Loading...
HomeMy WebLinkAboutFY 1995-1996 -- Service LevelSERVICE LEVEL ADJUSTMENTS TABLE OF CONTENTS GENERAL FUND PG. REF. CUMULATIVE POSITIONS DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL POLICE 1 26 8 CHAIRS (ES #3) $4,800 $4,800 0.0 2 4 SCHOOL RESOURCE OFFICER (ES #3,4, SI #18 AP) (I FTE) 63,456 68,256 1.0 1.0 6 5 CUB SCOUT PROGRAM (ES #3, 6, SI #18 AP, 22 AP) 1,000 69,256 1.0 POLICE SUBTOTAL $69,256 1.0 FIRE 7 18 LIFE-PAK 10 FOR EMS (ES #3, 5) $10,500 $79,7156 1.0 8 21 BOMB TRAINING (ES #3,4) 6,400 86,156 1.0 9 19 EXTRICATION TOOLS & POWER PLANT FOR 722 (ES #3, 5) 16,730 102,886 1.0 10 20 FIRE DEPARTMENT OVERTIME FUNDS (ES #3, 5) 40,600 143,486 1.0 11 27 FIRE STATION #2 FURNITURE (ES #3, 5) 5,080 148,566 1.0 FIRE SUBTOTAL $79,310 0.0 PUBLIC SERVICES 12 12 REFRIGERANT RECYCLER (MANDATE) (ES #5) $2,700 $151,266 1.0 13 13 FUEL ISLAND UPGRADE (MANDATE) (ES #5) 3,970 155,236 1.0 14 34 STREET SIGN SUPPLIES FOR STREETSCAPE (ES #6, SI #6) 8,500 163,736 1.0 15 41 GUARDRAIL UPGRADES FOR STREETSCAPE (ES ", SI #6) 15,000 178,736 1.0 16 52 DRIVE -ON -HOIST (ES #5) 8,000 186,736 1.0 17 36 PARKING LOT MAINTENANCE (PROP. COUNCIL BUDGET POLICY) (ES #5) 143,100 329,836 1.0 18 38 WPC HANDRAIL (ES #6, SI #6) 10,000 339,836 1.0 19 2 SOUTHGATE STREET SIGN REPLACEMENT (ES #7, SI #6 AP) 10,000 349,836 1.0 PUBLIC SERVICES SUBTOTAL $201,270 0.0 PARKS AND RECREATION 20 29 SOUTHWOOD POOL RENOVATION (FROM FY 95) (ES #2, 3, 8) $186,810 $536,646 1.0 21 30 ADAMSON REPAIR STUDY (ES #2, 3, 8) 25,000 561,646 1.0 22 22 AQUATICS SEASONAL PAY INCREASE (ES #2, 3. 8) 4,241 565,887 1.0 23 31 LINCOLN CENTER GYM FLOOR (ES #2, 3, SI #18) 55,000 620,887 1.0 24 32 BROTHER'S PARK PLAYGROUND (ES #2,3,8) 19,500 640,387 1.0 25 33 CENTRAL PARK IRRIGATION SYSTEM (ES #2, 3,5) 22,000 662,387 1.0 26 53 SOFTBALL SCOREBOARDS (ES #2, 3, 5) 13,9D0 676,287 1.0 27 44 CEMETERY LANDSCAPING (O&M) (ES #8, SI #6) 17,575 693,862 to 28 39 NATATORIUM (NET COST TO CITY) (ES #2, 3, SI #16, 18, 22) (8 FTE'S) 19,991 713,853 8.0 9.0 29 14 CLOSING TEEN CENTER (ES #3, 5, SI #18, 22) (-2 FTE'S) (37,212) 676,641 (2.0) 7.0 30 9 LINCOLN CENTER SURVEY (ES #3, S. SI 08 AP, 22 AP) 2,000 678,641 7.0 31 8 LINCOLN CENTER EXTENDED HOURS (ES #3, 6, SI #18 AP, 22) (2 FTE'S) 23,510 702,151 2.0 9.0 32 7 ADAMSON LAGOON FAMILY NIGHTS (ES #3, 6, 81 #18 AP, 22 AP) 2,100 704,251 9.0 33 6 BOY SCOUT PROGRAM (ES #3, 6, SI #18, 22) 1,000 705,251 9.0 34 40 WPC HOLLEMAN/DARTMOUTH BRIDGE PLANTER (ES #2, 3, SI #6) 10,000 715,251 9.0 PARKS AND RECREATION SUBTOTAL $365,415 8.0 ECONOMIC & DEV. SERVICES 35 10 PRINT/DISTRIBUTE COMP. PLAN (ES #1, 3. 5. 7) $5,000 $720,251 9.0 36 42 UNIV. DRIVE BANNERS (ES #6, 7, SI #5) 10,000 730,251 9.0 37 43 LANDSCAPE INCENTIVE PILOT PROGRAM (ES #7, SI #6) 10,000 740,251 9.0 38 11 PAINT TESTING (MANDATE, CD GRANT) (ES #3, 6, 7, SI #6) 10,000 740,251 9.0 ECONOMIC & DEV. SERVICES SUBTOTAL $35,000 0.0 SERVICE LEVEL ADJUSTMENTS TABLE OF CONTENTS GENERAL FUND PG. REF, CUMULATIVE POSITIONS # # DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL MANAGEMENT SERVICES 39 36 PARK BUILDING MAINTENANCE (PROP. COUNCIL BUDGET POLICY) (ES #2, 5) $50,000 $790,251 9.0 40 55 FUNDS FOR PRINTING BILL STUFFERS (ES #4, 5) 6,000 796,251 9.0 41 37 INTERNET (ES #6, 31 #7,13, 16) 33,516 829,767 9.0 42 45 2 KIOSKS (ES #41, 6, SI #13,43) 80,000 909,767 9.0 43 3 TV ACCESS TO CITY HALL (ES #4, 6, SI #13 AP) 239,000 1,148,767 9.0 MANAGEMENT SERVICES SUBTOTAL $408,516 0.0 FISCAL & HUMAN RESOURCES 44 15 BCAD FEE INCREASE (ES #4. 5) $9,675 $1,158,442 9.0 45 16 BANK FEE INCREASE (ES #4, 5) 2,200 1,160,642 9.0 46 17 COLLECTION FEE INCREASE (ES #4, 5) 4,088 1,164,730 9.0 47 60 PERFORMANCE APPRAISAL SYSTEM REVIEW (ES #5) 30,000 1,194,730 9.0 48 51 FIXED ASSET INVENTORY (AUDIT RECOMMENDATION )(ES #4, 5) 35,000 1,229,730 9.0 FISCAL & HUMAN RESOURCES SUBTOTAL $80,963 0.0 GENERAL GOVERNMENT 49 46 COUNCIL LAPTOPS OPTION I (ES #4, 6, SI#13) 40,230 1,269,960 9.0 50 47 COUNCIL LAPTOPS OPTION 2 (ES #4, 6, SI#13) 27,034 1,269,960 9.0 51 48 COUNCIL LAPTOPS OPTION 3 (ES #4, 6, S1#113) 20,146 1,269,960 9.0 52 56 COPIER UPGRADE (ES K 5) 4,356 1,274,316 9.0 53 28 CD-ROM FOR LEGAL LIBRARY SERVICES (ES #5) 23,324 1,297,640 9.0 57 54 CITIZEN SURVEY PRINTING, POSTAGE, AND SUPPLIES (ES #4, 5) 1,360 1,299,000 9.0 GENERAL GOVERNMENT SUBTOTAL $69,270 0.0 NON -DEPARTMENTAL 58 49 LAND FOR CITY SERVICES RELOCATION (DEBT SERVICE) (ES 95, SI #23) $40,000 $1,339,000 9.0 59 1 NORTHGATE REVITALIZATION (DEBT SERVICE) (SI #1 AP) 85,000 1,424,000 9.0 60 23 800 MHz RADIO SYSTEM 120,000 1,544,000 9.0 61 24 HEALTH DEPARTMENT (ES #3, 5) 2,980 1,546,980 9.0 63 57 CHAMBER OF COMMERCE - DEBT RETIRE (ES #4, 5) 20,000 1,566,980 9.0 67 58 MHMR BRA70S VALLEY (ES #1, 2, 3, 4, 5,7, 8) 75,000 1,641,980 9.0 69 59 TAMU DEPARTMENT OF WILDLIFE & FISHERIES (ES #4) 37,500 1,679,480 9,0 71 25 MERIT AND SCALE ADJUSTMENTS 323,015 2,002,495 9.0 NON -DEPARTMENTAL TOTAL $703,495 0.0 GENERAL FUND TOTAL $2,002,496 9.0 LESS FUND BAL. FOR MAJOR MAINTENANCE (308,310) NET GENERAL FUND OPERATING COSTS $1,694,186 LEGEND TO CURRENT SERVICE LEVEL ABBREVIATIONS M Maintenance - ongoing annual maintenance MM Major maintenance-4.e., generally a one-time expenditure MN MANDATE -Required by state or federal law or regulation or council policy ABBREVIATIONS INCLUDED IN DESCRIPTION BOLD Service Level Adjustments that are related to a City Council Strategic Issue and the cost is included in the action plan. ES City Council Ends Statement SI City Council Strategic Issue SERVICE LEVEL ADJUSTMENTS TABLE OF CONTENTS PARKLAND DEDICATION FUND PG. REF. CUMULATIVE POSITIONS # # DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL -lip r_, ..t.•.,r., «.._.a:,.,-.._..><...?.,.,...,,.......,___....:.,...;a."r3, .,,:e>.tk:'.i.:a,....:....re,•:,."..t......„_.,.."._ir.?':..,.::. ,..._,. ,.c_:.,,::.,....,:f�,_.....,:..,....��., ........r.a,.:.......:.. r..:«. _....:...,.I<...>.J,. ..._,,.A..q._:.......:;:_.....: <.:....:rfr,..,.r._,.r,.._",.G..f.,.a..:,...m,-d.;m,..:.r,...,�...,:.:»t.t._..r:...:... ,C. ,_,v.3,.:..:...Y>.s.4r•':9,2.,�.�:.5.,.v."..;a,P..mSxttaR:.a .rn.«.Sr... 3<�_i.,,.».Y';...�,r..R,.a-�:.,.n:.�,., r^..n..:t:::.:•t_o-k. :.. ::.- .:..;....:-', �.., -`.�«.:;:,:._ .:rG. 1::".�':r'.;2&t':�'".:'?..S�,:u� :.,,, .3$s>.'.'.,''Ss .'ve.sl..'.r',T:'u§: 77`'6.i„.:;�^.i.:,.�:.r.e'�ri^.,t:„%"5l1„:v;oa::'Su" r?F. .:s,?•?,.t?a,?"<;Cdr) °3;.-r±}.;S�'}?:^;•:^'.y?:;,<:^_.:...f.i.:a?9..s.,..w.,..,,.'..^r. trM1....:'_5i',f.'::_<F&_.1,..S;,'..-,'fr.,.rm...t...d,i,; 3a"r:� �,...1n.8.:.:3tr i.-.". •._�T.a�3' fls.aJ', 75 60 CENTRAL PARK IMPROVEMENTS (ES #2, 3, 5) $37.500 $1,731,685 9.0 76 61 WPC PLAYGROUND IMPROVEMENTS (ES 02, SI 028) 24,000 1,755,685 9.0 PARKLAND DEDICATION FUND TOTAL HOTEUMOTEL FUND PG. REF. # # DESCRIPTION 79 64 CONFERENCE CENTER A/V EQUIPMENT (ES #5) 80 62 BUSH LIBRARY TOURIST HOUSING ANALYSIS (ES #4, 6, SI #16 AP) 81 63 PUBLIC ART PROGRAM (ES #6, SI #5 AP, 16,41) * 82 65 NORTHGATE REVITALIZATION (DEBT SERVICE) (SI #1 AP) - 83 66 AGS SWIM CLUB (ES #2) 86 67 CONVENTION 8, VISITORS BUREAU (ES #1, 5, 7) 89 68 SCA STUD. AMBASSADOR PROGRAM (ES #4, 6) 93 69 BRAZOS VALLEY BUSH LIBRARY COMMITTEE (3 YR. PER.) (ES #4, 5) 94 70 SISTER CITIES ASSOCIATION (ES #2, 4, 6) 96 71 LIONS CLUB (ES #8) HOTEUMOTEL FUND TOTAL * If city council wants to give $100,000 for public art program, the authorization needs to come out of the Arts Council funding or another fund due to the fact that only 1/7 of the Hotel/Motel tax can be used for programs such as this. Explanation of Net Amount: 117 of approximate FY 96 Hotel/Motel Tax Revenue = $179,000 FY 96 request from Arts Council = $155,000 Difference is the amount that could be spent on Public Art Program = $24,000 ** Of the $365,000 proposed, $300,000 is to come from fund balance. ELECTRIC FUND $61,600 0.0 CUMULATIVE POSITIONS NET AMOUNT AMOUNT NEW TOTAL .....::..:. $1,500 $1,757,185 9.0 10,000 1,767,185 9.0 24,000 1,791,185 9.0 365,000 2,156,185 9.0 15,400 2,171,685 9.0 34,500 2,206,085 9.0 500 2,206,585 9.0 50,000 2,256,585 9.0 9,000 2,265,685 9.0 550 2,266,135 9.0 $510,460 0.0 PG. REF. CUMULATIVE POSITIONS # # DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL 101 77 INSPECTOR/LOCATOR POSITION (ES #5, 7) (1 FTE) $50,421 $2,316,556 1.0 10.0 102 78 HYDRAULIC COMPRESSION WRENCH (ES #5) 2,300 2,318,856 10.0 103 73 HOTSTICK METER TEST CLAMPS (ES #5) 3,000 2,321,856 10.0 104 75 CONCRETE SAW (ES #5) 7,000 2,328,856 10.0 105 72 TIMEKEEPER CENTRAL SYSTEM (ES #5) 24,000 2,352,856 10.0 106 74 LAPTOP COMPUTER (ES #5) 3,000 2,355,856 10.0 107 76 REPLACEMENT COMPUTER (ES #5) 3,000 2,358,856 10.0 108 79 NCR MAINTENANCE CONTRACT (6 MONTHS) (ES #5) 15,000 2,373,856 10.0 109 80 800 Mhz RADIO SYSTEM 15,250 2,389,106 10.0 110 81 ECONOMIC DEVELOPMENT CORPORATION (ES #4, 5, 7) 17,000 2,406,106 10.0 113 82 MERIT AND SCALE ADJUSTMENTS 70,035 2,476,141 10.0 ELECTRIC FUND TOTAL $210,006 1.0 SERVICE LEVEL ADJUSTMENTS TABLE OF CONTENTS WATER FUND PG. REF. CUMULATIVE POSITIONS DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL M -nI W, NE,RkK"' 117 84 BACK HOE/LOADER (ES #5) $49,500 $2,525,641 10.0 118 83 STRAP ON FLOW METER (ES #5) 8,500 2,534,141 10.0 119 85 800 Mhz RADIO SYSTEM 15,250 2,549,391 10.0 120 86 MERIT AND SCALE ADJUSTMENT 18,181 2,567,572 10.0 WATER FUND TOTAL $91,431 0.0 WASTEWATER FUND PG. REF. CUMULATIVE POSITIONS # # DESCRIPTION NET AMOUNT AMOUNT NEW TOTAL 123 87 UPGRADE TO SLUDGE SPREADER (ES #5) $60,500 $2,628,072 10.0 124 88 AUTOMATIC SAMPLING MACHINE (ES #5) 5,000 2,633,072 10.0 125 89 800 MHz RADIO SYSTEM 15,250 2,648,322 10.0 126 90 MERIT AND SCALE ADJUSTMENT 28,994 2,677,316 10.0 WASTEWATER FUND TOTAL $109,7" 0.0 SOLID WASTE COLLECTION FUND PG. REF. N # DESCRIPTION 129 92 APARTMENT RECYCLING (CONTINUE PILOT PROGRAM) (ES #5) 130 91 COMPUTER (1) (ES #5) 131 93 $00 MHz RADIO SYSTEM 132 94 MERIT AND SCALE ADJUSTMENT SOLID WASTE COLLECTION FUND TOTAL ALL FUNDS TOTAL CUMULATIVE POSITIONS NET AMOUNT AMOUNT NEW TOTAL $4,000 $2,681,316 10.0 2,000 2,683,316 10.0 15,250 2,698,566 10.0 15,962 2,714,528 10.0 The reference number may be used to identify specific Service Level Adjustment packages from the list provided with the memo from the Interim City Manager. $37,212 .. 0.0 $2,714,528 10.0 m v k 0 We're Committed To Excellence 10 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank 1 Maintenance of Service Level + X Division Rank 1 DEPARTMENT/DIVISION: 4141 TOTAL THIS REQUEST: $4.800 ACTIVITY CENTER:.541 LESS SAVINGS: PREPARED BY: M. Newton NET EFFECT ON BUDGET: $4.800 Proposed Project or Program Replace eight chairs in Patrol. The original chairs were purchased in 1987 and most have become unserviceable with broken backs, bases, and armrests. Council Ends Statement/issues Ends Statement #3: Health and Public Safety Impact on Service Level Current Service Level: Maintain effective levels of Proposed Service Level: No change in service level. police services on a 24-hour per day basis throughout the city. Impact on Performance Indicators Current Performance Indicator: 46% of a patrol Proposed Performance Indicator: No change in officer's time is spent on preventative patrol, report writing, performance indicator. and other required tasks. Appropriation Category 1000 2000 3000 4000 5000 6000 7000 1 Description Salaries & Benefits Supplies Maintenance Professional Services Property Services Other Services Capital Total Eight chairs @ $600 each = $4,800. Request Explanation of Savings/Revenues None 4,800 $4, 800 Explanation of Costs 1 N Service Level Adjustment Increased Service Level X, City Rank Decreased Service Level Department Rank 2- Maintenance of Service Level I I Division Rank 1 DEPARTMENT/DIVISION: 4143 TOTAL THIS REQUEST: $63.466 ACTIVITY CENTER: 9551 LESS SAVINGS: (15.3231 PREPARED BY: M. Patterson NET EFFECT ON BUDGET: $48.133 Proposed Project or Program Requesting an additional High School Resource Officer due to an increase in demand by students wanting to take the courses. Other programs including proactive truancy reduction, programs for "at risk" students, and a criminal vocational club are not being implemented. The 2nd officer will allow these programs to get started. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety Ends Statement #4: Educational/Information Strategic Issue #18 - Youth at Risk . Impact on Service Level Current Service Level: Provide classroom Proposed Service Level: Provide classroom instruction in criminal justice courses for high school credit instruction in criminal justice courses for high school credit and for college credit in conjuction with the Tech Prep and for college credit in conjuction with the Tech Prep Program at Blinn College. Program at Blinn College for a greater number of students. Impact on Performance Indicators . Current Performance Indicator: 95% of teachers Proposed Performance Indicator: go% of and administrators surveyed in the high school are satisfied students who sign up for these types of classes are with the School Resource Officer Program. able to get into a class. School programs beyond teaching are established and maintained. Appropriation Explanation of Savings/Revenues Category Description Request It is anticipated that the city will be reimbursed 50% of the 1006 Salaries & Benefits 30,646 salary and benefits for this position ($15,323) by the 2000 Supplies 1,910 College Station Independent School District. 3000 Maintenanre 4000 Professional Services 390 Additionally CSISD pays about $1,500 for TECH -PREP 5000 Property Services conferences, $1,000 in College tuition and books for 6000 Other Services 28,550 teacher certification and $1,800 for classroom 7000 Capital 1,960 curriculum and printing materials. Total $63,456 Explanation of Costs Supplies = Office supplies $150, File Cabinet/Phone $750, Clothing/Uniforms $510, Pager $300, Fuel/Oil $200. Prof. Services = Cleaning allowance. Other Services = Travel/Lodging $1,200, Outside Training $800, Vehicle (incl. light bar and radio) $23,600, one year fleet cost $2,950. Capital = Desk/chair $1,200, side chairs $760. A&M Consolidated High School College Station Independent School Distric January 30, 1995 Chief Feldman College Station Police 2611 A Texas Ave. S. College Station, Texas Dear Chief Feldman, 701 West Loop South College Station, TX 77840 409-764-5500 FAX 409-693-0212 Department 77840 RECEIVEO FEB 0 1 1995 4 'acdjj t �C.1 � f- / t A� would first like to thank -you for the cooperation we have received from the College Station Police Department this year. All officers have been tremendous and supportive. We appreciate all the time & hard work they put in to support our students and teachers. would also like to let you know what an excellent job Mark Langwell is doing. The idea of the Police Officer as an instructor in our Criminal Justice Courses is excellent. We commend you and give you our support. However, because of Officer Langwell's teaching load we are unable to use him as the officer on duty during our lunch period. He does help before and after school, but as the school continues to grow and the cafeteria, parking lot and halls become more crowded, we need more help. While fighting at A & M Consolidated is not a major issue, fights are becoming more frequent. Before school, after school and lunch periods are the most common times that fights occur. As a preventative measure I would like to request that a police officer, in addition to Mark Langwell, be assigned to A & M Consolidated. The most important times are: 7:30a.m.-8:30a.m. 11:00a.m.-1:00p.m. 3:00p.m.-4:00p.m. "HRISSY HESTER JIM SCALES, Ph.D. Principal Excellence In Education... -An Investment In The Future Superintendent of Schools N Please let me know how we can work together to take this preventative measure. We need to keep our high school a safe environment where learning occurs. I believe an additional officer will help provide this. Please let me know what I need to do to help make this happen. Sincerely, Chrissy Hester Principal cc: Dr. Jim Scales, Superintendent Mr. John Rouse, Assistant Superintendent for Instruction Mr. Larry Ringer, Mayor Ms. Lynn Mcllhaney, Councilwoman Mr. Tom Brymer, City Manager 06/26/95 08:25 `Y409 764 3466- C.6: ruLiub ur,rl 06--01-19% 02:28PM FROM R&m coNsu-iDATo HS TO s Wjuuz ?643468 P.01 5 •- A&M Consolidated High School College Station Independent School District I 701 .Vest Loop South Como station, Tx 77840 409-764-5500 FAX 409-698-0212 10 Chief Feldman Dr. Jim Scales Additional School Resource Officer June 1. 1995 1 would like to request an additional School Resource Officer for the 1995-96 School year. officer Langwell has done an excellent job, therefore our course offerings in criminal justice are increasing. The additional resource officer would: 1. Teach Emergency Communications 2. Develop Emergency Communications lessons because it Is our 1st year to offer it as a course. 3. Be available to supervise the campus 1st, 4th and 7th periods as well as before and after school. 4. CS1SD will pay 50% of each officers salaries. believing Officer Langwell from teaching Emergency Communications will allow him to continue :o be available to students and faculty while still supervise the campus. The rote he has developed this year is very positive. As we move into a 3 year construction Droject and continue to grow in numbers, we need additional security. I would like to request Craig Anderson be this additional officer. CHRIS;SY HESTER Principal Erceldence In F.ducadan.. An Invarr unt A The Future JIM SCALES, Ph.D. Superintendent of Schools, I Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 41-43 PD ACTIVITY CENTER: 551 Soec. Svcs. PREPARED BY: David Gerlina City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: 6 $1.000 Proposed Project or Program Cub scout pack program at Lincoln Center. This is one of a group of alternative programs if the Teen Center is closed. Council Ends Statement/Issues Ends Statements #3 Health and Public Safety Strategic Issues #16 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Provide proactive Proposed Service Level: No change preventative programs that allow police officers to interact with school age children in a non -confrontational environment. Impact on Performance Indicators Current Performance Indicator: None Proposed Performance Indicator: None Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital Total supplies = $1,000 Request 1,000 None Explanation of Savings/Revenues $1,000 1 Explanation of Costs Service Level Adjustment 7 Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENT/DIVISION: Fire 4251 ACTIVITY CENTER: Suunression 562 PREPARED BY: D. Giordano City Rank Department Rank 1 Division Rank 1 TOTAL THIS REQUEST: $10.600 LESS SAVINGS: NET EFFECT ON BUDGET: $10.500 Proposed Project or Program Requesting a Life Pak 10 defibrillator for Advanced Life Support EMS Response. This equipment would replace an existing, obsolete and unrepairable unit. This piece of equipment allows a broad range of life saving techniques to be implemented and is vital to the delivery of emergency medical services. Council Ends Statementlissues Ends Statement #3: Health and Public Safety. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Ensure advanced life support Proposed Service Level: No change in service level. response equipment is available at an emergency scene within 4.5 minutes. Impact on Performance Indicators Current Performance Indicator: Provide Proposed Performance Indicator: No change in paramedic care and advanced life support equipment with performance indicator. first arriving units 100% of the time. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 10,500 Total $10,500 None Explanation of Savings/Revenues Explanation of Costs Life Pak 10 defibrillator purchase cost = $10,500. J Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank 2 Maintenance of Service Level Division Rank 1 DEPARTMENT/DIVISION: Fire 4252 TOTAL THIS REQUEST: $6.400 ACTIVITY CENTER: Prevention 566 LESS SAVINGS: PREPARED BY: B. Ellen NET EFFECT ON BUDGET: $6.400 Proposed Project or Program Request is for funding to train two bomb technicians. Promotions and transfers within the department have left the division without properly trained personnel to handle emergencies involving explosives. At this time, no other agency exists within Brazos county or surrounding counties that offers these services. All academic costs are paid for by the federal govt. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety Ends Statement #4: Educational/Information Impact on Service Level - Current Service Level: Provide explosive ordinance Proposed Service Level: No change in service level. disposal. Impact on Performance Indicators Current Performance Indicator: Respond to all Proposed Performance Indicator: No change in requests for explosive ordinance disposal within one hour. performance indicator. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 6,400 7000 Capital Total $6,400 Per diem: 27 days @ $45 = $1,215 Lodging: 26 nights @ $65 = $1,690 Travel: $295 Explanation of Savings/Revenues Explanation of Costs Total: $3,200 per person x 2 personnel = $6,400 9 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank 3 Maintenance of Service Level Division Rank 2 DEPARTMENT/DIVISION: Fire 4251 ACTIVITY CENTER: Sunnression 562 PREPARED BY: D. Giordano TOTAL THIS REQUEST: $16.730 LESS SAVINGS: NET EFFECT ON BUDGET: $16.730 Proposed Project or Program Request is for an additional set of extrication tools and power plant for Engine 722. Currently we have extrication equipment located in the north and south districts, but do not have any on the engine at Station #2. This tool will allow the Fire Department to use both equipment and staffing more effectively and efficiently. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide prompt, effective Proposed Performance Indicator: Reduce response to individuals trapped in automobile accidents, equipment response time in the area covered by station #2. construction site emergencies, and other disasters. Impact on Performance Indicators Current Performance Indicator: Provide Proposed Performance Indicator: No change in appropriate emergency rescue equipment and manpower performance indicator. within 4.5 minute 95% of the time. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 16,730 Total ( $16,730 Explanation of Savings/Revenues Explanation of Costs Engine $5,080 Hydraulic Rams (2 @ $2,515) $5,030 Spreader Magnum 27" $4,165 Tips Set Pulling, Chains Set with Hooks, Hose $2,455 10 Service Level Adjustment Increased Service Level City Rank Decreased Service Level ( Department Rank 4 Maintenance of Service Level X Division Rank 3 DEPARTMENT/DIVISION: Fire 4251 TOTAL THIS REQUEST: $40.600 ACTIVITY CENTER: SunDression 562 LESS SAVINGS: PREPARED BY: D. Giordano NET EFFECT ON BUDGET: $40.600 Proposed Project or Program Requesting overtime funds for shift level staffing. It is necessary to call in off -duty pers. due to illness or special assignments or training. As the Fire Dept. continues to see an increase in emer, responses & assoc. services, "call back" pers. are used to staff additional units in order to provide pre -determined levels of service to our citizens. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide prompt, effective fire Proposed Service Level: No change in service level. response and EMS response. Provide appropriate work conditions for employees. Impact on Performance Indicators Current Performance Indicator: Maintain Proposed Performance Indicator: No change in minimum staffing levels necessary to achieve 4.5 minute performance indicator. emergency fire response 95% of the time. , Appropriation Category Description Request None 1000 Salaries & Benefits 40,600 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $40,600 Explanation of Savings/Revenues Explanation of Costs The FY 95 Budget for overtime is $79,072 (approximately 4,673 hours of overtime). Based on expenditures, it is expected that there will be approximately 2,100 extra hours of overtime for FY 95 and roughly the same for FY 96 ($35,000 overtime + $5,600 benefits). Service Level Adjustment 11 Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENT/DIVISION: Fire 4250 ACTIVITY CENTER: Administration 561 PREPARED BY: D. Giordano City Rank Department Rank Division Rank TOTAL THIS REQUEST: $5.080 LESS SAVINGS: NET EFFECT ON BUDGET: $3.080 5 K7 Proposed Project or Program Requesting replacement of furniture at Fire Station #2. Current furniture is ten years old and has deteriorated to the point it is no longer cost effective to continually repair it. Due to current conditions of the furniture at Station #2, the livibility in the station is questionable. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level .Current Service Level: Monitor departmental budget Proposed Service Level: No change in service level. to assure fiscally responsible policies and practices. Impact on Performance Indicators Current Performance Indicator: Work within 97% Proposed Performance Indicator: No change in of budgeted funds. performance indicator. 0 Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 5,080 Total $5,080 None Explanation of Savings/Revenues Explanation of Costs Kitchen Table $250, 12 Stacking chairs $480, 4 Office chairs $1,000, 2 Love seats $1,000, 4 Arm chairs $1,200, 3 End tables $750, and 4 Ottomans $400. 0 12 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank 1 Maintenance of Service Level X Division Rank 1 DEPARTMENT/DIVISION: Public Services 4433 TOTAL THIS REQUEST: $3.600 ACTIVITY CENTER: Fleet 599 LESS SAVINGS: J9001 PREPARED BY: L. Scott NET EFFECT ON BUDGET: $2.700 Proposed Project or Program Requesting a refrigerant recycler. After November 15, 1995, the E.P.A. has mandated requirements to prevent the release of ozone depleting substances (freon) during vehicle servicing and repair. Our R134A and R12 freon will fall within these rules. Currently Fleet does not have the ability to recover, recycle, and charge with the new R134A freon. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide pro; r;pt and reliable Proposed Service Level: No change in service level. fleet maintenance programs at rates comparable with the private sector. Impact on Performance Indicators Current Performance Indicator: Keep the shop Proposed Performance Indicator: No change in rate at, or below, $30 per hour. performance indicator. Appropriation Explanation of Savings/Revenues Category Description Request Fleet spends $1,800 per year on freon. With this new 1000 Salaries & Benefits refrigerant equipment, we will have the ability to recover 2000 Supplies (900) and recharge our vehicles. Fleet expects a 50% 3000 Maintenance reduction in freon purchases. The savings will recover 4000 Professional Services the cost in approximately three years. 5000 Property Services 6000 Other Services 7000 Capital 3,600 Total $2,700 Explanation of Costs Capital Cost = purchase price of refrigerant recycler. 13 Service Level Adjustment Increased Service Level City Rank Decreased Service Level ' Department Rank 2_ Maintenance of Service Level X Division Rank 2i DEPARTMENT/DIVISION: Public Services 4433 TOTAL THIS REQUEST: $3.970 ACTIVITY CENTER: Fleet 599 LESS SAVINGS: PREPARED BY: L. Scott NET EFFECT ON BUDGET: M970 Proposed Project or Program Requesting an upgrade in the Public Services Center fuel island. E.P.A. requires all underground fuel tanks & lines be tested yearly. Fleet will need to upgrade their current equipment with new software, printer replacement, yearly line leak test at Public Services and Public Utilities, replace worn hoses and install new breakaways, and seal concrete surface. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide prompt and reliable Proposed Service Level: No change in service level. fleet maintenance programs at rates comparable with the private sector. Impact on Performance Indicators Current Performance Indicator: Maintain Proposed Performance Indicator: No change in downtime for vehicles and equipment below 2%. performance indicator. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 1,245 3000 Maintenance J 4000 J Professional Services J 2,725 5000 Property Services J 6000 J Other Services J 7000 Capital Total J $3,970 Explanation of Savings/Revenues Explanation of Costs Supplies: sealer for concrete surfaces. Purchased Professional Services: contract to perform work (conduct yearly line leak test, replace worn hoses, install new breakaways, and seat concrete). This service level adjustment is being driven by a federal mandate from the E.P.A. 14 Service Level Adjustment Increased Service Level ' X City Rank Decreased Service Level Department Rank 3 Maintenance of Service Level Division Rank 1 DEPARTMENT/DIVISION: Public Services 4434 TOTAL THIS REQUEST: $$.500 ACTIVITY CENTER: Traffic 634 LESS SAVINGS: PREPARED BY: P. Urso NET EFFECT ON BUDGET: $8.500 Proposed Project or Program Requesting an upgrade of our current inventory of supplies. This request will upgrade a portion (20%) our annual inventory of street sign poles & materials to meet streetscape specifications. Our plan is to over time eliminate the current standard of aluminum colored poles & signs & replace damaged/vandalized equipment with streetscape equipment. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Ends Statement #8: Civic Pride Strategic Issue #5 - Community Appearance and Beautification. . Impact on Service Level Current Service Level: Provide traffic marking Proposed Service Level: Provide traffic marking maintenance programs that keep signage and pavement maintenance programs that keep signage and pavement markings in good condition. markings in good condition and meet streetscape standards. Impact on Performance Indicators Current Performance Indicator: Customer Proposed Performance Indicator: No change in satisfaction survey results indicate satisfaction rate of 95% performance indicator. or more with traffic maintenance services. 20% of streetsigns replaced annually will meet streetscape 0% of streetsigns replaced annually meet streetscape standards. standards. Appropriation I Explanation of Savings/Revenues Category Description Request None 1000 Salaries & Benefits 2000 Supplies 8,500 3000 Maintenance 4000 Professional Services ._ 5000 Property Services 6000 Other Services 7000 Capital Total $ 8 500 I Explanation of Costs 200 street sign poles @ $42.50 each. 15 Service Level Adjustment Increased Service Level I X I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Public Services 4431 ACTIVITY CENTER: Streets 632 PREPARED BY: P. Urso City Rank a Department Rank 4 Division Rank 3 TOTAL THIS REQUEST: SM.000 LESS SAVINGS: NET EFFECT ON BUDGET: S ,000 Proposed Project or Program Requesting an upgrade to our current standard of guardrail placement to meet streetscape specifications. Currently our routine standard of guardrail placement consists of fabricated 2" pipe painted silver after installation. This request will upgrade new installations to meet streetscape standards and to replace 5 crossings annually. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Ends Statement #8: Civic Pride Strategic Issue #5 - Community Appearance and Beautification. Impact on Service Level Current Service Level: Provide street maintenance Proposed Service Level: Provide street programs which result in roadways that are safe, in good maintenance programs which result in roadways that are repair, smooth, and aesthetically pleasing. safe, in good repair, smooth, aesthetically pleasing, and meet streetscape specifications. Impact on Performance indicators Current Performance Indicator: Customer Proposed Performance Indicator: No change in satisfaction survey results indicate satisfaction rate of 95% performance indicator. or more with streets maintenance services. 0% of guardrails meet streetscape standards. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 15,000 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $15,000 20% of guardrails upgraded to streetscape standards. Explanation of Savings/Revenues Explanation of Costs 10 guardrails @ 5 crossings will be replaced to streetscape standards on an annual basis. 16 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level ! Department Rank 3 Maintenance of Service Level O Division Rank 1 DEPARTMENT/DIVISION: Public Services 4433 TOTAL THIS REQUEST: $8.000 ACTIVITY CENTER: Fleet 599 LESS SAVINGS: PREPARED BY: L. Scott NET EFFECT ON BUDGET: $8.000 Proposed Project or Program Requesting a 12,000 lbs, drive hoist for heavy trucks. Fleet will service 70 heavy trucks twice a year. This is being done in one bay with a pit. With this extra lift, fleet could reduce the vehicle downtime and by having a drive on hoist we would have the ability to perform other types of maintenance and not tie our only bay up. It also improves safety. Council Ends Statement/issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide prompt and reliable Proposed Service Level: Provide prompter and fleet maintenance programs at rates comparable with the more reliable fleet maintenance programs at rates private sector. comparable with the private sector. Impact on Performance Indicators Current Service Level: Maintain downtime for Proposed Performance Indicator: Maintain vehicles and equipment below 1.6%. downtime for vehicles and equipment below 1.5%. Current downtime is approximately 13,200,hours annually Appropriation Category 1000 2000 3000 4000 5000 6000 7000 Description Salaries & Benefits Supplies Maintenance Professional Services Property Services Other Services Capital Total Request 8,000 $8, 000 Proposed downtime would be approximately 12,300 hours annually. Reduction, of approximately 900 hours of downtime. Explanation of Savin gs/Revenues Explanation of Costs Capital Outlay = purchase price for 12,000 lbs. drive on hoist. 17 Service Level Adjustment Increased Service Level I X I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Public Services 4431 ACTIVITY CENTER: Streets 632 PREPARED BY: P. Urso City Rank Department Rank 6 Division Rank 2 TOTAL THIS REQUEST: $143.100 LESS SAVINGS: NET EFFECT ON BUDGET: $143.100 Proposed Project or Program Requesting funds to allow Pub. Svcs. to maintain all city -owned parking lots. Currently there is minimal maintenance done on city -owned parking lots. This request will enable Pub. Svcs. to maintain these areas at the same level of service of our current street program. They will be graded, put on the Pavement Mgmt. Sys., and put on a routine schedule for repairs. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level . Current Service Level: Provide street maintenance Proposed Service Level: Provide street and programs which result in roadways that are safe, in good parking lot maintenance programs which result in repair, smooth, and aestheticaly pleasing, roadways that are safe, in good repair, smooth, and aestheticaly pleasing. Impact on Performance Indicators Current Performance Indicator: Using the Proposed Performance Indicator: Using the Pavement Management System, rate 95% of city streets at Pavement Management System, rate 95% of city street and a LEVEL C or greater. city parking lots at a LEVEL C or greater. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 143,100 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $143,100 Explanation of Savings/Revenues Explanation of Costs 18,910 square yards (10%) of resurface annually = $79,470; Concrete maintenance and repair = $24,000; Street sweeping = $17,280; Pot -hole patching = $20,350; and Pavement marking replacement = $2,000. This service level adjustment is being driven by city council policy. Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I x I City Rank Department Rank Division Rank DEPARTMENT/DIVISION: 4431 Public Services TOTAL THIS REQUEST: $10.000 ACTIVITY CENTER: 632 Streets LESS SAVINGS: 0 PREPARED BY: Eric Ploeaer NET EFFECT ON BUDGET: $10.000 Proposed Project or Program Installation of a handrail for the northwest corner of the Dartmouth/Holleman intersection. Handrail will provide a barrier to the dangerous area above the existing entrance to the box culverts that go under the interseciton. Presently, there is a temporary fence that protects against a fall of approximately 12 ft. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide street maintenance Proposed Service Level: Provide street programs which result in roadways that are safe, in good maintenance programs which result in roadways that are repair, smooth, and aesthetically pleasing. safer, in good repair, smooth, and aesthetically pleasing. Impact on Performance Indicators Current Performance Indicator: Customer Proposed Performance Indicator: This request satisfaction survey results indicate satisfaction rate of 95% would improve safety and appearance. or more with streets maintenance services. Appropriation Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital $10,000 Total $10,000 Explanation of Savings/Revenues Explanation of Costs Capital = Handrail $10,000 19 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Pub Srvc. ACTIVITY CENTER: Streets PREPARED BY: x City Rank Department Rank Division Rank 4431 TOTAL THIS REQUEST: $10.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $10.000 Proposed Project or Program Southgate street sign replacement. Replace the street signs in a portion of the older southgate area with distinctive signage. This request is a result of discussion and revision of the Community Appearance Strategic Issue action plan. Council Ends Statement/issues Council End Statement: 7) Civic Pride. Council Strategic Issue: 5) Community Appearance/Beautification Impact on Service Level Current Service Level: Develop and implement Proposed Service Level: Implement a program to projects associated with assigned strategic issues. directly address strategic issue #5 Community Appearance. Impact on Performance Indicators Current Performance Indicator: Address all Proposed Performance Indicator: Address assigned strategic issues and report on progress quarterly. strategic issue #5 Community Appearance. Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total Request $ 0 10,000 0 0 0 0 $10,000 1 Explanation of Savings/Revenues Explanation of Costs The package provides $10,000 to be used to purchase distinctive signage for the Southgate area. 20 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENT/DIVISION: Parks 53-82 ACTIVITY CENTER: Aauatics 652 PREPARED BY: Eric Ploeaer City Rank Department Rank 1 Division Rank 1 TOTAL THIS REQUEST: $194.000 LESS SAVINGS: $7.190 NET EFFECT ON BUDGET: $186.810 Proposed Project or Program Southwood Pool Renovation - This project was funded in the FY94-95 budget but not completed. This will authorize the funds to carry over to FY95-96. The project design is expected to be complete during FY94/95, with construction carried over to the next year. Council Ends Statementlissues Ends Statement #2 Parks and Recreation. #3 Health and Public Safety. #8 Civic Pride. Impact on Service Level I Current Service Level: Provide safe facilities for Proposed Service Level: No change in service level. aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Operate three Proposed Performance Indicator: No change in public swimming pools on a seasonal basis that provide performance indicator. safe recreation opportunities for 90,000 people annually. Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 I Capital Total Explanation of Savings/Revenues Request Maintenance cost reduction = $5,000/year Water cost reduction = $2,190/year (5000) 194,000 (2,190) $186,810 Explanation of Costs The project is to correct pool leaks (2 gal/hr), repair gutters, possibly install pool liner, repair of the mechanical system and repair all pool decks. Originally, $219, 000 was budgeted. Fees expended from the FY94/95 budget are expected to be $25,000 leaving $194,000 for construction in FY95/96. 21 Service Level Adjustment Increased Service Level f Decreased Service Level Maintenance of Service Level X DEPARTMENT/DIVISION: Parks 53-82 ACTIVITY CENTER: 652 Aauatics PREPARED BY: David Gerlina City Rank Department Rank 2�_ Division Rank 2__ TOTAL THIS REQUEST: $25.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $25,000 Proposed Project or Program Architectural/Engineering Fees for Adamson Lagoon Repair - These funds will be used to have an engineer/architect explore and study deficiencies at Adamson Lagoon. He will be instructed to consider filtering system, sinking decks, lighting, ADA requirements, pool shell integrity and State of Texas Inspection citations of 5/25/95. Council Ends Statement/Issues Ends Statement #2 Parks and Recreation. #3 Health and Public Safety. #8 Civic Pride. Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: No change in service level. aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Operate three Proposed Performance Indicator: No change in public swimming pools on a seasonal basis that provide performance measure. safe recreation opportunities for 90,000 people annually. Appropriation 1 Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services $25,000 5000 Property Services 6000 Other Services 7000 Capital Total $25,000 J Explanation of Savings/Revenues No savings up front. Only in the increased longevity of the facility and length of the facility and length of closure due to State citations. Explanation of Costs Architectural/Engineering Fees - $25,000 22 Service Level Adjustment Increased Service Level Decreased Service Level I Maintenance of Service Level X DEPARTMENT/DIVISION: Parks 53-82 ACTIVITY CENTER: Aauatics 652 PREPARED BY: David Gerlina Aquatics Seasonal Pay Increase City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Council Ends Statement/issues Ends Statements #2 Parks and Recreation. #3 Health and Public Safety. #8 Quality Service. K, 3 $38.661 $34.410 $4,,241 Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: No change in service level. aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Operate three Proposed Performance Indicator: Operate three public swimming pools on a seasonal basis that provide public swimming pools on a seasonal basis that provide safe safe recreation opportunities for 90,000 people annually. recreation opportunities for 90,000 people annually. Appropriation Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits $38,651 Approximately $34,400 can be generated by increasing 2000 Supplies pool use fees by $0.25 at Thomas and Southwood and 3000 Maintenance $0.50 at Adamson Lagoon, if this package is approved. 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital "Total $38,651 Explanation of Costs This package will increase the hourly rate of pay for cashiers from $4.40/hr to $5.00/hr. Lifeguards from $4.65 per hour to $5.50 per hour, and managers from $5.50 per hour to $7.00 per hour. Currently, we are having difficulty keeping qualified (E&A certified) guards. 23 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I X DEPARTMENT/DIVISION: Parks 53-82 ACTIVITY CENTER: Lincoln Center 654 PREPARED BY: David Gerlina City Rank Department Rank 4 Division Rank 4 TOTAL THIS REQUEST: $55.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $55.000 Proposed Project or Program Resurface/Replace Lincoln Center gym floor - The gymnasium floor is the original covering put in place 1985. Over that period, the flooring has become worn and the non-skid surface has become slick. Council Ends Statement/Issues Ends Statements #2 Parks and Recreation, #3 Health and Public Safety. Strategic Issue #18 - Youth at risk. Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: No change in service level. aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Provide one Proposed Performance Indicator: No change in recreation center for youth and adult activities that is open a performance level. minimum of 303 days per year. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services $55,000 5000 Property Services 6000 Other Services 7000 Capital Total $55,000 None Explanation of Savings/Revenues Explanation of Costs These funds will allow the contractor to remove, prepare, and apply a new flooring comparable to the current flooring. 24 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank 5 Maintenance of Service Level I X Division Rank 1 DEPARTMENT/DIVISION: Parks 53-83 TOTAL THIS REQUEST: SM500 ACTIVITY CENTER: South Dist. 667 LESS SAVINGS: 0 PREPARED BY: Eric Ploeaer NET EFFECT ON BUDGET: $19.500 Proposed Project or Program Brothers Pond Park - This package is for the replacement of Brothers Park's playground equipment. This playground is an older style that contains wood parts that are no longer used by the Parks Department. Playground is requiring increased maintenance to maintain safety. Installation date: 1983. Council Ends Statement/issues Ends Statements #2 Parks & Recreation. #3 Health and Public Safety. #8 Civic Pride. Impact on Service Level Current Service Level: Provide effective Proposed Service Level: No change. maintenance, mowing and safety inspection activities for 27 parks throughout the year. Impact on Performance Indicators Current Performance Indicator: Inspect 32 play Proposed Performance Indicator: No change. units on a monthly basis, 384 inspections annually. Appropriation Category Description Request 1000 Salaries & Benefits None. 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital $19,500 Total $19,500 Explanation of Savings/Revenues Explanation of Costs This cost includes addition of recycled rubber to the gravel cushion material to provide safety. Replacement of several other similar wood playgrounds will be requested in future years as the units are of similar construction and age. 25 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 63-83 ACTIVITY CENTER: 656 PREPARED BY: Eric Ploeaer City Rank Department Rank I X I Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Central Park Softball Field Irrigation System Replacement Council Ends Statement/Issues Ends Statements #2 Parks and Recreation. #3 Health and Public Safety. #5 Quality Service. Impact on Service Level Current Service Level: Supervise and provide Proposed Service Level: No change. landscape maintenance activities for parks, municipal grounds, and public facilities. 9 $24.000 2.000 $22.000 Impact on Performance Indicators Current Performance Indicator: Provide irrigation Proposed Performance Indicator: No change. system maintenance for all city parks, public buildings, and The use of the softball fields may be impaired due to faulty municipal grounds to ensure that all systems are irrigation systems. operational 90% of the time. Appropriation Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits Less labor for irrigation repair will be needed and parts 2000 Supplies will be interchangeable with our more up-to-date systems. 3000 Maintenance This will be an ongoing project to replace the aging 4000 Professional Services 2,000 hydraulic systems. Approximately $2,000 is spent on 6000 Property Services repair parts for these fields. Also, the new type of 6000 Other Services sprinkler heads cost $30 to replace versus $100 for the 7000 Capital 22,000 existing units. Total $24,000 Explanation of Costs This package is for the replacement of the Central Park softball field irrigation system. This package is for parts and trencher rental only. The PARD irrigation crew will complete the installation. The old system is a hydraulically controlled unit that is prone to malfunction and parts are difficult to obtain. All new systems are the more reliable low voltage electrically controlled type. Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 63-81 ACTIVITY CENTER: 643 PREPARED BY: Linda Waltman City Rank Department Rank I X ( Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Scoreboards at Central Park and Bee Creek softball fields. Council Ends Statement/Issues Ends Statements #2 Parks and Recreation #3 Health and Public Safety #5 Quality Service Impact on Service Level Current Service Level: Provide a variety of special Proposed Service Level: No change. events for local citizens and to attract visitors to the community. 10 1 $16.400 2,600 $13.900 Impact on Performance Indicators Current Performance Indicator: Host a minimum Proposed Performance Indicator: Continue to host of two state or nationally sanctioned athletic tournaments a minimum of two state or nationally sanctioned athletic annually that provide an economic impact of $2,000,000 or tournaments annually. greater. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital $16,400 Total $16,400 Explanation of Savings/Revenues Advertising space can be sold for each scoreboard on an annual basis to recover costs. The four scoreboards at Central Park could recover approximately $500 each and the two at Bee Creek approximately $250 each. This will allow for a recovery of all costs within seven years. The scoreboards should have a life expectancy of ten years or more. Also, the economic impact from these tournaments will be lost resulting in a decline in hotel/motel revenues if we do not install scoreboards.. Explanation of Costs Purchase and installation of four new scoreboards for Central Park Softball Complex and installation of two renovated scoreboards at Bee Creek Softball Fields. Four old scoreboards were removed from the Little League complex at Southwood Athletic Park and parts will be utilizied to make two working scoreboards for Bee Creek Park. 27 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Parks 53-84 ACTIVITY CENTER: Cemetery 649 PREPARED BY: Ross Albrecht City Rank Department Rank 11 Division Rank 2 TOTAL THIS REQUEST: $17.575 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $17,575 Proposed Project or Program The cemetery committee has developed a master landscape plan that encompasses city landscape efforts and memorial plantings. The plan provides planters and trees in various areas. Council Ends Statement/Issues Ends Statement #8 - Civic pride Strategic Issue # 5 - Community appearance Impact on Service Level Current Service Level: Supervise and provide Proposed Service Level: Supervise and provide landscape maintenance activities for parks, municipal increased landscape maintenance activities for parks, grounds, and public facilities. municipal grounds, and public facilities. Impact on Performance Indicators Current Performance Indicator: Provide for the Proposed Performance Indicator: No change. operation and maintenance of one municipal cemetery. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital $17,575 Total $17,575 Explanation of Savings/Revenues Explanation of Costs This request will fund: 2 planters in section k, seating area with 4 planters in section O, shade trees in sections J,K, and A, and screening in section A. Installation - $9,375 (This could be done by forestry division); Plants & materials - $8,200 Maintenance will be done by the on -site staff and is not expected to adversely impact their current operations due to the size and nature of this project. rs Service Level Adjustment Increased Service Level I x I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Parks 53-81 & 82 ACTIVITY CENTER: Aauat. & Instruction PREPARED BY: Linda Waltman City Rank Department Rank 1 2— Division Rank 2 TOTAL THIS REQUEST: $80,527 LESS SAVINGS: Revenues ($60.536), NET EFFECT ON BUDGET: $19.991 Proposed Project or Program To manage and offer a wide variety of instructional aquatic programs at the CSISD Jr. High School Natatorium on a year- round basis. Council Ends Statement/issues Ends Statements #2 Parks and Recreation Strategic Issues - #18 Youth at risk #3 Health and Public Safety #15 Intergovernmental relations #22 Recreational programs for youth Impact on Service Level Current Service Level: Provide a variety of youth Proposed Service Level: Provide public operation of and adult leisure programs that meet the needs of our CSISD natatorium year round and three pools from May citizerns. Provide safe facilities for aquatic, recreational, through August and educational activities to meet the needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Provide a Proposed Performance Indicator: Serve a minimum of fifteen recreation programs to meet the minimum of 100,000 customers annually. participant demand levels on an annual basis. Operate Generate a minimum of $124,000 in pool revenue annually. three public swimming pools on a seasonal basis that provide safe recreation opportunities for 90,000 people annually. Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total Explanation of Savings/Revenues Request Revenue $79,027 Public swim- $24,000 Lessons- $5,500 Swim team- $1,000 CSISD-$30,036 (reimbursement for life guards) The additional revenue that would result from this request $1,500 is $60,536. Total revenue from the natatorium is estimated to be $108,000. $80,527 Explanation of Costs The city would take care of daily operations(cashiers, maintain chemical levels, guarding and scheduling). CSISD would pay for chemicals, utilities, etc. and life guards during class time. Life guards - $42,435 Audit Fee $1,600 Instructors $36,592 It is the current policy of the City of College Station to subsidize youth athletic activities. It is estimated that the Natatorium will be utilized by 80% youth and 20% adult populations. 29 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 53-82 ACTIVITY CENTER: 655 PREPARED BY: David Gerlina City Rank X Department Rank 13 Division Rank 6 I I TOTAL THIS REQUEST: 0 LESS SAVINGS: ($37,212) NET EFFECT ON BUDGET: ($37.2121 Proposed Project or Program Parks proposes that the Teen Center be closed. It currently only supports about 50 households or 60 kids. the PARD 1 believes the funds ($37,212) would be better spent at Lincoln Center and on other programs. Alternatives are presented in 4 separate Service Level Adjustments and 1 from the Police Department. Council Ends Statement/Issues Ends Statements #3 Health and Public Safety Strategic Issues #18 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: This service level would be aquatic, recreational, and educational activities to meet the eliminated. needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Provide one Proposed Performance Indicator: All associated recreation center for youth and adult activities that is open a performance indicators would be eliminated. minimum of 303 days per year. Appropriation Category Description 1000 2000 3000 4000 5000 6000 Salaries &Benefits Supplies Maintenance Professional Services Property Services Other Services Total Capital Request (26,862) (1,986) (1,139) (1,290) (4,953) (1,992) (37,212) 1 Explanation of Savings/Revenues PARD staff has recommended closing the Teen Center. FY96 budget savings are $37,212. The building would be used for PARD storage. Explanation of Costs Entire Teen Center budget would be eliminated. 30 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level X City Rank p Department Rank 14 Division Rank 6 DEPARTMENT/DIVISION: 53-82 TOTAL THIS REQUEST: $Z&O ACTIVITY CENTER: 654 LESS SAVINGS: PREPARED BY: David Gerlina NET EFFECT ON BUDGET: $2,000 Proposed Project or Program Lincoln Center citizens survey to determine effectiveness of existing programs and needs assessment for new services. Council Ends Statement/issues Ends Statements #3 Health and Public Safety Strategic Issues #18 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: Provide safe facilities for aquatic, recreational, and educational activities to meet the aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. identified needs of local citizens and visitors to our community. Impact on Performance Indicators Current Performance Indicator: Provide one Proposed Performance Indicator: Provide one recreation center for youth and adult activities to meet the recreation center for youth and adult activities that better needs of local citizens and visitors to our community. meets the identified needs of local citizens and visitors to our community. Appropriation Explanation of Savings/Revenues Category Description Request Use of volunteer organizations is more cost effective than 1000 Salaries & Benefits paid employees. 2000 Supplies $1,500 3000 Maintenance 4000 Professional Services 500 5000 Property Services 6000 Other Services 7000 Capital Total $2,000 Explanation of Costs Survey supplies = $1,500 Volunteer organizations = $500 This would be donated to an a volunteer organization that helps distribute the survey. 31 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level City Rank Department Rank 16 Division Rank DEPARTMENT/DIVISION: 53-82 Parks TOTAL THIS REQUEST: $23.510 .ACTIVITY CENTER: 654 Coln Center LESS SAVINGS: PREPARED BY: David Gerlina NET EFFECT ON BUDGET: $23,510 Proposed Project or Program Lincoln Center extended hours -- center would be open weekends and 1.5 hours longer on week days thereby providing a safe environment for recreational activities on weekends and evenings. Council Ends Statement/Issues Ends Statements #3 Health and Public Safety Strategic Issues #18 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: Provide safe facilities for aquatic, recreational, and educational activities to meet the aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. needs of local citizens and visitors to our community for a longer period of time. Impact on Performance Indicators 'Current Performance Indicator: Provide one Proposed Performance Indicator: Provide one recreation center for youth and adult activities that is open a recreation center for youth and adult activities that is open a minimum of 303 days per year. minimum of 360 days per year. Appropriation Category Description Request 1000 Salaries & Benefits $23,510 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $23,510 None Explanation of Savings/Revenues Explanation of Costs Temp./seasonal salaries = 27.5 hours per week x 3 staff x 52 weeks x $5/hour = $21,450 FICA, WC, LIE = $2,060 32 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank 16 Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 53-82 Parks TOTAL THIS REQUEST: $2,100 ACTIVITY CENTER: 652 Aauatics LESS SAVINGS: PREPARED BY: David Gerlina NET EFFECT ON BUDGET: $2,100 Proposed Project or Program Provide three family nights at Adamson Lagoon each summer. This will add to the activities available for local residents during the summer months. Council Ends Statement/Issues Ends Statements #3 Health and Public Safety Strategic Issues #18 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Je a variety of special Proposed Service Level: Provide a greater variety activities and public services a..• facilities for local of special activities and public services at park facilities for residents. local residents. Impact on Performance Indicators Current Performance Indicator: Provide a Proposed Performance Indicator: Provide a minimum of ten special recreation and educational activities minimum of 13 special recreation and educational activities for local residents annually. for local residents annually. Appropriation Category Description Request None 1000 Salaries & Benefits 1,500 2000 Supplies 3000 Maintenance 4000 Professional Services 600 5000 Property Services 6000 Other Services 7000 Capital Total $2,100 Explanation of Savings/Revenues Explanation of Costs Temp./seasonal salaries & benefits = $1,500 for lifeguards Disk -jockey = $600 00 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 53-80 Parks TOTAL THIS REQUEST: ACTIVITY CENTER: 642 Emera. Ma_ mt LESS SAVINGS: PREPARED BY: David Gerlina NET EFFECT ON BUDGET: Proposed Project or Program Boy scout program with emergency management emphasis (Explorer Post) for youth ages 14-20. Council -Ends Statement/Issues Ends Statements #3 Health and Public Safety Strategic Issues #18 Youth at risk #5 Quality Service #22 Recreation programs for youth Impact on Service Level Current Service Level: Provide effective emergency Proposed Service Level: Provide effective planning preparedness and disaster response services for emergency planning preparedness and disaster response the citizens of College Station. services for the citizens and youth of College Station. Impact on Performance Indicators Current Performance Indicator: Participate in a Proposed Performance Indicator: No change minimum of one interjurisdictional training exercise annually. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 1,000 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7060 Capital Total $1,000 Explanation of Savings/Revenues I _ Explanation of Costs supplies = $1,000 This will provide for minor equipment, clothing, and supplies to conduct meetings and special events throughout the year. 34 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 6384 Parks ACTIVITY CENTER: 648 WPC PREPARED BY: Eric Ploeaer City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Installation of a planter for the northwest corner of the Dartmouth/Holleman intersection. Council Ends Statement/issues Ends Statement #2: Parks and Recreation. Ends Statement #5: Quality Service at a reasonable cost. 18 $10.000 0 $10.000 Impact on Service Level Current Service Level: Supervise and provide Proposed Service Level: Supervise and provide landscape maintenance activities for parks, municipal landscape maintenance activities for parks, municipal grounds, and public facilities. grounds, and public facilities Including the northwest corner of the Dartmouth/Holleman intersection. Impact on Performance Indicators Current Performance Indicator: Provide Proposed Performance Indicator: Provide horticultural and forestry services for all city parks, public horticultural and forestry services for all city parks, public buildings, and municipal grounds. buildings, and municipal grounds including the northwest corner of the Dartmouth/Holleman intersection. Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total Capital = Planter $10,000 Request $10,000 $10,000 None. Explanation of Savings/Revenues Explanation of Costs 35 Service Level Adjustment Increased Service Levei Decreased Service Level Maintenance of Service Level x DEPARTMENT/DIVISION: Dev Srvc 4362 ACTIVITY CENTER: Plannina_ 577 PREPARED BY: T. McDaniel City Rank Department Rank 3 Division Rank 1 TOTAL THIS REQUEST: $5.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $5.000 Proposed Project or Program Print and distribute copies of the completed Comprehensive Plan. It is the departments policy to provide updates to meet all requests and to replace earlier versions for those people who have purchased previous editions of documents. This will be a one time expense. Council Ends Statement/issues Council End Statements: 1) Transportation/Mobility; 3) Health and Public Safety; 5) Quality of service delivered at a reasonable tax rate; 7) Civic Pride. ( Impact on Service Level Current Service Level: Maintain, monitor & Proposed Service Level: No change in service level. implement the city's comprehensive planning program. Impact on Performance Indicators Current Performance Indicator: oversee Proposed Performance Indicator: No change in completion of HOK contact by 1995 year end. indicator. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 I 5000 Property Services 0 i 6000 Other Services 5,000 7000 Capital 0 Total $5,000 J Explanation of Savings/Revenues Explanation of Costs The package provides for printing and distribution of the final updated version of the comprehensive plan as adopted by the city council. 36 Service Level Adjustment Increased Service Level x City Rank Decreased Service Level Department Rank 4 Maintenance of Service Level Division Rank 2 DEPARTMENT/DIVISION: Dev Svcs 4362 TOTAL THIS REQUEST: $10.000 ACTIVITY CENTER: Plannina_ 577 LESS SAVINGS: 0 PREPARED BY: T. McDaniel NET EFFECT ON BUDGET: $1Q4000 Proposed Project or Program Pilot program to place banners on entrances into the city. The project is planned for the area of University Drive between Texas Ave. and the Hwy. 6 Bypass. This was recommended by the community appearance committee. The pilot program was originally considered for the Northgate area but it was determined that it would be more prudent to wait on the nit of +ho hlnrthea+o c+i ir4% hri fnr&4nlaninc honncra in +hat arcs Council Ends Statement/Issues Council End Statement 5) Quality of service delivered at a reasonable tax rate and 7): Civic Pride; Strategic Issue 5: Community Appearance. Impact on Service Level Current Service Level: Project development/ Proposed Service Level: Implement a program to implementation/management associated with the strategic directly address Council Strategic Issue #5 Community issues. Appearance. Impact on Performance Indicators Current Performance Indicator: Address all Proposed Performance Indicator: Address assigned City Council Strategic Issues and report on Council Strategic Issue #5 Community Appearance. progress quarterly. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 10,000 3000 Maintenance 0 4000 Professional Services 0 6000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $10,000 Explanation of Savings/Revenues Explanation of Costs The package will provide for the purchase and installation of banners along University Drive between Texas and the Hwy. 6 Bypass (10,000). 37 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: pev Srvc. 4362 ACTIVITY CENTER: Plannina_ 577 PREPARED BY: T. McDaniel City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: I Proposed Project or Program I Landscape Incentive Pilot Program to encourage businesses to upgrade landscaping around their buildings. Council Ends Statement/Issues II Council End Statement: 7) Civic Pride. ! Council Strategic Issue: 5) Community Appearance/Beautification $10.000 0 $10.000 Impact on Service Level Current Service Level: Develop and implement Proposed Service Level: Implement a program to projects associated with assigned strategic issues. directly address strategic issue #5 Community Appearance. Impact on Performance Indicators Current Performance Indicator: Address all Proposed Performance Indicator: Address assigned strategic issues and report on progress quarterly. strategic issue #5 Community Appearance. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 10,000 7000 Capital 0 Total $10,000 Bring 10 commercial sites up to a higher standard of landscaping. Explanation of Savings/Revenues Explanation of Costs The package provides $10,000 to be used as matching funding to encourage business owners to improve the landscaping around their buildings. The program as envisioned is anticipated to match up to $1,000 per business. KM Service Level Adjustment Increased Service Level I x I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Dev Srvcs 4362 ACTIVITY CENTER: Com Dev 679 PREPARED BY: T. McDaniel City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Testing of paint in existing structures for lead as required by new federal and state mandates. $10.000 10.000 $ 0 Council Ends Statement/Issues Council End Statements: 3) Health and Public Safety; 5) Quality of service delivered at a reasonable tax rate. 7) Civic Pride; Strategic Issue: 5) Community Appearance. Impact on Service Level Current Service Level: Improve the condition of the Proposed Service Level: Improve the condition of existing housing within the city for low and moderate the existing housing within the city for low and moderate income residents. income residents. Impact on Performance Indicators Current Performance Indicator: 1. Rehabilitate or Proposed Performance Indicator: 1. Rehabilitate replace 25 dwelling units. 2. Demolish 10% of dilapidated or replace 25 dwelling units. 2. Demolish 10% of residential structures annually and meet current federal and dilapidated residential structures annually and meet new state requirements. federal and state requirements. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $10,000 Explanation of Savings/Revenues The block grant will cover the cost of purchasing, operating and maintaining the equipment ($10,000). Explanation of Costs The package provides for the purchase of an X-ray Florescence lead based paint analyzer to test for lead in existing paint, ($10,000). City is training an employee to utilize the equipment and to do the tests. 39 Service Level Adjustment ncreased Service Level x )ecreased Service Level Maintenance of Service Level )EPARTMENT/DIVISION: Mat Svcs 6019 %CTIVITY CENTER: ]Facilibi Maint 667 'REPARED BY: C. Shear City Rank Department Rank 2 Division Rank 1 TOTAL THIS REQUEST: $50.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $50.000 Proposed Project or Program '3rovide an additional $50,000 annually for building maintenance in order to add parks buildings to the city's facilities maintenance program that will maintain roofs, heating and air conditioning and other ongoing maintenance items. Council Ends Statement/Issues =nds Statement 2: Citizens benefit from parks and recreational activities that are geographically and demographically accessible and serve a diversity of interests. Ends Statement5: Citizens benefit from value and quality of service Delivered at a reasonable tax rate. Impact on Service Level Current Service Level: Maintain a clean, safe, Proposed Service Level: Extend the service level to aesthetically pleasing working environment for city include parks departments buildings. ,mployees, customers, and citizens. Impact on Performance Indicators Current Performance Indicator: Complete 80% of Proposed Performance Indicator: Extend the maintenance projects within two months. performance indicator to include the parks department buildings. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 3000 Maintenance 50,000 4000 Professional Services ' 0 6000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $50,000 Explanation of Savings/Revenues Explanation of Costs Estimated increase is based upon the anticipated life of various portions of building maintained by facilities maintenance and the cost to replace the systems when necessary. The additional $50,000 brings the annual budget for major maintenance items to $250,000 that is dedicated for the stated purposes of replacing or repairing as is most cost effective all roofs, heating and air conditioning, security and alarm systems, exterior painting, flooring and various pumps. Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I x I DEPARTMENT/DIVISION: Mat. Svcs. 6016. ACTIVITY CENTER: PR/Mrkta_. 662 PREPARED BY: P. Calliham City Rank Department Rank 5 Division Rank 1 TOTAL THIS REQUEST: $6.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $6.000 Proposed Project or Program Provide resources to do periodic mailouts using the new utility bill mailers. It is estimated that printing costs will be $1,000 for each mailer. PR anticipates covering 1/2 of the annual costs and that departments using the mailer will pay the other half of the costs from existing resources. Council Ends Statement/issues Ends Statement 4: Citizens benefit from access to broad -based information and knowledge. Ends Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Impact on Service Level Current Service Level: Reach a majority of all Proposed Service Level: Reach a larger majority of College Station households with factual, timely, cost- all College Station households with factual, timely, cost- effective city information. effective city information. Impact on Performance Indicators Current Performance Indicator: Provide Proposed Performance Indicator: Provide information through different media formats on a weekly information through different media formats including basis (print, television, and radio). 22,000 utility bill stuffers monthly. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 6000 Property Services 0 6000 Other Services 6,000 7000 Capital 0 Total $6,000 Explanation of Savings/Revenues Explanation of Costs Provide the funding for printing of at least one-half (1/2) of the anticipated mail stuffers to be included with the utility bills in the envelopes. The balance of the cost will be paid by departments as they use the stuffers to disseminate information. 41 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Mat. Svcs. 6026 ACTIVITY CENTER: MIS 674 PREPARED BY: N. Bauer City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: 8 r $33.516 0 $33.516 Proposed Project or Program Provide for the purchase of software and hardware to be used to connect the City of College Station network to the internet through TAMU. Council Ends Statement/issues End Statement: 5) Citizens benefit from value and quality of service delivered at a reasonable tax rate. Council Issues: 13) Electronic access to city services; 5) Intergovernmental cooperation; and 7) Library planning Impact on Service Level Current Service Level: Provide professional and Proposed Service Level: Provide more professional helpful service to city end users. and helpful service to city end users. Impact on Performance Indicators Current Performance Indicator: No current Proposed Performance Indicator: Extend the performance indicator for the function this software would city's network to include access to the internet through provide. TAMU's hub. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 3,516 7000 Capital 30,000 Total $33,516 Explanation of Savings/Revenues Explanation of Costs The package includes the purchase of improved e-mail and calandering, other software ($10,000), hardware ($20,000); telephone connection and monthly fee (2,236), and payment to TAMU (1,280) for access through their hub to provide connectivity through the city's network to the internet. 42 Service Level Adjustment Increased Service Level I x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Mat. Svcs. 6016 ACTIVITY CENTER: PR/Mrkta. 662 PREPARED BY: P. Calliham City Rank Department Rank 9 Division Rank 3 TOTAL THIS REQUEST: $80.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $80.000 Proposed Project or Program Provide for the purchase and installation of two kiosks to provide an electronic city hall at locations where they could be accessed by all citizens. Council Ends Statement/Issues Ends Statements: 4) Education/Information; 5: Quality Service Strategic Issue: 13) Electronic access to city services and 43) Kiosks at mall with city information Impact on Service Level Current Service Level: Reach a majority of College Proposed Service Level: Reach a greater majority Station households with factual, timely and cost-effective of College Station households with factual, timely, cost - information. effective city information. Impact on Performance Indicators Current Performance Indicator: Provide weekly Proposed Performance Indicator: Provide weekly information through the use of different media formats. information through the use of different media formats including electronic city hall. Appropriation Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 7,000 3000 Maintenance 9,000 4000 Professional Services 0 6000 Property Services 12,600 6000 Other Services 3,400 7000 Capital 48,000 Total $80,000 Explanation of Costs The package includes the purchase of two kiosks to act as a 24 hour city hall at locations outside of the actual city hall. The purchase include kiosks with multi media computers, touch screen monitors, modems, printers and cabinets ($32,000); two additional modems connecting the kiosks to the city's network ($1000), a CDROM writing system ($7,000); software ($16,000); high speed data lines ($10,600); space rental ($2,000); maintenance agreements for the equipment and software ($9,000); training to use the system ($3,400), and supplies for the systems ($7,000). 43 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Mat. Svcs. 6016 ACTIVITY CENTER: PR/Mrkta_ 662 PREPARED BY: P. Calliham City Rank Department Rank 10 Division Rank 2 TOTAL THIS REQUEST: $239.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $239.000 Proposed Project or Program Provide for televised access to city hall via cable and add capability to do in-house televised programming. Council Ends Statement/issues Council End Statement 4: Citizens benefit from access to broad -based information and knowledge. Council End Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Council Issue 13: Electronic access to city services. Impact on Service Level Current Service Level: Reach a majority of College Proposed Service Level: Reach a larger Station households with factual, timely and cost-effective percentage of College Station households with factual, information. timely and cost-effective information. Impact on Performance Indicators 1 Current Performance Indicator: Provide weekly Proposed Performance Indicator: Provide information through the use of different media formats. immediate access to city services through the local cable system. Appropriation Category Description Request 1000 Salaries & Benefits $44,600 2000 Supplies 15,000 3000 Maintenance 5,500 4000 Professional Services 0 5000 Property Services 24,000 6000 Other Services 0 7000 Capital 150,000 Total $239,000 Explanation of Savings/Revenues Explanation of Costs The package includes two (2) new positions ($44,500); the purchase of video taping and editing equipment ($150,000); supplies and maintenance to meet the needs of the new activity ($20,500) and rental of space outside of city hall to house the operation ($24,000). Ell Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 3021 ACTIVITY CENTER: 523 PREPARED BY: K. Hubbard City Rank Department Rank 1 X Division Rank 2 TOTAL THIS REQUEST: $9.675 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $9.675 Proposed Project or Program Increase in fees paid to the Brazos County Appraisal District, calculated based on the amount of Ad Valorem taxes collected. Council Ends Statementlissues Ends Statement #4: Education/Information. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Process and record all Proposed Service Level: No change in service level. financial transactions in an accurate, efficient, and timely manner. Impact on Performance Indicators Current Performance Indicator: Achieve Proposed Performance Indicator: No change in satisfaction level of at least 80% from internal and external performance indicator. customers on annual survey. Appropriation Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 9,675 5000 Property Services 6000 Other Services 7000 Capital Explanation of Savings/Revenues Total $9,675 Explanation of Costs Amount budgeted for FY95 was $68,648, Actual expenditures for FY95 will be $73,025. Based on a 2% increase over the FY95 amount, a $6,460 increase is requested. 45 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank DEPARTMENT/DIVISION: 3021 TOTAL THIS REQUEST: ACTIVITY CENTER: 523 LESS SAVINGS: PREPARED BY: K. Hubbard NET EFFECT ON BUDGET: Proposed Project or Program Increase in Bank Service Charges for First American due to increased activity and bank fees. Council Ends Statement/Issues Ends Statement #4: Education/Information. Ends Statement #5: Quality Service at a reasonable cost. 2 3 $2.200 0 $2.200 Impact on Service Level Current Service Level: Process and record all Proposed Service Level: No change in service level. financial transactions in an accurate, efficient, and timely manner. _ Impact on Performance Indicators Current Performance Indicator: Achieve at least Proposed Performance Indicator: No change in an 80% approval rating on annual customer survey. performance indicator. Appropriation . Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance _ 4000 Professional Services _ 5000 Property Services 6000 Other Services $2,200 7000 Capital Total + $2,200 None. Explanation of Savings/Revenues Explanation of Costs Amount budgeted in FY95 was $35,000. Projected actual expenditures for FY95 are $36,112. Therefore, an increase of $2,200 is requested. 46 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank 3 Maintenance of Service Level X Division Rank 1 DEPARTMENT/DIVISION: 3021 TOTAL THIS REQUEST: $4.088 ACTIVITY CENTER: 523 LESS SAVINGS: PREPARED BY: K. Hubbard NET EFFECT ON BUDGET: $4.088 Proposed Project or Program Current year expenditures show a need to increase the amount budgeted for collection agency fees due to increased collection activity. Projected expenditures for FY95 = $18,738 ($4,686 over budget). Under our contract with the collection agency, for every dollar paid to the collection agency, the city receives 2 dollars. Therefore, it is cost effective to increase the budget for these fees. Council Ends Statement/issues Education/Information. Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Process and record all Proposed Service Level: No change in service level. financial transactions in an accurate, efficient, and timely manner. Impact on Performance Indicators Current Performance Indicator: Achieve Proposed Performance Indicator: No change in satisfaction level of at least 80% from internal and external performance indicator. customers on annual survey. Appropriation Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 4,088 5000 Property Services 6000 Other Services 7000 Capital Explanation of Savings/Revenues Total $4,088 Explanation of Costs Professional Services = increase in collection agency fees. 47 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 3012 F/HR ACTIVITY CENTER: 521 Human Resources PREPARED BY: K. Pavlinski City Rank Department Rank 4 Division Rank 1 TOTAL THIS REQUEST: $30.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $30.000 Proposed Project or Program Performance Appraisal - in order to have a performance appraisal system that meets organizational need for performance measurement standards and instruments of that appraisal, it is necessary to revise the entire performance evaluation system. Outside assistance is needed to do a comphrehensive review in a timely manner. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide and maintain a Proposed Service Level: Provide and maintain a competitive benefit and compensation plan designed to competitive benefit and compensation plan designed to attract and retain quality employees. And provide tools to attract and retain quality employees. And provide more adequately assess employee performance. tools to adequately assess employee performance. Impact on Performance Indicators Current Performance Indicator: None. Proposed Performance Indicator: Provide tool to ensure that performance appraisal system compares employees performance to council desired service level/performance measures 98% of the time. Appropriation Category description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 30,000 5000 Property Services 6000 Other Services 7000 Capital Total $30,000 None. Explanation of Savings/Revenues Explanation of Costs Professional Services = fee to outside agency to do comprehensive review of the city's performance appraisal system. Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 3021 F/HR ACTIVITY CENTER: 523 Accountina_ PREPARED BY: K. Hubbard City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: 5 4 $35.000 $35.000 Proposed Project or Program Our external auditors have included in their Report to Management a comment concerning the lack of detailed records for the city's general fixed assets. Because staff does not have the expertise to perform the asset valuation, the Accounting Division requests that trained individuals be hired to conduct the inventory and asset valuation. Council Ends Statement/Issues Ends Statement #4: Education/Information. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Process and record all Proposed Service Level: Process and record all financial transactions in an accurate, efficient, and timely financial transactions in an accurate, efficient, and timely manner. Provide useful and up-to-date information to manner. Provide more useful and up-to-date information to internal and external customers. internal and external customers. Impact on Performance Indicators Current Performance Indicator: Able to provide Proposed Performance Indicator: Able to provide needed information to users 90% of the time. needed information to users 95% of the time. Appropriation Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 35,000 7000 Capital Total $35,000 Explanation of Savings/Revenues Explanation of Costs Other Services = fee to outside agency to conduct asset valuation and inventory. Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Gen Govt. 1001 ACTIVITY CENTER: Council Office 501 PREPARED BY: N. Bauer City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Provide laptop computers for the city council and access to the city's network system. (Alternative A) 1a 1 $41,,230 1.000 $40.230 Council Ends Statement/Issues Council End Statement 4: Citizens benefit from access to broad -based information and knowledge. Council End Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Council Issue 13: Electronic access to city services. Impact on Service Level Current Service Level: Insure that the agenda Proposed Service Level: Insure that the agenda process is driven by council directions and initiatives. process is driven by council directions and initiatives, and that council has all needed information in a useful and expedient format. Impact on Performance Indicators Current Performance Indicator: None. Proposed Performance Indicator: None Appropriation Explanation of Savings/Revenues Category Description Request Savings occurs in the City Secretary's budget from 1000 Salaries & Benefits $ 0 reduce copier and printing costs for the agendas 2000 Supplies 0 provided for the city council. Total estimated savings 3000 Maintenance 0 is $1,000. 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 40,230 Total $40,230 Explanation of Costs The package includes the purchase of 7 laptops, one for each council person @ $5,442 ea. ($38,094) and software at $448 ea. ($3,136). 0 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Gen Govt 1001 ACTIVITY CENTER: Council Office 501 PREPARED BY: N. Bauer City Rank Department Rank 1 b Division Rank 1 TOTAL THIS REQUEST: $28.034 LESS SAVINGS: 1.000 NET EFFECT ON BUDGET: $27.034 Proposed Project or Program Provide laptop computers for the city council and access to the city's network system. (Alternative B) Council Ends Statement/Issues Council End Statement 4: Citizens benefit from access to broad -based information and knowledge. Council End Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Council Issue 13: Electronic access to city services. Impact on Service Level Current Service Level: Insure that the agenda Proposed Service Level: Insure that the agenda process is driven by council directions and initiatives. process is driven by council directions and initiatives, and that council has all needed information in a useful and expedient format. Impact on Performance Indicators Current Performance Indicator: None. Proposed Performance Indicator: None Appropriation Explanation of Savings/Revenues Category Description Request Savings occurs in the City Secretary's budget from 1000 Salaries & Benefits $ 0 reduce copier and printing costs for the agendas 2000 Supplies 0 provided for the city council. Total estimated savings 3000 Maintenance 0 is $1,000. 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 27,034 Total $27,034 Explanation of Costs The package includes the purchase of 7 laptops, one for each council person @ $3,414 ea. ($23,898) and software at $448 ea. ($3,136). Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Gen Govt. 1001 ACTIVITY CENTER: Council Office 501 PREPARED BY: N. Bauer City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Provide laptop computers for the city council and access to the city's network system. (Alternative C) 51 1c 1 $21.146, 1.000 $20.146 Council Ends Statementlissues Council End Statement 4: Citizens benefit from access to broad -based information and knowledge. Council End Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Council Issue 13: Electronic access to city services. Impact on Service Level Current Service Level: Insure that the agenda Proposed Service Level: Insure that the agenda process is driven by council directions and initiatives. process is driven by council directions and initiatives, and that council has all needed information in a useful and expedient format. Impact on Performance Indicators Current Performance Indicator: None. Proposed Performance Indicator: None , Appropriation Explanation of Savings/Revenues Category Description Request Savings occurs in the City Secretary's budget from 1000 Salaries & Benefits $ 0 reduce copier and printing costs for the agendas 2000 Supplies 0 provided for the city council. Total estimated savings is 3000 Maintenance 0 $1,000. 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 20,146 Total $20,146 Explanation of Costs The package includes the purchase of 7 laptops, one for each council person @ $2,430 each ($17,010) software at $448 ea. ($3,136). 52 Service Level Adjustment Increased Service Level ' City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank 2- DEPARTMENT/DIVISION: Gen. Govt. TOTAL THIS REQUEST: $4.356 ACTIVITY CENTER: Citv Sec. LESS SAVINGS: PREPARED BY: C. Hooks NET EFFECT ON BUDGET: $A,,356 Proposed Project or Program Upgrade of Canon copier model 2020 to Canon model 6650 through a lease program. Current model unable to meet speed and quality demands and requires constant maintenance. Standard lease contract. Council Ends Statement/issues Ends Statement #4 Education/Information. #5 Quality Service. Impact on Service Level Current Service Level: Assist internal and external Proposed Service Level: No change in service level. customers through daily interaction of requests for information (resolutions, ordinances, minutes, publicity, general). Serve as resource for parents and family members to retain certified documents of birth and death records. Impact on Performance Indicators Current Performance Indicator: Staff requests are Proposed Performance Indicator: No change in performed within 3 days of request; Public requests are performance indicator. processed within 3 days of request. 90% of birth certificates are processed within ten minutes of an applicant's request. Appropriation Explanation of Savings/Revenues Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services I $4,356 6000 Other Services i 7000 Capital Total $4,356 Explanation of Costs Lease cost of $363.00/month, or $4,356/year [ON] Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 1013 ACTIVITY CENTER: 503 PREPARED BY: C. Locke City Rank Department Rank I X I Division Rank TOTAL THIS REQUEST: $23.324 LESS SAVINGS: NET EFFECT ON BUDGET: $23.324 Proposed Project or Program This decision package is being submitted in response to the council's request for innovation. In the last coupe of years, it has become increasingly clear that the demands for service have exceeded the current capability of the Legal Department library. In developing a plan, two issues have been addressed. First, the lack of available space; and second, the reduction in services because of the cost of updating existing materials. In the past, the increased cost of basic necessary materials, such as Texas statutes (see attached page) Council Ends Statement/issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide legal services to the Proposed Service Level: This is hopefully a city council and staff to maintain cost efficiencies in possible cost containment measure. protecting the city from threatened or actual litigation and effective legal services. i Impact on Performance Indicators Current Performance Indicator: Ensure that Proposed Performance Indicator: No change in departmental activities are in -line with its stated mission service level. and goals of the city council and city staff. Appropriation Explanation of Savings/Revenues Category Description Request Capital cost would be recovered over three years. 1000 Salaries & Benefits 2000 Supplies 15,002 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 8,322 Total $23,324 Explanation of Costs Amount that it would take to obtain needed support materials & at the same time reduce dependence on Westlaw and Texas A&M: $35,124 (CD-ROM $14,422, Westlaw $6,000, hard copy supplements $5,427, update the McQuillin's Municipal Corporations - a comprehensive treatise that provides nationwide coverage of most areas of municipal law $953, capital cost (CD-ROM hardware) $8,322). From this total, subtract the one-time capital expenditure of $8,322 & the current fiscal year's budget for Educational Office supplies of $12,800 & the result is the amount needed for new supplies. .� 54 and cases, has been offset by reduction in the variety of materials, By way of example, the City's subscription to the MoQuillin's Municipal Law treatises was canceled in the 1992-1993 budget year. This was not a comprehensive approach to handling needed support materials, and when the workload increased, it forced the attomeys to Westlaw or the library at A&M. From a time management standpoint, the latter was as or more expensive as the first. Currently the staff gets onto Westlaw and get the needed information as quickly as possible. This information is sent to the printer and downloaded after Westlaw is exited. In the last year, we tried to compensate and reduce our rising dependence on Westlaw by indexing and computerizing our in-house access to previously retrieved case law, statutes, regulations, and our own previous legal opinions. This has helped to provide a quicker and less expensive starting place to update research where the issue has been visited in the part. It is not anticipated that service demands will go down. if anything, this will probably grow with the new city manager and expanded participation of the City Council. Quite simply, if a council member or staff member desires a service, it will be assigned to an attomey to provide that service. In the 1993-1994 budget year, the department was over budget by $4,384.00. This was for the usage on Westlaw. In the 1994-1995 budget year, the department is anticipated to be over budget by $12,569.94.1 The basic current materials in the library are Texas cases, Texas Statutes, Shepard's Citations, Texas Litigation Guide, Texas Digest and Shepard's case histories. When we evaluated this issue in the past, the purchase of more books was not a viable solution since there is no place to store them. Another problem was that CD-ROM was not widely available, cost effective, or user friendly. Finally, it was discovered that without easy and full access to materials on CD-ROM, what CD -ROM's we had were not completely utilized. In an effort to get control of these rising costs by reducing dependence on Westlaw and the A&M library, the following plan is recommended: 1. Purchases of CD-ROM hardware that will be networked for the attomeys. This cost will be $8,322.00. 2. Take the Shepard's Citations on CD-ROM in 1994-1995. These materials are replaced once every two to three years as a matter of course. The cost of going to CD-ROM is $63.44 more ($3,227.44 verses $3,164.00). 3. Purchases materials on CD-ROM in 1995-1996. The annual update charge is listed as well. Start Up Cost Annual Update Texas Trial Guide $ 157.00 $ 157.00 Q'Case $1,155.00 $ 660.00 Texas Jur. 3rd $2,995.00 $ 700.00 Texas Digest $ 495.00 $ 495.00 Am. Jur. $1,995.00 $ 895.00 5th Cir. $ 995.00 $ 600.00 U.S. Code $ 995.00 $ 780.00 Tex. Statutes $ 750.00 $ 360.002 ADA Regs./dec. $ 995.00 $ 595.00 TX Litigation Guide $1,095.00 $1,095.003 Shepard's ($3,227.44)4 CFR Plus $2,795.00 $2.795.00 $14,422.00 $9,132,00 4. The other aspect of this recommendation would be to continue to take the less voluminous and more topic specific materials in hard copy, such as most treatises. The estimated costs of these materials is $5,623.00. However, $3,200 has been budgeted in the past. The differences in supplement dates makes it hard to predict the total expenditures. By way of example, without any other updates, the cost of the Shepard's update and Texas Litigation Guide came to $4,072.94 in the 1994-1995 budget year.5 5. The Texas Litigation Guide is currently being purchased in hard copy and on CD-ROM for $1,845.00 for annual updates. This is now available on CD-ROM only. The future cost will be $1,095.00 for CD-ROM only. 6. Sell current Texas materials for $1,000. This in tentative. There doesn't seem to be a market because lawyers are going to CD-ROM. 55 7. Update the McQuillin's Municipal Corporations, a comprehensive treatise that provides a nationwide coverage of most area of municipal law. This will cost $953.00 This future cost would be $475. CaWory Expected current Chance vear Subsequent year Year expenditures CD-ROM $ 5,268.946 $14,422.00 $ 9,132.007 Westlaw $14,400.008 $ 6,000.009 $ 6,000.00 Hard copy $ 6,701.0010 $ 5,427.0011 $ 5,427.00 McQuillin's $ 0.00 $ 953.00 $ 953.00 Capital Cost Booksale Totals $ 0.00 $ 0.00 $26,369.9412 Year 1994-1995 1995-1996 1996-1997 $ 8,322.00 ($ 1.000.00) $34,124.00 Budget13 $22,800.0014 $34,124.00 $21,512.00 $ 0.00 $ 0.00 $21,512.00 While there is some savings after the next budget year, it is not tremendous. The following goals are sought to be obtained: The problem with a change is as follows: 1. Reduction of dependence on Westlaw; 1. Significant start-up cost; 2. Address lack of library space and 2. Difficulty in effectively utilizing hard copy CD-ROM hardware at the same time; 3. Difficulty in pinning down cost savings, if any 3. Create a system that is user friendly; 4. Become more efficient with time; and 5. Get control of rising costs. '.The staff preference is to either go CD-ROM as fully as possible or wait and continue as is. When we evaluated this issue in the past, the purchase of more books was not a viable solution since there is no place to store them. Another problem was that CD-ROM was not widely available, cost effective, or user friendly. Finally, it was discovered that without easy and full access to materials on CD-ROM, what CD -ROM's we had were not completely utilized. This assumes CD-ROM purchase for Shepard's. 2 This would provide the Texas Administrative Code also. 3 This a already on CD-ROM. It was our first attempt to move to CD-ROM. 4 Approximate triennial update purchased in 1994-1995. 5 $6,200 was budgeted for all written materials. This is already on CD-ROM. It was our first attempt to move to CD-ROM. 7 This adds one-third of the cost of the Sehpard's update. 8 Actual budget was $12,800.00. 9 Because we don't know for sure, this number is arbitrary. 10 Actual budget was $3,200.00. 11 Material Update Cost: 1. Environmental Compliance Manual $ 80.00 2. Index to Attorney General Opinions $ 15.00 3. Texas Trial Handbook $ 34.00 4. Baylor Law review $ 28.00 5. Texas Courtroom Evidence $ 43.00 6. Texas Municipal Zoning Laws $ 60.00 7. Texas Mechanic's & Materialman's Lien Laws $121.00 8. Search & Seizure Checklist $106.00 9. §1983 in State Litigation $112.00 10. Cable TV Regulations $128.00 11. Police Misconduct $112.00 56 12. Civil Rights $160.00 13. Subdivision taw $425.00 14. Wetlands Regulations $ 91.00 15. Texas Worker's Compensation $ 95.00 16. Condenation $109.00 17. Trial Objections $ 47.00 18. Federal Forms $219.00 19. Legal Directory $ 57.00 20. Texas Environmental Compliance $107.00 21. Secretary's Handbook $ 75.00 22. Police Civil Liability $177.00 23. Federal Tax Guide $ 67.00 24. Southwest Institute $129.00 25. Texas Rules of Evidence $ 51.00 26. Letters of Credit $220.00 27. Employment Screening $138.00 28. Moore's Federal Rules $144.00 29. Construction Litigation $ 24.00 30. Texas Land use Handbook $ 40.00 31. Robert's Rules $130.00 32. Texas Discovery $100.00 33. Federal Discovery $ 90.00 34. Texas Discovery Practice Guide $ 48.00 35. Federal Civil Procedure $ 6.00 36. EEOC Claims $ 64.00 37. Civil Rights and Liability $ 74.00 38. Federal Practice Manual $ 69.00 39. Motions in Federal Court $135.00 40. SMU Law journal $ 36.00 41. Toxic Materials $205.00 42. Real Estate Manual $ 38.00 43. Civil Digest $ 38.00 -44. Texas Water Law $ 83.00 45. Pattern Jury Instructions $ 33.00 46. Modem Real Estate Acquisition $ 30.00 47. Paralegal Forms $ 85.00 48. Texas Session Laws $110.00 49. Paperback Codes and Rules (Federal & State) $316.00 50. Texas Practice Guides (limited volumes) $242.00 51. Texas Criminal Forms $208.00 52. Blue Book $ 26.00 53. Federal Evidence $ 47.00 * $5,427.00 * This total does not include shipping charges but they are absori., ,d with the different delivery dates 12 if we make final purchase on CD-4OM. ` 13 All of these estimates are in today's dollars. 14 As modified at the date of preparation 57 Service Level Adjustment ncreased Service Level x City Rank )ecreased Service Level Department Rank Maintenance of Service Level Division Rank )EPARTMENT/DIVISION: 1028 TOTAL THIS REQUEST: $1.360 %CTIVITY CENTER: 521 LESS SAVINGS: 0 ,REPARED BY: Charles Crvan NET EFFECT ON BUDGET: $1.360 Proposed Project or Program develop an annual random sample, mail survey of approximately 3,000 utility customers to provide information on a tariety of city services. In-house staff will develop the survey, analyze the results and present the results to the city ;ouncil. This survey would expand the questionnaire to include detail questions for all city services. Council Ends Statement/issues council Issue 4: Citizens benefit from access to broad -based information and knowledge. ;ouncil Issue 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Impact on Service Level Current Service Level: Provide a budget that clearly, Proposed Service Level: Provide a budget that concisely and accurately reflects the intent of the city clearly, concisely and accurately reflects the intent of the vouncil, upper management and the departments for the citizens, city council, management and departments and anticipated spending and intended outcomes for the budget provides for intended outcomes for the community. year. Impact on Performance Indicators Current Performance Indicator: none Proposed Performance Indicator: Provide an annual random sample survey that allows citizens and customers to indicate their interests and concerns with an 85% positive response for the city. Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 180 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 1,180 7000 Capital 0 Total $1,360 Explanation of Savings/Revenues Explanation of Costs The costs include printing of 3,000 surveys, up to three 2 sided pages, $360; mailing of 3,000 surveys, $570; return postage for 600, $250; 6,000 preprinted envelopes, $180. Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: General Fund ACTIVITY CENTER: PREPARED BY: City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program This package would fund the debt service for the purchase of land for city services relocation. Council Ends Statement/issues Council End Statement: 5) Quality Service Council Strategic Issue: 23) Future Facilities Plan Current Service Level: Impact on Service Level Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation $40.000 0 $40.000 Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $40,000 Explanation of Costs The package includes $40,000 of debt service to fund the purchase of land for a future city facilities site. 59 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: General Fund ACTIVITY CENTER: PREPARED BY: M. Lindsev City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: $85.000 $85.000 Proposed Project or Program This package is part of a funding mechanism for the Northgate Land and Parking Lot project. This package would use $85,000 per year from the General Fund for 5 years to pay debt service on $350,000 used for land purchase and parking lot development. Council Ends Statement/issues Ends Statement #8 Civic Pride. Strategic Issue #1 Northgate redevelopment and revitalization. Impact on Service Level Current Service Level: Develop and implement Proposed Service Level: Implement a program to projects associated with assigned strategic issues. directly address strategic issue #1. Impact on Performance Indicators Current Performance Indicator: Address all Proposed Performance Indicator: Address assigned strategic issues and report on a quarterly basis. strategic issue #1. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $85,000 Explanation of Savings/Revenues Explanation of Costs This package is associated with another $300,000 from the Hotel/Motel Fund balance and $65,000 per year for 5 years to pay for $250,000 worth of debt service. Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level x DEPARTMENT/DIVISION: General Fund Deats ACTIVITY CENTER: PREPARED BY: City Rank Department Rank Division Rank TOTAL THIS REQUEST: $120.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $120.000 Proposed Project or Program This package is part of the funding mechanism for the 800 Mghtz Radio System Project that is in the current CIP budget. It has been proposed to pay for this project using debt and using an interfund loan that is to be paid back through the department users of the radio system. This package funds the General Fund portion of the 800 Mghtz Project. Council Ends Statement/Issues Council End Statement: 4) Education/Information Council End Statement: 5) Quality Service . Impact on Service Level Current Service Level: Provide efficient Proposed Service Level: No change communications services for the city's internal customers. Impact on Performance Indicators Current Performance Indicator: Maintain service Proposed Performance Indicator: No change reliability through proper maintenance Appropriation Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $120,000 Explanation of Costs The package includes $120,000 from the General Fund for 10 years to pay for the General Fund portion of the 800 mghtz radio system. 61 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level City Rank Department Rank Division Rank DEPARTMENT/DIVISION: 9111 Br. Cntv_ . Health DeA.TOTAL THIS REQUEST: $2,980 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $2,980 Proposed Project or Program Increase in funding from the City of College Station for various services which are necessary for the Health Department to provide in order to qualify for funds which will be tied to fee -for -service reimbursement by the state beginning this September. Council Ends Statement/Issues Ends Statement #3: Health and Public Safety. Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Lower food -borne illness Proposed Service Level: Lower food -borne illness attributable to public food preparation by 50% by 1997. attributable to public food preparation by 50% by 1999. Impact on Performance Indicators "Current Performance Indicator: By 1997, the # of Proposed Performance Indicator: By 1999, the # critical items (4 & 5 pt. violations) per inspection in Brazos of critical items (4 & 5 pt. violations) per inspection in Brazos County, will be reduced from an average of 1.5 to 0.75 per County, will be reduced from an average of 1.0 to 0.60 per inspection. inspection. Appropriation Category Description Request . 1000 Salaries & Benefits _ 2000 Supplies 3000 Maintenance 4000 Professional Services _ 5000 Property Services _ 6000 Other Services 7000 Capital Total $2,980 None. Explanation of Savings/Revenues Explanation of Costs Increases in various services which are necessary in order for the Health Department to qualify for funds. Future state funding will also depend on whether or not the Health Department increases these various services. 62 BRAZOS COUNTY HEALTH DEPARTMENT 201 NORTH TEXAS AVENUE . BRYAN, TEXAS 77803-5317 0 409/3614440 409/361-4450 June 2, 1995 Mr. Charles Cryan Assistant Director of Fiscal and Human Resources City of College Station, Budget & Evaluation Division P. O. Box 9960 College Station, Tx. 77842 Dear Charles, Please accept this letter as our formal application to the City of College Station for fiscal year 1995-96 (FY 96) funds. Enclosed you will find our budget, approved yesterday by the local board of health, detailing the information which you requested in your letter dated February 22, 1995. The City Council and your division will notice that the budget includes a 4 % increase above the approved funds for FY 95 from College Station. You may recall that our budget requests for two of the past four fiscal years included no increase to the local funding entities. Our entire operating budget for FY 96 is increased by $84,777. This includes increases in various services which are necessary for us to provide in order to qualify for funds which will only be tied to fee for -service reimbursement by the state beginning this September. The proposed $2,980 increase from College Station enables us to maintain the same level of state funding as received in previous fiscal years. Future state funding will also depend on whether or not we increase these various services. Also enclosed are our FY 95 and FY 96 objectives. You will find that these relate to the City's end statement numbers 3 and 5. The goals of our objectives are to allow the city residents to benefit from health services, a reasonably safe environment, as well as value and quality of services delivered. I have included copies of our objective monitoring reports to indicate how we are attaining these goals. Should you have any questions on our budget proposal, or any of the other enclosed items, please call me. I look forward to hearing from you. In the meantime, our department certainly does appreciate all the support you, the other city staff, and the City Council give to us in our efforts to protect and promote good health in College Station. Sinter y, 4�, K . Bost Executive Director Enclosures: 1995 Outcome Objectives 1995 Outcome Objective Monitoring Reports 1996 Budget 01 1996 Outcome Objectives 63 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I X I DEPARTMENT/DIVISION: 9111 B/CS Chamber ACTIVITY CENTER: 949 PREPARED BY: C. Crvan City Rank Department Rank Division Rank TOTAL THIS REQUEST: $20.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $20.000 Proposed Project or Program Provide funding to assist the Bryan/College Station Chamber of Commerce in meeting its debt service requirements on the Facilities at its present 29th Street complex. Council Ends Statement/Issues Ends Statements: 5: Quality Service Impact on Service Level Current Service Level: Provide a coordinated effort Proposed Service Level: to attain, maintain and improve the local economy and provide services to citizens and businesses. Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 20,000 7000 Capital 0 Total $20,000 Explanation of Savings/Revenues Explanation of Costs The Chamber incurred debt in order to move into its present offices at the 29th Street complex. This request along with similar requests to the City of Bryan and Brazos County will be used as a match to raise private funds for a three year debt retirement and capital fund drive. This action should put the Chamber in a good position to meet its capital needs and retire its current debt in 1998 ($202,000) ; purchase needed equipment ($25,000); develop an operating reserve equal to two months of operating expenses ($65,000), and provide for "special projects" at the boards discretion ($68,000). 64 t , m w er CHAMM of commeRce BRYAN/COLLEGE STATION, TX June 9, 1995 Mr. Tom Brymer City of College Station P.O. Box 9960 College Station, Texas 77842 Dear Tom: The Chamber of Commerce would like to pay off debt acquired by relocating Chamber offices to the present 29th Street complex in 1993. The Chamber also put a substantial amount of money into the relocation beyond the remaining debt. To retire the note, it is our hope that we will have a successful fund-raising campaign. The purpose of the campaign will be to pay the debt. We also expect to replenish needed funds that we will use to focus the Chamber effort on important issues. We have a need to replenish funds that were held in reserve before the new building was completed. Many of those reserve funds were used to supply the new facility with furnishings, telephone systems, computer terminals, etc. If we have the needed funds, we believe we can improve on om, effort to support and help grow the community. It is our hope that the two cities and the county will develop a program enabling us to match each dollar obtained from Bryan, College Station and Brazos County. The proposed annual contribution from each of the government entities would be $20,000 per year for the next three years. This would allow us to raise $360,000 if we meet the ultimate challenge. $20,000 x 3 = $60,000 per year provided by the three entities $60,000 per yr. x 3 years= $180,000 total provided by the three entities $180,000 provided by Chamber fund drive Total: $360,000 total debt retirement campaign The money will be used in the following format: Pay off debt on build -out: $202,000 P.O. Box 3579 Bryan, Texas 77805 (409) 260-5200 row With debt retirement income of $120,000 per year ($360,000 divided by three years), we would propose to pay $67,333.33 per year on the debt (a total of $202,000) retiring the debt in 1998. Equipment purchases/ Build Chamber Reserve $158,000 The money will be used in this format: Equipment purchases: $25,000 *Reserve fund: $65,000 (two months operating capital -utilized only with board approval). Special projects: $68,000 (special projects --dollars utilized only with board approval). Totals: $158,000 *The reserve fund would only be used to smooth out fluctuations in cash flow. Reserve funds would be replenished in order to maintain a fund level of two months operating capital or approximately $65,000. We would use approximately $52,666.66 ($158,000 divided by three years) per year to purchase equipment and build a reserve for the Chamber of Commerce. This reserve will include replacing a portion of the $30,000 provided by the Brazos County Industrial Foundation to _ help fund the Chamber's Business Development/Business Retention Program (1994-95 total budget of $54,000). The B.C.I.F. funding commitment is for one year (1994- 95). Equipment purchases will include five computers and printers at a cost of approximately $13,000; a networking system that will cost approximately $3,500 This will be a system that will provide all employees access to the same computer network, including a list of all Chamber members on fax modem to reduce the cost of postage; committee lists, board member names and addresses, etc.; a new membership tracking program at a cost of approximately $3,400 and new software to include accounting, community development, and economic/business development at a cost of approximately $3,000; training for employees on new equipment and software at a cost of approximately $2,100, for a total of $25,000. Equipment: Five Computers/Printers: $13,000 Networking software: $ 3,500 Membership software: $ 3,400 Accounting software $ 3,000 Training $ 2,100 Total: $25,000 We believe that this equipment is needed to allow our Chamber staff to do the job more efficiently. We will be able to improve communications with our board and our members; it will save on postage costs as we communicate more through fax modem and it will allow us to be more productive in less time. The Chamber has good leadership and management. We believe that it will be beneficial to everyone to relieve the Chamber of the financial pressure with which it has struggled for the past two years. With a successful debt retirement campaign, we believe that the Chamber can be where it needs to be in our community. Please review this request. Feel free to contact me --or Ivan Olson-- should you have additional questions or suggestions. Sincerely, Harold Dean President Ivan soI n --� Chairman, Debt Retirement Committee 67 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I X I City Rank Department Rank Division Rank DEPARTMENT/DIVISION: 9111 MHMR Brazos Vallev TOTAL THIS REQUEST:-X5.000 ACTIVITY CENTER: 949 LESS SAVINGS: 0, PREPARED BY: NET EFFECT ON BUDGET: $75.000 Proposed Project or Program Enable the Mental Health Mental Retardation Authority of Brazos Valley to maintain the quality services that its customers of the Brazos Valley depend on. Council Ends Statement/issues Ends Statement #1: Transportation/Mobility, Ends Statement #4: Educational/Information, Ends Statement #2: Parks and Recreation, Ends Statement #5: Quality at a reasonable cost, Ends Statement #3: Health and Public Safety, Ends Statement #7: Diverse employment opportunities, and Ends Statement #8: Civic Pride. Impact on Service Level Current Service Level: Provide: habilitative services Proposed Service Level: No change in service level. which promote independence and support; statutory mandated core services; professional, quality services in an efficient and effective manner; multiple domestic support and outreach programs; and an aggressive outreach and public information program. Impact on Performance Indicators Current Performance Indicator: Maintain Proposed Performance Indicator: No change in projected number of individuals to be served from the performance indicator. community by MHMR services at 2,075 contacted, 745 served, and 2,220 bed days provided. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 75,000 5000 Property Services 6000 Other Services 7000 Capital Total $75,000 None. Explanation of Savings/Revenues Explanation of Costs The funding would be used to maintain the quality services that MHMR of the Brazos Valley provides to the community. Mental Health Mental Retardation Authority of Brazos Valley CENTRAL ADMINISTRATION 804 Texas Avenue Bryan, Texas 77803 (409) 822-MHMR FAX (409) 361-9806 MAILING ADDRESS P.O. Box 4588 Bryan, Texas 77805 June 2, 1995 Charles Cryan City of College Station Budget & Evaluation Division P O Box 9960 College Station, Texas 77842 Mr. Cryan, Please accept this letter as a formal request for funding from the City of College Station. Approximately twenty (20) percent of all the services we provide to individuals in the Brazos Valley are provided to College Station residents. Providing services to these individuals requires a substantial portion of our overall budget of $8 million. Therefore, we are requesting the City of College Station to contribute $75,000 to help its maintain quality services. Without MHMR to provide a safety net for individuals who are indigent or who meet our priority population definition as mandated by the state, these services would become the responsibility of the county and the city. Contacts for questions regarding this request are: Financial Concerns: Daniel R. Monson, Deputy Director of Operations Mental Health Programs: Sherry Suarez, MH and Residential Services Program Director Mental Retardation Programs: Bobbi Perry, MR Services Program Director Thank you for your consideration of this request for funds. Sincerely yo rs, Leon Bawcom Executive Director Service Level Adjustment Increased Service Level ' X City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 9111 TAMU Wildlife/Fish. Dept. TOTAL THIS REQUEST: $37.500 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $37.600 Proposed Project or Program )evelop a new educational program within the framework of the Texas Cooperative Wildlife Collection facilities; to ncrease the number of visitors to the facility, both from local citizenry and from out-of-town visitors; and to provide an added attraction for visitors to the George Bush Presidential Library. Council Ends Statement/Issues =nds Statement #4: Educational/Information Impact on Service Level current Service Level: Proposed Service Level: Attract out-of-town tourists visiting the Bush Library. Provide outreach to local school groups. Allow the facility to serve as a window on natural resource educational and research efforts at the University and the natural resource issues of the state. Impact on Performance Indicators urrent Performance Indicator: Proposed Performance Indicator: kppropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $37,500 None. Explanation of Savings/Revenues Explanation of Costs 'he funding would be used to initiate the educational program of the Texas Cooperative Wildlife Collection, hire an ducation specialist, publicize the program, arrange for exhibits, and write grants to obtain continued support for these rograms. 70 TEXAS A&M UNIVERSITY Department of Wildlife & Fisheries Sciences June 21, 1995 Mr. Charles Cryan Assistant Director of Fiscal and Human Resources Budget & Evaluation Division City of College Station 1101 Texas Avenue College Station, TX 77842 Dear Mr. Cryan This letter, along with the accompanying documentation, is the formal application by the Department of Wildlife and Fisheries Sciences on behalf of the Texas Cooperative Wildlife Collection (TCWC) for funding of a Natural Resources Interpretive Center by the City of College Station. We are requesting $ 75,000 of a two-year budget totalling $ 100,000; we will seek the remaining $ 25,000 from Brazos County. I believe you will find all of the elements included which you mentioned in your letter to Dr. Warren Evans on February 22. Monies from this grant would be handled through the Texas A&M Development Foundation. This grant would provide startup funds to initiate a new public educational program at the TCWC, hire an education specialist, publicize the program, arrange for exhibits, and prepare grants to obtain continued support of this program. We are excited about the possibility of developing a new tourist attraction for the City of College Station, which will be an attraction not only to visitors of the Bush Library, but local citizens as well. We have the expertise to develop outstanding educational exhibits (see attachments). This new facility will function complementary to the Brazos Valley Natural History Museum. If you have further questions, please do not hesitate to call. incerely Robert D. Brown Enclosures: Professor and Head Interpretive Center Proposal Annual and Total Budgets Diagrams of TI Facility Present and Future Interior Plans Diagrams of TI Facility Present and Future Exterior Plans (Nature Trail) Examples of White-tailed Deer and Endangered Species Exhibits Support Letter from Brazos Valley Museum of Natural History A Walk Through the TCWC Interpretive Center List of TCWC Faculty Supervisors and Permanent Professional Staff Room 210, Nagle Nail . College Station, Texas 77843-2258 • (409) 845-5777; FAX (409) 845-3786 71 Increased Service Level Decreased Service Level Continuance of Service Level Service Level Adjustment City Rank Department Rank X Division Rank FUND: 001 General Fund TOTAL THIS REQUEST: $323.015 DIV./ACT.: 9111-900 LESS SAVINGS: PREPARED BY: J. GRAFF NET EFFECT ON BUDGET: $323.015 Proposed Project or Program =unding for Merit and Scale Adjustment for the 1995 - 96 Fiscal Year. current Service Level: Council Ends Statement/issues Impact on Service Level Proposed Service Level: Impact on Performance Indicators current Performance Indicator: Proposed Performance Indicator: 4ppropriation Category Description Request 1000 Salaries & Benefits 323,015 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Explanation of Savings/Revenues None. Total $323,015 Explanation of Costs Aerit and Scale Adjustment costs as reviewed by the city council on March 8, 1995 and April 26, 1995. WLea Avecoollo e Ao, PARKLAND DEDICATION FUND r 1>1 Were Committed To Excellence 4 75 Service Level Adjustment Increased Service Level x City Rank Decreased Service Level ' Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 53-83 TOTAL THIS REQUEST: ACTIVITY CENTER: 651 LESS SAVINGS: PREPARED BY: Eric Ploeaer NET EFFECT ON BUDGET: Proposed Project or Program Improvements to the area around the recently renovated ponds at Central Park. Council Ends Statement/issues Ends Statements #2 Parks and Recreation #3 Health and Public Safety #5 Quality Service PDF 1 3 $37.500 0 $37.500 Impact on Service Level Current Service Level: Provide a variety of adult and Proposed Service Level: Provide a variety of adult youth leisure programs and facilities to meet the needs of and youth leisure programs and facilities to meet the needs citizens. of more citizens. Impact on Performance Indicators Current Performance Indicator: Provide facilities Proposed Performance Indicator: Provide facilities to meet the needs of citizens. to meet the needs of more citizens.. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital $37,500 Total $37,500 Explanation of Savings/Revenues Explanation of Costs Handicap accessible walks would be added to make two of the three fishing piers accessible to handicap individuals. A small shelter added on the east side of the main lake to provide an additional covered picnic area with grill and tables. Funding is from Parkland Dedication Fund Zone 3 76 Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 63-84 Parks ACTIVITY CENTER: 648 WPC PREPARED BY: Eric Ploeaer City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: $24.000 $24.000 Proposed Project or Program Request to use existing Zone 3 Parkland Dedication Funds to install a handicap accessible rubber cushioning at the WPC playground to make it accessible and cut down on the cleanup maintenance required in sweeping the current gravel system from the surrounding walks. Provide three park benches for the walks surrounding the lake at Wolf Pen Creek. Council Ends Statement/Issues Ends Statement #2 Parks and Recreation Strategic Issue #2a Neighborhood park planning Impact on Service Level Current Service Level: Provide a variety of adult and Proposed Service Level: Provide a variety of adult youth leisure programs and facilities to meet the needs of and youth leisure programs and facilities to meet the needs citizens. of more citizens. Impact on Performance Indicators Current Performance Indicator: Provide facilities Proposed Performance Indicator: Provide facilities to meet the needs of citizens. to meet the needs of more citizens. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital I $24,000 Total i $24,000 Benches $2000 Playground surface $17,000 Handicap accessories $5,000 Explanation of Savings/Revenues Explanation of Costs I HOTELAJOTEL FUND m 9 u We're Committed To Excellence Service Level Adjustment 79 Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENT/DIVISION: 53-82 Parks ACTIVITY CENTER: 653 Conf. Cntr. PREPARED BY: David Gerlina City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program Conference Center audio/visual equipment replacement. Council Ends Statement/issues Ends Statement #5 Quality Service I: 6ki Impact on Service Level Current Service Level: Provide safe facilities for Proposed Service Level: No change. aquatic, recreational, and educational activities to meet the needs of local citizens and visitors to our community. $1.500 0 $1.500 Impact on Performance Indicators Current Performance Indicator: Customer survey Proposed Performance Indicator: No change. results indiciate a satisfaction rate of 90%, or greater. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital $1,500 Total $1,500 None Explanation of Savings/Revenues I Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: 53-80 Parks ACTIVITY CENTER: 641 Admin. PREPARED BY: Steve Beachv City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Proposed Project or Program George Bush Library Impacts & Planning -- See Action plan 16 Council Ends Statement/Issues Ends Statements #4 Education/information Strategic Issue #16 George Bush Library #6 Cultural Arts and Civic Pride Impact on Service Level Current Service Level: None Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: None Proposed Performance Indicator: Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services $10,000 5000 Property Services 6000 Other Services 7000 Capital Total $10,000 211V 1 $10.000 0 $10.000 Explanation of Savings/Revenues Explanation of Costs The funds are requested to implement milestones; conduct a preliminary qualitative and quantitative analysis of the tourist housing market in Brazos County. Conduct a feasibility study concerning the development of a high quality recreation vehicle park in College Station. Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank HMS Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 53-80 TOTAL THIS REQUEST: $24.000 ACTIVITY CENTER: 641 LESS SAVINGS: 0 PREPARED BY: Steve Beachv NET EFFECT ON BUDGET: $24.000 Proposed Project or Program Public Art Program Council Ends Statement/Issues Ends Statement #6 Cultural Arts Strategic Issues -- #5 Community Appearance #16 George Bush Library #41 Public Art Impact on Service Level Current Service Level: None Proposed Service Level: Provide a visual artistic experience for visitors and local residents at key public facilities and locations in the community. Impact on Performance Indicators ;Current Performance Indicator: None Proposed Performance Indicator: The completion of one major artwork each year in accordance with a predetermined action plan. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 24,000 5000 Property Services 6000 Other Services 7000 Capital Explanation of Savings/Revenues j Total $24,000 Explanation of Costs This request is to establish a long-term public art program that will emphasize the placement of original sculptures, Daintings, and other works of art at significant public locations. These works will relate to key historical figures, events, and locations in the community and will enhance the tourism experience for out of town visitors. NO) Service Level Adjustment Increased Service Level x Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Hotel/Motel Fund ACTIVITY CENTER: PREPARED BY: City Rank Department Rank Division Rank TOTAL THIS REQUEST: $365.000 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $365.000 Proposed Project or Program This package is part of the funding mechanism for the Northgate Land and Parking Lot project. This package would use $300,000 in Hotel/Motel Fund Balance and $65,000 a year for 5 years in debt service from the Hotel Motel Fund to fund the land purchase and parking lot development. Council Ends Statement/Issues Council End Statement: 7) Civic Pride. Council Strategic Issue: 5) Northgate Redevelopment and Revitalization Impact on Service Level Current Service Level: Develop and implement Proposed Service Level: Implement a program to projects associated with assigned strategic issues. directly address strategic issue #1 Northgate Redevelopment and Revitalization Impact on Performance Indicators Current Performance Indicator: Address all Proposed Performance Indicator: Address assigned strategic issues and report on progress quarterly. strategic issue #1 Northgate Redevelopment and Revitalization. Appropriation Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 . .. 7000 Capital 0 Total $365,000 Explanation of Costs The package includes $300,000 from Hotel Motel Fund Balance and $65,000 a year for 5 years to pay for $250,000 worth of debt service. 83 Service Level Adjustment Increased Service Level X ( City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 9111 Aa_a_ie Swim Club TOTAL THIS REQUEST: $16.400 ACTIVITY CENTER: 949 LESS SAVINGS: PREPARED BY: NET EFFECT ON BUDGET: $15.400 Proposed Project or Program Requesting funds to enable the Aggie Swim Club to hold the State Championship at the end of the winter season. Council Ends Statement/issues Ends Statement #2: Parks and Recreation Impact on Service Level . 'Current Service Level: Serve children from Proposed Service Level: Serve children from approximately 50 families. approximately 50 families, and attract 700 families for state championship. Impact on Performance Indicators 'Current Performance Indicator: Proposed Performance Indicator: Host Texas Age Group State Championships. Appropriation Category Description 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total Explanation of Savings/Revenues Request Direct economic impact of 700 families staying 3 nights likely to exceed $200,000. 15,400 $15,400 1 Explanation of Costs The funding would be used to support the hosting of the Texas Age Group State Championships in March of 1996. 1 SWIM CLUB May 23, 1995 Mr. Charles Cryan Assistant Director of Fiscal and Human Resources Budget and Evaluation Division City of College Station P.O. Box 9960 College Station, TX 77842 Dear Mr. Cryan, Enclosed is a request for a grant of $15,400 from Hotel/Motel tax funds to support the Aggie Swim Club's hosting of the Texas Age Group State (TAGS) Championships in College Station from March 14-17, 1996. For some years now the Aggie Swim Club has received a grant of $6,000 to host two major swim meets in the summer season. This has comprised part of the total budget request of the Bryan -College Station Athletic Federation. The swim club will be requesting a similar amount through the Federation this year for those meets. This application represents a request for additional funds to enable the Club to hold the State Championship at the end of the winter season. The opportunity has arise as a result of the opening of the new Texas A&M aquatic complex. The new A&M facility is believed to be the finest competitive swimming complex in the nation. It could result in many major meets coming to College Station and the city will benefit from the substantial economic impact of these visitors. The TAGS meet for which we are requesting funds, typically attracts approximately 1,000 competitors and their families. The competitors swim an average of four events each spread over the three and a half day event. It is the major meet in Texas for elite swimmers aged 18 and under. Attached are extracts from last year's program showing how many competed in the meet, where they came from, a schedule of events over the four day period, and two sample pages of the 80 page preliminary sessions heat information. Our application ties to City Council End Statements #'s 7 and 2. You will note from the attached information that 5 competitors qualified from the Aggie Swim Club. This means that approximately 1,000 will be coming from out-of-town. We project this will result in sales of at least 1,500 bed nights in the community. You have a standard formula for computing economic impact, but the impact of 700 families (assuming some families have P.O. Box 9397 • College Station, Texas 77842 two children competing) staying four days and three nights in the community is likely to exceed $200,000 before considering multiplier values. Indeed, the direct income to the city from its share of the Hotel/Motel tax revenues on 1,500 bed nights is likely to exceed $5,000. In the winter season, the Aggie Swim Club serves children from approximately 50 families. To stage an event of this magnitude is a daunting challenge for such a small volunteer organization. Bids for this meet were requested in December 1994. In committing to it, the Aggie Swim Club has taken a substantial financial risk. We did briefly discuss it with Mayor Ringer and Mr. Glenn Schroeder. Both indicated they were generally supportive of our program but, of course, were unable to make any kind of financial commitment to us. Mr. Schroeder did indicate that the event may qualify for support from the Hotel/Motel Tax contingency fund. We note that the Chamber of Commerce has recently formed a joint committee with the city to attract major events such as this to the area, recognizing their substantial economic impact. Given the excellence of the new A&M aquatic facility, we believe that if we demonstrate to the swimming world a capability to effectively stage this type of event, then many more opportunities of this scale will be forthcoming. We appreciate the city's fine support of our past efforts to bring meets here and hope they are able to offer us this additional support as we bring a quantumly larger event to the city. Sin el � John L. Crompton Past -President, Aggie Swim Club 1000 Rose Circle College Station, Texas 77840 phone 696-0825 (home) 845-5320 (office) 86 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 9111 Conv. & Visitors Bur. TOTAL THIS REQUEST: $34.500 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $34.500 Proposed Project or Program Increased opportunity for more conventions and tourism in our community due to previous marketing efforts by the bureau and with the coming of the Bush Library and the Special Events Center create the need for additional sales personnel and more marketing by CVB. Council Ends Statement/Issues Ends Statement #1: Transportation/Mobility. Ends Statement #5: Quality service at a reasonable cost. Ends Statement #7: Diverse employment opportunities. Impact on Service Level Current Service Level: Provide effective marketing Proposed Service Level: of College Station/Bryan as a meeting site and tourism destination. Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $34,500 Lein Explanation of Savings/Revenues Explanation of Costs Increased demand for our sales, marketing, and service efforts by tourism and meeting clients and by our local hotel/motel constituents have necessitated adding two new employees and increasing significantly our marketing s:.les efforts. We have created tremendous momentum and need to ensure its growth. Ub J CHA,�ER COMMERCE BRYAN / COLLEGE STATION, TX May 15, 1995 Mr. Charles Cryan Assistant Director of Fiscal & Human Resources City of College Station P.O. Box 9960 College Station, TX 77842 Dear Charles, In accordance with the annual budget process and procedure of the city of College Station, the Bryan/College Station Chamber of Commerce appreciates the opportunity to submit its request for funding of the Convention and Visitor Bureau in fiscal year 1996. The mission of the Bureau continues to be the effective marketing of Bryan/College station as a meeting site and tourism destination. Our efforts again have been rewarded by an increase in the occupancy rate at our local hotels, a corresponding increase in hotel/motel tax collections and an increase in overall tourism spending in our.. -community. We now have a Manager of Convention Sales and Services and two full time convention sales representatives working to bring the maximum number of meetings, conferences and conventions to our community. Our tourism development department continues to grow with more participation in travel shows in and out of the state. More detail on our efforts and their results is provided in the enclosed documentation including complete projected convention sales and services and tourism budgets for the coming fiscal year. The Chamber respectfully requests the approval of the attached budget. It does contain an increase of slightly more than five percent and additional funding to support the bid for the Association of Mayors, Councilmembers and Commissioners. We do, however, feel that we have been frugal and prudent in our spending the past few years and would remind you we did not seek an increase last year. However, we see an increased opportunity to capitalize on the coming Bush Library Center and the Special Events Center on campus. We need to increase our marketing efforts to fully benefit from these new facilities. P.O. Box 3579 Bryan, Texas 77805 (409) 260-5200 88- 2. Please call me or Dick Forester at the bureau if you have any questions regarding our request. We would appreciate an early budget workshop with the council. Please let us know the schedule. Thanks again for your help. Sincerely, Ronnie Morrison Executive Vice President Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank DEPARTMENT/DIVISION: 9111 SCA Stud. Amb. Proa. TOTAL THIS REQUEST: $500 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $500 Proposed Project or Program Form bonds of friendship, cooperation, and exchanges in the areas of education, commerce, culture, art, and information between peoples. Council Ends Statement/issues Ends Statement #4: Educational/Information. Ends Statement #6: Cultural Arts Current Service Level: Impact on Service Level Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $500 None. Explanation of Savings/Revenues Explanation of Costs 90 Bryan -College Station Sister Cities Association P.O. Box 9643 aror College Station, TX 77842 May 31, 1995 Mr. Charles Cryan Assistant Director of Fiscal and Human Resources City of College Station Budget & Evaluation Division P. O. Box 9960 College Station, TX 77842 Dear Mr. Cryan: Please accept this letter as a formal application to the City of College Station requesting funds for fiscal 1995-96 (FY 96). 1) We request consideration for funding for the Bryan -College Station Sister Cities .Association Student Ambassadors group in the amount of $9000, and designate Morris Gelber, Vice President of the Bryan College Station Sister Cities Association and Chair, Youth Exchange Group, as the responsible contact with the City of College Station. 2) The budgets for the Student Ambassadors group for FY 95 and FY 96 are as follows: FY 95 a) Anticipated revenues Fees from participants (@ $500 each) $ 8500.00 T-shirt sales 4000.00 Garage sales 600.00 Grant from City of College Station 8500.00 Total $21600.00 b) Anticipated expenditures Airlines tickets (B/CS delegates) $14900.00 Airlines tickets (guest delegates) 5400.00 Insurance for guests 1100.00 Total $21400.00 Estimated year-end balance $ 200.00 F�31 Page 2 FY 96 c) Anticipated revenues: Fees from participants (@ $500 each) $ 8000.00 T-shirt sales 4000.00 Garage sales 600.00 Grant from City of College Station 9000.00 Total $21600.00 d) Anticipated expenditures Airlines tickets (B/CS delegates) $14500.00 Airlines tickets (guest delegates) 6000.00 Insurance for guests 1000.00 Total $21500.00 Estimated year-end balance $ 100.00 Additionally, there are in -kind expenditures borne by the host families which we estimate to be at least $150 per family. 3) The Bryan -College Station Sister Cities Association was formed in 1989, when a protocol was signed between citizens of Bryan -College Station and our first sister city, Kazan, Tatarstan, Russia. We have subsequently signed sister city protocols with Zuazua, Nuevo Laredo, Mexico, and Greifswald, Germany. We also hope in the near future to sign a sister cities agreement with a city in Great Britain. The goals of our association are to form bonds of friendship, cooperation, and exchanges in the areas of education, commerce, culture, art, and information between peoples. These objectives benefit the citizens of the City of College Station and relate directly to the "End Statements" 4. Education/Information and 6. Cultural Arts. 4) Since 1989, there have been three adult exchanges between Bryan -College Station and Kazan, Tatarstan, Russia, and two adult exchanges between Bryan -College Station and Zuazua, Nuevo Laredo, Mexico. There have been three student exchanges between Bryan -College Station and Kazan, Tatarstan, Russia involving a total of 30 students and 6 adult sponsors. More than half of these students and adult sponsors were citizens of College Station. There have been two student exchanges between Bryan -College Station and 7uazua, Nuevo Laredo, Mexico, Iricluding one this spring. This summer, 1995, there will be three students and one teacher from College Station traveling to Kazan, Tatarstan, Russia, and 11 students and 3 adult sponsors making our first exchange visit to Greifswald Germany. Again, the majority of the delegates to Germany will be from College Station. The bonds of friendship that have been forged between the students of Bryan - College Station and Kazan, Tatarstan, Russia, have been very strong. The first group of delegates corresponds regularly with their counterparts, and at least three students and one adult from Bryan -College Station have made subsequent trips to Kazan to visit their friends and "families." As a result of these exchanges, several of our young people have decided to major in international studies. One mother told me recently that the exchange with Kazan 92 Page 3 had "changed her child's life," and that now, this student delegate from College Station is planning on making a career in international work. Our communities have profited greatly by having these exchanges. Even those students in our public schools who have not had an opportunity to partake in an exchange, have had the opportunity to meet, listen to, and learn about people who live half -way around the world. The delegates from each exchange have visited many elementary and middle schools in Bryan -College Station in addition to attending A&M Consolidated High School and Bryan High School. Russia is no longer an "abstract" concept to our students who have learned through these exchanges that all people are basically the same. Thank you for yAice sideration to our request. Morris J. Gelbe,President Bryan -College Station Sister Cities Association, and Chair, Youth Exchange Committee 3714 Sunnybrook Lane Bryan, TX 77802-3923 93 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 9111 Bush Library Comm. TOTAL THIS REQUEST: 550.000 ACTIVITY CENTER: 949 LESS SAVINGS: PREPARED BY: NET EFFECT ON BUDGET: $50.000 Proposed Project or Program Requesting funds to assist with the development of the George Bush Presidential Library. Council Ends Statement/issues Ends Statement #4: Educational/Information. Ends Statement #5: Quality service at a reasonable rate. Current Service Level: Impact on Service Level Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $50,000 Ihrein Explanation of Savings/Revenues Explanation of Costs $50,000 per year for 3 years. Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank DEPARTMENT/DIVISION: 9111 Sister Cities Assoc. TOTAL THIS REQUEST: $9.000 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $9.000 Proposed Project or Program Improving international understanding by broadening opportunities for citizens of this area to meet foreign visitors and learn about their culture. These contacts vary in nature and take place in a variety of settings. Council Ends Statement/Issues Ends Statement #2: Parks and Recreation. Ends Statement #4: Educational/Information. Ends Statement #6: Cultural Arts. Impact on Service Level Current Service Level: Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Explanation of Savings/Revenues Category Description Request None. _ 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $9,000 Explanation of Costs Our organization operates on a volunteer basis with almost 90% of its budget devoted to expenses of visitors from our sister cities to Bryan/College Station. These expenses usually consist of paying round-trip airfare of visitors from their port of entry (usually New York) to Texas, a welcome dinner, and a farewell dinner for the delegation for which corporate sponsorships are sought and tickets sold. RECE! _ 95 1 M02194 BRYAN-COLLEGE STATION SISTER CITIES ASSOCIATION Post Office Box 10087 College Station, TX 77842 ------------------------------------------------------------------ 25 May 1995 Charles Cryan, Assistant Director of Fiscal and Human Resources City of College Station Post Office Box 9960 1101 Texas Avenue College Station, TX 77842-0960 Dear Mr. Cryan: The Bryan -College Station Sister Cities Association would appreciate being considered for funding by the City of College Station during the 1995-96 fiscal year. The enclosed application includes: 1). Statement of Goals 2). Description of Programs 3). Budget 4). Suggestions for Assessing Our Program The enclosed budget will be presented to the BCS Sister City Board of Directors at its 7 June meeting. After discussions and possibly amendments, it will be formally adopted at our annual membership meeting in September, in accordance with our bylaws, and take effect 1 October 1995 to 30 September 1996, which coincides with officer terms of office. Even when adopted our budget is subject to change as discussions with Griefswald and our other sister cities develop. As president of the Bryan -College Station Sister City Association, I am available to respond to any questions you might have concerning this application. Please feel free to contact me at my office (845-7165) or home (774-0660). After 1 July I will be away from the area much of the time. Please contact our vice president, Morris Gelber, at 846-5229. Thank you for consideration of this application. Sincerely, V James C. Bradford Enclosures I Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank DEPARTMENT/DIVISION: 9111 Lions Club TOTAL THIS REQUEST: ACTIVITY CENTER: 949 LESS SAVINGS: PREPARED BY: NET EFFECT ON BUDGET: Proposed Project or Program Requesting funds to provide 4th of July fireworks presentation. Council Ends Statement/Issues Impact on Service Level Current Service Level: Provide annual 4th of July Proposed Service Level: fireworks display. $550 $550 Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Explanation of Savings/Revenues Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services .: 6000 Other Services 7000 Capital . Total $550 Explanation of Costs The additional $550 is to cover increases in fireworks cost. 97 College Station Noon Lions Club We Serve Post Office Box 112 Dan Galvin College Station, TX 77843 President June 23, 1995 Honorable Larry Ringer Mayor City of College Station 1101 Texas Ave College Station, TX 77840 Dear Larry: On behalf of the College Station Noon Lions Club I respectfully request assistance for the 1996 Fourth of July Celebration in the amount of $6,500.00. We gratefully acknowledge the grant of $5,950.00 for the 1995 event. As you know all monies received by the Club.from the City go towards purchase of the fireworks. If you have questions or desire further information please call me (845-8448) or our incoming President, Bill Pope (845-15.54). This cooperative effort between the City and Club has provided a safe, family oriented, patriotic event for the community for many years. The vision shown by one of your early Fire Chiefs and the continued support by subsequent City Councils should be commended. The CS Noon Lions Club supplies the licensed pyrotechnic operator as well as 75-80 civic minded individuals who work on the 4th to support this function. Other organizations such as the Bryan Amateur Radio Club also support this endeavor. Of course Texas A&M University also provides additional assistance at Olsen Field. The College Station Noon Lions Club was honored to be one of the inaugural events for the Wolf Pen Creek Amphitheater. For the two years the event was held there the City of College Station provided support in addition to the grant for the fireworks. That support is gratefully acknowledged also. Your success in additional construction in the Wolf Pen Creek area has necessitated the move back to Olsen Field. Hope to see you there on the 4th. Dan Galvin O"e4 coffolll�� 0 ELECTRIC FUND m 0 0 We're Committed w 1,010-1 low' ToExcellence, 6 101 Service Level Adjustment Increased Service Level I X I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Pub. Utilities 5192 ACTIVITY CENTER: Trans./Dist. 601 PREPARED BY: R. Havens City Rank Department Rank Division Rank TOTAL THIS REQUEST: $50.421 LESS SAVINGS: NET EFFECT ON BUDGET: $50.421 Proposed Project or Program Requesting an Inspector/Locator to do underground utility locates for the Public Utilities Department. This position will also do underground ditch inspections. With so many underground utilities, we are required to call for locates before digging. This position is for all 3 areas in the Public Utility Department. Council Ends Statementlissues Ends Statement #5: Quality Service at a reasonable cost. Ends Statement #7: Diverse employment opportunities. Impact on Service Level Current Service Level: Provide reasonably priced Proposed Service Level: Provide reasonably priced electric power for the citizens of College Station. electric power for the citizens of College Station. Provide prompt response to customer needs. Provide a faster response to customer needs. Impact on Performance Indicators Current Performance Indicator: Reduce Proposed Performance Indicator: Hold distribution O&M expense per retail customer below the distribution and O&M relatively constant (not increase). APPA Southwest/West regional average of $80 per retail Complete 80% of water service requests in 5 days or less. customer. Complete 100% of waste water requests in 5 days or less. Complete 75% of service requests in 5 day's for water. Complete 100% of waste water requests in 5 days. Appropriation Explanation of Savings/Revenues Category Description Request Currently there are 3 foreman who postpone their 1000 Salaries & Benefits 29,701 supervisory duties and paperwork to perform these 2000 Supplies 700 locates. This position would perform the locates for the 3000 Maintenance department allowing the different divisions to run more 4000 Professional Services efficiently. There would not be any actual dollar savings, 5000 Property Services 780 however there would be greater operational efficiencies. 6000 Other Services 19,240 7000 Capital Total $50,421 Explanation of Costs Salaries/Benefits pay grade 421; Supplies gas and tools; Property Services = mobile phone and uniforms; Other Services = Vehicle w/tool box and radio, and one year fleet replacement cost. 10A Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank 4 Maintenance of Service Level Division Rank 2 DEPARTMENTIDIVISION: Pub. Utilities 5192 TOTAL THIS REQUEST: $2.300 ACTIVITY CENTER: Tech. Svcs. Admin. 601 LESS SAVINGS: PREPARED BY: T. Michalskv NET EFFECT ON BUDGET: $2.300 Proposed Project or Program Requesting a hydraulic operated compression wrench. It is used by crews when working on energized conductors. It will be put on unit #92-29, a bucket truck, to completely outfit the vehicle for daily operations. Will allow for another crew to be developed for faster response time to problem calls and faster repair time. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide reliable electric Proposed Service Level: Provide more reliable service to the citizens of College Station. electric service. Impact on Performance Indicators Current Performance Indicator: Keep outage Proposed Performance Indicator: Keep outage minutes per year below 800,000 minutes. minutes per year below 800,000 minutes. Keep frequency of outages below national average of 1.45 Lower outage duration to below the College Station per year. average of 46 minutes. Keep duration of outages below national average of 90 nutes per outanp M Appropriation Explanation of Savings/Revenues Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 2,300 Total $2,300 Explanation of Costs Capital = purchase price of hydraulic operated compression wrench. 103 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I X I DEPARTMENT/DIVISION: Pub. Utilities 5191 ACTIVITY CENTER: Subst./Meterina 603 PREPARED BY: G. Lanae City Rank Department Rank Division Rank TOTAL THIS REQUEST: $3.000 LESS SAVINGS: NET EFFECT ON BUDGET: $3.000 5 K .I Proposed Project or Program Requesting Hotstick meter test clamps. This equipment will allow us to check large electrical transformers for metering accuracy and will compliment the test equipment. The equipment will also reduce the hazard of working on high voltage, energized conductors by allowing the technicians to install from ground level. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level - Current Service Level: Provide accurate customer Proposed Service Level: Provide more accurate I billing through electrical meter maintenance. customer billing through electrical meter maintenance. Impact on Performance Indicators Current Performance Indicator: none Proposed Performance Indicator: Conduct tests on 10% of residential meters annually. Test all commercial meters annually. Test all primary meters twice per year. Respond to 100% of service requests within 24 hours. Appropriatinn Category . Description ........ . 4666" ""' ..... . . .......... .. ........... . .. Sala'r'ies­'&' Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total Explanation of Savings/Revonucs Request Find malfunctioning meters to ensure billing is more accurate and the appropriate amount of revenue is being received. 3,000 $3,000 Explanation of Costs Capital = purchase price of Hotstick meter test clamps. 104 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENTIDIVISION: Pub. Utilities 5191 ACTIVITY CENTER: Traffic Sia. Sys. 605 PREPARED BY: G. Lanae City Rank Department Rank Division Rank TOTAL THIS REQUEST: $7.000 LESS SAVINGS: NET EFFECT ON BUDGET: $7.000 r 3 Proposed Project or Program Requesting a replacement concrete saw. The current saw has been in service for over ten years and is inadequate in size and is beyond rebuilding. The saw is also proving to be a safety hazard and need to be replaced. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Maintain signals to provide Proposed Service Level: No change in service level. safe, efficient traffic movement, Impact on Performance Indicators Current Performance Indicator: Keep traffic signal Proposed Performance Indicator: No change in system operational 99.5% of the time. performance indicator. Complete 100% of service requests within 24 hours. Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital 7,000 Total $7,000 Explanation of Savings/Revenues Explanation of Costs Capital = purchase price of concrete saw. 105 Service Level Adjustment Increased Service Level I X I Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Pub. Utilities 5010 ACTIVITY CENTER: Admin. 601 PREPARED BY: B. Pohl City Rank Department Rank Division Rank TOTAL THIS REQUEST: $24.000 LESS SAVINGS: NET EFFECT ON BUDGET: $24.000 Proposed Project or Program 10 I Requesting a Timekeeper Central System. It is an integrated time accounting solution software and a variety of data collection options including the terminal. The system completely automates the manual payroll preparation process and provides a wide number of labor management tools. Currently entering and keeping PUD employee time has nPPrn)e6mntP1%t 9 fn A efanc Th v Q QnfKAinr,= utill rar4i ino thnf fn ') efim. c, Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide reasonably priced Proposed Service Level: Provide more reasonably electric power for the citizens of College Station. priced electric power for the citizens of College Station. Impact on Performance Indicators Current Performance Indicator: Reduce Proposed Performance Indicator: Further reduce distribution O&M expense per retail customer below the distribution O&M expense per retail customer below the APPA Southwest/West regional average of $80 per APPA Southwest/West regional average of $80 per customer. customer. Hold constant the cost of processing time sheets. (Not increase or add personnel.) Appropriation Explanation of Savings/Revenues Category Description Request Gained efficiency from no duplication of effort and staff is 1000 Salaries & Benefits freed up to do their assigned tasks. 2000 Supplies 3000 Maintenance 1,000 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital 23,000 Total $24,000 Explanation of Costs Maintenance = maintenance for Timekeeper Central System software. Capital = hardware $9,000 and software $14,000. 106 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level I X I DEPARTMENT/DIVISION: Pub. Utilities 5191 ACTIVITY CENTER: Substation/Meterina 603 PREPARED BY: G. Lanae City Rank Department Rank Division Rank TOTAL THIS REQUEST: $3.000 LESS SAVINGS: NET EFFECT ON BUDGET: $3.000 13 4 Proposed Project or Program Requesting a laptop computer. This computer would be used in voltage monitoring, meter programming, and relay and ACP testing. Presently, one computer is shared by eight individuals in the Substation/Metering area. The additional computer would increase efficiency by providing each area with access to an available unit. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost, Impact on Service Level Current Service Level: Provide reliable electric Proposed Service Level: service to the citizens of College Station. Provide more reliable and accurate electric service and customer billing through electrical meter maintenance to the citizens of College Station. Impact on Performance Indicators Current Performance Indicator: Test 10% of Proposed Performance Indicator: Test 10% of residential meters annually, test all commercial meters residential meters annually, test all commercial meters annually, test primary meters twice per year. annually, test primary meters twice per year. (Increase the number of accurate meters.) Appropriation Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 3,000 Total $3,000 Capital = purchase price of laptop computer. Explanation of Savings/Revenues Explanation of Costs 107 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level X DEPARTMENTIDIVISION: Pub. Utilities 5191 ACTIVITY CENTER: Traffic Sia. Svs. 605 PREPARED BY: G. Lanae City Rank Department Rank 14 Division Rank 5 TOTAL THIS REQUEST: $3.000 LESS SAVINGS: NET EFFECT ON BUDGET: $3.000 Proposed Project or Program Requesting a replacement computer. The present computer is over 7 years old & has a history of prolonged downtime and costly repairs. It cannot process the amount of information required in monitoring and maintaining our Traffic System, & it is incompatible with the city's network. This is part of the traffic system & not part of the network system. Council Ends Statement/issues Ends Statement #5: Quality Service at a reasonable cost. r Impact on Service Level Current Service Level: Maintain signals to provide Proposed Service Level: No change in service level. safe, efficient traffic movement. Impact on Performance Indicators Current Performance Indicator: Maintain 99.5% Proposed Performance Indicator: No change in system availability. performance indicators. I Complete 75% of service calls on the same day. Appropriation Explanation of Savings/Revenues Category Description Request None 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital 3,000 Total $3,000 Explanation of Costs Capital = purchase price of computer. A 108 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank I Maintenance of Service Level X I Division Rank I DEPARTMENTIDIVISION: 6026 TOTAL THIS REQUEST: $15.000 ACTIVITY CENTER: 674 LESS SAVINGS: 0 PREPARED BY: N. Bauer NET EFFECT ON BUDGET: $16.000 Proposed Project or Program Provide an additional $15,000 for a maintenance contract on the existing NCR that is used to produce utility bills. During the process of estimating the target the NCR maintenance was not included. The age of the existing system and the fact that the city will not have the new system completely installed prior to the end of the current contract makes this important. Council Ends Staternekils" s u'es Council Ends Statement 5: Citizens benefit from value and quality of service delivered at a reasonable tax rate. Impact on Service Level Current Service Level: Provide professional and Proposed Service Level: No change in service level. helpful customer service to city computer end users. ... ..... . ... Impact on Performance Indicators Current Performance Indicator: Provide for 98% Proposed Performance Indicator: Failure to 11up time" for mid -range computer systems during normal extend the contract could result in not having adequate business operating times. response to an equipment failure and could delay billing and collection processes for the city's utilities averaging more than $3.5 million in monthly revenues. Appropriation .. ............ Explanation of Savings/Revenues Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance $15,000 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital Total $151000 . ...... ... Explanation of Costs The maintenance contract is based on the current annual cost of the maintenance contract. It is anticipated that the amount will be reduced and prorated for the actual time that the contract is necessary as that becomes more predictable. Any reduction in the time needed for the contract will reduce the cost. 109 Service Level Adjustment Increased Service Level Decreased Service Level Maintenance of Service Level x DEPARTMENTIDIVISION: Electric Fund ACTIVITY CENTER: PREPARED BY: City Rank Department Rank Division Rank TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: $16,250 0 $15,250 I Proposed Project or Program This package is part of the funding mechanism for the 800 Mghtz Radio System Project that is in the current CIP budget. It has been proposed to pay for this project using debt and using an interfund loan that is to be paid back through the department users of the radio system. This package funds the Electric Fund portion of the 800 Mghtz Project. Council Ends Statement/issues Council End Statement: 4) Education/Information Council End Statement: 5) Quality Service Impact on Service Level Current Service Level: Provide efficient Proposed Service Level: No change communications services for the city's internal customers. -1 Impact on Performance Indicators Current Performance Indicator: Maintain service Proposed Performance Indicator: No change I reliability through proper maintenance Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $15,250 Explanation of Savings/Revenues Explanation of Costs The package includes $15,250 from the Electric Fund for 10 years to pay for the Electric Fund portion of the 800 mghtz I radio system. 110 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank Maintenance of Service Level Division Rank DEPARTMENT/DIVISION: 9111 Eco. Dev. Cori). TOTAL THIS REQUEST: -W.000 ACTIVITY CENTER: 949 LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $17.000 Proposed Project or Program Provide Economic Development services to Bryan/College Station. Council Ends Statement/issues Ends Statement #4: Educational/information, Ends Statement #5: Quality service at a reasonable rate, and Ends Statement #7: Diverse employment opportunities. Impact on Service Level Current Service Level: Provide: marketing, Proposed Service Level: Provide: marketing, promotion, and development services to prospective new promotion, & dev. services to prospective new businesses businesses and industry; marketing of available land in CS and industry; marketing of available land in CS Bus. Park; Bus. Park; existing business enhancement, retention, and existing business enhancement, retention, and expansion expansion programs; and small business support. programs; small business support; and tech. transferprog. wITech. Lken. Office of Texas A &M Univ. System. Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category Description Request None. 1000 Salaries & Benefits 17,000 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital Total $17,000 Explanation of Savings/Revenues Explanation of Costs Virtually all of the increase in the FY 96 funding request is due to a proposed new position - Technology Transfer/TAMUS Liaison. April 24, 1995 Mayor Larry Ringer City of College Station P. 0. Box 9960 College Station, Texas 77842 Dear Larry: B)t BRYAN/COULME STATM Eoowmc DEVELOPMENT COR�TION 4001 EAST 29TH ST., STE. 180 BRYAN, TX 77802 The EDC board approved the Proposed Fiscal Year 1996 Budget on April 20 during our regular monthly meeting. Even though Fiscal Year 1996 does not begin until October 1, 1995, and the City of College Station requested our budget by June 7, 1995, we are beginning the budget process early so that all EDC funding entities have plenty of time to consider and act on our requests. There has not been a budget increase in the EDC since Fiscal Year 1992. Virtually all the increase in the enclosed budget is dedicated to a proposed new position, Technology Transfer/TAMUS Liaison. There is a job description and budget enclosed for the proposed new position. The request to the City of College Station is for $152,500. Enclosed you will find: * Proposed FY '96 Budget - * Listing of EDC Board of Directors * Summary of EDC industrial and other successful locations * Job description and budget for new Technology Transfer/TAMUS Liaison position Services currently provided by the EDC to the citizens of College Station directly or through contract with the Chamber of Commerce and Small Business Development Center include: * Marketing, promotion and development services to prospective new business and industry (excluding retail) * Marketing of available land in the College Station Business Park, in addition to privately owned land in College Station (409) 260-1755 - FAX (409) 260-5252 - 1-800-347-3033 112 - Page 2 - Mayor Ringer Technology transfer program in cooperation with the Technology Licensing Office of The Texas A & M University System (on a limited basis pending funding for new position * Existing business enhancement, retention and expansion programs * Small business start-up counseling and training You will be contacted in the near future to set up a meeting with key EDC leaders to discuss the budget request. Thank you for your continuing support of community economic development programs. We look forward to more success and welcome your input and advice. Please notify me if clarification or more information is needed. Sincerely, Robert M. Worley Executive Director Encl. (4) cc: Charles Cryan and Elrey Ash 113 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Continuance of Service Level X Division Rank FUND: 211 Electric Fund TOTAL THIS REQUEST: $70.036 DIVJACT.: 9111-900 LESS SAVINGS: PREPARED BY: J. GRAFF NET EFFECT ON BUDGET: $70.035 Proposed Project or Program Funding for Merit and Scale Adjustment for the 1995 - 96 Fiscal Year. Council Ends Statement/Issues Impact on Service Level - Current Service Level: Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Explanation of Savings/Revenues Category Description Request None. 1000 Salaries & Benefits 70,035 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $70,035 J Explanation of Costs Merit and Scale Adjustment costs as reviewed by the city council on March 8, 1995 and April 26, 1995. ."Lldre . ttAd Sence of.j�ce n , P k tted *e�ve COn-"o 'o, teovzo 'Tof.1%ce m 117 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Pub. Utilities 5194 ACTIVITY CENTER: Water Dist. 615 PREPARED BY: J. Koska City Rank Department Rank 3 Division Rank 2 TOTAL THIS REQUEST: $49.500 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $49.500 Proposed Project or Program Funds requested are for purchase of an additional back hoe/loader to install water taps, repair water mains, etc. This equipment will increase capability, productivity, and efficiency and allow for decreased time of installations of new water services. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. I Impact on Service Level J! Current Service Level: Provide prompt response to Proposed Service Level: Provide a faster response I customer needs. to customer needs. Impact on Performance Indicators Current Performance Indicator: Complete 88% of Proposed Performance Indicator: Complete service requests within 5 days. 100% of services request within 5 days. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services $49,500 7000 Capital Total $49,500 None. Explanation of Savings/Revenues i Explanation of Costs Other services = purchase price of back hoe/loader ($45,000) + one year fleet replacement cost ($4,500). 118 Service Level Adjustment Increased Service Level X City Rank Decreased Service Level Department Rank 8 Maintenance of Service Level Division Rank 6 DEPARTMENTIDIVISION: Pub. Utilities 5194 TOTAL THIS REQUEST: $8.500 ACTIVITY CENTER: Water Prod. 612 LESS SAVINGS: 0 PREPARED BY: J. Koska NET EFFECT ON BUDGET: $8.500 Proposed Project or Program Funds requested are for purchase of a portable electronic strap -on flow meter. It will be used to verify accuracy of well master flow meters, determine water loss, and flows on water and sewer main collection lines. Council Ends Statementlissues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide a reliable municipal Proposed Service Level: Provide a more reliable water supply. municipal water supply. Impact on Performance Indicators Current Performance Indicator: Percentage of Proposed Performance Indicator: Percentage of unaccounted for water not to exceed 9%. unaccounted for water not to exceed 8%. Appropriation Explanation of Savings/RevenUes Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 8,500 Total $8,500 Explanation of Costs Capital = purchase price of portable electronic strap -on flow meter. Service Level Adjustment 119 Increased Service Level Decreased Service Level Maintenance of Service Level x DEPARTMENT/DIVISION: Water Fund ACTIVITY CENTER: PREPARED BY: City Rank Department Rank Division Rank $15.250 0 $15-250 I I Proposed Project or Program This package is part of the funding mechanism for the 800 Mghtz Radio System Project that is in the current CIP budget. It has been proposed to pay for this project using debt and using an interfund loan that is to be paid back through the department users of the radio system. This package funds the Water Fund portion of the 800 Mghtz Project. TOTAL THIS REQUEST: LESS SAVINGS: NET EFFECT ON BUDGET: Council Ends Statement/Issues Council End Statement: 4) Education/information Council End Statement: 5) Quality Service Impact on Service Level Current Service Level: Provide efficient Proposed Service Level: No change communications services for the city's internal customers. Impact on Performance Indicators ,Current Performance Indicator: Maintain service Proposed Performance Indicator: No change reliability through proper maintenance Appropriation Exvlanation of Savinas/Revenues Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $15,250 Explanation of Costs The package includes $15,250 from the Water Fund for 10 years to pay for the Water Fund portion of the 800 mghtz radio system. 120 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Continuance of Service Level X Division Rank FUND: 212 Water Fund TOTAL THIS REQUEST: $18.181 DIVJACT.: 9111-900 LESS SAVINGS: PREPARED BY: J. GRAFF NET EFFECT ON BUDGET: $18.181 Proposed Project or Program Funding for Merit and Scale Adjustment for the 1995 - 96 Fiscal Year. Current Service Level: Council Ends Statement/issues Impact on Service Level Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indleator: Appropriation Explanation of Savings/Revenues Category Description Request None. 1000 Salaries & Benefits 18,181 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital Total $18,181 Explanation of Costs Merit and Scale Adjustment costs as reviewed by the city council on March 8, 1995 and April 26, 1995. VIL Nov NNN .9 r 9 t We'reCommitted AQqrA. Ar , To Excellence 123 Service Level Adjustment Increased Service Level X Decreased Service Level Maintenance of Service Level DEPARTMENT/DIVISION: Pub. Utilities 5195. ACTIVITY CENTER: Yk9ewater Trmt. 621 PREPARED BY: L. Carter City Rank Department Rank Division Rank I TOTAL THIS REQUEST: $60.500 LESS SAVINGS: 0 NET EFFECT ON BUDGET: $60.500 Proposed Project or Program Improvements at CCWWTP require the acquisition of a sludge spreader vehicle. This request is for the additional funds required for the purchase of the spreader vehicle. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level 3urrent Service Level: Attain and maintain all state Proposed Service Level: Abide with all state and ind federal regulations regarding WWTPs. federal regulations regarding waste water treatment plant permits. Impact on Performance Indicators --urrent Performance Indicator: Stay within Proposed Performance Indicator: Stay within lischarge parameters 100% of the time discharge parameters 100% of the time . Apply 100% of sludge produced to land in a cost effective manner. kppropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 60,500 7000 Capital Total $60,500 None. Explanation of Savings/Revenues Explanation of Costs or IFY 95 there was $38,000 approved for replacement of a dump truck. Improvements at the Wastewater Treatment lant require the acquisition of a sludge spreader vehicle. Therefore, the currently authorized funds for the dump truck ,placement will be rolled over into the FY 96 budget year. This request is for the additional funds ($55,000) required for 'e purchase of the spreader vehicle and the one year replacement cost ($5,500). Total price = $93,000. i 124 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank 5 DEPARTMENT/DIVISION: Pub. Utilities 5195 TOTAL THIS REQUEST: $5.000 ACTIVITY CENTER: Wastewater Trmt. 621 LESS SAVINGS: 0 PREPARED BY: L. Carter NET EFFECT ON BUDGET: $5.000 Proposed Project or Program This request is for an automatic sampling machine. This equipment will reduce the workload of the current laboratory staff, therefore delaying the need to hire an additiional Laboratory Technician. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. ... .... .......... .... Impact on Service Level Current Service Level: Attain and maintain all state Proposed Service Level: No change in service level. and federal regulations regarding WWTP permits. Impact on Performance Indicators Current Performance Indicator: 100% of the time Proposed Performance Indicator: No change in within discharge parameters. performance indicator. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 5,000 Total $5,000 Explanation of Savings/Revenues Explanation of Costs Capital = purchase price of automatic sampling machine. 125 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level x Division Rank DEPARTMENT/DIVISION: Wastewater Fund TOTAL THIS REQUEST: $15.250 ACTIVITY CENTER: LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $15,250 Proposed Project or Program This package is part of the funding mechanism for the 800 Mghtz Radio System Project that is in the current CIP budget. It has been proposed to pay for this project using debt and using an interfund loan that is to be paid back through the department users of the radio system. This package funds the Wastewater Fund portion of the 800 Mghtz Project. Council Ends Statement/Issues Council End Statement: 4) EducationA nformation Council End Statement: 5) Quality Service Impact on Service Level blurrent Service Level: Provide efficient Proposed Service Level: No change ",ommunications services for the city's internal customers. Impact on Performance Indicators �-urrent Performance Indicator: Maintain service Proposed Performance Indicator: No change ,eliability through proper maintenance kppropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 6000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $15,250 Explanation of Savings/Revenues Explanation of Costs he package includes $15,250 from the Wastewater Fund for 10 years to pay for the Wastewater Fund portion of the 800 �ghtz radio system. 126 Increased Service Level Decreased Service Level Continuance of Service Level Service Level Adjustment City Rank Department Rank X Division Rank FUND: 213 Wastewater Fund TOTAL THIS REQUEST: $28.994 DIVJACT.: 9111-900 LESS SAVINGS: PREPARED BY: J. GRAFF NET EFFECT ON BUDGET: 128.994 Proposed Project or Program Funding for Merit and Scale Adjustment for the 1995 - 96 Fiscal Year. o un cil Ends Statement/Issues Impact on Service Level Current Service Level: Proposed Service Level: .... ..... ... . Impaci"o'n P er,formance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Category 1000 2000 3000 4000 5000 6000 7000 Description Salaries & Benefits Supplies Maintenance Professional Services Property Services Other Services Capital ---- --- — -- ------- . ......... Explanation of Savings/Revenues Request None. 28,994 Total $28,994 Explanation of Costs Merit and Scale Adjustment costs as reviewed by the city council on March 8, 1995 and April 26, 1995. SOLID WASTE COLLECTION FUND I In m 6 , tted \Vdre CO TO .,xcelien,ce b - a 129 Service Level Adjustment Increased Service Level I X I Decreased Service Level 'Maintenance of Service Level DEPARTMENT/DIVISION: Pub. Services 4471 ACTIVITY CENTER: Comm. Collection 584 PREPARED BY: J. Smith City Rank Department Rank I Division Rank I TOTAL THIS REQUEST: $4.000 LESS SAVINGS: NET EFFECT ON BUDGET: $4.000 Proposed Project or Program Requesting an extension of the Pilot Apartment Recycling Program through March of 1996. This extension is due to the lack of data (ie. tonnage, costs, etc.) needed to properly evaluate the program. Extending this program through March of 1996 will allow us to collect an entire year of data for an accurate evaluation of this process. Council Ends Statement/issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide residential recycling Proposed Service Level: Continue pilot recycling for apartment residents. program. Impact on Performance Indicators Current Performance Indicator: Annually divert Proposed Performance Indicator: Annually divert 9.5% of the Residential Municipal Solid Waste (MSW) 11.5% of the Residential Municipal Solid Waste (MSW) stream. stream. Appropriation Category Description Request 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 1,500 5000 Property Services 1,100 6000 Other Services 1,400 7000 Capital Total $4,000 None Explanation of Savings/Revenues Explanation of Costs Professional Services = contract labor to get containers serviced. Property Services = advertising/promotional activities. Other Services = rental of containers. In the event the city decides to expand the program and make it a part of the normal service, there will be a budget amendment during FY 96. 130 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level X Division Rank DEPARTMENTIDIVISION: Public Services 4471 TOTAL THIS REQUEST: $2.000 ACTIVITY CENTER: Residential Coll. 582 LESS SAVINGS: PREPARED BY: J. Smith NET EFFECT ON BUDGET: $2.000 W Proposed Project or Program Requesting 1 computer that will be used to access the Utility Billing System to obtain information on the type & number of containers utilized at each customer location, service days per week, & monthly collection fee. Also, the system will permit us to track/locate each container by ID # & will assist in the monitoring & maintenance of our comm. collection system. Council Ends Statement/Issues Ends Statement #5: Quality Service at a reasonable cost. Impact on Service Level Current Service Level: Provide residential solid Proposed Service Level: No change in service waste collection for College Station citizens. levels. Provide commercial sanitation service to College Station businesses. Impact on Performance Indicators Current Performance Indicator: 1% or less Proposed Performance Indicator: No change in missed collection reports per week. performance indicator. Appropriation Explanation of Savings/Revenues Category Description Request None. 1000 Salaries & Benefits 2000 Supplies 3000 Maintenance 4000 Professional Services 5000 Property Services 6000 Other Services 7000 Capital 2,000 Total $2,000 Explanation of Costs Capital Cost software $200 and hardware $1,800. 131 Service Level Adjustment Increased Service Level City Rank Decreased Service Level Department Rank Maintenance of Service Level x Division Rank ,DEPARTMENT/DIVISION: Sanitation Fund TOTAL THIS REQUEST: $16.250 ACTIVITY CENTER: LESS SAVINGS: 0 PREPARED BY: NET EFFECT ON BUDGET: $15-250 Proposed Project or Program rhis package is part of the funding mechanism for the 800 Mghtz Radio System Project that is in the current CIP budget. t has been proposed to pay for this project using debt and using an interfund loan that is to be paid back through the Jepartment users of the radio system. This package funds the Sanitation Fund portion of the 800 Mghtz Project. Council Ends State me nt1lss ues ,ouncil End Statement: 4) Education/Information :�ouncil End Statement: 5) Quality Service Impact on Service Level Durrent Service Level: Provide efficient Proposed Service Level: No change ,ommunications services for the city's internal customers. Impact on Performance Indicators ,,urrent Performance Indicator: maintain service Proposed Performance Indicator: No change -eliability through proper maintenance Appropriation Category Description Request 1000 Salaries & Benefits $ 0 2000 Supplies 0 3000 Maintenance 0 4000 Professional Services 0 5000 Property Services 0 6000 Other Services 0 7000 Capital 0 Total $15,250 Explanation of Savings/Revenues Explanation of Costs Fhe package includes $15,250 from the Sanitation Fund for 10 years to pay for the Sanitation Fund portion of the 800 nghtz radio system. 132 Increased Service Level Decreased Service Level Continuance of Service Level Service Level Adjustment City Rank Department Rank X Division Rank FUND: 214 Solid Waste Collection Fund TOTAL THIS REQUEST: $15.962 DIVJACT.: 9111-900 LESS SAVINGS: PREPARED BY: J. GRAFF NET EFFECT ON BUDGET: $16.96Z_ Proposed Project or Program Funding for Merit and Scale Adjustment for the 1995 - 96 Fiscal Year. ......... ..... ........... . ...... .... .. ..... . ..... .. ... ........... Council Ends Statementlissues Impact on Service Level Current Service Level: Proposed Service Level: Impact on Performance Indicators Current Performance Indicator: Proposed Performance Indicator: Appropriation Explanation of Savings/Revenues Category Description Request None. 1000 Salaries & Benefits 15,962 2000 Supplies 3000 Maintenance 4000 Professional Services 6000 Property Services 6000 Other Services 7000 Capital Total $15,962 Explanation of Costs Merit and Scale Adjustment costs as reviewed by the city council on March 8, 1995 and April 26, 1995. 133 ,W;0 ,4 CITY OF COLLEGE STATION BUDGET & RESEARCH DEPARTMENT �Sw P.O. BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77842 (409) 764-3577 Fax (409) 764-3571 MEMORANDUM TO: Tom Brymer, Interim City Manager Basic Services Team FROM: Charles Cryan, Interim Director of Budget and Research DATE: June 7, 1995 SUBJECT: FY 1995-96 Fleet Replacement For FY 1995-96, there is approximately $788,752 worth of vehicles/equipment recommended for replacement by the Fleet Coordinators Group. The total amounts requested and recommended are broken down by fund as follows with the number of vehicles/equipment requested and recommended for replacement in parentheses: General Fund Electric Fund Water Fund Wastewater Fund Solid Waste Collection Fund Requested $707,752 (22) 80,825(3) 27,750(l) 175,000(4) 92,000(l) $1.083.327 (31) Recommended $610,252 (15) 38,500(l) 0(0) 48,000(2) 92,000(l) $788.752 (19) The city's policy is to replace a vehicle or piece of equipment with a similar vehicle or piece of equipment. There are two vehicles recommended for replacement in which the replacement being sought is an upgrade over the current equipment (ie. I ton pickup rather than a 3/4 ton pickup, larger engine than what is currently in the vehicle/equipment, etc.). One is in the General Fund in the Forestry Division of the Parks and Recreation Department and the other one is in the Wastewater Fund in the Treatment Division of the Public Utilities Department. Cost for vehicles similar to existing equipment is budgeted in the Fleet Replacement Fund. Amounts associated with the upgrades will be requested through the decision package process. 134 Radios are an integral part of most motor vehicle equipment. If the city purchases the 800 Mhz system this year, then any dollar amounts associated with radios in the vehicles/equipment packages recommended for replacement will be removed. This amount for vehicles/equipment requested and recommended per fund is as follows: For Requested For Recommended Equipment Equipment General Fund $46,000 $30,800 Electric Fund 4,000 0 Water Fund 2,000 0 Wastewater Fund 6,000 2,000 Solid Waste Collection Fund 2.000 zM WOO $34,800 135 F-111111 42110 molts fell CA I FUND General Fund Electric Fund Water Fund Wastewater Fund Solid Waste Collection Fund TOTAL ESTIMATED REPLACEMENT COST $610,252.00 38,500.00 r lexelf] 48,000.00 92,000.00 TOTAL: $788,752.00 136 GENERAL FUND Total Estimated Vehicle Vehicle Composite Replacement Cumulative Dept./Div. Description Ref. # Score Cost Total Pg. # 1 4141-541 1993 Chevy Caprice 41-11 27 23,700.00 23,700.00 3 2 4141-541 1993 Chevy Caprice 41-12 27 23,700.00 47,400.00 5 3 4141-541 1993 Chevy Caprice 41-13 25 23,700.00 71,100.00 7 4 4141-541 1993 Chevy Caprice 41-14 23 23,700.00 94,800.00 9 TOTAL: $94,800.00 5 4251-562 1981 C30 One Ton Mini Pumper 51-62 58 73,650.0011 168,450.0011 17 6 4251-562 1981 Chevy One Ton PU 51-63 69 24,475.00 192,925.00 19 TOTAL: $98,125.00 7 4431-632 1982 Cat Loader 31-03 51 90,000.00 282,925.00 21 8 4431-632 1984 International Dump Truck 31-20 40 42,000.00 324,925.00 23 9 4431-632 1977 Rosco Asphalt Distributor 31-21 77 86,000.00 410,925.00 25 10 4431-632 1984 International Dump Truck 31-22 36 42,000.00 452,925.00 27 11 4431-632 1979 Broce Broom 31-32 80 38,000.00 490,925.00 29 12 4432-633 1985 J.D. w/Side Boom Mower 32-03 49 40,000.00 53.0,925.00 35 TOTAL: $338,000.00 13 5383-658 1988 Chevy Crew Cab PU 83-26 54 26,327.0011 557,252.00 37 14 5384-659 1978 Mitts & Merrill Tree Chipper 84-02 11 63 11 18,000.00 575,252.00 41 1 15 5384-659 1987 Chevy One Ton PLI 84-12 47 35,606.00 610,252.00 43 TOTAL: $79,327.00 GENERAL FUND TOTAL: $610,262.00_ 137 Vehicle Dept./Div. Description 1 5192-601 1990 Ditch Witch ELECTRIC FUND Total Vehicle Composite Ref. # Score 92-56 45 ELECTRIC FUND TOTAL - Estimated Replacement Cost 38,500.0011 $38,500.00 Cumulative Total Page # 38,500.0011 49 1 138 WATER FUND Total Estimated Vehicle Vehicle Composite Replacement Cumulative Dept./Div. Description Ref. # Score Cost Total Page # WATER FUND TOTAL: $0.00 Mue WASTEWATER FUND Total Estimated Vehicle Vehicle Composite Replacement Cumulative Dept./Div. Description Ref. # Score Cost Total Page # 1 5195-621 1980 F800 Dump Truck 95-01 49 $40,000.0011 $40,000.0011 53 1 2 5195-621 1984 Three Wheeler 95-09 25 8,000.00 48,000.0011 57 1 WASTEWATER FUND TOTAL: $48,000.00 140 SOLID WASTE COLLECTION FUND Total Vehicle Vehicle Composite Dept./Div. Description Ref. # Score 1 4471-582 1989 Crane Carrier w/Pac. REL 71-19 31 SOLID WASTE COLLECTION FUND TOTAL: Estimated Replacement Cumulative Cost Total Page # $92,000.0011 $92,000.0011 61 1 $92,000.00 141 Strategic Issues Addressed Strategic Issue #1 -- Northgate Revitalization & Development Net Other Description Department Budget Effect Issues Addressed Northgate Revitalization Debt Svc. Non -departmental $450,000 Strategic Issue #6 -- Community Appearance and Strategic Net Other Description Department Budget Effect Issues Addressed Banners at entrances Development Services $10,000 Landscape incentive pilot prog. Development Services 10,000 Paint testing Development Services 10,000 Street sign supplies Public Services 8,500 Guardrail Upgrades Public Services 15,000 Landscape maintenance PARD 7,200 Cemetery landscape PARD 17,575 WPC handrail PARD 10,000 WPC planter PARD 10,000 Public Art PARD 24,000 #16 -TOTAL $122,275 Strategic Issue #13 -- Electronic Access to City Services Laptops for Council General Government $41,230 (nternet access Management Services 33,516 TV access to City Hall Management Services 239,000 TOTAL $313,746 Strategic Issue #16-- George Bush Library Tourist housing analysis PARD $10,000 Strategic Issue #18-- Youth at risk Resource officer Police $63,456 #22 Lincoln Center gym floor PARD 55,000' #22 Natatorium PARD 47,294 #15 and #22 Lincoln Center extended hours PARD 23,510 #22 Lincoln Center survey PARD 2,000 #22 Adamson Lagoon family nights PARD 2,100 #22 Teen center closing PARD (37,212) #22 Boy scout program PARD 1,000 #22 Cub scout program Police 1,000 #22 TOTAL $158,148 Strategic Issue #43-- Klosks with City Information Kiosks Management Services $80,000 #13 TOTAL ALL ISSUES $1,134,169 RUN OUTSIDE AGENCY FUNDING REQUESTS FY 95-96 FY 95-96 FY 93-94 FY 94-95 BASE ADDITIONAL GENERALFUND ACTUAL BUDGET REQUEST OR NEW RSVP $4,000 $5,000 $5,000 $0 BVCASA 25,000 25,000 25,000 0 HEALTH DEPARTMENT 74,505 74,505 74,505 2,980 LITERACY VOLUNTEERS OF AMERICA 4,225 8,275 0 0 BRAZOS BEAUTIFUL (1/2 in SW FUND) 0 8,500 8,600 0 EDC INCENTIVE FUNDING 0 50,000 50,000 0 MHMR BRAZOS VALLEY 0 0 0 75,000 TAMU DEPARTMENT OF WILDLIFE & FISHERIES 0 0 0 37,50C CHAMBER OF COMMERCE DEBT RETIRE. 0 0 0 20,000 $107,730 $171,280 $163,005 $135,480 HOTEL/MOTEL FUND ARTS COUNCIL $142,000 $155,000 $155,000 $0 ATHLETIC FEDERATION 14,000 16,725 14,000 0 BALLOON CLASSIC 6,000 5,000 0 0 CONVENTION AND VISITORS BUREAU 420,500 420,500 420,500 34,500 NOON LIONS CLUB-4TH OF JULY 5,650 5,950 5,950 550 SCA STUDENT AMBASSADOR PROGRAM 5,000 8,600 8,500 500 SISTER CITY ASSOC. 0 0 0 9,000 BRAZOS VALLEY BUSH LIBRARY COMMITTEE 0 0 0 50,000 SWIM CLUB 0 0 0 15,400 $592,150 $611,675 $603,950 $109,950 ELECTRIC FUND ECONOMIC DEVELOPMENT CORPORATION BVDC REVOLVING LOAN BUSINESS INCUBATOR SOLID WASTE COLLECTION FUND BRAZOS BEAUTIFUL (1/2 IN GENERAL FUND) TOTAL AGENCY FUNDING AND REQUEST $140,000 $140,000 $140,000 0 16,667 16,667 25,000 25,000 0 $165,000 $181,667 $156,667 16,000 8,500 8,600 $16,000 $8,500 $8,500 $880,880 $973,122 $932,122 $17,000 0 0 $17,000 FY 95-96 TOTAL REQUEST $5,000 25,000 77,485 0 8,500 50,000 75,000 37,500 20,000 $298,485 $156,000 14,000 0 455,000 6,500 9,000 9,000 50,000 15,400 $713,900 $157,000 16,667 0 $173,667 0 8,500 $0 $8,500 $262,430 $1,194,562