligible areas, and Code Enforcement should remain active in other areas as well with a more strict timeline for compliance.Project / Program Code Enforcement A seminar supper was dedicated to the use of SeeClickFix in FY12 and in FY13 there were three city blogs posted to promote the utilization of it. Code enforcement processes were restructured in Q3 and Q4 to optimize public transparency of issue complaints and issues to the SeeClickFix platform.  PF&S 6.3 Create an indicator system that tracks Code Enforcement and property maintenance activity to identify frequent violations, specific properties, and time periods. Project / Program Code Enforcement SeeClickFix is utilized to track all complaints received through Code Enforcement.  Appendices Page 80 of 107 SOUTHSIDE AREA NEIGHBORHOOD PLAN (2012-2019) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETECode Enforcement PF&S 6.4 Develop a more robust property maintenance enforcement program to include specific training on the International Property Maintenance Code and cross-training with Police, Fire, and Utilities to identify issues. Project / Program Code Enforcement This is being implemented through proactive code enforcement and is therefore on-going. PF&S 6.5 Utilize the Rental Registration program information to provide annual reminders to rental property residents about code requirements and notify property owners of significant enforcement activity. Project / Program Community Services The Rental Registration program is a way to maintain current contact information on the owners and manager of rental property. This information, along with utility customer information, can be accessed through the Code Mobile Mapping Application for code staff to make appropriate contact when there is an issue with a property.  Neighborhood Enhancement PF&S 7.1 Provide technical assistance to neighborhood organizations applying for neighborhood grants.Project / Program Neighborhood Services Pre-Application meetings were held to explain how the grant system works (FY 2012 or 2013). PF&S 7.2 Identify and work with key community partners (like Big Event, Aggie Replant, and Keep Brazos Beautiful to assist with neighborhood beautification projects.Project / Program Neighborhood Services Funding for beautification projects were identified through community partners such as Keep Brazos Beautiful with the assistance of the City, as well as the amendments to the Neighborhood Grant program which allows for funding for beautification projects within neighborhoods.  46 9 0 6 25 Total 86 Appendices Page 81 of 107 SOUTH KNOLL AREA PLAN (2013-2020) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETECode Enforcement NI&CC 1.1 Identify properties not meeting code.Project / Program Code Enforcement This is being implemented through proactive code enforcement. NI&CC 1.2 Digital information packets for HOA and new residents to be emailed to rental registration contacts annually, online, and advertised City-wide if needed.Project / Program Neighborhood Services The digital information packet is available online and information is sent to rental registration contacts annually after the annual update of the packet (2014). NI&CC 1.5 Amend the Code of Ordinances to strengthen codes that may reduce undesirable character impacts in neighborhoods.Policy-based decision Planning & Development Services Certain ordinances have been revised in effort to assist staff in effective enforcement and to clarify specific requirements depending on the circumstance. Parking Character NI&CC 2.2 Allow residents to request on-street parking removal from one side of all streets in the South Knoll Area when a super-majority (2/3) of property owners on that street are in favor.Regulation Planning & Development Services / Public Works The Joint Parking Task Force established on-street parking removal requests as being limited to issues where emergency vehicles could not pass. NI&CC 2.3 Amend the UDO to limit the size of allowable SF parking areas within the front portion of single-family lots. In addition, larger lots would be permitted a max of 50% of the front portion of the property to be paved or 1,000 sq ft. Regulation Planning & Development Services The UDO was amended in 2017 to limit parking areas in the front yard of a single-family residence to no more than 50% of the area. NI&CC 2.4 Amend the UDO to require one parking space per bedroom for new single-family construction, with a max of 4 spaces required.Regulation Planning & Development Services The UDO was amended in 2018 to require one parking space per bedroom for all areas designated Neighborhood Conservation on the Comprehensive Plan Future Land Use & Character Map (Ordinance 2018-4040).  NI&CC 2.5 Amend the UDO to require rear yard parking be screened from adjacent single-family properties.Regulation Planning & Development Services The UDO was amended to include Section 7.3.C.3 which provides additional requirements for rear parking screening, such as parking located behind a structure shall be screened by a solid hedge wall, fence, or wall, at least six feet in height.  Land Use Designations NI&CC 3.1 Amend the Comprehensive Plan - Future Land Use and Character for the property located on the east side of Anderson Street between Brentwood Drive and Southwest Parkway to conform to the existing General Commercial zoning. Policy-based decision Planning & Development Services This land use change to General Commercial is no longer being pursued. While the underlying zoning is General Commercial, the properties are developed as multi-family apartment complexes. There are also apartment complexes across Anderson St. The future land use classification of Neighborhood Commercial is better suited for this area.  NI&CC 3.2 Amend the Comprehensive Plan - Future Land Use and Character for the property located to the west of Angelina Court / Augustine Court to conform to the existing land use in that area. Policy-based decision Planning & Development Services The land uses were updated as a part of the 10-Year Update to the Comprehensive Plan, adopted in October 2021. NI&CC 3.3 Amend the Comprehensive Plan - Future Land Use and Character along the 100-year floodplain line to comply with new, more accurate engineering and flood data.Policy-based decision Planning & Development Services The Natural & Open Areas land use designation within the Future Land Use & Character Map was overhauled with the 10-Year Comprehensive Plan Update in 2021. Staff used more recent FEMA 100-year floodplain data, along with flood studies from private development to refine the boundaries of this land use.  Historic Preservation NI&CC 4.1 Work with property owners for further study in the Quimby McCoy Historic Resources Survey (2008), including a specific district in the Orr Street / Winding Road area. Project / Program Planning & Development Services The City and property owners in this area had discussions regarding the Orr Street and Winding Road area. This action is no longer being pursued due to lack of consensus from the residents. Individual property owners can apply for designation through the Historical Marker Program or coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay.  Appendices Page 82 of 107 SOUTH KNOLL AREA PLAN (2013-2020) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEHistoric Preservation NI&CC 4.2 Work with property owners for further study in the Quimby McCoy Historic Resources Survey (2008), including specific properties for potential landmarks. Project / Program Planning & Development Services City staff had discussions with two neighborhood groups within this area to identify properties for potential landmarks. No action was taken due to a lack of consensus from the groups. Individual property owners can apply for designation through the Historical Marker Program or coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay.  Rezoning NI&CC 5.1 Work with property owners in the Northeast corner of Welsh Avenue and Southwest Parkway to initiate a rezoning to reflect the existing land use on the properties. Regulation Planning & Development Services The property was zoned R-6 at the time the South Knoll Neighborhood Plan was created. The R-6 zoning district has since been retired but permits existing multi-family development and townhomes that meet townhouse zoning standards. This rezoning was not completed, and is no longer being pursued. The Future Land Use designation of the property was revised to Mixed Residential with the Comprehensive Plan Update in 2021, which ensures that any future rezonings would be aligned with the Mixed Residential land use category.  NI&CC 5.2 Work with property owners in the area of the Medina Drive and Dexter Drive area to initiate rezoning to reflect the existing land use on the properties.Regulation Planning & Development Services The property was zoned R-6 at the time the South Knoll Neighborhood Plan was created. The R-6 zoning district has since been retired but permits existing multi-family development and townhomes that meet townhouse zoning standards. This rezoning was not completed, and is no longer being pursued. The Future Land Use designation of the property was revised to Mixed Residential with the Comprehensive Plan Update in 2021, which ensures that any future rezonings would be aligned with the Mixed Residential land use category.  Neighborhood Associations NI&CC 6.1 Encourage existing neighborhood groups (HOAs and NAs) to become more active.Project / Program Neighborhood Services Existing neighborhood groups, such as Homeowner Associations and Neighborhood Associations, began meeting after the planning process ended. The Knoll & Lawyer Place subdivisions were two of the most active groups.  NI&CC 6.2 Encourage the creation of Neighborhood Associations through partnering with Neighborhood Services.Project / Program Neighborhood Services Neighborhood Services keeps a database of current Homeowner Association and Neighborhood Associations and regularly engages with them through events such as the Seminar Supper and through the regularly distributed Neighborhood eNewsletter email list. Several areas adopted deed restrictions in relation to the number of unrelated individuals are allowed within a single-family home.  NI&CC 6.3 Provide staff support in the creation and leadership training for new Neighborhood Associations and HOAs.Project / Program Neighborhood Services New Neighborhood Associations and Homeowner Associations leadership training was held in 2010-2011. This was stopped (2013-2014) as the number of associations outweighed the amount of staff available to run the training. The trainings have resumed in recent years with Greater Houston Community Association Institute hosting training opportunities.  NI&CC 6.4 Support the continuation of informal and formal larger neighborhood groups resulting from the connections made during the planning process.Project / Program Neighborhood Services Neighborhood groups have continued to be supported since the planning process. NI&CC 6.5 Support neighborhood activities such as block parties, National Night Out events, and various other events aimed at outreach, education, and getting to know one another.Project / Program Neighborhood Services Neighborhood activities such as National Night Out, block parties, welcome bags, Seminar Suppers, weekly newsletters, and others have been supported by the City. NI&CC 6.6 Explore opportunities for a community garden that would allow neighborhood organizations to utilize public spaces like parks.Project / Program Community Services Research for potential community garden opportunities was done by Community Services, but no action was taken. Appendices Page 83 of 107 SOUTH KNOLL AREA PLAN (2013-2020) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEParking - Safety M 1.1 Conduct bi-annual emergency vehicle safety evaluations of streets identified as heavily parked. If it warrants action, the City should pursue on-street parking removal from one side of all streets with safety issues. Project / Program Public Works & Fire Fire crews monitor patterns while they are out and will take picture to send to the Fire Marshall and Traffic Management Committee for consideration of parking removal. If a citizen complaint is received a unit is sent out to observe/report back and then take it to Traffic Management Committee if needed.  M 1.2 Conduct safety evaluations upon request of homeowners & residents to ensure that parking is safe. If it warrants action, then the City should pursue on-street parking removal from a portion of the roadway. Project / Program Public Works & Fire Safety evaluations are completed on a case by case basis and therefore are on-going. M 1.3 Remove parking from the “bends” in Caudill Street and Lawyer Street.Policy-based decision Public Works & Fire Parking was removed in the “bends” in Caudill Street and Lawyer Street by the Fire Dept. in 2019. M 1.4 Monitor the Ridgefield cul-de-sacs for safety issues.Project / Program Public Works & Fire Areas are monitored when residents reach out due to safety concerns and therefore are on-going. M 1.5 Install “No Parking” signs as previously approved on Guadalupe Drive, Langford Street (from Southwest Parkway to King Arthur’s Circle), and on Glade Street from Holleman Drive to Orr Street. Policy-based decision Public Works This action has been completed and “No Parking” signs have been installed in the areas mentioned. M 1.6 Pursue an ordinance that would remove additional parking on Langford Street from King Arthur’s Circle to Guadalupe Street to facilitate a safe pedestrian and bicycle route to the high school.Regulation Public Works This action has been completed. M 1.7 Correct confusing parking signage on Valley View Drive near Longmire Drive.Project / Program Public Works The signage on Valley View Drive near Longmire Drive has been corrected. M 1.8 Initiate Speed awareness program utilizing radar speed signs at targeted locations, such as Glade Street, to increase awareness of the posted speed limit in neighborhood areas. Project / Program Public Works Radar speed signs were acquired with the addition of a speed spy box for the Police Department. Parking - Character M 2.2 Allow residents to request on-street parking removal for character reasons from one side of all streets in the South Knoll Area when a super-majority of property owners on that street are in favor.Project / Program Public Works On-street parking removal is evaluated and completed when warranted and is therefore on-going. M 2.3 Amend the UDO to limit the size of allowable SF parking areas within the front portion of single-family lots. In addition, larger lots would be permitted a max of 50% of the front portion of the property to be paved or 1,000 sq ft. Regulation Planning & Development Services This was completed in 2013 with the adoption of Ordinance 2013-3522. Parking for all single-family uses (other than Southside Area V) were capped at a maximum of 50% of the area in front of the structure allotted for parking.  M 2.4 Amend the UDO to require one parking space per bedroom for new single-family construction, with a max of 4 spaces required.Regulation Planning & Development Services The UDO was revised in 2018 to require one parking space per bedroom for all areas designated Neighborhood Conservation on the Comprehensive Plan Future Land Use & Character Map (Ordinance 2018-4040).  M 2.5 Amend the UDO to require rear yard parking be screened from adjacent single-family properties.Regulation Planning & Development Services The UDO was amended to include Section 7.3.C.3 which provides additional requirements for rear parking screening, such as parking located behind a structure shall be screened by a solid hedge wall, fence, or wall, at least six feet in height.  Pedestrian Safety M 3.1 Amend the Bicycle, Pedestrian & Greenway Master Plan- and conduct a feasibility analysis to propose sidewalks on both sides of Welsh Avenue, where possible. Policy-based decision Planning & Development Services The Bicycle, Pedestrian & Greenway Master Plan was amended to include Welsh Avenue. M 3.2 Amend the Bicycle, Pedestrian & Greenway Master Plan - and conduct a feasibility analysis to extend the proposed sidewalk on Caudill Street and north along Winding to Holleman Drive.Policy-based decision Planning & Development Services The action to amend the Bicycle, Pedestrian & Greenway Master Plan - Caudill Street & Winding has been included in the FY22 Unfunded Projects list for potential funding consideration. Appendices Page 84 of 107 SOUTH KNOLL AREA PLAN (2013-2020) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEPedestrian Safety M 3.3 Amend the Bicycle, Pedestrian & Greenway Master Plan - conduct a feasibility analysis to include a proposed sidewalk on Valley View Drive. Policy-based decision Planning & Development Services This was included in the FY22 Unfunded Projects list for potential funding consideration  M 3.4 Reconstruct the sidewalk along Langford Street to be compliant with ADA standards.Capital Improvement Planning & Development Services / Public Works The sidewalk along Langford Street has been reconstructed to be compliant with ADA standards. M 3.5 Construct a sidewalk on Guadalupe to be compliant with ADA standards.Capital Improvement Planning & Development Services / Public Works The sidewalk on Guadalupe has been constructed to be compliant with ADA standards. M 3.6 Work with property owners to purchase a public access easement on property adjoining Arboles and Comal Circle; explore additional maintenance and lighting opportunities.Project / Program Planning & Development Services / Public Works Added to the Pedestrian Plan with the 10-Year Comprehensive Plan update. This was included in the FY22 Unfunded Projects list for potential funding consideration  M 3.7 Explore Welsh Pedestrian Refuge on Welsh Ave between A&M Consolidated High School and its sports facilities in place of the existing mid-block crossing.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration  M 3.8 Explore Southwest Parkway Pedestrian Refuge connecting to the Woodlands.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. This would limit the ability for left turns into development and driveway challenges.  Bicycle Safety M 4.1 Amend Bicycle, Pedestrian, and Greenways Master Plan to remove the proposed bike lane on Glade Street between Holleman Drive and Southwest Parkway and make it a bike route instead. Policy-based decision Planning & Development Services The proposed bike lane on Glade Street between Holleman Drive and Southwest Parkway was changed to a proposed bike route on the Bicycle, Pedestrian, and Greenways Master Plan.  M 4.2 Explore way-finding opportunities to direct bicycle and pedestrian traffic through the neighborhood (such as posting QR codes that link to the City’s Bicycle Map online). Project / Program Planning & Development Services This action has not been completed. M 4.3 Explore opportunities to install trail way-finding signage in Bee Creek and Lemon Tree parks.Capital Improvement Planning & Development Services This action has not been completed. M 4.4 Re-stripe bike lanes on Holleman Drive.Capital Improvement Public Works The bike lanes on Holleman Drive have been restriped. M 4.5 Bee Creek Trail grading for the future trail with sewer installation in this area.Capital Improvement Public Works Bee Creek Trail grading was installed for the future trail with sewer installation. M 4.6 Reconstruct existing sidewalk to make it wider on Southwest Parkway to accommodate both bicycle and pedestrian traffic.Capital Improvement Public Works This action has not been completed. Safety at Intersections M 5.1 Improve pedestrian safety at Texas Avenue & Manual Drive (near Target/Outback) by connecting the existing private sidewalk to the sidewalk on Texas Avenue; explore the addition of signage, striping or markings to reduce conflicts between bicyclists and motorists. Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Easements and an approximate 5 foot sidewalk are needed to make the area more safe for pedestrians. M 5.2 Improve pedestrian safety at Southwest Parkway & Anderson Street by installing accessible ramps and possible signage to reduce conflicts between pedestrians and motorists. Capital Improvement Planning & Development Services / Public Works Included in the ADA Transition Plan; Included in FY17, FY18, and FY 2022 Unfunded Projects list for potential funding consideration. Appendices Page 85 of 107 SOUTH KNOLL AREA PLAN (2013-2020) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETESafety at Intersections M 5.3 Improve bicycle safety at Southwest Parkway & North Bardell Court by exploring the addition of signage, striping or markings to reduce conflicts between bicyclists and motorists.Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. Code Compliance PF&S 1.1 Identify properties not meeting code and work with property owners to move towards compliance.Project / Program Code Enforcement This is being implemented through proactive code enforcement. PF&S 1.2 Have HOA and new resident digital information packets posted online, emailed to rental registration contacts annually, and otherwise advertised City-wide.Project / Program Neighborhood Services The digital information packet is available online and information should be sent to rental registration contacts annually after the annual update of the packet (2014). PF&S 1.3 Increase awareness and accessibility of SeeClickFix through Neighborhood Services and the Police Department.Project / Program Code Enforcement SeeClickFix is being promoted through various mediums such as social media and community outreach. PF&S 1.4 Re-instate pro-active code enforcement to maintain and re- establish the single-family character.Project / Program Code Enforcement Code enforcement education program was initiated in 2013. Floodplain PF&S 2.1 Increase awareness of the Adopt-A-Greenway Program to create better creek environments, aesthetics, and function.Project / Program Planning & Development Services Awareness of the Adopt-A-Greenway Program has been increased. Public Safety PF&S 3.1 Evaluate where additional street lights may be needed in South Knoll.Capital Improvement Planning & Development Services / College Station Utilities Streetlights were installed as per the guidelines at the time of development. If additional lighting is desired it will require funding and easements.  PF&S 3.2 Assist in the organization of Neighborhood Watch programs through the City’s Neighborhood Services and Police Department.Project / Program Neighborhood Services / Police Neighborhood Watch programs were discontinued nationwide (2012-2013). The College Station Police Department created the Community Enhancement Unit in place of a Neighborhood Watch and has encouraged neighborhoods to use the Nextdoor website as a means of communication about crime and other safety concerns.  Parks & Trails PF&S 4.1 Install bike racks at all parks.Capital Improvement Parks & Recreation / Planning & Development Services This action has not been completed. PF&S 4.2 SK1 Bee Creek Park improvements: install new bicycle racks at Adamson Lagoon, more picnic tables in the park, and benches along the trail. Capital Improvement Parks & Recreation Benches, bike rack, and tables were added to Bee Creek Park in 2016. PF&S 4.3 SK2 Anderson Arboretum improvements: clean up and maintain the arboretum area.Capital Improvement Parks & Recreation Benches, bike rack, and tables were added in 2016 to Anderson Arboretum. PF&S 4.4 SK3 Lemon Tree park improvements: install benches along the trail. Capital Improvement Parks & Recreation Benches, bike rack, and tables were added in 2016 to Lemon Tree Park. PF&S 4.5 SK4 Gabbard Park improvements: install more benches, add rubber under playground equipment, and maintain the pond aerator.Capital Improvement Parks & Recreation Benches, bike rack, and tables were added in 2016 to Gabbard Park. PF&S 4.6 SK5 Install landscaping along the Harvey Mitchell Parkway Trail.Capital Improvement Planning & Development Services The construction was completed for landscaping along the Harvey Mitchell Parkway Trail from Texas Avenue to Welsh Avenue (2019). Neighborhood Projects PF&S 5.1 Assist neighborhood groups in identifying funding for neighborhood projects and incorporate training for organizations on developing projects that would be available for funding.Project / Program Neighborhood Services City staff assisted with identifying groups (such as Keep Brazos Beautiful) in the community that could assist with funding for neighborhood projects. The Neighborhood Grant Program was overhauled (2013) and is available for neighborhoods interested in pursuing projects. A portion of the grant can be used on beautification projects.  40 5 0 6 12 Total 63 Appendices Page 86 of 107 WELLBORN COMMUNITY PLAN (2013-2023) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEZoning CC2.1 Create Wellborn Residential Zoning Districts to implement proposed land uses (amend UDO).Regulation Planning & Development Services Wellborn Estate (WE), Wellborn Restricted Suburban (WRS) zoning districts were created in 2016 with Ordinance 2016-3792. CC2.2 Create Wellborn Commercial Zoning District to implement proposed land use (amend UDO).Regulation Planning & Development Services Wellborn Commercial (WC) zoning district was created in 2016 with Ordinance 2016-3792. CC2.3 Create Wellborn Business Park Zoning District to implement proposed land use that is sensitive to the rural character of the area (amend UDO).Regulation Planning & Development Services The Business Park (BP) and Business Park Industrial (BPI) zoning districts were created in 2012 on a city-wide scale. CC3.1 Create design standards for Wellborn Commercial Zoning District that promote the rural character.Regulation Planning & Development Services Wellborn Commercial (WC) zoning district was created in 2016 with Ordinance 2016-3792. History CC2.4 Explore opportunities for distinguishing areas of historical significance within the Wellborn Community.Project / Program Planning & Development Services Distinguishing areas of historical significance would need to be neighborhood initiated. The City has resources for individual property owners to apply for designation through the Historical Marker Program, coordinate with neighborhoods to pursue a Neighborhood Conservation Overlay, or can attribute to Project HOLD (historic online library database).  Image Corridor CC3.2 Pursue rezoning of existing developed properties to conform to the Proposed Future Land Use & Character Map (Map 2.1).Policy-based decision Planning & Development Services / Public Works Private development requests for zoning changes have occurred in many areas to match the Future Land Use & Character Map designations. Wellborn Commercial is zoned along various points on Wellborn Road; Wellborn Restricted Suburban was also zoned along Royder Road.  CC4.1, CC4.2 Create identification & notification package for Gateway elements that have details that is specific to the community. Include a Central Gateway element near the Post Office. Project / Program Planning & Development Services / Public Works This action has not been completed to date, but has been included in Unfunded Project lists for potential funding consideration.  Code Enforcement CC5.1 Track code enforcement and property maintenance case activity to identify frequent violations.Project / Program Code Enforcement SeeClickFix was implemented in 2014 and is the current method of monitoring enforcement. The neighborhood indicator program guidelines have been proposed to staff for comments and staff has collaborated with stakeholders for insight. Staff has also developed a property survey form which may be used to review housing/property conditions in neighborhoods.  Thoroughfares M1.1 Amend the Thoroughfare Plan to designate Live Oak Street as a minor collector (General Suburban context). This street will connect McCullough Road to Royder Road and provide a parallel street to F.M. 2154. Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to remove the connection from Greens Prairie Road West to McCullough Road.Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to reclassify McCullough Road from a major collector to a minor collector (Rural context).Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to reclassify Barron Cut-Off Road from a major collector to a minor collector (General Suburban context).Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to realign the planned thoroughfare west of South Dowling Road to straddle the property line on the north side of the tract. Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to reclassify the planned thoroughfare west of South Dowling Road from a four lane major arterial to a major collector (Rural context). Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Appendices Page 87 of 107 WELLBORN COMMUNITY PLAN (2013-2023) STRATEGY ACTION #MAP #ACTION ITEM TASK TYPE CITY DEPARTMENT ACTION UPDATE ACTION STATUS COMPLETEIN-PROGRESSDESIGNED OR FUNDEDNO LONGER PURSUINGINCOMPLETEThoroughfares M1.1 Amend the Thoroughfare Plan to reclassify the planned Greens Prairie Road extension west of F.M. 2154 from a minor collector to a major collector (Rural context). Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). Amend the Thoroughfare Plan to reclassify street contexts for F.M. 2154, McCullough Road, South Dowling Road, and Koppe Bridge Road to incorporate an appropriate rural street cross-section. Policy-based decision Planning & Development Services This action was completed with amendments to the Thoroughfare Plan when the plan was adopted (2013). M1.2, M8.2 W1 Coordinate with Public Works on Public Facility Maintenance for roadways, markers, and signage for vehicular and bicycle networks.Capital Improvement Public Works The City provided a two course seal coat for the following gravel roads and streets: McCullough Road, Church Street, Madison Street, Live Oak Street, and Royder Road. Public Works includes lane stripes and bicycle markers when restriping a street with bike lanes which is part of their striping maintenance plan for street bike lanes (2012).  M2.1 Approach the railroad about the relocation of S. Dowling & F.M. 2154 R.R. Crossing to align w/ Greens Prairie Road West.Capital Improvement Planning & Development Services / Public Works This project is no longer being pursued. The railroad crossing at S. Dowling Road is now proposed to be relocated to the realigned Royder Road location.  M2.2 Conduct Intersection Study & Improvements: South Dowling Road and F.M. 2154.Capital Improvement Planning & Development Services / Public Works This location is no longer being pursued as the railroad crossing at S. Dowling Road is now proposed to be relocated to the realigned Royder Road location.  W2 Conduct Intersection Study and Improvements: Greens Prairie Trail (now Road) and F.M. 2154.Capital Improvement Planning & Development Services / Public Works Greens Prairie Trail (now Road) was a capital project from Wellborn Road to Royder Road. It now includes bike lanes and sidewalks (funded 2015, construction 2015-2017, completed in 2017).  M3.1 W3 Rehabilitate Royder Road from Greens Prairie Road West to Greens Prairie Trail.Capital Improvement Planning & Development Services / Public Works Royder Road was realigned and widened from the north of Backwater Drive to Wellborn Road as a major collector. It now includes bike lanes and sidewalks on both sides (designed 2018, constructed 2019-2021, completed 2021).  Rehabilitate Greens Prairie Road West [now Victoria Ave.] from F.M. 2154 to Greens Prairie Trail [now new segment of Woodlake Dr. to new Greens Prairie Road]. Capital Improvement Planning & Development Services / Public Works The existing project for Victoria Avenue portion is under design and the portion of Woodlake Drive between Victoria Avenue and Woodlake Drive does not have a project (minor collector, approx. 2700 feet). This is included in the Unfunded Projects master list (Nov. 2021).  W4 Rehabilitate Greens Prairie Trail from F.M. 2154 to Greens Prairie Road.Capital Improvement Planning & Development Services / Public Works Greens Prairie Trail was widened to 4-lane minor arterial with bike lanes from F.M. 2154 to Royder Road as well as shared-use paths on both sides from Royder Road to the City limits. Rehabilitate Live Oak Street (rehabilitation and extension of Live Oak).Capital Improvement Planning & Development Services / Public Works This was included in the FY22 Unfunded Projects list for potential funding consideration. The existing Live Oak rehabilitation is approximately 1270 ft, with an extension of 650- feet.  Bicycle & Pedestrian M5.1 Amend the Bicycle, Pedestrian, and Greenways Master Plan for Bike/Ped facilities: (1) add sidewalks along Live Oak Street from McCullough Road to Greens Prairie Road West; (2) Remove proposed sidewalk from the connection of Greens Prairie Road West and McCullough Road; (3) Remove the proposed sidewalk along I&GN Road; (4) Remove the proposed sidewalk along South Dowling Road. Policy-based decision Planning & Development Services This action was completed with adoption of the Bicycle, Pedestrian, and Greenways Master Plan. Appendices Page 88 of 107 WELLBORN COMMUNITY PLAN (2013-2023) Bicycle & Pedestrian M7.1 Amend the Bicycle, Pedestrian, and Greenways Master Plan for Bike facilities: (1) add bike route along Live Oak Street, from its intersection with McCullough Road and Greens Prairie Road West; (2) remove bike lanes along South Dowling Road and change to bike routes; (3) remove bike lanes along I&GN Road and change to bike route; (4) remove bike lanes along McCullough Road; (5) Remove bike route along F.M. 2154, but explore opportunities when road is widened; (5) remove proposed bike lanes from the connection of Greens Prairie Road West to McCullough Road. Policy-based decision Planning & Development Services This action was completed with adoption of the Bicycle, Pedestrian, and Greenways Master Plan. M8.1 Add Live Oak Street bike route signage Capital Improvement Planning & Development Services / Public Works This action is not complete, but has been included on the Bicycle Plan under the Bike Route Proposed category. Add South Dowling Road bike route signage Capital Improvement Planning & Development Services / Public Works This action is not complete, but has been included on the Bicycle Plan under the Bike Facility Proposed category (east of I&GN) .  Add Koppe Bridge Road bike route signage Capital Improvement Planning & Development Services / Public Works This action is not complete, but had been included on Bicycle Plan under the Bike Route Proposed category. M9.1 Identify opportunities to expand funding sources beyond general funds and bonds to facilitate bicycle and pedestrian improvements. Policy-based decision Planning & Development Services This action has not been completed. 18 1 0 5 6 Total 30 Appendices Page 89 of 107 cstx.gov/pds Page 90 of 107 September 1, 2022 Item No. 5.3. Shared Housing Sponsor: Michael Ostrowski, Director of Planning and Development Reviewed By CBC: N/A Agenda Caption:Public Hearing, presentation, discussion, and possible action regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 6, "Use Regulations," Section 6.3 "Types of Use,” Section 6.4 "Specific Use Standards,” Article 7, "General Development Standards," Section 7.2 "General Provisions,” Section 7.3 "Off-Street Parking Standards,” Section 7.6 "Landscaping and Tree Protection,” Section 7.7 "Buffer Requirements,” Article 11, "Definitions," Section 11.2 "Defined Terms,” of the Code of Ordinances of the City of College Station, Texas, regarding the creation of a new use called Shared Housing. Case #ORDA2022-000005 (Note: Final action on this item will be considered at the September 22, 2022 City Council Meeting - Subject to change). Relationship to Strategic Goals:  Neighborhood Integrity Recommendation(s): Staff recommends approval of the ordinance amendment. Summary: City staff presented at two City Council workshops (5/27/2021 and 4/28/2022) on options to preserve neighborhood character / integrity. One of the items coming out of the workshops was to address issues relating to the increasing number of properties that are redeveloping into a Shared Housing type use, which may not be compatible with the other residential uses within the area. To address the concerns, one of the first steps is to define the use within the Unified Development Ordinance (UDO). Therefore, staff is proposing to create a use and related definition for Shared Housing. Shared Housing, also known as “Stealth Dorms” or “Ag Shacks” are uses that typically facilitate allowing more than four unrelated persons within a structure, which exceeds the definition of Family. However, because the structures are currently categorized as single family, they have been allowed to develop as single-family within residential neighborhoods. The following is a list of changes/additions being proposed:  Section 6.3 – Add Shared Housing to the use table, and make it a permitted use within the MF – Multi-Family and Northgate districts. The intent would also be to make them a permitted use within the MH – Middle Housing district once it is created.  Section 6.3 – Remove the Northgate High-Density Dwelling Unit as the Shared Housing use would replace it.  Section 7.2 – Require that structures with Shared Housing uses would be subject to the Low- Density Residential Height Protection requirements.  Section 7.3 – Set the parking standards for Shared Housing uses to one per room that are at least 70 s.f. in area, excluding a kitchen, a living room, and a laundry room. The Administrator may also exclude additional rooms, but not below the number of bedrooms.  Section 7.7 – Require Shared Housing uses to buffer to lower classification uses or zoning districts. Page 91 of 107  Section 11.2 – Remove the Northgate High Density Dwelling Unit definition, as it is being replaced by the Shared Housing use.  Section 11.2 – Add a definition for Shared Housing, to be as follows: Shared Housing: A dwelling unit that is designed or intended to be used for the purpose of housing more than four unrelated persons. Such use may be identified by a combination, but not necessarily all, of the following characteristics:  A dwelling unit containing more than four bedrooms or able to house more than four people using other rooms such as dens, offices, game rooms, or alike that have the potential to be used for sleeping purposes in accordance with the International Residential Code (IRC) definition of habitable space;  A dwelling unit containing a similar bedroom to bathroom parity in excess of four;  A dwelling unit containing a high quantity of bathrooms, usually in excess of four, of which most can only be accessed through a bedroom or other room such as a den, office, or game room;  A dwelling unit that is in excess of one story;  The property where the dwelling unit is located does not contain a garage;  The property where the dwelling unit is located contains a parking area that will allow parking in excess of four vehicles; and/or  The property where the dwelling unit is located is within two (2) miles of a campus of higher education. The Administrator shall determine whether the characteristics presented are that of a shared housing or other type of use. Budget & Financial Summary: N/A Attachments: 1. Cover Sheet 2. UDO - Section 6.3 - Types of Uses 3. UDO - Article 7 - General Development Standards 4. UDO - Section 11.2 - Defined Terms Page 92 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 1 of 6 Sec. 6.3. Types of Use. A. Uses of land or structures which are not expressly listed in the Use Table as permitted uses (P), permitted uses subject to specific use standards (P*), or conditional uses (C) in a zoning district or planned development are prohibited uses and shall not be established in that district or planned development. B. The Administrator shall determine whether or not an unlisted use, that is otherwise prohibited, as stated above should be processed. In doing so, the Administrator shall utilize purpose statements adopted herein in conjunction with the applicable zoning district, and consideration of the following criteria: 1. The actual or anticipated characteristics of the activity in relationship to known characteristics of similar projects in standard planning practice; 2. The relative amount of site area, floor space, and equipment; 3. Relative volumes of sales from each activity; 4. The customer type for each activity; 5. The relative number of employees in each activity; 6. Hours of operation; 7. Building and site arrangement; 8. Vehicles used with the activity and the relative number of vehicle trips generated by the use; and 9. How the use advertises itself. C. Use Table. Except where otherwise specifically provided herein, regulations governing the use of land and structures with the various zoning districts and classifications of planned developments are hereby established as shown in the following Use Table. 1. Permitted Uses. A "P" indicates that a use is allowed by right in the respective district. Such uses are subject to all other applicable regulations of this UDO. 2. Permitted Uses Subject to Specific Standards. A "P*" indicates a use that will be permitted, provided that the use meets the provisions in Section 6.4, Specific Use Standards. Such uses are also subject to all other applicable regulations of this UDO. 3. Conditional Uses. A "C" indicates a use that is allowed only where a conditional use permit is approved by the City Council. The Council may require that the use meet the additional standards enumerated in Section 6.4, Specific Use Standards. Conditional uses are subject to all other applicable regulations of this UDO. Click here to access a PDF version of the Use Table. Page 95 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 2 of 6 USE TABLE Residential Districts Non-Residential Districts Retired Districts Design Districts Specific Uses R WE E WRS RS GS T** D** MF** MU** MHP** P-MUD** O SC WC GC CI BP BPI CU NAP R-1B R-4** R-6** C-3** M-1 M-2 R&D** WPC** NG-1** NG-2** NG-3** KEY:P = Permitted by Right; P* = Permitted Subject to Specific Use Standards C = Conditional Use; ** = District with Supplemental Standards (refer to Article 5) RESIDENTIAL Assisted Living/Residential Care Facility P P P Boarding and Rooming House P P P P P Extended Care Facility/Convalescent/Nursing Home P P P P P P P P Dormitory P P P P P P P P Duplex P P P P Fraternity/Sorority P P P P P P Manufactured Home P* P* P* Mixed-Use Structure P P P P P P P Multi-Family P P P P P C1 P P P Multi-Family built prior to January 2002 P P P P P P P P Northgate High-Density Dwelling Unit P P P Shared Housing P P P P Single-Family Detached P P P P P P P P P P Single-Unit Dwelling P Townhouse P P P P P P Two-Unit Dwelling P Live-Work Unit P* P* PUBLIC, CIVIC AND INSTITUTIONAL Page 96 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 3 of 6 Educational Facility, College and University P Educational Facility, Indoor Instruction P P P P P P P P P P P P P Educational Facility, Outdoor Instruction P C C P P P P Educational Facility, Primary and Secondary P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P Educational Facility, Tutoring P P P P P P P P P P P P Educational Facility, Vocational/Trade P P P P P P P P Governmental Facilities P* P* P* P* P* P* P* P* P* P* P* P P P* P* P P P P P P* P* P* P P P P P P P P* Health Care, Hospitals P P Health Care, Medical Clinics P P P P P P P P P P Parks P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P Places of Worship P* P* P* P* P* P* P* P* P* P* P* P P P P* P P P P P P* P* P* P P P P P P P P COMMERCIAL, OFFICE AND RETAIL Agricultural Use, Barn or Stable for Private Stock P P P Agricultural Use, Farm or Pasturage P P P Agricultural Use, Farm Product Processing P Animal Care Facility, Indoor P P P P P P P P P P P P Animal Care Facility, Outdoor P* P Art Studio/Gallery P P P P P P P P P P P P Car Wash P* Commercial Garden/Greenhouse/Landscape Maint. P* P* P* P* P* P* Commercial Amusements P P P C C P* P* C P P P Conference/Convention Center P P P P P P P P Country Club P P P P P P P P P P Day Care, Commercial P P C P P P P P C C P P P P Page 97 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 4 of 6 Drive-in/thru window P* P C P* Dry Cleaners and Laundry P P P* P* P P* P P P* P* P* P* P* Fraternal Lodge P P P P P P Fuel Sales P* P* P* P Funeral Homes P P P P Golf Course or Driving Range P* P* P* P* Health Club/Sports Facility, Indoor P P P P P P P P P P P P Health Club/Sports Facility, Outdoor P P* P P P P P* P Hotels C2 P P P P P P P P Mobile Food Court C4 C4 C4 C4 C4 C4 C4 Night Club, Bar or Tavern C C C C C P P Offices P P P P P P P P P P P P P P P P P P Parking as a Primary Use P P C P P P P* Personal Service Shop P P P P P P P P P P P P Printing/Copy Shop P P P P P P P P P P P P P P Radio/TV Station/Studios P P P P P P P P P P P P* Recreational Vehicle (RV) Park C3 C3 Restaurants P P P P* P* P P* P P P P* Retail Sales - Single Tenant over 50,000 SF P P P Retail Sales and Service P P P P* P* P* P* P P P P P Retail Sales and Service - Alcohol C P P* P* P C P P Sexually Oriented Business (SOB) P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* Shooting Range, Indoor P P P P P Theater P P P P P P P P Retail Sales, Manufactured Homes P P* Storage, Self Service P* P* P P P P* P Page 98 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 5 of 6 Vehicular Sales, Rental, Repair and Service P* P* P P* Wholesales/Services P* P* P P P P INDUSTRIAL AND MANUFACTURING Bulk Storage Tanks/Cold Storage Plant P P P Micro-Industrial P* P* P P* P* Industrial, Light P P P P P P Industrial, Heavy P P Recycling Facility - Large P* P P Salvage Yard P* P* Scientific Testing/Research Laboratory P P P P P Storage, Outdoor - Equipment or Materials P P* P P P Truck Stop/Freight or Trucking Terminal P P Utility P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* P* Warehousing/Distribution P C P P P Waste Services P P Wireless Telecommunication Facilities - Intermediate P* P* P* P* P* P* P P* P* P* P* P* P* P* P* P* Wireless Telecommunication Facilities-Major C P* C C C C P C C C P* C Wireless Telecommunication Facilities-Unregulated P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P ** District with Supplemental Standards (Refer to Article 5). 1 Multi-family residential uses located in stories or floors above retail commercial uses are permitted by right. 2 Hotels only allowed when accessory to a Country Club development and are limited to a maximum of fifteen (15) rooms. 3 Refer to Section 6.4.Z "Recreational Vehicles Park Standards (RV Parks)" for Specific Use Standards. 4 Refer to Section 6.4. AC "Mobile Food Courts" for Specific Use Standards. Page 99 of 107 Created: 2022-07-05 19:55:21 [EST] (Supp. No. 6, Update 6) Page 6 of 6 Per Ordinance No. 3243 (April 22, 2010) Per Ordinance No. 3271 (August 26, 2010) Per Ordinance No. 3280 (September 9, 2010) Per Ordinance No. 2011-3312 (January 27, 2011) (Ord. No. 2012-3449 , Pt. 1(Exh. G), 9-27-2012; Ord. No. 2012-3450 , Pt. 1(Exh. D), 9-27-2012; Ord. No. 2013-3510 , Pt. 1(Exh. A), 7-25-2013; Ord. No. 2013-3521 , Pt. 1(Exh. H), 9-12-2013; Ord. No. 2014-3624 , Pt. 1(Exh. G), 12-18-2014; Ord. No. 2015-3655 , Pt. 1(Exh. A), 4-23-2015; Ord. No. 2015-3708 , Pt. 1(Exh. B), 10-8-2015; Ord. No. 2016-3792 , Pt. 1(Exh. D), 7-28-2016; Ord. No. 2017-3931 , Pt. 1(Exh. A), 9-11-2017; Ord. No. 2018-3999 , Pt. 1(Exh. C), 4-12-2018) Page 100 of 107 Subpart B - LAND DEVELOPMENT ORDINANCES Appendix A - UNIFIED DEVELOPMENT ORDINANCE Article 7. General Development Standards College Station, Texas, Code of Ordinances Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 1 of 6 Article 7. General Development Standards The following general development standards shall apply to all zoning districts, except where expressly stated to apply to, or exclude, specific districts. Sec. 7.2. General Provisions. H. Low-Density Residential Height Protection. 1. Purpose. The purpose of low-density residential height protection is to help mitigate negative visual impacts of higher-density residential and non-residential uses on adjacent, low-density residential uses and districts. This is accomplished by regulating the height of such higher-density residential or any non- residential uses when adjacent to low-density residential uses and districts. 2. Applicability. a. This subsection shall apply to all multifamily structures, structures with Shared Housing uses, and nonresidential structures to be constructed or reconstructed in any way that would increase the building height as defined in Section 11.2 Defined Terms of this UDO, on property adjacent to a detached single-family, manufactured home park, or townhouse use or district. b. Unless otherwise stated in this UDO, the regulations herein shall not apply to any of the following: 1. Structures located in NG, RDD, and P-MUD zoning districts; 2. Utility structures such as elevated water storage tanks and electrical transmission lines; 3. Individual architectural structures such as flagpoles, belfries, cupolas, spires, domes, monuments, chimneys, bulkheads, elevators, or chimney flues; or any other similar structure extending above the roof of any building where such structure does not occupy more than thirty-three (33) percent of the surface area of the roof; 4. Residential radio/television receiving antennas; 5. When the detached single family, manufactured home park or townhome use on the adjacent tract is nonconforming; 6. When the use on the adjacent tract is agricultural; or 7. Developments designed to be mixed use or that are within areas where it has been identified that redevelopment is appropriate, as shown on the Future Land Use and Character Map of the City's Comprehensive Plan. Such developments at the periphery of the mixed use area or area identified as appropriate for redevelopment shall meet the terms of Low-Density Residential Height Protection, when applicable. 3. Slope Requirement. a. Multi-family structures, structures with Shared Housing uses, and non-residential structures shall remain under an imaginary line formed by a 1:2 slope as illustrated by the inclined plane in the Page 101 of 107 Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 2 of 6 graphic below, where 'A' is located at the property line shared with a detached single-family, manufactured home park or townhouse use or district. When the adjacent lot is one dedicated by plat for detention or open area and is not buildable for a detached single-family house, townhouse, or manufactured home or residential amenity, the measurement shall be taken from the closest property line shared with a buildable detached single-family, townhouse, or manufactured home lot. b. In addition to the height limitations set forth above in this subsection, the following additional height limitations apply in WC Wellborn Commercial zoning: 1. No building may exceed two (2) stories; 2. Maximum eave height shall be twenty-four (24) feet; 3. Maximum overall height to peak of roof shall be thirty-five (35) feet; 4. Any structure with an eave height over fifteen (15) feet will be constructed to resemble a two-story facade; 5. Buildings located closest to detached single-family, manufactured home park or townhouse use or district and that are within fifty (50) feet of the property line are limited to one-story in height with an eave maximum of twelve (12) feet; and 6. An eave maximum of fourteen (14) feet in height is permitted when mechanical equipment is housed within a mezzanine. Sec. 7.3. Off-Street Parking Standards. H. Number of Off-Street Parking Spaces Required. In computing the number of parking spaces required, the following rules shall govern: 1. Parking requirements based on square footage shall be based upon the gross floor area, unless otherwise stated. Service areas such as mechanical rooms, restrooms, and closets shall be included in the calculation of "gross floor area" for determining required parking spaces; 2. Where fractional spaces result in computing required parking spaces, the required number of spaces must be increased to the nearest whole number. At least one (1) parking space must be provided unless otherwise specified in this UDO; 3. The parking space requirements for a use not specifically listed shall be the same as those for the most similar to the proposed use, as determined by the Administrator; 4. Whenever a building or use constructed or established after the effective date of this UDO is changed or enlarged in floor area, number of employees, number of dwelling units, seating capacity, or Page 102 of 107 Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 3 of 6 otherwise, parking requirements shall be met on the basis of the enlargement or change. Whenever a building or use existing prior to the effective date of this UDO is enlarged, the enlarged building or increased use shall then and thereafter comply with the parking requirements set forth herein; 5. At the time of construction, redevelopment, or when an addition to the number of existing bedrooms is completed, all single-family and townhouse uses shall come into compliance with the minimum off- street parking requirements. Garages that meet minimum dimensional standards may be counted towards parking requirements; 6. Where requirements are established on the basis of the number of seats, such requirements shall be based on the seating capacity as determined by the Building Official; 7. Where a manufacturing/industrial use has more than one (1) working shift of employees, parking shall be provided to accommodate overlap requirements during transition periods; and 8. The Design Review Board may waive parking space requirements in the Northgate and Wolf Pen Creek districts if the development meets the goals of the master plan for the respective district. MINIMUM OFF-STREET PARKING REQUIREMENTS Use Unit Spaces/Unit Plus Spaces For: Assisted Living/Residential Care Facility As determined by the Administrator***** Airport As determined by the Administrator***** Banks 250 s.f. Floor area over 500 s.f.: 1.0 Bowling Alley As Determined by the Administrator***** Bus Depot As Determined by the Administrator***** Car Wash (Self-Serve) Wash Bay 1.0 1.0 space per vacuum bay Church Seat 0.33* Convalescent Home/Hospital Bed 0.5 Duplex Dwelling: 1 & 2 Bedroom DU 2.0 3+ Bedroom BR 1.0 Dormitory Bed 0.75 Day Care Center 250 s.f. Floor area over 500 s.f.: 1.0 Fraternal Lodge 75 s.f. Floor area over 150 s.f.: 1.0 Fraternity/Sorority House Person 1.0 1/30 s.f. meeting room Freight Station As Determined by the Administrator***** Funeral Parlor Seat 0.33 Furniture Sales, Freestanding 350 s.f. Floor area over 700 s.f.: 1.0 Golf Driving Range Tee Station 1.0 Health Club/Sports Facility As Determined by the Administrator***** Gasoline and Fuel Service 300 s.f. 1.0 Group Housing BR 2.0 As Determined by the Administrator Health Studio 150 s.f. Floor area over 300 s.f.: 1.0 Hospital As Determined by the Administrator***** Page 103 of 107 Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 4 of 6 Hotel/Motel DU 1.0 1/200 s.f. meeting room HUD-Code Manu. Home DU 2.0 Laundry 150 s.f. Floor area over 300 s.f.: 1.0 Live-Work Unit 250 s.f. of non- residential portion of structure Floor area over 250 s.f.: 1.0 1/BR, Residential DU Motor Vehicle Sales/Service: Office/Sales Area 250 s.f. 1.0 Service Area 200 s.f. 1.0 Medical or Dental Clinic < 20,000 s.f. 200 s.f. Floor area over 400 s.f: 1.0 Mixed-Use Structure**** 250 s.f. of non- residential portion of structure Floor area over 500 s.f.: 1.0 1/BR, including residential DU and hotel/motel DU Multi-Family Dwelling: 1 Bedroom BR 1.5 2+ Bedroom BR 1.0 Night Club 50 s.f. 1.0 Office Building 250 s.f. Floor area over 500 s.f.: 1.0 Personal Service Shop 250 s.f. Floor area over 500 s.f.: 1.0 Priv. School or Comm. Studio 100 s.f. Floor area over 200 s.f.: 1.0 Retail Sales & Service: GC, SC, WC, C-3 250 s.f. Floor area over 500 s.f.: 1.0 CI 350 s.f. Floor area over 700 s.f.: 1.0 Restaurant (w/o drive-through) 65 s.f. Floor area over 130 s.f.: 1.0 Restaurant (w/drive-through) 100 s.f. Floor area over 200 s.f.: 1.0 Rooming/Boarding House Person 1.0 Sales Display 250 s.f. Floor area over 500 s.f.: 1.0 Page 104 of 107 Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 5 of 6 Shared Housing Rooms at least 70 s.f. in area, excluding a kitchen, a living room, and a laundry room. The Administrator may also exclude additional rooms, but not below the number of BRs. 1.0 Single-Family Dwelling*** BR 1.0*** Minimum of 2, Maximum of 4 1.0/Accessory Living Quarter Single-Unit Dwelling BR 1.0 Shopping Center** : GC, SC, WC, C-3 250 s.f. 1.0 CI 350 s.f. 1.0 Townhouse*** BR 1.0*** Minimum of 2, Maximum of 4 Theater Seat 0.25 Truck Terminal As Determined by the Administrator***** Two-Dwelling Unit BR 1.0 Veterinary Clinic 300 s.f. Floor area over 600 s.f.: 1.0 Warehouse 1,000 s.f. 1.0 "s.f." = square footage. "DU" = Dwelling Unit. "BR" = Bedroom. * Overflow parking above required parking spaces may be grassed rather than paved. All unpaved spaces shall be shown on site plan and organized for efficient traffic circulation using wheel stops and other appropriate measures as required by the Administrator. ** The minimum number of parking spaces for a shopping center shall be calculated at a rate of 1:250 in GC SC, or WC, and 1:350 in CI regardless of the composing uses unless otherwise determined by the Administrator that such composing uses require a modification to the applicable requirements. *** For areas designated Neighborhood Conservation on the Comprehensive Plan's Future Land Use and Character Map there shall be no maximum number of parking spaces. **** Mixed-Use structures in the MU Mixed-Use and MF Multi-Family districts. Page 105 of 107 Created: 2022-07-05 19:55:23 [EST] (Supp. No. 6, Update 6) Page 6 of 6 ***** When determining the required off-street parking requirements for the uses noted above, the Administrator shall consider the anticipated traffic demand, traffic circulation, and surrounding conditions. The Administrator may also consider information provided by the applicant that demonstrates the proposed number of off-street parking spaces is adequate for the proposed use and has been successfully employed in other locations. Sec. 7.7. Buffer Requirements. F. Minimum Buffer Standards. The buffer requirements are designed to permit and encourage flexibility in the widths of buffer yards, the number of plants required in the buffer yard, and opaque screens. Standard buffer requirements are depicted in the table below. The numbers shown are the required buffer widths. DEVELOPING USE (Classification) ABUTTING PARCEL* (Use more restrictive of the zoning or the developed use.) Single-Family Residential (ii) Multi-Family Residential (i) Non-Residential (iii) Single-family (ii) N/A N/A N/A Multi-Family (i) (iii) 10' (1) N/A N/A Office 10' (1) N/A N/A Commercial *** 15' (2) 10' (1) N/A Industrial 25' (2) 15' (2) 5' Business Park 50' (2) 15' (2) 5' Business Park - Industrial 50' (2) 30' (2) 10'** SOB 50' (2) 50' (2) 50' (2) (i) Includes duplexes and Shared Housing uses. (ii) Includes manufactured homes, mobile homes, manufactured home parks, and townhouses. (iii) Includes commercial and other non-residential uses developed in the MF Multi-Family district. * When an abutting parcel is vacant and zoned R Rural, the Administrator shall use the future land use of the property as designated on the Comprehensive Land Use Plan in lieu of the zoning category in determining the buffer requirement. ** When an abutting parcel is zoned BP Business Park or BPI Business Park Industrial, the buffer width shall be reduced to five feet (5'). *** When a developing parcel is zoned WC Wellborn Commercial and adjacent to single-family, the buffer width shall be twenty (20) feet with a fence. (1) Fence (2) Wall Page 106 of 107 Created: 2022-07-05 19:55:24 [EST] (Supp. No. 6, Update 6) Page 1 of 1 Sec. 11.2. Defined Terms. Northgate District definitions (applicable only to development in Northgate): Redevelopment: The revision or replacement of an existing land use or existing site through the acquisition or consolidation, and the clearance and rebuilding of this area according to the Northgate Redevelopment Plan. Site Development: Any excavation, landfill or land disturbance, including new construction, reconstruction, relocation, or change of use. For the purposes of the Northgate Districts only, site development includes installation of walls, accessory structures, and other similar additions. Rehabilitation: The process of returning a structure to a state of utility, through repair or alteration, which make possible an efficient contemporary use while preserving those portions and features of the property which are significant to its historic, architectural, and cultural value. Façade Work: The removal, or replacement, substitution or change of any material or architectural element on the exterior face of a building, which includes, but is not limited to, painting, material change, awning or canopy replacement, signage, or other permanent visible façade treatment. Minor Site/Building Projects: The addition, maintenance, and/or replacement of minor building or site elements, including such actions related to storage building(s), screening, fencing, and refuse containers. This also includes requests for changes in service for dumpster and other refuse receptacles. Northgate High-Density Dwelling Unit: A residential structure providing complete, independent living facilities for three (3) or more households, living independently of each other and including permanent provisions for living, sleeping, cooking, eating, and sanitation in each unit. Households in a Northgate High- Density Dwelling Unit allows more than four (4) but not greater than six (6) unrelated individuals, when one (1) bedroom is provided per each unrelated individual. Shared Housing: A dwelling unit that is designed or intended to be used for the purpose of housing more than four unrelated persons. Such use may be identified by a combination, but not necessarily all, of the following characteristics: • A dwelling unit containing more than four bedrooms or able to house more than four people using other rooms such as dens, offices, game rooms, or alike that have the potential to be used for sleeping purposes in accordance with the International Residential Code (IRC) definition of habitable space; • A dwelling unit containing a similar bedroom to bathroom parity in excess of four; • A dwelling unit containing a high quantity of bathrooms, usually in excess of four, of which most can only be accessed through a bedroom or other room such as a den, office, or game room; • A dwelling unit that is in excess of one story; • The property where the dwelling unit is located does not contain a garage; • The property where the dwelling unit is located contains a parking area that will allow parking in excess of four vehicles; and/or • The property where the dwelling unit is located is within two (2) miles of a campus of higher education. The Administrator shall determine whether the characteristics presented are that of a shared housing or other type of use. Page 107 of 107