Loading...
HomeMy WebLinkAbout11/15/2021 - Agenda Packet - Bicycle, Pedestrian, and Greenways Advisory BoardCollege Station, TX Meeting Agenda Bicycle, Pedestrian, and Greenways Advisory Board 1101 Texas Ave, College Station, TX 77840 Internet: https://zoom.us/j/88481790260 Phone: 888 475 4499 and Webinar ID: 884 8179 0260 The City Council may or may not attend this meeting. November 15, 2021 3:00 PM Council Chambers College Station, TX Page 1 This meeting will offer both in-person and remote participation following both the City’s Guidelines for in-person, virtual attendance, and the speaker protocol in the agenda. The city uses a third-party vendor to help host the meeting and if the call-in number is not functioning access will be through the internet link only. 1.Call meeting to order and consider absence requests. 2.Hear Visitors. At this time, the Chairperson will open the floor to visitors wishing to address the Board on issues not already scheduled on tonight's agenda. An individual who wishes to address the Board regarding any item on the agenda shall register with the Board Secretary prior to 12 p.m. on the day of the meeting. To register, the individual must provide a name and phone number by calling 979.764.5044 or emailing gfuentes@cstx.gov prior to 12 p.m. To submit written comments to the Board, email gfuentes@cstx.gov and they will be distributed to the Board. The visitor presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Board and to allow adequate time for completion of the agenda items. The Board will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name andaddress for the record.) 3.Agenda Items 3.1.Consideration, discussion, and possible action to approve meeting Minutes. 3.2.Presentation and discussion regarding the Bicycle, Pedestrian, and Greenways Advisory Board calendar of upcoming meetings. December 20, 2021 ~ Bicycle, Pedestrian, and Greenways Advisory Board at 3:00 p.m. 3.3.Presentation and discussion regarding an update on grant applications submitted to the Texas Department of Transportation. 3.4.Presentation, discussion, and possible action regarding a recommendation on sidewalk project priorities. 3.5.Presentation, discussion, and possible action regarding a recommendation on shared-use project priorities. 3.6.Presentation and discussion regarding items on future City Council meetings related to biking, walking and greenways. Page 1 of 79 Bicycle, Pedestrian, and Greenways Advisory Board Page 2 November 15, 2021 4.Discussion and possible action on future agenda items. Possible action and discussion on future agenda items – A Bicycle, Pedestrian, and Greenways Advisory Board Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 5.Adjourn. Adjournment into Executive Session may occur in order to consider any item listed on the agenda if a matter is raised that is appropriate for Executive Session discussion. I certify that the above Notice of Meeting was posted on the website and at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on November 9, 2021 at 5:00 p.m. City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 2 of 79 MINUTES BICYCLE, PEDESTRIAN, AND GREENWAYS ADVISORY BOARD MEETING Monday, October 18, 2021 3:00 PM City Hall Administrative Conference Room MEMBERS PRESENT: Chairperson Elizabeth Cunha, Dennis Jansen, David Higdon, Kathy Langlotz, Joy Chmelar, and Rebecca Brooker. STAFF PRESENT: Bicycle, Pedestrian and Greenways Planning Administrator Venessa Garza, Administrative Support Specialist Kristen Hejny, and Board Secretary Grecia Fuentes. AGENDA ITEM NO. 1: Call to Order and consider absence requests. Chairperson Cunha called the meeting to order at 3:00 p.m. There were no absence requests for consideration. AGENDA ITEM NO. 2: Hear Visitors. There were no visitors who requested to speak. AGENDA ITEM NO. 3: Agenda Items. AGENDA ITEM NO. 3.1: Consideration, discussion, and possible action to approve meeting minutes. Board Member Langlotz motioned to approve the minutes from September 13, 2021. The motion was seconded by Board Member Jansen and was approved (5-0). AGENDA ITEM NO. 3.2: Presentation and discussion regarding the Bicycle, Pedestrian and Greenways Advisory Board calendar of upcoming meetings. • Monday, November 15, 2021 at 3:00 p.m. This meeting will be in person. AGENDA ITEM NO. 3.3: Presentation and discussion regarding an update on proposed changes to the Bike Share Ordinance. Ms. Garza gave a presentation on the proposed changes to the Bike Share Ordinance. The following were items decided on by the City Council: • Interested in allowing shared electric micro vehicles. • Switching to a lock-to parking system. • Interested in allowing both sit-down and stand-up micro vehicles. • No opinion on wheel size. Page 3 of 79 • Interested in a pilot area. • No opinion on fleet size. • Agreed on 15 mph speed limit. Ms. Garza will be bringing back a proposed ordinance amendment draft to the BPG board for further review. Board Member Higdon asked about the City of Bryan having electric micro vehicles in use in their area. Ms. Garza stated she spoke to them about having Blue Duck scooters in downtown and at the Blinn Campus. Overall, Blue Duck has been successful there. Board Member Brooker asked if fleet size will address the issue of accessibility in certain areas in the city. Ms. Garza stated the fleet size does not help address that issue. It will depend the location of the geofence determined by the company and the City and the availability of bike racks available for the lock-to system. AGENDA ITEM NO. 3.4: Presentation and discussion regarding the prioritization process for bicycle and pedestrian projects. Ms. Garza gave a presentation on the prioritization process for the bicycle and pedestrian projects. There was a general discussion amongst the Board regarding the presentation. AGENDA ITEM NO. 3.5: Presentation and discussion regarding items on future City Council meetings related to biking, walking and greenways. • Jason Schubert, Transportation Planning Coordinator, will be giving a presentation on Traffic Congestion Analysis next Thursday – October 28,2021 AGENDA ITEM NO. 4: Discussion and possible action on future agenda items. A Bicycle, Pedestrian, and Greenways Advisory Board Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. Chairperson Cunha requested the following topics: • There are four board member openings, deadline for applications is November 29, 2021. • Updating and adding the rules for the public to easily find on our city website. Board Member Higdon requested the following topic: • To discuss the corridor along Jones Butler Rd. AGENDA ITEM NO. 5: Adjourn. The meeting adjourned at 3:53 p.m. Page 4 of 79 APPROVED: ATTEST: ____________________________ ____________________________ Elizabeth Cunha, Chairperson Grecia Fuentes, Board Secretary Page 5 of 79 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 MEMORANDUM DATE: November 15, 2021 TO: Members of the Bicycle, Pedestrian, and Greenways Advisory Board FROM: Venessa Garza, AICP Bicycle, Pedestrian and Greenways Planning Administrator SUBJECT: Sidewalk project priorities Item: Presentation, possible action, and discussion regarding a recommendation on sidewalk project priorities. Background: This item is before the Board to review and update stand-alone sidewalk project priorities and was introduced at the October Board meeting. The Bicycle, Pedestrian and Greenways Master Plan includes nighty nine (99) sidewalk miles that are proposed in the City limits and the extra-territorial jurisdiction (ETJ). Fifteen (15) miles are identified as stand-alone projects in areas that are already established. Eighty-four (84) miles will be constructed with a road project when a road is extended or widened. Proposed stand-alone sidewalk projects will typically only be added to one side of the road where it is most feasible unless it is a major roadway (thoroughfare). As discussed in October, stand-alone sidewalk projects are prioritized initially based on a GIS spatial model and methodology. Priorities are further refined based on previous input from the Board as well as location. Sidewalks proposed along road corridors that already have a sidewalk on the other side are given a lower priority unless there isn’t a complete connection on one side of the road between pedestrian crossings or there is a worn path that identifies pedestrian activity in that location. The proposed sidewalk projects are then reviewed by the Board to determine the top projects (10-15) for staff to use in selecting projects to fund as different funding opportunities arise. Funding sources may include local funding (certificates of obligation, sidewalk zones, etc.) and/or federal funding. Attached is the list of stand-alone sidewalk projects with a proposed priority order and a Map Book. The list of projects also includes Map Book page numbers for reference, the priority score from the GIS model, previous Board priorities identified, the street name, general location, the length of the proposed segment in miles, and additional information and comments from previous Board input. Attachments: 1. List of Sidewalk Projects 2. Map Book of Sidewalk Projects Page 6 of 79 Bicycle, Pedestrian, and Greenways Master Plan Stand-alone Sidewalk Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Score BPG Board Priorites Street Name From To Miles Additional information Previous comments from BPG Board 1 5 7.39 X PARK PLACE 1 ANDERSON ST BACK OF HEB 0.34 2 14,15 7.08 X WELSH AVENUE 3 SOUTHWEST PW HARVEY MITCHELL PW S 0.53 Sidewalk on other side Wanted it to be a high priority due to adjacency to school 3 5,6 7.00 X UNIVERSITY OAKS BLVD 1 UNIVERSITY OAKS BL GEORGE BUSH DR E 0.08 Sidewalk on other side Keep at top of list due to the sidewalk not being continuous on the north side to George Bush Drive 4 5 7.00 X KYLE AVENUE PURYEAR DRIVE 2 GEORGE BUSH DR E 0.04 5 5,6 7.00 X GEORGE BUSH DRIVE EAST DOMINIK DR UNIVERSITY OAKS BL 0.12 6 5,6 7.00 X UNIVERSITY OAKS BLVD 4 OLYMPIA WY STALLINGS DR 0.14 7 8,9 7.00 X TIMBER STREET GEORGE BUSH DR PARK PLACE 0.20 Keep a high priority due to adjacency to school 8 1,2,4,5 7.00 X WALTON DRIVE 1 PURYEAR DR FOSTER AV 0.22 9 14,15 7.00 X NUECES DRIVE GUADALUPE DR HARVEY MITCHELL PW S 0.07 10 9,14 7.00 X DEXTER DRIVE SOUTH 1 LLANO PL CONCHO PL 0.11 Construct this before Trigger for connectivity 11 5 7.00 JAMES PARKWAY NORTHSIDE FRANCIS DR SOUTHSIDE FRANCIS DR 0.03 12 4,5 7.00 X FOSTER AVENUE 1 LINCOLN AVE FRANCIS DR 0.27 13 8,9,13,14 7.00 GEORGIA STREET HOLLEMAN DR NEVADA ST 0.25 Unsure about proposed sidewalk location and need 14 8,9 7.00 X WELSH AVENUE 1 HOLLEMAN DR SWISS CT 0.15 Sidewalk on other side Keep in priority order due to observed pedestrian use 15 5,6 7.00 PURYEAR DRIVE KYLE AV DOMINIK DR 0.03 16 9 7.00 X TRIGGER STREET GUNSMITH ST DEXTER DR S 0.12 17 8,9,13,14 6.98 PHOENIX STREET 1 HOLLEMAN DR ALABAMA ST 0.08 18 9 6.83 CAUDILL STREET HOLLEMAN DR GUNSMITH ST 0.37 19 8,9 6.80 FAIRVIEW AVENUE GEORGE BUSH DR LUTHER ST 0.39 20 8,9 6.77 DEXTER DRIVE SOUTH 2 WINDING RD HANES DR 0.25 Page 7 of 79 Bicycle, Pedestrian, and Greenways Master Plan Stand-alone Sidewalk Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Score BPG Board Priorites Street Name From To Miles Additional information Previous comments from BPG Board 21 1,2 6.72 WALTON DRIVE 2 NUNN ST FRANCIS DR 0.26 22 1,2 6.60 WELLESLEY COURT UNIVERSITY TOWN CENTER CONNECTOR TARROW ST 0.15 23 5 6.58 GILCHRIST AVE WEST FOSTER AV TEXAS AV 0.08 24 13,14 6.56 HOLLEMAN DRIVE WEST 1 WOODWAY DR LEGACY LN 0.27 25 9,10 6.55 ANDERSON STREET 2 SOUTHWEST PKWY ENTRANCE OF COLLEGE ST 0.17 26 13,14 6.52 SOUTHLAND STREET ONEY HERVEY DR WELLBORN RD 0.20 27 9 6.51 HAINES DRIVE TAURUS AV LANGFORD ST 0.27 28 13,14 6.49 NEVADA STREET WELSH AV PHOENIX ST 0.19 29 9 6.41 GUNSMITH STREET TRIGGER ST CAUDILL ST 0.09 30 15 6.30 VAL VERDE DRIVE RIO GRANDE BL PEDERNALES DR 0.20 31 5 6.21 GILCHRIST AVE EAST FOSTER AV PURYEAR DR 0.16 32 15 6.19 TODD TRAIL 1 SOUTHWOOD DR RIO GRANDE BL 0.36 33 13 6.05 WOODWAY DRIVE WOODSMAN DR HOLLEMAN DR W 0.03 34 1,2 6.00 BILLIE MADELY PARK CONNECTOR SUNNY LN COONER ST 0.10 35 5 6.00 FOSTER AVENUE 2 GILCHRIST AVE GEORGE BUSH DR E 0.10 36 1,2 6.00 ARGUELLO DRIVE CHIMNEY HILL DR TARROW ST 0.11 37 2,3 6.00 BAYOU WOODS DRIVE RHETT BUTLER DR HARDWOOD LN 0.17 38 2,3 6.00 RHETT BUTLER DRIVE BAYOU WOODS DR HARDWOOD LN 0.06 39 14,15 6.00 HONDO DRIVE SOUTHWEST PW NUECES DR 0.21 40 9,10 6.00 BRENTWOOD DRIVE EAST BRENTWOOD DR E BRENTWOOD DR (ACROSS TEXAS AVE S)0.05 41 8,9 6.00 ELEANOR STREET MONTCLAIR AVE THOMPSON ST 0.06 42 15 6.00 AIRLINE DRIVE SOUTHWOOD DR SHENANDOAH DR 0.20 43 10,11,15 6.00 FM 2818 SERVICE ROAD 1 HILLTOP DR 500FT SW OF LONGMIRE DR.0.09 44 10,11 6.00 FM 2818 SERVICE ROAD 2 LONGMIRE DR 250FT SW FROM LONGMIRE DR 0.05 Page 8 of 79 Bicycle, Pedestrian, and Greenways Master Plan Stand-alone Sidewalk Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Score BPG Board Priorites Street Name From To Miles Additional information Previous comments from BPG Board 45 13,14 6.00 PHOENIX STREET 2 ALABAMA ST NEVADA ST 0.13 46 15 6.00 PEDERNALES DRIVE SAN BENITO DR VAL VERDE DR 0.05 47 3 6.00 HARVEY ROAD EARL RUDDER FW S FRONTAGE RD W 740FT NE OF RHETT BUTLER DR 0.32 48 19 6.00 HARVEST DRIVE SPRINGFIELD DR WESTFIELD DR 0.03 49 19,21 6.00 FLOWER MOUND DRIVE WESTFIELD DR SPRINGFIELD DR 0.03 50 22,23 6.00 ARRINGTON ROAD 2 WESTBOUND WILLIAM D. FITCH PW EASTBOUND WILIAM D. FITCH PW 0.07 51 2,3 6.00 MERRY OAKS DRIVE DOMINIK DR MAGNOLIA DR 0.05 52 14,15 6.00 Comal to Arboles Connection COMAL CR ARBOLES CR 0.07 53 3 6.00 SCARLETT OHARA DRIVE 1 UNIVERSITY OAKS BL HARVEY RD 0.15 54 15,16 5.99 TODD TRAIL 2 LONGMIRE DR BROTHERS BL 0.27 55 2,3 5.80 UNIVERSITY OAKS BLVD 3 TARA CT RHETT BUTLER DR 0.42 56 4 5.72 NAGLE STREET 1 INLOW BL CROSS ST 0.13 57 1,2 5.66 TARROW STREET EAST TARROW ST UNIVERSITY DR E 0.20 58 1,2 5.59 TARROW STREET E 29TH ST PEYTON ST 0.50 59 10 5.45 VALLEY VIEW DRIVE LONGMIRE DR SOUTHWOOD DR 0.28 60 5,6 5.12 MANUEL DRIVE CREST ST CORNELL DR 0.26 61 1,2 5.11 AUTUMN CIRCLE TARROW ST AUTUMN CR 0.02 62 10,11,15,16 5.06 BROTHERS BOULEVARD NORTH TEXAS AVE S LONGMIRE DR.0.20 63 3 5.05 UNIVERSITY OAKS BLVD 2 TARA CT MERRY OAKS DR 0.04 64 15,16 5.02 NORMAND DRIVE DEACON DR PONDEROSA DR 0.47 65 1,2 5.00 HEARTHSTONE CIRCLE CHIMNEY HILL CR TARROW ST 0.04 66 22 5.00 DECATUR DRIVE FRONT ROYAL DR SOUTHERN PLANTATION DR.0.14 67 2,3 5.00 SHADY DRIVE FOREST DR FRANCIS DR 0.15 Page 9 of 79 Bicycle, Pedestrian, and Greenways Master Plan Stand-alone Sidewalk Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Score BPG Board Priorites Street Name From To Miles Additional information Previous comments from BPG Board 68 23,24 4.60 GATEWAY BLVD LAKEWAY DR SH 6 0.20 69 20,22 4.32 SOUTHERN PLANTATION DRIVE OFF RAMP SH 6 S STONY CREEK LN 0.46 70 16,17 4.00 SHADOWCREST DRIVE TIMBER KNOLL DR WOODCREEK DR 0.24 71 11,12 4.00 SANDSTONE DRIVE EMERALD PW SEBESTA RD 0.12 72 7 4.00 WILDERNESS DRIVE NORTH BUTLER RIDGE DR RAINTREE DR 0.08 73 16,17 4.00 WOODCREEK CONNECTOR BROOKWATER CR SHADOWCREST DR 0.06 74 7 4.00 RAINTREE DRIVE WILDERNESS DR N FOREST OAKS DR 0.19 75 9,10 8.00 ANDERSON STREET 1 VILLAGE DR HOLLEMAN DR 0.11 Sidewalk on other side 76 8,9,13,14 7.00 HOLLEMAN DRIVE 3 ARIZONA ST WELLBORN RD 0.25 Sidewalk on other side 77 14 7.00 WELSH AVENUE 2 NEVADA ST SOUTHWEST PW 0.19 Sidewalk on other side 78 8,9 7.00 HOLLEMAN DRIVE 2 ANDERSON ST ELEANOR ST 0.07 Sidewalk on other side 79 13 6.75 HOLLEMAN DRIVE WEST 2 MARION PUGH DR CORREGIDOR DR 0.43 Sidewalk proposed on other side 80 9 6.72 HOLLEMAN DRIVE 1 ANDERSON ST ELEANOR ST 0.74 Sidewalk on other side 81 14,15 6.00 NAVARRO DRIVE WELSH AV PINTAIL LN 0.09 Sidewalk on other side 82 18 6.00 DEACON DRIVE 2 DURANGO CT FRATERNITY ROW 0.06 Sidewalk on other side 83 18 6.00 FRATERNITY ROW 1 DEACON DR FRATERNITY ROW CORNER 0.11 Sidewalk on other side Page 10 of 79 Bicycle, Pedestrian, and Greenways Master Plan Stand-alone Sidewalk Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Score BPG Board Priorites Street Name From To Miles Additional information Previous comments from BPG Board 84 18 6.00 FRATERNITY ROW 2 FM 2154 FRATERNITY ROW PARKING LOT ENTRANCE 0.02 Sidewalk on other side 85 13 6.00 HOLLEMAN DRIVE WEST 3 HOLLEMAN DR W HARVEY MITCHELL PW S 0.04 Sidewalk on other side 86 9,10 7.61 x HOLLEMAN DRIVE 4 430FT N OF VILLAGE DR ANDERSON ST 0.16 Not feasible due to limited/no ROW - remove as stand-alone project. Will need to occur with redevelopment Page 11 of 79 PEDESTRIAN PLANSIDEWALK PROJECTS FY 2022 Page 12 of 79 ROCKPRAIRIERD TEX A S A V S TEX A S A V UNIVERSITY DRVICTORIAAV SH 6 SUNIVERSITYDRESOUTHWESTPWGEORGEBUSHDRHARVEYRD PEACHCREEKRDHO L L EM A N D R S HOPESCR E E K RDWILLIAM D FITCH PWH A RVEY MITCHELLPWS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 0 21Miles Grade Separation Funded Grade Separation Proposed Grade Separation Existing Sidewalk ExistingSidewalk FundedSidewalk Proposed P e d e s t r i an PlanP e d e s t r i an Plan CSISD Property Parks Stand-Alone Sidewalk Project Shared-use Path ExistingShared-use Path FundedShared-use Path Proposed Stand-Alone Sidewalk PrioritiesStand-Alone Sidewalk Priorities Page 13 of 79 BillieMadely Lions University 61 65 34 36 22 57 8 21 58 WALTOND RTANGLEWOODDRCARTERCREEKPWSPRING LO BROADMOORDRN ROSEMARY DRGARDENAC R ESB L E NORTH AVNO R T H P O I N T L N NAGLEST HENSELDRLINCOLN AVS TE X A S A V S C O L L E G E A V TAR R O W S T E29THST C A V I T T A V EBROOKSIDEDRTEX A S A V UNIVERSITY DR EMEADOW LNEDGEW OODDR PRESTON STTARROW STECHIMNEYHILLDR WBROOKSIDED RHO L I C K L N PASLERST GREENWAY DRTUR N E R S TBANKS STFIF T H STLAZY LNH E N SE L A VDUNN STPOPLAR STHELENA STCOLLEGEVIEWDRINWOOD DRWINDOWMERE ST AUTUMN CR MIL A M S T CU L P E P P E R D R NIM I T Z S TEAGLEPASSSTCOONER STREDBUDSTASH STFOURTHSTMARY LAKE DRSROSEMARYDRENFIELD STAVE N U E ADAY AVGILBERT STVASSAR CTPEYTON STSUNNY LNCRESC E N T DRJA N E S TSTANFIELD CRD O ERGEST S H A D YLN WELLESLEY CTROYAL STPARK LNEDGEMOREDRMORANSTVINE STLIVE OAK ST1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 2See Page 4 Page 1 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 14 of 79 College HillsElementarySchool BillieMadely Lions Parkway RichardCarter University 61 65 51 38 34 36 22 67 37 57 8 21 55 58 DOMINIK DRNROSEMARYDRWALTONDR MUN S O N A V SPRING LO FRANCIS DRLINCOLN AVTEX A S A V TAR R O W S T E29THST EA R L R U D D E R F W S U N IV E R SITY D R EPRESTON STTARROW STECHIMNEYHILLDR PASLERST AU T U M N C R TUR N E R S T ASH B U R N A VBANKS STCAROL STBAYOUWOODSDRPOPLAR STSANC TUARYCTNIM I T Z S TCOONER STWINTE R P ARKASH STLYCEUM CTBRAZOSWOODDRSROSEMARYDRSUMMERGLEN DRAVE N U E A SERV ALLNPEYTON STJ A MESPWSUNNY LNVINE STJA N E S T WELLESLEY CTVASSAR CTPARK LNWIL L I A M S S T BER K E L E Y S T WES T O V E R S T HOLT STNE A L P I C K E T T D R ME R R Y O A K S D R APRILBLOOM F OREST DRROSECRLIVE OAK ST1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 1See Page 3See Page 5 Page 2 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 15 of 79 College HillsElementarySchool Merry Oaks Parkway RichardCarter Windwood SmithTract Smith Tract 6351 38 53 67 37 4755DOMINIK DRMUNSONAVFRANCIS DRLINCOLNAVU N IV ERSITYDREEARL RU D D ER F W S HARVEY RDASHBURNAV CAROL STBAYOUWOODSDRBROOKWAY DRSANC TUARYCTLYCEUM CTBRAZOSWOODDRHORSESHOEDR SUMMERGLE N DRWIN D W O O D D R SERV ALLNM AGNOLIADRAS S O C I A T E S A V RANCHERORDBER K E L E Y S T WES T O V E R S T HOLT STNE A L P I C K E T T D R ME R R Y O A K S D R F OREST DRROSECR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 2See Page 6 Page 3 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 16 of 79 A&M ConsolidatedMiddle School OakwoodIntermediateSchool CollegeView HighSchool Northgate Eastgate Eastgate Eastgate Eastgate 56 8 12WALTONDR AN D E R S O N S TNEW MAIN DRC O K E S TLUBBOCK STBIZZELLST LEWIS STJOE ROUTT BLCROSS STINLOWBLSP E N C E S T CO L L E G E A V OLSE N BL OLDMAIND R A G R O N O M Y R D FOSTERAV GEORGEBUSHDRWELLBORN RD TEX A S A VLINCOLN AVRAYMONDSTOTZERPWS C O L L E G E A V W ELLB O R N R D N UNIVERSITY DRBO Y E T T S T REDMONDD R AS P E N S T MILNERDR OA K L A W N S T FIRSTST TAU B E R S TFOCH STREDBUDSTMIL A M S T LOUISE AVPURYEARDR MAYWOODDR STA S N E Y S T AVE N U E A NATALIE STCUL P E P P E R D R CH URCHAV HARRINGTONAVHENSEL DRNA G L E S T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 1 See Page 5See Page 8 Page 4 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 17 of 79 A&M ConsolidatedMiddle School OakwoodIntermediateSchool College HillsElementarySchool CollegeView HighSchool Oaks Wolf PenCreek Eastgate Eastgate Eastgate Eastgate Thomas Thomas 11 154 38 23 3355 6 31 8 60 12 1AN D E R S O N S T DOMINIK DRMU N S O N A V WALTONDR GEORGEBUSHDRENEW MAIN DRBIZ Z E L L S TLUBBOCK STLEWIS STGILCHRIST AVFOSTERAV GEORGEBUSHDRUNIVERSITY DRHO LLEM A N D RTEXASAVS HOLLEMAN DR ELINCOLN AVDA R T M O U T H S T TEX A S A V HARVEY RDRO S E M A R Y L N REDMOND D RMILLIFF RDRICHARDS STCORNELLDRHARDWOODLNMANUEL DRARMISTEADSTASHBURN A V KYLE AVLAS S I E L N PURYEARDR ATH E N S D R STERLING STJ A ME S PWMILNERDR W OL F RUN AVE N U E A OLY M P I A W Y S T A L LIN G SDRBROOKS AVRHETT B UT L ER DR HARRINGTONAV WIL L I A M S S T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 2 See Page 4See Page 6See Page 9 Page 5 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 18 of 79 College HillsElementarySchool Oaks Windwood Wolf PenCreek Wolf PenCreek Wolf PenCreek 15 38 35 6 60DOMINIK DRCOLGATEDRMU N S O N A V KRENEK TAP RDGEORGEBUSH DRE SOUTHW ESTP W EE A R L R U D D E R F W S HO LLEM A N D RTEX A S A V S HARVEY RDHO LLE M A N D R E DART MOUT HS T C ORNELL D RKYLE AVRICHARDS STCRE S T S T CROSST IMBERSDRCY P R E S S D RCAMELLIA CTHARDWOODLNEAS T M A R K D R ASHBURN A V H O R SEHAVENLNLAS S I E L N COL GA TE CR AZALEA CTATH E N S D R WALTONDR STERLING STC A R NATI ONCTMANUEL DRCE N T R A L P A R K L N TEA L S T OLY M P I A W Y G I L C H R IS TA VWIL L I A M S S T S T A L LIN G SDR RHETT B UT L ER DR PARK PLACE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 3 See Page 5See Page 7See Page 10 Page 6 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 19 of 79 Windwood Wolf PenCreek Art &Myra Bright Art & MyraBright Carter'sCrossing 72 74 COLGATEDRKRENEK TAP RDRA IN TR E E DR E A R L R U D D E R FW SHOLLEMANDRE WILDERNESSDRNCROSST IMBERSDRCY P R E S S D R SPRIN G C R E E K EAS T M A R K D R H O R SEHAVENLNCAMELLIA CTAZALEA CTWILDERNESSDR WILDERNESSDRSWILDEWOOD CR R O L L IN G R O C KPLCE N T R A L P A R K L N SH A D O W O A K S TEA L S T SUMTER DRBLAC K J A CKDRRED HILL DRSTTHOMASRDTURTLEROCKLO CHESTNUT O AKCRHALTER LO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 6See Page 11 Page 7 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 20 of 79 A&M ConsolidatedMiddle School OakwoodIntermediateSchool CollegeView HighSchool Brison LutherJones W A Tarrow 41 78 17 14 7 1376 20 19 80 DEXTERDRS DEXTERDR TIM B E R S T MARION PUG H D R FAI R V I E W A V R E S E A R C H PWPE N B E R T H Y B LJOHN KIMBROUGH BLOL S E N B L LEWIS STJOE ROUTT BLOLDMAINDRBIZ ZELL ST PARK PLACEC O K E S TRAYMONDSTOTZERPW GEORGEBUSHDRW ELLB O R N R D GEORGE BUSH DR WHOLLEMAN DRPERSHINGDR A Y RSHIREST PERSHING AV HER E F O R D S T TIMMDRMA R Y E M S T HIG H L A N D S S TANGUS AVKERRY STBELL STSUF F O L K A V GROVE STC A R O L I N A S TOLDJERSEYSTFIDELITY STDEXTERDRW HAWTHORNS TLUTHERSTELE A N O R S T THOMPSON STHO L I K S T THOM A S S TBURT STLEE A V DE T R O I T S T W IN D INGRD GE O R G I A S T PH OENIX ST GLADEST WE L S H A V 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 4 See Page 9See Page 13 Page 8 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 21 of 79 South KnollElementarySchool A&M ConsolidatedMiddle School OakwoodIntermediateSchool CollegeView HighSchool Anderson Bee Creek Brison Gabbard Lemontree LutherJones W A Tarrow 40 41 78 17 29 75 10 1614 86 25 77 7 39 1376 20 27 18 19 80 GLADEST DEXTERDR SOUTHWOOD DR TIM B E R S T FAI R V I E W A V LANGFORDSTHAINES DR LEM O N T R E E L N C O K E S T LEWIS STBIZ ZELL ST PARK PLACEAND E R S O N S T HOLLEM A N D RTEX A S A V S GEORGEBUSHDRWEL L B O R N R D BRENTWOOD DRMANUEL DRA Y RSHIREST PERSHING AV HER E F O R D S T VILLAGEDRGROVE STMA R Y E M S TANGUS AVKERRY STBELL STORRSTCEDARRUNSUF F O L K A V PERSHINGDR WINDING RD M E D I N A D R BEE CREE K DRLAU R A L N LA W Y E R S T C A R O L I N A S T GOODE STOLDJERSEYSTTIMMDRFIDELITY STTAUR US A V HOLIKDRDEXTERDRWHAWTHORNST LUTHERSTELE A N O R S T THOMPSON STHO L I K S T CAUDILLSTTHOMASSTBURT STLEE A V DE T R O I T S T GE O R G I A S T D EXTER DRS PH OENIXST BOSWELLSTBARTHELOWDR PINE RIDGE DR WE L S H A V 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 5 See Page 8See Page 10See Page 14 Page 9 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 22 of 79 South KnollElementarySchool Bee Creek StephenC BeachyCentral Cy MillerLemontree CollegeStationCemetery 40 44 62 29 43 75 62 86 25 39 59 GL A D E S T SOUTHW O OD DR KRENEK TAP RDLEMONTREELN LANGFORDST SOUTHWEST PW EBRENTWOODDREDARTMOUTHST TEX A S A V SHOLLEMANDRANDERSONST HARVEYMITCHELLPWSC ENTRAL P A RKLN BRENTWOOD DRMANUEL DRWILLIAMKINGCOLEDRASHFORD DRCO R N E L L D R CEDARRUNBEE CREE K DRLAU R A L N VALLEYVIEWDRLA W Y E R S T AN G EL INACRHOLIKDR TEA L S T BOSWELLSTBARTHELOWDR MORGANS LNPIN E RIDGE DR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 6 See Page 9See Page 11See Page 15 Page 10 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 23 of 79 StephenC BeachyCentral Cy Miller EmeraldForest Sandstone Headlake(FormerGreenway) 44 62 71 62KRENEK TAP RDFROSTDRAPPOMATTOXDREM ERA LDPWCORSAIRDRHARVEYMITCHELLPW S TEX A S A V S EARLRUDDERFWSDA R T M O U T H S T SH 6 SC ENTRA L PA RKLN SPRINGC REEKBENTTREEDRBENT OAK STWALNUTBEND ROSEWOODDRAMBERRIDGEDRDRIFTW OODDR LAUREND RCHIPPENDALE ST PAVILIONAVWILLIAMKINGCOLEDRTEA L S T SANDSTONED R ROLLINGHILLTRE MERALDP LZJUS T I N A V ALIS O N A V MILE DRMORGANS LNOAKWOODTRFOXFIR E DRSEBESTA RD1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 7 See Page 10See Page 12See Page 16 Page 11 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 24 of 79 EmeraldForest Sandstone 71 FR O S T D RSEBESTA RDAPPOMATTOXDREM ERALDPWCORSAIRDRSPRINGC REEKBENTTREEDRFONTAIN E DRBENT OAK STWALNUTBEND ROSEWOODDRLAUREN DRAMBERRIDGEDRDRIFTW OODDR FRIARCHIPPENDALE ST HUNTIN GTO N DR JUS T I N A V ROLLINGHILLTRH OWEDR FOXFIRE DRFAULKNERDRFRENEAUDROAKWO ODTRSANDST O NEDR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 11See Page 17 Page 12 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 25 of 79 Southwest JohnCrompton Southland(FormerGreenway) 33 85 17 45 28 26 1376 24 79LUTHER ST WDOWLING RDMAR ION P UGH D RRESEARCHPWPEN BERTH Y BL FM 2 1 5 4WEL L B O R N R D HOLLEMAN DR WHOLLEMAN DRGEORGE BUSH DR WHARVEYMITCHELLPWS H O L L E M A N D R S MARK ETSTCANYO N CREEKCRCORREGIDOR DR C A R O L I N A S T O N E Y H E R V E Y D R SI E NNA DR ARIZO N A ST JONESBUTLERRD PH O E N I X S T GRIDIROND R1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 8 See Page 14Page 13 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 26 of 79 A&M Consolidated High School GeorgieK FitchSouthwest Steeplechase JohnCrompton Southland(FormerGreenway) 52 9 17 81 10 45 28 77 26 39 1376 24 2 DOWLING RDJONESBUTLERRD NUECES DRMAR ION P UGH D R WELSH A V LANGFORDSTSOUTHWEST PWHARVEY MITCHELL P W S FM 2154WEL L B O R N R DHOLLEMAN DRHOLLEMANDRW H O L L E M A N DR S PEDERNALESDR DEXTER D R S MARK ETSTWESTRIDGEDRSANPEDRODRLAWYERST GUADALUPEDRSHADOW WOO DDRBIGR IV ERSTWAXWING LNSANBENITODRPINTAILLOC A R O L I N A S T SANSABADRO N E Y H E R V E Y D R SANMARIOCTARIZO N A ST PH O E N I X S T BO S Q U E D R SW AND RBOXWOO D TR M A D ERACRPINTAIL L N PHEAS A N T L N M E DINADRLEO N ADR HONDODR NAVARRODR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 9 See Page 13See Page 15Page 14 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 27 of 79 A&M Consolidated High School Southwood ValleyElementary School BrothersPond GeorgieK Fitch Longmire Steeplechase 46 62 52 9 81 43 62 30 42 39 54 32 64 2 PO N D ERO SA D RRIO G R A N D E B LBRO T H E R S BLN UECESDR LONGMIREDR WELSH A V TODDTRAIRLINEDRLANGFORDSTTEX A S A V S HARVEY MITCHELL P W STREEHOUSETRBA H I A D R PEDERNALESDR SOUTH W O O D D R GAILPLDEACON DRWESTRIDGEDRSANPEDRODRCARM ELCTCARMELPLLAWYERST WILDRYE D R COASTAL D RGUADALUPEDRSHADOWWOODDRBIGRIVERSTNORMANDDR W AXWINGLNSANBENITODRVANH O RN D RHALEYP L DALLIS D RPIERREPL PINTAILLOHENRY CTHAWKTREEDRAUSTIN AVVALVERDEDRSANMARIOCTSANSABADRSUMMIT STCELIN D A CRJENNI FERDRHAD D O XCTBO S Q U E D R CORO NADO D R SA N D Y C R HILLSIDEDRLEONADRMADERACR ADRI ENNEDRPINTAIL L N PHEAS A N T L N MILE DRCA MILLEDR M E DINADR HONDODR C OLTONPLNAVARRODR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 10 See Page 14See Page 16See Page 18 Page 15 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 28 of 79 Southwood ValleyElementary School BrothersPond Longmire Woodcreek 70 62 73 62 7054 64 PONDEROSA DRRIO G R A N D E B LBRO T H E R S BLWOODCREEKDRSEBESTA RDTODD TRLONGMIREDR DEACON DRTEX A S A V S EARLRUDDERFWSSH 6 S ROCK PRAIRIE RD STONEBROOKDR TREEHOUSETRBA H I A D R ESSE X G R EEN RIVERSTONECTCONCOR DCRTIMBER KNOLL DRGAILPLAUSTINAVWATERFORDD R S U S S E X D RST ONE B RID GEDR CARM ELC TWILDRYE D R COASTAL D RNORMANDDR BLUESTEM DRHALEYPL DALLIS D RPIERREPL FO X F I R E D R LODGEP OLE DR BROOKWATER CRHENRY CT H A W K TREEDR CELIN D A CRH IL L S I DE DR JENNI FERDRCORO NADO D R SA N D Y C R M I D TOWNDRSARA DRADRI ENNEDRPINON DRCOLTONPL H E A LIN G WA YLAKEFORESTCTNAIRLINEDRMILE DRTECHNOL O GY PW1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 11 See Page 15See Page 17See Page 19 Page 16 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 29 of 79 Woodcreek MidtownReserve MidtownReserve 7073 70 L ONGMI REDRWOODCREEK D R MEDICALAVFR O S T D R FOX F I R E D R S H 6 S ROCK PRAIRIE RDSTONEBROOKDRESSEXGREENRIVERSTONECTCONCORDCRTIMBER KNOLL DR TOLEDO BEND DR BALLY MOREDRHAYWOODDR CRYSTALLNWATERFORDD R S U S S E X D RST ONE B RID GEDR WHITNEY LNTOWNLAKEDRFRIARTRUMPETER SWAN DRF ONT AI N E DR BROOKWATER CRFIN NEYM I D TOWNDR STRA N D LN H E A LIN G WA YLAKEFORESTCTNTECHNOLOGYPW BIRD POND RDFLYINGAC E CR RITCHEY RDAMISTADLO1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 12 See Page 16See Page 20 Page 17 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 30 of 79 Rock PrairieElementarySchool College StationMiddle School Edelweiss Jack &Dorothy Miller BrianBachmann Steeplechase Barracks II Barracks II 84 82 83 GRAHAM RDRIO G R A N D E B L WE L S H A VBALCONESDR CAIN RDGE N E R A L P W FM 2 1 5 4 ROCK PRAIRIE RDVIC T O R I A A V OL D W E L L B O R N R D PA P A B E A R D R GAILPLCORONADODRWILDRYE D RSANMARIOCT HARVEST DRMARIELENECR ARNOLD RDWE S T C H E S T E R A V SCHAFFERRD CULLENTR SU M M E R W A Y D R SHIRE DRKEEFERLOCAPPS DRGR A Z D RKNOX DRNOTTINGHAM DRARMORED AVBERNBURG L NBA H I A D R SOPHIA LNENCINAS PLPRONGHORN LOMARTA STDALLIS D R CASTLEBROOK DRHAYES LNAXIS C T DOVER DRPINTAILLOASTER DRTRACEMEADOWS C HANTALCR CAMILLEDR ORCHID STANTELOPELN RE G A L R O W C T VO N T R A P P L N LANDSBU RGLNGR E T A C T FAR A H D R BRUSSELS DRAZT E C S T HASSELT STBO L E R O S T CO R T E Z S T LIES L C T VIE N N A D R COLTONPL ABBEY LNMOMMA BEAR DRTRAVISCOLEAV MORTIERDRAZT E C C T BO L E R O C T CECILIACT CO R T E Z C T KIMBER LNHONEYSUCKLE LNCANTERBURYDRCAT E R I N A L N WILLOWLO1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 15 See Page 19Page 18 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 31 of 79 Rock PrairieElementarySchool College StationMiddle School Cypress GroveIntermediateSchool Creek ViewElementarySchoolEdelweiss BrianBachmann Huntington Trail 48 49 RIO G R A N D E B L LO N G MI REDRGRAHAM RDROCK PRAIRIE RDEAGLEAVBIRMINGHAMRDS H 6 S VIC T O R I A A V BARRON RDD O VETRGAILPLNORMANDDRCORONADODRWILDRYE D R SPRI N G F I E L D D R MARIELENECR ME A D O W V I E W D R EMERALD DOVE AVCARDINALLNSC H A F F E R R D DOVE CHASE LNCRYSTAL DOVE AVWHI T E D O V E T R MY S T I C D O V E W Y WE S T C H E S T E R A V DO V E H O L L O W L N HAWK O WLCVSHIREDRGR A Z D R NOTTINGHAM DR CHESAPEAKELNBRIDLE CT M IDTOW N D R BRIDLEGATEDRSTARLING D RPURPLEM A RTIN C V BERNBURG L NBA H I A D R DALLIS D R CASTLEBROOK DRDOVE LANDING AVDOVER DRTURTLE DOVE TRDOVE RUN TRASTER DRWE S T F I E L D D R C HANTALCR CAMILLEDR ORCHID STRE G A L R O W C T GARDENIA STBOUGAINVILLEA STBRUSSELS DRHASSELT STVIE N N A D R COLTONPL ABBEY LNMORTIERDRDURH AMLO FAR A H D RCANTERBURYDR WHITEWING LNARNOLD RDSTUTTGART CR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 16 See Page 18See Page 20See Page 21 Page 19 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 32 of 79 Huntington Trail MidtownReserve MD WheelerPh2 MD WheelerPh2 69 LO N G MI REDRGRAHAM RDBIRMINGHAM RD SH 6S BARRON RDD O VETR TIFF A N Y T R WINDSWEPTDR KERNSTOWN LNCARDINALLNDOVE CHASE LNWHI T E D O V E T R MY S T I C D O V E W Y HAWK O WLCVCHESAPEAKELNBRIDLE CT MIDTOW N D R BRIDLEGATEDRSTARLING D RPURPLEM ARTIN C V STRASBURGCR WINDFREEDREMERALD DOVE AVDOVE LANDING AVDOVE RUN TRPUF F I N W YDURHAMLO EAGLEA V CARROLLFANCHERWYCREAGOR LNCORPORATE PWLAKESHO RE CR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 17 See Page 19See Page 22 Page 20 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 33 of 79 CollegeStationHigh School EdelweissGartens Sonoma Sonoma ReattaMeadows Creek View 49 GRAHAM RDVICTO RIA AVBARRONRDFM2154WILLIAM D FITCH PW KLEINELN R E N E ELN FIELDSTO N E PLCRESTEDPOINTDRHARVEST DROLDENBURG LN RUGEN LNBRANDENBURGLNHARTFORD DRPASSENDALELNKARTEN LNBARCHETTA DRHOFBURG DRSOUT H ERNTRACEDRLAM B E R M O N T D R KERNSTOWN LNDEVRNEDR MC L A R E N D R HAL I F A X D R SPRING MISTDR INC O U R T L N MARKHAM LNSILVEROAKDRNIGHTRAINDR LIEN Z L N PO M E L D R ROUCOURTLO STO N Y C R E E K L N DRESDEN LN JEANNE DRBITT E R N D RDELREY DRLEYLA LNREMINGTON CTROANOKE CTNORFOLK CTPORTSMOUTH CTSKYLINE CTCHESAPEAKELNMARIELENECR MCFA RLA N D DRS I MI DRMEIR LNDANVILLELNNE W P O R T L NSTUTTGARTCR LADOVE DRJA M E Y L N LATI N N E L N HANNA CTEAGLEAVSILVEROAKTRANQUILPATHDRNORTONLNCRESTMONTDRALA C IA CT WALCOUR TLOLO ESS E N RE A T T A L NWINDMEADOWSDR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 19 See Page 22Page 21 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 34 of 79 CollegeStationHigh School WoodlandHills Castlerock Castlerock Southern Oaks SouthernOaks Sonoma Sonoma ReattaMeadows 50 66 69 ARRINGTONRD VICTO RIA AVBARRONRDWILLIAM D FITCH PW SH 6 S GREENSPRAIRIERDDAW N LYNNDRFIEL D S T ONEPLBRIDGEWATERDRROCKY VISTA DRWHISPERING CREEK DRROCKYCREEKTRBARCHETTA DRKERNSTOWN LNHAL I F A X D R SPRING MISTDRMARKHAM LNW IN DMEADOWSDR PO M E L D R HEATH DRROBINSVILLE CTHARRISONBURGLNROCK BEND DRHUNTERCREEKDRSTO N Y C R E E K L N BITT E R N D R BRUNSWICKCTDELREY DRREMINGTON CTROANOKE CTNORFOLK CTPORTSMOUTH CTSKYLINE CTSI MI DRCHESAPEAKELNSALEMCTFRONT ROYAL DRDAYTON CTDANVILLELNNE W P O R T L N LADOVE DRHANNA CT FINCASTLEL OROCKY RHODES DR H O LLOW STONE DR MILLSP A RKCRRE A T T A L N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 See Page 20 See Page 21See Page 23Page 22 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 35 of 79 Pebble CreekElementarySchool Pebble Creek WoodlandHills Castlerock Southern Oaks Wildwood 50 68OLD ARRINGTON RDARRINGTONRD LAK E W A Y D R WILLIAM D FITCH PWSH 6 S GREENSPRAIRIERDDAW N LYN NDRROCKY VISTA DRWHISPERING CREEK DRWINGEDFOOTDRONYX DRLAPIS CTHEATH DRROCK BEND DR RO C K Y M E A D O W S D RWOODLANDRIDGEDR SAPPHIRE DRROYALAD ELADEDR PR O C T SLI C E C T SHOALCREEKDR ROCKY RHODES DR PUTTER CTGATEWAY BLH O LLOW STONE DR MILLSP A RKCRVENTUREDRAGATEDRQUALITYC R MIDTO W N DR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 22See Page 24Page 23 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 36 of 79 Pebble CreekElementarySchool Pebble Creek Wildwood LickCreek LickCreek Lick Creek 68 LAK E W A Y D R PEBBLE CREEK P W SH 6 SWILLIAM D FITCH PWFIRESTONEDRQUARRY OA KS D R ROYAL ADELADE DRM I S S I O N HILLSDRWINGEDFOOTDRA UGUSTA C R ONYX DRLAPIS CTPRESTWICKCTC AS C A D ESDR BI RKDALEDRQUAK E RRIDGEDR CONGRESSIONALDRS YC A M ORE HILLS DRSAPPHIRE DRFLINTHILLSDR BELLERIVE BEN DDRPR O C T SLI C E C T BERRY CREEKPUTTER CTPLUMH O L L O W D RPINE VALLEY D RHOGAN ALLEYSTANDREW S D R BALLYBUNIO NLN CROSSWATERDR GATEWAY BLSHOALCREEKDR VENTUREDRHOLSTON HILLS D RAGATEDR QU A L I T Y C R STO NEWATER LO1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24See Page 23Page 24 of 24 SIDEWALKPROJECTS Grade Separation Existing Grade Separation Funded Grade Separation Proposed 0 0.250.125 Miles Sidewalk Proposed Sidewalk FundedSidewalk Existing Stand-Alone Sidewalk Project Shared-use Path ProposedShared-use Path FundedShared-use Path Existing CoCS Greenways CoCS Parks Schools/CSISD Property Page 37 of 79 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM DATE: November 15, 2021 TO: Members of the Bicycle, Pedestrian, and Greenways Advisory Board FROM: Venessa Garza, AICP Bicycle, Pedestrian and Greenways Planning Administrator SUBJECT: Shared-use path project priorities Item: Presentation, possible action, and discussion regarding a shared-use path project priorities. Background: This item is before the Board to review and update stand-alone shared-use path project priorities and was introduced at the October Board meeting. The Bicycle, Pedestrian and Greenways Master Plan includes seventy-three (73) miles of shared-use paths that are proposed in the City limits and the extra-territorial jurisdiction (ETJ). Sixty (60) miles are identified as stand-alone projects. Thirteen (13) miles will be constructed with road projects. As discussed in October, stand-alone shared-use path projects are prioritized initially based on a GIS spatial model and methodology. Priorities are further refined and moved higher or lower on the list based on several factors. Projects are moved higher on the list: 1) if portions of a share-use path have already been constructed and there are remaining phases to complete; 2) if planning efforts have begun such as the completion of a preliminary engineering report; or 3) if funding has been identified based on criteria set by the funding source available. Projects are moved lower on the list: 1) if facilities exist that can serve the needs of both bicyclists and pedestrians in the interim; 2) if the property is undeveloped and easements for the shared-use path are needed; or 3) if the project is in the ETJ. The proposed shared-use path projects are then reviewed by the Board to determine the top projects (3- 5) for staff to use in selecting projects to fund as different funding opportunities arise. Funding sources may include local funding (certificates of obligation, parkland dedication funds, etc.) and/or federal funding. Attached is the list of stand-alone shared-use path projects with a proposed priority order and a Map Book. The list of projects also includes Map Book page numbers for reference, the priority score from the GIS model, previous Board priorities identified, the street name, general location, the length of the proposed segment in miles and additional information. Attachments: 1. List of Shared-use path Projects 2. Map Book of Shared-use path Projects Page 38 of 79 Bicycle, Pedestrian, and Greenways Master Plan Shared-use Path Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Level BPG Board Priorities Street Name From To Miles Additional information 1 22,23 6.00 X SPRING CREEK 6 BRIDGEWATER DR REATTA MEADOWS PARK 0.19 PER completed; Phase 1 - land acquisition; estimate also includes connection to Reatta Meadows Park 2 5 7.43 HARVEY ROAD WEST (on northside)TEXAS AV S SH 6 1.33 in ROW; Design funds only; MPO funds available for construction FY25-29; earlier if design can be completed sooner; Sidewalk on southside 3 22,23 6.00 SPRING CREEK 4 SOCO APARTMENTS SOUTHERN OAKS PARK 0.21 PER completed; Completes connection to Southern Oaks Park from deadend at SoCo apartments 4 22,23 6.00 X SPRING CREEK 5 SOUTHERN OAKS PARK BRIDGEWATER DR 0.25 PER completed; includes connection to Castlerock Park 5 9,10 7.35 X BEE CREEK TRIB B HOLLEMAN DR.SOUTHLAND ST.0.26 Easement needed; Phase 1 - PER and Midblock Crossing at Southwest Parkway 6 5,6 5.00 APPOMATTOX DRIVE CONNECTOR HORSEBACK DR.APPOMATTOX DR.0.15 Easement needed; Undeveloped section; North/south connection on East side of SH 6 7 9,10 7.97 LEMON TREE PARK CONNECTOR 255FT E OF CHARLES CT GLADE ST 0.10 Easement needed; Developed 8 10,17 7.64 BEE CREEK TRIBUTARY B.3 1 RIO GRANDE BL. LARRY J RINGER LIBRARY 0.30 in ROW (Southside of FM 2818); Rural cross section 9 9,10,16,17 7.19 JOHN CROMPTON PARK CONNECTOR HOLLEMAN DR W JONES BUTLER RD 0.39 10 10 7.00 BEE CREEK 2 BEE CREEK PARK HARVEY MITCHELL PW S 0.57 11 17,18 7.00 BRIAN BACHMANN PARK CONNECTOR 2 ROCK PRAIRIE RD.ARNOLD RD.0.23 12 17,18 6.39 BRIAN BACHMANN PARK CONNECTOR 1 ROCK PRAIRIE RD.ARNOLD RD.0.23 Page 39 of 79 Bicycle, Pedestrian, and Greenways Master Plan Shared-use Path Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Level BPG Board Priorities Street Name From To Miles Additional information 13 1,2 6.00 TARROW STREET E 29TH ST AUTUMN CR 0.03 in ROW; no facilities; will connect to City of Bryan project 14 23 5.90 X SPRING CREEK 2 SH 6 S ARRINGTON RD 0.37 15 23 6.00 X SPRING CREEK 3 ARRINGTON RD SOCO APARTMENTS 0.08 includes RRFB for Midblock Crossing; Complete with or after Spring Creek 2 16 11,12 5.06 BEE CREEK 1 HARVEY MITCHELL PW S E OF ROLLING ROCK PL 0.98 Easements needed 17 10,11 5.00 STEPHEN C. BEACHY CENTRAL PARK CONNECTOR EARL RUDDER FW S FRONTAGE RD W CENTRAL PARK LN 0.08 18 10,11 5.00 BEE CREEK TRIB 3 DARTMOUTH ST. EXISTING MULTI USE PATH APPROX. 700FT S OF RECREATION DR.0.23 19 9 8.10 WELLBORN ROAD 1 GEORGE BUSH DR LUTHER ST 0.40 in ROW; No facilities; Complete after George Bush and Wellborn Road Intersection Improvements 20 5,6 6.81 WOLF PEN CREEK CONNECTOR HOLLEMAN DR E EASTMARK DR 0.08 Easements needed; Platted but undeveloped 21 10,11 6.30 TEXAS AVENUE HARVEY MITCHELL PW S EARL RUDDER FW FRONTAGE RD W 0.69 in ROW; Rural cross section; no facilities 22 22,23 6.30 WILLIAM D. FITCH PARKWAY 1 FM 2154 SH 6 S FRONTAGE RD W 3.05 in ROW; Rural cross section; no facilities 23 19,20,23,24 5.25 X SPRING CREEK 1 WILLIAM D FITCH PW SH 6 S 1.29 Undeveloped; Construct with Midtown Business Park 24 23,24 6.00 SPRING CREEK WOODLAND HILLS CONNECTOR SPRING BRANCH CT WOODLAND RIDGE DR 0.09 Connection to Woodland Hills Park; construct after Spring Creek 1 25 19,20,23,24 5.64 X SPRING CREEK CONNECTOR SPRING CREEK 1 SPRING BRANCH CT 0.18 Connection to Woodland Hills Subdivision; construct after Spring Creek 1 26 2,3,5,6 5.13 HARVEY ROAD EAST FM 158 TEXAS AV S 3.01 Possibly wait for road reconstruction and development Page 40 of 79 Bicycle, Pedestrian, and Greenways Master Plan Shared-use Path Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Level BPG Board Priorities Street Name From To Miles Additional information 27 8 4.82 F&B HARVEY MITCHELL PW S TURKEY CREEK RD.0.52 Stand alone? 28 2,3,5,6,7,11,1 2,13,19,20,24 ,25,28,29 4.16 GULF STATES UTILITY EASEMENT 1 UNIVERSITY DR E PATRIOT DR 8.18 Easements needed for portions (Need to breakout into sections/phases) 29 5,6 5.00 GULF STATES UTILITY EASEMENT CONNECTOR HORSEBACK DR GULF STATES UTILITY EASEMENT 1 0.09 Construct after GSUE shared-use path is complete 30 5,6 5.00 SWITCH STATION ROAD CONNECTOR GULF STATES UTILITY EASEMENT 1 APPOMATTOX DR 0.21 Construct after GSUE shared-use path is complete 31 8 4.00 RAYMOND STOTZER PARKWAY 1 MEMORIAL CEMETERY DW TURKEY CREEK RD 0.36 in ROW; no facilities 32 20,21 3.59 WILLIAM D. FITCH PARKWAY 2 ROCK PRAIRIE RD 4800FT NE ALONG WILLIAM D FITCH PW 0.91 in ROW; Rural cross section; no facilities 33 17,18 6.17 LICK CREEK 1 HIBISCUS ST LONGMIRE DR 0.84 Easements needed; feasability study needed; Developed and Undeveloped sections 34 5 7.56 WOLF PEN CREEK HARVEY RD GEORGE BUSH DR E 0.24 Feasibility study needed 35 16,17 8.76 SOUTHWEST PARKWAY SOUTHSIDE 2 WELLBORN RD SOUTHWEST PARK 0.10 in ROW; Sidewalk currently exists; some sections very new 36 24 6.00 PEBBLE CREEK PARKWAY MUIRFIELD VILLAGE ROYAL ADELADE DR 0.59 in ROW; Sidewalks currently exist and buffered bike lanes 37 22,23 6.00 ALEXANDRIA AVENUE SOUTHERN PLANTATION DR.SALEM CT.0.33 in ROW and along Southern Oaks Park; sidewalks currently exist 38 1,2,4,5 7.53 UNIVERSITY DRIVE EAST LINCOLN AV TEXAS AV 1.14 in ROW; Sidewalk currently exists 39 5,6,9,10,11,1 6,17 7.36 SOUTHWEST PARKWAY NORTHSIDE WELLBORN RD SH 6 2.85 in ROW; Sidewalk currently exists; some sections very new 40 5,6,9,10,11,1 6,17 7.30 SOUTHWEST PARKWAY SOUTHSIDE 1 SH 6 SOUTHWEST PARK 2.70 in ROW; Sidewalk currently exists; some sections very new 41 17,18 7.20 ROCK PRAIRIE ROAD 3 WESTCHESTER AV FM 2154 0.80 in ROW; Sidewalk currently exists 42 17,18 7.00 ROCK PRAIRIE ROAD 2 NORMAND DR WESTCHESTER AV 0.52 in ROW; Sidewalk currently exists 43 17,18 6.42 ROCK PRAIRIE ROAD 1 NORMAND DR LONGMIRE DR 0.32 in ROW; Sidewalk currently exists Page 41 of 79 Bicycle, Pedestrian, and Greenways Master Plan Shared-use Path Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Level BPG Board Priorities Street Name From To Miles Additional information 44 17,18 6.08 ARNOLD ROAD FARAH DR.SCHAFFER RD.0.12 in ROW; sidewalk currently exists 45 8,9 5.78 RAYMOND STOTZER PARKWAY 2 WELLBORN RD RESEARCH PW 1.06 in ROW; sidewalk currently exists 46 8,9,15,16 5.63 GEORGE BUSH DRIVE HARVEY MITCHELL PW S WELLBORN RD 1.25 in ROW; sidewalks currently exist 47 18 5.07 LONGMIRE DRIVE ROCK PRAIRIE ROAD GRAHAM RD 0.35 in ROW; sidewalk currently exists 48 1,2,4,5 6.59 UNIVERSITY DRIVE CONNECTOR UNIVERSITY DR E SHADY DR 0.17 Easements needed; Redevelopment 49 23,24,25 5.17 ALUM CREEK TRIB 1 LAKEWAY DR.ALUM CREEK 0.99 Easements needed for a portion; City park and Undeveloped property 50 19,20 4.56 LICK CREEK TRIB 10 ROCK PRAIRIE RD CARROLL FANCHER WY 0.80 Easements needed for portion; Undeveloped 51 18,19 4.50 LICK CREEK 2 Huntington Apartments Lick Creek Greenway Trail 0.66 Easements needed; Undeveloped 52 22,23 6.22 X SPRING CREEK 7 REATTA MEADOWS PARK VICTORIA AV 0.30 Easements needed; Undeveloped 53 22,23 6.05 X SPRING CREEK 8 VICTORIA AV HANNA CT 0.42 Easements needed; Undeveloped 54 22,23 6.00 X SPRING CREEK TRIB 7 BRIDGEWATER DR WILLIAM D FITCH PW 0.43 Easements needed; Undeveloped 55 24,25,28 4.73 ALUM CREEK SH 6 S PEBBLE CREEK PW.1.16 Easements needed; Undeveloped 56 24,25,28,29 4.00 ALUM CREEK TRIB 4 ALUM CREEK FUTURE TFARE 29 0.37 Easements needed; Undeveloped 57 24,25 3.04 ALUM CREEK TRIB 2 GULF STATES UTILITY EASEMENT 1 5500FT NE OF GULF STATES UTILITY EASEMENT 1 1.07 Easements needed; Undeveloped 58 26,27 2.37 HOPES CREEK CONNECTOR HOPES CREEK S DOWLING RD 0.51 Easements needed; Undeveloped 59 32,33 3.65 PEACH CREEK TRIB 20 ROYDER RD PEACH CREEK SOUTH 1.00 ETJ; Easements needed; Undeveloped 60 2,3,5,6,7,12,1 3,14,20,21 2.73 CARTER'S CREEK HARVEY RD.ROCK PRAIRIE RD.7.60 ETJ; Easements needed; Undeveloped 61 32,33,34 2.29 PEACH CREEK SOUTH PEACH CREEK TRIB 20 MILLICAN CREEK TR 2.12 ETJ; Easements needed; Undeveloped Page 42 of 79 Bicycle, Pedestrian, and Greenways Master Plan Shared-use Path Projects November 2021 Proposed Priority Order Map Book Page Number(s) GIS Priority Level BPG Board Priorities Street Name From To Miles Additional information 62 26,27,30,31 2.08 HOPES CREEK S DOWLING RD HOPES CREEK CONNECTOR 3.90 ETJ; Easements needed; Undeveloped 63 29 2.00 GULF STATES UTILITY EASEMENT 2 870FT N OF PATRIOT DR PEACH CREEK CUT- OFF RD 1.00 ETJ; Easements needed; Undeveloped Page 43 of 79 Page 44 of 79 Page 45 of 79 Page 46 of 79 Page 47 of 79 Page 48 of 79 Page 49 of 79 Page 50 of 79 Page 51 of 79 Page 52 of 79 Page 53 of 79 Page 54 of 79 Page 55 of 79 Page 56 of 79 Page 57 of 79 Page 58 of 79 Page 59 of 79 Page 60 of 79 Page 61 of 79 Page 62 of 79 Page 63 of 79 Page 64 of 79 Page 65 of 79 Page 66 of 79 Page 67 of 79 Page 68 of 79 Page 69 of 79 Page 70 of 79 Page 71 of 79 Page 72 of 79 Page 73 of 79 Page 74 of 79 Page 75 of 79 Page 76 of 79 Page 77 of 79 Page 78 of 79 Page 79 of 79